Skip to main content

Full text of "The life of Isambard Kingdom Brunel, civil engineer. By Isambard Brunel"

See other formats


.^' 


2b 


■"*     ^f^'"C^:.,-ai 


.#r^^^^  a/if^^^.  J^^^Sy^.^^^  y/^^a^.<iH- 


THE     LIFE 


OP 


ISAMBARD    KINGDOM   BRUNEL, 


CIVIL    ENGINEER. 


BY 


ISAMBAED     BEUNEL,     B.C.L., 

OF    LINCOLN'S    INN; 
CHANCBLLOR    OP    THB    DIOCE8H    OF    ELY. 


LONDON: 

LONGMANS,    GREEN,    AND    CO. 

1870. 


FEB  23  W 


PEEFACE. 


I  HAVE  NOT  attempted  to  describe  the  events  of  my 
father's  life  in  chronological  order  beyond  the  end  of 
Chapter  III.,  which  brings  down  the  narrative  to  the 
close  of  1835,  the  year  in  which  the  Act  was  obtained 
for  the  Great  Western  Railway. 

Chapter  IV.  contains  a  general  account  of  my 
father's  railway  works,  with  the  exception  of  the 
Bridges,  which  are  described  in  Chapter  VII.  The 
history  of  the  Broad  Gauge  and  of  the  trial  of  the 
Atmospheric  System  on  the  South  Devon  Railway 
is  given  in  Chapters  V.  and  VI. 

Chapters  VIII. — XIII.  contain  an  account  of  my 
father's  labours  for  the  advancement  of  Ocean  Steam 
Navigation.  It  will  be  noted  that  these  chapters 
cover  the  same  period  as  Chapters  IV. — VII.,  namely, 
from  1835,  the  year  of  the  commencement  of  the 
Great  Western  Railway  and  the  '  Great  Western ' 


VI  PEEFACE. 

Steam-ship,  to  1859,  the  year  of  his  death,  in  which 
the  Saltash  Bridge  and  the  '  Great  Eastern '  were  both 
completed. 

Chapters  VII.  (on  the  Bridges)  and  XIV.  (on  the 
Docks)  have  been  written  by  Mr.  William  BeU,  for 
many  years  a  member  of  my  father's  engineering 
staff;  and  in  regard  to  Chapter  V.  (on  the  Broad 
Gauge),  I  have  to  acknowledge  assistance  rendered 
me  by  Mr.  William  Pole,  F.R.S. 

For  the  Note  on  the  Carbonic  Acid  Gas  Engine 
which  follows  Chapter  I.,  I  am  indebted  to  Mr. 
William  Hawes;  and  for  Chapter  VI.  (on  the  Atmo- 
spheric System)  to  Mr.  Froude,  F.R.S. 

I  have  also  printed  letters,  written  to  me  at  my 
request,  relating  to  various  incidents  in  my  father's 
life. 

The  assistance  I  received  in  the  preparation  of  the 
chapters  on  Steam  Navigation  from  my  friend  the 
late  Captain  Claxton,  R.N.,  has  been  referred  to  in 
the  note  to  p.  234. 

I  have  throughout  availed  myself  of  my  brother's 
professional  knoAvledge. 

I  have  been  compelled,  in  order  to  bring  the  work 
within  the  compass  of  a  single  volume,  to  omit  much 


PEEFACE.  vii 

that  would  otherwise  have  been  inserted,  and  I  must 
therefore  be  held  responsible  for  the  general  arrange- 
ment of  those  parts  which  have  been  contributed  by 
others,  as  well  as  for  the  chapters  which  I  have 
written  myself. 

Lastly,  I  desire  gratefully  to  thank  those  friends 
who,  by  supplying  me  with  materials  and  revising  the 
proof  sheets,  have  helped  me  in  my  endeavour  to 
make  this  book,  as  far  as  possible,  an  accurate  record 
of  my  father's  life,  written  in  the  spirit  of  which  he 
would  have  approved. 

I.  B. 

18  Duke  Street,  Wesiiiinster  : 
November,  1870. 


CONTENTS. 


PAGE 

List  op  Reports  and  other  Original  Documents      .  .    xvii 

List  of  Lllustrations       .  .  .  .  .  .  xxvii 


CHAPTER  I. 

EARLY    LIFE. 

A.D.  1806—1828. 

Birth  of  Mr.  Brunei,  April  9,  1806— Sir  Marc  Isambard  Brunei — 
The  Block  Machinery — Mr.  Brunei's  School  Life — The  Thames 
Tunnel — Sinking  of  the  Rotherhithe  Shaft — Description  of  the 
Shield — Extracts  from  Sir  Isambard  Brunei's  Journals  from  the 
Commencement  of  the  Thames  Tunnel  to  the  date  of  the  Second 
Irruption  of  the  River,  January  12,  1828 — Note  A :  The  Bourbon 
Suspension  Bridges — Note  B :  Experiments  with  Carbonic  Acid 
Ga«.  ........ 


CHAPTER  II. 

THE  CLIFTON  SUSPENSION  BRIDGE. 

A.D.  1829—1853.    .ffiTTATls  24—48. 

Origin  of  the  Undertaking— The  First  Competition,  November  1829 
— Description  of  Mr.  Brunei's  Plans — Mr.  Telford's  Decision  as 
Umpire — Mr.  Telford's  Design — The  Second  Competition — Mr. 
Brunei  appointed  Engineer,  March  1831 — Commencement  of  the 
Works,  August  1836— Description  of  the  Design — Abandonment 
of  the  Works,  1853 — Formation  of  a  New  Company  and  Comple- 
tion of  the  Bridge,  1864 — Note:  The  Hungerford  Suspension  Bridge    46 


X  CONTENTS. 

CHAPTER  III. 

EARLY  HISTORY  OF  THE   GREAT  WESTERN  RAILWAY. 

A.D.  1833—1835.    .fflTATis  27—30. 

PAGE 

Sketch  of  the  History  of  Railways  in  England  prior  to  1833 — The 
Stockton  and  Darlington — The  Livei-pool  and  Manchester — The 
London  and  Birmingham —Proposed  Railway  between  London 
and  Bristol — Mr.  Brunei  appointed  Engineer,  March  7,  1833 — 
Survey  of  the  Line— Unsuccessful  Application  to  Parliament  in 
1834 — Successful  Application  in  1835  —  Reminiscences  of  Mr. 
Brunei,  1833-1835 — Extract  from  Mr.  Brunei's  Diary,  written  at 
the  close  of  1835     .  .  .  .  .  .  .61 

CHAPTER  IV. 

RAILWAY  WORKS. 

A.D.  1835—1859.    .ETATIS  30—54. 

Construction  of  the  Great  Western  Railway — The  Box  Tunnel — 
The  Bath  and  Bristol  Stations — The  Paddington  Station — The 
Great  Western  Hotel — Branches  and  Extensions  of  the  Great 
Western  Railway — The  Bristol  and  Exeter  Railway — Railways 
in  Devonshire  and  Cornwall — Railways  to  Basingstoke,  to  Wey- 
mouth, and  to  Salisbury — In  South  Wales — In  Ireland — In  Italy 
— In  India — Supervision  of  Works — Mr.  Brunei's  Engineering 
Staff — His  Reputation  as  a  Witness — Reminiscences  of  Mr.  Brunei, 
1835-1838 79 

CHAPTER  V. 

THE  BROAD    GAUGE. 

Origin  of  the  Ordinary  Gauge  of  Railways — Adoption  by  Mr.  Brunei 
of  the  Broad  Gauge  on  the  Great  Western  Railway — Reasons  for 
its  Adoption — The  Permanent  Way — Repoi-ts  of  Mr.  Nicholas 
Wood  and  Mr.  John  Hawkshaw,  1838 — Extract  from  Repon-t  of 
Director's  of  Great  Western  Raihoay  Company  (December  20, 
1838) — Extension  of  the  Broad  Gauge  System — Break  of  Gauge 
— Royal  Commission  on  the  Gauge  of  Railways,  1845 — Letter  of 
Mr.  Brunei  on  the  Broad  Gauge  (August  6,  1845) — Gauge  Act  of 
1846 — The  Mixed  Gauge — Report  of  Railway  Commissioners, 
1847 — Northern  Extensions  of  the  Great  Western  Railway- 
Advantages  of  the  Broad  Gauge — Partial  Abandonment  of  the 
Broad  Gauge  .  .  .  .  ^  .  .99 


CONTENTS.  XI 


CHAPTER  VI. 

THE  ATMOSPHERIC  SYSTEM. 

A.D.  1840—1848.    .asTATls  35—43. 

PAGE 

Preliminary  Observations — The  South  Devon  Railway — Description 
of  the  Atmospheric  System — History  of  its  Introduction  prior  to 
1844 — Report  hy  Mr.  Brunei,  recommending  its  Adoption  on  the 
South  Devon  Baihvay  (August  19,  1844) — Examination  of  this 
Report — Mr.  Brunei's  Evidence  before  the  Select  Committee  on 
Atmospheric  Railways,  1845 — History  of  the  Application  of  the 
System  on  the  South  Devon  Railway,  1844-1848 — Hejwrt  on 
State  of  Works  (August  28, 1847) — BeiJort  on  Causes  of  Failure 
(August  19,  1848)  —  Abandonment  of  the  System,  September 
1843— Note :  Comparison  of  Stationary  and  Locomotive  Power   ,  131 


CHAPTER  VII. 
RAILWAY  BRIDGES  AND    VIADUCTS. 

1.  Brickwork  and  Masonry  Bridges— Hanwell  Viaduct — Maiden- 
head Bridge — Flying  Bridges — Letter  from  Mr.  Brunei  on  Bridge 
Construction  (December  30,  1854) — 2.  Timber  Bridges — Souning 
Bridge — Bath  Bridge — Stonehouse  Viaduct — Bourne  Viaduct — 
St.  Mary's  Viaduct — Viaducts  on  the  South  Devon  Railway — Ivy- 
bridge — Viaducts  on  the  South  Wales  Railway — Newport — Lan- 
dore — Viaducts  on  the  Cornwall  Railway — St.  Pinnock — Viaducts 
on  the  West  Cornwall  and  Tavistock  Railways — Preservation 
of  Timber — 3.  Cast-iron  Bridges — Letter  on  Use  of  Cast  Iron 
(April  18,  1849) — Hanwell  Bridge — Experiments  on  Cast-iron 
Girders — Eoctract  from  Letter  to  Secretary  of  Commission  on  Aj)- 

plication  of  Iron    to  Railway   Structures   (March   13,   1848) 

4.  Wrought-iron  Bridges — Girder  Bridges — Experiments  on 
Wrought-iron  Girder — Opening  Bridges — Trussed  Bridges — New- 
port Viaduct — Windsor  Bridge — Chepstow  Bridge — Method  of 
Sinking  the  Cylinders — Description  of  the  Main  Truss — The 
Floating  Operations — The  Royal  Albert  Bridge  at  Saltash — The 
Centre  Pier — Description  of  the  Superstructure — The  Floating 
and  Raising  of  the  Trusses — Opening  of  the  Bridge  by  H.  R.  H. 
the  Prince  Consort — Note :  Experiments  on  Matters  connected 
with  Bridge  Couatiuction  .  .  .  .  ,  .  171 


Xll  CONTENTS. 


CHAPTER  VIII. 

STEAM  NAVIGATION.     THE  '  GREAT    WESTERN' 
STEAM-SHIP. 

A  D.  1835—1847.    ^TATIS  30—42. 

PAGE 

Introduction  to  the  Chapters  on  Steam  Navigation — Formation  of 
the  Great  Western  Steam-Ship  Company — Commencement  of 
the  Building  of  the  'Great  Western '—i?epor^  on  Selection  of 
the  Builders  of  the  Engines  (June  18,  1836) — Statements  of  Dr. 
Lardner  on  the  probable  Failure  of  a  line  of  Steam-ships  between 
England  and  America — Voyage  of  the  *  Great  Western '  to  London 
— Completion  of  the  Engines — Her  return  to  Bristol — Fire  on 
Board,  and  Accident  to  Mr.  Brunei — Voyage  to  New  York — Com- 
parison between  the  Performances  of  the  *  Great  Western  '  and 
the  *  Sirius  ' — Subsequent  History  of  the  '  Great  Western ' — Note  : 
Dimensions  of  the  Ship  and  Engines  ....  231 


CHAPTER  IX 

S  TEAM  NA  VIGA  TION.      THE  '  GREA  T  BRIT  A  IN' 
STEAM-SHIP. 

A.D.  1838—1847.    iETATIS  33—42. 

Commencement  of  the  building  of  the  *  Great  Britain ' — Heport  on 
the  Engines  (June  13,  1839) — Experiments  on  the  Screw  Pro- 
peller— Its  Adoption  in  the  '  Great  Britain ' — Completion  of  the 
Ship — Her  Voyage  across  the  Atlantic — Stranding  of  the  *  Great 
'  Britain  '  in  Dundrum  Bay — Letter  to  Captain  Claxton  on  the 
Condition  of  the  '  Great  Britain,'  and  on  the  Means  to  be  adojtted 
for  saving  her  (December  10,  lM&)—Iieport  to  the  Directors  on 
the  same  Subject  (December  14,  1846)— Appointment  of  Captain 
Claxton  to  superintend  the  Execution  of  Mr.  Brunei's  Plans — 
Letter  to  Captain  Claxton  on  the  Difficulties  to  be  overcome 
(December  29,  1846) — Report  enclosing  Captain  Claxton' s  Account 
of  the  Erection  of  the  Breakwater  (February  27,  \%A7)— Report 
on  the  Arrangements  for  Floating  off  the  Ship  (May  4,  1847) — 
Successful  Accomplishment  of  the  Floating  Operations  —  Sub- 
sequent History  of  the  '  Great  Britain  '—Note :  Dimensions  of 
the  Ship  and  Engines         .  .  .  .  •  •  246 


CONTENTS.  Xlil 


CHAPTER  X. 

STEAM  NAVIGATION.      INTRODUCTION  OF    THE  SCREW 
PROPELLER  INTO   THE  ROYAL  NAVY. 

A.D.  1841—1844.    .srrATis  36—39. 

PAGE 

Appointment  of  Mr.  Brunei  to  conduct  Experiments  for  the  Admi- 
ralty with  various  Forms  of  the  Screw  Propeller,  April  1841 — 
Trials  with  the  *  Polyphemus ' — Opposition  to  Mr.  Brunei's 
Experiments  —  Trials  with  the  '  Rattler/  October  1843 — 
October  1844  .        . 283 


CHAPTER  XI. 

STEAM  NAVIGATION.  THE  'GREAT  EASTERN'  STEAM- 
SHIP, FROM  THE  COMMENCEMENT  OF  THE  UNDER- 
TAKING  TO   THE  LAUNCH. 

A.D.  1851—1857.    iKTATIS  46—52. 

Introductory  Observations — The  Australian  Steam  Navigation 
Company — Statement  of  Mr.  BruneVa  Project  of  a  Line  of  large 
Ships  (June  10,  1852) — Adoption  of  his  Plans  by  the  Eastern 
Steam  Navigation  Company — Attract  from  a  Letter  describing  the 
Scheme  (July  1,  1852) — Letter  to  J,  Scott  Russell,  Esq.,  on  tJie 
Form  and  Dimensions  of  the  Great  Ship  (July  13,  1852) — Report 
on  Mode  of  Proceeding  (July  21,  1852) — Report  on  Enquiries 
Relating  to  the  Draught  and  Form  of  the  Vessel  (October  6,  1852) 
— Report  on  tJie  Proceedings  of  the  Committee  appointed  to  con- 
sider Mr.  BruneVs  Plans  (March  21, 1853) — Tenders  invited  for 
the  Ship  and  Engines — Report  on  Tenders  (May  18,  1853) — 
Preparation  of  the  Contracts  and  Specifications — Extracts  from 
Mr.  Brunei's  Memoranda  (a.d.  1852,  1853,  1854) — Letter  on  his 
Position  and  Duties  as  Engineer  of  the  Company  (August  16, 
1854) — Letter  on  an  Article  in  a  Newspaper  (November  16, 
1854)  —  Rejwrt  on  the  Undertaking  (February  5,  1855)  — 
Arrangements  proposed  for  obtaining  Astronomical  Observa- 
tions— Letter  to  G.  B.  Airy,  Esq.,  Astronomer  Royal  (October  5, 
1852) — Appointment  of  Mr.  William  Harrison  to  the  Command 
of  the  Ship — Meinorandum  on  the  Management  of  the  Great  Shij? 
(October  1855) — Letter  on  the  Duties  of  the  Chief  Engineer 
(March  19,  1857) — Suspension  and  Resumption  of  the  Works      ,  289 


XIV  CONTENTS. 


CHAPTER  XII. 

S TEAM  NA  VI G A  TION.    THE  '  GREA T  EAS TERN '  S TEAM- 
SHIP.    THE  LAUNCH. 

A.D.  1857,  1858.        iETATiS  62. 

PAOE 

Determination  that  the  Ship  should  be  launched  broadside  to  the 
River — And  that  the  Launch  should  be  slow — Extracts  from  Mr. 
BruneTs  Report  of  February  1855 — Reasons  for  the  Adoption  of 
Iron  Sliding  Surfaces — Description  of  the  Ways  and  Cradles — And 
of  the  Motive  Power  provided  for  launching  the  Ship — Memo- 
randum on  proposed  Arrangements  for  the  Launch  (September  26, 
1857) — Letter  to  Captain  Harrison  on  River  Tackle  (September  30, 
1857) — Letter  on  the  Nature  of  the  Operations  (October  23,  1857) 
— Memorandum  on  general  Arrangements  and  intended  Mode  of 
Proceeding  (October  30,  1857) — History  of  the  Launch,  Nov.  3, 
1857  to  January  31, 1858 — Letter  to  the  Directors  (November  26, 
1857) — Report  and  Memorandum  on  the  Launching  Ojwrations 
(December  17, 1857) — Floating  the  Ship — Note  A:  Experiments 
and  Observations  on  Friction — Note  B:  Letter  to  W.  Froude, 
Esq.  (February  2, 1858) 340 

CHAPTER  XIII. 

S  TEAM  NA  VI G  A  TION.      THE  «  GREA  TEAS  TERN'  S  TEAM- 
SHIP.    COMPLETION  AND   SUBSEQUENT  HISTORY. 

A.D,  1858,  1859.    JETAllS  52-54. 
A.D.  1859—1870. 

Preparations  for  completing  the  Ship — Formation  of  the  Great 
Ship  Company — Mr.  Brunei's  Absence  from  England — Progress 
of  the  Works  from  his  Return  to  his  last  Illness — Voyage  to  Wey- 
mouth— Explosion  of  Water-Heater — Storm  at  Holyhead — De- 
scription of  the  Ship — Her  first  Voyage  to  New  York,  June  1860 — 
Second  Voyage  to  New  York,  May  1861 — Voyage  with  Troops  to 
Quebec,  June  1861 — Fracture  of  Rudder  Head  and  Destruction  of 
Paddlewheels,  September  1861 — Voyages  in  1862 — Accident  off 
Montauk  Point,  August  27,  1862— Voyages  in  1863 — Formation 
of  the  Great  Eastern  Steam-Ship  Company — Remarks  on  the 
History  of  the  '  Great  Eastern '  previous  to  her  Employment  in 
laying  Submarine  Telegraph  Cables — Telegraph  Expeditions  of 
1865  and  1866— French  Cable  Expedition  of  1869— Voyage  to 
Bombay  and  Aden,  1869,  1870— Concluding  Remarks — Note: 
Dimensions  of  the  Ship  and  Engines 392 


CONTENTS.  XV 


CHAPTER  XrV. 

DOCK  AND  PIER    WORKS. 

A.D.  1831—1859.        iETATis  26-54, 

PAGE 

Monkwearmouth  Docks,  1831  —  Bristol  Docks — Floating  Harbour, 
1832 — Proposed  Works  at  Portishead — New  Lock  at  Bristol,  1845 
— Bristol  Dock  Gates — Plymouth  Great  Western  Docks,  1847 — 
Briton  Ferry  Docks,  1851— Brentford  Dock,  1856— Pier  at  Mil- 
ford  Haven,  1857 417 

CHAPTER  XV. 

MISCELLANEOUS  WORKS. 

The  Great  Exhibition  of  1851— The  Crystal  Palace  Water  Towers, 
1853— Polygonal  Rifle,  1852  —  Gunnery  Experiments,  1854 — 
Floating  Gun-Carriage,  1854 — Renkioi  Hospital  Buildings,  1856 .  445 

CHAPTER  XVI. 

MR.  BRUNEUS  PROFESSIONAL   OPINIONS  AND 
PRACTICE. 

Scheme  of  the  Chapter — Mr.  Brunei's  Position  in  relation  to  the 
Companies  of  which  he  was  Engineer — Letter  on  the  Dii-ection  of 
Railway  Works  in  Italy  (March  4, 1845) — Letter  on  the  Position 
of  Joint  Engineer  (October  16,  1843) — Letter  on  tJie  Position  of 
Consulting  Engineer  (December  30,  1851) — Letter  on  the  Position 
of  the  Engineer  in  relation  to  the  Contractors  (May  26,  1854) 
— Letters  on  the  Position  of  the  Engineer  in  relation  to  the  Directors 
(April  15,  1850,  December  6,  1851,  January  22,  1857)— Mr. 
Brunei's  Assistants — Letters  on  Interference  of  Directors  with  the 
Assistant  Engineers  (January  19, 1842,  January  28, 1842,  January 
12,  1851)— Mr.  Brunei's  Pupils— His  Relations  with  other  En- 
gineers— Inventors — Letter  in  reply  to  an  Inventor  (September  17, 
1847) — Mr.  Brunei's  Views  as  to  State  Interference — Letter  on  the 
Royal  Commission  on  the  Application  of  Iron  to  Raihvay  Structures 
(March  13, 1848) — Letter  on  a  Proposal  to  obtain  the  Recognition  in 
England  of  Decorations  conferred  at  the  Paris  Exhibition  of  1855 
(February  9,  1856) — Mr.  Brunei's  Opinion  on  the  Patent  Laws — 
Metnorandum  for  Evidence  before  the  Select  Committee  of  the  House 
of  Lords  on  the  Patent  Laws,  1851 — Extract  fro7n  Observations  on 
the  Patent  Laivs,  made  by  Mr.  Brunei  at  a  Meeting  of  the  Society 
of  Arts,  March  26,  1856  .  .  .  .  .474 


XVI  CONTENTS. 

CHAPTER  XYII. 
PRIVATE  LIFE. 

PAGE 

Keininiscences  of  Mr.  Brunei's  Private  Life — Removal  to  18  Duke 
Street,  Westminster — His  Marriage,  1836 — Special  Constable  in 
1848— Mr.  Brunei's  Love  of  Art— His  Journey  to  Italy,  1842— 
Accident  vrith  the  Half-Sovereign,  1843 — Purchase  of  Property 
in  Devonshire,  1847 — His  life  at  Watcombe — The  Launch  of  the 
'  Great  Eastern,'  1857 — Mr.  Brunei's  Failing  Health — Journeys 
to  Switzerland  and  Egj^t,  1858 — Letter  from  Philce  (February  12, 
1859)— His  last  Illness— His  Death,  September  15,  1859— 
Funeral — Address  of  Joseph  Locke,  Esq.,  M.P.,  at  the  Institution 
of  Civil  Engineers,  November  8, 1859        ....  499 


APPENDIX  I. 

Report  to  the  Directors  of  the  Great  Western  Railway  on  the  Broad 
Gauge,  &c.  (August  1838)  .  .  .  .  .525 


APPENDIX  II. 

Report  to  the  Directors  of  the  Great  Western  Steam-Ship  Company, 
recommending  the  Adoption  of  the  Screw  Propeller  in  the  <  Great 
*  Britain '  Steam-ship  (October  1840)        ....  539 


INDEX 559 


LIST 

OF 

EEPORTS  AND  OTHER  ORIGINAL  DOCUMENTS. 


FAGS 

1.  Extract  from  Mr.  Brunei's  Diary  (December  26, 1835).  .    78 

2.  Letter  on  the  Box  Tunnel  (June  21,  1842)  .  .  .81 

3.  Extract  from  Report  to  Directors  of  the  Great  Western  Rail- 

way Company  on  Break  of  Gauge  (December  13,  1838)         .  105 

J    4.  Extract  from  Report  to  Directors  of  the  Great  Western  Rail- 
way Company  on  the  Permanent  Way  (February  1837)        .  109 

5.  Letter  on  various  Points  relating  to  the  Broad  Gauge  (August  4, 

1845) 120 

6.  Extract  from  Letter  on  Atmospheric  System  (April  8,  1844)     .  137 

7.  Report  to  the  Directors  of  the  South  Devon  Railway  Company, 

recommending   them    to  adopt    the  Atmospheric    System 
(August  19,  1844)       .  .  ...  138 

The  question  had  been  frequently  considered  by  him  (p.  138) 
— Stationary  power  is  cheaper  and  otherwise  better  than  locomotive 
power  (p.  138) — The  Atmospheric  System  is  a  good,  economical 
mode  of  applying  stationary  power  (p.  138) — Reasons  for  con- 
sidering it  applicable  to  the  South  Devon  Railway  (p.  139) — In 
the  construction  of  the  line  (p.  140) — In  the  subsequent  working 
(p.  141). 

8.  9.  Letters  on  giving  Evidence  before  the  Select  Committee  of  the 

House  of  Commons  on  the  Atmospheric  System  (March  31, 
1845  J  April  3,  1845) 146 

10.  Report  to  the  Directors  of  the  South  Devon  Railway  on  the 

State  of  the  Atmospheric  Apparatus  (August  27, 1847)        .  149 

Regret  at  postponement  of  working  (p.  149) — Which  has  been 
caused  by  delay  in  completion  of  the  engines  (p.  149) — Experi- 
mental trains  have  run  (p.  149) — Difficulties  have  exceeded  all 
just  anticipations  (p.  150). 

a 


XVlll  LIST,  OF  REPORTS,  ETC, 

PAGE 

11.  Report  toa  Committee  of  tlie  Directors  of  the  South  Devon 
Railway  Company  on  the  Causes  of  the  Failure  of  the  Atmo- 
spheric System  (August  19,  1848)      .  .  .  .159 

The  first  difficulty  has  been  in  the  stationary  engines,  which 
have  consumed  an  excessive  amount  of  fuel  (p.  159) — The  diffi- 
culties in  the  working  of  the  longitudinal  valve  have  been  more 
numerous  (p.  161) — The  principal  evil  might  be  remedied  in  a 
new  valve  (p.  1 62) — An  extension  of  the  system  beyond  Newton 
cannot  be  recommended  (p.  162) — The  delay  in  obtaining  the 
telegraph  has  been  a  great  disappointment  (p.  163). 

12.  Letter  on  the  Design  of  Engineering  Works  (December  30, 1854)  178 

13.  Extract  from  Letter  on  the  Use  of  Cast  Iron  in  Bridge  Con- 

struction (April  18,  1849)       .  .  .  .  .100 

14.  Extract  from  Letter  on  the  same  Subject  (March  13, 1848)       .  192 

15.  16,    17.    Extract  from  Letters  on  Bridges  of  Large  Spans 

(January  31,  1862;  December  1,  1852;  May  30,  1854)  .  212 

18.  Extract  from  Report  on  the  Cornwall  Railway  as  to  making 

the  Saltash  Bridge  for  a  Single  Line  (February  5,  1862)       .  214 

19.  Report  to  the  Directors  of  the  Great  Western   Steam-Ship 

Company  on  the  Selection  of  the  Builders  of  the  Engines 
for  the  *  Great  Western '  Steam-ship  (June  18,  1836)  .  235 

Every  means  must  be  taken  to  secure  the  best  engines  possible 
in  this  the  boldest  attempt  yet  made  (p.  235) — The  peculiar  con- 
ditions required  in  these  engines  (p.  235) — They  must,  as  far  as 
is  possible,  be  perfect  in  all  their  details  from  the  moment  of 
their  completion  (p.  235) — The  machinery  required  is  by  no 
means  an  ordinary  steam-engine  (p.  236) — Modifications  neces- 
sary in  designing  engines  of  so  large  a  size  (p.  236) — Reasons 
based  on  these  considerations  for  preferring  Messrs.  Maudslay 
and  Field  as  builders  of  these  engines  (p.  236). 

20.  Letter  on  the  Engines  for  the  '  Great  Britain '  Steam-ship 

(June  12, 1839) 249 

Both  the  plans  of  Messrs.  Maudslay  and  Field  and  Mr.  Hum- 
phrys  are  adapted  to  the  case,  and  the  choice  will  depend  upon 
the  relative  cost  and  advantages  of  forming  an  establishment  to 
build  the  engines,  and  that  of  having  the  skill  of  experienced  manu- 
factvu^ers  (p.  249). 

21.  Letter  to  T.  R.  Guppy,  Esq.,  on  the  Construction  of  Iron  Ships 

(August  3,  1843) 259 

22.  Extract  from  Letter  on  the  *  Great  Britain '  Steam-ship  (Decem- 

ber 11,  1844) 261 

23.  Letter  to  Captain  Claxton  on  the  State  of  the  '  Great  Britain  ' 

Steam-ship  (December  10, 1846)         .  .  .  .264 


LIST  OF  REPORTS,  ETC.  XIX 

PAGE 

24.  Report  on  the   Condition  of  the  'Great  Britain'   Steam-ship 

when  stranded  in  Dundrum  Bay  (December  14,  1846)  .  267 

The  ship  is,  apart  from  mere  local  damage,  perfectly  sound, 
which  would  not  have  been  the  case  had  she  been  built  of  timber 
(p.  267) — Description  of  hor  injuries  (p.  268) — Consideration  of 
the  best  means  of  recovering  the  property  invested  in  her — It 
would  not  be  profitable  to  break  her  up  (p.  268) — How,  then,  is 
the  vessel  to  be  got  into  port?  (p.  269) — This  question  is 
secondary  to  that  of  how  she  is  to  be  preserved  until  she  can  be 
removed  (p.  269) — A  stiff  timber  breakwater  would  not  stand, 
even  if  it  could  be  safely  constructed  (p.  269) — The  best  plan  is 
to  form  under  the  stem  and  along  the  exposed  side  of  the  ship  a 
mass  of  fagots  (p.  270) — And  in  order  to  preserve  the  ship,  this 
must  be  done  without  delay  (p.  270) — As  to  floating  her  off,  she 
should  be  lifted  and  made  water-tight  (p.  271) — But  she  must  first 
be  preserved  (p.  272). 

25.  Letter  to  Captain  Claxton  on  the  Breakwater  (December  29, 

1846)    . 272 

26.  Report  enclosing  Captain  Claxton's  Account  of  the  Proceedings 

at  Dundrum  (February  27,  1847)        .  .  .  .273 

Success  achieved  by  Captain  Claxton  in  constructing  the  break- 
water of  fagots  (p.  273) — Introduction  by  him  of  several  im- 
portant alterations  and  improvements  in  the  plans  proposed 
(p.  274). 

27.  Report  on  the  proposed  Means  of  Floating  the  *  Great  Britain  ' 

Steam-ship  (May  4,  1847)       .  .  .  .  .278 

The  ship  has  been  successfully  protected  and  lifted,  and  made 
water-tight,  so  that  the  operation  of  floating  by  camels  becomes 
more  practicable  (p.  279) — The  Directors  would  do  well  to  call  in 
Mr.  Bremner  to  advise  them  (p.  280). 

28.  Extract  from  Letter  relating  to  Proceedings  at  the  Admiralty 

as  to  the  Screw  Propeller  (July  8,  1842)        .  .  .283 

20.  Extract  from  Letter  on  the  same  Subject  (August  6,  1842)       .  286 

80.  Statement  of  Project  for  a  Line  of  large  Steam-ships  (June  10, 

1852)    .  .  .  .  .  .  .  .292 

The  principle  advocated  is  that  of  making  the  vessel  large 
enough  to  carry  her  own  coal  for  the  voyage,  just  as  the  '  Great 
'Western'  steam-ship  did  in  1838  (p.  292) — The  size  being 
limited  only  by  the  extent  of  demand  for  freight,  and  by  the 
circumstances  of  the  ports  to  be  frequented  (p.  292). 

31.  Extract  from  Letter  describing  the  Project  of  the  Great  Ship 

(July  1,  1852) 293 

32.  Letter  to  J.  Scott  Russell,  Esq.,  on  the  Form  and  Dimensions  of 

the  Great  Ship  (July  13,  1852)  .  .  .  .294 

33.  Report  to  the  Directors  of  the  Eastern  Steam  Navigation  Com- 

pany on  mode  of  Proceeding  (July  21,  1852)  .  .  296 

a  2 


XJC  LIST  OF  EEPORTS,  ETC. 

FAOB 

34.  Report  on  Enquiries  relating  to  the  Draught  and  Form  of  the 

Great  Ship  (October  6,  1852)  .  .  .  .  .297 

35.  Report  on  the  Dimensions  of  the  Great  Ship  (March  21, 1853)  299 

36.  Report  on  the  Tenders  for  the  Ship  and  Engines  (May  18, 

1853) 301 

A  short  specification  was  drawn  up  for  the  engines,  and  detailed 
drawings  and  specifications  for  the  ship  (p.  301) — Tenders 
have  been  received  for  the  engines  from  Mr.  J.  Scott  Eussell, 
Messrs.  Watt  and  Co.,  and  Mr.  Humphrys  (p.  302) — After  fre- 
quent communications  with  these  gentlemen,  Messrs.  Watt  and  Co.'s 
designs  are  preferred  for  the  screw  engines,  which  will  be  the 
largest  yet  made,  and  on  which  will  mainly  depend  the  perform- 
ances of  the  ship  (p.  302),  and  Mr.  J.  Scott  Russell's  for  the 
paddle  engines  (p.  302) — As  regards  a  tender  for  the  ship,  after 
communications  with  several  parties,  the  result  is  a  tender  from 
Mr.  J.  Scott  Russell  (p.  303). 

87.  Extracts  from  Mr.  Brunei's  Memoranda  relating  to  the  '  Great 

Eastern '  Steam-ship  (July  11,  1852,  to  Novemher  18,  1853)  304 

July  11,  1852  :  Dimensions  of  the  ship  (p.  304) — Division  of 
power  between  the  screw  and  paddle  engines  (p.  305) — Every 
known  means  must  be  adopted  to  ensure  efficiency  (p.  305) — 
Jacketing  of  steam  pipes,  &c.  (p.  305).  July  17,  1852:  Con- 
ference with  Mr.  Field  as  to  division  of  power  between  the  screw 
and  paddle  engines  (p.  305) — Pressure  of  steam  (p.  305) — Nothing 
uncertain  must  be  risked  (p.  305) — Jacketing  (p.  305).  July  19, 
1852  :  Strong  bulkheads  every  30  feat  or  thereabouts,  and  the 
main  ribs,  and  even  at  least  two  main  deck  beams,  to  be  longitu- 
dinal, instead  of  transverse  (p.  305).  February  2,  1853  :  Present 
views  as  to  the  construction  of  the  ship  and  engines  (p.  306) — 
Boilfirs  (p.  307) — Advantages  of  oscillating  engines  for  both  screw 
and  paddle  engines  (p.  307).  February  21,  1853  :  Proper  dimen- 
sions for  the  Calcutta  line  (p.  308) — Gas  (p.  308) — Ventilation 
(p.  308)— Steering  (p.  308).  March  14,  1853:  Dimensions  now 
determined  on  (p.  308).  March  22,  1853 :  Various  dimensions 
settled  (p.  308).  April  28,  1853  :  Tenders  are  being  sought  for 
(p.  308) — Arrangements  for  measuring  the  coal  (p.  309) — Use 
of  clean  water  (p.  309).  August  7,  1853  :  Memoranda  for  engines 
(p.  309).  November  18,  1853  :  Governors  (p.  309)— Auxiliary 
engine  and  boiler  (p.  309). 

38.  Extracts  from  Mr.  Brunei's  Memoranda  relating  to  the  *  Great 

Eastern '  Steam-ship  (February  25  to  March  10,  1854)  .  310 

February  25,  1854 :  Thought  and  labour  involved  in  the 
details  of  the  construction  both  of  the  ship  and  engines  (p.  310) — 
Cabin  arrangements  (p.  310) — Economy  of  material  in  the  con- 
struction of  the  ship  (p.  310) — A  matter  generally  neglected  in 
shipbuilding  (p.  310) — AH  this  misconstruction  forbidden  (p.  311). 
March  3,  1854:  Details  of  screw  engines  (p.  311).  March  10, 
1854  :  Details  of  ship  (p.  311). 


LIST  OF  REPOETS,  ETC.  xxi 


39.  Letter  to  the  Secretary  of  the  Eastern  Steam  Navigation  Com- 

pany, on  Position  as  Engineer  of  the  Company  (August  16, 
1854) 311 

His  unusual  stake  in  the  undertaking,  and  the  heavy  responsi- 
bility he  has  incurred  (p.  311) — The  work  is  one  which  requires 
that  it  should  be  entirely  under  his  individual  management  and 
control  (p.  312) — And  therefore  there  must  be  no  other  adviser 
or  source  of  information  on  any  question  connected  with  the  con- 
struction or  mode  of  carrying  out  the  work  (p.  312). 

40.  Letter  to  the  same  on  an  Article  in  a  Newspaper  (November 

16, 1854) 813 

His  general  rule  is  not  to  notice  newspaper  articles,  but  this  one 
bears  the  stamp  of  authority  (p.  313) — Marked  care  is  shown  in 
depreciating  his  former  efforts  in  advancing  steam  navigation,  and 
in  representing  him,  in  the  present  case,  as  the  passive  approver 
of  the  project  of  another  (p.  313) — Whereas  it  originated  solely 
with  him,  and  has  been  worked  out  by  him  with  great  thought 
and  labour  (p.  314). 

41.  Report  to  the  Directors  of  the  Eastern  Steam  Navigation  Com- 

pany, describing  the  Nature  of  the  Undertaking  (February  5, 
1856) 315 

Labour  of  preparing  the  preliminary  designs  for  the  ship 
(p.  316) — [Proposed  arrangements  for  launching] — Principal 
peculiarities  in  the  construction  of  the  ship  (p.  316) — Water-tight 
compartments  (p.  316) — Transverse  bulkheads  (p.  316) — Double 
skin  (p.  317) — Longitudinal  bulkheads  (p.  318) — Economy  in 
materials  (p.  318)— Engines  (p.  318)-y Boilers  (p.  319)— The  best 
advice  has  been  sought  on  every  point  (p.  319) — The  position 
and  design  of  the  paddlewheels  (p.  319) — The  screw  propeller — 
(p.  320)— Protection  from  fire  (p.  320)— Masts  and  sails  (p.  320)— 
Astronomical  observations  (p.  320) — Lightning  conductors  (p.  321) 
— Adjustment  of  compasses  (p.  321). 

42.  Letter  to  G.  B.   Airy,  Esq.,  Astronomer  Royal  (October  5, 

1852) 821 

As  so  much  depends  on  perfect  navigation,  every  means  is  to  be 
taken  to  ensure  a  constant  determination  of  the  ship's  position  and 
course  (p.  321) — It  is  proposed  to  have  an  observatory  and  staff  of 
observers  to  be  constantly  engaged  in  taking  observations  (p.  322) 
— What  should  be  the  nature  of  these  observations  and  of  the 
instruments  required  ?  (p.  322). 

43.  Memorandum  on  the  Management  of  the  Great  Ship  (October 

1865) 324 

The  principles  to  be  followed  in  the  use  of  this  new  machine,  and 
the  qualifications  of  the  commander,  have  long  been  a  subject  of 
anxious  consideration  by  him  (p.  324) — This  ship  requires  a  totally 
different  management  from  that  suited  to  ordinary  vessels  (p.  325) 
— Examples  of  this  proposition  (p.  326) — Size  of  the  great  ship  (p. 
326) — By  no  possibility  must  she  be  allowed  to  touch  the  ground 
(p.  327) — Probable  effects  of  the  great  size  and  mass  of  this  vessel 

Univergitv    —    - 


XXU  LIST  OF  EEPORTS,  ETC. 

PAGE 

(p.  329) — And  of  her  speed  (p.  330) — The  proposed  system  of  con- 
tiuuous  observation  (p.  330) — The  exact  course  the  ship  is  to  take 
must  be  determined  previously  to  the  voyage,  and  must  be  strictly 
adhered  to  (p.  331) — Economy  of  fuel  another  consideration  of  the 
highest  importance  (p.  332) — Proper  speed  of  the  engines  (p.  332) 
— Use  of  the  sails  (p.  333) — Peculiarities  of  the  position  of  the  com- 
mander (p.  333) — His  attention  must  be  devoted  exclusively  to  the 
general  management  of  the  system  by  which  the  ship  is  to  be  made 
to  go  like  a  piece  of  machinery  (p.  333) — His  assistants  (p.  334) — 
Four  chief  officers  (p.  334) — A  master  at  the  head  of  a  staif  of  ob- 
servers, who  are  to  make  continuous  observations  upon  the  position 
and  performances  of  the  ship  (p.  334) — The  chief  engineer  (p.  335) 
— The  principles  herein  set  out  are  to  be  adopted  by  the  com- 
mander as  the  guide  of  his  conduct  in  working  this  machine 
(p.  336). 

44.  Letter  on  the  Responsibility  of  his  Position  (sent  with  last)      .  324 

46.  Letter  on  the  Duties  of  the  Chief  Engineer  of  the  Great  Ship 

(March  19,  1857)         . 335 

The  success  of  the  ship  as  a  steamboat  will  depend  entirely  upon 
the  amount  of  power  developed  by  the  engines  in  proportion  to  the 
fuel  consumed  (p.  336) — The  peculiar  duties  of  the  chief  engineer 
will  be  to  obtain  the  largest  amount  of  steam  from  the  defined  ex- 
penditure of  fuel,  and  the  use  of  this  steam  so  as  to  obtain  the 
largest  amount  of  power  and  the  largest  amount  of  result  (p.  337) 
■ — Accurate  measurements  required  of  fuel  expended  and  results 
obtained  (p.  337) — Economy  in  every  department  may  make  the 
difference  between  the  success  and  failure  of  the  ship  (p.  337) — 
The  chief  engineer  should,  if  possible,  superintend  the  erection  of 
the  engines  (p.  338). 

46.  Extract  from  Report  to  the  Directors  of  the  Eastern  Steam  Na- 

vigation Company,  describing  the  proposed  Arrangements  for 
Launching  (February  5,  1855)  ....  341 

Eeasons  for  deciding  to  launch  the  ship  sideways  (p.  341) — And 
probably  gradually  (p.  342). 

47.  Extract  from  Memorandum  as  to  Power  rec[uired  to  move  the 

Ship  (September  26,  1857)      .  .  .  .  .352 

48.  Letter  to  Captain  Harrison  on  the  River  Tackle  (September  30, 

1867)  .  .  .  .  .  .  .  .  354 

49.  Letter  to  the  Directors  of  the  Eastern  Steam  Navigation  Com- 

pany on  the  Nature  of  the  Launching  Operations  (October  23, 
1857) 355 

The  date  is  imcertain  (p.  355) — The  ship  is  to  be  lowered  down 
and  floated  off  by  a  slow  and  laborious  operation  (p.  355) — She 
may  stop  or  not  move  at  all  (p.  856). 

50.  Memorandum  on  General  Arrangements  and  intended  JMode  of 

Proceeduig  in  the  Launching  Operations  (October  30, 1857)  .  356 


LIST   OF  EEPORTS,  ETC.  xxiii 

PAGE 

51.  Letter  to  the  Directors  of  the  Eastern  Steam  Navigation  Com- 

pany on  the  State  of  the  Operations  (November  26,  1857)     .  366 

52.  Letter  to  the  Directors,  and  Memorandum  on  the  State  of  the 

Operations  (December  17,  1857)        ....  377 

53.  Letter  to  W.  Froude,  Esq.,  describing  the  Floating  of  the  '  Great 

Eastern '  (February  2,  1858)  .  .  ,  .  .389 

64.  Extract  from  Report  to  the  Directors  of  the  Bristol  Dock  Com- 
pany on  the  Condition  of  the  Floating  Harbour  (August  31, 
1832) 423 

55.  Extract  from  Report  on  the  same  subject  (January  31, 1842)     .  424 

66.  Extract  from  Report  on  Portishead  Pier  (December  26,  1839)  .  427 

57.  Letter  on  the  Distribution  of  Prizes,  addressed  to  the  Chairman 

of  the  Committee  of  the  Section  of  Machinery  of  the  Exhi- 
bition of  1851  (March  11,  1850)         .  .  .  .445 

58.  Extract  from  Report  of  the  Jury  of  Class  VII.  of  the  Exhibition 

of  1851  on  Sir  Joseph  Paxton's  Design  for  the  Building        .  447 

59, 60, 61.  Letters  to  Westley  Richards,  Esq.,  on  the  Polygonal  Rifle 

(October  25, 1862 ;  February  7, 1853;  November  26,  1858)  450-1 

62.  Extract  from  Letter  to  James  Nasmyth,  Esq.,  on  the  Construc- 
tion of  Large  Guns  (April  2,  1855)     ....  452 

C3.  Extract  from  Letter  to  W.  G.  Armstrong,  Esq.,  on  the  Wire 

Gun  (June  8,  1865)     .  .  .  .  .  .464 

64.  Memorandum  on  the  Floating  Gun-Carriage   (December  20, 

1855) 455 

The  principle  is  fixing  a  very  heavy  gun  in  a  floating  shot-proof 
chamber  (p.  465) — Mode  of  working  the  gun  (p.  455) — Mode  of 
manoeuvring  the  vessel  (p.  456) — Mode  of  attacking  the  Baltic 
forts  with  a  fleet  of  such  vessels  (p.  457) — Thickness  of  iron  re- 
quired to  make  the  vessel  shot  proof  (p.  458) — Best  manner  of 
constructing  the  vessels  (p.  458). 

65.  Letter  to  the  Secretary  of  the  Admiralty  on  the  Floating  Gun- 

Carriage  (July  27,  1855) 459 

66.  Memorandum  on  Renkioi  Hospital  Buildings  (March  1856)       .  463 

Necessary  conditions  in  designing  these  buildings  (p.  463) — 
General  description  of  them  (p.  463) — Closets  and  lavatories 
(p.  464)— External  and  internal  covering  (p.  464) — Ventilation 
(p.  464) — Kitchens  (p.  465) — Drainage  (p.  466) — Officers'  quarters 
(p.  466) — Transport  of  materials  (p.  466) — Portable  baths  {p.  467) 
—Cost  of  buildings  (p.  467). 


ixiv  LIST   OF  EEPORTS,  ETC. 

PAGE 

67.  Letter  on  the  Direction  of  Railway  Works  (March  4,  1845)     .  476 

68.  Letter  on  the  Position  of  Joint  Engineer  (October  16,  1843)     .  476 

69.  Letter  on  the  Position  of  Consulting  Engineer  (December  80, 

1851) 477 

70.  Letter  on  the  Position  of  the  Engineer  in  relation  to  the  Con- 

tractors (May  26,  1854)  .  .  .  .  .477 

71.  72,  73.  Extracts  from  Letters  on  the  Relations  between  the  Engi- 

neer and  the  Directors  (April  15,  1850 ;  December  6,  1851 ; 
Jan.  22,  1857) .  .....        478-481 

74,  76,  76.  Extracts  from  Letters  on  Interference  of  Directors  with 
the  Assistant  Engineers  (January  19, 1842 ;  January  28, 1842 ; 
December  12,  1851)    .....  481-3 

77.  Extract  from  Diary  (May  6,  1846)  ...  485 

78.  Letter  to  an  Inventor  (September  17, 1847)       .  .  .486 

79.  Letter  on  the  Royal  Commission  on  the  Application  of  Iron  to 

Railway  Structures  (March  13, 1848)  .  .  .   486 

80.  Letter  on  a  Proposal  to  obtain  Recognition  in  England  of  De- 

corations conferred  at  the  Paris  Exhibition  of  1855  (Feb.  9, 
1866) .  .489 

81.  Memorandum  for  Evidence  before  the  Select  Committee  of  the 

House  of  Lords  on  the  Patent  Laws,  a.d,  1851  .  .  490 

He  has  had  large  experience  of  the  patent  laws  (p.  490) — Has 
never  taken  out  one,  and  is  of  opinion  that  the  system  is  productive 
of  immense  evil  (p.  491) — Eeasons  for  this  belief  (p.  491) — Condi- 
tions necessary  for  a  successful  patent  (p.  493) — Disadvantages  of 
patents  (p.  494) — Impediments  in  the  way  of  improvements 
(p.  495). 

82.  Extract  from  Observations  on  the  Patent  Laws  made  by  Mr. 

Brunei  at  a  Meeting  of  the  Society  of  Arts  (March  28,  1856)  497 

83.  Letter  from  Philse,  describing  the  Ascent  of  the   Cataracts 

(February  12,  1859)    .  .  .  .  .  .617 

84.  Report  to  the  Directors  of  th©  Great  Western  Railway  Com- 

pany on  the  Broad  Gauge,  &c.  (August  1838)  .  .  625 

He  is  desirous  of  combining  his  views  into  one  report  (p.  625) 
— The  difficulties  have  been  overcome,  or  are  gradually  diminish- 
ing (p.  625) — And  the  result  justifies  the  attempt  which  has  been 
made  (p.  526) — The  gradients  of  the  Great  Western  Eailway  are 
favourable  (p.  526) — Advantages  of  the  broad  gauge  (p.  527) — 
Eeasons  for  adopting  it  (p.  528) — Additional  cost  in  construction 
is  very  slight  (p.  529) — Weight  of  carriages  (p.  630) — Freedom 


LIST  OF  REPOETS,  ETC.  XXV 

from  accidents  (p.  531) — Greater  space  for  works  of  locomotives 
(p.  532)^ — The  greater  width  gives  scope  for  improvement  in  every 
part  (p.  532) — Speed  obtained  (p.  532) — Design  of  the  engines 
(p.  533) — The  continuous  system  of  permanent  way  is  best  adapted 
to  high  speeds  (p.  535) — Calculations  as  to  its  cost  compared  with 
that  of  a  well  constructed  line  with  stone  blocks  (p.  537). 

85.  Report  to  the  Directors  of  the  Great  Western  Steatn-Ship 
Company,  recommending  the  Adoption  of  the  Screw  Pro- 
peller in  the  '  Great  Britain '  Steam-ship  (October  1840)      .  539 

This  subject  will  be  considered  under  two  heads :  1 .  The 
efficiency  of  the  screw  propeller,  compared  with  the  paddlewheel. 
2.  The  advantages  or  disadvantages  attending  its  use  (p.  539) — 
The  first  question  involves  the  consideration  not  merely  of  the 
effect  produced,  but  also  of  the  proportionate  power  absorbed  in 
producing  that  effect  (p.  539) — Observations  on  the  slip  of  the 
paddlewheel  and  screw  in  the  'Great  Western'  and  'Archimedes,' 
respectively  (p.  540) — The  result  of  the  comparison  being,  that 
with  similar  areas  the  screw  will  meet  with  at  least  equal,  if  not  a 
greater  resistance,  and  will  consequently  slip  as  little  as  or  less 
than  the  ordinary  paddle-board  (p.  542) — Eefiitation  of  the  com- 
mon error,  that  the  action  of  the  screw  is  a  very  oblique  one,  and 
that  it  imparts  a  considerable  rotatory  motion  to  the  water  (p.  543) 
— Description  of  the  action  of  the  screw  (p.  543) — The  result 
of  the  experiments  is  that,  as  compared  with  the  ordinary 
paddlewheel  of  sea-going  steamers,  the  screw  is,  both  as  regards 
the  effect  produced  and  the  proportionate  power  required  to 
obtain  that  effect,  an  efficient  propeller  (p.  548) — Objections  to 
the  use  of  the  screw  propeller  (p.  548) — Answered  seriatim 
(p.  549) — Statement  of  the  principal  advantages  peculiar  to  the 
use  of  the  screw  (p,  652) — The  result  of  these  enquiries  is  a  strong 
and  decided  opinion  in  favour  of  the  screw  propeller  being  adopted 
in  the  '  Great  Britain '  steam-ship  (p.  657). 


LIST 

OF 

ILLUSTRATIONS. 


ENGRA  VINGS. 

Portrait  (engraved  with  permission  of  Messrs.  Graves  and  Company  by 
T.  O,  Barlow,  from  a  portrait  by  J.  C.  Horsley,  R.A.,  in  the  pos- 
session of  Mrs.  Brunei)    .....  Frontispiece 


PLATE  to  face  PAGB 

I.     The  Clifton  Suspension  Bridge  .  .  .  .  .     49 ' 

n.     The  Hungerford  Suspension  Bridge      .  .  .  .59 

III.  The  Royal  Albert  Bridge  at  Saltash.     General  View .  .  171 

IV.  The  Newport,  Windsor,  and  Chepstow  Bridges.     Elevations 

and  Sections  ......  206 

V.    The  Royal  Albert  Bridge  at  Saltash.   Elevations  and  Sections .  218 


WOODCUTS. 

FIG.  PAQB 

1.  Maidenhead  Bridge  (longitudinal  section)  .  .  .  174 

2.  Bourne  Viaduct  (outline  elevation)         .  .  .  .  181 

3.  Ivybridge  Viaduct  (the  same)     .....  182 

4.  Landore  Viaduct  (the  same)        .....  184 


XXVIU  LIST  OF  ILLUSTRATIONS. 

no.  PAGB 

5.  St,  Pinnock  Viaduct  (outline  elevation,  transverse  section,  and 

plans  of  piers)  .......  187 

6.  Experimental  Girder  (transverse  section)  .  .  .  193 

7.  Girder  on  South  Wales  Railway  (the  same)        .  .  .  194 

8.  Girder  on  Eastern  Bengal  Railway  (the  same)    .  .  .  195 

9.  Cumberland  Basin  Swing  Bridge  (transverse  section  of  girder)  .  196 

10.  Windsor  Bridge  (transverse  section  of  truss)       .  .  .  200 

11.  Chepstow  Bridge  (the  same)       .....  208 

12.  Saltash  Bridge  (the  same)  .  .  .  .  .219 

13.  Transverse  Section  of  the  '  Great  Britain '  Steam-Ship  .  .  256 

14.  Copy  of  a  Sketch  in  a  Letter  on  Iron  Ships         .  .  .  259 

15.  Transverse  Section  of  the  Cradles  and  the  Launching  Ways  of 

the  '  Great  Eastern '  Steam-Ship        ....  347 

16.  Longitudinal  Section,  Plan,  and  Midship  Section  of  the  '  Great 

Eastern '  Steam-Ship  .  .  .  .  .  .  397 

17.  Monkwearmouth  Dock  Gates       .....  421 

18.  Bristol  Dock  Gate  .  .  .  .  .  .430 

19.  Plymouth  Great  Western  Dock  Gates    ....  435 

20.  Briton  Ferry  Dock  Gate  .  .  .  .  .  .439 

21.  Brentford  Dock  Gate       .  .  .  .  .  .441 

22.  Renkioi  Hospital  .  .  .  .  .  .470 


LIFE 

OF 

ISAMBAED    KINGDOM   BEUNEL 


CHAPTEE  I. 

EARLY  LIFE. 
A.D.  1806—1828. 

BIRTH     OF   MR.    BRUNEI,,    APEIl    9,    1806 — SIR   MARC   ISAMBARD    BRUNEI, 

THE  BLOCJt  MACHINERY MR.  BRUNEl'S  SCHOOL  LIFE THE  THAMES  TUNNEL 

SINKING   OF   THE    EOTHERHITHE    SHAFT DESCRIPTION    OF    THE     SHIELD 

EXTRACTS  FROM  SIR  ISAMBARD  BRUNEL's  JOURNALS  FROM  THE  COM- 
MENCEMENT OF  THE  THAMES  TUNNEL  TO  THE  DATE  OF  THE  SECOND 
IRRUPTION  OF  THE  RIVER,  JANUARY  12,  1828 — NOTE  A  :  THE  BOURBON 
SUSPENSION   BRIDGES t^OTE  B  ;    EXPERIMENTS   "WITH   CARBONIC   ACID   GAS, 

IsAMBAED  Kingdom  Brunel  was  born  on  the  ninth,  day  of 
April,  1806,  at  Portsmouth,  and  was  the  onlj  son  of  Sir 
Marc  Isambard  Brunei.^ 

Most  biographies  commence  with  an  account  of  the 
parentage  of  the  person  whose  life  is  about  to  be  written. 
If  this  be  permitted  in  any  case,  no  apology  can  be 
needed  for  prefixing  to  a  Life  of  Mr.  Brunei  some  par- 
ticulars of  his  father's  career,  since  he  was  indebted  to 
him,  not  only  for  the  inheritance  of  many  natural  gifts, 
and  for  a  professional  education  such  as  few  have  been 

'  To  avoid  confusion,  Sir  Isambard  on  March  24,  1841. 

Brunei  has  been  called  throughout  by  His  Life  has  been  written  by  Mr. 

that  designation,  the  one  by  which  he  Kichard    Beamish,   F.E.S.    (London, 

is  generally  known :  he  was  knighted  1862.) 


'O 


B 


2  SIR  ISAMBARD  BRUNEL. 

able  to  procure,  but  also  for  a  bright  example  of  the  culti- 
vation of  those  habits  of  forethought  and  perseverance, 
which  alone  can  ensure  the  successful  accomplishment  of 
great  designs. 

Sir  Marc  Isambard  Brunei  was  a  native  of  Hacqueville, 
a  village  in  Normandy,  where  his  family  had  been  settled 
for  several  generations.  He  was  originally  intended  for 
the  priesthood ;  but,  as  he  showed  no  inclination  for  that 
calling,  and  a  very  decided  talent  for  mechanical  pursuits, 
he  was  permitted  to  enter  the  French  Navy ;  and  he  served 
in  the  West  Indies  for  six  years,  namely,  from  1786  to 
1 792.  On  his  return  home,  at  the  expiration  of  his  term  of 
service,  his  strong  loyalist  sympathies  made  it  unsafe  for 
him  to  remain  in  France,  and  with  great  difficulty  he 
managed  to  escape  to  America.  He  landed  at  New  York 
in  September  1793,  and  soon  obtained  employment  as  a 
civil  engineer.  A  few  years  afterwards  he  was  appointed 
engineer  to  the  State  of  New  York ;  and,  while  holding 
that  office,  he  designed  a  cannon  foundry  and  other  im- 
portant public  works. 

In  January  1799,  when  Sir  Isambard  was  in  his  thir- 
tieth year,  he  came  over  to  England,  and  shortly  after  his 
arrival  married  Miss  Sophia  Kingdom,  a  lady  for  whom  he 
had  formed  an  attachment  some  years  before.^ 

The  first  great  work  undertaken  by  him  in  this  country 
was  the  machinery  for  making  blocks,  which  he  designed 
and  erected  for  Government  at  Portsmouth. 

The  history  of  the  invention  and  construction  of  this 
system  of  machinery  (for  it  consisted  oi  forty -three  separate 
machines)  need  not  be  given  at  length ;  but  it  may  be  per- 
mitted to  extract  the  following  passage  from  Mr.  Beamish's 

'  Lady  Brunei  survived  her  husband  wife  of  the  late  Sir  Benjamin  Hawes, 

five  years.     Of  their  children,  three  K.C.B.,  Under  Secretary  of  State  for 

lived  to  maturity,  one  son,  Isambard  War,  and   Emma,  wife  of  the  Rev. 

Kingdom,  and  two  daughters,  Sophia,  George  Harrison,  Rector  of  Sutcombe. 


THE  BLOCK  MACHINEEY.  3 

'Life  of  Sir  Isambard  Brunei'  (pp.  97,  99,  2nd  edition), 
in  wliich  lie  points  out  the  benefits  whicli  have  resulted 
from  its  introduction,  and  the  position  its  inventor  is 
entitled  to  hold  among  those  who  have  contributed  to  the 
progress  of  mechanical  science. 

Where  fifty  men  were  necessary  to  complete  the  shells  of  blocks 
previous  to  the  erection  of  Brunei's  machinery,  four  men  only  are 
now  required,  and  to  prepare  the  sheaves,  six  men  can  now  do  the 
work  which  formerly  demanded  the  labours  of  sixty.  So  that  ten 
men,  by  the  aid  of  this  machinery,  can  accomplish  with  uniformity, 
celerity,  and  ease,  what  formerly  required  the  uncertain  labour  of 
one  hundred  and  ten. 

When  we  call  to  mind  that  at  the  time  these  works  were 
executed,  mechanical  engineering  was  only  in  its  infancy,  we  are 
filled  with  amazement  at  the  sagacity  and  skill  that  should  have  so 
far  anticipated  the  progress  of  the  age,  as  to  leave  scarcely  any  room, 
during  half  a  century,  for  the  introduction  of  any  improvement.  .  .  . 

Beautiful  as  are  the  combinations  and  contrivances  in  the  block 
machinery,  and  highly  deserving  as  the  inventor  may  be  of  credit 
for  originating  such  labour-saving  machines  for  the  production  of 
ships'  blocks,  there  is  a  far  higher  claim  to  the  admiration  and 
gratitude  of  all  constructors  of  machinery,  and  of  all  workers  in 
metal.  In  this  block  machinery  exist  the  types  and  examples  of  all 
the  modern  self-acting  tools,  without  the  aid  of  which  the  various 
mechanical  appliances  of  the  present  day  could  not  be  produced  with 
the  marvellous  accuracy  which  has  been  attained.  It  is  true  that  to 
the  trades  unions  or  combinations  among  the  artisans,  is  in  a  grent 
measure  directly  due  the  introduction  of  self-acting  machines ;  but 
the  types  of  all  these  tools  existed  in  the  machines  and  combinations 
of  Brunei's  block  machinery.  The  drilling,  the  slotting,  and  the 
shaping  machines,  the  eccentric  chuck,  and  the  slide  rest,  Avith  the 
worm  wheel  motion,  are  all  to  be  found  in  his  machine. 

On  the  completion  of  the  block  machinery  Sir  Isambard 

Brunei  removed  to  London,  and  took  a  house  in  Lindsay 

Row,  Chelsea,  where  he  remained  until  he  was  obliged 

to  live  nearer  the  works  of  the  Thames  Tunnel. 

Mr.  Brunei's  first  recollections  were  of  the  house  at 
Chelsea ;  and  in  1814,  when  he  was  eight  years  old,  he 

B  2 


4  ISAMBAED  KINGDOM  BKUNEL.  [a.d.  18U. 

commenced  his  school  life  under  the  Rev.  Weeden  Butler, 
who  resided  in  the  neighbourhood.  Previously  to  his  going 
to  Mr.  Butler,  he  had  been  taught  Euclid  by  Sir  Isambard ; 
and  he  had  also  a  great  talent  for  drawing,  for  which  he 
had  been  remarkable  even  from  four  years  old.  His 
drawings  were  beautifully  precise  and  neat,  but,  when 
the  subject  admitted  of  it,  full  of  vigour  and  picturesque 
effect. 

After  some  time  he  was  sent  to  Dr.  Morell's  school  at 
Hove,  near  Brighton.  The  following  extract  is  taken 
from  one  of  his  letters  home  in  1820  : — ■ 

I  have  past  Sallust  some  time,  but  I  am  sorry  to  say  I  did  not 
read  all,  as  Dr.  Morell  wished  me  to  get  into  another  class.  I  am  at 
present  reading  Terence  and  Horace.  I  like  Horace  very  much,  but 
not  as  much  as  Virgil.  As  to  what  I  am  about,  I  have  been  making 
half  a  dozen  boats  lately,  till  I  have  worn  my  hands  to  pieces.  I 
have  also  taken  a  plan  of  Hove,  which  is  a  very  amusing  job.  I 
should  be  much  obliged  to  you  if  you  would  ask  papa  (I  hope  he  is 
quite  well  and  hearty),  whether  he  would  lend  me  his  long  measure. 
It  is  a  long  eighty-foot  tape ;  he  will  know  what  I  mean.  I  will 
take  care  of  it,  for  I  want  to  take  a  moi'e  exact  plan,  though  this 
is  pretty  exact,  I  think.  I  have  also  been  drawing  a  little.  I  intend 
to  take  a  view  of  all  (about  five)  the  principal  houses  in  that  great 
town.  Hove.     I  have  already  taken  one  or  two. 

In  the  intervals  of  his  classical  studies  he  seems  to  have 
employed  himself,  not  only  in  making  a  survey  of  Hove  in 
its  existing  state,  but  also  in  a  critical  examination  of  the 
works  in  progress  for  its  enlargement.  It  is  told  of  him 
that  one  evening  he  predicted  the  fall,  before  the  next 
morning,  of  some  houses  which  were  building  opposite  the 
school,  and  laid  a  bet  on  the  subject,  which  his  com- 
panions readily  accepted.  He  had  noticed  the  bad  way  in 
which  the  work  was  done,  and  that  the  stormy  weather, 
which  appeared  to  be  setting  in  for  the  night,  would 
probably  blow    the   walls    down.      In   the   morning   he 


iET.  9.]  SCHOOL  LIFt:.  6 

claimed  the  wager,  for  the  buildings  had  fallen  in  the 
night. 

Except  from  November  1820  to  August  1822,  when 
he  was  at  the  College  Henri  Quatre  at  Paris, ^  Mr.  Brunei 
was  so  verj  little  absent  from  home  that  he  became  tho- 
roughly acquainted  with  all  his  father's  undertakings. 
Among  these  was  the  veneering  machinery  at  Battersea, 
remarkable  for  the  great  diameter  of  the  saw,  the  steadi- 
ness of  its  motion,  and  the  mechanical  arrangements  for 
clearing  the  veneer  from  the  saw ;  also  the  works  at  the 
Government  establishments  at  Woolwich  and  Chatham, 
and  the  machinery  for  making  shoes.  They  have  been 
fully  described  by  Mr.  Beamish  ;  but  the  mere  mention  of 
their  names  is  enough  to  show  how  great  were  the  advan- 
tages enjoyed  by  Mr.  Brunei  in  receiving  from  his  father 
his  early  professional  education. 

From  the  year  1828  Mr.  Brunei  was  regularly  employed 
in  his  father's  office.  It  was  in  the  early  part  of  this  year 
that  the  project  of  the  Thames  Tunnel  first  began  to  occupy 
Sir  Isambard's  attention ;  but  he  was  also  engaged  at  that 
time  in  other  works  of  great  importance,  among  them 
the  suspension  bridges  for  the  He  de  Bourbon,  and 
designs  for  bridges  of  the  same  character  over  the 
Serpentine,  and  over  the  Thames  at  Kingston.^  Some  ac- 
count of  the  Bourbon  bridges,  and  also  of  experiments  with 
carbonic  acid  gas,  on  which  Mr.  Brunei  was  engaged,  will 
be  found  in  the  notes  to  this  chapter. 

'  He  was  sent  to  Paris  to  re-  holidays  in  examining  the  various 
cover  his  knowledge  of  French,  which  engineering  works  going  on  in  Paris, 
had  got  rather  rusty  at  school,  and  and  he  used  to  send  his  father  draw- 
also  to  study  mathematics.  He  re-  ings  and  descriptions  of  them, 
tained  through  life  a  great  admira-  ^  Sir  Isambard  was  also  consulted 
tion  of  the  method  of  teaching  this  upon  a  proposed  suspension  bridge 
subject  which  was  adopted  in  France.  over  the  Tamar  at  Saltash,  where  Mr. 

In  addition  to  the  time  spent  in  the  Brunei  subsequently  built  the  Koyal 

study  of  mathematics  and  languages,  Albert  Bridge. 
Mr.  Brunei  occupied  himself  on  his 


6  THE   THAMES   TUNNEL.  [a.d.  1823. 

The  history  of  the  Thames  Tunnel  will  be  told,  as  far 
as  possible,  in  Sir  Isambard  Brunei's  own  words,  as  given 
in  his  journals.^  Although  these  extracts  do  not  relate 
to  works  for  which  Mr.  Brunei  was  personally  responsible, 
they  have  been  inserted  in  the  belief  that  they  are  valu- 
able, not  only  as  showing  the  nature  and  extent  of  his 
duties  as  his  father's  assistant,  but  also  as  displaying,  in 
the  most  interesting  and  authentic  form.  Sir  Isambard's 
character  and  genius  at  a  time  when  his  son  was  brought 
into  hourly  contact  with  him,  and  under  circumstances 
which  would  cause  the  influence  of  his  example  to  make  a 
deep  and  lasting  impression. 

Previously  to  the  year  1823  there  had  been  several  plans 
suggested  for  the  construction  of  a  tunnel  under  the 
Thames ;  and  it  would  seem  that  a  great  demand  was 
supposed  to  exist  for  some  such  means  of  communication 
between  the  two  sides  of  the  river  eastward  of  London 
Bridge ;  for  after  the  failure  of  the  operations  undertaken 
by  Mr.  Vasie  in  1805,  and  Mr.  Trevethick  in  1807,^  a  high 
level  suspension  bridge  was  proposed,  although  it  was  not 
intended  to  be  used  for  heavy  traffic.^ 

The  first  reference  to  the  Tunnel  in  Sir  Isambard's 
journals  is  dated  February  12,  1823.  *  Engaged  on  draw- 
'  ings  connected  with  Tunnel ; '  and  on  the  1 7th  and 
following  days  of  the  same  month,  '  Isambard  was  en- 
*  gaged  on  Tunnel.'  These  entries  become  more  and  more 
frequent  in  the  pages  of  his  diary,  until  it  is  evident  that 

'  This  history  has  been  -written  by  *  For  an  aceonnt  of  these  earlier 

Mr.  Beamish  in  his  Life  of  Sir  Isam-  attempts  see  Law,  pp.  3-7. 

hard  Brunei,  pp.  202-304,  and  also,  up  ^  This  expectation  does  not  seem  to 

to  the  year  1828,  in  the  very  valuable  have  been  realised,  as  there  was  never 

work  by  Mr.  Henry  Law,  C.E.,  entitled  any  considerable  traffic  through  the 

'  A  Memoir  of  the  several  Operations,  Thames  Tunnel.     Perhaps,  however, 

'  and  the  Construction,  of  the  Thames  it  would  have  been  otherwise  had  the 

'  Tunnel,'  and  published  by  the  late  large  descents  for  carriages  and  horses 

Mr.  Weale  in  his    Quarterly  Papers  been  constructed. 
on  Engineering. 


iET.  17.]  OKIGINATION  OF  THE  PROJECT.  "  7 

Sir  Isambard's  whole  time  and  thouglits  were  absorbed 
in  this  work. 

The  spring  of  1823  was  occupied  in  preparing  drawings 
and  models  of  his  plans,  and  in  enlisting  the  sympathy  and 
assistance  of  various  influential  persons.  By  the  close  of 
the  year  the  designs  were  matured  sufficiently  to  enable 
the  promoters  of  the  scheme  to  commence  the  task  of 
organising  a  company  for  carrying  it  out ;  and  in  January 
1824  they  resolved  to  call  a  general  meeting  of  their 
friends,  and  invite  public  subscriptions. 

On  February  17,  Sir  Isambard  explained  his  plans  at 
the  Institution  of  Civil  Engineers,  and  on  the  next  day 
a  meeting  was  held  at  the  City  of  London  Tavern,  under 
the  presidency  of  Mr.  William  Smith,  M.P.,  more  than 
a  hundred  persons  being  present.  Resolutions  authoris- 
ing the  formation  of  a  company  were  passed  unanimously, 
and  the  share  list  was  opened.  In  the  course  of  an  hour 
one-third  of  the  subscriptions  was  filled  up,  namely,  1250 
shares ;  and  before  the  end  of  the  day  the  number  of  shares 
taken  was  1381. 

Borings  were  then  commenced  in  order  to  ascertain  the 
nature  of  the  strata  through  which  the  Tunnel  would  pass. 
A  bed  of  gravel  was  found  over  the  clay,  which  gave  Sir 
Isambard  great  anxiety.  A  large  pipe  or  shaft  was  sunk 
on  the  side  of  the  river,  and  in  it  the  water  rose  to  within 
three  feet  of  the  surface  of  the  ground,  and  fell  about 
eighteen  inches  with  the  tide.  '  It  is  manifest  (Sir 
'  Isambard  writes)    from   this  that  unless  the  Tunnel  is 

*  enclosed  in  the  stratum  of  clay,  it  would  be  unsafe  to 

*  drive  through  the   bed   of  gravel.     The  Tunnel   must, 

*  therefore,  begin  with  the  substantial  clay.' 

However,  the  result  of  thirty-nine  borings  in  two  parallel 
lines  across  the  river,  to  the  depth  of  from  23  to  37^  feet, 
seemed  to  prove  that  there  was  below  the  gravel  a  stratum 


8 


THE   THAMES   TUNNEL. 


[a.u.  1824, 


of  strong  blue  clay  of  sufficient  depth,  to  ensure  tlie  safety 
of  tlie  Tunnel.^ 


'  The  results  obtained  by  tbese 
borings  were  no  doubt  fallacious,  but- 
not  to  the  extent  which  has  sometimes 
been  imagined.  At  a  meeting  of  the 
Institution  of  Civil  Engineers,  in  No- 
vember 1849,  Dean  Buckland  called 
attention  to  '  the  evils  arising  from 
'  the  ignorance  of  the  engineers  who 
'  reported  to  Sir  Isambard  Brunei, 
'  previous  to  tlie  commencement  of  the 
'  Thames  Tunnel,  that  the  whole  of 
'  the  bottom  of  the  river  at  that  spot 
'  was  London  clay.'  Whereupon  Mr. 
Brunei  rose  and  said,  that  he  '  agreed 
'  that  knowledge  of  every  kind  was 
'  most  desirable,  and  that  it  would  be 
'  well  if  engineers  were  generally  much 
'  better  informed  on  many  subjects 
'  which  would  be  useful,  and  more  par- 
'  ticularly  on  matters  connected  with 
'  geology;  at  the  same  time  he  could 
'  not  admit  that  tlioy  were  deficient  in 

*  that  knowledge  of  the  surface  of  the 
'  earth  which  was  necessary  for  the 
'  purpose  of  guiding  them  in  their 
'  work.  It  might  be  true  that  many 
'  members  of  the  profession  were,  like 
'  himself,  not  perfectly  well  acquainted 

*  with  the  minute  geological  character- 
'istics  of  the  soils  they  bad  to  deal 
'  with,  but  he  thought  the  education 
'  and  the  practical  experience  of  the 
'  profession  generally  rendered  them 
'  well  acquainted  with  those  features 

*  and  characteristics  which  were  ne- 
'  cessary  for  their  guidance  in  the  de- 
'  sign  or  execution  of  work.  He  must 
'  also  say  a  few  words  in  defence  of 
'  those  persons  (now  nearly  all  dead) 
'  who  made  the  borings  in  the  Thames, 
'  and  were  stated  to  have  made  so  fal- 
'  lacious  a  report  previous  to  the  com- 
'  mencement  of  the  Tunnel.  Now, 
'  although  that  statement  had  by  con- 
'  stant   repetition   become   a   sort   of 

*  historical  fact,  it  was  really  only  one 
'  of  those  popular  fallacies  which  ob- 
'  tained    too   ready   credence   in   the 


'  world.  The  position  of  the  Tunnel 
'  was  not  determined  by  any  report,  or 
'  by  the  result  of  any  borings,  but  with 
'  a  view  to  establishing  a  communica- 
'  tion  between  particular  localities  for 
'  encouraging  the  traffic  which  was  an- 
'  ticipated  from  the  facility  of  access  to 
'  the  docks,  and  for  other  local  reasons, 
'  such  as  the  general  direction  of  the 
'  roads  and  streets  on  both  shores. 
'  After  the  position  was  settled,  and 
'  not  until  tlien,  borings  were  made  to 
'ascertain  what  soils  might  be  ex- 
'  pected  in  that  part  of  the  river.  It 
'  must  be  remembered  that  these  bor- 
'  ings  were  made  fuU  twenty-five  years 
'  ago,  when  boring  in  the  bed  of  a 
'  river  through  a  depth  of  water  of 
'  nearly  thirty  feet  was  not  an  ordinary 
'  occurrence.  The  tool  then  generally 
'  employed  was  the  worm,  and  tubes 
'  were  not  even  used  in  such  cases. 
'  The  borings  showed  the  existence  in 
'  that  spot  of  something  which,  in  the 
'  ordinary  acceptation  of  the  term, 
'  might  have  been  inadvertently  called 
'  London  clay,  but  he  had  no  recoUec- 
'  tion  of  its  geological  designation 
'  having  ever  been  thouglit  of.  It  was 
'  reported  and  shown  to  be  a  very  fair 
'clay  for  working  in  ....  The 
'  errors  which  were  made  in  giving  the 
'  results  of  the  borings  did  not,  in  fact, 
'  arise  from  ignorance,  but  from  me- 
'chanical  defects  in  the  tools,  for  it 
'  was  subsequently  discovered  that  the 
'  worm  frequently  carried  a  portion  of 
'  the  upper  tenacious  clay  through  the 
'  softer  strata  beneath,  and  brought  it 
'  up  again.  The  tenacious  clay  might 
'  have  been  called  London  clay,  but 
'  no  value  was  attached  to  that  parti- 
'  cular  designation ;  they  cared  little 
'  in  engineering  for  its  denomination, 
'  provided  it  was  of  a  good  tenacious 
'  quality.  This  mistake  in  terms 
'  (supposing  it  to  have  occurred)  could 
'  not  have  had  any  influence  on  after 


^T.  18.]  COMMENCEMENT   OF  THE  WORKS.  9 

A  report  to  this  effect  was  made  to  tlie  shareholders  at 
their  first  general  meeting  in  Julj,  and  it  was  also  stated 
that  the  works  would  be  completed  in  three  years. 

The  first  operation  connected  with  the  works,  was  the 
construction  of  a  shaft;  and  for  this  purpose  land  was 
bought  on  the  Rotherhithe  bank,  about  fifty  yards  from 
the  river.  On  March  2,  1825,  the  ceremony  of  laying  the 
first  stone  of  the  shaft  was  performed. 

Mr.  Smith,  our  chairman,  attended  by  most  of  the  members  of  the 
Court  of  Directors,  and  a  very  numerous  cortege  of  friends  invited 
on  the  occasion,  proceeded  from  the  Tunnel  Wharf  to  the  ground, 
where  they  were  received  among  the  cheers  of  a  great  concourse  of 
people.  Mr.  Smith  addressed  the  assembly  in  a  very  eloquent  speech 
suitable  to  the  occasion,  and  performed  the  ceremony  of  laying  the 
first  stone.     From  this  day  dates  the  beginning  of  the  work.^ 

The  mode  in  which  Sir  Isambard  decided  to  construct 
the  shaft  was  one  not  uncommonly  adopted  in  the  con- 
struction of  wells ;  but  to  apply  it  to  sinking  a  shaft  fifty 
feet  in  diameter  was  a  novel  and  bold  undertaking.  The 
brickwork  intended  to  form  the  lining  of  the  shaft  was 
built  on  the  surface  of  the  ground,  and  the  earth  being 
excavated  from  within  and  underneath  the  structure,  it 
sank  gradually  down  to  its  final  position. 

The  brickwork  was  3  feet  thick,  bound   together  by 

'  proceedings ;  for,  Ijefore  the  Tunnel  '  length  into  these  details  than  might 

'  was  far  advanced,  he  conducted  with  '  perhaps  appear  necessary,  because  he 

'  great  care  a  series  of  borings  extend-  '  felt  it  was  incumbent  upon  those  who 

'  ing  across  the  Thames,  and,  as  he  '  had  the  conduct  of  works  to  show 

'  used    improved    tools   and   worked  '  that  they  did  not  proceed  so  igno- 

'  through  tubes,  the  holes  were  kept  •  rantly  or  so  recklessly  as  had  been 

'  so  dry  that  a  candle  was  frequently  '  assumed,  in  the  design  or  execution 

'  lowered  down  to  the  bottom  in  order  '  of  large  undertakings.' 

'  to  see  the  amount  of  infiltration.  By  '  The  paragraphs    in    small   type, 

'  this  means  he  was  enabled  to  con-  without  any  reference,  are  from    Sir 

'  struct  a  correct  section  of  the  bed  of  Isambard's  joiuTials.      The  sentences 

•  the   Thames  at  that   spot,  showing  inserted  at  the  side  are  his  marginal 

'  every  layer  of  shells  and  gravel  as  summary.     Occasionally  a  few  words 

'  well  as  every  variation  of  the  surface  are  added  (in  square  brackets)  by  way 

'  of  the  silt,  &c.     He  entered  more  at  of  explanation. 


10  THE  THAMES  TUNNEL.  [a.d.  1825. 

iron  and  timber  ties,  and  tliere  were  built  into  it  48  per- 
pendicular iron  rods,  one  inch,  in  diameter,  fastened  to 
a  wooden  curb  at  the  bottom,  and  to  another  curb  at 
the  top  of  the  wall,  by  nuts  and  screws. 

When  the  shaft  or  tower  of  brickwork  was  completed 
np  to  the  top,  42  feet  in  height,  the  next  step  was  to 
remove  the  blockings  on  which  it  rested,  and  this  being 
done  the  gravel  was  excavated  and  hoisted  up,  and  the 
shaft  descended  by  its  own  weight. 

The  Eotherhithe  shaft  was  only  sunk  forty  feet  in  this 
manner ;  the  remaining  twenty  feet,  in  order  to  leave  the 
opening  for  the  Tunnel,  was  constructed  by  under- pinning, 
or  underlaying,  as  it  was  then  termed.  The  underlaying 
was  commenced  in  the  beginning  of  June.^ 

By  July  4  they  had  got  down  to  the  level  of  the  in- 
tended foundation  of  the  shaft,  having  passed  into  a 
stratum  of  gravel,  black  pebbles  embedded  in  greenish  sand, 
with  little  or  no  water ;  from  which  circumstance  Sir 
Isambard  was  of  opinion  that  it  was  unconnected  with  the 
stratum  of  gravel  above. 

July  12. — Engaged  on  a  general  drawing  for  the  great  shield,  and 
in  preparing  some  instructions  for  moving  the  same  (a  very  intricate 
operation  ! ) 

July  22 Underlaying  is  a  very  laborious  mode  of  proceeding. 

The  sinliing  of  a  wall  well  bound  as  the  first,  would  evidently  be  the 
best  and  cheapest  mode  for  making  another  tower  of  50  feet 
diameter. 

On  the  28th  Sir  Isambard  enters  in  his  journal  the 
following  additional  observations  upon  the  success  of  his 
plans  for  sinking  the  shaft : — 

Considering  the  great  labour  necessary  for  securing  the  ground  for 
the  underlaying,  the  waste  of  planking,  and  of  shores,  and  the  time 
necessarily  taken  up  in  moving  about,  in  securing  and  in  baling  out 

'  The  shaft  subsequently  made  on  the  Wapping  shore  was  sunk  to  its  full 
depth  without  any  under-pinning. 


XT.  19.]  THE  EOTHEKHITHE  SHAFT.  11 

the  water,  and  the  many  causes  of  interruption,  and  the  imperfect 
way  tliat  things  are  done  in  underlaying,  it  is  quite  conclusive  that 
the  original  plan  of  making  a  shaft,  by  sinking  the  structure,  is  the 
safest  and  the  most  economical.  What  is  done  is  sound,  and  when 
once  in  place,  may  be  secured  with  foundations  in  a  very  easy  man- 
ner. The  brickwork  of  the  shaft  is  remarkably  hard.  Had  it  been 
made  with  brick  facings  and  rubble  stone,  it  would  certainly  be 
water-tight,  and  almost  impenetrable  by  ordinary  ways.  The 
vertical  ties  and  the  circular  wall  bands  are  not  to  be  dispensed  with 
in  a  structure  destined  to  be  moved  as  the  present  has  been. 

On  August  11  the  underlaying  was  completed,  and  pre- 
parations were  made  for  constructing  a  reservoir  in  the 
bottom  of  the  shaft  for  receiving  the  permanent  pumps. 
This  was  finished  on  October  11,  with  great  difficult j, 
ovdng  to  the  nature  of  the  ground,  which  consisted  of 
loose  sand  containing  a  large  quantity  of  water. 

August  19. — Engaged  at  home  in  revising  my  plans  for  the  man- 
ner of  carrying  on  the  horizontal  excavation,  more  particularly  of 
penetrating  through  the  shaft.  This  part  of  the  operation  requires 
indeed  very  great  attention,  as  it  presents  great  difficulties,  arising 
from  the  wall  to  be  broken  through,  and  chiefly  from  the  angular 
opening  that  is  to  be  made  at  each  extremity.  Then  another  con- 
sideration is  the  uniting  the  brick  arches  to  the  brickwork  of  the 
shaft. 

September  16. — Engaged  in  the  early  part  of  the  day  on  revising 
my  plans  of  future  operations  in  the  Tunnel  work,  and  in  adapting 
them  to  the  nature  of  the  ground  as  it  is  found  at  the  various  depths 
we  have  penetrated  :  namely,  to  about  73  feet.  Went  afterwards 
to  Maudslay  to  request  that  the  great  shield  may  be  completed. 

October  14. — Engaged  in  the  early  part  of  the  morning  in  making 
Great  shield,  some  arrangements  for  the  working  of  the  great  shield. 
Too  much  attention  cannot  be  given  to  that  subject  at  the  early  part; 
for,  when  once  in  its  place,  it  would  be  extremely  inconvenient  to 
make  any  alteration. 

October  15. — The  dome  of  the  reservoir  will  be  covered  to-day 
about  noon ;  the  bottom  of  the  shaft  will  therefore  be  completed. 
Thev  are  now  preparing  to  apply  two  frames  of  the  shield.  Preparing 

r^-,  1  •        1       /  •  1     1  ,      T        T      for  the 

The  ground  now  open  in  the  front  is  remarkably  hard ;  frames. 
it  consists  of  pebbles  imbedded  in  a  chalky  substance,  Avith  hard 


12  TIIE  THAMES   TUNNEL.  [a.b.  1825. 

loose  stones  of  the  nature  of  the  Kentish  rag.  Everything  is  going  on 
well.  Devised  -with  Isambard  how  to  make  our  wells  for  the  descent 
of  the  materials,  &c. 

TIlus  at  last  the  shaft  was  completed,  and  Sir  Isambard 
was  able  to  commence  the  Tunnel  itself,  which,  he  nlti- 
matelj  determined  to  construct  in  the  form  of  a  rectan- 
gular mass  of  brickwork,  37^  feet  wide  and  22  feet  high, 
pierced  bj  two  parallel  horseshoe  archways,  each  14  feet 
wide  and  17  feet  high. 

Before  entering  upon  the  history  of  this  undertaking, 
some  account  must  be  given  of  the  machine  which  Sir 
Isambard  Brunei  devised  for  effecting  its  accomplishment. 

In  order  to  avoid  a  quicksand  of  considerable  depth  and 
extent,  the  Tunnel  had  to  be  carried  but  a  short  distance 
below  the  bed  of  the  river ;  and,  as  in  all  tunnelling 
through  soft  soil,^  the  top  and  sides  of  the  excavation 
had  to  be  supported  until  the  brickwork  was  built  in ;  and 
the  front  or  face  had  also  to  be  held  up  as  the  miners 
advanced.  This  support  was  given  by  means  of  a  machine 
called  'the  shield,'  described  on  one  occasion  by  Sir 
Isambard  as  '  an  ambulating  cofferdam,  travelling  hori- 
*  zontally.'  ^ 

The  main  body  of  the  shield  consisted  of  twelve  inde- 
pendent structures  or  '  frames  '  made  of  cast  and  wrought 
iron.  They  were  each  22  feet  high,  and  rather  more  than 
3  feet  wide  ;  and,  when  placed  side  by  side,  like  books  on 
a  shelf,  against  the  face  of  the  excavation,  they  occupied 
the  whole  area  of  the  face,  and  also  the  top,  bottom,  and 
sides  for  9  feet  in  advance  of  the  brickwork.     Each  frame 

'  Professor  Rankine,  in  his  work  on  circumstances  which  led  Sir  Isambard 

Civil  Engineering,  p.  699,   describes  to  conceive  the  idea  of  a  shield,  and 

the  Thames  Tunnel  works  under  the  the  earlier  designs  he  made  for  it,  are 

significant    heading    '  Tunnelling    in  described,  with  illustrations,  by  Mr. 

'  Mud.'  Law,  pp.  7-10. 

^  Proceedings  Inst.  C.  E.  i.  34.    The 


XT.  20.]  THE   SHIELD.  V6 

stood  on  two  feet  resting  on  tlie  ground,  and  was  divided 
in  its  height  into  three  cells  by  cast-iron  floors.  In  these 
cells,  of  which  there  were  thus  thirty-six  in  all,  the 
miners  stood,  and  worked  at  the  ground  in  front  of 
them. 

The  duty  which  the  shield  had  to  perform  was  to  sup- 
port the  ground  until  the  brickwork  was  built  within  the 
excavation ;  but  it  was  essential  that  this  should  be  done 
in  such  a  manner  as  to  allow  of  the  mining  operations 
being  carried  on ;  and  it  was  also  necessary  that  the 
machine  itself  should  be  capable  of  being  moved  forward. 
The  first  point,  therefore,  which  has  to  be  explained  in 
the  action  of  the  shield  is  the  manner  in  which  the  earth 
was  supported  by  it. 

It  has  been  already  stated  that  each  frame  rested  upon 
two  feet,  or  large  iron  plates.  These  two  feet  together 
covered  the  ground  under  the  frame  to  which  they 
belonged,  and  thus  the  whole  of  the  earth  beneath  the 
frames  was  pressed  down  by  the  feet. 

The  earth  above  was  supported  by  narrow  iron  plates, 
called  staves,  laid  on  the  heads  of  the  frames  parallel  to 
the  line  of  the  Tunnel,  the  ends  resting  on  the  completed 
brickwork  behind  it.  The  earth  at  the  sides  was  kept  up 
by  staves  resting  against  the  outermost  frames. 

The  arrangement  for  holding  up  the  earth  at  the  face 
of  the  excavation  was  necessarily  of  a  more  complicated 
character.  Each  frame  supported  a  series  of  boards  called 
poling-boards,  by  means  of  small  screw-jacks  or  poling- 
screws,  two  to  each  poling-board,  which  abutted  against 
the  frames,  and  pressed  the  boards  against  the  earth. 
The  boards  were  3  feet  long,  6  inches  wide,  and  3  inches 
thick,  and  were  arranged  horizontally.  These  poling- 
boards,  more  than  five  hundred  in  number,  covered  the 
whole  surface  in  front  of  the  frames. 


14  THE  THAMES  TUNNEL.  [a.d.    1825. 

To  resist  the  backward  tlirust  of  tlie  poling-screws 
against  tlie  frames,  eacli  frame  was  held  forward  by  two 
large  screws,  one  at  the  top  of  the  frame,  and  the  other 
at  the  bottom,  abutting  against  the  brickwork  of  the 
Tunnel.  The  brickwork  was  completed  close  up  behind 
the  shield  as  it  advanced. 

The  way  in  which  the  earth  was  excavated,  and  the 
shield  moved  forward,  has  now  to  be  explained. 

The  plates  or  staves  which  supported  the  ground  at  the 
top  and  sides  of  the  shield  were  pushed  forward  sepa- 
rately by  screw-jacks ;  but  in  order  to  advance  the  poling- 
boards  in  front,  it  was  necessary  that  that  portion  of  the 
ground  against  which  they  pressed  should  be  removed. 

The  miner,  standing  in  his  cell,  took  down  one,  or,  at 
the  most,  two  of  the  poling-boards,  commencing  at  the 
top  of  the  cell,  and  having  excavated  the  earth  a  few 
inches  in  advance,  replaced  the  poling-boards  against  the 
newly-formed  face,  pressing  them  against  it  with  the 
poling-screws.  Thus  the  excavation  was  carried  on  with- 
out depriving  the  ground  of  the  support  it  received  from 
the  shield,  except  at  the  point  where  the  miner  was 
actually  at  work. 

The  operation  of  advancing  the  frames  was  effected  in 
the  following  way.  When  everything  was  ready  for  a 
move,  one  of  the  feet  which  carried  the  frames  on  jointed 
legs  was  lifted  up,  and  advanced  forward  a  few  inches, 
and  then  pressed  down  on  to  the  ground,  until  in  its  new 
position  it  again  bore  the  weight  of  the  frame.  This 
done,  the  other  foot  was  lifted,  moved  forward,  and 
screwed  down  in  the  same  manner,  and  then  the  frame 
itself  was  pushed  ahead  by  means  of  the  large  abutting 
screws,  which  kept  it  top  and  bottom  from  being  forced 
back  on  the  brickwork. 

It  is,  however,  evident  that  these  abutting  screws  would 


MT.  20.]  THE   SHIELD.  15 

have  been  unable  to  push  on  the  frame,  while  the  ground 
in  front  was  pressing  back  the  poling-boards  against 
it;  therefore,  during  the  process  of  moving  a  frame, 
it  had  to  be  relieved  from  the  thrust  of  its  poling-screws. 
Accordingly,  when  it  was  desired  to  advance  any  one  of 
the  frames,  the  butts  of  the  poling-screws  of  the  tier 
of  boards  in  front  of  it  were  shifted  sideways,  so  as  to 
rest,  not  against  the  frame  to  which  they  belonged,  but 
against  the  frames  next  it  on  either  side.  This  done,  the 
frame  itself  was  advanced,  and  was  then  ready  to  receive 
again  its  own  poling-screws,  and  also  those  belonging  to 
the  adjoining  frames,  so  that  they  might  in  their  turn  be 
moved  forward.  It  will  thus  be  seen  that  the  whole 
shield  was  not  moved  forward  at  one  time,  but  that  the 
frames  were  advanced  alternately. 

There  were  many  other  ingenious  arrangements  in  the 
design  of  the  shield,  which  need  not  be  referred  to  in  a 
description  intended  only  to  give  such  a  general  idea  of 
the  machine  as  may  make  the  history  of  its  operation  in- 
telligible.' 

When  the  frames  had  been  completed  in  Messrs.  Mauds- 
lay's  factory,  they  were  conveyed  to  Rotherhithe,  and 
lowered  down  the  shaft.  An  opening  had  been  left  at  the 
bottom  of  the  wall,  about  37  feet  wide  by  22  feet  high, 
and  against  this  the  shield  was  erected.  It  was  then 
ready  to  commence  its  progress  through  the  ground  below 
the  river. 

On  November  25,  1825,  the  shield  made  its  first  start. 
Sir  Isambard  was  unfortunately  unable  to  witness  what 
was  in  fact  the  actual  commencement  of  the  Tunnel,  as 
he  had  three  days  before  been  seized  with  a  sudden  and 
alarming  attack  of  illness,  which  kept  him  at  home  till 

'  Mr.  Law's  memoir  contains  a  detailed  description  of  every  part  of  the  shield, 
illustrated  by  careful  drawings. 


16  THE   THAINIES   TUNNEL.  [a.d.    1825. 

December  6.     The  works  were  left  under  the  direction 
of  Mr.  Brunei. 

December  8. — The  great  shield  is  advancing  very  slowly,  meeting 
with  much  interruption  by  the  water,  which  still  runs  within  the 
cells,  and  also  by  the  difficulty  of  forming  abutments  for  the 
frames.  {^Temporary  abutments  were  necessary  until  the  shield  was 
sufficiently  advanced  to  allow  of  its  being  pushed  forwards  from  the 
hrichworh  built  up  behind  itJ] 

December  29. — The  frames  are  very  much  out  of  level  in  the 
transverse  line  of  the  Tunnel.  This  would  be  attended  with  serious 
inconvenience  if  I  had  not  provided  for  the  means  of  recovering  any 
irregularity  that  might  take  place,  and  which,  as  it  appears,  cannot 
perhaps  be  prevented ;  but  having  foreseen  this,  I  have  provided 
the  remedy  by  being  able  to  take  down  the  top  of  each  frame,  and 
to  remove  the  top  staves  in  parts,  or  the  whole,  at  pleasure — a  very 
important  provision  it  proves  to  be. 

January  16,  1826. — Too  much  precaution  cannot  be  taken,  in  the 
management  of  the  frames,  to  have  the  leg- screw  particularly  well 
secvired,  as  every  foot- run  of  the  arch  of  the  Tunnel  sustains  82  tons. 
Each  frame  carries  as  follows  : — 

The  two  end  frames  each  65  tons  =  130 
Ten  others,  each  .         .     52J  ,,  =525 

655  tons. 

January  21. — The  ground  at  the  top  and  sides  very  good  ;  same 
in  the  front.  In  breaking  the  ground  out  of  the  limits  of  the  shield 
on  the  right  a  great  deal  of  ground  fell  in.  This  indicates  that,  if  it 
was  not  for  the  protection  of  the  shield,  nothing  could  be  done. 
This  accounts  also  for  the  occasional  breaking  of  the  ground  in 
making  the  drift  in  1809. 
Tunnel  The  brickwork  of  the  entrance  being  carried  as  far  as 

begun.        directed,  the  body  of  the  Tunnel  was  begun  to-day. 

January  26. — Isambard  went  down  to  Eotherhithe  ;  the  water 
had  broken  in  in  great  abundance  upon  the  work  over  Nos.  4  and  5. 
Water  broke  [The  twelve  frames  were  distinguished  by  numbers.']  A 
■works.  4-inch  pipe   was  driven  over  the  shield  from  inside  the 

shaft,  but  the  water  did  not  follow  it,  and  the  stream  augmented 
very  rapidly.  The  frame  No.  5  was  moved  forward,  and  it  checked 
the  water  for  a  moment,  but  it  came  again  with  violence.  A 
heading  was  immediately  ordered  by  Armstrong  [the  resident 
engineer]  from  the  east  well,  in  which  Isambard  concurred. 


^T.  20.]  PEOGEESS  TO  MAECH   6,  1826.  17 

Fehruaru  3. — Ordered  a  pit  to  be  opened  and  made  by  sinking  a 
curb  8  feet  diameter  and  18  inches  thick,  well  bound  with  bolts. 
\_This  pit  teas  a  loell  sunk  from  the  surface  to  enable  the  gravel 
containing  water,  into  which  the  head  of  the  shield  had  penetrated,  to 
he  removed,  and  clay  substituted.^ 

Febi^ary  6. — The  shaft  begun  last  night,  and  was  sunk  20  feet 
to-day,  and  remarkably  true.  Had  we  known  the  ground  as  we 
now  know  it,  we  might,  by  having  opened  a  Avell  contiguous  to  the 
great  shaft,  have  sunk  the  shaft  in  a  week ;  but  for  that  purpose  we 
must  have  had  two  steam  engines,  one  for  pumping  the  water,  and 
the  other  for  taking  up  the  ground. 

February  10. — Went  very  early  to  the  Tunnel  for  the  purpose  of 
giving  directions  to  prop  up  the  back  of  the  staves,  which,  for  want 
of  weight  at  the  new  shaft,  might  be  overbalanced  by  the  pressure  of 
the   ground   at   the   back.     I  could  not  rest  a  moment  txnremittcd 

°  ,  attention 

until  it  was  done,  for  the  consequences  might  have  been  wanted. 
fatal,  at  this  moment  in  particular.     What  incessant  attention  and 
anxiety  1     To  be  at  the  mercy  of  ignorance  and  carelessness  !     No 
Avork  like  this. 

February  12. — The  ground  having  been  opened  carefully  from 
under  the  curb  of  the  pit  [see  above  on  date  February  3],  ^^l^^ni^d* 
the  greater  part  of  the  gravel  Avas  removed,  and  stilf  adopted  to 
clay  substituted  for  it.  This  was  done  by  driving  first  water, 
some  wrought-iron  flat  bars,  Avhich  kept  the  ground  up.  This 
shoAvs  that  the  shield  is  a  most  powerful  protection,  and  Avould 
enable  us  to  penetrate  through  a  bed  of  gravel.  Though  the  break- 
ing in  of  the  water  had  somewhat  terrified  the  man  in  No.  5,  he  soon 
returned  to  his  post,  and  the  others  have  acknoAvledged  their  full 
confidence  in  the  security  afforded  by  the  shield.  The  boring 
ahead  had  not  yet  been  attended  to  :  it  is  owing  to  the  want  of  this 
precaution  that  this  accident  is  chiefly  to  be  ascribed  ;  for  had  Ave 
knoAvn  as  much  as  Ave  now  do,  Ave  might  have  passed  through  Avith- 
out  the  pit  being  opened. 

March  1. — Water  at  the  back  of  the  frames,  but  less  than  before. 
The  men  show  a  great  deal  of  spirit  in  overcoming  the  present 
diflBculties.  Isambard  was  very  busy  yesterday  and  to-day  in  the 
frames,  and  about  the  works.  He  was  severely  hurt  in  the  leg  by  a 
piece  of  timber  falling  against  it.  \_This  accident  prevented  his 
attending  again  at  the  Tunnel  until  the  24^^.1 

On  March  6  tlie  proprietors  paid  a  visit  to  the  Tunnel, 

0 


18  -  THE   THAMES   TUNNEL.  [a.d.  182G. 

and  were  liignly  satisfied  with  what  they  saw.  On  that 
evening  Sir  Isambard  writes  : — 

It  is  of  absolute  necessity  now  to  provide  for  everything  that  is 
conducive  to  the  more  expeditious  management  of  the  frames,  and 
to  a  greater  facility  in  getting  up  the  brickwork.  If  these  two 
points  are  realized,  then  indeed  we  may  soon  expect  to  be  moving 
at  a  good  rate — not  less  than  I  have  held  out,  namely,  3  feet  per 
24  hours. 

March  11. — Eecelved  early  In  the  morning  a  report  from 
Armstrong  stating  that  the  water  was  completely  stopped — that  it 
Water  had  been  stopped  during  the  night.     Aware  that  we  had 

ptopped  as  ,     ,  ,     .  „  ,     , 

expected.  passed  the  gravel,  it  was  of  course  expected  that  we  were 
under  the  clay ;  means  were  therefore  resorted  to,  to  drive  clay  and 
oakum  at  the  tail  of  the  top  staves,  which  was  productive  of  a  very 
good  effect.  The  great  shield  was  soon  entirely  free  of  water.  This 
shoAvs  the  efficiency  of  the  shield  to  oppose  difficulties  which  could 
not  have  been  overcome  without  the  complete  protection  it  affords, 
under  almost  any  circumstances.  Indeed  this  has  been  a  tedioils 
operation  since  January  25,  when  the  water  first  burst  upon  No.  5, 
at  the  front  of  the  shield.  The  miners  as  well  as  the  bricklayers 
have  worked  with  great  spirit  and  perseverance  through  the  whole, 
during  a  period  of  44  days.  The  well  that  was  made  at  the  front 
of  the  shaft  has  been  of  use  in  acquainting  us  with  the  extent  of  the 
open  ground  we  had  to  pass  through.  It  will  be  made  a  useful 
opening  for  ventilating  the  works.  By  means  of  this  well  Ave  have 
been  able  to  apply  the  lead  pipes  with  which  the  water  has  been 
diverted  :  it  is  not  therefore  a  useless  expense.  Things  were  put 
in  better  order  to  prepare  for  a  more  expeditious  Avay  of  working. 
Directions  Avere  given  to  place  the  frames  in  a  better  condition. 
Isambard  is  ?till  too  unwell  to  go  to  the  Tunnel. 

March  25. — Went  to  the  Tunnel  with  Isambard.  Found  that  a 
considerable  fall  of  ground  had  taken  place  again  at  the  right  side. 
Considerable  ■'^°  *^"^  could  account  satisfactorily  for  it.  I  inspected  it, 
slip  of  and  directed  that,  after  making  it  good,  flat  bars  of  Iron 

pround:how  _  '  .  . 

to  check  it.  be  driven  at  the  head  of  the  side  staves,  in  order  to  pin 
it  up,  and  in  order  to  enable  the  miners  to  get  at  the  solid  ground, 
y  dan-  I*  i^  '^'^^y  b'^^  ^"^  extremely  dangerous  ;  the  ground  is 
gerous.  evidently  the  same  as  that  which,  in  the  report  of  the 

first  attempt,  was  found  so  loose  as  to  have  dropped  upon  the  Avorks, 
leaA'ing  a  large  cavity  above,  AA'hen  it  is  said  the  man  ascended  and 
made  good  the  hole.     We  should  be  warned  by  this,  lest  Ave  shoidd 


iKT.  20.]  PROGEESS   TO   JUNE   5,    1826.  19 

meet  another  as  fatal  as  it  ultimately  was  on  that  occasion.     [^This 
observation  refers  to  the  driftway  o/1807.] 

April  24. — By  Armstrong's  report  the  water  is  entirely  out,  and 
the  men  at  work  in  the  morning  in  removing  the  dirt,  &c.  Isam- 
bard  engaged  at  the  Tunnel,  where  I  am  not  yet  able  to  attend  as 
often  as  I  could  wish.  Everything  goes  on  well,  much  through  his 
exertions. 

]\ray  11. — One  hundred  feet  will  be  completed  to-night. 

Maij  22. — The  top  plate  over  the  frame  No.  1  has  been  cracked 
without  any  particular  violence  or  stress.  It  appears  that  it  is 
nothing  but  the  change  of  temperature  that  is  the  cause  of  that 
rupture.  The  accident  justifies  the  opinion  I  have  of  cast-iron  not 
being  safe  upon  traction,  and  the  precaution  of  having  had  wrought- 
iron  bolts  at  the  back  of  the  frames.  [  TAese  were  vertical  rods  ivhich 
took  the  tensional  strain.^  Without  these  bolts  what  would  have 
become  of  the  shield,  if  one  casting  Avas  to  break  ?  The  fracture 
was  accompanied  with  a  loud  report  like  that  of  a  gun.  Isambard 
was  in  the  work.s  at  the  time  of  breaking  :  nothing  could  have  pre- 
vented it. 

May  25. — I  observed  that  nothing  whatever  had  been  gained 
to  recover  the  deviation  [^the  shield  had  gradually  ivorked  The  shield 
2  feet  3  inches  to  the  ivestward'],  which  subjects  us  to  so  mich  out, 
much  inconvenience  and   loss  of  time.     The  only  way  to  move^ft  *" 
bring  the  shield  right  is  by  taking  the  frames  sideways.       bodUy. 

June  3. — Finding  it  too  laborious  and  almost  fruitless  to  bring 
the  frames  in  the  right  way,  I  came  to  the  determination  of  having 
them  brought  bodily  to  the  east  by  cutting  the  ground  on  the  side. 
I  accordingly  gave  directions  to  Armstrong  to  proceed  in  making  a 
heading  out  of  No.  12,  and  by  securing  the  side  staves  to  continue 
downwards  until  the  ground  be  clear.  The  working  was  accordingly 
discontinued  in  front. 

June  4. — The  mode  of  proceeding  by  the  common  way  of  mining 
shows  the  impracticability  of  carrying  a  large  excavation  anywhere, 
particularly  under  a  considerable  body  of  water.  The  expense  of 
timbering  Avould  be  too  great,  even  if  it  could  be  sound.  The 
ground  above  the  frames  is  remarkably  good,  but  under  it  there  is 
a  stratum  of  silt  which  breaks  and  falls  in  large  masses. 

June  5. — Isambard  got  into  the  drift,  and  gave  the   line  for  the 
better  disposition  of  the  staves,  which  was  afterwards  done  isambard's 
in  a  proper  manner,     Isambard's  vigilance  and  constant  important 
attendance  were  of  great  benefit.     He  is  in  every  respect  effldciit? 
a  most  useful  coadjutor  in  this  undertaking. 

c  2 


20  THE   THAMES   TUNNEL.  [a.u.  1826. 

June  10. — The  last  frame  (No.  1)  is  brought  close  to  the  others, 
and  the  brickwork  brought  up  to  fill  the  back, 

June  15. — On  inspecting  the  face  of  the  ground  this  morning  I 

observed  a  breach  in  the  front  of  Nos.  3,  4,  and  5,  where  the  ground 

Dangerous     has  given  wav  in  the  lower  cell.     This  was  truly  alarm- 
state  of  the     .         '^  •'  •' 
ground.         ing.     1  Ordered  iron  staves  to  each  floor  in  order  to  pin 

taken.  the  ground,  and  thereby  to  counteract  the  slipping  which 

would  immediately  take  place. 

June  19. — The  bricklayers  left  off  work,  but,  on  enquiring  into 
the  cause,  I  learned  there  was  no  other  but  to  have  a  libation  upon 
the  new  arrangement  of  piece-Avork. 

June  29. — Gave  positive  directions  to  cut  only  4^  to  5  inches 
thick  at  a  time  at  the  front  of  the  top  cells,  instead  of  9  inches,  as 
they  had  done  for  some  time. 

July  3. — The  great  question  is,  does  the  clay  undulate  at  its 
surface  ?  We  should  have  some  reason  to  apprehend  that  it  does 
so,  because  at  the  beginning  we  had  not  proceeded  many  feet  into 
the  clay  when  we  struck  again  into  the  gravelly  stratum.  The 
surface  of  the  clay  must  therefore  have  sunk  at  that  particular  spot ; 
which  circumstance  seems  to  warn  one  of  the  need  of  great  vigilance 
and  great  prudence  in  the  progress  of  the  enterprise. 

July  10. — A  cofferdam  burst  yesterday  at  the  works  at  Woolwich, 
Cofferdam  having  blowu  up  from  the  foundation.  How  cautious  this 
Wooiw^kih  should  make  our  men  !  The  cofferdam  may  be  repaired, 
Warning  and  very  easily  too,  but  an  irruption  into  the  Tunnel — • 
forus.  what  a  difference,  particularly  at  this  eai-ly  period  ! 

August  10. — Found  the  lowest  cell  of  No.  1  left  by  the  workmen 
Carelessness  witliout  a  single  poling  against  the  ground.  This  is  indeed 
miners.         a  most  unjustifiable  neglect. 

August  12. — At  six  this  morning  completed  205  feet. 

August  21. — This  piece-work  has  not  been  productive  of  much 
effect  as  to  quantity  of  work.  As  to  quality  it  is  very  qucstion- 
Observations  able.     A  work  of  this  nature  should  not  be  hurried  in 

on  the  bad  , 

effect  and      this  manner.     Fewer  hands,  enough  to  produce  9  feet 

consequence  ,  iiipi  ^  ■, 

of  driving  per  Week,  would  be  far  better  than  the  mode  now  pur- 
done.'^  sued  from  necessity^  but  not  from  inclination  on  my  part. 
Great  risks  are  in  our  way,  and  we  increase  them  by  the  manner 
the  excavation  is  can-ied  on.  The  frames  are  in  a  very  bad 
condition 

September  5. — It  is  much  to  be  regi-etted  that  such  a  work  as  the 
Tunnel  should  be  carried  on  by  the  piece.  Obliged  to  drive  on,  no 
time  is  left  to  make  any  repair,  or  to  recover  any  lost  advantage. 


MT.  2].]  PROGRESS  TO  SEPTEMBER    12,    1826.  21 

Isanibard  is  most  active.     Mr.  Beamish  shows  much  judgment  in 
his  exertions,  and  zeal  in  his  attendance.* 

Septembei'  8. — About  2  p.m.   I  was  informed   by  Munday  that 
water  was  running  down  over  No.   9.     I  went  immediately  to  it. 
The  ground  being  open,  and  consequently  unsupported,  it  water 
soon  became  soft,  and  settled  on  the  back  of  the  staves,  arback^or 
moving  down  in  a  stream  of  diluted  silt,  which  is  the  ^aii'^s- 
most  dangerous  substance  we  have  to  contend  with.     Some  oakum 
was   forced    through  the  joints   of  the   staves,  and  the  How  to 
water   was   partly   checked.     Isambard   was   the   whole  j^ambard's 
night,  till  three,  in  the  frames.     At  three  I  relieved  him.  exertions. 
He  went  to  rest  for  about  a  couple  of  hours ;  I  took  some  rest  on 
the  stage. 

September  9. — Towards  noon  the  stream  changed  its  character. 
The  clay,  being  loosened  by  the  water,  began  to  run,  but  it  thickened 
gradually.  It  was  late  in  the  evening  before  the  loosened  clay 
acquired  the  consistency  of  a  loose  puddling,  which  covered  the 
staves,  and  made  them  a  complete  shield  against  further  irruption, 
or  rather,  oozings  of  mud.  If  we  consider  that  at  this  place  Ave 
have  at  the  utmost  9  feet  between  the  top  staves  and  the  gravel,  over 
which  the  river  flows,  it  is  most  satisfactory  and  most  encouraging 
to  have  this  additional  proof  of  the  protection  which  the  shield 
affords.  At  nine  o'clock  at  night  Isambard  sent  me  word  that  '  tout 
*  va  a  mcrveille ;  '  indeed  it  was  so,  for  it  was  like  a  stopper  inter- 
posed between  the  river  and  the  top-staves.  Instructed  Things 
as  the  men  were  by  the  fii'st  accident,  they  went  on  as  ™p'o'^"'s. 
usual  in  the  irrespective  occupations.  Pascoe,  junr.,  and  Collins  were 
remarkably  active  and  persevering,  and  some  other  men  equally  so  ; 
while  old  Greenwell  encouraged  them  by  a  speech  of  his  own  in 
high  commendation  of  the  secimty  of  their  situation. 

September  12. — The  water,  bringing  with  it  a  sort  of  clay  broken 
in  small  particles,  increased  to  an  alarming  degree.  In  consequence 
of  this  continued  displacement  of  the  silt  and  clay,  a  water  more 
cavity  had  been  formed  above  the  staves.  At  about  i^i"^o'm 
three,  when  I  had  gone  to  the  Court  of  Directors,  the  *^®  ^''^^ ' 
ground  fell  upon  the  staves  with  great  violence,  causing  a  surge 
most  alarming  as  to  probable  consequences.  Isambard  was  at  that 
moment  in  the  upper  frames,  and  he  gave  directions  for  increasing 
the  means  of  security.  On  my  return  I  found  things  much  worse 
than  I   left  them,  but   every   means  of  security  was  judiciously 

1  Mr.  Beumiah  had  joined  the  works  on  August  7. 


22  THE  THAMES  TUNNEL.  [a.d.  182G. 

applied.  During  the  night  in  particular  things  presented  a  very 
unfavourable  appearance.  The  men,  however,  were  as  calm  as  if 
there  were  no  other  danger  to  be  dreaded  than  wet  clothes  or  the 
splashing  of  mud.  I  observed  the  men  in  the  lower  cells  were 
sound  asleep. 

September  13. — Every  means  were  resorted  to  in  the  course  of 
the  night  and  during  the  early  part  of  the  day  to  stop  the  water. 
Exertions  by  '^^^^  vaeii  have  shown  great  zeal  and  good  manage- 
themen.  ment  in  their  respective  avocations,  and  above  all  the 
utmost  confidence.  Isambard  has  not  quitted  the  frames  but  to  lay 
down  now  and  then  on  the  stage.  I  have  prevailed  on  him  to  go  to 
his  bed,  or  rather,  used  my  endeavours  to  induce  him ;  but  he  has 
Blight  im-  ^ot  since  last  Friday  night  (the  8th).  Things  were 
proTement.    j.aj.jjgr  better  at  the  close  of  the  day. 

September  ^14:. — Things  upon  the  whole  have  assumed  a  more 
favourable  aspect.  The  situation  is  nevertheless  very  critical. 
Nothing  but  the  utmost  precaution  in  following  up  what  has  begun 
can  bring  us  out  of  it.     This  has  been  a  most  eventful  week  ! 

September  18. — Isambard  was  the  greater  part  of  the  night  in  the 
works,  and  the  benefit  of  his  exertions  is  indeed  most  highly  felt : 
no  one  has  stood  out  like  him  !  Everything  is  quite  safe,  the  water 
is  kept  back,  and  the  work  proceeds  in  a  most  satisfactory  manner. 

October  22. — It  is  evident  [_from  a  Jloio  of  silt  which  had  taken 
place  on  that  day]  that  with  the  shield  we  have  passed  close  under 
a  body  of  collected  water  a  few  inches  only  above  the  staves. 
Isambard  is  too  unwell  to  stay  long  in  the  works. 

October  24. — The  want  of  the  main  drain  which  was  originally 
intended  to  carry  the  water  to  the  main  reservoir  is  felt  every- 
The  want  of  where.     This  drain  is  in  my  original  plan,  but  the  com- 

a  drain  sub-         .  .  ,  ..,., 

jects  us  to  mittee  expressing  on  several  occasions  a  wish  that  1  shou.]d 
convenience,  dispense  witli  it,  I  complied,  most  reluctantly  however, 
to  prove  my  earnest  wish  to  reduce  the  expenses.  It  will  not,  I 
apprehend,  be  found  an  economy, 

October  26. — Every  step  we  take  shows  how  much  security  is 
derived  from  the  shoes,  supporting  as  they  do  the  shield  and  the 
superincumbent  weight.  They  press  down  in  the  same 
shoes  in  proportion  the  ground  on  which  they  bear.  They  keep 
grouna^  ^  it  ^■s  dense  as  it  originally  was,  and  fit  it  for  the  structure 
dense.  ^^^  -g  ^^  come  Upon  it.     It  is  evident,  therefore,  that 

what  is  wanted  is  that  the  ground  should  be  kept  pressed.  It  is 
with  this  object  in  view  that  I  have  holdfasts  ar  d  jacks.  What 
incessant  vigilance  is  required,  what  an  incessant  call  on  the  re- 


A^T.  21.]  PROGRESS  TO  DECEMBER   12,    1826.  23 

sources  of  the  mind,  not  only  to  direct,  but  more  particularly  to 
provide  for  many  things  that  may  occur. 

November  17. — At  this  date  307  feet  9  inches  had  been  com- 
pleted.' 

December  8. — The  evil  [that  of  not  having  a  proper  drain]  is 
going  on  with  us,  and  virithout  any  remedy  except  the  drain,  or  a 
cesspool  by  way  of  expedient.  How  much  anxiety  must  one  feel  at 
being  so  circumstanced!  Should  any  water  break  in,  how  should 
we  proceed  ?  This  is  another  source  of  great  solicitude.  "We  have 
no  command  of  the  frames  when  they  rest  upon  wooden  legs,  or 
when  the  screws  are  bent ;  and  what  is  w^orse  is  that  the  men  drive 
on  without  any  consideration  or  any  fear  of  consequences.  This 
circumstance,  and  the  apprehension  of  the  water  breaking  in,  are 
matters  of  the  most  dreadful  anxiety. 

December  12. — Little  do  others  know  of  the  anxiety  and  fatigue 
I  have  to  imdergo  day  and  night.  Advanced  as  we  are,  we  have 
only  gained  somewhat  more  experience,  but  the  casualties  are  just 
the  same.  An  accident  now  might  be  as  fatal  as  it  Avould  have 
been  200  feet  back,  or  as  it  would  be  200  feet  forwards.  We  have 
not  a  period  when  we  can  think  ourselves  safe  except  when  we  have 
connected  these  arches  with  a  shaft  on  the  other  side.  Loaded  as 
we  are  with  the  weight  of  the  river,  we  have  to  advance  our  shield 
and  build  our  structure  under  that  weight,  a  weight  which  varies 
twice  a  day,  and  twice  a  month  to  a  much  greater  extent.  Tlie 
shoes  are  the  great  foundation  ofoitr  security.  When  once  pressed 
down  with  the  greatest  power  that  can  be  applied,  they  do  not 
give  in  the  least  afterwards.     They  have  not  yielded  even  suporincum- 

°  J  J  bent  weight 

xipon  loose  gravel ;   Ave  must  therefore  congratulate  our-  varying 
selves  that  they  have  answered  so  completely.     We  have  stiumore 
now  walked  oiir  frames  upwards  of  350  feet ;  we  have  fortnight. 
had  to  renew   the   legs   and   the   heads,   but  it  is  not  on  the''  ^^^ 
through  want  of  strength  so  much  as  from  mismanage-  Thfllfoes 
ment.     The  first  legs  were  never  injured  so  long  as  their  '^feJj^fT'^a 
action  was  limited  to  3  inches,  but  when  it  was  increased  mostpport- 
to  6  inches,  they  immediately  gave  way  one  after  another,  cumstance. 
without  however  any  damage  to  the  structure  or  to  the  shield.     The 
heads  gave  way,  or  began  to  give  way,  from  the  moment  the  legs  did  ; 
because,  when  a  leg  gave  way,  it  brought  upon  the  contiguous  frame 
an  increased  weight  which  broke  the  heads  one  after  Another.     That 

'  On  November  20  Mr.  Brunei  '  in  the  Tunnel.  For  nine  days  on  an 
mentions  in  his  diary  that  he  had  '  average  20^  hours  per  day  in  the 
'  passed  seven  days  out  of  the  last  t^n       '  Tunnel  and  3f  to  sleep.' 


24  THE   THAMES  TUNNEL.  [a.d.  182G. 

the  breaking  of  so  important  a  part  of  oxir  shield  should  not  have  been 
attended  with  any  bad  consequences  is  a  proof  that  provision  had 
been  made  for  the  casualty.  The  proof  that  it  had  been  foreseen 
and  provided  for  is  in  the  manner  these  heads  were  adapted  to  the 
frames.  By  the  way  they  were  fixed  they  would  be  easily  taken 
down  and  replaced.  Though  the  heads  gave  way,  the  top  staves 
were  not  materially  affected  by  it,  and  the  service  continued  until 
new  heads  were  substituted.  Some  have  fancied  that  the  ground  did 
not  bear  wholly  upon  the  shield  and  the  arches,  but  supported  itself 
in  parts.  Experience  proves  that  the  pressure  is  rather  more  than 
that  which  rests  artificially  on  the  frames.  The  ground  is  com- 
pressed all  round  by  the  increased  weight  of  high  water :  we  might 
therefore  conclude  that  the  shield  operates  as  a  pillar,  that  supports 
beyond  the  limits  of  its  base  or  cap.  It  is  a  great  satisfaction  to  be 
able  to  say  that  so  long  as  we  followed  the  original  plan,  nothing 
gave  way  except  the  back  screws.  These  again  were  damaged  by 
being  run  out  of  the  sockets.  We  may  therefore  ascribe  most  of 
the  evils  and  damages  to  the  increased  range  of  action,  and  still  more 
to  the  rude  implements  the  men  have  used,  whenever  they  met  with 
any  difficulty  in  moving  the  frames.  If  it  is  considered  that  we  had 
no  other  men  to  train  in  the  use  of  this  immense  machine  but  ex- 
cavators and  miners,  very  great  allowance  must  be  made  for  what 
has  occurred. 

December  20. — An  accident  of  an  alarming  nature  occurred. 
The  poling-screws  of  Nos.  10  and  12,  being  on  No.  11,  Moul,  the 
Falling  of      miner  in  that  frame,  removed  his  butting  screw  ;  the  con- 

threefacings  i       ,.  -i  ■,       ^        ^ 

from  sequence  was  that  the  frame  started  back,  the  polmgs  and 

Awful  f  poling-screws  fell  down  with  a  tremendous  crash,  and  the 
ground  followed  to  a  considerable  extent.  This  is  the  most  formid- 
able accident  that  has  yet  occurred  in  the  face  of  the  work.  The 
ground  was  fortunately  unusually  firm,  and  no  fatal  consequences 
ensued. 

December  31. — Isambard  and  nine  friends  sat  down  to  a  dinner 
under  the  Thames  !  Now  a  year  is  over  since  we  began  to  make 
any  progress  horizontally,  for  we  had  only  1 1  feet  of  arch  when  the 
water  broke  in  on  January  24  last.  We  may  therefore  say  that  the 
whole  of  what  has  been  made  of  the  Tunnel  has  been  made  in  that 
period.  It  is  worthy  of  remark  that  until  the  end  of  April  no  fracture 
whatever,  no  bending  of  the  legs,  had  taken  place,  notwithstanding 
that  we  had  siipported  for  a  period  of  nearly  three  months  a  greater 
weight  than  we  ever  had  since.  The  ground  nearly  40  feet  high 
Icept  sinking  upon  us  p.s  we  advanced,  and  yet  no   stave,  no  top,  no 


^T.  21.]  rnOGRESS   TO   FEBRUARY   2G,    1827.  25 

leg  gave  way.  Each  leg  was  capable  of  carrying  nearly  80  tons  at 
the  point  of  fracture,  consequently  the  aggregate  strength  of  3G  legs 
was  equal  to  2,880  tons,  which  is  six  times  over  the  greatest  effort 
tliat  could  be  exerted  by  the  superincumbent  weight.  The  heads, 
after  they  had  given  way,  remained  in  place,  some — namely,  Nos. 
1,  8,  12 — for  seven  months,  and  the  others  from  four  to  six  months. 
It  cannot  be  said  therefore  that  there  was  a  want  of  strength,  since 
the  broken  heads  continued  to  perform  for  so  many  months  after 
being  so  much  damaged ;  nor  is  there  any  defect  in  the  iron. 
If  the  frames  were,  as  some  have  fancied,  lanky,  which  implies 
weakness  in  their  sides,  how  could  they  have  supported  the 
alternate  stress  to  which  they  are  put  by  standing  alternately  on 
one  leg  ?  Not  one  single  joint  has  yet  started.  Every  frame  has 
been  upwards  of  2,000  times  in  that  raking  posture,  consequently 
the  shield  has  been  upwards  of  24,000  times  strained  under  the 
weight  that  has  broken  the  heads.  One  single  side  has  broken,  and 
is  now  as  good  as  the  rest.  Is  such  a  machine  to  be  stigmatised  as 
it  has  been,  without  looking  more  minutely  into  its  operations  ? 

January  4,  1827.' — A  work  that  requires  such  close  attention, 
BO  much  ingenuity,  and  carried  on  day  and  night  by  the  observations 
rudest  hands  possible — what  anxiety,  what  fatigue,  both  gpoJ^isib'iity 
of  mind  and  body  !     Every  morning  I  say.  Another  day  attached  to 
of  danger  over  !  prise. 

January  12. — It  is  astonishing  how  the  silt  resists  the  sliding  of 
the  top  staves.  Assiired  as  we  were  of  having  stiff  clay  from  33  to 
37  feet,  with  what  confidence  we  might  have  looked  to  making  18 
feet  per  week.  There  would  be  no  difficulty  in  having  accomplished 
it.     We  must  not  look  back,  but  overcome  all  difficulties  ! 

January  1 6. — Isambard  having  been  up  several  successive  nights, 
went  to  bed  at  ten,  and  slept  till  six  the  next  morning,  igambardon 
I  am  very  much  concerned  at  his  being  so  unmindful  of  guccessrvT^ 
his  health.     He  may  pay  dear  for  it.  nights. 

February  2. — Work  done  to  this  day  405  feet  4  inches. 

Feh-uary  3. — I  visited  the  works ;  and,  being  in  the  cabin,  I 
complained  of  the  dust  there.     Dust  under  the  Thames  ! 

February  26. — I  went  to  the  Tunnel.  The  arch  being  well 
lighted  up,  and  the  whole  walk  completed,  a  few  visitors  were  ad- 
mitted. The  coup  d'oeil  was  splendid.  Mrs.  Brunei,  Emma,  Sophia 
and  her  three  little  children  were  the  first.  It  gave  me  great  pleasure 
to  see  the  whole  of  my  family  in  the  new  scene. 

•  On  the  previous  day  Mr.  Brunei  had  been  formally  appointed  residen 
engineer. 


2G  THE  THAMES  TUNNEL.  [a.».  1827. 

No  clay  March  21. — There  being  no  clay  above  us,  there  is 

stl'ouid'wMk'   iiiuch  to  apprehend  from  the  springs.      It  would  be  much 
slower.  better  to  work  slower  than  Ave  do.     It  is  indeed  very  hard 

to  be  under  the  necessity  of  driving.     Anxiety  increasing  daily. 

March  28. — The  top  pumps  failed;  the  water  rose  above  the 
abutting  screws.  The  frames  of  some  of  them  could  not  be  ad- 
Waterin-      vanced,  nor  could  the  bottom  brickwork  be  laid  down — 

creasing 

daily.  great  source  of  complaint.     Isambard  called  the  men  in  at 

10  o'clock ;  they  went  ou  cheerfully.     It  is  surprising  that  tlic  men 
are  so  steady. 

March  29. — Things  are  getting  worse  every  day  by  the  influx  of 
water ;  by  which  the  ground  is  softened,  and  the  operation  rendered 
Oursitua-  extremely  complicated  and  slow.  As  to  the  ground,  it  is 
ting  much  evident  we  are  now  as  Isambard  found  it  by  his  borings 
worse  daily,  ^f  August  last.  We  have  nothing  above  our  heads  but 
clayey  silt,  and  it  is  of  a  nature  to  be  detached  and  run  into  mud  by 
the  action  of  water. 

April  3. — The  pumping  now  requires  forty  hands.  There  is  no 
exaggeration  in  saying  that  the  influx  of  water,  and  the  badness  of 
the  ground,  cause  an  extra  expense  of  150Z.  a  week. 
Obstacles  in  April  7. — It  may  now  be  said  that  we  are  contending 
every  way.  with  the  elements  above  and  around,  gaining  and  disput- 
ing every  inch  that  we  add  to  the  structure. 

April  9. — Isambard's  birthday,  he  being  of  age  to-day. 

April  14. — Doing  as  well  as  can  be  expected  from  the  nature  of 
the  ground,  and  the  difficulties  that  increase  upon  us. 

April  18. — The  faces  are  foimd  extremely  tender;  but  having 
proceeded  with  great  caution,  no  accident  occurred.  None,  I  feel 
confident,  would  occur  if  all  idea  of  piece-work  were  abandoned.  It 
To  be  Ob-  always  operates  as  a  stimulant,  a  very  dangerous  one. 
drive  too  Obliged  to  drive  on,  on  account  of  expense,  Ave  run  im- 
aiternative.  minent  risks  indeed  for  it.  That  a  Avork  of  this  nature, 
under  such  circumstances,  should  be  thus  carried  on,  is  truly 
lamentable.  It  is  obvious  that  the  clay  Ave  have  above  our  heads  has 
been  broken,  by  the  ground  beneath  it  running  or  breaking  in  upon 
us.  We  shall  have  to  fight  it  out  until  Ave  have  a  stronger  or  thicker 
stratum  of  clay.     Sad  prospect  indeed  it  is  for  us  1 

April  20. — The  ground  at  No.  1  broke  in  again,  and  occasioned 
great  delay.     Some  bones  and  china  came  doAvn. 

April  22. — The  diving-bell  being  on  the  spot,  and  Isambard 
having  moored  it  over  the  shield,  he  and  Gravatt'  descended  at 

'  Mr.  Gravatt  had  been  appointed  an  assistant  engineer  six  months  before. 


;et.  21.]  TEOGEESS   TO   MAY    13,  1827.  27 

thirty  feet  water.  They  found  the  same  substances  which  had  come 
through  the  ground  into  the  Tunnel.  When  Isambard  was  in  the 
bell,  he  drove  a  strong  rod  into  the  ground.  Nelson,  who  Avas  in 
the  frame,  heard  the  blows. 

April  29. — Ground  improving  as  we  advance  ;  we  are  not,  how- 
ever, free  from  danger  :  a  dreadful  alarm  took  place  this  morning. 
While  Isambard  and  Gravatt  were  at  breakfast,  the  porter  ^  dreadful 
came  running  in,  and  exclaiming,  '  It  is  all  over !  The  P**'"*^- 
'  Tunnel  has  fallen  in,  and  one  man  only  has  escaped.'  Gravatt  Avas 
the  first  to  get  to  tlie  spot,  and  found  all  the  pumpers  upon  the  floor 
of  the  shaft,  all  stupefied  with  horror,  though  every  one  was  there 
quite  safe,  and  no  rush  of  water  was  heard.  Gravatt  and  Isambard 
were  soon  in  the  shield,  where  they  observed  that  a  small  portion  of 
clay  had  fallen  from  the  top  on  the  top  floor. 

May  8. — At  half  past  three  in  the  morning,  an  irruption  took 
place,  bringing  down  the  deposits  of  the  bottom  of  the  river — lumps 
of  clay,  stones,  bones,  wood,  nails,  &c.,  &c.,  with  water.  The 
pumpers  and  men  on  the  stage  (Irish)  all  ran  away,  some  exclaiming, 
*  The  Thames  is  in  !  The  Thames  is  in  ! '  Ball  and  Rogers  stood 
to  their  post,  and  soon  stopped  this  most  formidable  attack. 

May  10. — Great  difficulties  present  themselves,  that  oppose  our 
progress ;  the  chief,  hoAvever,  is  the  lodgment  of  Avatcr  above  our 
heads.  There  it  loosens  the  silt  or  sand,  and  runs  out,  leaving 
cavities  that  cause  the  clay  above  to  break,  and  run  down  in  lumps 
and  disturbed  streams.  This  is  very  aAvful !  This  opens  the  Avay 
for  the  river. 

May   12. — In  moving  No.  6,   they  left   by  some  unaccountable 
neglect  the  top  staves  behind,  and  in  that  state  t\\^o  top   polings 
were   taken  down.     The   ground   being   very  bad,  and  ^^^^^ 
high   water  at  the   same   moment,   the    ground    began  qumcesof 

°  _  '  o  o  want  of  care 

SAvelling.     Attention  was  called   to    several   points,   and  more  terrific 
Gravatt  continued  in  No.  6.     He  drew  out  at  the  front  of  chievous 
the  top  staves  a  shovel,  and  also  a  hammer,  that  had  come  precedSig 
through  the  ground  above.     They  are  the  same  which  °^^^' 
Isambard  left  at  the  bottom  of  the  river,  Avhen  he  went  down  in  the 
diving-bell. 

May  13. — Notwithstanding  every  prudence  on  our  part,  a  disaster 
may  still  occur.  May  it  not  be  when  the  arch  is  full  of  visitors  ! 
It  is  too  awful  to  think  of  it.  I  have  done  my  part  by  recom- 
mending to  the  directors  to  shut  the  Tiumel.  My  solicitude  is 
not  lessened  for  that :  I  have  indeed  no  rest,  and  I  may  say  have 


28  THE   THAMES   TUNNEL.  [a.d.  1827. 

Tiiumph  of  ^^^^  none  for  many  weeks.  So  far  the  shield  has  triumphed 
the  shield.  Qyer  immense  obstacles,  and  it  ivill  carry  the  Tunnel 
through.  During  the  preceding  night  the  whole  of  the  ground  over 
our  heads  must  have  been  in  movement,  and  that  too  at  high  water. 
The  shield  must  have  therefore  supported  upwards  of  six  hundred 
tons :  it  has  walked  for  many  weeks  with  that  weight  twice  a  day 
over  its  head.  What  flippancy  and  inconsistency  in  some  indi- 
viduals, who,  without  any  knowledge  of  the  subject,  without  so 
much  as  examining  the  state  of  the  work,  will  Avithout  the  least 
reflection  and  hesitation  obtrude  their  suggestions  upon  every  case. 
What  shallow  conceit  for  such  to  pretend  they  can  know  better  than 
those  that  have  already  the  experience  that  must  result  from  years 
of  deep  thought,  from  days  and  nights  of  incessant  attention ;  Avho 
have  the  advantage  of  the  combined  talents  of  several  ingenious  men, 
who  devote  their  undivided  study,  the  whole  resource  of  their  well- 
stored  minds,  to  the  enterprise  ;  and  to  add  to  this,  the  benefit  of  the 
skill  of  one  hundred  miners  and  excavators.  Among  this  class  of 
men,  some  have  been  employed  in  the  most  perilous  enterprises, 
when  each  individual  must  have  acted  upon  his  sole  judgment, 
where,  in  fact,  there  is  no  room  for  an  engineer  to  instruct  and 
How  easy  to  direct  their  efforts.  How  easy  it  is  to  attack  everything, 
detract.  ^^  detract  from  the  merits  of  the  best  plan.  There  is 
always  some  weak  point  which  may  be  open  to  the  penetration  of 
the  shallowest  mind.  Then  comes  the  exulting  expression.  That  I 
always  said  woidd  never  do,  &c.,  and  all  the  consequences  with  it. 

3Iay  15. — The  water  increased  very  much  at  9  o'clock.  This 
is  inquie'tant !  My  apprehensions  are  not  groundless.  I  apprehend 
nothing,  however,  as  to  the  safety  of  the  men,  but  first  the  visitors, 
and  next  a  total  invasion  by  the  river.  We  must  be  prepared  for 
the  worst.  I  have  had  no  rest  for  many  weeks  on  this  apprehension. 
Should  it  occur  we  must  make  the  best  of  it,  by  improving  our 
situation. 

May  17. — There  is  no  doubt  of  the  ground  having  improved  very 
materially  since  last  Saturday.     Very  cheering  indeed. 

Jifay  18. — Visited  by  Lady  Raffles  and  a  numerous  party.  Having 
had  an  intimation  by  Mr.  Beamish  of  their  intended  visit,  I  waited 
to  receive  and  to  accompany  them,  not  only  from  the  interest  I  felt 
at  being  acquainted  with  Lady  KafSes,  but  also  from  motives  of 
solicitude,  knowing  that  she  intended  to  visit  the  frames.  Indeed,  my 
apprehensions  were  increasing  daily.  I  had  given  some  instructions 
for  enquiring  where  we  could  obtain  clay,  that  we  should  have  some 
barges  full  of  clay  to  be  in  readiness.     I  was  most  anxiously  Avaiting 


JET.  22.]  FIRST   lERUPTION,   MAY    18,    1827.  29 

for  the  removal  of  the  tier  of  colliers  that  was  over  lis,  being  convinced 
that  we  should  detect  some  derangement  then.  I  attended  Lady 
Raffles  and  party  to  the  frames,  most  uneasy  all  the  while,  as  if  I  had  a 
presentiment,  not  so  much  of  the  approaching  catastrophe  to  the  ex- 
tent it  has  occurred,  but  of  what  might  result  from  the  misbehaviour 
of  some  of  the  men,  as  was  the  case  when  the  Irish  labourers  ran 
away  from  the  pumps  and  the  stage.  I  left  the  works  at  half-past 
five,  leaving  everything  comparatively  well :  Mr.  Beamish  continued 
on  duty.' 

Mr.  Gravatt's  account  is  as  follows :  I  was  above  with  I.  Brunei 
looking  over  some  prints,  Beamish  being  on  duty.  Some  men  came 
running  up  and  said  to  Isambard  something  I  did  not  hear.  He 
immediately  ran  towards  the  works,  and  down  the  men's  staircase. 
I  ran  towards  it,  but  could  not  get  down.  I  leaped  over  the  fence, 
and  rushed  down  the  visitors'  stairs,  and  met  the  men  coming  up, 
and  a  lady,  who  1  think  was  fainting.  Met  Flyn  on  the  landing- 
place,  who  said  it  was  all  over.  I  pushed  on,  calling  him  a  coward, 
and  got  down  as  far  as  the  visitors'  barrier.  Saw  Mr  Beamish 
pidled  from  it.  He  came  on  towards  the  shaft  walking.  I  went  up 
to  him  to  ask  him  what  was  the  matter.  He  said  it  was  no  use 
resisting.  The  miners  were  all  upon  the  staircase ;  Brunei  and  I 
called  to  them  to  come  back.  Lane^  was  upon  the  stairs,  and 
lie  said  it  was  of  no  use  to  call  the  men  back.  We  stayed  some 
time  below  on  the  stairs,  looking  where  the  water  Avas  coming  in 
most  magnificently.  We  could  still  see  the  farthest  light  in  the 
west  arch.  The  water  came  upon  us  so  slowly  that  I  walked  back- 
wards speaking  to  Brunei  several  times.  Presently  I  saw  the  water 
pouring  in  from  the  east  to  the  west  arch  through  the  cross  arches. 
I  then  ran  and  got  up  the  stairs  with  Brunei  and  Beamish,  who  were 
then  five  or  six  steps  up.     It  was  then  we  heard  a  tremendous  burst. 


'  Sir  Isambard's  journal    of  this  form   in   his  Life  of   Sir  Isamhard 

eventful  night  consists — as  he  was  not  Brunei,  pp.  244-248. 

himself   present — of   Mr.    Beamish's  *  Mr.  Michael  Lane,  at  this  time 

journal,  with   a  few  words   in  warm  foreman   brickhiyer,   became    one    of 

commendation    of    that    gentleman's  Mr.  Brunei's  most  vahied  assistants, 

'judgment,    coolness,    and    courage,'  and   was   employed   by   him   on  the 

followed    by    observations   upon   the  Monkwenrmouth  Docks  and  the  Great 

stability  of  the  shield.     He  then  gives  Western  Railway.     After  filling  va- 

a  statement  made   by   Mr.    Gravatt,  rious  posts  in  the  service  of  that  com- 

and  taken  down    in    shorthand.     No  pany,  he  was  in  1860  appointed  their 

extracts   are  given   in  the  text  from  principal  engineer,  an  office  which  he 

Mr.  Beamish's  narrative,  as   he  has  held  till  his  death,  in  Febrxiary,  18G8. 
already  inserted   it   in   a  condensed 


30  THE  THAMES   TUNNEL.  [a.u.  1827. 

The  cabin  had  burst,  and  all  the  lights  went  out  at  once.  There  Avas 
a  noise  at  the  staircase,  and  presently  the  water  carried  away  the 
lower  flight  of  stairs.  Brunei  looked  towards  the  men,  who  Averc 
lining  the  staircase  and  galleries  of  the  shaft,  gazing  at  the  spectacle, 
and  said,  '  Carry  on,  carry  on,  as  fast  as  you  can  !  '  Upon  which 
they  ascended  pretty  fast.  I  went  up  to  the  top  and  saw  the  shaft 
filling.  I  looked  about  and  saw  a  man  in  the  water  like  a  rat.  He 
got  hold  of  a  bar,  but  I  afterwards  saw  he  was  quite  spent.  I  was 
looking  about  how  to  get  down,  when  I  saw  Brunei  descending  by  a 
rope  to  his  assistance.  I  got  hold  of  one  of  the  iron  ties,  and  slid 
down  into  the  Avater  hand  over  hand  Avith  a  small  rope,  and  tried  to 
make  it  fast  round  his  middle,  Avhilst  Brunei  AA'as  doing  the  same. 
Having  done  it  he  called  out,  '  Haul  up.'  The  man  was  hauled  up. 
I  swam  about  to  see  where  to  land.  The  shaft  Avas  full  of  casks. 
Brunei  had  been  swimming  too. 

The  first  alarm,  as  I  heard  it,  Avas  as  folloAvs :  Goodwin,  in  No. 
11,  said  to  Eoger,  in  the  next  box,  '  Eoger,  come,  help  me.'  Roger 
said,  '  I  can't,  I  have  my  second  poling  down,  and  my  face  Avill  run 
'  in.'  In  a  little  time  Goodwin  said,  *  You  must  come,'  Avhich  Mr. 
Beamish  directed  him  to  do.  Eoger  turned  round  and  saAv  Goodwin 
through  a  sheet  of  water.  Corps,  a  bricklayer,  Avent  to  help  Good- 
Avin  :  he  was  knocked  doAvn.  Eoger  made  his  Avay  alone,  calling  to 
Mr.  Beamish,  *  Come  aAvay,  sir,  'tis  no  use  to  stay.'  Eoger  saw 
Corps  fairly  washed  out  of  his  box  like  a  lump  of  clay. 

Sir  Isambard's  journal  continues  : — 

May  19. — Eelieved  as  I  have  found  myself,  though  by  a  terrible 
catastrophe,  of  the  worst  state  of  anxiety,  that  Avhich  I  have  been  in 
for  several  Aveeks  past,  I  had  a  most  comfortable  night.  Lsambard 
and  Gravatt  descended  Avith  the  diving-bell,  and  stood  upon  the  tails 
ofNos.  10,  11,  and  12. 

May  20 — Having  descended  into  the  hole  and  probed  the  ground, 
I  felt  that  the  staA'^es  Avere  in  their  places,  and  that  the  brickwork 
Avas  quite  sound.  It  is  evident  that  the  great  hole  has  been  a 
dredging  spot.  A  large  mass  of  bags  full  of  clay,  and  united  together 
with  ropes,  was  let  down.  The  Eotherhithe  curate,  in  his  sermon 
to-day,  adverting  to  the  accident,  said  it  was  a  fatal  accident,  that  it 
Avas  but  a  just  judgment  upon  the  presumptuous  aspirations  of 
mortal  men,  &c. !     The  poor  man  ! 

May  23. — Went  with  the  diving-bell  to  examine  the  ground  and 
the  bags,  which  do  apparently  Avell,  but  it  is  working  rather  in  the 
dark.  It  cannot,  hoAvever,  fail  of  making  a  much  better  stratum 
than  that  Ave  had  before.     Tlie  plan  is  therefore  good. 


MT.  22.]  FIRST   IRRUPTION,   MAY    18,    1827.  31 

On  the  30tli  a  raft  was  sunk  over  tlie  shield,  and  the 
water  in  the  shaft  was  brought  so  low  that  the  last  flight  of 
steps  was  visible.  However,  on  the  next  day  the  river 
broke  in  again;  and  as  it  was  found  that  the  raft  was  open 
at  the  west  side,  it  was  raised  and  towed  on  shore. 

June  5. — There  is  much  danger  in  getting  oixt  of  the  diving-bell, 
the  bags  are  so  loose  in  some  places.  One  might  sink  and  be 
swallowed,  which  had  very  nearly  happened  to-day.  Isambard  and 
Pinckney  being  down,  the  latter  lost  his  hold.  The  footboard  being 
accidentally  carried  away,  he  could  not  have  recovered  himself  had 
not  Isambard  stretched  out  his  leg  to  his  assistance. 

June  17. — Visited  by  Charles  Bonaparte.  Isambard  took  him 
into  the  arch  with  the  yawd.     Isambard  fell  overboard.' 

On  June  19,  a  general  meeting  of  the  proprietors  was 
held,  to  consider  the  position  of  the  company.  Sir  Isam- 
bard addressed  the  meeting,  and  also  presented  a  long 
report,  in  which  he  entered  very  fully  into  the  circumstances 
of  the  recent  accident  and  the  causes  which  led  to  it.  He 
then  described  the  means  he  had  taken  to  restore  the 
works  by  sinking  bags  of  clay  and  gravel.  He  adds  :  '  I 
*have    already   succeeded   in  closing   the   hole   through 

*  which  the  water  first  penetrated,  and  feel  confident  that 

*  the  second  opening  which  afterwards  appeared  is  also 
'  stopped,  but  a  short  time  is  necessary  to  elapse  for  the 
'  new  ground  over  the   shield  to  settle  and  consolidate. 

*  It  has  already  supported  a  head  of  water  of  thirty-five 

*  feet.' 

'  On  this  occasion  an  amusing  in-  mentions)  fell  overboard.     As  soon  as 

cident  occurred.     Mr.  Brunei  was  ex-  he  recovered  himself,  and  turned  to 

eeedingly    unwilling    to    permit    his  swim  back  to  the  boat,  he  remembered 

visitors  to  make  this  expedition  into  that  he  had  unwittingly  given  to  his 

the  arch;  but  on  the  assurance  that  companions  the  signal  to  jump  out  in- 

they  could  all  swim  perfectly  well,  he  to  the  water.     Ho  was  much  amused, 

consented  to  take  them,  wnth  the  un-  on  looking  up,  to  see  that  they  were  not 

derstanding  that,  if  he  jumped  over-  swimming  after   him,  but  were  still 

board,  they  were  immediately  to  follow  sitting   in  the   boat   clinging  to   the 

his  example,  and  swim  after  him  to  gunwale,    with    faces    expressive    of 

the  shaft,    "While  they  were  in  the  blank  despair. 
arch   Mr.  Brunei   (as  Sir  Isambiird 


32  THE   THAMES   TUNNEL.  [a.d.  1827. 

June  25. — At  7  p.m.  made  preparations  to  re-enter  the  shield. 
Isambard,  mustering  the  men  who  had  been  the  last  to  quit  the 
frames,  told  them  they  would  be  the  first  to  take  possession  of  them 
again — a  precedence  due,  as  he  said,  to  them.  Rogers,  Ball, 
Goodwin,  Corps,  and  Compton,  were  accordingly  ordered  to  trim 
themselves  for  the  expedition,  provided  with  a  phosphorus  box,  and 
dressed  in  light  clothes,  to  be  fit  for  a  swim. 

At  about  ten  o'clock,  Isambard  and  Mr.  Beamish,  accompanied 
by  Ball  and  Woodward  (miners),  went  down  with  the  punt,  and 
got  to  the  large  stage,  the  head  of  the  crane  just  emerging.  It  was 
found  impossible  to  get  into  the  frames,  as  a  mound  of  clay  and 
silt  closed  the  entrance.  The  centering  was  in  place  and  quite 
sound,  and  of  course  the  brickwork.  Finding  that  they  could  not 
get  nearer,  they  gave  three  cheers,  which  were  rapturously  answered 
by  the  men  at  the  mouth  of  the  Tunnel.  Having  placed  candles 
upon  the  ground  that  closed  the  entrance,  and  upon  the  head  of  the 
crane,  they  returned.  Isambard,  having  promised  that  the  men  who 
had  left  the  frames  last  should  be  the  first  to  re-enter,  returned  with 
them.     This  is  a  great  day  for  our  history  ! 

June  27. — Mr.  Beamish  was  able  to  get  to  the  frames,  which  he 
found  firm  and  undisturbed. 

A  small  tarpaulin  was  now  spread  over  the  frames,  and 
ojDerations  commenced  for  cleaning  them.  This  was  a 
most  difficult  and  dangerous  work,  especially  as  the  water 
was  still  so  high  that  the  frames  could  only  be  approached 
by  boats.  The  men,  even  the  best  hands,  were  at  first 
greatly  alarmed  at  the  danger  they  were  in ;  but  the  ex- 
ample set  by  Mr.  Brunei  and  Mr.  Beamish  produced,  as 
Sir  Isambard  notes,  the  best  effect,  and  they  soon  became 
reconciled  to  their  situation. 

July  7. — Very  uncomfortable  in  the  frames ;  the  candles  cannot 
burn,  the  ventilation  cannot  act.  Isambard  went  several  times  to- 
day down  in  the  diving-bell.  On  one  occasion  the  chain  slipped 
through  the  stoppers,  but  most  providentially  it  jammed  itself  tight 
before  being  altogether  run  out.  2'he  consequence  miglit  indeed  have 
been  fatal.  Can  there  be  a  more  anxious  situation  than  that  which 
I  am  constantly  in?  Not  one  moment  of  rest  either  of  mind  or 
body.  Mr.  Beamish  always  ready.  Poor  Isambard  always  at  his 
post  too,  alternately  below,  or  in  the  barges,  and  in  the  diving-bell. 


^T.  22.]  THE  SHIELD  REGAINED.  33 

On  July  11 J  Sir  Isambard  thought  that  matters  had  so 
far  advanced  that  a  large  tarpaulin,  which  it  was  proposed 
to  sink  over  the  frames,  '  would  have  its  full  effect.'  It 
was  accordingly  sunk  on  the  following  day,  under  the 
superintendence  of  Mr.  Brunei.  Sir  Isambard  adds  to  his 
account  of  the  operation — '  This  reflects  great  credit  on 

*  Isambard,  and  the  apparent  facility  with  which  it  was 

*  effected  evinces  his  presence  of  mind,  for  a  single  faux 
'pas  would  have  spoilt  the  whole.'  ^ 

Juli/  21. — Dxiring  the  early  part  of  the  night  an  alarm  was  given, 
by  Fitzgerald  calling  for  clay  wedges,  and  exclaiming  that  the  whole 
of  the  faces  were  coming  in  altogether.  Eogers  collected  a  quantity 
of  wedges  to  go  to  the  frames,  but  no  boat  was  to  be  seen.  He 
called  to  the  men  in  the  frames,  but  received  no  answer.  Taking  the 
small  boat  in  the  east  arch,  he  reached  the  frames,  but  found  nobody, 
nor  any  appearance  of  derangement  in  the  ground.  Conjecturing 
they  might  be  drowned,  he  explored  further,  and  saw  the  four  men 
stretched  on  the  small  stage,  not  drowned,  but  sound  asleep ! 

July  26. — ^Water  nearly  out  of  the  arches.  For  the  first  time  we 
could  walk  to  the  frames — a  most  gratifying  circumstance  indeed  ! 
Two  months  and  eight  days. 

September  30. — How  slow  our  progress  must  appear  to  others ;  but 
it  is  not  so,  if  it  is  considered  how  much  we  have  had  to  do  in  right- 
ing the  frames  and  in  repairing  them ;  what  with  timbering,  shoring, 
shipping  and  refitting — all  these  operations  being  in  confined  situa- 
tions, the  water  bursting  in  occasionally,  and  the  ground  running  in  : 
in  short,  it  is  truly  terrific  to  be  in  the  midst  of  this  scene.  If  to 
this  we  add  the  actual  danger,  magnified  by  the  re-echoing  of  the 
pumps,  and  sometimes  (still  more  awful  warning !)  the  report  of 
large  pieces  of  cast  iron  breaking,  it  is  in  no  way  an  exaggeration 
to  say  that  such  has  been  the  state  of  things.  Nevertheless,  my  con- 
fidence in  the  shield  is  not  only  undiminished — it  is,  on  the  contrary, 
tried  with  its  fviU  eifect,  and  it  is  manifest  now  that  it  will  soon 

'  Mr.    Brunei's    comment    in    his  '  ways  to  the  men  who  were  to  execute 

diary  is  as  follows : — '  Without  ascrib-  '  them,  I  succeeded  in   an   operation 

'  ing  any  particular  merit  to  myself,  I  'not  altogether   mean,  and   which  a 

'  cannot  help  observing,  for  my  future  '  very  trifling  want  of  precaution   or 

'guidance,that  being  alone,  and  giving  '  order  might  have   caused   to   be  a 

'  few  but  clear  orders,  and  those  al-  '  total  failure.' 


^4  THE   THAMES   TUNNEL.  [a.u.  1827- 

replace  us  in  good  ground,  and  in  a  safe  situation.    No  top  staves  have 
given  way.     That  is  our  real  protection. 

October  17. — At  2.15  a.m.  Kemble,  having  first  called  upon 
Gravatt,  came  to  Isambard  in  a  hurry,  and,  quite  stupefied  Avith  fright, 
told  him  that  the  vv^ater  was  in.  Says  Issimbard — 'I  could  not 
'  believe  him.  He  said  it  was  up  the  shaft  when  he  came.  This 
'  being  like  positive,  I  ran  without  a  coat  as  fast  as  possible,  giving 

*  a   double  knock  at  Gravatt's  door  in  my  way.     I  saw  the  men  on 

*  the  top,   and  heard   them   calling  earnestly   to  those  whom  they 
'  fancied  had  not  had  time  to  escape.     Nay,  Miles  had  already,  in  his 

*  zeal  for  the  aid  of  others,  thrown  a  long  rope,  and  was  swinging  it 

*  about,   calling   to    the    unfortunate    sufferers   to    lay   hold   of  it, 
'  encouraging  and  cheering  those  who  might  not  find  it,  to  swim  to 

*  one  of  the  landings.    I  immediately,  I  should  say  instantly,  flew 
'  down  the  stairs.     The  shaft  was  completely  dark.     I  expected  at 

*  every  step  to   splash  into  the  Avater.     Before  I  was  aAvare  of  the 
'  distance  I  had  run,  I  reached  the  frames  in  the  east  arch,  and  met 

*  there  Pamphillon,  who  told  me  that  nothing  was  the  matter,  but  a 

*  small  run  in  No.  1   top,  where  I   found  Huggins  and  the   corps 

*  ci elite.    They  Avere  not  even  aware  that  any  one  had  left  the  frames. 

*  The  cause  of  the  panic  was  one  of  the  labourers  ;  hearing  the  man  in 
'  No,  1  call  for  Ball,  he  ran  away,  jumping  off"  the  stage,  crying, 

*  "  Run,   nin,  murder,  murder;  i^ut  the  lights  outy      His   felloAV- 
'  labourers  followed  like  sheep,  making  the  same  A'ociferations.' 

November  10. — Isambard  gave  his  entertainment  to  nearly  forty 
persons,  who  sat  at  table  in  the  Tunnel.  Nothing  could  exceed  the 
effect  for  brilliancy.  About  120  men  partook  of  a  dinner  in  the 
adjoining  arch. 

As  tlie  year  drew  to  a  close,  the  difficulty  of  working  the 
silt  increased,  and  with  this  difficulty  increased  also  the 
expense  of  maintaining  the  staff  of  men  required.  On 
December  18,  Mr.  Brunei,  writing  for  his  father,  who  was 
absent  from  town  for  a  few  days,  thus  describes  the  nature 
of  the  soil  through  which  they  Avere  then  passing. 

The  state  of  the  ground  over  Nos.  1,  2,  and  3  top  has  caused 
considerable  delay,  particularly  this  week,  although  not  such  as  to 
give  any  cause  of  anxiety  as  to  our  future  rate  of  progress,  or  to 
have  any  serious  effect  except  the  increased  expense  incidental  to 
this  delay.  My  father  desired  me  to  describe  to  the  Board  the 
causes  of  these  difficulties.     There  is  a  considerable  spring  at  this 


Mr.  22.]  PROGRESS   TO   JANUARY   12,  1828.  35 

point,  and  a  corresponding  soft  part  in  the  bed  of  the  river,  which 
seems  to  indicate  the  rising  of  the  spring.  The  ground  in  the 
neighbourhood  is  affected  by  this  spring  in  rather  a  peculiar  manner  : 
at  the  half-flood  tide  the  pressure  is  greatest :  dry  hard  clay  oozes 
with  great  force  through  openings  hardly  observable,  the  silt  and 
water  running  by  starts.  At  high-water  the  pressure  and  quantity 
of  water  begin  to  diminish  and  on  the  ebb-tide  the  ground  is  hard 
and  dry,  and  can  be  worked  Avith  ease.  On  the  flood-tide  there  are 
as  many  as  twelve  and  fifteen  of  the  best  hands,  besides  myself  (or 
one  of  my  assistants)  and  the  foreman,  engaged  entirely  at  one  face. 

On  January  1,  1828,  Sir  Isambard  returned  to  London ; 
and  on  the  12th,  when  about  600  feet  of  the  Tunnel  had 
been  completed,  a  second  irruption  occurred,  which  put  a 
stop  to  the  works  for  seven  years. 

The  particulars  of  this  accident  are  thus  described  by 
Mr.  Brunei,  in  a  letter  to  the  Directors  of  the  Company  : — 

I  had  been  in  the  frames  (shield)  with  the  workmen  throughout 
the  whole  night,  having  taken  my  station  there  at  ten  o'clock. 
During  the  workings  through  the  night,  no  symptoms  of  insecurity 
appeared.  At  six  o'clock  this  morning  (the  usual  time  for  shifting 
the  men)  a  fresh  set  or  shift  of  the  men  came  on  to  work.  "We 
began  to  work  the  ground  at  the  west  top  corner  of  the  firame  :  the 
tide  had  just  then  begun  to  flow  ;  and  finding  the  ground  tolerably 
quiet,  we  proceeded  by  beginning  at  the  top,  and  had  worked  about 
a  foot  downwards,  when  on  exposing  the  next  six  inches,  the  ground 
swelled  suddenly,  and  a  large  quantity  burst  through  the  opening 
thus  made.  This  was  followed  instantly  by  a  large  body  of  water. 
The  rush  was  so  violent  as  to  force  the  man  on  the  spot,  where  the 
burst  took  place,  out  of  the  frame  (or  cell)  on  to  the  timber  stage 
behind  the  frames.  I  was  in  the  frame  with  the  man,  but  upon  the 
•rush  of  the  water  I  went  into  the  next  box  (or  cell),  in  order  to 
command'a  better  view  cf  the  irruption,  and  seeing  that  there  was 
no  possibility  of  then  opposing  the  water,  I  ordered  all  the  men  in 
the  frames  to  retire.  All  were  retiring,  except  the  three  men  who 
were  with  me,  and  they  retreated  with  me.  I  did  not  leave  the 
stage  until  those  three  were  down  the  ladder  of  the  frames,  when 
they  and  I  proceeded  about  twenty  feet  along  the  west  arch  of  the 
Tunnel.  At  this  moment  the  agitation  of  the  air,  by  the  rush  of 
water,  was  such  as  to  extinguish  all  the  lights,  and  the  water  had 


UNIVr-RGITY    OF    'iO;.-3Ni.' 


36  .  THE   THAMES   TUNNEL.  [a.d.  1828 

gained  the  lieiglit  of  our  waists.  I  was  at  that  moment  giving  direc- 
tions to  the  three  men,  in  what  manner  they  ought  to  proceed  in  the 
dark  to  effect  their  escape,  when  they  and  I  were  knocked  down,  and 
covered  with  a  part  of  the  timber  stage.  I  struggled  under  water 
for  some  time,  and  at  length  extricated  myself  from  the  stage,  and 
by  swimming  and  being  forced  by  the  water,  I  gained  the  eastern 
arch  where  I  got  a  better  footing,  and  was  enabled  by  laying  hold 
of  the  railway  rope,  to  pause  a  little,  in  the  hope  of  encouraging  the 
men  who  had  been  knocked  down  at  the  same  time  with  myself. 
This  I  endeavoured  to  do  by  calling  to  them.  Before  I  reached  the 
shaft  the  water  had  risen  so  rapidly  that  I  was  out  of  my  depth,  and 
theiefore  swam  to  the  visitors'  stairs,  the  stairs  for  the  workmen 
being  occupied  by  those  who  had  so  far  escaped.  My  knee  was  so 
injured  by  the  timber  stage  that  I  could  scarcely  swim,  or  get  up 
the  stairs,  but  the  rush  of  the  water  carried  me  up  the  shaft.  The 
three  men  who  had  been  knocked  down  with  me  were  unable  to 
extricate  themselves,  and  I  am  grieved  to  say,  they  are  lost ;  and 
I  believe  also  two  old  men,  and  one  young  man,  in  other  parts  of 
the  work. 

This  statement  Sir  Isambard  embodied  in  a  report  to 
the  Directors  of  January  28,  which  was  circulated  among 
the  proprietors. 

As  soon  as  the  first  excitement  caused  by  the  irruption 
had  ceased,  Mr.  Brunei  directed  the  diving-bell  to  be  pre- 
pared in  order  to  ascertain  the  state  of  the  shield  and  the 
extent  of  the  disturbance  of  the  bed  of  the  river  caused 
by  the  rush  of  water  into  the  Tunnel. 

He  was,  however,  so  seriously  injured  that  he  could  not 
actively  superintend  the  preparations,  but  his  orders  were 
given  with  his  usual  clearness,  calmness,  and  decision  ;  and 
as  soon  as  the  barge  containing  the  diving-bell  was  pro- 
perly moored  over  the  Tunnel,  he  was  carried  out  and 
laid  upon  a  mattress  on  the  deck  of  the  barge,  that  he 
might  direct  what  was  to  be  done. 

As  evening  came  on  he  became  so  much  worse  that 
he  was  taken  into  the  cabin ;  but  everything  which  took 
place  was  reported  to  him. 


JBT.  22.]  SECOND   IRRUPTION,  JANUARY   12,  1828.  37 

At  length,  the  bell  being  ready,  it  was  lowered  early  on 
the  Sunday  morning,  but  the  chain  not  being  long  enough, 
proceedings  were  delayed  until  a  longer  chain  could  be 
obtained. 

As,  however,  a  chain  of  the  right  size  and  length  could 
not  be  obtained,  the  strongest  cable  which  could  be 
procured  in  the  neighbourhood  was  substituted,  for  the 
chain.  A  controversy  then  arose  between  the  assistant 
engineers  and  the  foremen  as  to  the  sufl&ciency  of  the 
strength  of  the  cable;  and  it  was  agreed  to  consult  and 
to  abide  by  the  opinion  of  Mr.  Brunei,  who  was  then 
lying  in  great  pain  in  the  cabin. 

No  answer  could  be  obtained  from  him  for  some  minutes, 
and  then  he  only  said,  '  Don't  go  down.'  This  not  being 
satisfactory  to  the  advocates  of  the  sufl&ciency  of  the 
cable,  it  was  agreed  to  lower  the  bell  empty,  which  was 
done,  and  it  was  brought  up  safely ;  but  just  as  it  was 
swung  over  the  barge,  the  rope  broke  and  the  bell  fell  on 
to  the  stage. 

The  next  day  Mr.  Brunei  was  taken  home,  when  it 
was  found  that,  besides  the  injury  to  his  knee  which  he 
received  while  endeavouring  to  save  the  lives  of  the  three 
men  who  were  with  him,^  he  had  received  serious  internal 
injuries,  which  kept  him  under  medical  treatment  for 
several  months. 

When  he  was  able  to  return  to  Eotherhithe  all  hope  of 
continuing  the  works  was  for  the  time  abandoned.     When 

'  On  January  15,  1828,  the  Direc-  '  neer,  when  the  Thames  broke  into 

tors  of  the  Thames  Tunnel  Company  '  the  Tunnel  on  the  morning  of  tho 

passed  the  following  resolution,  which  '12th   instant,  are   desirous   to  give 

they  ordered  to  be  advertised  in  the  '  their   public  testimony  to  his  calm 

Times,   New    Times,  Herald,  Ledger,  '  and   energetic    endeavours,   and    to 

and    Courier :  —  '  That     this     court,  '  that    generous   principle   which   in- 

'  having  heard  with  great  admiration  '  duced  him   to   put   his  own  life  in 

'  of  the  intrepid  courage  and  presence  '  more  imminent  hazard  to  save  the 

•  of  mind  displayed  by  Mr.  Isambard  '  lives  of  the  men  under  his  immediate 

Brunei,  the  company's  resident  cngi-  '  care.* 


38  THE  THAMES  TUNNEL. 

they  were  resumed,  in  1835,  he  was  entirely  engrossed  in 
the  independent  pursuit  of  his  profession ;  and,  with  the 
exception  of  a  few  occasions  when  he  acted  for  his  father, 
he  had  no  farther  connection  with  the  Tunnel. 

It  is  not,  therefore,  necessary  to  continue  the  narrative 
in  detail ;  but  a  brief  summary  of  the  subsequent  history 
of  the  enterprise  may  be  interesting  to  those  who  are  un- 
acquainted with  it. 

The  Tunnel  was  cleared  of  water,  and  efforts  were  made, 
unfortunately  without  success,  to  raise  funds  for  the  com- 
pletion of  the  undertaking.  Great  enthusiasm  was  ex- 
hibited by  the  general  public  and  by  many  eminent 
persons,  including  the  Duke  of  Wellington ;  but  the  money 
was  not  forthcoming,  and  nothing  was  left  but  to  brick  in 
the  shield,  and  wait  for  more  favourable  times. 

It  was  not  till  the  beginning  of  1835  that  the  Company 
was  able,  by  the  aid  of  a  loan  from  Government,  to  recom- 
mence the  works.  The  old  shield  was  removed  and  a 
new  one  substituted,  in  which  considerable  improvements 
were  introduced.  Slings  connecting  the  frames  were 
added,  which  enabled  each  frame  to  support  its  neighbours 
when  necessary,  and  important  alterations  were  also  made 
in  the  arrangements  for  keeping  the  frames  at  the  right 
distance  from  one  another,  and  for  giving  greater  facility 
of  adjustment  to  the  various  parts. 

Before  the  Wapping  side  was  reached  there  were 
three  more  irruptions  of  the  river,  namely,  August  23, 
November  3,  1837,  and  March  21,  1838;  but  in  October 
1840  the  shaft  on  the  Wapping  shore  was  commenced. 
It  differed  from  the  Rotherhithe  shaft,  in  being  sunk 
the  whole  depth  without  underpinning,  and  was  made  of  a 
slightly  conical  form,  to  reduce  the  friction  in  sinking, 
and  had  a  larger  quantity  of  iron  hoops  introduced  into 
the  brickwork,  in  order  to  increase  its  strength.     When 


EESUMPTION   OF  THE  WORKS,  a.d.  1835.  39 

this  structure  liad  been  sunk  to  the  required  depth  (70  feet), 
the  excavation  of  the  Tunnel  was  resumed,  and  at  last  the 
shield  was  brought  up  to  the  brickwork  of  the  shaft.  The 
operation  of  making  the  junction  between  the  Tunnel  and 
the  shaft  was  one  of  much  difficulty,  but  it  was  at  length 
satisfactorily  accomplished,  and  the  Tunnel  was  opened  to 
the  public  on  March  25, 1843 — eighteen  years  and  twenty- 
three  days  after  the  commencement  of  the  work.' 

Sir  Isambard  Brunei,  whose  health  had  for  some  time 
been  failing,  now  retired  altogether  from  his  profes- 
sional labours.  After  passing  a  few  years  in  peaceful  and 
happy  seclusion,  surrounded  by  those  he  loved,  and  watched 
over  by  their  affectionate  care,  he  died  on  December  12, 
1849,  in  his  81st  year,  having  been  spared  to  carry  to 
completion  his  greatest  work,  and  to  see  his  son  following 
in  his  footsteps  with  a  success  which  must  have  exceeded 
his  most  sanguine  expectations. 

The  education  Mr.  Brunei  received  from  his  father  was 
well  calculated  to  form  the  foundation  of  his  future  career. 
During  the  later  and  more  arduous  part  of  the  contest, 
which  was  ended  by  the  irruption  of  January  1828,  he 
held  both  the  nominal  and  actual  post  of  Resident  Engi- 
neer of  the  Thames  Tunnel ;  but  from  the  commencement 
of  the  works,  when  he  was  only  nineteen  years  old,  he  had 
been,  as  stated  by  Sir  Isambard,  *  a  most  valuable  coadju- 
tor in  the  undertaking.'  While  placed  in  this  respon- 
sible position  he  acquired  habits  of  endurance  and  of  self- 
reliance,  and  learnt  to  act  with  promptitude  and  decision 

'  The  Thames  Tunnel  was  not  sue-  by  the  East  London  Railway  Company, 

cessful  as  a  commercial  undertaking;  and   trains   now   (March,    1870)  run 

but  it  has  always  been  considered,  es-  through  it.     The  possibility  of  using 

pecially  by  foreigners,  one  of  the  most  the   Tunnel   as  a   railway  had  been 

interesting  sights  in  London,  and  has  considered   in   Mr.  Brunei's  lifetime, 

been  visited  by  several  millions  of  and  the  idea  was  approved  of  by  him. 
persons.     In  1865  it  was  purchased 


40  EAKLY  LIFE. 

in  the  application  of  those  measures  which  experience  had 
shown  to  be  effective  in  each  particular  class  of  emergency. 
But  beyond  all  other  advantages,  he  had  before  him  the 
example  of  his  father's  character,  in  which  a  rare  degree 
of  gentleness  and  modesty  of  disposition  was  joined  to 
unflinching  energy,  and  a  determination  to  overcome  all 
difficulties. 


NOTE  A  (p.  5). 

The  Bourbon  Suspension  Bridges.^ 

The  suspension  bridges  designed  by  Sir  Isambard  Brunei  for  cross- 
ing rivers  in  the  He  de  Bourbon  were  two  in  number.  One  of 
them  had  two  spans  of  122  feet  each  in  the  clear,  and  131  feet  9 
inches  between  the  points  of  suspension  of  the  chains.  The  second 
had  but  one  span  of  the  same  dimensions  as  tliose  of  the  larger  bridge. 
In  the  design  of  these  bridges  one  of  the  most  important  points  to 
be  attended  to,  was  to  render  them  secure  against  hurricanes,  which 
are  both  frequent  and  severe  in  the  lie  de  Bourbon. 

In  the  larger  bridge  there  was  a  pier  of  masonry,  built  in  the 
middle  of  the  river  up  to  the  level  of  the  roadway  of  the  bridge. 
The  suspension  chains  of  the  bridge  were  in  three  groups,  i)  feet  8 
inches  apart,  so  as  to  leave  room  for  two  roadways,  each  aborit  8 
feet  9  inches  wide.  Each  of  these  groups  of  chains  consisted  of 
two  chains  side  by  side.  Each  chain  was  made  with  long  links  like 
those  of  the  chain  cables  used  for  moorings. 

These  links,  which  were  made  of  iron  1'36  inch  in  diameter,  were 
4  feet  8  inches  long,  inside  measure,  and  were  each  connected  to- 
gether by  two  short  coupling  links,  8f  inches  long,  inside  measure, 
of  iron  1'36  inch  by  1  inch,  and  two  pins,  each  two  inches  in 
diameter. 

The  two  chains  of  each  group  were  placed  side  by  side,  with  the 
links  upright;  one  of  the  pins  at  each  joint  was  made  long  enough 
to  serve  for  both  chains,  and,  in  the  middle  of  its  length  between  the 

'  This  description  is  based  on  the  Suspendus,'byM.'Sa.yieT  (Paris,  1823, 

translation    given    by    Mr.     Drewry  p.  49).     M.  Navier  saw  the  bridges 

(Suspension   bridges,   London,   1832,  when  they  were  erected  at  ShefBeld 

p.  7o),  from  the  Mhnoirc  sw  les  Fonts  in  May  1823. 


THE  BOUEBON  SUSPENSION  BEIDGES.  41 

two  chains,  was  passed  through  an  eye  at  the  upper  end  of  one  of  the 
suspending  rods  of  the  bridge.  Thus  to  every  joint  in  each  group 
of  the  main  chains,  or  at  intervals  of  about  5  feet,  there  was  a  sus- 
pending rod.     These  rods  were  1^  inch  in  diameter. 

The  pins  of  the  joints  of  the  main  chains  had  half  heads  at  each 
end  of  them.  They  could  thus  be  easily  inserted  in  erecting  the 
bridge,  but  once  in  place  were  quite  secure.  At  every  fourth  joint 
in  the  main  chains  one  of  the  joint  pins  was  made  in  two  halves, 
with  wedges  inserted  between  them  for  adjusting  the  length  of  the 
main  chains. 

Thus  there  Avere  six  chains,  and  as  the  links  of  these  had  each 
two  parts  of  iron  1*36  inch  in  diameter,  the  total  sectional  area  of 
the  six  chains  was  17 '4  inches. 

Each  group  of  the  main  chains  was  supported  at  a  height  of  25 
feet  6  inches  above  the  roadway  at  the  centre  pier,  and  at  a  height  of 
5  feet  3  inches  at  each  of  the  side  piers,  the  lowest  portion  of  the 
curve  of  the  chain  being  about  1  foot  below  the  points  of  suspension 
of  the  side  piers. 

The  upright  standards,  carrying  the  chains  both  at  the  centre  pier 
and  at  the  side  piers,  consisted  for  each  group  of  chains  of  a  trian- 
gular framework  of  cast  iron,  strengthened  by  long  bolts  of  wrought 
iron.  There  were  thus  three  of  these  triangular  frames  parallel  to  each 
other  at  each  of  the  piers,  and  those  at  the  centre  pier  were  braced 
together  over  the  carriage  road.  The  main  chains  were  not  bolted 
to  the  standards,  but  were  slung  from  them  by  a  vertical  suspension 
link,  which  thus  allowed  them  to  move  a  little  lengthways.  This 
link,  in  fact,  performed  the  function  of  the  rollers  now  generally 
put  under  the  saddles  of  suspension  bridges. 

The  ends  of  the  main  chains  Avere  held  by  back  stays,  formed  of 
bars  3  inches  broad  by  1^  inch  thick,  and  10  feet  long,  with  joints 
made  with  short  links,  and  2|  inch  pins.  The  ends  of  those  back 
stays  were  secured  to  holding  down  plates  3  feet  in  diameter,  sunk 
deep  in  the  ground  and  well  loaded. 

As  there  was  a  vertical  suspension  rod  at  each  joint  of  the  main 
chains,  there  was  a  suspension  rod  hanging  from  each  of  the  three 
groups  of  chains  at  about  every  five  feet  of  the  length  of  the 
bridge.  To  each  set  of  these  rods  was  attached  a  cross  girder  of  cast 
iron  of  a  y  section,  with  a  large  rounded  bead  at  the  lower  edge  of 
the  upright  web  ;  and  connecting  these  imder  each  of  the  main  chains 
was  a  longitudinal  timber  beam  about  8  inches  square. 

The  cast-iron  cross  girders  carried  longitudinal  teak  planking,  the 
planks  on  which  the  carriage  wheels  ran  being  12  inches  wide  and 


42  EARLY  LIFE. 

4  inches  tliick,  protected  at  the  top  by  wrought-iron  plates  running 
longitudinally.  The  horse-path  was  protected  by  iron  plates  arranged 
crosswise. 

Under  each  span  of  the  bridge  were  four  chains  curved  upwards 
and  also  sideways.  These  chains  were  fastened  at  their  ends  into 
the  piers,  and  were  connected  to  the  roadway  by  ties  drawn  up 
tight  and  attached  to  the  main  longitudinal  bearers  of  the  platform  ; 
the  object  being  to  stiffen  the  platform. 

These  under  tie  chains  were  made  each  of  a  set  of  rods  1  ^  inch  in 
diameter  with  eyes  at  their  ends,  the  ends  being  connected  by  short 
joint  links  and  1;^  inch  pins  ;  and  to  these  joint  links  were  attached 
the  tie  rods  which  connect  these  inverted  chains  with  the  platfoi-m 
of  the  bridge,  and  so  prevented  its  being  lifled  or  blown  sideways 
by  the  force  of  the  wind. 

In  the  smaller  bridge,  which,  as  has  been  said,  consisted  of  one 
span  of  131  feet  9  inches  between  the  points  of  suspension,  these 
points  were  15  feet  5  inches  above  the  roadway,  and  the  lowest  part 
of  the  chain  was  9  feet  7  inches  below  the  points  of  suspension. 
The  details  of  this  bridge  were  similar  to  those  of  the  larger  one. 


NOTE    B   (p.  5). 

Experiments  with  Carbonic  Acid  Gas. 

In  1823  Mr.  Faraday  made  the  important  discovery  that  under 
certain  conditions  of  temperature  and  pressure  many  gases  could  be 
liquefied,  and  that  these  liquids  exerted  great  expansive  force  by 
slight  additions  of  temperature,  returning  quickly  with  regularity 
and  certainty  to  their  original  state  upon  the  application  of  cold. 

The  discovery  of  this  new  force  appeared  of  such  importance,  that 
Mr,  Faraday  lost  no  time  in  publishing  it  to  the  Avorld ;  and  Sir 
Isambard  Brunei  very  soon  aflerwards  commenced  a  series  of  ex- 
periments to  determine  the  value  of  the  liquid  gas  as  a  mechanical 
agent. 

The  first  experiments  were  made  at  Chelsea ;  but  the  prosecution 
of  them  was  soon  transferred  to  the  care  of  Mr,  Brunei  at  Eotherhithe, 
where  he  devoted  all  his  spare  time  to  the  construction  of  his 
father's  proposed  *  Differential  Power  Engine.' 

That  the  progress  of  this  discovery,  and  of  the  experiments  made 


THE  CAEBONIC  ACID   GAS  ENGINE.  43 

with  a  view  to  the  application  of  the  liquid  gas,  as  a  motive  power, 
may  be  understood,  it  is  necessary  to  state  that  in  March  1823  Mr. 
Faraday  communicated  to  the  Royal  Society  the  results  of  his  first 
experiments  on  the  liquefaction  of  gases. 

The  fluid  Avas  then  produced  by  the  decomposition  of  the  hydrate 
of  chlorine  by  heat  in  a  closed  tube,  the  amount  of  gas  evolved  being 
so  great  as  to  produce  a  pressure  in  the  tube  suiScient  to  condense 
the  gas  into  a  fluid  of  the  same  volume. 

This  interesting  experiment  was  followed  by  others  with  tliat 
rapidity  and  success  so  remarkable  in  everything  undertaken  at 
that  time  in  the  laboratory  of  the  Royal  Institution ;  and  within  a 
month  another  paper  was  read  before  the  Royal  Society,  in  which 
the  degrees  of  pressure  and  temperature  at  which  several  gases 
could  be  liquefied  were  recorded,  and  the  means  employed  to  pro- 
duce and  liquefy  each  gas  accurately  described. 

On  April  17  a  third  paper  was  communicated  by  Mr.  Faraday, 
'  On  the  Application  of  Liquids  produced  by  the  Condensation  of 
'  Gases  as  Mechanical  Agents.' 

The  question  is  thus  stated  :  '  The  ratio  of  the  elastic  force 
'  dependent  upon  pressure  is  to  be  combined  with  that  of  the  ex- 

*  pansive  force  dependent  on  temperature ;  and  the  development  of 

*  latent  heat  on  compression  and  the  necessity  of  its  reabsorption  in 

*  expansion  must  awaken  doubts  as  to  the  economical  results  to 

*  be  obtained  by  employing  the  steam  of  water  under  very  great 

*  pressures  and  very  elevated  temperatures. 

'  No  such  doubt  can  arise  respecting  liquids,  which  require 
'  for  their  existence  even  a  compression  equal  to  thirty  or  forty 
'  atmospheres,  and  where  slight  elevations  of  temperature  are 
'  sufficient  to   produce   an   immense  elastic  force,  and  where  the 

*  principal   question   arising   is   whether   the  effort   of  mechanical 

*  motion  is  to  be  most  easily  produced  by  an  increase  or  diminution 
'  of  heat  by  artificial  means.' 

Difficulties  were  suggested  by  Mr.  Faraday  as  to  the  possibility  of 
obtaining  sufficient  strength  in  the  apparatus,  but  the  small  difference 
of  temperature  required  to  produce  an  elastic  force  of  many  atmo- 
spheres, he  considered  would  render  the  risk  of  explosion  small. 

To  construct  the  machinery  whereby  this  new  force  could  be 
practically  applied  as  a  substitute  for  steam,  occupied  the  time  of 
Sir  Isambard  Brunei  and  his  son  at  intervals  for  several  years ;  for 
although  Mr.  Brunei  was  satisfied  at  an  early  period  of  the  enquiry 
that  the  liquefied  gases  could  only  be  advantageously  employed 
where  the  cost  of  motive  force  was  secondary  to  economy  of  space 


44  -    '  EAELY  LIFE. 

and  to  the  avoidance  of  the  cumbrous  apparatus  required  for  the 
use  of  steam,  still  he  was  so  impressed  with  the  importance  of  the 
subject,  if  the  difficulties  he  foresaw  in  its  application  could  be 
overcome,  that  he  continued  his  experiments  for  a  long  period  with 
unflagging  energy  and  perseverance. 

The  facts  relating  to  the  liquefaction  of  the  gases,  their  elastic 
force  when  liquefied  under  different  temperatures,  the  rapidity  with 
which  they  could  be  alternately  expanded  and  condensed,  and  the 
best  mode  of  producing  each  gas,  were  determined  by  Mr.  Faraday ; 
and  as  Mr.  Brunei  was  at  that  time  attending  the  morning  chemical 
lectures  at  the  Eoyal  Institution,  he  was  in  constant  communication 
with  him,  and  thoroughly  conversant  with  his  experiments. 

After  Mr.  Brunei  had  made  a  few  preliminary  experiments.  Sir 
Isambard  determined  to  employ  liquefied  carbonic  acid  gas  for  the 
motive  power  of  the  proposed  new  engine,  the  facility  and  cheapness 
of  its  production,  its  great  expansive  force,  and  its  neutral  cha- 
racter distinguishing  it  from  any  other  gas  ;  but  it  was  long  before 
vessels  were  constructed,  in  which  gas  could  be  produced  in  sufficient 
quantity  and  purity  to  exert  the  force  required  to  liquefy  it  in 
its  own  volume,  for  it  was  soon  found  to  be  impossible  to  obtain  the 
required  pressure  with  pumps. 

Carbonate  of  ammonia  and  svilphuric  acid  were  the  elements  used, 
and  the  generator  Avas  so  arranged  that  it  could  be  charged,  emptied 
of  atmospheric  air,  and  the  joints  made  perfect,  before  the  com- 
mencement of  the  formation  of  the  gas  which  was  to  be  liquefied. 

To  the  generator  was  attached  a  receiver,  which  could  be  sur- 
rounded with  a  freezing  mixture,  so  that  the  temperature  of  the  gas 
in  the  cylinder  might  be  below  that  in  the  generator. 

The  gradual  formation  of  the  liquid,  the  development  of  its  elastic 
force,  and  the  regularity  and  rapidity  with  which  it  increased  or 
diminished  by  each  degree  of  heat  or  cold,  were  carefully  Avatched 
through  a  glass  gauge,  and  the  receiver  when  filled  with  liquid  could 
be  disconnected  from  the  generator. 

The  mechanical  difficulties  as  they  arose,  one  after  the  other,  in 
the  construction  and  arrangement  of  the  various  parts  of  the  gene- 
rator and  receiver  were  at  length  overcome ;  and  the  receiver  was 
not  only  filled  with  liquid  gas,  but  found  to  be  capable  of  retaining 
it,  whether  exerting  an  elastic  force  of  30  atmospheres  at  ordinary 
temperatures,  or  of  ICO  atmospheres  when  subjected  to  a  slight 
degree  of  heat. 

The  receiver  being  satisfactorily  completed,  the  next  object  of 
attention  was  the  design   and  construction  of  a  Avorking  cylinder 


THE  CARBONIC  ACID  GAS  ENGINE.  45 

capable  of  resisting  at  least  1,400  lbs.  pressure  on  tlie  square  inch ; 
a  task  which  was  one  of  great  anxiety,  as  any  weakness  might  havg 
caused  a  serious  accident. 

It  was  only  after  the  trial  of  every  known  method  of  makng 
joints  to  resist  high  pressures  had  failed,  that  an  arrangement  was 
devised,  requiring  the  most  perfect  workmanship,  by  which  packing 
of  any  kind  was  dispensed  with,  and  the  cylinder  fitted  for  use. 

With  the  improved  tools  of  the  present  day  it  is  not  easy  to 
realise  the  difficulties,  delays,  and  disappointments  which  forty-five 
years  ago  occurred  from  the  failure,  first  of  one  part  of  a  joint,  and 
then  of  another  ;  but  the  construction  of  vessels  capable  of  producing 
and  also  of  retaining  the  gas  in  its  liquid  state,  with  the  means  of 
alternately  expanding  and  condensing  it  from  thirty  or  forty  to  eighty 
or  one  hundred  atmospheres,  having  been  accomplished,  the  object 
of  the  expenditure  of  so  much  labour  and  inventive  power  appeared 
to  be  within  reach. 

The  construction  of  the  machinery  to  utilise  the  elastic  force  con- 
tained in  the  cylinder  was  now  proceeded  with.  Day  by  day  new 
difficulties  arose,  and  each  as  it  was  successfully  met  seemed  but  to 
leave  another  of  greater  importance  to  be  surmounted. 

It  is  not  necessary  in  this  Note  to  describe  the  various  arrange- 
ments which  were  devised  for  transferring  the  great  elastic  force  in 
the  cylinder  of  small  diameter  to  a  piston  in  another  cylinder  of 
much  larger  dimensions ;  it  is  sufficient  to  say,  that  after  the  devotion 
of  much  valuable  time  extending  over  several  years,  and  a  very 
large  expenditure  of  money,  and  after  carefully  considering  the  cost 
of  the  liquid  carbonic  acid  gas,  the  difficulty  of  preventing  waste,  and 
the  necessarily  very  expensive  character  of  the  machinery,  Mr. 
Brunei  was  satisfied  *  that  no  sufficient  advantage  in  the  sense  of 

*  economy  of  fuel  can  be  obtained  by  the  application  of  liquefied 

*  carbonic  acid  gas  as  a  motive  power  ;  but  so  thoroughly  did  he 
exhaust  the  subject  before  he  committed  himself  to  this  opinion,  that 
no  one  has  since  renewed  the  enquiry  or  attempted  to  make  a 
machine  to  be  moved  by  the  elastic  force  of  liquefied  gases,  the 
construction  of  which,  it  was  well  known,  had  baffled  the  inventive 
genius  of  Sir  Isambard  Brunei  and  his  son. 


46 


CHAPTER   II. 

THE    CLIFTON   SUSPENSION  BBILGE. 
A.D.  1829—1853,     ^TATis  24—48. 

ORIGIN     OF     THE     UNDERTAKING THE     FIRST      COMPETITION,     NOVEMBEE 

1829 DESCRIPTION    OF    MR.    BRUNEl's     PLANS — MR.    TELFORd's     DECISION 

AS    TIMPIKE — MR.     TELFORD's     DESIGN — THE     SECOND      COMPETITION MK. 

BRUNEL     APPOINTED    ENGINEER,     MARCH     1831 COMMENCEMENT     OF    THE 

■WORKS,  AUGUST  1836 — DESCRIPTION  OF  THE  DESIGN — ABANDONMENT  OF 
THE  ■WORKS,  1853 — FORMATION  OF  A  NEW  COMPANY  AND  COMPLETION 
OF    THE    BRIDGE,    1864.       NOTE:    THE    HUNGERFOBD    SUSPENSION    BRIDGE. 

After  Mr.  Brunei  liad  recovered  from  liis  accident  in  tlie 
Thames  Tunnel,  he  went  for  a  trip  to  Plymouth,  where 
he  examined  with  great  interest  the  Breakwater  and  other 
engineering  works  in  the  neighbourhood.  He  notes  in 
his  diary  that  he  went  to  Saltash,  and  that  he  thought 
the  river  there  'much  too  wide  to  be  worth  having  a 
'  bridge.'  This  remark  was  no  doubt  made  in  conse- 
quence of  his  father  having  some  years  before  been  con- 
sulted as  to  the  construction  of  a  suspension  bridge  at 
this  place,  which  Mr.  Brunei  himself,  eighteen  years 
afterwards,  selected  for  the  crossing  of  the  Tamar  by  the 
Cornwall  Railway,  and  built  there  the  largest  and  most 
remarkable  of  his  bridges. 

Por  the  remainder  of  the  year  1828,  and  during  the 
greater  part  of  1829,  Mr.  Brunei  kept  himself  fully  em- 
ployed in  scientific  researches,  and  in  intercourse  with 
Mr.  Babbage,  Mr.  Faraday,  and  other  friends ;  but  he 
was  without  any  regular  occupation,  until,  in  the  autumn 
of  1829,  he  heard  that  designs  were  required  for  a 
suspension  bridge  over  the  Avon  at  Bristol,  and  he 
determined  to  compete. 


ORIGIN  OF  THE  UNDERTAKING.  47 

This  project  originated  in  a  bequest  made  in  1753,  by 
Alderman  William  Vick,  of  the  sum  of  1,000Z.  to  be  placed 
in  the  hands  of  the  Society  of  Merchant  Venturers  of 
Bristol,  with  directions  that  it  should  accumulate  at  com- 
pound interest  until  it  reached  10,000Z.,  when  it  was  to  be 
expended  in  the  erection  of  a  stone  bridge  over  the  river 
Avon,  from  Clifton  Down  to  Leigh  Down.  Alderman 
Vick  stated  that  he  had  heard  and  believed  that  the 
building  of  such  a  bridge  was  practicable,  and  might  be 
completed  for  less  than  10,000Z. 

The  legacy  was  duly  paid  to  the  Society  of  Merchant  Ven- 
turers, and  invested  by  them.  The  interest  accumulated ; 
and  in  1829,  Avhen  the  fund  amounted  to  nearly  8,000L,  a 
committee  was  appointed  to  consider  in  what  way  it 
would  be  possible  to  carry  out  Alderman  Vick's  intentions. 

An  estimate  for  a  stone  bridge  was  procured,  but  as  it 
gave  the  cost  at  90,000L,  it  was  evident  that  this  scheme 
must  be  abandoned. 

The  committee  then  advertised  for  designs  for  a  sus- 
pension bridge.  Mr.  Brunei,  on  hearing  through  a  friend 
of  the  proposed  competition,  went  to  Bristol ;  and,  after 
examining  the  locality,  he  selected  four  difterent  points 
within  the  limits  prescribed  by  the  instructions  of  the 
committee,  and  made  a  separate  design  for  each  of  them. 
His  plans  were  sent  in  on  the  day  appointed,  Nov.  19, 
1829,  with  a  long  statement,  from  which  the  following 
description  of  them  is  taken. 

The  first  design  was  for  a  bridge  of  760  feet  span  be- 
tween the  points  of  suspension,  the  length  of  the  suspended 
floor  being  720  feet.  In  order  to  obtain  a  height  of  215 
feet  above  high-water  mark  (which  was  the  least  that  the 
levels  allowed  of),  towers  70  feet  high  would  have  had  to  be 
built  on  the  cliffs  to  carry  the  chains.     The  total  length 

.         University  or  Tc;:o.;t 


48  THE   CLIFTON  SUSPENSION  BRIDGE.  [a.d.  1829. 

of  chain,  including  the  land-ties,  was  about  1,620  feet. 
Mr.  Brunei  did  not  approve  of  this  design,  as  the  situation 
was  not  favourable  to  architectural  effect,  a  point  to 
which  the  committee  attached  great  importance ;  but  he 
suggested  it  from  its  being  somewhat  more  economical 
in  construction  than  his  other  plans. 

In  another  design,  the  situation  being  some  way 
farther  down  the  river  than  that  of  the  design  last 
mentioned,  towers  would  also  have  been  necessary.  The 
distance  between  the  points  of  suspension  was  1,180 
feet,  with  a  suspended  floor  of  over  900  feet.  It  is 
probable  that  Mr.  Brunei  only  proposed  this  plan  because 
the  site  came  within  the  limits  of  deviation,  as  he  does 
not  say  anything  in  favour  of  it  in  his  report. 

The  two  remaining  plans  are  the  most  interesting  of 
the  series,  as  there  can  be  no  doubt  that,  if  Mr.  Brunei 
had  had  his  own  way,  he  would  have  adopted  one  of  them 
for  execution ;  and  it  appears  from  a  little  sketch  on  the 
top  of  one  of  his  earliest  letters  from  Bristol,  that  his  first 
idea  for  the  bridge  was  that  which  is  carried  out  in  these 
two  designs.  The  site  selected  was  one  where  the  rocks 
rise  perpendicularly  for  a  considerable  height  above  the 
proposed  level  of  the  bridge,  and  therefore  piers  and  land- 
ties  were  dispensed  with,  the  chains  being  hung  directly 
from  the  rock.  No  masonry  was  required  except  for 
architectural  effect.^ 

'  The  dimensions  of  these  designs  were  as  follows : — 


(fi.)  Length  of  floor         .... 

.     890  feet. 

Distance  between  points  of  suspension 

.     980    „ 

Length  of  chain       .... 

.  1,300    „ 

With  a  capacity  to  bear  excessive  load  of    . 

.     660  tons. 

(b.)  Length  of  floor        .... 

.     916  feet. 

Distance  between  points  of  suspension         . 

.  1,160    , 

Length  of  chain        .... 

.  1,468    „ 

With  capacity  to  bear  excessive  load  of 

.     650  tons 

hi 

0-) 

o 

00 

Q 

Q 



g 

■d 

a: 

Xj 

CQ 

r 

o 

^ 

7^ 

■-ri 

O 

^ 

a 

CO 

,ti 

z 

n 

III 

Q_ 

c/) 

23 

Z) 

^ 

fO 

"8 

a  J 

S 

7 

^ 

O 

h 

1 

Ll 

S 

J 

0) 

W 

O 

^  ^ 


vET.  24.]  ME.  BEUNEL'S  PLANS.  49 

The  principal  difference  between  these  two  designs  is 
that  in  the  second  a  short  tunnel  is  avoided  at  one  end. 
The  style  of  architecture  selected  for  the  tunnel-front 
and  the  face  of  the  rock,  as  shown  on  the  drawings  sent 
in  to  the  committee,  is  Norman.  There  are  also  extant 
many  beautiful  sketches  made  by  Mr.  Brunei  for  different 
parts  of  the  design.' 

In  determining  upon  the  mode  of  construction,  which 
was  the  same  in  the  four  designs,  Mr.  Brunei  acted  upon 
the  principle  which  guided  him  in  all  his  subsequent 
undertakings,  which  was,  as  he  states  in  his  report,  'to 
'  make  use  of  all  that  has  been  found  good  in  similar 

*  works,  and  to  avail  himself  of  the  experience  gained  in 
'  them,  and  to  combine  with   all  their   advantages   the 

*  precautions  which  time  and  experience  had  pointed  out,' 

He  dismissed  in  a  few  words  the  plan  of  breaking  the 
span  into  two  or  three  lengths.  This  was  in  his  opinion 
unnecessary,  and  he  computed  that  the  cost  of  a  pier 
built  up  from  the  water's  edge  to  sufficient  height  above 
the  bridge  to  carry  the  chains,  would  be  at  least  10,000?. 
For  this  reason  he  recommended  the  adoption  of  spans, 
the  smallest  of  which  far  exceeded  any  up  to  that  time 
constructed. 

In  designing  the  chains,  he  dispensed  with  the  short 
connecting  links,  which  had  been  previously  adopted  in 
suspension  bridges,  introducing  instead  the  method  now 
universally  used,  of  connecting  each  set  of  links  directly 
with,  the  adjoining  one  by  means  of  a  pin  passed  through 
the  holes  of  both.  The  number  of  joints  and  pins  was 
thus  reduced  one  half,  and  a  considerable  saving  of  ex- 
pense, as  well  as  diminution  of  weight,  effected. 

Another  improvement,  which  diminished  still  further 

'  On  plate  I.  is  given  (fig.  1)  a  fac-  ing  sent  in  by  Mr.  Brunei  for  the  last- 
simile  on  a  smaller  scale  of  the  draw-      mentioned  {/>)  of  these  two  designs.. 


50  THE  CLIFTON  SUSPENSION  BRIDGE.  [a.d.  1829. 

the  weiglit  of  the  chains,  was  making  the  links  in  lengths 
of  16  feet,  or  nearly  double  that  of  the  longest  links 
at  the  Menai  bridge.  The  chief  reason  for  this  altera- 
tion was  to  ensure  a  near  approximation  to  equality 
in  the  strains  on  the  different  links,  should  all  the  dis- 
tances between  the  holes  not  be  exactly  equal.  This 
improvement  was  afterwards  carried  still  further  in  the 
Hungerford  Suspension  Bridge,  the  links  of  which  were 
24  feet  long.* 

Mr.  Brunei  also  intended  to  introduce  equalising  beams 
in  the  supports  of  the  floor,  so  that  each  chain  should 
bear  an  equal  share  of  the  load.  By  this  arrangement, 
there  would  have  been  comparatively  few  points  of  suspen- 
sion, and  *  the  view  of  the  scenery  would  not  be  impeded 

*  from  the  observer  being  surrounded  by  a  forest  of  sus- 

*  pension  rods.' 

The  disturbance  of  the  strains  on  the  links  arising  from 
the  greater  expansion  of  the  metal  of  the  outer  links  by  tha 
direct  heat  of  the  sun,  he  proposed  to  obviate  by  sheet- 
iron  plates  placed  on  each  side  of  the  chains,  but  separated 
from  them  by  a  small  interval,  and  thus  screening  them 
from  the  heat.  He  did  not,  however,  use  this  protecting 
covering  at  the  Hungerford  bridge. 

All  the  designs  show  a  camber  or  rise  in  the  centre  of 
the  platform  of  the  bridge,  to  the  extent  of  two  or  three 
feet;  and  the  main  chains  are  brought  down  almost  to 
the  level  of  the  platform.  To  this  last  arrangement,  as 
tending  to  prevent  undulation,  Mr.  Brunei  attached  some 
importance ;  and  he  further  intended  to  stiffen  the  bridge 
against  the  action  of  high  winds  by  a  system  of  transverse 
bracing,  and  by  the  addition  of  inverted  chains,  similar  to 
those  used  with  success  by  his  father  in  the  Bourbon 
bridges.'* 

Such,  then,  were  the   main  features  of  the  bold  and 

'  Sec  below,  p.  60.  '  See  above,  p.  42. 


;kt.  24.]  MR.   TELFORD'S  ADVERSE  DECISION.  51 

carefully  matured  designs  placed  by  Mr.  Brunei  before  the 
committee.  Out  of  twenty-two  plans  submitted,  only 
tliose  of  Mr.  Brunei  and  four  otber  competitors  were 
deemed  worthy  of  consideration.  He  and  his  friends  were 
naturally  much  gratified  at  this,  and  were  full  of  hope 
for  his  ultimate  victory.  But  now,  when  he  seemed  to 
have  a  fair  chance  of  success  in  a  contest  which  he  justly 
deemed  would  have  a  most  important  bearing  upon  his 
future  professional  career,  an  obstacle  presented  itself, 
which  for  the  time  seemed  almost  insurmountable ;  for 
he  met  with  an  unexpected  opponent  in  Mr.  Telford,  the 
foremost  engineer  of  the  day,  and  the  designer  of  the 
famous  suspension  bridge  over  the  Menai  Straits. 

The  committee  of  the  Society  of  Merchants  had,  not 
unnaturally,  found  themselves  unable  to  decide  upon  the 
merits  of  designs  for  a  suspension  bridge,  and  had  asked 
Mr.  Telford  to  act  as  their  adviser  in  the  matter.  Un- 
fortunately for  Mr.  Brunei,  Mr.  Telford  was  of  opinion 
that  the  maximum  span  admissible  was  that  of  the  Menai 
bridge,  i.e.  under  600  feet,  and  that  Mr.  Brunei's  proposed 
bridge,-*  though  very  pretty  and  ingenious,  would  most 
certainly  tumble  down  in  a  high  wind. 

This  decision  was,  of  course,  fatal  to  the  success  of  any 
design  which  substituted  one  large  span  for  two  or  more 
smaller  ones,  and  dispensed  with  pillars.  Mr.  Brunei 
therefore  obtained  permission  to  withdraw  his  plans  from 
the  competition. 

Mr.  Telford  then  reported  to  the  committee  that  none 
of  the  remaining  designs  were  suitable  for  adoption  with- 
out the  introduction  of  such  material  alterations  as  would, 
in  fact,  constitute  a  new  design.  Whereupon  the  com- 
mittee took  the  only  course  which,  under  the  circum- 
stances, was  open  to  them,  and  requested  Mr.  Telford  to 
prepare  a  design  himself. 

E   2 


52  THE  CLIFTON  SUSPENSION  BRIDGE.  [a.d.  1829. 

Mr.  Bnmel  was  not  a  little  disappointed  at  the  turn 
matters  had  taken ;  but,  having,  as  he  said,  *  smoked  away 
*■  his  anger,'  he  took  leave  of  his  friends  at  Bristol,  and  went 
for  a  visit  to  some  of  the  principal  manufacturing  towns 
in  the  north. 

Meanwhile  Mr.  Telford  prepared  his  design,  and  it  was 
exhibited  in  Bristol  in  January  1830.  It  consisted  of  a 
suspension  bridge  of  three  spans  (the  centre  span  360  feet, 
and  the  side  ones  180  feet  each),  the  chains  being  supported 
at  the  intermediate  points  by  tall  stone  piers  rising  from 
the  river's  banks  at  just  sufficient  distance  apart  to  avoid 
interfering  with  the  roadways  on  either  side  of  the 
stream.  The  style  of  architecture  was  a  florid  Grothic ; 
and,  in  order  to  display  the  peculiar  features  of  that  style, 
the  faces  of  the  piers  were  covered  with  elaborate  panel- 
ling, and  the  chains  ornamented  with  fret-work. 

This  design  was  received  with  a  flourish  of  trumpets ; 
numerous  engravings  were  published,  exhibiting  the  bridge 
from  various  points  of  view,  and  *  thousands  of  copies 
*  were  disposed  of; '  but,  after  a  time,  it  would  appear  that 
the  captivating  effect  of  the  Gothic  belfries  wore  off, 
and  that  the  more  the  citizens  of  Bristol  looked  at  Mr. 
Telford's  plan,  the  less  they  were  satisfied  with  it;  for, 
although  it  was  deposited  in  the  Private  Bill  Office,  on 
application  being  made  for  an  Act  of  Parliament,  the 
trustees  who  were  appointed  under  the  Act  determined  to 
invite  a  second  competition. 

On  this  occasion,  Mr.  Telford  appeared  as  a  competitor 
and  not  as  a  referee,  that  office  being  filled  by  Mr.  Davies 
Gilbert,  sometime  President  of  the  Eoyal  Society. 

The  site  of  the  bridge  was  fixed,  being  that  selected  by 
Mr.  Telford ;  but  the  trustees  expressly  left  it  to  the  judg- 
ment of  the  competitors  to  decide  whether  there  should 
be  intermediate  piers  or  one  unbroken  span. 


JET.  24.]  MR.   BRUNEL   APPOINTED   ENGINEER.  53 

Of  tlie  thirteen  designs  sent  in,  five,  including  those 
submitted  bj  Mr.  Telford  and  Mr.  Brunei,  were  reserved 
for  further  examination.  On  March  17,  1831,  Mr.  Davies 
Gilbert  (who  had  been  assisted  by  Mr.  Seward)  made  his 
report.  Mr.  Telford's  design  was  put  aside,  '  on  account  of 

*  the  inadequacy  of  the  funds  requisite  for  meeting  the 

*  cost  of  such  high  and  massive  towers  as  were  essential 

*  to  the  plan  which  that  distinguished  individual  had  pro- 

*  posed.' 

Mr.  Brunei's  design  was  placed  second.*  Although 
Mr.  Gilbert  reported  that  it  presented  every  desirable 
strength  and  security,  he  saw  objections  to  many  of  the 
details,  and  therefore  did  not  recommend  it  for  adop- 
tion. However,  on  the  following  day,  March  18,  he  stated 
to  the  trustees  that  he  had  seen  Mr.  Brunei,  and  that  it 
gave  him  much  pleasure  to  state  that  the  explanations 
made  by  Mr.  Brunei  had  materially  altered  his  views  as 
to  the  details  of  the  plans,  which  he  (Mr.  Gilbert)  was 
now  satisfied  were  quite  equal  to  those  which  he  had 
placed  first,  and  that,  considering  the  superiority  of  Mr. 
Brunei's  design  in  the  essential  particular  of  strength,  he 
should  judge  it  preferable  to  any  of  the  others. 

Thereupon  the  trustees,  *  having  considered  Mr.  Davies 
'  Gilbert's  report,  and  referred  to  all  the  plans,  including 
'  Mr.  Telford's,  unanimously  gave  the  preference  to  Mr. 

*  Brunei's,'  and  appointed  him  their  engineer. 

Subscriptions  came  in  but  slowly,  and  it  was  not  till 
1836  that  the  works  were  commenced. 

The  first  stone  of  the  abutment  on  the  Leigh  woods  or 
Somersetshire  side  of  the  river  was  laid  on  August  27 

'  The  dimensions  proposed  in  this  design  were  as»follows : — 

Distance  between  points  of  suspension         .  ,     600  feet. 

Versed  sine.  .  .  ^  .  .       60    ,, 

Width  of  roadway   .  .  .  .  .      32    „ 


54  THE   CLIFTON   SUSPENSION  BRIDGE.  [a.d.  1836. 

by  the  Marquis  of  Northampton,  President  of  the  British 
Association,  which  was  then  holding  its  meeting  in 
Bristol. » 

The  span  of  the  bridge  is  greater  than  that  of  Mr. 
Brunei's  design  for  the  second  competition,  but  much  less 
than  the  spans  of  the  earlier  designs,  to  which  he  had 
given  the  preference.'*  On  this  point,  as  well  as  on  the 
question  of  site,  he  had  to  conform  to  the  wishes  of  the 
trustees.^  The  span  approved  of  by  them  necessitated  the 
building  of  a  very  large  abutment  on  the  Leigh  woods 
side,  the  height  of  which,  from  the  surface  of  the  rock 
to  the  level  of  the  roadway,  is  110  feet.  Above  the  road- 
way, the  tower  to  carry  the  chains  is  built  to  a  height  of 
86  feet.  On  the  Clifton  side,  the  base  of  the  tower  is 
formed  by  one  of  the  boldest  of  the  range  of  St.  Vincent's 
rocks,  which  here  rise  almost  perpendicularly  to  a  height 
of  230  feet  above  high  water,  and  consequently  a  very 
small  abutment  was  required.  The  tower  on  this  side  is 
3  feet  higher  than  that  on  the  Leigh  woods  side,  and  the 
roadway  has  a  general  inclination  of  about  1  in  233. 
Mr.  Brunei  thought  that  if  the  roadway  were  level,  it 
would   have  the   appearance  of  falling  towards  Clifton, 

'  A  few  days  before  this  ceremony,  destine  trial  trip,  and  owing  to  a  bend 

an   iron  bar,  1^  inch  diameter,  and  in  the  bar,  the  basket  stuck  half  way, 

about  1,000  feet  in  length,  was  hung  and  the   mast  of    a  passing  steamer 

across  the  valley  from  Clifton  Kocks  caught  in  the   rope.     The   rope  was  ' 

to  Leigh  Down,  to  facilitate  the  works.  however  cut,  and  he  was  drawn  back. 

It  was  traversed  by  a  basket  pulled  When  the  apparatus  had  been  put  to 

by  ropes.     The  first  few  journeys  of  rights,  on  another  occasion,  when  Mr. 

this  machine  were  somewhat  perilous.  Brunei    was   in    the    basket,   it   got 

It  was  intended  that  Mr.  and  Mrs.  jammed,  and  he  had  to  climb  up  the 

Brunei  should  be  the  first  passengers  ;  connecting  link  and  get  upon  the  bar, 

but,  when  all  was  ready,  one  of  Mr.  before  he  could  release  the  basket. 
Brunei's  assistants  started  on  a  clan- 

2  Span       .  .  .  .  .702  feet  3  inches. 

Versed  sine         .  .  .  .       70    „ 

Roadway  above  high-water         .  .     248    „ 

^  Plate  I.  fig.  2  (p.  49),  shows  an  elevation  of  the  bridge  according  to  the 
designs  on  which  it  was  commenced. 


JET.  31.]  DESCRIPTION  OF  THE  DESIGN.  55 

owing  to  the  ground  there  being  precipitous,  while  on 
the  Leigh  woods  side  it  is  sloping. 

He  intended,  in  the  construction  of  the  bridge,  to  have 
followed  out  the  ideas  embodied  in  his  report  of  1829, 
and  would  have  preferred  to  have  had  only  one  chain  on 
each  side  of  the  bridge,  and  that  much  stronger  than  was 
usually  adopted;  but,  in  deference  to  public  opinion,  he 
put  two  chains,  though  he  doubted  if  they  would  expand 
equally.     *  A  rigid  platform  would   in  some  degree  pre- 

*  vent  the  unequal  distribution  of  load  thus  caused,  but 
'  he   endeavoured    to  lessen   the   effect   of   unequal  ex- 

*  pansion  by   arranging   a   stirrup   at  the   top   of   each 

*  suspending  rod,  so  as  to  hold  equally  at  all  times  on 

*  both   chains,    and  thus    to    cause   each   to  sustain   its 

*  proportion  of  the  load.' 

The  road  platform  was  to  have  had  beneath  it  '  a  com- 

*  plete  system  of  triangular  bracing,  which  would  render 
'  it  very  stiff.' 

In  order  to  lessen  the  action  of  wind  on  the  bridge,  he 
brought  down  the  main  chains  in  the  centre  nearly  to  the 
level  of  the  platform,  and  intended  to  apply  the  system 
of  brace  chains  at  a  small  angle  to  check  vibration. 
There  were,  moreover,  to  be  two  curved  chains  lying 
horizontally,  and  attached  underneath  the  platform,  so 
as  to  resist  the  lateral  action  of  the  wind.^ 

He  here  introduced  movable  saddles  to  carry  the 
chains  on  the  top  of  the  towers,  with  rollers  running 
on  perfectly  flat  and  horizontal  roller  beds.^  By  this 
arrangement  no  pressure  except  a  vertical  one  could 
come  on  the  towers. 

He  also  devised  means,  by  levers  and  hydraulic  presses, 

'  See  Mr.  Bmnel's  remarks : — Pro-  *  EoUers  on  an  arched  surface  had 

ceedings  Inst,  C.  E.  for  1841,  pp.  78,       been     used    previously     in     several 
79.  bridges. 


66  THE  CLIFTON  SUSPENSION  BKIDGE. 

for  relieving  the  rollers  and  roller  beds  from  pressure, 
in  the  event  of  their  requiring  renewal. 

Mr,  Brunei  ultimately  determined  to  adopt  the  Egyp- 
tian style  of  architecture.  His  brother-in-law,  Mr.  John 
Callcott  Horsley,  E.A.,  gives  the  following  account  of  the 
proposed  designs  for  the  towers  ; — 

'  His  conception  of  the  towers  or  gateways  at  either 

*  end  of  the  bridge  was  peculiarly  grand  and  effective,  as 

*  may  be  seen  from  his  sketches  still  existing.     They  were 

*  to  be  purely  Egyptian ;  and,  in  his  design,  he  had  caught 
'  the  true  spirit  of  the  great  remains  at  Philie  and  Thebes. 
'  He  intended  to  case  the  towers  with  cast  iron,  and,  as 
'  in  perfect  accordance  with  the  Egyptian  character  of 
'  his  design,  to  decorate  them  with  a  series  of  figure  sub- 
'  jects,  illustrating  the  whole  work  of  constructing  the 
'  bridge,  with  the  manufacture  of  the  materials — begin- 
'  niug  with  quarrying  the  iron  ore,  and  making  the  iron; 
'  and  ending  with  a  design  representing  the  last  piece  of 
'  construction  necessary  for  the  bridge  itself.  The  subjects 
'  would  have  been  arranged  in  tiers  (divided  by  simple 
'  lines)  from  top  to  bottom  of  the  towers,  and  in  the  exact 
'  proportion  of  those  found  upon  Egyptian  buildings. 
'  He  made  very  clever  sketches  for  some  of  these  pro- 
'  posed  figure  subjects,  just  to  show  what  he  intended  by 
'  them.  I  remember  a  group  of  men  carrying  one  of  the 
'  links  of  the  chainwork,  which  was  excellent  in  character. 

'  He  proposed  that  I  should  design  the  figure  subjects, 
'  and  he  asked  me  to  go  down  with  him  to  Merthyr  Tydvil, 

*  and  make  sketches  of  the  iron  processes.  We  accom- 
'  plished  our  journey,  and  all  the  requisite  drawings  for  the 
'  intended  designs  were  made.' 

The  works  were  commenced  with  the  Leigh  abutment, 
which  was  completed  in  1840,  great  delay  having  been 
caused  by  the  failure  of  the  contractors.     This  misfortune 


ABANDONMENT  OF  THE  WORKS,  a.d.    1853.  57 

led  to  a  large  excess  of  expenditure  over  the  original  esti- 
mates. In  1843  the  whole  of  the  funds  raised  (amounting 
to  45,000  Z.)  were  exhausted,  and  there  still  remained  to 
be  executed  the  ornamental  additions  to  the  piers  (the 
cost  of  which  was  estimated  at  about  4,000Z.),  half  of  the 
iron  work,  the  suspension  of  the  chains  and  rods,  the  con- 
struction of  the  flooring,  and  the  completion  of  the  ap- 
proaches, &c.,  the  estimate  for  the  execution  of  which 
was  30,000Z. 

Unfortunately,  all  efforts  to  raise  further  subscriptions 
were  unsuccessful;  and  in  July  1853,  when  the  time 
limited  for  the  completion  of  the  bridge  had  expired,  the 
works  were  closed  in,  and  the  undertaking  abandoned.' 

Several  proposals  for  completing  the  bridge  were  made 
in  Mr.  Brunei's  lifetime,  and  he  took  every  opportunity 
of  furthering  this  object,  which  he  had  very  much  at 
heart.  It  was  not,  however,  till  about  a  year  after  his 
death  that  the  superstructure  of  the  bridge  was  actually 
commenced. 

A  company  was  formed  in  1860  by  some  of  the  prin- 
cipal members  of  the  Institution  of  Civil  Engineers,  *  who 

*  had  an  interest  in  the  work  as  completing  a  monument 

*  to  their  late  friend  Brunei,  and  at  the  same  time  remov- 

*  ing  a  slur  from  the  engineering  talent  of  the  country.'  ^ 
Mr.  John  Hawkshaw,  F.R.S.,  and  Mr.  W.  H.  Barlow, 
F.R.S.,  were  appointed  the  engineers,  and  "Mr.  Brunei's 
old  friend  Captain  Christopher  Claxton,  E.N.,  the  secre- 
tary. The  works  were  carried  on  with  vigour;  and  the 
bridge  was  opened  with  much  ceremony  on  December  8, 
1864. 

The  chains  were  brought  from  the  Hungerford  -Suspen- 

'  The  ehiiins  weiv  iisod  in  the  con-  Captain  Mark  Iluish,  at  the  first  gene- 
struction  of  the  Saltash  bridge.  ral  meeting,  August  2,  1861. 

'  Speech  of  the  Chairman,  the  late 


68 


THE  CLIFTON  SUSPENSION  BRIDGE. 


sion  Bridge,  tlien  in  process  of  demolition.  A  description 
of  the  Hungerford  bridge  will  be  found  in  tbe  note  to  this 
chapter.' 

Although  the  Clifton  bridge  was  not  completed  by- 
Mr.  Brunei,  his  connection  with  it  forms  a  very  important 
passage  in  the  history  of  his  life.  Doubtless,  if  he  had 
never  heard  of  the  proposed  competition  in  1829,  or  if  he 
had  been  one  of  the  disappointed  competitors,  he  would 
have  found  some  other  opportunity  of  making  a  name  in 
his  profession ;  but,  as  a  matter  of  fact,  the  Clifton  bridge 
competition  did  give  him  the  opportunity  he  desired,  and 
all  his  subsequent  success  was  traced  by  him  to  this 
victory,  which  he  fought  hard  for,  and  gained  only  by 
persevering  struggles.  He  never  forgot  the  debt  he  owed 
to  Bristol,  and  to  the  friends  who  helped  him  there ;  and 
he  would  have  greatly  rejoiced  to  see  the  completion  of  his 
earliest  and  favourite  work. 


'  Some  re-arrangement  of  Mr. 
Brunei's  design  was  rendered  neces- 
sary in  order  to  adapt  the  Hungerford 
bridge  chains  to  the  Clifton  bridge, 
and  there  are  three  chains  instead  of 
two,  as  in  Mr.  Brunei's  design.  The 
platform  is  stiffened  by  wrought-iron 
girders  instead  of  by  timber  trussing, 
and  the  whole  bridge  is  stiffened  trans- 


versely by  the  wrought-iron  girders 
at  the  sides,  which  are  connected 
throughout  by  diagonal  bracing.  The 
clear  width  of  the  bridge  is  30  feet,  5 
feet  less  than  originally  intended.  It 
shoidd  be  added,  that  no  attempt  has 
been  made  to  complete  the  towers 
according  to  Mr.  Brunei's  architec- 
tural designs. 


UJ 

o 

Q 

DC 
CD 

Z 

o 

in 

z 

Lui 

Q_ 
Ul 

Z) 
CO 

Q 
DC 
O 

Ll. 

cr 

LU 

O 
z 

X 


69 


NOTE   (p.  58). 

The  Hungerford  Suspension  Bridge. 

The  suspension   bridge   which   spanned  the   Thames   at   Charing 
Cross,  on  the  site  of  the  present  railway  bridge,  was  designed  and 
constructed  by  Mr.  Brunei  between  the  years  1841  and  1845.     It 
consisted  of  a  centre   span  of  676   feet,  and  two  side   spans   of 
343  feet  each.     Being  intended  for  foot  passengers  only,  its  width 
was  14  feet.     The  versed  sine,  or  deflection  of  the  middle  of  the 
catenary,  was  50  feet.     The  two  river  piers,  which  still  exist  up 
to  the  level  of  the  railway,  and  form  piers  of  the  present  bridge, 
were  of  brickwork,    with  large    footings  at  the  bottom,   so  as  to 
distribute    the    pressure   over    a    considerable   area.      The   whole 
structure  was   made    hollow  and  as  light  as  possible.     From  the 
level  of  the  footway  the  piers  were  carried  up  as  ornamental  cam- 
panile towers,  the  weight  of  the  chains  being  taken  by  four  ^solid 
pillars  of  brickwork,  7  feet  3  inches  square,  forming  the  angles.   Mr. 
Brunei  introduced  here  many  of  the  arrangements  he  had  designed 
for  the  Clifton  bridge.     In  order  that  the  pressure  from  the  chains 
might  be  always  vertical  on  the  piers,  the  saddles  rested  on  rollers 
working  in  oil,  on  the  level  surface  of  a  large  cast-iron  bed-plate. 
By  this  arrangement  it  was  rendered  possible  for  the  chains  of  the 
land  spans  to  leave  the  tower  at  a  greater  inclination  than  those  of 
the  middle  span,  so  that  the  chains  were  made  shorter,  and  as  they 
were  at  a  lower  level  where  they  met  the  abutment,  there  was  less 
change  in  their  direction  at  that  point,  and  consequently  less  thrust 
on  the  brickwork.     Freedom  of  horizontal  motion  was  also  secured, 
so  that,  in  the  case  of  imequal  loading  of  the  spans,  the  chains  might 
accommodate   themselves   to  the   strains,   and   move    horizontally 
until  equilibrium  was  restored.    At  each  of  the  land  abutments 
the  chains  passed  down  over  a  fixed  saddle,  at  an  inclination,  to 
anchorages  placed   at   the  bottom  of  the   abutment.     The  brick- 
work under  the  fixed  saddle  was  so  disposed  as  to  resist  directly 
the  thrust  resulting  from  the  change  of  direction  between  the  main 
chains  and  the  anchor  chains.     To  resist  any  movement   of  the 
abutments,  the  piles  on  which  they  rested  were  driven  obliquely, 
with  their  heads  inclined  from  the  river.     These  piles  were  very 
numerous,  the   abutments   spreading  out   so  as   to  cover  a    large 


60  THE  HUNGERFOED  SUSPENSION  BRIDGE. 

area  at  the  foundations.  Nearly  all  the  spaces  between  the  longi- 
tudinal, cross,  and  outside  walls  were  filled  with  concrete,  in  order 
that  the  abutments  might  be  as  massive  as  possible.  The  details  of 
the  brickwork  in  the  piers  and  abutments  showed  Mr.  Brunei's  skill 
in  the  economical  employment  of  this  material.  The  chains  were 
constructed  so  that  the  sectional  area  was  proportional  to  the  strain  ; 
the  total  area  at  the  centre  was  296  square  inches,  while  near  the 
piers  it  was  312  square  inches.  There  were  four  chains,  two  on  each 
side  of  the  bridge,  placed  one  above  the  other,  and  consisting 
each  alternately  of  ten  and  eleven  links.  The  links  were  24  feet 
long  and  7  inches  in  depth,  the  thickness  varying  so  as  to  give 
the  requisite  sectional  area. 

The  relative  diameter  of  pin,  and  proper  form  of  the  ends  of  the 
link,  wer(i  subjects  of  much  consideration,  and  many  experiments 
were  made  in  order  to  determine  these  points.  The  fact  that  two 
specimens  of  iron,  apparently  identical  in  every  respect,  sometimes 
exhibit  considerable  difference  in  their  breaking  weights,  shows 
that  an  average  of  a  great  number  of  experiments  is  required  in 
order  to  test  satisfactorily  any  proposed  refinements  of  construction. 
Mr.  Brunei,  however,  convinced  himself  by  experiment  that  he  had 
practically  arrived  at  such  a  form  of  link  and  diameter  of  pin 
that  the  chain  would  have  no  tendency  to  break  at  one  point  rather 
than  another.  The  links  were  forged  with  shoulders  near  the  eyes, 
in  order  that  by  means  of  clamps  the  pin  could  be  taken  out  and 
the  links  disengaged,  if  necessary. 

The  eflficient  action  of  the  rollers  was  demonstrated  shortly  after 
the  completion  of  the  bridge.  On  the  occasion  of  the  opening  of 
the  Corn  Exchange  by  Prince  Albert,  one  of  the  land  spans  was 
crowded  with  people,  while  the  centre  span  was  nearly  empty. 
In  consequence  of  this  the  land  chains  became  depressed  con- 
siderably below  their  normal  position ;  and  the  saddles  on  the  top 
of  the  tower  nearest  to  the  loaded  span  moved  horizontally  on 
the  "rollers  to  the  extent  of  3  inches ;  and,  when  the  crowd  bad 
dispersed,  they  returned  to  their  original  position. 

Many  years  after  the  completion  of  the  bridge  a  proposal  was 
made  to  widen  it  for  carriage  traffic ;  but  this  was  not  carried 
out,  and  eventually  the  superstructure  was  removed,  to  make  way 
for  the  bridge  of  the  Charing  Cross  Eailway.  As  the  Hungerford 
Suspension  Bridge  has  ceased  to  exist,  an  engraving  has  been  given 
of  it  (Plate  II.  p.  59),  in  order  that  some  record  of  its  appearance 
may  remain. 


61 


CHAPTER  III. 

EARLY  HISTORY   OF   THE   GREAT  WESTERN  RAILWAY. 
A.D.  1833—1835.     iETATis  27—30. 

SKETCH   OF    THE   HISTORY   OF    RAILWAYS   IN    ENGLAND    PBIOB   TO    1833 — 

THE    STOCKTON   AND    DARLINGTON THE    LIVERPOOL    AND    M^VNCHESTER 

THE  LONDON  AND  BIRMINGHAM — PROPOSED  RAILWAY  BETWEEN  LONDON 
AND  BRISTOL MB.  BRUNEL  APPOINTED  ENGINEER,  MARCH  7,  1833 SUR- 
VEY OF  THE  LINE UNSUCCESSFUL  APPLICATION  TO    PARLIAMENT  IN  1834 

SUCCESSFUL     APPLICATION    IN      1835 REMINISCENCES       OF       MR.       BRUNEL, 

1833-1835 — EXTRACT  FROM  MR.  BRUNEl's  DIARY,  WRITTEN  AT  THE 
CLOSE    OF    1835. 

Before  entering  upon  the  history  of  the  Great  Western 
and  the  other  railways  of  which  Mr.  Brunei  was  the 
engineer,  it  may  be  useful  to  give  a  brief  sketch  of  the 
development  of  the  railway  system,  previous  to  the  period 
when  he  first  became  engaged  in  works  of  this  descrip- 
tion. 

The  first  railway  in  England  designed  for  the  con- 
veyance of  general  merchandise  and  passengers,  was  the 
Stockton  and  Darlington.  An  Act  of  Parliament  author- 
ising the  construction  of  this  line  was  passed  in  1821. 

In  1823,  a  further  Act  was  obtained,  in  which  a  clause 
was  inserted,  at  the  request  of  Mr.  George  Stephenson, 
then  the  engineer  of  the  company,  taking  power  to  work 
the  railway  by  locomotive  engines,  and  to  employ  them 
for  the  haulage  of  passengers.  This  railway,  which  con- 
sisted of  a  single  line  with  four  sidings  in  the  mile,  was 
opened   for  trafiic  on  September  27,  1825.      Its   success 


62  THE  GEEAT  WESTERN  RAILWAY. 

led  at  once  to  the  promotion  of  similar  works  in  other  parts 
of  the  country. 

Next  in  order  must  be  noticed  the  celebrated  railway- 
between  Liverpool  and  Manchester.  A  project  for  con- 
structing a  line  of  railway  between  these  important  towns 
was  discussed  as  early  as  the  year  1822 ;  but  a  company 
for  carrying  it  out  was  not  formed  till  two  years  later. 
In  1825,  the  directors  applied  to  Parliament  for  an  Act; 
and  after  a  long  contest  before  a  committee  of  the  House 
of  Commons,  the  preamble  approving  of  the  construction 
of  the  railway  was  carried  by  a  majority  of  one.  The  Bill 
was,  however,  withdrawn,  as  the  first  two  clauses  em- 
powering the  company  to  make  the  line,  and  to  acquire 
land  for  that  purpose,  were  lost.*  In  the  following  year 
the  Act  was  obtained,  and  the  works  were  commenced 
under  the  direction  of  Mr.  George  Stephenson.  The  line 
was  opened  for  traffic  on  September  15,  1830. 

In  1824,  Mr.  George  Stephenson  wrote  a  report  on 
a  proposed  line  connecting  Liverpool  and  Birmingham. 
Surveys  were  made,  and  plans  deposited ;  but  the  Bill 
was  thrown  out  on  standing  orders.  A  similar  fate 
attended  the  introduction  of  a  Bill  in  1826.  In  1830,  a 
new  line  was  surveyed  by  Mr.  Joseph  Locke  and  Mr. 
Rastrick,  under  the  direction  of  Mr.  George  Stephenson. 
The  Act  was  obtained  in  1833,  and  the  railway,  which 
was  called  the  Grand  Junction,  and  is  now  a  part  of  the 
London  and  North- Western  system,  was  constructed  by 
Mr.  Locke.^ 

In  1830,  surveys  were  commenced  by  Mr.  Robert 
Stephenson  for  a  line  between  London  and  Birmingham, 
and  a  Bill  was  introduced  into  Parliament  in  1832.     The 


'  A  graphic  account  of  this  famous       Lives  of  the  Engineers,  chapter  xi. 
parliamentary  contest  will  be  found  -  See  Mr.  Smiles'   Life  of  George 

in  the  third  volume  of  Mr.  Smiles'       Steiyhenson,  p.  325. 


HISTOEY  OF  RAILWAYS  PRIOR  TO  a.d.  1833.  63 

Liverpool  and  Manchester  Railway  had  now  been  opened 
for  some  time,  and  the  promoters  of  the  Birmingham  line 
had  the  advantage  of  being  able  to  give  in  evidence  the 
results  of  the  working  of  the  earlier  undertaking.  Those 
results,  it  is  said,  were  such  as  to  startle  most  of  those 
who  heard  them.  It  was  shown  that  a  speed  had  been 
attained  double  that  of  the  fastest  stage-coach,  that  the 
cost  of  travelling  had  been  diminished  by  one  half,  and 
that  out  of  700,000  persons  carried  since  the  opening  of 
the  railway,  only  one  had  met  with  a  fatal  accident. 
The  amount  of  travelling  between  Liverpool  and  Man- 
chester had  increased  four-fold,  and  the  value  of  the 
shares  of  the  railway  had  risen  one  hundred  per  cent. 
Similar  evidence  was  given  as  to  the  results  of  the 
working  of  the  Stockton  and  Darlington  Railway,  and 
the  promoters  endeavoured  to  prove  that  advantages  at 
least  as  great  would  arise  from  the  construction  of  a 
railway  between  Birmingham  and  London.  They  were 
successful  in  the  House  of  Commons;  but,  they  failed  to 
convince  the  Upper  House  that  the  benefits  which  such  a 
railway  would  confer  on  the  country  traversed  by  it  were 
sufficient  to  entitle  its  promoters  to  receive  for  it  the 
sanction  of  the  legislature.  The  Bill  was  again  intro- 
duced in  the  following  session  (1833) ;  and,  strange  to 
relate,  it  passed  both  Houses  almost  without  opposition.* 

Meanwhile,  the  principal  merchants  of  Bristol,  who  had 
in  1825  made  an  attempt  to  get  up  a  railway  company, 
were  urged  forward,  both  by  the  inadequacy  of  their 
communications  with  the  metropolis,  and  by  the  success 
of  the  Liverpool  and  Manchester  Railway,  to  make  another 
effort.  In  the  autumn  of  1832  a  committee  was  formed 
of  members  of  the  corporation,  and  other  public  bodies  of 

'  Sec  Mr.  Smiles'  Lives  of  the  Engineers,  vol.  iii.  chap.  xv. 


64  THE  GREAT  WESTERN  RAILWAY.  [a.-d.  1833. 

the  city  of  Bristol,  to  carry  out  the  project  of  a  railway  to 
London. 

The  first  step  taken  by  the  committee  was  the  ap- 
pointment of  an  engineer  to  make  the  preliminary  surveys, 
and  to  prepare  an  estimate  of  the  cost  of  the  undertaking. 

Among  the  candidates  for  the  post  was  Mr.  Brutnel. 
He  was  well  known  in  Bristol  as  the  engineer  of  the 
Clifton  Suspension  Bridge,  and  of  the  works  for  the 
improvement  of  the  Floating  Harbour.  He  had  made 
many  friends  among  the  leading  citizens,  and  they  used 
their  best  exertions  to  procure  his  election;  but  there 
were  several  other  candidates  in  the  field  who  had  great 
local  interest,  and  the  contest  was  a  close  one. 

While  the  issue  was  yet  undecided,  an  unexpected 
difficulty  arose.  Some  members  of  the  committee  resolved 
to  select  their  engineer  by  means  of  a  competition  among 
the  candidates,  as  to  which  of  them  would  provide  the 
lowest  estimate.  Upon  this  being  announced,  Mr.  Brunei 
declared  that  he  must  withdraw  his  name,  as  he  could 
not  consent  to  become  a  party  to  so  objectionable  a  pro- 
ceeding. *  You  are  holding  out,'  he  wrote  to  the  com- 
mittee, '  a  premium  to  the  man  who  will  make  you  the 

*  most  flattering  promises.  It  is  quite  obvious  that  the 
'  man  who  has  either  least  reputation  at  stake,  or  who 
'  has  most  to  gain  by  temporary  success,  and  least  to  lose 

*  by  the  consequences  of  disappointment,   must  be  the 

*  winner  in  such  a  race.'  Happily,  this  plan  was  aban- 
doned ;  Mr.  Brunei  obtained  a  majority  of  votes,  and  was 
appointed  engineer  on  March  7,  1833. 

He  commenced  the  survey  without  delay ;  and  in  ad- 
dition to  his  strictly  professional  duties,  he  assisted  in 
forming  a  committee  in  London,  and  took  a  leading  part 
in  the  consultations  which  were  held  upon  various  im- 
portant matters  connected  with  the  general  interests  of 
the  undertaking. 


.TiT.  27.]  PRELIMINARY  SURVEYS.  65 

A  hasty  siii'vey  of  the  country  between  London  and 
Bristol  occupied  him  till  the  middle  of  June  ;  and  as  soon 
as  it  was  completed,  and  the  course  of  the  line  settled  on, 
preparations  were  made  for  placing  the  scheme  before  the 
public. 

The  first  public  meeting  was  held  on  July  30,  1833. 
Mr.  Brunei  thus  refers  to  it  in  his  diary  : — *  Got  through 

*  it  very  tolerably,  which  I  consider  great  things.     I  hate 

*  public  meetings :  it  is  playing  with  a  tiger,  and  all  you 

*  can  hope  is,  that  you  may  not  get  scratched,  or  worse.' 
The  result,  however,  seems  to  have  been  successful,  and 
in  a  month's  time  a  company  was  formally  constituted, 
and  the  parliamentary  survey  commenced. 

Mr.  Brunei  organised  a  staff  of  assistants,  at  that  time 
rather  a  difficult  task,  and  set  them,  to  work  on  various 
parts  of  the  line.  His  own  duty  of  superintendence 
severely  taxed  bis  great  powers  of  work.  He  spent  seve- 
ral weeks  travelling  from  place  to  place  by  night,  and 
riding  about  the  country  bj''  day,  directing  his  as- 
sistants, and  endeavouring,  very  frequently  without  suc- 
cess, to  conciliate  the  landowners  on  whose  property  he 
proposed  to  trespass. 

His  diary  of  this  date  shows  that  when  he  halted  at  an 
inn  for  the  night,  but  little  time  was  spent  in  rest,  and 
that  often  he  sat  up  wi'iting  letters  and  reports  until  it 
was  almost  time  for  his  horse  to  come  round  to  take  him 
on  the  day's  work.  '  Between  ourselves,'  he  wrote  to  Mr. 
Hammond,  his  assistant,  *  it  is  harder  work  than  I  like. 
'  I  am  rarely  much  under  twenty  hours  a  day  at  it. 

A  great  portion  of  this  labour  was  for  the  time  thrown 
away,  for  as  November  30  drew  near,  it  became  evident 
that  subscriptions  were  not  coming  in  to  the  extent  which 
would  enable  the  directors  to  lodge  a  Bill  for  the  whole 
line  in  the  session  of  1 834. 


66  THE  GREAT  WESTERN  RAILWAY.  [a.d.  1833. 

The  directors  therefore  determined  to  apply  to  Parlia- 
ment for  powers  to  make  a  railway  from  London  to  Read- 
ing, and  from  Bath  to  Bristol,  '  as  a  means  of  facilitating 
'  the  ultimate  establishment  of  a  railway  between  London 
*  and  Bristol ; '  postponing  till  a  future  session  their  ap- 
plication for  an  Act  to  enable  them  to  complete  the  under- 
taking by  making  the  line  from  Reading  to  Bath. 

The  Bill  was  introduced  into  the  House  of  Commons, 
and  on  March  10,  Lord  Granville  Somerset  moved  that 
it  be  read  a  second  time.  This  motion  was  seconded  by 
the  Earl  of  Kerry,  and  supported  by  several  influential 
members,  amongst  whom  were  Mr.  Labouchere  (the  late 
Lord  Taunton)  and  Mr.  Daniel  O'Connell. 

The  second  reading  was  carried  by  a  majority  of  ninety 
in  a  House  of  274  members. 

The  Bill  was  then  referred  to  a  committee  which  met  on 
April  16,  Lord  Granville  Somerset  being  in  the  chair. 
Evidence  was  called  to  prove  the  advantages  of  the  railway 
to  the  agricultural  and  trading  community  of  the  country 
through  which  it  would  pass,  even  if  only  the  two  proposed 
divisions  of  the  line  were  constructed. 

The  traffic  in  merchandise  between  Bristol  and  London 
was  at  this  time  principally  carried  on  by  means  of  water 
carriage,  consisting,  first  of  the  river  Avon  navigation  from 
Bristol  to  Bath,  next  of  the  Kennet  and  A.von  Canal  from 
Bath  to  Reading,  and  lastly  of  the  river  Thames  from 
Reading  to  London.  The  evidence  went  to  show  that 
the  distance  between  London  and  Reading,  which  by  rail- 
way would  be  thirty-six  miles,  amounted  by  the  river  to 
nearly  eighty;  that  the  delays  and  impediments  arising 
from  drought,  flood,  and  frosts  on  the  rivers,  were  such  as 
sometimes  to  detain  barges  for  several  weeks  ;  and  that  so 
great  were  the  consequent  uncertainties  and  inconveni- 
ences of  this  navigation,  that  goods  which  came  as   far 


JET.  28.]       HOUSE  OF   COMMONS  COMMITTEE,  a.d.  1834.  67 

as  Reading  by  the  canal,  M'^ere  frequently  sent  thence  to 
London  by  road,  although  at  a  great  increase  of  expense. 
Even  under  the  most  advantageous  circumstances,  goods 
could  not  be  conveyed  from  Reading  to  London  in  less 
than  three  days,  or  in  less  than  a  day  by  the  river  Avon 
from  Bath  to  Bristol.  It  wsls  therefore  contended,  that 
to  form  a  railway  w^hich  should  supersede,  or  at  all  events 
come  in  aid  of,  the  worst  portions  of  the  navigation 
between  London  and  Bristol,  would  be  an  important  public 
benefit.^  The  various  advantages  of  the  measure  were 
most  fully  discussed  in  an  investigation  which  lasted 
during  fifty-seven  days.  Against  the  Bill  was  arrayed 
every  class  of  opponent  that  a  private  Bill  could  possibly 
encounter.  Those  interested  in  the  canals,  rivers,  and 
stage-coaches,  opposed  it  from  the  fear  of  competition; 
the  inhabitants  of  Windsor  opposed  it,  because  the  rail- 
way did  not  run  so  near  to  the  town  as  they  wished ;  the 
corporation  of  Maidenhead  opposed  it,  because  they 
thought  that  all  the  traffic  which  paid  toll  on  their  bridge 
over  the  Thames  would  be  diverted  to  the  railway ;  land- 
owners and  farmers  near  town  opposed  it,  because  they 
feared  it  would  bring  produce  to  London  from  a  distance, 
as  cheap  as  that  supplied  by  themselves. 

There  was  another  very  formidable  class  of  opponents 
to  the  Bill,  consisting  of  landed  proprietors  and  owners  of 
houses  in  the  immediate  neighbourhood  of  London. 

Many  engineers  were  called  by  these  several  opponents, 
to  show  that  a  more  advantageous  line  of  railway  might 
have  been  selected;  but,  upon  sifting  the  merits  of  the 
various  new  lines  proposed,  it  became  apparent  that  the 
one  chosen  by  Mr.  Brunei  was  the  best.     Indeed,  although 

•  By  mpans  of  the  railway  (it  was       or  four  hours,    and   from    Bath   to 
said)  goods  woiild  be  conveyed  with      Brif<tol  in  one  hour, 
ease  from  London  to  Reading  in  three 

r  2 


68  THE  GEEAT   WESTERN  EAILWAY.  [a.d.  1831. 

some  ti'ifling  deviations  of  liis  Kne  were  suggested,  the 
opposing  engineers  admitted  tliat  in  all  essential  features 
the  railway  had  been  most  skilfully  laid  out.  It  was 
generally  agreed  that  the  line  through  the  valley  of  the 
Thames,  and  thence  in  a  direction  north  of  the  Marl- 
borough Downs,  was  the  only  proper  course  for  a  railway 
between  Bristol  and  London,  as  the  levels  were  much 
better,  and  communication  could  be  made  with  much 
greater  ease  with  the  northern  and  South  Wales  districts, 
than  if  the  route  to  the  south  of  the  Marlborough  Downs 
had  been  selected. 

The  plans  proposed  for  entering  London  raised  great 
opposition.  In  this  respect  public  feeling  has  greatly 
changed,  for  now  no  railway  is  thought  complete  which 
has  not  a  terminus  in  the  heart  of  London ;  and  it  is 
considered  an  advantage  for  houses  to  be  within  easy 
reach  of  a  railway  station  ;  but  in  1834  such  a  neighbour 
was  looked  upon  with  horror  and  dismay — a  nuisance  to 
be,  if  possible,  absolutely  prohibited. 

When  Mr.  Brunei  commenced  the  survey  for  the  London 
terminus,  he  had  some  idea  of  bringing  the  railway  in  on 
the  south  side  of  the  Thames ;  but  this  was  abandoned,  as 
it  was  found  to  involve  very  heavy  works,  and  the  line 
proposed  in  the  first  Bill  was  made  to  terminate  on 
the  north  side  of  the  river  at  Vauxhall  Bridge.  It  was 
to  have  been  carried  on  a  viaduct  24  feet  high,  with  a 
parapet  6  feet  6  inches  high,  to  prevent  the  passengers 
looking  into  the  windows  of  the  neighbouring  houses. 

The  owners  of  the  land  through  which  this  part  of  the 
line  would  pass  were  influential  members  of  the  Upper 
House,  and  therefore  the  directors  thought  it  useless  to 
brave  their  opposition ;  accordingly,  on  the  thirteenth 
day  of  the  hearing,  they  abandoned  the  last  two  miles 
of  the  viaduct,  and  proposed  to  stop  at  the  '  Hoop  and 


ii:T.  29.]      HOUSE   OF   COMMONS   COMMITTEE,   a.d.    1834.  69 

*  Toy,'  a  public-house  near  tlie  site  of  the  South  Kensington 
Station  of  the  Metropolitan  Eailwaj. 

But  although  the  opposition  of  some  of  the  landowners 
was  conciliated  hj  this  concession,  that  portion  of  the  line 
through  Brompton  which  had  not  been  abandoned  was 
attacked  with  unabated  energy.  The  residents  in  Brompton 
opposed  the  Bill  from  the  apprehension  that  the  railway 
would  interfere  with  their  quiet  and  seclusion ;  Brompton 
being  at  that  time  considered,  at  any  rate  by  one  of  the 
counsel  for  the  opposition,  '  the  most  famous  of  any  place 

*  in  the  neighbourhood  of  London  for  the  salubrity  of  its 

*  air,  and  calculated  for  retired  residences.'  They  could 
not,  indeed,  be  blamed  for  indulging  in  these  apprehen- 
sions, if  they  really  believed  in  their  counsel's  statement 
that  *  streams  of  fire  would  proceed  from  the  locomotive 

*  engines.' 

Others  objected  to  the  viaduct  itself  as  being  an  under- 
taking of  so  colossal  a  nature  as  hardly  to  be  practicable ; 
and  the  supposed  increase  of  traffic  and  consequent  ob- 
struction in  Piccadilly  and  other  leading  thoroughfares 
brought  down  upon  the  promoters  the  opposition  of  the 
Commissioners  of  Metropolitan  Roads. 

All  these  objections  were  made  the  ground  of  much 
argument  in  committee,  and  doubtless  had  great  influence 
over  the  minds  of  those  who  voted  against  the  Bill. 

The  engineering  evidence  occupied,  as  might  be  expected, 
the  greater  part  of  the  forty-two  days  during  which 
witnesses  were  examined  before  the  committee,  and  of 
these  forty-two  days  no  less  than  eleven  were  taken  up  by 
the  cross-examination  of  Mr.  Brunei.  So  protracted  a 
cross-examination  has  probably  never  been  heard  in  any 
court  or  committee-room.  One  of  those  present  thus 
describes  it : — • 

'  The   committee -room   was   crowded  with  landowners 


70  THE  GREAT  WESTERN  RAILWAY.  [a.d.  1834. 

*  and  others  interested  in  the  success  or  defeat  of  the  Bill, 
'  and  eager  to  hear  Brunei's  evidence.     His  knowledge  of 

*  the  country  surveyed  by  him  was  marvellously  great,  and 
'  the  explanations  he  gave  of  his  plans,  and  the  answers  he 

*  returned  to  questions  suggested  by  Dr.  Lardner,  showed  a 

*  profound  acquaintance  with  the  principles  of  mechanics. 

*  He  was  rapid  in  thought,  clear  in  his  language,  and  never 
'  said  too  much,  or  lost  his  presence  of  mind.     I  do  not 

*  remember  ever  having  enjoyed  so  great  an  intellectual 
'  treat  as  that  of  listening  to  Brunei's  examination,  and  I 
'  was  told  at  the  time  that  George  Stephenson  and  many 

*  others  were  much  struck  by  the  ability  and  knowledge 
'  shown  by  him.' 

In  his  evidence,  Mr.  George  Stephenson  stated  that  he 
did  not  know  any  existing  line  so  good  as  that  proposed 
by  Mr.  Brunei.     'I  can  imagine  (he  said)  a  better  line, 

*  but  I  do  not  know  of  one  so  good.'  ^ 

At  length,  on  the  fifty-fourth  day  of  the  sittings  of  the 
committee,  Mr.  Harrison,  K.C.,  rose  to  reply  on  behalf  of 
the  promoters,  and  on  the  conclusion  of  his  address  the 
Bill  was  passed. 

In  the  House  of  Lords  the  second  reading  was  moved 
by  Lord  Whamcliffe.  It  was  opposed,  and  on  a  division 
being  taken,  the  motion  was  lost  by  a  majority  of  seven- 
teen (30  content  and  47  non-content).  The  Bill  was 
therefore  thrown  out. 

•  During  Mr.  Stephenson's   cross-  '  Counsel.     I  feel  the  disadvantage, 

examination,  several   questions  were  '  Mr.  Bte'phenson.     I  am  siire  you 

put  to  him  as  to  the  dangerous  conse-  '  must.' 

quenees  which  might  be  expected  to  In  other  parts  of  the  engineering  evi- 

result  from  travelling  through  a  tunnel  dence  there  are  some  statements  which 

a  thousand  yards  long.     At  length  he  read  strangely  enough  at  the  present 

lost  all  patience  at  the  ignorance  dis-  day,  as   for  example  the   following  : 

played  by  the  questions  put  to  him  by  '  The  noise  of  two  trains  passing  in  a 

counsel,  and  the  following  passage  of  '  timnel  would  shake  the  nerves  of  this 

arms  took  place  : —  '  assembly.     I   do  not  know   such  a 

'  Mr.  Stephenson.     I  wish  you  had  '  noise.      No  passenger  would  be  in- 

'  a  little  engineering  knowledge— you  '  duced  to  go  twice.' 

*  would  not  talk  to  me  so. 


JET.  29.]      HOUSE  OF  COMMONS  COMMITTEE,  a.d.    1834.  71 

The  directors,  undaunted  by  their  defeat,  lost  no  time 
in  making  preparations  for  bringing  a  Bill  before  Parlia- 
ment in  the  session  of  1835,  with  such  improvements  as 
the  experience  of  the  past  campaign  suggested  to  them. 
Taking  into  consideration  the  various  grounds  on  which 
opposition  had  been  raised  to  the  plans  they  had  proposed 
for  entering  London  through  the  Brompton  district,  they 
opened  negotiations  with  the  London  and  Birmmgham 
Railway  Company,  and  arrangements  were  concluded  by 
which  the  traffic  of  the  Great  Western  Railway  was  to  be 
carried  upon  the  London  and  Birmingham  line  for  the 
first  four  miles  out  of  London,  the  junction  being  made 
a  little  to  the  west  of  the  Kensal  Green  Cemetery. 

They  had  also  during  the  autumn  raised  money  enough 
to  enable  them  to  apply  to  Parliament  for  powers  to 
construct  the  whole  of  the  line  from  London  to  Bristol. 
They  thus  escaped  all  the  sarcastic  observations  which  had 
been  made  upon  the  scheme  of  1834,  of  which  it  had  been 
said,  that  it  would  be  a  head  and  a  tail  without  a  body, 
and  neither  '  Great '  nor  *  Western,'  nor  even  a  '  railway ' 
at  all,  but  '  a  gross  deception,  a  trick,  and  a  fraud  upon  the 
'  public,  in  name,  in  title,  and  in  substance  ! ' 

On  March  9,  the  earliest  day  allowed  by  the  standing 
orders,  the  Bill  was  read  a  second  time  and  committed. 
A  division  being  taken  on  the  motion  for  committal,  there 
appeared  in  favour  of  the  motion  160,  and  against  it  none 
but  the  tellers. 

Shortly  after  its  first  meeting,  the  committee,  of  which 
Mr.  Charles  Russell,  then  member  for  Reading,  was 
chairman,  came  to  the  resolution  that,  inasmuch  as  the 
evidence  given  in  the  previous  year  as  to  the  public  ad- 
vantages of  a  Bristol  railway  had  been  referred  to  them 
by  order  of  the  House,  they  needed  no  further  evidence 
on    that    subject.     Counsel   were    therefore   directed  to 


72  THE  GEEAT  WESTERN  RAILWAY.  [a.d.  1835. 

confine  tlieir  case  as  much  as  possible  to  the  merits  of  the 
line  proposed. 

Evidence  was  called  by  the  opponents  chiefly  with  a 
view  to  show  the  advantages  of  a  proposed  line  from 
Basing  to  Bath,  and  the  inexpediency  of  granting  an 
entirely  new  line  of  115  miles  in  length  to  the  Great 
Western  Railway  Company,  which  involved  the  con- 
struction of  a  *  monstrous  and  extraordinary,'  'most  dan- 
'  gerous  and  impracticable,  tunnel'  at  Box,  and  this,  when 
44  miles  of  railwa}'  in  a  western  direction — viz.  as  far  as 
Basingstoke,  had  already  been  sanctioned  by  the  legisla- 
ture in  the  Southampton  Railway  Act,  passed  in  the 
previous  session.  The  promoters  of  the  Bill  contended 
that  the  levels  of  the  Basing  and  Bath  line  were  not  so 
good  as  those  proposed  for  their  own,  and  that  the  Great 
Western  Railway  would  approach  almost  every  town  of 
importance  situated  on  the  proposed  Basing  and  Bath 
line,  by  means  of  short  branches ;  whilst  at  the  same  time 
it  presented  the  great  advantage  of  being  capable  of  easy 
extension  to  Gloucester  and  Wales,  and  to  Oxford,  an 
object  wholly  unattainable  by  the  other  line.  In  reply  to 
these  assertions,  the  opponents  maintained  that  although 
the  levels  of  the  Basing  and  Bath  Railway  presented 
greater  inclinations  than  those  of  the  Great  Western,  yet 
that  they  were  so  balanced  as  that  the  rises  and  falls 
compensated  one  for  another,  so  as  to  render  the  line 
practically  level.  The  enunciation  of  this  theory  called 
forth  a  remark  by  the  chairman  that  according  to  this 
principle  the  Highlands  of  Scotland  would  be  as  good  as 
any  other  place  for  the  construction  of  a  railway. 

The  preamble  was  voted  proved,  and  the  Bill  passed 
the  House  of  Commons  without  further  opposition,  and 
on  May  27  was  read  a  first  time  in  the  Lords.     On  June 


XT.  29.]  PAELIAMENTARY  CONTESTS,  a.d.    1835.  73 

10,  the  second  reading  was  carried  after  a  sharp  debate, 
the  numbers  being  46  contents,  and  34  non-contents. 

Lord  Wharncliffe  was  chairman  of  the  committee.' 
The  proceedings  began  by  an  opposition  on  the  standing 
orders,  which,  after  much  skirmishing,  were  voted  to  have 
been  complied  with.  The  promoters,  however,  judged 
from  the  nature  of  the  first  day's  proceedings,  that  they 
had  to  expect  a  contest  of  no  inconsiderable  duration  ;  and 
the  result  proved  their  anticipations  to  have  been  correct. 
For  forty  days  the  battle  was  fought  with  a  degree  of 
earnestness  and  vigour  on  both  sides,  almost  unequalled 
in  any  similar  proceedings. 

The  committee  soon  came  to  the  same  decision  as  the 
House  of  Commons,  that,  with  regard  to  the  advisability 
of  a  Bristol  railway,  they  were  satisfied,  and  needed  no 
further  evidence.  The  case  became  then  one  of  mere 
comparison  between  the  relative  merits  of  the  two  lines 
proposed. 

The  case  in  support  of  the  Bill  occupied  eighteen  days, 
and  was  closed  with  a  speech  by  the  Hon.  John  Talbot. 

Mr.  Serjeant  Merewether,  whom  the  opponents  had 
chosen  as  their  leader  in  the  House  of  Lords,  was  then 
heard  on  their  behalf,  and  occupied  no  less  than  four  days 
in  the  delivery  of  his  speech,  in  which  certainly  no  argu- 
ment that  ingenuity  could  devise  was  omitted  to  strengthen 
his  case.  There  was  hardly  any  conceivable  injury  which, 
according  to  the  learned  Serjeant's  notions,  the  Great 
Western  Railway  would  not  inflict.  It  was  said  that  the 
Thames  would  be  choked  up  for  want  of  traffic,  the 
drainage  of  the  country  destroyed,  and  Windsor  Castle 
left  unsupplied  with  water.     As  for  Eton  College  it  would 

'  At  this  time  the  Lords'  commit-  sidered  indecorous  for  peers  who  had 
tees  were  open  to  all  peers  who  chose  not  attended  any  of  the  previous  sit- 
to  sit  on  them,  and  it  was  not  con-       tings  to  vote  on  the  division. 


74  THE  GEEAT  WESTERN  RAILWAY.  [a.d.  1835. 

be  absolutely  and  entirely  ruined :  London  would  pour  forth 
the  most  abandoned  of  its  inhabitants  to  come  down  by 
the  railway  and  pollute  the  minds  of  the  scholars,  whilst 
the  boys  themselves  would  take  advantage  of  the  short 
interval  of  their  play  hours  to  run  up  to  town,  mix  in  all 
the  dissipation  of  London  life,  and  return  before  their  ab- 
sence could  be  discovered.  Moreover,  while  the  beauty  of 
the  country  and  the  retirement  of  private  dwellings  would 
be  destroyed,  the  interests  of  the  public  would  be  far  more 
effectually  served  by  the  adoption  of  the  Basing  and  Bath 
line,  and  a  line  from  the  London  and  Birmingham  Rail- 
way to  Gloucester.  This  was  in  fact  the  point  at  issue, 
and  on  this  the  result  of  the  contest  depended.  The  pro- 
moters of  the  Bill  had  called,  in  support  of  their  line,  in 
addition  to  Mr.  Brunei,  who  being  engineer  to  the  com- 
pany might  be  considered  an  interested  witness,  Mr.  Locke, 
Mr.  Palmer,  Mr.  Price,  Mr.  George  Stephenson,  and 
Mr.  Vignoles.  They  expressed  their  unqualified  appro- 
bation of  the  line  chosen  by  Mr.  Brunei,  and  of  the 
estimates  he  had  prepared. 

The  preamble  was  proved,  and  after  an  unsuccessful 
opposition  the  Bill  was  read  a  third  time,  on  August  27. 
The  E/Oyal  Assent  was  given  on  the  last  day  of  that  month.  ^ 

During  this  contest  Mr.  Brunei  made  among  his  fellow- 
labourers  many  deep  and  lasting  friendships.  One  of  the 
most  intimate  of  these  friends,  Mr.  St.  George  Burke,  Q.C., 
has,  in  compliance  with  a  request  made  to  him,  furnished 


"  The  Great  Western  Railway  was  near  Kensal  Green.     This  change  of 

constructed  with  but  few  deviations  plan  was  rendered  necessary  by  reason 

from   the    line   sanctioned   in    1835.  of  a  difficulty  having  arisen  between 

The  only  alteration  of  any  importance  the  two  companies  as  to  the  terms  of 

was  at  the  London  end,  where,  by  an  their  agreement,  and  not,  as  has  been 

Act  passed  in  1836,  the  line  was  taken  often  stated,  in   consequence   of  the 

to  Paddington,  instead  of  joining  the  adoption  of  the  broad  gauge  on  the 

London    and    Birmingham    Railway  Great  Western  line. 


JET.  30.]    REMINISCENCES  OF  MR.   BRUNEL,  a.t>.  1833—1835.      75 

the  following  reminiscences  of  his  intercourse  with  Mr. 
Brunei  during  the  progress  of  the  Bill  through  Parlia- 
ment. 

March  9,  1869. 

'  Mj  dear  Isambard, — You  wish  me  to  supply  you  with 

*  reminiscences  of  my  old  associations  with  your  father,  in 
'  order  that,  in  your  biography  of  him,  you  may  present  a 

*  true  picture  of  those  features  of  his  character  which  so 

*  endeared  him  to  his  most  intimate  friends. 

*  For  many  years  it  was  my  good  fortune  to  enjoy  his 

*  friendship,  and  many  of  the  pleasantest  hours  of  my  life 

*  were  due  to  it. 

*  For  a  period  of  nearly  three  years,  viz.  during  the 

*  contest  for  the  Great  Western  Railway  Bill,  I  think  that 
'  seldom  a  day  passed  without  our  meeting,  whether  for 

*  purposes   of  business   or  pleasure,  both   of  which  his 

*  buoyant   spirits  enabled  him  to  combine  in  a  manner 

*  which  I  have  seldom  seen  equalled. 

*  It  would  be  wearisome  to  detail  the  many  incidents 

*  which  occurred  illustrative  of  the  singularly  facile  manner 

*  in  which,  in  the  midst  of  the  heaviest  and  most  responsible 

*  labours,  he  could  enter  into  the  most  boyish  pranks  and 

*  fun,  without  in  the  least  distracting  his  attention  from  the 

*  matter  of  business  in  which  he  was  engaged ;  but  all  who 

*  knew  him  as  I  did  could  bear  testimony  to  this  charac- 
'  teristic  of  his  disposition. 

*  I  believe  that  a  more  joyous  nature,  combined  with  the 

*  highest  intellectual  faculties,  was  never  created,  and  I 

*  love  to  think  of  him  in  the  character  of  the  ever  gay  and 
'  kind-hearted  friend  of  my  early  years,  rather  than  in  the 

*  more  serious  professional  aspect  under  which  your  pages 

*  will,  no  doubt,  rightly  depict  him. 

*In  1833  your  father  and  I  occupied  chambers  facing 

*  each  other  in  Parliament  Street,  and  as  my  duties  involved 


76  THE  GREAT  WESTERN  RAILWAY. 

*  the  superintendence,  as  Parliamentary  agent,  of  the  com- 
'  pliance  with  all  the  Standing  Orders  of  Parliament,  and 
'  very  frequent  interviews  and  negotiations  with  the  land- 
'  owners  on  the  line,  we  were  of  necessity  constantly  thrown 
'  together.  To  facilitate  our  intercourse,  it  occurred  to 
'  your  father  to  carry  a  string  across  Parliament  Street, 

*  from  his  chambers  to  mine,  to  be  there  connected  with  a 
'  bell,  by  which  he  could  either  call  me  to  the  window  to 

*  receive  his  telegraphic  signals,  or,  more  frequently,  to 

*  wake  me  up  in  the  morning  when  we  had  occasion  to  go 
'  into  the  country  together,  which,  it  is  needless  to  observe, 
'  was  of  frequent  occurrence  ;  and  great  was  the  astonish- 

*  ment  of  the  neighbours  at  this  device,  the  object  of  which 
'  they  were  unable  to  comprehend. 

*  I  believe  that  at  that  time  he  scarcely  ever  went  to 
'  bed,  though  I  never  remember  to  have  seen  him  tired  or 

*  out  of  spirits.  He  was  a  very  constant  smoker,  and  would 
'  take  his  nap  in  an  arm-chair,  very  frequently  with  a  cigar 

*  in  his  mouth ;  and  if  we  were  to  start  out  of  town  at  five 
'  or  six  o'clock  in  the  morning,  it  was  his  frequent  practice 

*  to  rouse  me  out  of  bed  about  three,  by  means  of  the  bell, 

*  when  I  would  invariably  find  him  up  and  dressed,  and  in 
'  great  glee  at  the  fun  of  having  curtailed  my  slumbers  by 
'  two  or  three  hours  more  than  necessary. 

'  No  one  would  have  supposed  that  during  the  night  he 
'  had  been  poring  over  plans  and  estimates,  and  engrossed 
'  in  serious  labours,  which  to  most  men  would  have  proved 

*  destructive  of  their  energies  during  the  following  day ; 
'  but  I  never  saw  him  otherwise  than  full  of  gaiety,  and 
'  apparently  as  ready  for  work  as  though  he  had  been 
'  sleeping  through  the  night. 

*  In  those  days  we  had  not  the  advantage  of  railways, 
'  and  were  obliged  to  adopt  the  slower,  though  perhaps  not 
'  less  agreeable,  mode  of  travelling  with  post-horses.    Your 


REMINISCENCES  OF  MR.  BRUNEL,  a.d.  1833-183.5.      77 

'  father  had  a  britzska,  so  arranged  as  to  carry  his  plans  and 
'  engineering  instruments,  besides  some  creature  comforts, 
'  never  forgetting  the  inevitable  cigar-case  among  them ; 

*  and  we  would  start  by  daybreak,  or  sometimes  earlier,  on 

*  our  country  excursions,  which  still  live  in  my  remembrance 

*  as  some  of  the  pleasantest  I  have  ever  enjoyed ;  though  I 

*  think  I  may  safely  say  that,  pleasurable  as  they  were,  we 

*  never  lost  sight  of  the  business  in  which  we  were  engaged, 

*  and  for  which  our  excursions  were  undertaken. 

*  I  have  never  known  a  man  who,  possessing  courage 
'  which  to  many  would  appear  almost  like  rashness,  was 

*  less  disposed  to  trust  to  chance  or  to  throw  away  any 

*  opportunity  of  attaining  his  object  than  was  your  father. 
'  I  doubt  not  that  this  quality  will  be  fully  exemplified  in 

*  the  details  which  you  will  have  received  of  his  engineering 

*  experiments ;  but  I  speak  of  him  also  in  the  character  of 

*  a  diplomatist,  in  which  he  was  as  wary  and  cautious  as 
'  any  man  I  ever  knew. 

*  We  canvassed  many  landowners  together,  and  I  had 

*  plenty  of  opportunities  of  judging  of  his  skill  and  caution 

*  in  our  discussions  with  them,  though  we  had  many  a  good 

*  laugh  afterwards  at  the  arguments  which  had  been  ad- 

*  dressed  to  us  as  to  the  inutility  and  impolicy  of  the  scheme 
'  in  which  we  were  engaged,  and  the  utter  ruin  it  would  be 
'  sure  to  entail  on  its  promoters,  as  well  as  on  the  country 

*  affected  by  it. 

'  I  frequently  accompanied  him  to  the  west  of  England, 
'  and  into  Gloucestershire  and  South  Wales,  when  public 
'  meetings  were  held  in  support  of  the  measures  in  which 
'  he  was   engaged,    and   I  had   occasion   to  observe  the 

*  enormous  popularity  which  he  everywhere  enjoyed.     The 

*  moment  he  rose  to  address  a  meeting  he  was  received 

*  with  loud  cheers,  and  he  never  failed  to  elicit  applause  at 
'  the  end  of  his  address,  which  was  distinguished  as  much 


78  THE  GREAT  WESTERN  RAILWAY. 

*  by  simplicity  of  language  and  modesty  of  pretension  as 
'  by  accurate  knowledge  of  his  subject. 

*  Yours  very  truly, 

*  St.  Geoege  Bueke. 

'  Isambard  Brunei,  Esq.' 

The  following  is  an  extract  from  Mr.  Brunei's  diary, 
written  at  the  end  of  the  year  1835  : — 

53  Parliament  Street,  December  26. 

"What  a  blank  in  my  journal  \^the  last  entry  is  dated  January 
1834],  and  during  the  most  eventful  part  of  my  life.  When  last  I 
wrote  in  this  book  I  was  just  emerging  from  obscurity.  I  had  been 
toiling  most  unprofitably  at  numerous  things,  unprofitabl}',  at  least, 
at  the  moment.  The  railway  was  certainly  being  thought  of,  but 
still  very  uncertain.  What  a  change.  The  railway  now  is  in 
progress.  I  am  thus  engineer  to  the  finest  work  in  England.  A 
handsome  salary,  on  excellent  terms  with  my  directors,  and  all 
going  smoothly.  But  what  a  fight  we  have  had,  and  how  near 
defeat,  and  what  a  ruinous  defeat  it  would  have  been.  It  is  like 
looking  back  upon  a  fearful  pass ;  but  we  have  succeeded. 

And  it  is  not  this  alone,  but  everything  I  have  been  engaged  in 
has  been  successful.  Cliilon  bridge — my  first  child,  my  darling,  is 
actually  going  on  :  recommenced  work  last  Monday — glorious !  ! 
[_Here  follows  a  list  of  the  undertakings  on  which  he  was  then  engaged^] 
I  think  this  forms  a  pretty  list  of  real  sound  professional  work,  un- 
sought for  on  my  part,  that  is,  given  to  me  fairly  by  the  respective 
parties — all,  except  the  Wear  Docks,  resulting  from  the  Clifton  bridge, 
which  I  fought  hard  for,  and  gained  only  by  persevering  struggles. 
.  .  .  And  this  at  the  age  of  twenty-nine.  I  really  can  hardly 
believe  it,  when  I  think  of  it.  I  am  just  leaving  53  Parliament 
Street,  where  I  may  say  I  have  made  my  fortune,  or,  rather,  the 
foundation  of  it,  and  I  have  taken  18  Duke  Street. 


79 


CHAPTEE  IV. 

RAILWAY  WORKS. 
A.D.  1835—1859.     JETATis  30—54. 

CONSTRUCTION    OF   THE    GREAT    WESTERN  RAILWAY THE  BOX    TUNNEI, THB 

BATH     AND     BRISTOL     STATIONS THE     PADDINGTON      STATION — THE      GREAT 

WESTERN     HOTEL BRANCHES    AND     EXTENSIONS     OF    THE     GREAT    WESTERN 

RAILWAY TH^   BRISTOL  AND    EXETER    RAILWAY RAILWAYS    IN    DEVONSHIRE 

AND    CORNWALL RAILWAYU  TO  BASINGSTOKE,  TO  WEYMOUTH,  AND  TO    SALIS- 
BURY  IN    SOUTH  WALES IN  IRELAND — IN    ITALY IN    INDIA SUPERVISION 

OF     WORKS ME.     BRUNEl's     ENGINEERING     STAFF HIS     REPUTATION     AS     A 

WITNESS REMINISCENCES    OF   MR.    BRUNEI.,    1835-1838. 

In  the  extract  from  Mr.  Brunei's  diary  given  at  the 
close  of  the  last  chapter  he  refers  to  the  successful  issue 
of  the  contest  for  the  Great  Western  Railway  Act  as  a 
very  important  event  in  his  life. 

As  the  result  proved,  he  did  not  take  too  hopeful  a  view 
of  his  future  prospects ;  for  from  that  time  to  his  death 
he  was  fully  employed  as  the  engineer  of  railways 
which,  in  number  and  importance,  were  not  inferior  to 
those  of  any  of  his  contemporaries.  Of  the  main  lines  he 
constructed,  one  extends  uninterruptedly  from  London  to 
the  Land's  End,  and  another  to  the  extremity  of  South 
Wales,  at  Milford  Haven,  285  miles  from  Paddington. 

It  would  be  impossible  to  describe  in  detail  all  the 
engineering  works  which  are  to  be  found  on  Mr.  Brunei's 
railways,  the  aggregate  length  of  which  is  upwards  of 
1,200  miles ;  but  in  this  chapter  it  is  proposed  to  give  a 
brief  sketch  of  the  lines  he  constructed,  omitting  all  that 


80  RAILWAY  WORKS. 

can  be  more  properly  inserted  in  the  three  chapters  which 
follow,  relating  to  the  broad  gauge,  to  the  Atmospheric 
System,  and  to  the  bridges  and  viaducts. 

The  Great  Western  Railway  was  opened  to  Maidenhead, 
a  distance  of  nearly  twenty-three  miles,  in  June  1838, 
aud  to  Twyford,  eight  miles  farther  on,  in  July  1839.  A 
description  of  the  Wharnclifife  Viaduct  at  Hanwell  will  ba 
found  at  j).  172,  and  of  the  Maidenhead  bridge  at  p.  173. 

The  line  from  Twyford  to  Reading  was  opened  in  March 
1840,  and  from  Reading  to  Chippenham  by  May  1841. 
Meanwhile  the  portion  from  Bristol  to  Bath  had  been 
opened  in  August  1840.  The  last  division,  namely,  that 
from  Chippenham  to  Bath,  containing  the  Box  Tunnel, 
was  opened  on  June  80,  1841 ;  and  the  railway  was  com- 
pleted throughout  its  whole  length.  • 

A  considerable  part  of  the  history  pf  the  Great 
Western  Railway  is  connected  with  the  adoption  on  it  of 
the  broad,  or  7-foot  gauge,  and  will  be  dealt  with  in  the 
next  chapter,  in  which  is  also  given  some  account  of 
the  longitudinal  system  of  permanent  way. 

The  bridges  are  described  in  Chapter  VII. ;  but  some  of 
the  other  works  may  be  noticed  here. 

In  laying  out  the  line,  Mr.  Brunei  endeavoured  to  make 
it  as  straight  and  as  level  as  possible  throughout,  and  to 
concentrate  those  changes  of  level,  which  could  not  be 
avoided,  into  short  inclines,  to  be  worked,  if  necessary,  by 
auxiliary  power. 

Accordingly  the  line  is  thus  divided  : — • 

Miles     Yai-ds 

Level,  or  with  an  inclination  not  exceeding 

4  feet  in  the  mile 67         88 

Above  4  feet,  and  not  exceeding  8  feet  in  the 

mile        .......       47       110 

Steep  inclines 3     1210 


THE   GKEAT   WESTERN   RAILWAY.  81 

The  steep  inclines  are  two  in  number,  of  a  gradient  of  1 
in  100,  or  about  53  feet  in  a  mile,  and  descend  towards  the 
Bristol  end  of  tbe  line. 

The  Wootton  Basset  incline,  85|^  miles  from  London,  is 
1  mile  550  yards  long. 

The  second  incline  is  at  Box,  99  miles  from  London,  and 
is  2  miles  660  yards  in  length.  An  assistant  engine  is 
still  occasionally  used  to  work  heavy  trains  at  this  point. 

On  this  incline  the  line  passes  through  the  Box  Tunnel. 
This  tunnel  is  the  first  out  of  London,  and  could  only  have 
been  dispensed  with  by  taking  a  circuitous  route  several 
miles  longer  than  that  adopted  by  Mr.  Brunei. 

The  tunnel  is  1|  mile  in  length,  and  is  ventilated  by 
six  shafts.  They  are  30  feet  in  diameter,  and  from  70  to 
300  feet  deep. 

The  Box  Tunnel  had  been  the  subject  of  much  criticism 
before  the  works  were  commenced  ;  and  during  its  actual 
construction  it  did  not  escape  the  unfavourable  notice  of 
those  who  Avere  ignorant  of  the  difficulties  which  presented 
themselves,  and  the  means  which  had  been  taken  to  over- 
come them.  Indeed,  for  some  time  after  the  opening  of 
the  line,  there  were  travellers  who  used  to  avoid  the  terrors 
of  the  tunnel  by  posting  along  the  turnpike  road  in  that 
part  of  their  journey. 

Mr.  Brunei  never  troubled  himself  about  the  ordinary 
gossip  which  is  always  circulated  concerning  any  remark- 
able work  ;  but  matters  assumed  a  different  aspect  when, 
a  year  after  the  completion  of  the  tunnel,  doubts  were 
expressed  as  to  its  safety  by  an  eminent  geologist,  at  a 
meeting  of  the  Institution  of  Civil  Engineers.  Mr.  Brunei, 
who  was  on  terms  of  friendly  intercourse  with  the  speaker, 
addressed  to  him  the  following  letter : — 

June  21,  1842. 
I  assure  you,  my  dear  Sir,  that  when  my  attention  had  been 
drawn  to  the  statements  reported  to  have  been  made  by  you  on  this 

G 


82  RAILWAY   WORKS. 

subject,  I  refrained  as  far  as  possible  from  expressing  any  opinion. 
I  tliought  it  my  duty  to  read  the  notes  taken,  but  I  never  said  that 
I  thought  your  statements  were  correct.  Indeed,  I  had  hoped  to 
have  avoided  the  necessity  of  making  any  observations  upon  these 
statements ;  but  as  a  letter  to  Mr.  Saunders  on  such  a  subject  is 
almost  the  same  thing  as  if  it  were  addressed  to  myself,  and  as  it  was 
shown  to  me,  it  would  not  be  candid  towards  you  if  I  now  refrained 
from  saying,  that  the  opinions  you  are  reported  to  have  expressed 
with  respect  to  the  Box  Tunnel  are  by  no  means  considered  coiTect, 
either  by  myself  or  by  those  others  who,  from  being  intimately  ac- 
quainted with  the  rock  as  it  was  really  found,  and  the  works  as  they 
were  really  executed,  are  capable  of  judging. 

In  the  notes  shown  to  me  the  observations  alluding  to  this  work 
in  particular,  as  an  illustration  of  the  views  you  were  explaining, 
appear  to  have  been  curtailed,  and  the  allusions  rendered  somewhat 
less  direct ;  but  still  the  inference  unavoidably  to  be  drawn  from 
them  is,  that  the  back  joints,  as  we  call  them,  and  other  defects 
which  exist  originally,  or  which  show  themselves  after  a  time,  in  this 
rock,  are  not  well  known,  and  tolerably  Avell  understood  and  guarded 
against,  by  practical  engineers,  and  even  by  our  workmen.  In  this 
opinion  I  assure  you  you  are  mistaken.  Ignorant  as  I  may  probably 
be  myself  of  the  science  of  geology,  I  cannot  have  been  engaged  for 
several  years  in  making  very  extensive  excavations,  probably  the 
largest  hitherto  made,  in  this  particular  rock,  having  also  the  oppor- 
tunity of  examining  very  old  and  large  quarries  in  the  same  rock 
and  close  to  the  line,  having  among  my  assistants  men  not  meanly 
acquainted  with  this  particular  branch  of  geology,  and  surrounded 
by  workmen  of  considerable  experience,  I  cannot  have  gone  through 
such  a  study  without  acquiring  a  very  intimate  and  practical  know- 
ledge of  the  structure  and  peculiarities  of  the  particular  mass  of  rock 
which  is  now  in  question  ;  and  I  will  say  frankly  what  I  feel  upon 
this  point,  which  is,  that  I  ought  now  to  possess  a  more  thorough  and 
practical  knowledge  of  this  particular  rock  and  its  defects,  and  the 
best  mode  of  remedying  them,  than  even  you  yourself,  with  your 
immeasurably  greater  scientific  knowledge  of  rocks  generally. 

The  opinion  you  are  said  to  have  expressed  of  there  being  gi'eat 
danger  of  some  serious  accident  occurring  in  the  tunnel  is,  I  am 
firmly  convinced,  erroneous ;  at  all  events  the  i-eason  given  convinces 
me  that  you  have  not  become  acquainted  with  the  means  which  have 
been  taken  by  me  to  examine  and  to  ascertain  the  security  of  every 
part  of  the  rock,  to  remove  or  to  support  with  masonry  any  part  not 
so  ascertained  to  be  secure,  or  with  the  precautions  taken  to  prevent 


THE  BOX  TUNNEL.  83 

any  such  accidents  as  those  you  hare  imagined.  And  notwithstand- 
ing the  heavy  responsibility  which  rests  upon  me,  from  all  which 
yoii  gentlemen  of  science  are,  happily  for  yourselves,  so  free,  I  feel 
that  as  regards  the  works  of  the  Box  Tunnel  everything  necessary 
has  been  done  to  render  them  secure,  and  that  the  doubts  and  fears 
you  have  so  easily  raised,  but  which  it  might  be  more  difficult  again 
to  set  at  rest,  are  entirely  unfounded. 

In  conclusion,  I  must  observe  that  no  man  can  be  more  sensible 
than  I  am  of  the  great  advantage  it  would  be  to  me  as  a  civil  engi- 
neer to  be  better  acquainted  with  geology,  as  well  as  with  many 
other  branches  of  science,  that  I  have  endeavoured  to  inform  my- 
self on  the  subject,  and  that  I  have  not  altogether  thrown  away  the 
many  opportunities  afforded  me  in  my  professional  pursuits ;  but 
that  if  from  a  conviction  that  you  possessed  information  far  more 
extensive  than  mine,  if  from  doubts  of  the  sufficiency  of  my  abilities 
or  the  means  I  was  likely  to  bring  to  bear  upon  the  subject,  if  from 
a  fear  of  such  consequences  as  you  now  anticipate,  you  had  kindly, 
on  any  one  of  the  many  occasions  Avhen  I  have  had  the  pleasure  of 
meeting  you,  intimated  that  you  had  any  suggestions  to  make  to  me, 
I  should  have  been  anxious  to  have  availed  myself  of  your  assist- 
ance. But  after  the  lapse  of  years,  the  first  intimation  I  have  of 
such  doubts  is  the  very  public  expression  of  a  very  strong  opinion, 
which,  if  weight  be  attached  to  it,  must  tend  to  alarm  the  public 
unnecessarily,  and  to  injure  the  value  of  the  property  of  individuals 
who  have  embarked  several  millions  in  that  property. 

Betwreen  Chippenham  and  Bristol  the  nature  of  the 
building  stone  enabled  Mr.  Brunei,  at  moderate  cost,  to 
make  the  bridges,  tunnel  fronts,  and  stations  ornamental 
features  in  the  picturesque  scenery  through  which  the 
railway  passes. 

He  took  great  pleasure  in  finishing  minutely  the  various 
designs,  and  making  them  correct  in  their  proportions 
and  details.  One  tunnel  front,  near  Bristol,  may  be  singled 
out  for  especial  mention.  During  its  construction  a  part 
of  the  ground  behind  slipped  away,  and  it  became  unneces- 
sary to  complete  the  top  of  one  of  the  side  walls.  It  was 
therefore  left  unfinished,  and  was  planted  with  ivy  so  as 
to  present  the  appearance  of  a  ruined  gateway. 

G  2 


84  EAILWAY  WORKS. 

The  roofs  of  the  Bath  and  Bristol  stations  are  of  large 
span,  and  are  handsome  architectural  structures.  They 
are  each  in  the  form  of  a  Tudor  arch ;  the  Bristol  roof 
is  72  feet  span,  and  the  Bath  roof  50  feet  span.  The 
framing  is  an  example  of  a  peculiar  form  of  construction, 
somewhat  analogous  to  that  adopted  in  the  large  ship- 
building sheds  in  the  dockyards.  There  are  no  cross 
tie-rods,  but  each  principal  of  the  roof  is  formed  of 
two  frameworks,  like  cranes,  meeting  in  the  middle  of 
the  roof;  the  weight  being  carried  on  columns  near  the 
edge  of  the  platform,  and  the  tail  ends  of  the  frames  held 
down  by  the  side  walls.  As  the  two  frames  do  not  press 
against  each  other  at  their  meeting  point  at  the  ridge  of 
the  roof,  there  is  no  outward  thrust.  The  side  walls  being 
on  a  viaduct  could  not  without  difficulty  have  been  made 
to  resist  a  horizontal  thrust. 

At  the  Bristol  station  Mr.  Brunei  introduced  hydraulic 
machinery  for  working  lifts.  By  these  the  waggons  were 
lowered  to  and  raised  up  from  the  goods  shed,  which  was 
placed  at  the  level  of  the  ground,  about  12  feet  below  the 
railway. 

Although  the  works  already  described  were  completed 
in  1841,  the  permanent  terminus  at  Paddington  was  not 
commenced  till  the  year  1849.  It  was  completed  in  1854, 
Previously  to  that  time  a  temporary  station  had  been 
used,  the  booking  offices  being  under  the  arches  of  the 
Bishop's  Road  bridge. 

As  the  level  of  the  railway  was  lower  than  that  of  the 
surrounding  land,  no  exterior  architectural  effect  could 
be  produced ;  but  Mr.  Brunei  took  this  opportunity  to 
carry  out  his  views  as  to  the  proper  structural  use  of 
metal  in  'works  of  this  description. 

In  the  design  of  the  ornamental  details,  he  obtained  the 
assistance  of  Mr.  (now  Sir  Matthew)  Digby  Wyatt. 


THE  PADDINGTON  STATION.  85 

The  interior  of  the  principal  part  of  the  station  is  700 
feet  long  and  238  feet  wide,  divided  in  its  width  by  two 
rows  of  columns  into  three  spans  of  68,  102,  and  68  feet, 
and  is  crossed  at  two  points  by  transepts  50  feet  wide, 
which  give  space  for  large  traversing  frames.  The  roof  is 
very  light,  consisting  of  wrought-iron  arched  ribs,  covered 
partly  with  corrugated  iron  and  partly  with  the  Paxton 
glass  roofing,  which  Mr.  Brunei  here  adopted  to  a  con- 
siderable extent.  The  columns  which  carry  the  roof  are 
very  strongly  bolted  down  to  large  masses  of  concrete,  to 
enable  them  to  resist  sideways  pressure. 

This  station  may  be  considered  to  hold  its  own  in 
comparison  with  the  gigantic  structures  which  have  since 
been  built,  as  well  as  with  older  stations.  The  appear- 
ance of  size  it  presents  is  due  far  more  to  the  proportions 
of  the  design  than  to  actual  largeness  of  dimension. 
The  spans  of  the  roof  give  a  very  convenient  subdivision 
for  a  large  terminal  station,  dispensing  with  numer- 
ous supporting  columns  and  at  the  same  time  avoiding 
heavy  and  expensive  trusses.  The  graceful  forms  of  the 
Paddington  station,  the  absence  of  incongruous  orna- 
ment and  useless  buildings,  may  be  appealed  to  as  a 
striking  instance  of  Mr.  Brunei's  taste  in  architecture  and 
of  his  practice  of  combining  beauty  of  design  with  eco- 
nomy of  construction. 

The  goods  station  was  erected  at  about  the  same  time 
as  the  passenger  station,  and  is  remarkable  for  the 
completeness  of  its  arrangements,  and  for  the  great  use 
made  of  hydraulic  machinery.  This  is  also  applied  in  the 
passenger  station.^ 

'  Sir  William  Armstrong's  hydraulic  '  plied  it  [water  pressure  machinery] 

machinery  at  Paddington  is  described  '  extensively  to  railway  purposeschiefly 

by  him   in  a  communication  printed  '  under  the  direction  of  Mr.  Brunei,  who 

in  the  Report  of  the  British  Association  '  has  found  a  multitude  of  cases  involv- 

for  1854,  p.  418:    *!   have  also  ap-  '  iug  lifting  or  traction  power  in  which 


86  KAILWAY  WORKS. 

In  connection  with  the  Paddington  station  mention 
may  be  made  of  the  Great  Western  Hotel,  which  was 
hnilt  at  the  extremity  of  the  land  belonging  to  the 
railway  company. 

When,  in  1854,  no  tenant  could  be  found  for  it,  a  few 
of  the  shareholders  of  the  Great  Western  Railway,  being 
unwilling  that  the  building  should  remain  empty  and  be 
a  loss  to  the  proprietors,  formed  themselves  into  a  com- 
pany to  lease  and  work  the  hotel.  Mr.  Brunei  became 
a  Director,  and  shortly  afterwards  (in  December  1855)  the 
chairman.  He  occupied  this  post  till  his  death,  by  which 
time  the  hotel  had  become  very  prosperous.  He  found 
attendance  at  the  meetings  of  the  Directors  and  the 
supervision  of  the  management  of  the  hotel  a  very  agree- 
able relaxation  from  the  more  important  duties  which  took 
him  to  Paddington. 

The  branches  and  extensions  of  the  Great  Western 
Railway,  as  far  as  their  history  affected  the  general  in- 
terests of  the  company,  are  referred  to  in  the  chapter  on 
the  broad  gauge.  Branches  were  opened  to  Oxford  in  1844, 
to  Windsor  in  1849,  to  Wycombe  in  1854,  to  Uxbridge  in 
1866,  to  Henley  in  1857,  and  to  Brentford  in  July  1859. 

The  Bristol  and  Exeter  Railway  is  a  continuation  of  the 
Great  Western  Railway,  and  was  opened  to  Exeter  in 
1844.  The  two  portions  of  it,  from  Bristol  to  Taunton, 
and  from  Taunton  to  Exeter,  are  in  marked  contrast  to 
each  other.  The  former  part  of  the  line  is  almost  level, 
and  has  very  easy  curves.     Between  Taunton  and  Exeter 

'  it  may  be  made  available.     Most  of  '  from  one  level  to  another,  the  moving 

'  these  applications  are  well  exempli-  '  of  turn-tables,   and  the   hauling  of 

'  fied  at  the  nevr  station  of  the  Great  '  trucks  and  traversing  machines  are 

*  Western  Railway  Company  in  Lon-  '  all  performed,  or  about  to  be  so,  by 

'  don,  where  the  loading  and  unloading  '  means  of  hydraulic  pressure  supplied 

'  of  trucks,  the   hoisting  into  ware-  '  by   one   central  steam   engine  with 

'  houses,  the  lifting  of  loaded  trucks  '  connected  accumulators.' 


SOMEESETSHIRE— DEVONSHIEE— COENWALL.  87 

it  passes  over  the  liigh  ground  on  the  borders  of  Devon- 
shire, with  the  Whitehall  Tunnel  at  the  summit,  f  mile  in 
length.  On  this  part  of  the  line  there  are  long  gradients 
of  from  1  in  80  to  1  in  120.  Mr.  Brunei  resigned  the 
position  of  engineer  in  1846,  in  consequence  of  differences 
having  arisen  between  the  Bristol  and  Exeter  and  the  Great 
Western  Companies,  which,  in  Mr.  Brunei's  opinion, 
made  it  impossible  for  him  to  continue  engineer  to  both 
railways. 

The  South  Devon  Railway,  and  the  adoption  on  it  of  the 
Atmospheric  System,  are  described  in  Chapter  VI.  In 
connection  with  this  line  is  the  important  Torquay  branch, 
and  the  railway  in  continuation  of  it  to  Dartmouth. 
This  was  completed  as  far  as  Paignton  during  Mr.  Brunei's 
lifetime. 

The  South  Devon  and  Tavistock  Railway  branches  off 
from  the  South  Devon  Railway  near  Plymouth,  and  has 
several  large  viaducts. 

On  the  Cornwall  Railway  from  Plymouth  to  Truro,  and 
the  West  Cornwall  Railway  from  Truro  to  Penzance,  the 
most  remarkable  works  are  the  viaducts,  and  the  Royal 
Albert  Bridge. 

In  the  case  of  the  Cornwall  Railway,  it  became  necessary 
to  reduce  the  capital  expenditure,  even  at  the  cost  of  in- 
creasing the  charges  for  maintenance.  With  this  object 
the  line  was  re-examined  and  modifications  introduced, 
principally  by  an  increase  in  the  extent  of  viaduct.  These 
lines  pass  through  a  very  difficult  country ;  involving  the 
adoption  of  steep  gradients  and  sharp  curves.  Mr.  Brunei, 
in  a  memorandum  written  in  1845,  after  having  explained 
his  reasons  for  considering  that  the  prejudicial  effects  of 
gradients  and  curves  were  commonly  overrated,  gives  the 
following  opinion  in  reference  to  the  proposed  Cornwall 
Railway  : — 


Univfrg!ty  or  Tc;.gNTo 


88  EAILWAY  WOEKS. 

I  must  not  be  understood  to  argue  against  the  advantage  of  straight 
lines  or  lai-ge  and  easy  curves,  but  I  wish  to  show  that  where  small 
curves  are  unavoidable,  they  can  in  practice  be  so  constructed  as  not 
to  be  very  prejudicial ;  and  I  consider  that  the  character  of  the 
country  in  Cornwall  is  such  that  no  railway  can  be  constructed  at 
any  moderate  expense  without  either  sacrificing  all  consideration 
for  the  interests  of  localities  and  the  position  of  the  population  to 
the  mere  choice  of  levels,  or  without  steep  gradients  and  sharp 
curves. 

The  principal*  lines  brancliing  off  from  the  Great 
Western,  and  since  incorporated  w^ith  it,  are,  on  the  south, 
the  Berks  and  Hants,  from  Reading  to  Basingstoke  and 
Hungerford;  and  the  Wilts  and  Somerset,  to  Weymouth 
and  Salisbury.  On  the  north-west  is  the  Cheltenham  and 
Great  Western  Union  Railway,  from  Swindon  to  Chelten- 
ham and  Gloucester.  This  line  passes  through  the  Cots- 
wold  Hills  at  Sapperton  by  a  tunnel  If  mile  in  length. 
The  Gloucester  and  Dean  Forest  Railway  runs  from  Glou- 
cester to  Grange  Court,  and  thence  to  Ross  and  Hereford. 

The  South  Wales  Railway,  which  extends  from  Grange 
Court  to  Milford  Haven,  contains  a  tunnel  at  Swansea  ^ 
mile  long,  and  some  of  Mr.  Brunei's  most  important 
works,  including  the  Chepstow  bridge  and  several  other 
bridges  of  considerable  size,  and  the  viaducts  at  Landore 
and  Newport.  There  are  also  on  this  line  four  opening 
bridges  across  navigable  channels.  The  works  at  the 
termination  of  the  line  at  Neyland,  in  Milford  Haven, 
are  described  in  Chapter  XIV.  Mr.  Brunei  considered 
that  Milford  Haven,  with  its  excellent  harbour,  which  can 
be  entered  at  all  times  of  tide  by  the  largest  vessels, 
would  probably  become  a  great  port  for  ocean  steamers, 
and  especially  for  the  '  Great  Eastern '  and  ships  of  her 
class. 

There  are  also  in  South  Wales  the  following  railways  : 
the  Taff  Vale,  the  Vale  of  Neath,  the  Llynvi  Valley,  and 


SOUTH  WALES.  89 

the  South  Wales  Mineral.  The  Taff  Vale,  a  line  from 
Cardiff  to  Merthyr,  was  opened  on  the  narrow  gauge  in 
1841.^  On  this  railway  is  the  lofty  masonry  viaduct  at 
Quaker's  Yard. 

On  the  Yale  of  Neath  Railway,  from  JsTeath  to  Aberdare 
and  Merthyr,  there  is  a  tunnel,  near  Merthyr,  1^  mile 
long,  and  650  feet  below  the  summit  of  the  hill. 

Full  advantage  is  taken  on  this  railway  of  the  facili- 
ties which  the  broad  gauge  offers  for  heavy  traffic.  The 
line  has  long  steep  gradients,  and  the  locomotives  used 
on  it,  of  the  class  known  as  tank  engines,  are  of  great 
power.  One  of  these  gradients  is  4|  miles  long,  with 
an  inclination  of  1  in  50.  Large  quantities  of  coal  are 
brought  downi  by  this  railway  to  the  Swansea  and  Briton 
Ferry  Docks.  The  coal  of  South  Wales  is  of  a  friable 
nature,  and,  in  order  to  avoid  the  breakage  consequent 
on  the  ordinary  mode  of  shipping  coal,  by  tipping  it 
down  a  shoot,  Mr.  Brunei  introduced  on  a  large  scale 
the  use  of  trucks  carrying  four  iron  boxes,  each  box  about 
4  feet  8  inches  cube,  and  containing  two  and  a  half  tons 
of  coal.  At  the  docks  machinery  is  provided  by  which 
each  box  is  lowered  down  into  the  hold  of  the  ship,  and 
the  under  side  being  allowed  to  open,  the  coal  is  de- 
posited at  once  on  the  bottom  of  the  vessel. 

The  Llynvi  Yalley  Railway  is  a  short  line,  leading  from 
the  South  Wales  Railway  at  Bridgend  into  the  coal  and 
iron  districts. 

The  South  Wales  Mineral  Railway  is  another  line  of 
the  same  class.  It  passes  through  a  very  heavy  country, 
and  has  on  it  a  self-acting  incline  of  1  in  9,  |  mile  long, 
worked  by  a  rope,  and  a  tunnel  f  mile  long,  and  470  feet 
below  the  surface. 

In   connection  with   the   South  Wales  district  is  the 

'  See  p.  104. 


90  EAILWAY  WORKS. 

Bristol  and  South  Wales  Union  Railway,  a  line  running 
from  Bristol  to  the  banks  of  the  Severn,  across  which  the 
traffic  is  carried  by  a  steamer  to  a  short  branch  from  the 
South  Wales  Railway  on  the  other  side.  This  railway 
had  been  for  a  long  time  contempla,ted,  and  Mr.  Brunei 
devoted  much  time  to  a  careful  investigation  of  the  Severn 
in  order  to  determine  the  most  suitable  point  for  the 
crossing.  He  decided  that  the  best  place  would  be  at  what 
is  known  as  the  New  Passage.  The  arrangements  had  to 
be  made  in  accordance  with  the  requirements  of  the  Ad- 
miralty. Trains  run  to  the  end  of  timber  piers  extending 
into  deep  water,  and  there  are  staircases  and  lifts  leading 
to  pontoons,  alongside  which  a  steamer  can  come  at  all 
times  of  tide.  The  tide  at  this  part  of  the  Severn  rises  46 
feet. 

The  three  railways  last  mentioned  were  not  completed 
during  Mr.  Brunei's  lifetime. 

The  Bristol  and  Gloucester  Railway,  on  which  is  the 
tunnel  at  Wickwar,  |  mile  long,  was  opened  in  1844, 
and  passed  into  the  hands  of  the  Midland  Company 
in  1846. 

The  northern  extensions  of  the  Great  Western  Rail- 
way are  the  Oxford  and  Rugby,  constructed  as  far  as 
Fenny  Compton ;  the  Birmingham  and  Oxford  Junc- 
tion ;  and  the  Oxford,  Worcester,  and  Wolverhampton 
Railways. 

Mr.  Brunei  ceased  to  be  engineer  of  the  last-mentioned 
company  in  1851,  and  the  works  were  completed  by  Mr. 
Fowler.  The  Oxford,  Worcester,  and  Wolverhampton  line 
has  since,  under  the  title  of  the  West  Midland,  become  a 
part  of  the  Great  Western  Railway. 

In  Ireland  Mr.  Brunei  was  eno-ineer  of  the  line  from 


MIDLAND  COUNTIES— lEELAND— ITALY— INDIA.  91 

Dublin  to  Wicklow,  round  Bray  Head,  and  of  a  line  from 
Cork  to  Youghal. 

He  laid  out  two  railways  in  Italy,  the  line  from  Florence 
to  Pistoja,  and  that  across  the  Apennines  from  Genoa 
to  Novi  and  Alessandria,  in  the  direction  of  Turin  and 
Milan.  He  acted  as  engineer  during  the  construction  of 
the  former  line ;  but  the  works  of  the  latter  were  carried 
out  by  the  Sardinian  Government. 

One  of  the  last  of  Mr.  Brunei's  important  railways  was 
the  Eastern  Bengal  Eailway,  a  line  of  about  100  miles  in 
length,  in  a  north-easterly  direction  from  Calcutta.  He 
took  a  great  interest  in  the  work  and  devoted  much  time 
to  the  special  arrangements  and  designs,  and  to  the  best 
way  of  crossing  the  Ganges  and  its  branches  in  the  future 
extension  of  the  railway;  but  no  part  of  it  was  opened 
during  his  lifetime. 

It  was  impossible  for  Mr.  Brunei  to  look  after  all  his 
works  to  the  same  extent  as  he  had  done  in  the  case  of 
the  Great  Western  Eailway;  and  he  was  compelled  to 
spend  a  very  considerable  amount  of  time  in  attendance 
on  Committees  of  the  Houses  of  Parliament  on  behalf  of 
the  railways  to  which  he  was  engineer.  Mr.  Brunei  fre- 
quently regretted  this,  and  considered  it  a  great  evil  that 
engineers  were  prevented  by  their  duties  during  the  session 
from  attending  properly  to  the  construction  of  their  works. 
He  endeavoured  as  far  as  possible  to  superintend  the 
execution  of  his  different  undertakings.  He  availed  him- 
self of  every  opportunity  of  examining  them,  and  was 
acquainted  throughout  with  all  the  designs  which  were 
prepared.  He  would  take  advantage  of  two  or  three  free 
days  to  go  down  to  the  distant  works  in  South  Wales  or 
in  Cornwall,  looking  after  details,  such  as  the  pickling 
tanks  for  timber,  and  the  masonry  of  the  viaducts. 


92  EAILWAY  WOKKS. 

He  was  fortunate  in  the  selection  of  the  members  of 
his  staff,  and  in  his  organisation  of  it.  He  had  a  rare 
power  of  utilising  the  capabilities  of  his  different  assist- 
ants ;  and  although  he  had  to  deal  with  a  great  variety 
of  men,  he  managed  that  they  should  work  in  harmony 
with  him.  From  the  complete  personal  supervision  Mr. 
Brunei  sought  to  maintain  over  all  his  works,  his  assist- 
ants had  not  perhaps  so  many  opportunities  of  indepen- 
dent action  as  they  might  otherwise  have  obtained,  but 
they  had,  on  the  other  hand,  the  advantage  of  constant 
personal  communication  with  their  chief. 

After  the  time  when  Mr.  Brunei's  works  became  so 
numerous,  and  his  time  so  much  occupied,  that  he  could 
not  exercise  in  person  that  general  supervision  which  he 
conceived  to  be  necessary,  he  was  ably  assisted  by  Mr. 
Robert  Pearson  Brereton,  who,  on  the  death  of  Mr.  Ham- 
mond in  1847,  became  the  chief  of  his  engineering  staff. 

Mr.  Brunei  rarely  made  any  changes  in  the  personnel  of 
his  office.  Mr.  Brereton  had  become  one  of  his  assistants 
in  1836;  and  his  secretary,  the  late  Mr.  Joseph  Bennett, 
came  to  him  in  the  same  year. 

The  Great  Western  Railway  retained  its  early  place  in 
his  affections,  and  among  his  most  valued  friends  were 
members  of  the  Board  of  Directors,  Mr.  Saunders  the 
Secretary,  and  other  officers  of  the  company.  When  in  the 
last  year  of  his  life  he  was  obliged  to  go  to  Egypt  for  his 
health,  it  was  a  matter  of  deep  anxiety  to  him  lest  his 
absence  from  England  should  cause  any  alteration  in  his 
relations  with  the  Company,  and  it  was  a  source  of  great 
pleasure  to  him  that  no  such  consequences  followed. 

Mr.  Brunei's  position  as  confidential  adviser  of  so  large 
a  number  of  railway  companies  gave  him  frequent  oppor- 
tunities of  acting  as  mediator  between  contending  parties; 


MR.  BRUNELS  ENGINEERING  STAFF.  '   93 

and  his  decisions  were  always  received  with  respect,  for  he 
was  known  to  be  scrupulously  just. 

Besides  the  more  friendly  task  of  reconciling  opponents 
he  had  a  large  practice  as  a  referee  under  Acts  of  Parlia- 
ment and  orders  of  the  superior  courts ;  and  displayed  in 
these  matters  great  judicial  abilities. 

In  all  the  causes  and  parliamentary  contests  affecting 
the  various  companies  of  which  he  was  engineer,  Mr. 
Brunei  was  a  very  important  member  of  the  preliminary 
consultations,  and  during  the  proceedings  counsel  relied 
with  confidence  on  his  suggestions. 

One  of  the  most  arduous  parts  of  his  duty,  as  engineer 
of  the  Great  Western  Eailway  Company,  was  connected 
with  the  conduct  of  the  great  cases  of  Eanger  and 
Macintosh.  To  the  former  of  these  reference  is  made  in 
the  letter  printed  below,  at  p.  478.  The  Macintosh  case, 
which  was  commenced  shortly  after  the  opening  of  the  line, 
was  not  concluded  before  Mr.  Brunei's  death.  He  was 
compelled  to  devote  a  considerable  portion  of  his  time  to 
it,  even  after  his  return  home  in  the  evening,  during  the 
launch  of  the  '  Great  Eastern.' 

Mr.  Brunei  had  a  very  high  reputation  as  a  witness. 
Mr.  St.  George  Burke,  Q.C.,  has  communicated  a  memo- 
randum on  this  subject. 

*  As  a  witness  he  could  always  be  relied  on  as  a  perfect 

*  master  of  the  case  he  had  to  support,  and  he  had  the  rare 

*  quality  of  confining  his  answers  to  a  simple  reply  to  the 

*  questions  put  to  him,  without  appearing  as  an  advocate. 

*  He  was,  however,  extremely  particular  as  to  the  questions 
'  which  should  be  put  to  him  in  his  examination  in  chief, 
'  and  was  therefore  never  satisfied  to  entrust  the  pre- 
'  paration  of  his  proof  to  the  solicitor,  without  revising  it 

*  himself. 

*  In  his  cross-examinations  he  was  generally  a  match 


94  EAILWAY  WORKS. 

*  for  the  most  skilful  counsel,  and  by  the  adroitness  of  his 

*  answers  would  often  do  as  much  to  advance  his  case  as 
'  bj  his  examination  in  chief. 

'  He  was  almost  as  much  of  a  diplomatist  as  an  en- 

*  gineer,  and  knew  perfectly  well  how  to  handle  a  case  in 

*  the   witness-box    so   as   to   leave   no   loophole   for  his 

*  opponents  to  take  advantage  of.     At  the  same  time  he 

*  was  a  perfectly  honest  witness,  and  while  he  avoided 
'  saying  more  than  was  necessary  for  the  advancement  of 
'  the   cause   in  which  he  was   engaged,   he  would  have 

*  scorned   to  say  or  imply  anything  by  his  evidence  in- 

*  consistent  with  strict  truth. 

*  Although  he  had  attained  to  great  celebrity  as  a 
'  witness,  the  committee  room  being  crowded  to  hear  him, 

*  he  always  declined  to  engage  in  the  very  lucrative  work 
'  of  a  professional  witness.     He   made  a  rule  never  to 

*  appear  except  on  behalf  of  undertakings  of  which  he  was 

*  the  engineer,  or  with   which  his  own  companies  were 

*  interested.     To  help  a  friend,  he  occasionally  but  very 

*  rarely  broke  through  this  resolve  ;  but,  whether  he  ap- 
'  peared  in  support  of  his  own  plans  or  those  of  others, 
'  there  were  few,  if  any,  professional  men  whose  evidence 
'  carried  more  weight  than  his  did  before  Parliamentary 

*  Committees.' 

The  following  memorandum  from  Mr.  George  T.  Clark, 
of  Dowlais,  formerly  one  of  Mr.  Brunei's  assistants,  con- 
tains his  recollections  of  Mr.  Brunei  during  the  construc- 
tion of  the  Great  Western  Railway : — 

'  I  made  your  father's  acquaintance,  rather  character- 

*  istically,  in  an  unfinished  tunnel  of  the  Coal-pit  Heath 

*  Railway ;  and  when  the  shaft  in  which  we  were  suspended 
'  cracked  and  seemed  about  to  give  way,  I  well  remember 

*  the  coolness  with  which  he  insisted  upon  completing  the 

*  observations  he  came  to  make.  Shortly  afterwards  I 
'  became,  at  his  request,   his  assistant ;  and  during  the 


EEMINISCENCES   OF   MR.  ERUNEL,  a.d.  1835—1838.  95 

*  parliamentary    struggle   of  1835,   and   the   subsequent 

*  organisation   of  the   staff,    and   commencement  of  the 

*  works  of  the  Great  Western,  1  saw  him  for  many  hours 

*  daily,  both  in  his  office  and  in  the  field,  travelled  much 

*  with  him,  and  joined  him  in  the  very  moderate  recreation 
'  he  allowed  himself. 

'  These  two  years,  and  the  preceding  year,  1834,  were, 

*  I  apprehend,  the  turning  points  of  his  life.  His  vigour, 
'  both  of  body  and  mind,  were  in  their  perfection.     His 

*  powers  were  continually  called  forth  by  the  obstacles  he 
'  had  to  overcome  ;  and  the  result  of  his  examinations  in 

*  the  committee  rooms  placed  him,  in  the  opinion  of  the 
'  members  of  the  legislature,  and  of  his  own  profession,  in 
'  the  very  first  rank  of  that  profession,  both  for  talents 

*  and  knowledge. 

*  I  wish  I  could  convey  to  you  even  a  tolerable  idea  of 
'  your  father  as  he  was  in  those  years,  during  which  I 
'  knew  him  intimately,  and  saw  him  often  under  circum- 
'  stances  of  great  difficulty. 

'  He  was  then  a  young  man,  but  in  the  school  of  the 
'  Thames  Tunnel  he  had  acquired  a  close  acquaintance 

*  with  all  kinds  of  masons'  and  carpenters'  work,  the 
'  strength  and  cost  of  materials,  bridge  building,  and  con- 

*  structions  under  water,  and  with  the  working  of  the 

*  steam  engine  as  it  then  stood.  It  happened  not  unfre- 
'  quently  that  it  was  desirable  to  accept  the  tender  of  some 
'  contractor  for  railway  work  whose  prices  upon  certain 
'  items  were  too  high,  and  then  it  became  the  engineer's 

*  business  to  go  into  the  details  and  convince  the  con- 

*  tractor  of  his  error.  On  such  occasions  Brunei  would 
'  go  step  by  step  through  the  stages  of  the  work,  and  it 

*  was  curious  to  see  the  surprise  of  the  practical  man  as 
'  he  found  himself  corrected  in  his  own  special  business 

*  by  the  engineer.     Thus,  I  remember  his  proving  to  an 

*  eminent  brickmaker  who  had  tendered  for  the  Chippen- 


96  EAILWAY   WOKKS. 

ham.  contract  that  the  bricks  could  be  made  much 
cheaper  than  he  supposed.  He  knew  accurately  how 
much  coal  would  burn  so  many  bricks,  what  it  would 
cost,  what  number  of  bricks  could  be  turned  out,  what 
would  be  the  cost  of  housing  the  men,  what  the  cart- 
age, and  how  many  men  it  would  require  to  complete 
the  work  in  the  specified  time.  The  contractor  was 
astonished ;  asked  if  Mr.  Brunei  had  ever  been  in  the 
brick  trade,  and  finally  took  and  made  money  by  the 
contract  at  the  proposed  figure. 

'  In  the  case  of  the  Maidenhead  bridge,  the  contractor 
being  alarmed  at  learning  that  the  arch  was  the  flattest 
known  in  brick,  Brunei  pointed  out  to  him  that  the 
weight  which  he  feared  would  crush  the  bricks,  would 
be  less  than  in  a  wall  which  he,  the  contractor,  had 
recently  built,  and  he  convinced  him  by  geometry,  made 
easy  by  diagrams,  that  the  bridge  must  stand.  Know- 
ledge of  detail  Brunei  shared  with  the  carpenter,  builder, 
or  contractor  for  earthwork,  and  he  was  their  superior  in 
the  accuracy  and  rapidity  with  which  he  combined  his 
knowledge,  and  arrived  at  correct  conclusions  as  to  the 
cost  of  the  work  and  the  time  it  would  take  to  execute  it. 

*  In  talking  to  landowners  and  others  whose  opposition 
it  was  important  to  overcome,  I  have  often  been  struck 
by  your  father's  great  powers  of  negotiation.  The  most 
absurd  objections — and  there  were  many  such — were 
listened  to  with  good  humour,  and  he  spared  no  pains  in 
explaining  the  real  facts,  so  that  it  sometimes  happened 
that  he  converted  opponents  into  supporters  of  the  rail- 
way. In  the  course  he  took  there  was  much  skilful 
diplomacy,  but  there  was  no  dishonesty,  no  humbug. 
He  was  very  frank  and  perfectly  sincere.  His  object 
was  to  impart  his  own  convictions,  and  in  that  he  often 
succeeded. 


REMINISCENCES   OF  MR.  BRUNEL,  a.d.  1835—1838.         97 

'  I  never  met  liis  equal  for  sustained  power  of  work. 

*  After  a  liard   day  spent  in   preparing   and  delivering 

*  evidence,  and  after  a  hasty  dinner,  he  would  attend  con- 

*  sultations  till   a  late  hour ;    and   then,  secure    against 

*  interruption,  sit  down  to  his  papers,  and  draw  specifica- 
'  tions,  write  letters  or  reports,  or  make  calculations  all 

*  through  the  night.     If  at  all  pressed  for  time  he  slept  in 

*  his  armchair  for  two  or  three  hours,  and  at  early  dawn 

*  he   was    ready   for   the   work   of   the   day.     When   he 

*  travelled  he  usually  started  about   four  or  five  in  the 

*  morning,  so  as  to  reach  his  ground  by  daylight.     His 

*  travelling  carriage,  in  which,  he  often  slept,  was  built 
'  from  his  own  design,  and  was  a  marvel  of  skill  and  com- 
'  fort.     This  power  of  work  was  no  doubt  aided  by  the 

*  abstemiousness  of  his  habits  and  by  his  light  and  joyous 

*  temperament.     One  luxury,  tobacco,  he  indulged  in  to 

*  excess,  and  probably  to  his  injury.     At  all  times,  even  in 

*  bed,  a  cigar  was  in  his  mouth ;  and  wherever  he  was 

*  engaged,  there,  near  at  hand,  was  the  enormous  leather 

*  cigar-case  so  well  known  to  his  friends,  and  out  of  which 

*  he  was  quite  as  ready  to  supply  their  wants  as  his  own. 

*  His  light  and  joyous  disposition  was  very  attractive. 

*  At  no  time  was  he  stern,  but  when  travelling  or  off  work 
'  he  was  like  a  boy  set  free.     There  was  no  fun  for  which 

*  he  was  not  ready,  On  the  old  Bath  road,  on  a  Wiltshire 
'  chalk  hill-side,  is  cut  a  large  horse,  the  pride  of  the  dis- 

*  trict,  and  only   inferior   in  reputation   to  that  of  the 

*  famous   Berkshire  vale.     The    people   of   the    district, 

*  afraid  to  lose  their  coach  traffic,  were  violently  opposed 
'  to  the  Great  Western  Eailway  Bill.     Talking  over  this 

*  one   evening,    some   one   suggested  turning   the   horse 

*  into  a  locomotive.    Brunei  was  much  amused  at  the  idea, 

*  and  at  once  sketched  off  the  horse  from  memory,  roughly 

*  calculated  its  area,  and  arranged  a  plan  for  converting  it 

H 


98  KAILWAY  WORKS. 

*  into  an  engine.     Ten  picked  men  were  to  go  down  in 
^  two  chaises,  and  by  moonliglit  to  peg  and  line  out  tlie 

*  new  figure,  and  then  cut  away  the  turf,  and  with  it  cover 

*  up  as  much  of  the  horse  as  might  be  left.     From  the 

*  tube  was  to  issue  a  towering  column  of  steam,  and  below 

*  was  to  be  inserted  in  bold  characters  the  offensive  letters 

*  G.  W.  R.     It  was,  of  course,  not  intended  to  carry  this 

*  joke  into  execution,  but  Brunei  often  alluded  to  it,  and 

*  laughed  over  the  sensation  it  would  have  created. 

'■  He  possessed  a  very  fine  temper,  and  was  always  ready 

*  to  check  differences  between  those  about  him,  and  to  put 

*  a  pleasant  construction   upon  any  apparent  neglect  or 
'  offence.     His  servants  loved  him,  and  he  never  forgot 

*  those  who  had  stood  by  his  father  and  himself  in  the 

*  old  Tunnel  days  of  trouble  and  anxiety. 

'  No  doubt  the  exertions  of  those  three  years,  though 

*  they  laid  the  foundation,  or  rather  built  the  fabric,  of  his 
'  reputation,  also  undermined  his  constitution,  and  even- 

*  tually  shortened  his  life.     Everything  for  which  he  was 

*  responsible  he  insisted  upon  doing  for  himself.     I  doubt 

*  whether  he  ever  signed  a  professional  report  that  was 
'  not  entirely  of  his  own  composition ;  and  ever}?-  structure 

*  upon  the  Great  Western,  from  the  smallest  culvert  up  to 

*  the  Brent  viaduct  and  Maidenhead  bridge,  was  entirely, 

*  in  all  its  details,  from  his  own  designs.' 

In  the  press  of  work  and  the  altered  circumstances 
under  which  he  superintended  the  construction  of  his  later 
railways,  many  changes  inevitably  followed.  The  open 
britzska  gave  place  to  a  close  travelling  carriage,  which  in 
its  turn  became  useless ;  and  no  time  was  left  for  fun  or 
practical  jokes ;  but  the  same  energy  of  mind  and  the 
same  kindliness  of  heart  remained  uninfluenced  by  in- 
creasing occupations  or  advancing  years. 


99 


CHAPTEE  V. 

THE  BROAD   GAUGE. 

ORIGIN    OF   THE   ORDINARY   GAUGE   OF  RAILWAYS — ADOPTION  BY  MB.  BRTTNEL 

OF   THE  BROAD  GAUGE  ON  THE  GREAT  WESTERN  RAILWAY REASONS    FOR  ITS 

ADOPTION THE   PERMANENT    WAY REPORTS    OF   MB.    NICHOLAS    WOOD    AND 

MB.     JOHN     HAWKSHAW,     1838 EXTRACT     FROM     REPORT     OF     DIRECTORS     OF 

GREAT    -WT^STEBN    RAILWAY    COMPANY     (DECEMBER    20,    1838) EXTENSION     OF 

THE    BROAD    GAUGE     SYSTEM — BREAK    OF    GAUGE — ROYAL     COMMISSION    ON 

THE    GAUGE    OF    RAILWAYS,    1845 LETTER     OF     MB.    BRUNEL    ON    THE    BROAD 

GAUGE  (august   6,  1845) GAUGE   ACT   OF   1846 — THE   MIXED    GAUGE — REPORT 

OP     RAILWAY    COMMISSIONEBS,    1847 NORTHERN    EXTENSIONS    OF   THE    GREAT 

WESTERN     RAILWAY  —  ADVANTAGES      OF     THE     BROAD      GAUGE PARTIAL 

ABANDONMENT    OF   THE   BEOAD    GAUGE. 

The  railways  designed  by  Mr.  Brunei  were,  with  a  few 
exceptions,  distinguished  from  those  in  all  other  parts  of 
England  by  a  peculiarity  in  the  width  between  the  two  rails 
forming  each  line  of  way,  or  in  what  is  called  the  gauge. 
In  most  railways,  the  distance  between  the  internal  edges 
of  the  rails  is  4  feet  8^  inches,  being  what  is  termed  the 
narrow  gauge ;  on  Mr.  Brunei's  railways,  it  was  seven  feet, 
or  what  is  termed  the  hroad  gauge. 

The  gauge  of  the  earlier  railways,  which  were  but  a 
modification  of  the  old  wooden  tramway,  was  made  that 
of  the  tram  plates  which  they  superseded ;  and  this  had 
been  originally  fixed  to  suit  the  distance  between  the 
wheels  of  the  country  carts  in  the  north  of  England. 

When  Mr.  George  Stephenson  introduced  the  loco- 
motive engine,  the  gauge  of  the  lines  in  the  Northumber- 
land district  had  been  already  fixed.  In  laying  out  the 
Stockton  and  Darlington  line  (1821-1825)  he  saw  no 
reason  to  depart  from  the  gauge  he  had  previously  adopted ; 
and,  indeed,  some  of  the  waggons  to  be  used  on  this  line 

H  2 


100  THE  BEOAD  GAUGE. 

were  brouglit  from  the  Northumberland  collieries.  In  this 
way  the  first  important  railway  in  England  was  made 
with  the  gauge  of  4  feet  8^  inches ;  not  from  a  deliberate 
choice  of  this  width  on  the  ground  of  any  peculiar  ad- 
vantages, but  from  the  mere  fact  of  its  already  being 
established  elsewhere. 

In  the  construction  of  the  Manchester  and  Liverpool 
Railway,  in  1826,  the  same  gauge  was  adopted  as  on  the 
Stockton  and  Darlington ;  this  course  was  also  followed  by 
the  Grand  Junction  and  the  London  and  Birmingham 
Railways,  and  thus  the  4  feet  8^  inches  gauge  became 
established  in  that  part  of  the  country. 

Long  experience  appears  to  have  determined  the  general 
type  of  wheeled  vehicles :  the  wheels  being  of  somewhat 
large  size,  and  the  body  placed  between  them,  so  as  to 
come  down  close  upon  the  axle-tree. 

This  type,  which  gives  obvious  advantages  in  a  me- 
chanical point .  of  view,  appears  to  have  been  adhered 
to  in  all  railway  vehicles  used  before  the  opening  of  the 
Liverpool  and  Manchester  Railway ;  these,  however,  were 
chiefly  coal- waggons.  But  on  the  Liverpool  and  Man- 
chester Railway  it  was  soon  perceived  that  the  great 
increase  of  carrying  power  which  the  railway  afforded 
must  be  met  by  a  corresponding  increase  of  space  in 
the  rolling  stock,  as  it  was  necessary  to  accommodate 
light  bulky  goods  and  passenger  traffic.  The  available 
width  between  the  wheels  was  limited  to  about  4  feet  6 
inches,  and  to  carry  in  this  width  any  large  amount  of 
cotton  goods,  or  of  passengers,  would  have  required  a 
train  of  an  inordinate  length.  To  meet  this  difficulty  a 
new  form  of  vehicle  was  designed ;  the  wheels  were  made 
small,  and  the  body  was  raised  and  widened  out,  projecting 
on  either  side  over  the  tops  of  the  wheels. 


OEIGIN   OF  THE  4  FEET  8^  INCHES  GAUGE.  101 

The  earliest  description  of  this  form  of  waggon  is  con- 
tained in  the  second  edition  of  Wood's  '  Practical  Treatise 
*on  Eailroads,'  published  in  1832,  about  two  years  after 
the  opening  of  the  Liverpool  and  Manchester  Railway. 
In  Plate  III.,  Mr.  Wood  shows  a  truck  with  a  raised 
platform  overhanging  the  wheels,  and  adapted  for  carry- 
ing loose  boxes  of  coals ;  adding,  in  the  description  : 

Although  the  drawing  shows  only  the  form  of  boxes  used  for  the 
conveyance  of  coals,  yet  it  will  readily  occur  that  the  form  can  be 
varied  to  suit  the  carriage  of  any  kind  of  articles ;  the  framework 
or  body  of  the  carriage  being  raised  above  the  wheels,  the  breadth 
can  be  extended  to  any  width  which  the  distance  between  the  railways 
[i.e.  between  the  up  and  down  lines  of  road]  will  admit  (p.  75). 

Such  was  the  state  of  matters  when,  in  the  year  1833, 
Mr.  Brunei  was  appointed  Engineer  of  the  Great  Western 
Railway.  With  the  view  of  leaving  the  question  of  gauge 
open  for  future  consideration,  he  procured  the  omission 
in  the  Great  Western  Act  of  a  clause  defining  it.  He 
came  to  the  conclusion  that  it  would  be  desirable  to  adopt 
a  wider  gauge,  and  he  recommended  this  measure  to  the 
Directors  in  a  report  dated  October  1835.* 

In  October  1836  a  Royal  Commission,  consisting  of  Mr. 
Drummond,  Under-Secretary  for  Ireland,  Mr.  R.  Griffith, 
Colonel  (now  Field-Marshal)  Sir  John  Burgoyne,  R.E.,  and 
Professor  Barlow,  of  Woolwich,  was  appointed  to  report 
on  the  establishment  of  railways  in  Ireland.  They  con- 
sidered carefully  the  question  of  gauge,  and  their  argu- 
ments in  favour  of  an  increase  in  the  gauge  were  afterwards 
stated  by  Mr.  Brunei  to  be  identical  with  his  own. 

*  No  copy  of  this  report  can  be  given  much  attention  to  the  principles 
found  ;  but  documents  of  subsequent  of  wheel  carriages,  as  is  manifested  by 
date  sufficiently  indicate  the  nature  of  an  interesting  article  '  On  Draught ' 
the  arguments  Mr.  Brunei  used  in  it.        written  by  him  for  the  work  on  '  The 

'  Horse,'  published  by  the  Society  for 

Mr.  Brunei  had  about  this  time      the  Diffusion  of  Useful  Knowledge. 


102  THE  BEOAD   GAUGE. 

They  drew  attention  to  the  advantage  of  large  wheels, 
the  use  of  which  would  be  facilitated  by  a  wider  gauge ; 
and  they  thought  it  a  matter  of  importance  to  be  able  to 
place  the  bodies  of  the  carriages  between  the  wheels,  in- 
stead of  over  them. 

It  was  the  width  of  the  carriages,  and  not  the  distance 
between  the  rails,  that  determined  the  general  dimensions, 
and  therefore  the  cost,  of  the  works  of  a  railway.  Mr. 
Brunei  saw  many  advantages  to  be  gained  by  an  increase 
in  the  gauge,  even  while  retaining  the  existing  dimensions 
of  carriages  j  and  he  thought  it  unwise  at  the  commence- 
ment of  a  work  of  such  magnitude  as  the  Great  Western 
Railway  to  retain  a  limit  the  inconvenience  of  which  had 
already  become  apparent. 

He  says,  in  his  evidence  before  the  Gauge  Commission : 

Looking  to  the  speed  which  I  contemplated  would  be  adopted 
on  railways,  and  the  masses  to  be  moved,  it  seemed  to  me  that  the 
whole  machine  was  too  small  for  the  work  to  be  done,  and  that  it 
required  that  the  parts  should  be  on  a  scale  more  commensurate 
with  the  mass  and  the  velocity  to  be  attained.     (Q.  3924.) 

The  width  between  the  rails  being  the  fundamental 
dimension  of  '  the  whole  machine,'  on  which  its  entire 
development  must  depend,  Mr.  Brunei  proposed  to  begin 
by  the  enlargement  of  this  dimension,  and  recommended 
that  on  the  Great  Western  Railway  the  gauge  should  be 
seven  feet.  He  considered  that  the  whole  of  the  parts  of 
the  railway  and  of  its  rolling  stock  would  be  susceptible  of 
continual,  though  gradual  improvement,  and  that  it  was 
highly  advisable  to  remove,  in  the  outset,  a  great  obstacle 
in  the  way  of  this  progress. 

He  did  not  in  the  first  instance  propose  any  important 
change  in  the  details  as  consequent  on  the  wider  gauge ; 


KEASONS  FOE  ADOPTION  OF  BEOAD  GAUGE.  103 

and   in  regard  to  one  of  the  principal  points,   tlie   dia- 
meter of  the  wheels,  he  said  : — 

I  am  not  by  any  means  prepared  at  present  to  recommend  any 
particular  size  of  wheel,  or  even  any  great  increase  of  the  present 
dimensions.  I  believe  they  will  be  materially  increased ;  but  my 
great  object  would  be  in  every  possible  way  to  render  each  part 
capable  of  improvement,  and  to  remove  what  appears  an  obstacle 
to  any  great  progress  in  such  a  very  important  point  as  the  dia- 
meter of  the  wheels,  upon  which  the  resistance,  which  governs  the 
cost  of  transport  and  the  speed  that  may  be  obtained,  so  materially 
depends.     (Eeport  in  Appendix  I.  p.  532.) 

Mr.  Brunei  also  looked  forward  to  the  advantages 
which  a  wider  gauge  would  give  for  the  construction  of  the 
locomotive  engines.  Difficulties  had  been  already  expe- 
rienced from  the  limited  width  between  the  wheels,  which 
cramped  the  machinery,  rendering  it  difficult  of  access  for 
repairs ;  it  also  limited  the  size  of  the  boiler  and  fire-box, 
on  which  the  power  depended.  For  this  reason  Mr. 
Brunei  considered  that  a  wider  gauge  would  present 
great  advantages,  as  it  would  allow  the  locomotives  to  be 
constructed  of  greater  power,  and  with  their  machinery  ar- 
ranged in  a  more  advantageous  manner.  He  also  thought 
that  the  greater  width  of  base  for  the  carriages  would 
give  increased  steadiness  and  smoothness  of  motion, 
with  greater  safety,  particularly  at  high  speeds,  and  that 
there  would  be  the  advantage  of  being  able  to  use  larger 
wheels  for  the  carriages.  Moreover,  he  had  in  view  the 
possibility  which  the  broad  gauge  would  give  of  adopting 
wheels  of  a  still  larger  diameter  without  raising  the  centre 
of  gravity,  the  body  of  the  carriage  being  placed  be- 
tween them,  as  in  the  original  type  of  common  road 
vehicles. 

The  broad  gauge  was  also  considered  by  Mr.  Brunei  in 
prominent  connection  with  the  peculiarly  favourable  cu'- 
cumstances  of  the  Great  Western  line,  in  regard  to  its 


104  THE  BKOAD  GAUGE. 

gradients  and  curves.  He  thonglit  that  *  it  would  not 
'  have  been  embracing  all  the  benefits  derivable  from 
'  the  gradients  of  the  Great  Western  Railway,  unless  a 
*  more  extended  gauge  was  adopted.'  In  the  first  place, 
it  was  evident  that  a  diminution  of  the  frictional  resistance 
would  present  the  greatest  advantage  where  the  gradients 
were  flat.  In  regard  to  curves,  the  wider  gauge  was  at  that 
time  considered  by  him  to  be  more  advantageously  applied 
where  the  curves  were  of  large  radius  than  where  they 
were  sharp.'  On  the  Great  Western  Eailway  both 
gradients  and  curves  were  remarkably  good;  with  the 
exception  of  two  inclines  of  1  in  100,  on  which  auxiliary 
power  was  proposed  to  be  used,  there  was  no  gradient 
between  London  and  Bristol  steeper  than  1  in  660,  the 
greater  part  of  the  line  being  nearly  level,  and  except 
between  Bath  and  Bristol  there  was  no  cm've  sharper  than 
about  one  mile  radius. 

For  these  reasons  Mr.  Brunei  thought  that  unusually 
high  speed  might  easily  be  attained  for  passengers,  and 
great  tractive  power  for  goods.     He  said : — 

I  shall  not  attempt  to  argue  with  those  who  consider  any  increase 
of  speed  unnecessary.  The  public  will  always  prefer  that  conveyance 
which  is  the  most  perfect,  and  speed,  within  reasonable  limits,  is  a 
material  ingredient  in  perfection  in  travelling.  (Report  in  Appen- 
dix I.  p.  532.) 

In  deciding  that  the  distance  between  the  rails  should 
be  seven  feet,  Mr.  Brunei  seems  to  have  been  guided  by 
the  principle  that  the  wheels  should  be  put  sufficiently  far 

'  With  regard  to  this   point,  Mr.  '  would  not  influence  me  now ;  but  at 

Brunei  afterwards   admitted  that  he  '  that  time  I  certainly  assumed  that 

had    held   a   mistaken    opinion.     In  '  the  effect  of  curves  was  such,  that 

speaking  of  his  reasons  for  adopting  '  the  radius   of  the  curve   might   be 

the  narrow  gauge  on  the  Taff  Vale  '  measured  in  xinifs  of  the  gauge,  in 

Eailway  in  1838,  he  said  before  the  '  which  I  have  since  found  myself  to 

Gauge    Commission  : — '  One    of    the  '  have  been  mistaken.' 
'  reasons,  I  remember,  was  one  which 


EEASONS  FOR  ADOPTION  OF  BEOAD  GAUGE.  105 

apart  to  admit  of  an  ordinary  carriage  body  being  placed 
between  them.* 

Mr.  Brunei  did  not  anticipate  that  the  difference  be- 
tween the  gauge  he  proposed  and  that  of  other  railways 
would  lead  to  any  important  inconvenience.  The  views 
he  held  on  this  subject  were  expressed  fully  by  him  in 
a  report  of  December  13,  1838.  He  says,  speaking  of 
the  difficulty  of  communication  between  the  Great  Western 
and  other  railways  : — 

This  is  undoubtedly  an  inconvenience;  it  amounts  to  a  pro- 
hibition to  almost  any  railway  running  northwards  from  London, 
as  they  must  all  more  or  less  depend  for  their  supply  upon  other 
lines  or  districts  where  railways  already  exist,  and  with  which  they 
must  hope  to  be  connected.     In  such  cases  there  is  no  alternative. 

The  Great  Western  Railway,  however,  broke  ground  in  an 
entirely  new  district,  in  which  railways  were  unknown.  At  present 
it  commands  this  district,  and  has  already  sent  forth  branches  which 
embrace  nearly  all  that  can  belong  to  it ;  and  it  will  be  the  fault  of 
the  company  if  it  does  not  effectually  and  permanently  secure  to 
itself  the  whole  trade  of  this  portion  of  England,  with  that  of  South 
Wales  and  the  south  of  Ireland ;  not  by  a  forced  monopoly,  which 
^  could  never  long  resist  the  wants  of  the  public,  but  by  such  attention 
to  these  wants  as  shall  render  any  competition  unnecessary  and 
hopeless.  Such  is  the  position  of  the  Great  Western  Railway.  It 
could  have  no  connection  with  any  other  of  the  main  lines,  and  the 
principal  branches  likely  to  be  made  were  well  considered,  and  almost 
formed  part  of  the  original  plan ;  nor  can  these  be  dependent  upon 
any  other  existing  lines  for  the  traffic  which  they  will  bring  to  the 
main  trimk. 

Mr.  Brunei  was  not  singular  in  holding  the  opinion  that 
it  would  be  desirable  to  allot  a  given  district  to  one  railway, 
which  might  conveniently  serve  it  by  means  of  a  trunk  line 
and  branches  of  a  special  gauge.     In  the  Eastern  Counties 

'  See  Mr.  Brunei's  report  of  August  tage  was  taken  of  the  broader  base  to 

1838,  printed  in  Appendix  I.  p.  528.  use  wheels  of  greater  diameter.   How- 

This  plan  was  never  adopted,  as  it  ever,  in  the  saloon  carriages,  where 

was  found  desirable  upon  the  broad  ease  of  travelling  was  the  chief  object 

gauge    to   use  still   wider    carriages  aimed   at,   the    bodies   were    placed 

overhanging  the  wheels ;  but  advan-  within  the  wheels. 


106  THE  BROAD  GAUGE. 

line,  designed  in  1836,  by  Mr.  Braithwaite,  and  opened  in 
1839,  a  gauge  of  5  feet  was  adopted ;  and  Mr.  Robert  Ste- 
phenson, as  engineer  of  another  line,  the  JSTorthern  and 
Eastern  Railway,  branching  out  from  the  Eastern  Coun- 
ties to  the  northward,  adopted  the  same  gauge.  It  was 
not  till  the  Northern  and  Eastern  line  was  extended,  some 
years  afterwards,  that  the  rails  of  the  whole  system  were 
altered  to  the  narrow  gauge. 

Mr.  Brunei's  recommendation  was  adopted  by  the 
Directors  of  the  Great  Western  Railway ;  and,  in  their 
report  of  August  25,  1836,  after  observing  that  the  gene- 
rally level  character  of  the  line  would  greatly  facilitate 
the  attainment  of  a  higher  speed  of  travelling,  they  pointed 
out  the  advantages  of  the  broad  gauge,  and  stated  that 
engines  had  been  ordered  specially  adaj)ted  to  the  nature 
of  the  line,  which  would  be  capable  of  attaining  with 
facility  a  rate  of  from  thirty-five  to  forty  miles  per  hour. 

The  line  was  opened  between  Paddington  and  Maiden- 
head on  June  4,  1838,  and  the  performance  of  the  engines 
was  considered  satisfactory,  trains  of  eighty  tons  and  up- 
wards being  drawn  at  speeds  of  from  thirty-eight  to  forty 
miles  per  hour. 

Notwithstanding  these  favourable  results,  the  change 
in  regard  to  the  gauge  did  not  pass  unquestioned. 
Attacks  were  made  on  it  in  various  quarters,  and  consi- 
derable excitement  was  caused  among  the  shareholders 
and  the  public. 

It  was  asserted  that  the  width  of  4  feet  8^  inches  was 
exactly  the  proper  width  for  all  railways,  and  that  a  devi- 
ation from  it  was  tantampunt  to  the  abandonment  of  an 
established  principle  which  experience  had  proved  to  be 
correct.  It  was  further  alleged  that  the  cost  of  all  the 
works  connected  with  the  formation  of  the  line  would  be 
greatly  increased ;  that  the  carriages  must  be  stronger  and 


ITS  ADOPTION   ON  THE  GREAT   WESTERN  RAILWAY.     107 

lieavier,  that  they  would  not  run  round  the  curves,  and 
would  be  liable  to  run  off  the  rails,  and  particularly 
that  the  increased  length  of  the  axles  would  render 
them  liable  to  be  broken.  These  were  not  advanced 
as  difficulties  which,  existing  in  all  railways,  might  be 
somewhat  increased  by  the  increase  of  gauge,  but  they 
were  assumed  to  be  peculiar  to  the  broad  gauge,  and 
fatal  to  it.  Some  urgent  representations  appear  to 
have  been  made  to  the  Directors ;  for  in  their  report  of 
August  15,  1838,  they  state,  that  as  the  gauge  and  the 
permanent  way,  which  had  also  been  the  subject  of 
adverse  criticism,  had  been  sources  of  some  anxiety  to 
them,  they  had  applied  to  three  of  the  most  eminent 
authorities  on  the  construction  and  working  of  railways — 
Mr.  James  Walker,  President  of  the  Institution  of  Civil 
Engineers,  Mr.  Robert  Stephenson,  and  Mr.  Nicholas 
Wood,  of  Newcastle-on-Tyne — to  undertake  a  thorough 
inspection  of  the  line,  to  investigate  the  working  of  it,  and 
to  give  their  opinion  on  the  plan  adopted. 

Mr.  Walker  and  Mr.  Stephenson  declined  the  task,  on 
the  ground  that  they  did  not  wish  to  become  embroiled 
in  professional  controversy,  but  Mr.  Wood  undertook  it ; 
and  a  similar  commission  was  afterwards  given  to  Mr. 
Hawkshaw. 

In  order  to  put  the  shareholders  fully  in  possession  of 
all  the  information  in  their  power,  the  Directors  published 
a  very  complete  statement  by  Mr.  Brunei  on  the  arrange- 
ments adopted  by  him.  It  will  be  seen  that  in  this  report, 
which  is  given  in  Appendix  I.  p.  525,  he  states  his  original 
arguments,  and  answers  the  objections  brought  against  his 
plans ;  and  he  contends  that  the  result  of  experience  esta- 
blishes their  success.     In  regard  to  the  gauge,  he  says : — 

Everything  that  has  occurred  in  the  practical  working  of  the 
hne  confirms  me  in  raj'  conviction  that  we  have  secured  a  most 


108  THE  BEOAD  GAUGE. 

valuable  power  to  the  Great  Westem  Eailway,  and  that  it  would  be 
folly  to  abandon  it. 

But  the  two  engineers,  to  wliom  the  consideration  of  this 
matter  had  been  referred,  differed  materially  in  opinion 
from  Mr.  Brunei.  The  nature  of  their  investigations  and 
reports,  and  of  Mr.  Brunei's  replies,  is  stated  in  the  extracts 
given  below  from  the  report  of  the  Directors  in  January 
1839. 

In  addition  to  the  question  of  gauge,  another  important 
matter  referred  to  the  consideration  of  Mr.  Wood  and 
Mr.  Hawkshaw  was  the  construction  of  the  permanent 
way.^  On  the  Great  Westem  a  construction  had  been 
introduced  by  Mr.  Brunei  differing  materially  from  that 
ordinarily  used;  and  as  defects  had  shown  themselves 
after  the  opening  of  the  railway,  some  anxiety  was  felt  in 
reference  to  it  by  many  of  the  shareholders. 

The  subject  of  the  permanent  way  adopted  on  the  Great 
Western  Eailway  does  not  necessarily  belong  to  the  gauge 
question,  and  would,  perhaps,  have  been  more  properly 
considered  in  the  chapter  on  Mr.  Brunei's  railway  works ; 
but,  as  a  matter  of  fact,  the  controversy  concerning  it 
became  so  interwoven  with  that  of  the  broad  gauge,  that 
in  a  historical  account  it  would  be  difficult  to  separate 
them. 

It  appeared  to  Mr.  Brunei  that,  with  a  view  of  applying 
the  engine  power  to  the  greatest  advantage,  particularly 
in  attaining  high  speed,  more  attention  ought  to  be  paid 
to  the  construction  of  the  permanent  way.  He  says,  in 
a  report  dated  February  1837  :  — 

'  In  the  course  of  constructing  the  When  these  were  done  with,  the  pro- 
earth-works  of  a  railway,  the  con-  per  road  for  the  trains  was  laid  down  ; 
tractors  were  accustomed  to  lay  down  and  this,  to  distinguish  it  from  the 
temporary  ways  or  lines  of  rail,  for  former  one,  was  called  the  permanent 
the   earth  waggons  to    travel   upon.  ivay. 


THE  PERMANENT  WAY.  109 

It  appears  to  be  frequently  forgotten  that  although  lofty  em- 
bankments and  deep  cuttings,  bridges,  viaducts,  and  tunnels  are 
all  necessary  for  forming  the  level  surface  upon  which  the  rails  are 
to  be  laid,  yet  they  are  but  the  means  for  obtaining  that  end  ;  and 
the  ultimate  object  for  which  these  great  works  are  constructed, 
and  for  Avhich  the  enormous  expenses  consequent  upon  them  are 
incurred,  consits  merely  of  four  level  parallel  lines,  not  above  two 
inches  wide,  of  a  hard  and  smooth  surface ;  and  upon  the  degree  of 
hardness,  smoothness,  and  parallelism  (which  last  has  hitherto  been 
very  much  neglected)  of  these  four  lines  depend  the  speed  and  cost  of 
transport,  and  in  fact  the  whole  result  aimed  at.  .  .  . 

In  forming  all  my  plans  I  have  looked  to  the  perfection  of  the 
surface  on  which  the  carriages  are  to  run,  as  the  great  and  ultimate 
desideratum  ;  and  in  the  detail  of  construction  of  this  last  operation, 
without  which  all  the  previous  labour  is  comparatively  wasted,  I 
have  always  contemplated  introducing  all  the  perfection  of  materials 
and  workmanship  of  which  it  is  capable. 

With  a  view  to  improvement  on  this  point,  Mr. 
Brunei  considered  it  would  be  advantageous  if  two  im- 
portant changes  were  made.  He  proposed,  in  the  first 
place,  to  abolish  the  use  of  stone  blocks  for  the  rails  to 
rest  on,  and  to  substitute  timber ;  and,  secondly,  to  apply 
the  support  uniformly  and  continuously  along  the  whole 
leng-th  of  the  rails,  instead  of  only  at  intervals. 

The  first  of  these  changes,  namely,  the  substitution  of 
timber  for  stone,  was  not  wholly  new,  for  transverse 
wood  sleepers  were  often  used  in  exceptional  situations ; 
but  it  was  the  general  opinion  that  stone,  where  it  could 
be  applied,  formed  the  best  support  for  the  rails,'  and  the 
exclusive  employment  of  timber  was  considered  a  great 
innovation. 

The  other  principle,  that  of  *  continuous  bearing,'  was 
similar  to  that  of  the  old  wooden  and  stone  tramways; 
and,  even  as  applied  to  iron  rails  it  had  been  extensively 
used  before,  as  Mr.  Brunei  mentions  in  his  report  of 
August  1838  (see  Appendix  I.  p.  535.) 

•  See  Wood  On  Railways,  3rd.  edit.  1838,  p.  151. 


110  THE  BROAD  GAUGE. 

Mr.  Brunei  designed  for  this  continuous  bearing  a 
peculiar  shape  of  rail,  which,  from  the  form  of  its  section, 
acquired  the  name  of  the  '  bridge  rail.'  The  rail  was 
bolted  down  to  the  longitudinal  timbers,  and  the  timbers 
of  the  two  rails  were  connected  together  at  intervals  by 
cross-pieces,  called  transoms,  bolted  to  them ;  these  served 
to  keep  the  two  rails  at  a  proper  distance  apart.  The 
longitudinal  timbers  lay  on  gravel  or  other  '  ballast,'  which 
had  been  found  to  form  the  best  foundation,  as  being 
firm  and  solid,  easy  of  adjustment,  and  allowing  free 
drainage.^ 

Mr.  Brunei,  however,  thought  there  would  be  difficulty 
in  giving  the  longitudinal  baulks  a  sufficiently  solid  bearing 
on  the  gravel  below  them. 

A  similar  difficulty  had  already  been  experienced  with 
the  heavy  stone  blocks  used  on  other  railways.  As  a 
remedy  for  this,  Mr.  Stephenson  caused  each  block  to  be 
lifted  and  dropped  several  times  on  its  place,  so  as  to  con- 
solidate the  ballast  below. 

The  same  thing  could  not  be  done  with  a  long  wooden 
baulk,  and  Mr.  Brunei  therefore  contrived  another  mode 
of  overcoming  the  difficulty.  Piles  were  driven  into  the 
ground  between  the  rails,  and  their  heads  bolted  to  the 
cross-transoms,  the  object  being  to  hold  the  timber 
framework  firmly  down.  The  gravel  was  then  rammed 
hard  under  the  longitudinal  baulks,  to  give  the  con- 
solidation desired.  The  result,  however,  of  this  mode  of 
construction  was  far  from  successful,  and  the  state  of  the 
road,  when  run  over  by  the  trains,  was  in  many  places 
very  defective.^ 

'  A  full  description  of  the  original  '  At  this   time    Mr.   Brunei    was 

road  of  the  Great  Western  Railway,  confined  to  the  house  by  the  effects 

communicated  by  Mr.  Brunei,  will  be  of  his  accident  on  board  the  '  Great 

{ownd  m  Wood's  Treatise  on  Eailroads,  'Western'  steam-ship   (see   p.  242). 

3rd  edit.  1838,  p.  708.  Had  he  been  on  the  spot,  he  would 


THE  PERMANENT  WAY.  Ill 

In  the  course  of  liis  enquiry  Mr.  Wood  tried  a  large 
number  of  experiments  on  the  Great  Western  and  other 
lines.  He  was  of  opinion  that  stone  blocks  afforded  a 
permanently  firmer  base,  and  so  caused  less  resistance  to 
the  train,  but  that  there  was  less  noise  with  continuous 
timber  bearings,  and  that  they  gave  a  smoother  and  a 
more  perfect  road  for  high  rates  of  speed.  He  thought, 
however,  that  the  piles  were  objectionable,  and  that  the 
weight  of  the  trains  would  in  the  course  of  time  sufficiently 
consolidate  the  foundation.  Mr.  Brunei  accepted  Mr. 
Wood's  conclusions  and  abandoned  the  piling,  adopting 
at  the  same  time  larger  timbers  and  heavier  rails. 

The  experience  of  the  permanent  way,  as  thus  altered, 
fully  justified  the  favourable  anticipations  Mr.  Brunei  had 
formed  of  the  continuous  timber  bearing.^ 

After  the  reports  of  Mr.  Wood  and  Mr.  Hawkshaw,  with 
Mr.  Brunei's  replies  to  them,  had  been  circulated  among 
the  shareholders,  a  special  general  meeting  was  called  in 
London,  to  receive  and  consider  these  documents.  It  was 
convened  for  December  20,  1838,  but  was  adjourned  till 
January  9,  1839.  This  meeting  was  of  great  importance, 
not  only  to  the  Company,  but  to  Mr.  Brunei  personally, 
as  on  the  resolutions  to  be  passed  depended  whether  or 
not  his  plans  should  be  proceeded  with. 

He  had,  however,  the  warm  support  of  the  Directors, 
as  will  appear  from  the  following  extracts  from  their 
report. 

have  been  able  to  give  the  work  care-  carriages  and  to  the  road  is  generally 

ful  consideration  during  its  progress,  less  serious  than  it  is  when  the  wheels 

and  to  judge   of   the  expediency  of  of  a  carriage  off  the  rails  come  into 

proceeding  with  the  plan.  repeated  and  violent  contact  with  the 

'  The   continuity  of    the   timbers  cross  sleepers.      Instances  have   fre- 

diminishes  the  risk  of  trains  leaving  quentlyoccurred  where  carriages  which 

the  line  from  small  imperfections  in  have  left  the  rails  have  run  consider- 

the  permanent  way.     And,  should  a  able  distances  on    the    longitudinal 

train  leave  the  rails,  the  injury  to  the  timbers  without  injury. 


112  TBE  BUOAD  GAUGE. 

It  may  be  here  concisely  stated,  that  Mr.  Wood  deduces  A-om 
experiments  upon  the  performance  of  engines  on  the  Great  Western 
and  other  lines,  that  although  a  higher  rate  of  speed  has  been 
attained  on  the  former,  it  would  appear  only  to  have  been  a,ccom- 
plished  by  the  increased  power  of  the  engines,  with  a  much  greater 
consumption  of  coke  when  calculated  per  ton  per  mile.  He  ascribes 
this  result  principally  to  the  resistance  presented  by  the  atmosphere 
to  the  motion  of  railway  trains,  especially  at  high  rates  of  speed. 
His  remarks  on  that  subject  are  qualified,  however,  by  the  ex- 
pression of  a  doubt  as  to  the  value  to  be  assigned  to  the  single  set 
of  experiments  on  each  of  two  inclined  planes,  which  are  quoted  as 
the  authority  for  the  degree  of  atmospheric  resistance  supposed  to 
have  been  discovered. 

The  reduction  of  friction  by  the  employment  of  wheels  of  in- 
creased diameter,  and  the  benefit  of  lowering  the  carriages  between 
the  wheels,  are  affirmed  by  Mr.  Wood  as  incontrovertible.  The 
increased  sta.bility,  and  consequent  increased  steadiness  of  motion 
to  carriages  on  the  wider  base,  are  also  admitted  by  him.   .  .  . 

The  various  propositions  of  doubtful  advantage  from  the  wide 
gauge,  as  well  as  of  alleged  objection  to  it,  appear  to  have  been 
thoroughly  considered  in  the  report  in  question.  The  experiments 
on  the  consumption  of  coke  at  high  velocities  were  unfavourable, 
and,  in  connection  with  the  theory  of  atmospheric  resistance,  appear 
to  have  influenced  the  mind  of  Mr.  Wood  to  consider  that  a  seven- ' 
feet  gauge  was  beyond  the  width  which  he  would  deem  the  best. 
At  the  same  time,  upon  a  review  of  all  the  circumstances,  and  con- 
sidering that  there  are  counteracting  advantages,  incidental  to  an 
increased  Avidth  of  gauge,  he  does  not  think  that  the  result  of  his 
enquiries  v/ould  justify  a  change  in  the  dimensions  adopted  on  this 
line,  and  he  recommends  the  present  width  should  be  retained. 

The  advice  thus  given  by  Mr.  Wood,  upon  mature  reflection, 
being  directly  at  variance  with  the  conclusion  at  which  Mr.  Hawk- 
shaw  had  previously  arrived  upon  an  investigation  similarly  dele- 
gated to  him,  it  became  the  duty  of  the  Directors  to  consider  most 
attentively  the  train  of  reasoning  and  argument  which  led  the  latter 
to  urge  such  an  opposite  course.  Naturally  expecting  from  that 
circumstance  to  find  in  his  report  a  clear  and  definite  statement  of 
the  positive  loss  or  disadvantages  accruing  from  the  increased  width 
of  gauge,  the  Directors  could  not  fail  to  remark  with  some  surprise 
that  he  enforces  his  recommendation,  not  upon  any  ascertained 
injury  or  failure  in  the  plan,  but  almost  exclusively  upon  the  pre- 
sumption that  all  railways,  however  disconnected  or  locally  situated, 


EEPOKT  OF  DECEMBEK   1838.  113 

should  be  constructed  of  one  uniform  width.  While  he  appears  to 
think  that  it  might  be  an  improvement  to  have  an  addition  of  a  few 
inches,  five  or  six  at  the  most,  he  still  questions  the  expediency  of  any 
variation  from  the  4  feet  8^  inches  gauge.  Mr.  Hawkshaw,  in  his  re- 
port, also  considers  any  additional  expense  upon  the  gauge,  as  well  as 
upon  the  improvement  of  gradients,  to  be  undesirable,  and  assumes  it 
at  a  scale  of  augmentation  far  beyond  the  real  difference  of  cost.  His 
estimates  on  that  head  are  impeached  in  the  engineer's  observations, 
and  no  doubt  exists  in  the  minds  of  the  Directors,  that  the  subject, 
reduced  to  a  mere  question  of  figures,  in  its  present  position,  would 
undeniably  show  a  pecuniary  loss  to  be  borne  by  the  Company  by 
any  such  change  of  system  as  he  advocates,  even  if  it  were  on  other 
grounds  deemed  advisable.  The  objection  that  the  wide  gauge 
might  prevent  a  junction  with  other  lines  seems  both  to  Mr.  Wood 
and  the  Directors  to  have  but  little  weight,  as  applied  to  the  Great 
Western  Railway.  Already  has  the  same  width  been  contemplated 
and  provided  for  in  the  extension  lines  through  Gloucestershire  to 
Cheltenham  and  from  Bristol  to  Exeter.  Any  local  branches  here- 
after to  be  made  would  undoubtedly  follow  the  same  course,  and  the 
proprietors,  therefore,  may  be  satisfied  that  no  apprehension  need  be 
entertained  by  them  on  that  head. 

The  advantage  of  following  Mr.  Wood's  advice,  in  not  making  any 
alteration  in  the  width  of  way,  has  been  since  most  forcibly  shown 
by  more  recent  experiments,  which  have  entirely  changed  the 
residts  upon  Avhich  the  chief  objections  to  the  gauge  were  founded. 
The  performance  of  the  engines,  shown  by  Mr.  Wood's  experiments 
in  September,  gave  such  a  disproportionate  result  in  their  power 
upon  the  attainment  of  high  velocities,  as  to  render  it  all  but  im- 
possible that  the  eifect  could  be  entirely  produced  by  the  action  of 
the  atmosphere  on  the  trains.  All  doubts  were  shortly  removed  by 
its  being  ascertained  that  a  different  cause  (a  mere  mechanical  defect 
in  the  engine  itself)  had  been  in  operation.  If  Mr.  Wood  had 
witnessed  these  recent  performances  of  the  engines,  he  must  un- 
questionably have  changed  his  opinions  as  to  the  means  and 
practicability  of  carrying  full  average  loads  at  a  high  speed,  Avithout 
the  great  increased  expense  of  fuel.  The  Directors  have  satisfied 
themselves  of  this  very  important  fact,  by  personally  attending  an 
experiment  (accompanied  by  several  gentlemen,  among  whom  was 
a  very  eminent  practical  mechanic),  on  which  occasion  the  '  North 
'  Star '  took  a  train  of  carriages,  calculated  for  166  passengers,  and 
loaded  to  43  tons,  to  and  from  Maidenhead,  at  a  mean  average  speed 
of  thirty-eight  miles  per  hour,  the  maximum  being  forty-five  miles 

I 


114  THE  BEOAD  GAUGE. 

per  hour,  consiiming  only  0'95,  or  less  than  1  lb.  of  coke  per  net  ton 
per  mile,  instead  of  2'76,  say  2|  lbs.,  as  previously  shown.  This 
was  accomplished  by  a  mere  altered  proportion  in  the  blast  pipe  of 
the  engine,  in  the  manner  explained  by  Mr.  Brunei,  being  a  simple 
adaptation  of  size  in  one  of  the  parts,  which  admits  a  more  free  escape 
of  steam  from  the  cylinder,  after  it  has  exerted  its  force  on  the  piston, 
still  preserving  sufficient  draft  in  the  fire.^ 

It   must  be  almost   needless  to  point  out  to    those   who   have 
perused  the  reports,  how  importantly  this  change  bears  upon  the 
subject  in  almost  every  relation  of  the  enquiry.     It  negatives  the 
assumption  that  the  velocity  can  only  be  attained  by  a  ruinous  loss 
of  power.     It  establishes  beyond  doubt  that  the  consumption  of  fuel 
as  now  ascertained,  in  proportion  to  the  load,  is  only  one-third  of 
that   which   from  the  former  experiments  had   been  the  basis  of 
Mr,  Wood's  arguments.     An  analysis  in  the  report  of  the  perfor- 
mance of  the  Great  Western  engines,  with  heavy  loads  varying  from 
80  tons  to  166  tons,  shows  in  every  respect  a  peculiarly  satisfactory 
result  at  a  small  cost  of  fuel,  and  warrants  the  expectation  of  very 
great  benefit  to  the    Company  from   the  economical  transport   of 
goods  on  the  line.     That  the  expenses  of  locomotive  repairs,  es- 
pecially on  that  heavy  class  of  repair  which  arise  from  lateral  strains 
on  the  wheels  and  framing  of  the  engines,  have  been  materially  less 
than  on  other  lines  is  ascertained  by  very  detailed  accounts,  ac- 
curately made  and  submitted  to  the  Board  by  the  superintendent  of 
that  department.     The  experience  of  some  months  has  now  enabled 
the  Directors  to  witness  the  progressive  improvement  in  the  practical 
working  of  the  railway.     A  higher  rate  of  speed  has  been  generally 
maintained  than  on  other  lines,  and  at  the  same  time,  with  that 
increased  speed,  great  steadiness  of  motion  has  been  found  in  the 
carriages,  with    consequent   comfort   to  the  pas.sengers.     If  speed, 
security,  and  comfort,  were  three  great  desiderata  in  the  original 
institution  of  railway  travelling,   the  Directors  feel  sure  that  the 
public  will  appreciate   and  profit  by  any  improvements  in   those 

'  This     experiment     excited     the  operation   of  the  blast-pipe   had   on 

greatest  interest,   and    it    was    long  the  working  of  the  locomotive  that  he 

afterwards  related  how  Mr.  Brunei,  by  afterwards  investigated  the  whole  sub- 

the  stroke  of  a  hammer,  had  knocked  ject,  and  made  further  experiments  to 

to  pieces  the  scientific  deductions  of  determine  whether  or  not  it  might  be 

Dr.  Lardner,  who,  as  was  well  known,  expedient  to  abandon  the  steam  blast, 

had  prompted  Mr.  Wood's  decision  in  and  to  maintain  the  draught  in  the 

this  matter.  chimney   with   a    fan    worked    by   a 

Mr.  Brunei  was  so  much  impressed  rotary  steam  jet. 
with  the  great   influence    which  the 


EEPORT   OF  DECEMBER   1838.  115 

qualities,  the  Company  deriving  ample  remuApration  in  the  shape  of 
increased  traffic.  A  saving  of  time  upon  a  long  journey,  with  in- 
creased comfort,  will  necessarily  attract  to  one  line  in  preference  to 
another  many  travellers  from  beyond  the  ordinary  distance  of  local 
connection,  and  will  thus  secxn-e  a  valuable  collateral  trade  which 
Avould  not  otherwise  belong  to  it.  It  has  also  a  decided  tendency 
to  avert  competition,  which  may  with  much  reason  be  regarded  as 
the  chief  peril  to  which  railway  property  is  subjected. 

The  Directors,  upon  a  deliberate  reconsideration  of  all  the  cir- 
citmstances  affecting  the  permanent  welfare  of  the  undertaking, 
divesting  the  question  of  all  personal  partialities  or  obstinate  ad- 
herence to  a  system,  unanimously  acquiesce  in  the  abandonment 
of  the  piles,  in  the  substitution  of  a  greater  scantling  of  timber,  and 
of  a  heavier  rail,  retaining  the  width  of  gauge  with  the  continuous 
timber  bearings,  as  the  most  conducive  to  the  general  interests  of 
the  Company. 

The  views  of  the  Directors  were  approved  of  by  the 
majority  of  the  shareholders  (the  numbers  being  7,792  for, 
and  6,145  against)  ;  and  the  construction  of  the  line  was 
proceeded  with  according  to  Mr.  Brunei's  plans. 

By  June  30,  1841,  the  whole  length  of  the  Great 
Western  Railway  was  opened  from  London  to  Bristol. 
Some  of  the  Directors'  reports  mention  the  fact  that  the 
speed  uniformly  maintained  by  the  engines  much  exceeded 
the  ordinary  rate  of  railway  travelling,  and  allude  to  the 
*  general  testimony  borne  to  the  smoothness  and  comfort  of 
'■  the  line  and  carriages.' 

As  has  been  before  mentioned,  extensions  and  branches 
on  the  same  gauge,  to  all  of  which  Mr.  Brunei  was  en- 
gineer, were  projected  and  ultimately  carried  out,  in 
accordance  with  the  original  scheme  of  the  undertaking, 
to  Exeter,  Plymouth,  and  Cornwall,  and  to  Gloucester, 
Hereford,  and  South  Wales,  as  well  as  to  Oxford,  Windsor, 
and  other  towns  in  the  immediate  neighbourhood  of  the 
line. 

About  1844,  the  attention  of  the  Company  began  to  be 

I   2 


116  THE  EEOAD  GAUGE. 

directed  to  projects  involving  extensions  of  a  much  more 
serious  character,  and  which  were  destined  to  have  a 
powerful  influence  on  the  position  of  the  gauge  question. 
During  the  railway  mania,  the  Great  Western  Company 
found  it  impossible  to  stand  aloof  from  the  contests  which 
were  going  on  around  them,  and  thought  it  necessary,  in 
order  to  protect  their  own  interests,  to  extend  their  lines 
beyond  the  district  to  which  they  had  originally  intended 
to  confine  themselves. 

At  the  general  meeting  in  August,  an  extension  from 
Oxford  to  Eugby  was  determined  on,  as  '  of  the  greatest 
'  importance  to  the  Great  Western  line.'  About  the  same 
time  a  broad-gauge  line  was  promoted  from  Oxford  to 
Worcester,  and  thence  by  Kidderminster  and  Dudley  to 
Wolverhampton,  in  order  to  open  an  immediate  communi- 
cation with  the  Staffordshire  and  Worcestershire  districts. 
There  were  also  rival  projects  on  the  narrow  gauge,  pro- 
moted by  the  London  and  Birmingham  Company;  and 
the  competing  plans  were  referred,  as  was  the  custom  at 
that  time,  for  the  examination  of  the  Railway  Department 
of  the  Board  of  Trade. 

In  regard  to  the  communication  from  north  to  south, 
through  Oxford,  the  question  was,  where  the  break  of 
gauge  should  be.^  The  Board  of  Trade  saw  nothing  in 
the  relative  merits  of  the  gauges  to  determine  this  ques- 
tion, and  from  commercial  considerations,  they  recom- 
mended that  the  change  of  gauge  should  be  made  at 
Oxford.  On  this  and  other  grounds  they  considered  that 
the  narrow  gauge  schemes  to  the  north  of  Oxford  were 
preferable  to  those  of  the  Great  Western  Railway. 

'  The  inconveniences  of  a  break  of  ter,  laid  on  the  narrow  gauge,  and 

gauge  had  already  bgen  brought  into  another   between   Bristol  and   Glou- 

notice.      One    of   the    narrow-gauge  cester,  on  the  broad  gauge  ;  and  thus 

companies,     the      Midland,     worked  there     was    a    break    of   gauge    at 

two   existing    lines   of    railway,  one  Gloucester, 
between   Birmingham   and   Glouees- 


EXTENSION   OF  THE  SYSTEM.  117 

The  rival  schemes  then  went  before  Parliament,  and 
after  a  protracted  enquiry,  obstinately  fought  between  the 
parties,  the  decision  was  given  in  favour  of  the  Great 
Western  lines,  contrary  to  the  recommendation  of  the 
Board  of  Trade.  It  was,  however,  stated  by  the  chairman 
of  the  Commons  Committee  that  the  decision  had  been 
founded  on  the  local  and  general  merits  of  the  respective 
lines,  without  any  reference  to  the  comparative  merits 
of  the  two  gauges.  On  this  account  some  peculiar  pro- 
visions were  made  in  the  Acts ;  for  though  the  lines 
were  sanctioned  on  the  broad  gauge,  the  proprietors  were 
bound  also  to  lay  down  narrow  gauge  rails  upon  them,  if 
required  to  do  so  by  the  Board  of  Trade.  At  the  same 
time  the  House  of  Commons,  on  the  motion  of  Mr. 
Cobden,  passed  a  Resolution  praying  her  Majesty  to  refer 
the  gauge  question  to  a  Royal  Commission. 

A  Commission  was  issued  in  July ;  the  Commissioners 
being  three  in  number — Sir  J.  M.  Frederic  Smith,  R.E. ; 
Mr.  G.  B.  Airy,  Astronomer  Royal ;  and  Professor  Barlow, 
of  the  Royal  Military  Academy,  Woolwich.  They  took 
a  large  amount  of  evidence,  both  oral  and  documentary, 
and  made  some  examinations  of  the  working  of  the  two 
gauges.  Their  report  was  presented  to  Parliament  early 
in  the  session  of  1846. 

Of  forty-eight  witnesses,  thirty-five  were  advocates  of  the 
narrow  gauge  ;  and  against  these  were  arrayed  but  four 
champions  of  the  broad  gauge,  all  officers  of  the  Great 
Western  Railway : — Mr.  Charles  Alexander  Saunders,  the 
secretary ;  Mr.  Seymour  Clarke,  the  traffic  superintendent ; 
Mr.  (now  Sir  Daniel)  Gooch,  the  locomotive  superinten- 
dent ;  and  Mr.  Brunei. 

The  report  was  of  considerable  length,  and  in  it  the 
Commissioners   addressed  themselves  to  three   heads   of 

enquiry,  viz. :—  j *•— — «««wuao,M»«v.. 

UNJVERf'r        - 


U  t  It  t 


118  THE  BEOAD  GAUGE. 

1.  Whether  the  break  of  gauge  was  an  inconvenience  of 
so  much  importance  as  to  demand  the  interference  of  the 
legislature. 

2.  What  means  could  be  adopted  for  obviating  or  miti- 
gating such  inconvenience. 

3.  Considerations  on  the  general  policy  of  establishing 
a  uniformity  of  gauge  throughout  the  country. 

The  general  conclusions  arrived  at  on  these  points  were 
thus  summed  up  by  the  Commissioners : — 

1 .  That,  as  regards  the  safety,  accommodation  and  convenience  of 
the  passengers,  no  decided  preference  is  due  to  either  gauge,  but  that 
on  the  broad  gauge  the  motion  is  generally  more  easy  at  high 
velocities. 

2.  That,  in  respect  of  speed,  we  consider  that  the  advantages  are 
with  the  broad  gauge  ;  but  we  think  the  public  safety  would  be  en- 
dangered in  employing  the  greater  capabilities  of  the  broad  gauge 
much  beyond  their  present  use,  except  on  roads  more  consolidated, 
and  more  substantially  and  perfectly  formed,  than  those  of  the  existing 
lines. 

3.  That,  in  the  commercial  case  of  the  transport  of  goods,  we 
believe  the  narrow  gauge  to  possess  the  greater  convenience,  and  to 
be  the  more  suited  to  the  general  traffic  of  the  country. 

4.  That  the  broad  gauge  involves  the  greater  outlay,  and  that  we 
have  not  been  able  to  discover,  either  in  the  maintenance  of  way,  in 
the  cost  of  locomotive  power,  or  in  the  other  annual  expenses,  any 
adequate  reduction  to  compensate  for  the  additional  first  cost. 

Therefore,  esteeming  the  importance  of  the  highest  speed  on  express 
trains  for  the  accommodation  of  a  comparatively  small  number  of 
persons,  however  desirable  that  may  be  to  them,  as  of  far  less  moment 
than  affording  increased  convenience  to  the  general  commercial 
traffic  of  the  country,  we  are  inclined  to  consider  the  narrow  gauge 
as  that  which  should  be  preferred  for  general  convenience,  and 
therefore,  if  it  were  imperative  to  produce  imiformity,  we  should 
recommend  that  uniformity  to  be  produced  by  an  alteration  of  the 
broad  to  the  narrow  gauge. 

Guided  by  the  foregoing  considerations,  the  Commis- 
sioners recommended  that  4  feet  8^  inches  should  be  fixed 
by  law  as  the  standard  gauge  of  the  country ;  and  that 


THE   GAUGE   COMMISSION,   a.d.  1845.  119 

as  to  the  existing  broad  gauge  lines,  either  they  should 
be  altered  to  the  narrow  gauge,  or  some  course  adopted 
which  would  admit  of  narrow  gauge  carriages  passing 
along  them.' 

This  adverse  report  was  a  great  surprise  to  the  sup- 
porters of  the  broad  gauge  system,  as  rumours  had  led 
them  to  hope  for  a  different  result.  Immediately  after 
its  appearance,  several  documents  were  published,  contain- 
ing powerful  and  severe  strictures  on  the  proceedings  and 
opinions  of  the  Commissioners.  The  most  important  of 
these  was  written  by  Mr.  Saunders,  Mr.  Daniel  Gooch,  and 
Mr.  Brunei.  It  occupied  fifty  closely  printed  folio  pages, 
and  was  entitled,  'Observations  on  the  Report  of  the 
*  Gauge  Commissioners,  presented  to  Parliament.'  To 
this,  '  Supplemental  Observations '  were  added,  after  the 
publication  of  the  Evidence  and  the  Appendix  to  the 
Report. 

In  the  conclusion  of  the  '  Observations  '  the  writers  gave 
a  summary  of  the  points  they  considered  to  have  been 
proved  in  the  controversy,  namely — 

That  the  question  of  *  break  of  gauge  *  originated  as  a 
cloak  to  a  monopoly. 

That  even  if  the  gauge  were  uniform,  through  trains 
would  be  impracticable. 

That  the  transfer  would  be  of  little  inconvenience. 

That  any  advantage  of  small  waggons  was  applicable 
to  the  broad  gauge,  but  that  the  advantage  of  large 
waggons  was  not  applicable  to  the  narrow. 

That  the  competition  between  the  two  systems  was  ad- 
vantageous. 

■  It    should,    however,   be   added,  '  present  rate  of  speed,  and  the  in- 

that  the  Commissioners  had  stated  in  '  creased  accommodation  of  the  rail- 

the  body  of  their  report :  '  We  feel  it  '  way  carriages,  to  the  genius  of  Mr. 

'  a  duty   to  observe   here,  that  the  '  Brunei    and  the   liberality   of   the 

'  public  arc  mainly  indebted  for  the  '  Great  Western  Company.' 


120  THE  BROAD  GAUGE. 

That  the  final  recommendations  of  the  Commissioners 
were  at  variance  with  their  separate  conclusions. 

That  it  would  be  unjust  to  refuse  to  allow  the  broad 
gauge  to  be  laid  down  on  lines  for  which  it  was  already 
sanctioned  by  Parliament. 

That  the  enquiry  before  the  Commissioners  was  not 
properly  conducted,  and  that  consequently  no  legislation 
ought  to  be  founded  on  it. 

That  the  data  published  by  the  Commissioners  were 
often  wrong,  and  in  some  cases  led  to  the  reverse  of 
their  conclusions. 

That  greater  economy  was  proved  on  the  broad  gauge. 

That  the  broad  gauge  was  superior  in  the  points  of 
safety,  speed,  and  conveyance  of  troops. 

That  the  experiments  made  in  the  presence  of  the 
Commissioners  had  demonstrated  beyond  all  controversy 
the  complete  success  of  the  broad-gauge  system. 

For  these  and  other  reasons,  a  strong  protest  was  made 
against  any  legislative  interference  with  the  broad-gauge 
system. 

A  reply  was  published  to  these  arguments ;  and  during 
the  controversy  a  large  number  of  pamphlets,  articles, 
and  other  publications  appeared  on  both  sides. 

Mr.  Brunei's  views  on  the  whole  question,  about  this 
time,  are  concisely  expressed  in  the  following  letter, 
written  to  a  friend  in  France,  who  asked  for  information 
on  the  subject  of  the  broad  gauge : — 

August  4,  1845. 

T  am  just  off  for  Italy,  but  write  a  few  hasty  lines  in  reply  to 
Mons, 's  queries,  and  which  you  must  scold  him  for  not  address- 
ing direct  to  me.  Nobody  can  answer  such  questions  but  myself, 
and  I  am  compelled  to  be  very  brief. 

In  answer  to  the  first,  I  send  a  drawing. 

Secondly.  I  see  no  reason  why  the  ordinary  construction  of  rails. 


OBSERVATIONS  ON  THE  COMMISSION EES'  REPOET.      121 

chairs,  and  sleepers  should  not  be  equally  applicable  to  the  wide 
gauge  as  to  the  narrow.  I  have  used  them  occasionally.  I  should 
think  75  lbs.  per  yard  heavy  enough  for  any  purposes. 

Thirdly.  Within  all  ordinary  limits,  certainly  in  curves  of  more 
than  250  metres  [12^  chains]  radius,  the  gauge  does  not  affect  the 
question  of  curves.  The  effect  of  a  curve  of  larger  radius  than  this 
appears,  both  from  much  observation  as  from  theory,  to  arise  merely 
from  two  causes,  the  one  centrifugal  force,  which  is  easily  neutralised, 
and  is  independent  of  gauge  ;  the  other  from  the  axles  not  being  able 
to  travel  in  the  direction  of  the  radius,  and  consequently  the  wheels 
not  running  in  a  tangent  to  the  curve.  This  also  is  unaffected  by 
the  width  of  gauge.  Practically  I  believe  the  conditions  are  not 
altered. 

Fourthly.  The  expenses  of  construction  are  not  dependent  on  the 
breadth  of  gauge  unless  the  total  width  allowed  for  the  loads  or 
carriages  is  thereby  or  for  other  reasons  increased,  which  is  not  a 
necessary  consequence  of  a  seven-feet  gauge. 

The  wide  gauge  could  be  laid  upon  the  London  and  Birmingham 
Railway  without  altering  any  of  the  works,  but  in  constructing  the 
Great  Western  Railway  I  thought  it  desirable  to  provide  for  carry- 
ing larger  bodies,  and  I  placed  the  centres  of  the  two  railways  13 
feet  apart,  instead  of  11  feet,  and  therefore  my  railway  became /owr 
feet  wider  in  total  width. 

The  increased  cost  of  this,  including  the  cost  of  land,  will  vary 
from  300/.  to  500/.  per  mile. 

Fifthly.  The  increase  of  width  will  not  increase  the  weight  of  an 
engine  (of  the  same  power)  500  lbs.,  but  I  avail  my  self  of  the  larger 
width  to  get  more  powerful  engines,  and  they  weigh,  with  water  in 
the  boiler,  18  to  21  tons.  I  send  a  drawing  of  one;  the  stroke  is  18 
inches. 

Sixthly.  The  passenger  carriages  are  aU  on  six  wheels,  and  exces- 
sively strong ;  at  present  the  framework  of  carriages  and  the  whole 
of  the  waggons  are  made  of  iron.  The  first-class  carriages  weigh, 
with  wheels,  &c.,  7  tons  16  cwt.  (17,472  lbs.),  and  carry  32  pas- 
sengers.    Second-class  about  the  same  weight,  and  hold  72. 

Seventhly  and  Eighthly.  The  comparison  being  on  different  rail- 
ways under  different  managements  and  totally  different  circum- 
stances, no  strictly  correct  comparative  results  can  be  given;  and 
of  course  the  most  opposite  opinions  are  entertained  and  expressed. 
I  believe  we  travel  much  quicker  at  the  same  cost  and  with  more 
ease,  and  certainly  the  wear  and  tear  of  engines  and  carriages  is 
very  much  less  with  us  than  with  the  other  lines ;  but  for  the  reasons 


122  THE  BKOAD  GAUGE. 

above  stated  it  cannot  be  made  matter  of  exact  proof,  but  remains 
matter  of  opinion. 

The  report  of  the  Gauge  Commission,  on  being  presented 
to  Parliament,  was  referred  by  the  House  of  Commons  to 
the  Board  of  Trade,  who  reported  on  it  in  June  1846. 
They  did  not,  however,  concur  with  the  Commissioners 
to  the  full  extent  of  their  recommendations ;  for,  while 
admitting  the  break  of  gauge  to  be  an  evil,  they  could 
not,  having  regard  to  the  circumstances  under  which,  the 
broad  gauge  companies  had  been  established,  and  the  in- 
terest they  had  acquired,  recommend  either  that  the 
broad  gauge  should  be  reduced  to  narrow,  or  that  rails 
should  be  laid  down  for  narrow  gauge  traffic  over  all 
their  lines.  Such  measures  would  involve  great  expense, 
and  they  were  unable  to  suggest  any  equitable  mode  of 
meeting  it. 

This  conclusion  necessarily  affected  the  opinion  of  the 
Board  of  Trade  in  regard  to  the  several  lines  under  con- 
struction connected  with  the  Great  Western  Railway, 
which  the  Board  recommended  should  be  all  made  on  the 
broad  gauge. 

In  regard  to  the  broad-gauge  lines  sanctioned  by  Par- 
liament from  Oxford  to  Rugby,  and  from  Oxford  to  Wor- 
cester and  Wolverhampton,  the  Board  determined  to  exer- 
cise their  powers  in  requiring  the  narrow  gauge  to  be  laid 
down,  in  addition  to  the  broad. 

The  House  of  Commons  adopted  the  recommendations 
of  the  Board  of  Trade,  and  passed  a  series  of  resolutions 
in  conformity  thereto,  and  'An  Act  for  regulating  the 
*  Gauge  of  Railways '  received  the  Royal  Assent  on 
August  18,  1846. 

It  was  enacted  that  it  should  not  be  lawful  to  construct 
any  new  passenger  railway  on  any  other  gauge  than  4 
feet  8^  inches  in  England,  and  5  feet  3  inches  in  Ireland. 


THE  GAUGE  ACT,  a.d.  1846.  123 

Exceptions,  however,  were  made  in  favour  of  certain 
lines  in  the  west  of  England  and  South  Wales. 

The  provisions  relating  to  the  gauge  in  the  Acts  for  the 
Oxford  and  Rugby,  and  the  Oxford,  Worcester,  and  Wol- 
verhampton Railways,  were  left  in  force. 

The  Act  also  generally  excepted  'any  railway  con- 
'  structed  or  to  be   constructed  under  the  provisions  of 

*  any  present  or  future  Act  containing  any  special  enact- 

*  ment  defining  the  gauge  or  gauges  of  such  railway  or 
'  any  part  thereof.' 

This  Act,  while  it  professed  to  establish  the  narrow 
gauge  as  the  standard  throughout  the  kingdom,  did  so 
only  nominally ;  in  reality,  by  the  words  '  present  or 
'  future,'  in  the  passage  above  quoted,  it  left  the  question 
of  the  gauge  of  any  new  railway  open  for  the  consider- 
ation of  the  committee  on  the  particular  bill ;  and  it 
only  obliged  the  promoters  of  the  undertaking  to  adopt 
the  narrow  gauge  when  no  case  could  be  proved  by  them 
for  the  adoption  of  some  other.  This  was  equivalent  to 
the  former  state  of  things,  so  that  all  the  agitation  of 
the  question  had  ended  in  a  mere  expression  of  opinion, 
and  the  broad-gauge  party  were  not  only  left  with  all 
their  former  liberty,  but  were  encouraged,  and  almost 
compelled,  to  push  their  system  still  farther  wherever 
they  could. 

About  the  time  of  the  passing  of  the  Gauge  Act,  a 
Board  of  Commissioners  of  Railways  was  established,  to 
whom  the  powers  formerly  possessed  by  the  Board  of  Trade 
were  transferred. 

One  of  the  first  duties  of  the  Commissioners  was  to  pro- 
vide for  the  due  compliance  with  the  order  of  the  Board  of 
Trade  respecting  the  introduction  of  the  narrow  gauge,  in 
conjunction  with  the  broad,  on  the  Oxford  and  Rugby 
Railway. 


124  THE  BROAD  GAUGE. 

It  was  proposed  to  effect  this  either  by  laying  a  nar- 
row gauge  line  concentrically  between  the  two  rails  of  the 
broad  gauge,  or  by  laying  down  only  one  additional  rail 
between  the  two  broad-gauge  rails,  making  one  of  the 
latter  serve  for  both  broad  and  narrow  gauges.  Mr. 
Brunei  recommended  the  second  of  these  plans  to  be 
adopted  on  the  Oxford  and  Eugby  line. 

After  a  careful  consideration  of  the  question,  the 
Commissioners  sanctioned  the  mixed  gauge  formed  by 
the  introduction  of  a  third  rail;  this  was  accordingly 
laid  down,  and  none  of  the  dangers  which  were  at  the 
time  prognosticated  in  reference  to  it  were  found  to  exist. 
It  has  been  the  plan  almost  exclusively  used  in  the  many 
cases  where  the  combination  of  the  two  gauges  has  been 
required. 

In  1846  the  Great  Western  Eailway  Company  had 
promoted  a  bill  for  a  branch  to  Birmingham  from  the 
Oxford  and  Rugby  line  at  Fenny  Compton.  The  Act  was 
obtained,  but  they  were  defeated  on  the  question  of  the 
gauge.  However,  after  the  passing  of  the  Gauge  Act,  the 
Company  again  attempted  to  carry  the  broad  gauge  to 
Birmingham.  Their  application  was  backed  by  a  strong 
memorial  from  the  districts  interested,  and  in  June  1847 
an  order  was  passed  by  the  House  of  Lords  directing  the 
Board  of  Commissioners  of  Railways  — 

To  inquire  into  the  accommodation  aiForded  by  the  several  lines 
of  railway  noAV  open,  or  in  the  course  of  construction,  or  projected, 
between  London  and  Birmingham ;  and  to  report  to  this  House,  early 
in  the  ensuing  Session  of  Parliament  in  what  manner  they  are  of 
opinion  that  the  interests  of  the  public  may  be  most  effectually 
ecured  in  regard  to  such  lines;  and  whether  it  is  expedient  that  the 
broad  gauge  should  be  extended  to  Birmingham  ;  and  if  so,  in 
what  manner  such  an  arrangement  can  be  carried  into  effect  with 
the  least  interference  with  existing  interests.  .  .  . 


THE  MIXED  GAUGE.  125 

This,  of  course,  opened  up  again  the  whole  question 
of  the  comparative  merits  of  the  two  gauges. 

The  Railway  Commissioners  issued  a.  series  of  queries 
addressed  to  the  officials  of  the  Great  Western  and  the 
London  and  North  Western  Railway  Companies,  and 
others.  On  the  part  of  the  Great  Western,  answers  were 
given  by  Mr.  Brunei  and  Mr.  Daniel  Gooch.  Mr.  Gooch 
also  furnished  the  results,  with  tables  and  diagrams,  of  a 
very  comprehensive  series  of  dynamometrical  experiments, 
made  by  him  on  a  mile  of  straight  and  level  line  on  the 
Bristol  and  Exeter  Railway.  These  experiments  fully  de- 
monstrated the  advantages  of  the  broad  gauge,  and  are 
still  the  chief  authority  on  train  resistances. • 

In  their  report  the  Commissioners  adopled  the  opinion 
of  the  Gauge  Commissioners  '  that  a  break  of  gauge  was 
/  a  most  serious  impediment  in  the  transport  of  mer- 
'  chandise,  and  that  the  broad  gauge  did  not  offer  any 
'  compensating  advantage  so  far  as  that  description  of 
'  traffic  was  concerned.'  In  regard,  however,  to  passenger 
traffic,  they  found  a  case  for  further  enquiry.     They  said — 

It  is  notorious  that  higher  speeds,  with  larger  and  heavier  pas- 
senger trains,  are  regularly  maintained  on  a  part  of  the  line  of  the 
Great  "Western  Railway  than  on  any  other  railway  in  the  country. 
This  fact  is  known  and  greatly  appreciated  by  a  very  large  portion 
of  the  public ;  and  no  opinion  respecting  the  extension  of  the  district 
within  which  the  broad  gauge  should  be  adopted  is  likely  to  be 
received  with  confidence  which  is  not  founded  on  a  full  consideration 
of  the  circumstances  to  which  the  above  fact  is  to  be  attributed, 
and  of  the  extent  to  which,  tinder  differing  circumstances,  if  attri- 
butable to  the  breadth  of  gauge,  the  gauge  of  the  Great  "Western 
Railway  offers  this  advantage  (p.  11). 

They  assumed  that  the  greater  speed  was  due  to 
greater  engine  power,  and  they  admitted  that  the  increase 

'  These  experiments  will  be  found  ing  railway  communication  between 
in  the  Appendix  to  the  Report  of  the  London  and  Birmingham  (ordered  to 
Commissioners  of  Railways,  respect-       be  printed  May  22,  1848). 


126  THE  BEOAD  GAUGE. 

of  gauge  allowed  of  an  increase  in  the  size  and  power  of 
the  locomotive.  They  arrived  at  the  result  that  the 
broad-gauge  engine  '  can   draw  on   a  level  an  ordinary 

*  passenger  train  of  60  tons  with  as  much  facility  at 
'  sixty  miles  an  hour  as  the  narrow-gauge  engines  can  at 

*  fifty,'  the  advantage,  however,  diminishing  with  steep 
gradients.  In  their  report  the  following  passages  are  to 
be  found : — 

Such  appear  to  the  Commissioners  to  be  the  advantages  which 
the  broad  gauge  at  present  ofFers ;  and  although  they  cannot  consider 
them  sufficient  to  compensate  the  evils  attendant  on  two  gauges,  if 
it  were  now  possible  to  obtain  uniformity  of  gauge,  yet,  as  two  gauges 
are  established,  it  appears  to  them  that  it  might  be  expedient,  and 
for  the  public  interest,  on  account  of  those  advantages,  to  extend 
the  broad  gauge  to  Birmingham     ...     (p.  14.) 

By  introducing  the  mixed  gauge  on  the  Birmingham  and  Oxford 
Junction  Railway,  the  line  from  Birmingham  by  Fenny  Compton 
to  London  would  probably  offer,  as  a  broad-gauge  railway,  as  rapid 
a  communication  as  the  existing  direct  line  ;  ^  and  great  as  the  ad- 
vantages which  the  public  have  received  by  the  rivalry  between  the 
gauges,  in  the  rapid  improvement  in  railway  travelling,  have  been, 
it  might  even  be  expected  that  these  would  be  further  increased 
when  the  two  systems  are  brought  into  direct  competition,  which  as 
yet  they  have  not  been  (p.  16). 

The  report  of  the  Railway  Commissioners  was  presented 
in  May  1848.  Their  decision  was  ratified  by  the  passing 
of  an  Act  in  the  same  session  for  extending  the  broad 
gauge  from  Oxford  to  Birmingham ;  and  the  line  was 
opened  in  October  1852. 

Beyond  Birmingham  the  Great  Western  Company  pur- 
chased existing  railways  leading  through  Wolverhampton 
and  Shrewsbury  to  Chester,  and  obtained  access  to 
Birkenhead  and  Manchester.     It  thus  secured  a  commu- 

'  This  was  fully  borne  out  after-  against  113  of  the  narrow.     Similar 

wards,  the  express  trains  running  in  favourable   results    have    been   since 

the  same  time,    3   hours,  over   both  exhibited  in  the  competition  between 

routes,     though   the    length    of     the  the  broad  and  narrow  gauge  lines  to 

broad-gauge    line  was   129  miles,  as  Exeter. 


BREAK  OF  GAUGE.  127 

nication  with  the  great  Lancashire  towns  and  the  manu- 
facturing districts. 

But  all  the  lines  north  of  Wolverhampton  had  been 
constructed  on  the  narrow  gauge,  and  therefore,  unless 
the  broad  gauge  had  been  laid  down  on  these  lines,  there 
was  a  break  of  gauge  between  the  northern  districts  and 
London. 

The  break  of  gauge  was  found  to  be  a  much  more  serious 
evU  than  had  been  anticipated  by  the  Great  Western  Com- 
pany when  they  were  fighting  their  great  battle  in  1845. 
For  passengers  the  inconvenience  was  unimportant;  but 
for  the  goods  traffic  between  the  manufacturing  towns 
:ind  London  it  was  serious,  partly  on  account  of  the  ex- 
pense, but  more  especially  in  consequence  of  the  loss  of 
time.  The  delay  of  some  hours  by  change  of  waggons, 
where  great  competition  existed,  was  fatal. 

For  these  reasons  the  abolition  of  the  break  of  gauge 
became  desirable.  The  number  of  narrow-gauge  lines  had 
by  the  year  1861  been  so  increased  that  there  was  no  longer 
any  hope  of  advantageously  extending  the  broad  gauge 
in  the  north.  Therefore  the  mixed  gauge  was  completed 
to  London. 

After  the  establishment  of  the  narrow-gauge  communi- 
cation on  the  northern  lines  of  the  Great  Western,  and  its 
prolongation  to  London,  there  was  but  little  inducement 
to  use  the  broad  gauge  north  of  Didcot. 

So  far  as  it  extended,  the  broad  gauge  had  exhibited  in 
a  marked  degree  the  advantages  Mr.  Brunei  claimed  for 
it,  and  which  were  neither  few  nor  unimportant. 

It  may  be  desirable  before  concluding  this  chapter  to 
sum  up  those  advantages : — 

1.  It  gave  the  power  of  constructing  more  powerful 
engines,  by  which  greater  speed  for  passenger  trains  and 


128  THE  BROAD  GAUGE. 

greater  tractive  power  for  heavy  goods  trains  were  ob- 
tained.' 

2.  It  gave  more  space  for  the  convenient  arrangement 
and  benej&cial  proportions  of  the  machinery,  as  well  as  for 
convenient  access  to  it.  In  all  these  points  difficulties 
had  been  found  on  the  narrow  gauge;  and  the  com- 
pulsory restriction  of  so  important  a  dimension  as  the 
width  between  the  rails  has  been  a  bar  to  any  improve- 
ments of  great  magnitude  or  comprehensive  nature. 

3.  It  gave,  even  with  the  overhanging  carriage,  the 
facility  for  obtaining  large  wheels,  and  consequently  dimi- 
nishing the  axle  friction  without  sacrifice  of  stability. 

4.  The  greater  width  of  base  for  the  carriages  to  rest 
on  gave  increased  steadiness  and  smoothness  of  motion, 
particularly  at  high  speeds.  It  was  the  impulse  given 
by  the  increase  of  speed  and  comfort  obtained  without 
difficulty  on  the  broad  gauge,  which  had  led  to  the 
chief  improvements  introduced  in  railway  travelling. 

5.  Greater  safety  was  secured,  particularly  at  high  speed, 
from  the  greater  stability  of  position  due  to  the  wider 
base,  producing  increased  steadiness  and  diminishing  the 
chance  under  exceptional  circumstances  of  the  derange- 
ment of  any  part  of  the  train. 

6.  While  the  broad  gauge  was  but  little  more  costly 
than  the  narrow,  the  width  of  the  works  being  deter- 
mined not  by  the  width  of  the  rails,  but  by  the  width 
of  the  carriages,  and  the  extra  cost  of  rolling  stock 
being  very   small,^  the   broad  gauge    could    be   worked 

'  Among  many  important  advances  line  to  Exeter,  express  trains  ran  from 

in   railway   travelling    made    on   the  London  to  Exeter,  194  miles,  in  4 J 

Great  Western   Railway,  it  may  be  hours.     This  rate  of  travelling,  which 

mentioned  that  it  was  on   this   line  was  accomplished  without  difficulty 

that  express  trains  running  long  dis-  by  the  broad  gauge  in  its  early  days, 

tances   without   stopping   were    first  has  scarcely  been  exceeded  since  on 

introduced  ;  and  that,  in  1845,  within  any  railway, 
about  a  year  of  the  completion  of  the  *  Even  in  the  locomotives  when  of 


ADVAXTAaES   OF  THE   BROAD   GAUGE.  129 

more  economically  under  parallel  circumstances  tlian  tlie 
narrow. 

7.  It  gave  the  facility  of  using  broader  vehicles  v?itli 
equal  steadiness,  in  cases  where  the  extra  breadth  would 
be  useful,  though  the  extra  breadth  was  by  no  means 
an  essential  part  of  the  scheme. 

The  truth  of  these  assertions,  as  establishing  the 
superiority  of  the  broad  gauge,  was  of  course  vehemently 
denied  by  the  advocates  of  the  narrow  gauge. 

One  objection  urged  by  them,  the  inconveniences  of 
the  break  of  gauge,  has  undoubtedly  been  proved  by  ex- 
perience to  be  a  very  powerful  one,  so  powerful  indeed  as 
to  compel  the  abandonment  of  the  broad  gauge  on  the 
lines  where  any  considerable  quantity  of  goods  traffic  has 
to  be  carried  in  competition  with  other  companies. 

Had  Mr.  Brunei's  original  plan  been  carried  out,  and 
had  the  broad-gauge  companies  taken  possession  of  all  the 
western  portions  of  England,  and  avoided  extensions  into 
the  north,  the  points  of  contact  would  no  doubt  have  been 
so  unimportant  that  no  great  inconvenience  would  have 
arisen,  or  a  few  miles  of  double  gauge  would  have  re- 
moved any  difficulty ;  but,  under  the  actual  circumstances 
of  the  case,  the  Great  Western  Company  were  forced  to 
yield. 

The  advantages  of  the  broad  gauge  were  so  much  ap- 
preciated by  the  districts  it  served,  that  its  abandonment 
was  viewed  with  considerable  displeasure,  particularly  in 
the  neighbourhood  of  Birmingham ;  but  the  inconvenience 

equal  power,  Mr.   Brunei  calculated  although  Mr.  Brunei  had  taken  ad- 

that  the   extra  weight  was  not  more  vantage   of  the   broad  gauge  to  get 

than  about  500  lbs.  carriage  bodies  2  feet  wider  than  was 

The  extra  cost  of  the  Great  Western  then  usual. 

Railway  was    only,   including    land,  The  wide  carriages  and  wagons  were 

from  300^.  to  500^.  per  mile,  or  less  found  less  costly  than  the  narrow  ones 

than    10    per   cent,   of    the   whole  ;  in  proportion  to  the  load  they  carried. 


130  THE  BROAD   GAUGE. 

of  double  traffic  arrangements  far  outweighed  tlie  advan- 
tages derivable  from  the  use  of  the  broad  gauge,  to  the 
limited  extent  it  could  be  applied  on  those  outlying  por- 
tions of  the  Great  Western  system.  For  these  reasons 
the  Company  came  to  the  determination  to  work  their 
northern  lines  on  the  narrow  gauge  only. 

The  broad  gauge  is  therefore  now  confined  to  the  dis- 
trict for  which  it  was  originally  intended.  Even  in  this 
district  there  are  many  points  of  contact  with  the  narrow 
gauge ;  but  the  inconveniences  of  break  of  gauge  are  by 
no  means  so  important  as  they  were  in  the  north,  and  do 
not,  at  present  at  least,  menace  the  continued  existence  of 
Mr.  Brunei's  design. 


131 


CHAPTER  VI. 

THE  ATMOSPHERIC  SYSTEM. 

A.D.   1840—1848.      JETATIS   35—43. 

PRELIMINARY  OBSERVATIONS — THE  SOUTH  DEVON  RAIL-WAT — DESCRIPTION 
OF  THE  ATMOSPHERIC  SYSTEM — HISTORY  OF  ITS   INTRODUCTION  PRIOR  TO  1844 

REPORT   BY    MR.    BHXTNEL,    RECOMMENDING    ITS    ADOPTION    ON    THE    SOUTH 

DEVON  RAILWAY  (AUGUST  19,  1844) — EXAMINATION  OF  THIS  REPORT — MR. 
BRUNEl's  EVIDENCE  BEFORE  THE  SELECT  COMMITTEE  ON  ATMOSPHERIC 
RAILWAYS,    1845 — HISTORY    OF    THE    APPLICATION   OF   THE   SYSTEM    ON   THE 

SOUTH  DEVON  RAILWAY,  1844-1848 REPORT  ON  STATE  OF    WORKS  (AUGUST  28, 

1847) REPORT     ON     CAUSES    OF     FAILURE    (AUGUST  19,  1848) ABANDONMENT 

OF  THE  SYSTEM,  SKPTEMBEB  1848 — NOTE — COMPARISON  OF  STATIONARY  AND 
LOCOMOTIVE  POWER. 

In  tlie  year  1844  Mr.  Brunei  recommended  the  adoption 
of  the  Atmospheric  System  of  propulsion  on  the  South 
Devon  Railway,  a  line  of  52  miles  in  length,  which  he 
was  then  constructing  between  Exeter  and  Plymouth. 
This  system  had,  under  the  management  of  Messrs. 
Clegg  and  Samuda,  been  in  operation  with  success  on  the 
Dalkey  line  for  some  time  before  Mr.  Brunei  adopted 
their  apparatus  on  the  South  Devon  Railway.  After  it  had 
been  in  use  on  the  South  Devon  for  about  twelve  months, 
it  was  abandoned,  and  the  railway  worked  throughout  by 
locomotives. 

It  is  therefore  as  important  as  it  is  interesting  to  exa- 
mine the  causes  of  the  failure  of  the  Atmospheric  System, 
and  to  consider  the  reasons  which  induced  Mr.  Brunei  in  the 
first  instance  to  adopt  it,  and  afterwards  to  recommend  its 
abandonment. 

Up  to  about  the  year  1843,  the  cost  of  railways,  which 

x2 


132  THE  ATMOSPHERIC  SYSTEM. 

was  in  a  great  measure  due  to  the  conditions  imposed 
by  the  limited  capabilities  of  the  locomotive,  had  pre- 
vented their  construction,  except  in  cases  where  they 
would  secure  a  large  traffic,  and  at  the  same  time  traverse 
what  was  then  considered  a  practicable  country. 

A  curvature  of  one  mile  radius  was  regarded  as  the 
maximum  generally  admissible  on  a  line  where  high 
speeds  were  aimed  at,  and  auxiliary  locomotives  were 
required  to  work  heavy  gradients.  * 

Nevertheless,  by  the  growing  wants  of  the  public  and 
the  growing  boldness  of  engineers,  the  railway  system  was 
gradually  being  forced  into  districts  hitherto  regarded  as 
unsuitable  for  it;  and  no  country  was  held  to  be  imprac- 
ticable where  the  gradients  could  be  surmounted  by  the 
inconvenient  and  costly  expedient  of  auxiliary  power. 

The  south  of  Devon  had  for  several  years  demanded 
railway  accommodation,  and  at  the  period  now  under 
review,  Mr.  Brunei  projected  what  was  called  the  coast 
line.  This  line,  while  it  best  accommodated  the  popula- 
tion of  the  district,  passed  through  a  very  difficult  country. 
If  it  was  to  be  constructed  at  a  moderate  cost,  curves  of 
a  quarter  of  a  mile  radius  had  to  be  admitted ;  and  above 
30  miles  of  its  entire  length  traversed  a  district  involving 
the  adoption  of  gradients  steeper  than  had  been  elsewhere 
used  for  such  considerable  distances.  The  Act  for  this 
railway  was  obtained  in  the  Session  of  1844. 

The  South  Devon  Railway,  on  leaving  Exeter,  crosses 
the  flat  country  on  the  right  bank  of  the  river  Exe,  as  far 
as  Starcross,  a  village  nearly  opposite  to  Exmouth.  From 
this  point  it  runs  down  to  the  coast  and  along  the  sea- 
shorCj  by  Dawlish,  to  Teignmouth ;  being  protected  by  a 
sea-wall  for  the  greater  part  of  the  distance,  and  passing 
through  several  headlands  by  short  tunnels.  Beyond 
Teignmouth  it  follows  the  left  bank  of  the  river  Teign, 


THE   SOUTH   DEVON  EAILWAY.  133 

whicli  it  crosses  a  short  distance  before  reaching  the 
station  at  Newton  Abbott.  The  portion  of  the  line  from 
Exeter  to  Newton — 21-^  miles  in  length — is  very  nearly- 
level,  the  steep  inclines  for  which  the  railway  is  noted 
being  west  of  Newton.  Between  Newton  and  Totness,  for 
the  first  mile  and  a  half  the  line  is  almost  level,  and  in  the 
next  two  miles  it  rises  200  feet,  with  gradients  of  1  in  100, 
1  in  60,  and  nearly  a  mile  of  1  in  43.  At  the  summit  is 
a  short  tunnel ;  and  thence  the  line  descends  1 70  feet  in 
a  mile  and  three-quarters,  with  gradients  of  1  in  40  and 
1  in  43  for  about  three-quarters  of  a  mile,  and  gradients 
of  1  in  57  and  1  in  88  for  the  rest  of  the  incline.  It 
then  runs  with  more  moderate  gradients  and  about  a  mile 
and  a  half  of  level  line  to  Totness. 

From  the  valley  of  the  Dart  at  Totness  the  line  rises  at 
once  by  a  rapid  ascent  of  350  feet  in  four  miles  and  a 
half,  with  gradients  varying  from  1  in  48  to  1  in  90, 
more  than  a  mile  and  a  half  averaging  1  in  50.  Thence  it 
runs,  with  easy  up  and  down  gradients,  for  a  distance  of 
12  miles  along  the  skirts  of  Dartmoor,  crossing  by  lofty 
viaducts  the  deep  valleys  which  penetrate  the  moor.  It 
then  descends  to  Plympton,  in  the  valley  of  the  Plym, 
falling  273  feet  in  a  little  more  than  two  miles,  with  a 
gradient  of  1  in  42 1.  From  Plympton  the  line  for  two 
miles  is  level,  and  then  rises  on  an  incline  of  1  in  80  for 
a  mile  and  a  half,  and  descends  by  a  similar  gradient  into 
the  Plymouth  station. 

The  main  characteristics  of  the  railway  are  that,  while  it 
traverses  a  very  heavy  country,  its  principal  changes 
of  level  are  concentrated  into  four  long  and  steep  inclines. 
These  four  inclines  were  intended  to  be  worked  by  auxiliary 
power. 

Hitherto  on  gradients  of  unusual  steepness  a  stationary 
engine  with  rope  traction  had  been  generally  regarded  as 
the  only  available  expedient ;  but  the  special  difficulties 


134  THE  ATMOSPHEEIC  SYSTEM. 

by  which  this  system  was  encumbered  rendered  it  un- 
suitable for  high-speed  passenger  traffic,  and  practically 
inapplicable  to  an  extended  line.  It  had,  however,  been 
very  successfully  employed,  by  Mr.  Eobert  Stephenson  on 
the  Blackwall  Railway,  a  line  of  about  3|  miles  in  length. 
Messrs.  Clegg  and  Samuda,  the  projectors  of  the 
Atmospheric  System,  which  was  another  mode  of  using 
stationary  power,  had,  previously  to  this  period,  laboured 
to  attract  the  attention  and  win  the  favourable  opinion 
of  engineers  and  the  general  public. 

It  is  desirable,  before  proceeding  further,  to  give  a  brief 
description  of  this  system  of  traction,  upon  the  merits  of 
which  distinguished  engineers  entertained  widely  different 
opinions. 

Between  the  two  rails  of  the  line  of  way  was  laid  a 
cast-iron  tube,  which  on  the  Croydon  and  Dalkey  rail- 
ways and  the  completed  or  level  portion  of  the  South 
Devon  Railway  was  fifteen  inches  in  diameter.  On  the 
inclines  it  was  proposed  to  use  a  twenty-two  inch  tube. 

At  intervals  of  about  three  miles  along  the  line  were 
erected  stationary  engines,  working  large  air-pumps,  by 
means  of  which  air  could  be  exhausted  from  the  tube,  and 
a  partial  vacuum  created  within  it.  A  close-fitting  piston 
was  placed  in  one  end  of  the  tube,  and  the  air  being 
exhausted  from  it,  the  pressure  of  the  external  air  on  the 
surface  of  the  piston  which  was  towards  the  open  end 
of  the  tube  forced  the  piston  through  the  tube  towards 
the  end  where  the  air-pumps  were  working;  so  that  if 
the  piston  were  connected  with  a  carriage  running  on  the 
rails,  it  would  draw  the  carriage  with  it.  The  connec- 
tion between  the  piston  and  the  carriage  was  arranged 
by  Messrs.   Clegg  and  Samuda  in  the  following  way:^ 

'  The  apparatus  patented  in  1839  proved  from  time  to  time  by  them,  was 
by  Mr.  Samuel  Clegg  and  Messrs.  that  adoptedin  almost  all  the  attempts 
Jacob  and  Joseph  Samuda,  and  im-      made  in  this  country  to  introduce  the 


DESCEIPTION  OF  THE  APPAKATUS.  135 

Along  the  top  of  the  tube  was  a  slit  about  2^  inches 
wide ;  this  slit  was  closed  by  a  long  flap  of  leather,  which 
was  strengthened  with  iron  plates,  and  secured  to  the 
tube  at  one  side  of  the  slit.  One  edge  of  the  leather  thus 
formed  a  continuous  hinge;  the  other  edge,  where  it 
closed  on  the  tube,  was  sealed  with  a  composition  of 
grease,  to  render  it  air-tight.  This  flap  was  known  by 
the  name  of  the  longitudinal  valve. 

When  the  valve  was  closed,  the  air  could  be  exhausted 
from  the  tube  in  front  of  the  piston,  and  a  partial 
vacuum  formed.  Behind  the  piston,  the  air  being  at 
atmospheric  pressure  both  within  and  without  the  tube, 
there  was  no  objection  to  opening  the  longitudinal  valve  ; 
and  a  bar,  extending  downwards  from  the  under  side  of 
the  carriage,  entered  the  slit  obliquely  under  the  opened 
valve,  and  was  connected  to  the  rear  end  of  a  frame  about 
ten  feet  long,  the  front  end  of  which  carried  the  piston. 
To  allow  the  bar  to  pass  along  the  slit,  the  valve  was 
opened  on  its  hinge,  being  pressed  upwards  by  a  series 
of  wheels  carried  by  the  moving  piston-frame  inside  the 
tube.  The  valve  closed  again  after  the  passage  of  the 
train ;  and  the  tube  was  ready  to  be  exhausted  in  prepara- 
tion for  the  passage  of  the  next  train.* 

Atmospheric  System.  In  reckoning  was  useful  in  traction.  This,  how- 
up  the  force  which  was  available  for  ever,  was  not  the  case ;  for,  as  was 
mastering  the  practical  difficulties  of  admitted  by  the  more  scientific  of 
the  undertaking,  the  death,  in  1844,  the  opponents  of  the  Atmospheric 
of  Mr.  Jacob  Samuda  must  be  con-  System,  the  power  employed  in  an- 
sidered  to  have  been  to  his  brother,  ticipatory  pumping  was  work  legiti- 
and  to  all  others  concerned,  a  great  mately  stored  up  and  re-delivered  in 
and  irreparable  loss.  relief  of  the  engines  during  the 
'  A  considerable  amount  of  engine  passage  of  the  train.  A  waste  of 
power  was  necessarily  consumed  in  power  incidental  to  the  Atmospheric 
exhausting  the  tube  before  the  passage  System  was  indicated  by  the  heat  of 
of  the  train  commenced ;  and  it  might  the  air  which  was  delivered  by  the 
at  first  sight  appear  that  this  work  exhausting  pumps.  This  waste,  how- 
was  wasted,  and  that  it  was  only  the  ever,  amounted  on  the  average  to  only 
work  which  the  engine  performed  10  per  cent,  of  the  total  work  done.  A 
during  the  passage  of  the  train  which  further  source  of  waste  of  power  was 


136  THE   ATMOSPHEEIC   SI' STEM. 

The  Atmospheric  System  was  first  tried  in  1840.  An 
experimental  tube  was  laid  down  at  Wormwood  Scrubs 
on  part  of  tlie  short  line  now  incorporated  into  the  West 
London  Railway,  and  then  known  by  the  title  of  the 
Bristol,  Birmingham,  and  Thames  Junction  Eailway.  Its 
working  was  the  subject  of  eager  discussion  among 
engineers. 

In  1842  Sir  Frederic  Smith,  E.E.,  and  Professor  Barlow, 
under  an  order  from  the  Board  of  Trade,  reported  so 
favourably  on  the  system  with  reference  to  the  proposal 
for  its  application  on  the  Dalkey  branch  of  the  Dublin  and 
Kingstown  Eailway,  that  it  was  adopted  there.  In  1843 
Mr.  (afterwards  Sir  William)  Cubitt  determined  to  employ 
it  on  the  Croydon  Eailway ;  and  about  the  same  time  Mr. 
Robert  Stephenson  was  desired  by  the  Directors  of  the 
Chester  and  Holyhead  Eailway  to  report  on  the  propriety 
of  introducing  it  on  that  line. 

Mr.  Stephenson's  report  was  based  on  a  series  of  ex- 
periments on  the  working  of  the  system  at  Dalkey.  The 
riew  he  took  was  adverse  to  its  adoption,  not  only  on 
the  Chester  and  Holyhead,  but  on  almost  every  railway 
whatsoever ;  and  this  on  the  ground  that,  though  it  was 
quite  capable  of  being  developed  into  a  practical  working 
system,  yet  on  lines  with  ordinary  gradients  the  atmo- 
spheric traction  must  be  considerably  more  costly  than 
locomotive  traction,  and  on  steep  gradients  than  rope 
traction ;  in  other  words,  that,  as  a  mechanical  appliance 
it  was,  though  practicable,  not  economical. 

Mr.  Stephenson's  report  had  no  sooner  appeared  than 
the  correctness  of  his  conclusions  was  disputed  on  his 
giving   evidence   before   a   Committee   of  the   House   of 

the  friction  of  the  air  passing  along       the  average,  to  from  10  to  15  percent, 
the  tube  to  the  exhausting  pumps  ;       of  the  total  work  done, 
this  waste  was  found  to  amount,  on 


niSTOEY   OF  ITS  INTEODUCTION.  137 

Commons,  in  tlie  spring   of  1844,  on  the  Croydon  and 
Epsom  Railway  Bill. 

Mr.  Brunei  also  was  summoned  as  a  witness.  Previously 
to  this  time  he  had  taken  a  great  interest  in  the  various 
attempts  which  had  been  made  to  introduce  the  Atmo- 
spheric System,  and  he  had  himself  conducted  experiments 
at  Wormwood  Scrubs  and  at  Dalkey.  As  early  as  July 
1840  he  had  considered  its  applicability  to  the  Box  Tunnel 
incline  on  the  Great  Western  Railway.  He  had  also  con- 
sidered it  in  reference  to  various  projected  lines ;  and  in 
1843  he  recommended  it  for  adoption  in  a  long  tunnel 
on  one  of  the  steep  inclines  of  the  Genoa  and  Turin 
Railway,  the  success  of  the  system  being  then  (he  wrote) 
sufficient  to  justify  its  use  on  a  part  of  the  line  protected 
from  weather.  It  was  not,  however,  applied  on  this 
railway.' 

Mr.  Brunei's  views  at  this  time  are  indicated  in  the 
following  letter : — 

April  8,  1844. 
Any  part  I  have  taken  in  examining  into  the  system  has  been 
purely  from  the  desire  which  I  always  feel  to  forward  good  inven- 
tions ;  and  when  I  have  formed  a  decided  opinion,  no  fear  of  the 
consequences  ever  prevents  my  expressing  it.  My  great  anxiety, 
however,  is  to  see  a  line  of  railway  and  all  its  appurtenances  made 
expressly  for  the  Atmospheric  System,  and  worked  accordingly  j 
until  this  is  done  the  results  will  be  comparatively  unsatisfactory. 

*  This  was  almost  the  only  case  in  '  circumstances.     I  remember  a  case 

which  Mr.  Stephenson   approved  of  '  where  it  might  be  advantageous.  Mr. 

the  application  of  the  System.  '  Brunei  went  to  Italy  for  the  purpose 

Before  the  Croydon  and  Epsom  Com-  '  of  laying  out  a  line  there,  and  from 

mittee,  in  answer  to  thequestion,  'Does  '  Genoa  over  the  Apennines  he  had  to 

'  the  Atmospheric  railway  give  you  any  '  form  a  line  ;  it  would  probably  rise 

'  power  of  using  practically  and  use-  *  15  or  20  miles  at  1  in  100  or  1  in  60 

'  fully  steeper  inclines  than  the  loco-  *  or  70.     Where  there  is  that  continu- 

'  motive  railways  ?  '   Mr.   Stephenson  *  ous  line  of  ascent, where  no  stoppages 

said,  '  Yes,  I  think  it  does,  but  still  '  are  required,  where  the  locomotive  is 

*  at  a  very  inordinate  loss  of  power ;  '  totally  inapplicable,  there  I  can  con- 

'  still  it  is  within  the   scope  of  the  *  ceive  nothing  more  eligible  than  the 

'  Atmospheric  System  under  particular  '  Atmospheric  plan '  (p.  80). 


138  THE  ATMOSPHEEIC  SYSTEM  [a.d.  1844. 

Although  unwilling  to  express  general  opinions,  Mr. 
Brunei  spoke  strongly  before  the  Croydon  and  Epsom 
Railway  Committee  in  favour  of  the  advantages  of  the 
Atmospheric  System  under  certain  circumstances,  and 
approved  of  its  use  on  that  line. 

A  few  months  later  Mr.  Brunei  recommended  the  Direc- 
tors of  the  South  Devon  Eailway  Company  to  adopt  the  At- 
mospheric System,  and  they  resolved  to  act  on  his  advice. 

His  report  was  as  follows  : — 

August  19,  1844. 

I  have  given  imicli  consideration  to  the  question  referred  to  me 
by  you  at  your  last  meeting — namely,  that  of  the  advantage  of  the 
application  of  the  Atmospheric  System  to  the  South  Devon  Railway. 

The  question  is  not  new  to  me,  as  I  have  foreseen  the  possibility 
of  its  arising,  and  have  frequently  considered  it. 

I  shall  assume,  and  I  am  not  aware  that  it  is  disputed  by  anybody, 
that  stationary  power,  if  freed  from  the  weight  and  friction  of  any 
medium  of  communication,  such  as  a  rope,  must  be  cheaper,  is  more 
under  command,  and  is  susceptible  of  producing  much  higher  speeds 
than  locomotive  power ;  and  when  it  is  considered  that  for  high 
speeds,  such  as  sixty  miles  per  hour,  the  locomotive  engine  with  its 
tender  cannot  weigh  much  less  than  half  of  the  gross  weight  of  the 
train,  the  advantage  and  economy  of  dispensing  with  the  necessity  of 
putting  this  great  weight  also  in  motion  will  be  evident. 

I  must  assume  also  that  as  a  means  of  applying  stationary  power 
the  Atmospheric  System  has  been  successful,  and  that,  unless  where 
under  some  very  peculiar  circumstances  it  is  inapplicable,  it  is  a 
good  economical  mode  of  applying  stationary  power. 

I  am  aware  that  this  opinion  is  directly  opposed  to  that  of  Mr. 
Eobert  Stephenson,  who  has  written  and  published  an  elaborate 
statement  of  experiments  and  calculations  founded  upon  them,  the 
results  of  which  support  his  opinion. 

It  does  not  seem  to  me  that  we  can  obtain  the  minute  data  required 
for  the  mathematical  investigation  of  such  a  question,  and  that  such 
calculations,  dependent  as  they  are  upon  an  unattained  precision  in 
experiments,  are  as  likely  to  lead  you  very  far  from  the  truth  as  not. 

By  the  same  mode  M.  Mallet  and  other  French  engineers  have 
proved  the  success  of  the  system  ;  and  by  the  same  mode  of  inves- 
tigation Dr.  Lardner  arrived  at  all  those  resiilts  regarding  steam 


JET.  39.]  EECOMMENDED  BY  ME.  BRUNEL.  139 

navigation  and  the  speed  to  be  attained  on  railways,  wliich  have 
since  proved  so  erroneous. 

Experience  has  led  me  to  prefer  what  some  may  consider  a  more 
superficial,  but  what  I  should  call  a  more  general  and  broader  view, 
and  more  capable  of  embracing  all  the  conditions  of  the  question 
— a  practical  view. 

Having  considered  the  subject  for  several  years  past,  I  have 
cautiously,  and  without  any  cause  for  a  favourable  bias,  formed  an 
opinion  which  subsequent  experiments  at  Dalkey  have  fully  proved 
to  be  correct ;  viz.  that  the  mere  mechanical  difficulties  can  be  over- 
come, and  that  the  full  eifect  of  the  partial  vacuum  produced  by  an 
air-pump  can  be  communicated,  without  any  loss  or  friction  worth 
taking  into  consideration,  to  a  piston  attached  to  the  train. 

In  this  point  of  view  the  experiment  at  Dalkey  has  entirely  suc- 
ceeded. A  system  of  machinery  which  even  at  the  first  attempt 
works  without  interruption  and  constantly  for  many  months,  may 
be  considered  practically  to  be  free  from  any  mechanical  objection. 

No  locomotive  line  that  I  have  been  connected  with  has  been 
^equally  free  from  accidents. 

That  which  is  true  for  one  railway  of  two  miles  in  length  is 
equally  true  for  a  second  or  third,  although  they  may  be  placed  the 
one  at  the  end  of  the  other ;  the  chances  of  an  accident  are  only  in 
the  proportion  of  the  number,  or  in  other  words,  the  length,  a  pro- 
portion which  holds  equally  good  with  locomotives,  except  that  a 
locomotive  may  be  aifected  by  the  distance  it  has  previously  run, 
while  a  stationary  engine  and  its  pipes  cannot  in  like  manner  be 
affected  by  the  previous  working  of  the  neighbouring  engine  and  pipes. 

In  my  opinion  the  Atmospheric  System  is,  so  far  as  any  stationary 
power  can  be,  as  applicable  to  a  great  length  of  line  as  it  is  to  a 
short  one. 

Upon  aU  these  points  I  could  advance  many  arguments  and  many 
proofs,  but  I  shall  content  myself  with  saying  that,  as  a  professional 
man,  I  express  a  decided  opinion  that,  as  a  mechanical  contrivance,  the 
Atmospheric  apparatus  has  succeeded  perfectly  as  an  effective  means 
of  working  trains  by  stationary  power,  whether  on  long  or  short  lines, 
at  higher  velocity  and  with  less  chance  of  interruption  than  is  now 
effected  by  locomotives. 

I  will  now  proceed  to  consider  the  question  of  the  advantage  of 
its  application  to  the  South  Devon  Kailway. 

It  will  simplify  the  discussion  of  the  question  very  much  if  it  is 
considered  as  a  comparison  between  a  double  line  worked  by  loco- 
motives in  the  usual  manner,  and  a  single  line  of  railway  worked  by 


140  THE  ATMOSPHEEIC  SYSTEM  [a.d.  1844. 

stationary  power,  the  only  peculiarity  of  the  present  case  being  that 
upon  four  separate  portions  of  the  whole  52  miles  stationary  assistant 
power  would  under  any  circumstances  have  been  used,  these  four 
inclines  forming  together  one-fifth  of  the  whole  distance. 

It  is  necessary  to  consider  it  as  a  question  of  a  single  line  on 
account  of  the  expense,  th"e  cost  of  the  pipe  for  each  line  being 
about  3,500^.  per  mile. 

An  addition  of  7,000Z.  per  mile,  or  of  about  330,000/.,  in  the  first 
construction  could  not  be  counterbalanced  by  any  adequate  advan- 
tage in  the  saving  in  the  works  on  the  South  Devon  Eailway,  and 
probably  not  by  any  subsequent  economy  or  advantage  in  the 
working;  but  the  system  admits  of  the  working  with  a  single 
line,  without  danger  of  collision,  certainly  with  less  than  upon  a 
double  locomotive  line.  And  I  believe  also  that,  considering  the 
absence  of  most  of  the  causes  of  accidents,  there  will  even  be  less 
liability  of  interruption  and  less  delay  in  the  average  resulting  from 
accidents  than  in  the  ordinary  double  locomotive  railway. 

By  the  modification  of  the  gradients  and  by  reducing  the  curves  to 
1,000  feet  radius  where  any  great  advantage  can  be  gained  by  so 
doing,  and  by  constructing  the  cuttings,  embankments,  tunnels,  and 
viaducts  for  a  single  line,  a  considerable  saving  may  be  effected  in 
the  first  cost. 

In  the  permanent  way  and  ballasting,  the  reduction  will  be  about 
one-half  I  should  propose  to  make  the  rails  about  52  lbs.  weight 
and  the  timber  12x6;  the  quantity  of  ballast  would  probably  be 
rather  more  than  half,  but  at  the  present  prices  of  iron  and  timber 
the  saving  could  not  be  less  than  2,500Z.  per  mile. 

From  a  careful  revision  of  the  works  generally,  I  consider  that  a 
reduction  may  be  effected  in  the  following  items,  and  to  the  amount 
specified  in  each,  viz.,  ballasting  gradients  and  curves  : — 


Eeduction  in  earth  work 

„         in  length  of  principal  tunnel 


Saving  hy  single  line. 


Earth  work 

Tunnels 

Viaducts 


£ 
16,500 
14,000 

s. 
0 
0 

d. 
0 
0 

30,500 

0 

0 

25,000 
11,500 
15,000 

0 
0 
0 

0 
0 
0 

Peiinanent  way  and  ballast. 
To  allow  for  sidings,  say  50  miles,  2,500^.         .     125,000    0     0 

207,000     0     0 


£ 

s. 

d. 

145,000 

0 

0 

35,000 

0 

0 

10,000 

0 

0 

190,000 

0 

0 

JP.T.  39.]  EECOMMEXDED   BY   MR.    BRUNEL.  141 

Per  contra. 

£ 
Pipe  on  41  i  miles  >         .  .  138,500 

Increase  on  inclined  pianos,  10  J  miles     .    6,500 

Engines  for  the  4^  miles 

Patent  right,  say  .... 

The  difference  in  first  cost  therefore  is  .  .       17,000     0     0 

To  this  must  however  be  added  the  cost  of  the 
locomotive  power,  with  its  attendant  expenses 
of  engine-houses,  &c.,  which  cannot,  I  think, 
be  put  at  less  than     ....       50,000     0     0 

Making  a  saving  of       .  .  .  .      67,000     0    0 

I  have  not  included  in  the  expense  of  the  Atmospheric  apparatus 
that  of  the  telegraph,  because  at  its  present  reduced  cost  of  160Z.  per 
mile  I  am  convinced  its  use  would  repay  the  outlay  in  either  case. 

It  would  appear,  then,  that  the  line  can  be  constructed  and  fur- 
nished with  the  moving  power,  in  working  order,  on  the  Atmospheric 
System,  for  something  less  than  the  construction  only  of  the  railway 
fitted  for  the  locomotive  power,  but  without  the  engines ;  and  that 
taking  into  consideration  the  cost  of  locomotive  power,  a  saving  in 
first  outlay  may  be  effected  of  upwards  of  60,000Z. 

But  it  is  in  the  subsequent  working  that  I  believe  the  advantages 
will  be  most  sensible. 

In  the  first  place,  with  the  gradients  and  curves  of  the  South  Devon 
Railway  between  Newton  and  Plymouth,  a  speed  of  thirty  miles  per 
hour  would  have  been,  for  locomotives,  a  high  speed,  and  under 
unfavourable  circumstances  of  weather  and  of  load,  it  would  probably 
have  been  found  difficult  and  expensive  to  have  maintained  even 
this ;  with  the  Atmospheric,  and  with  the  dimensions  of  pipes  I  have 
assumed,  a  speed  of  forty  to  fifty  miles  may  certainly  be  depended 
upon,  and  I  have  no  doubt  that  from  twenty-five  to  thirty-five 
jninutes  may  be  siived  in  the  journey. 

Secondly,  the  cost  of  running  a  few  additional  trains  so  far  as  the 
power  is  concerned  is  so  small,  the  plant  of  engines,  the  attendance 
of  engine-men,  &c.,  remaining  the  same,  that  it  may  almost  be 
neglected  in  the  calculations;  so  that  short  trains,  or  extra  trains  with 
more  frequent  departures,  adapted  in  every  respect  to  the  varying 

'  The  length  of  the  line  was   52  miles  of  very  steep  inclines,  the  cost 

miles,  but  as  it  was  considered  that  of  the  Atmospheric  apparatus  is  taken 

auxiliary   stationary  power  would  in  on  41 J  miles, 
any  case  bo   necessary   on   the   10^ 


142  THE  ATMOSPHERIC  SYSTEM.  [a.d.  1844. 

demands  of  tlie  public,  can  be  worked  at  a  very  moderate  cost.  I 
have  no  doubt  that  a  considerable  augmentation  of  the  general  traffic 
will  be  thus  effected,  by  means  which  with  locomotive  engines  would 
be  very  expensive,  and  frequently  unattainable,  particularly  as  regards 
one  class  of  short  trains,  whether  for  passenger  or  goods,  which  from 
the  inconvenience  of  working  them  by  locomotives  are  hardly  known 
— I  refer  to  trains  between  the  intermediate  stations. 

By  many  means,  which  the  easy  command  of  a  motive  power  at 
any  time,  at  every  part  of  a  line,  must  aiford  of  accommodating  the 
public,  I  believe  the  traffic  may  be  increased. 

It  appears  to  me  also  that  the  quahty  of  the  travelling  will  be 
much  improved ;  that  we  shall  attain  greater  speed,  less  noise  and 
motion,  and  an  absence  of  the  coke  dust,  which  is  certainly  still  a 
great  nuisance ;  and  an  inducement  will  thus  be  held  out  to  those 
(the  majority  of  travellers)  who  travel  either  solely  for  pleasure,  or 
at  least  not  from  necessity,  and  who  are  mainly  influenced  by  the 
degree  of  comfort  with  which  they  can  go  from  place  to  place. 

Lastly,  the  average  cost  of  working  the  trains  will  be  much  less 
than  by  locomotives. 

"With  the  gradients  of  the  South  Devon  Eailway,  and  assuming 
that  not  less  than  eight  trains,  including  mail  and  goods  trains, 
running  the  whole  distance,  and  certainly  one  short  train  running 
half  the  distance,  be  the  least  number  that  would  suffice,  I  think 
an  annual  saving  of  8,000Z.  a  year  in  locomotive  expenses,  including 
allowance  for  depreciation  of  plant,  may  very  safely  be  relied  upon. 

For  all  the  reasons  above  quoted,  I  have  no  hesitation  in  taking 
upon  myself  the  full  and  entire  responsibility  of  recommending  the 
adoption  of  the  Atmospheric  System  on  the  South  Devon  Railway, 
and  of  recommending  as  a  consequence  that  the  line  and  works 
should  be  constructed  for  a  single  line  only.^ 

In  this  report  Mr.  Brunei  rested  his  recommendation 
principally  on  two  assumptions,  wliicli  he  held  to  be  in- 
disputable— (1)  That  stationary  power,  if  freed  from  in- 
cumbrances such  as  the  friction  and   dead  weight  of  a 

'  It    must    be    remembered    that  South  Devon  for  the  application  of 

beyond  the    South   Devon    Railway  the  Atmospheric  System.     Had  that 

was   the  projected  railway    through  system  succeeded,  and  been  introduced 

Cornwall,  which,  with  its  long  and  on  the  Cornwall  Railway,  a  very  great 

heavy  gradients,  was,  in  all  its  fea-  saving  might  have  been  made  in  the 

txiies,  even   more   suitable  than  the  cost  of  the  works  of  this  line. 


AT.  39.]  GEOUNDS  OF  MK.  BRUNEL'S  RECOMMENDATION.   143 

rope,  was  superior  to  locomotive  power ;  and  (2)  That  the 
Atmospheric  System  of  traction  was  theoretically  a  good 
and  economical  method  of  applying  stationary  power,  and 
that  it  was  also  a  practical  and  working  system,  as  had 
been  shown  in  its  first  and  somewhat  crude  application  at 
Dalkey. 

The  superiority  of  stationary  as  compared  with  loco- 
motive power  depends  on  two  principles — (a)  That  a 
given  amount  of  power  may  be  supplied  by  a  stationary 
engine  at  a  less  cost  than  if  supplied  by  a  locomotive. 
{h)  That  the  dead  weight  of  a  locomotive  forms  a  large 
proportion  of  the  whole  travelling  load,  and  thus  in- 
herently involves  a  proportionate  waste  of  power — a  waste 
which  is  enhanced  by  the  steepness  of  the  gradients  and 
the  speed  of  the  trains. 

A  detailed  examination  of  these  principles  is  given  in 
the  note  to  this  chapter. 

It  is  there  shown  that  at  the  time  referred  to  stationary 
power  could  be  obtained  for  one  farthing  per  horse- 
power per  hour,  while  locomotive  power  cost  more  than 
one  penny  per  indicated  horse-power  per  hour,  the  cost 
of  the  locomotive  power  being  more  than  four  times 
that  of  the  stationary  power.  On  a  level  line  at  a  speed 
of  60  miles  per  hour,  for  each  horse-power  usefully  em- 
ployed, a  locomotive,  in  consequence  of  its  own  dead 
weight  and  the  friction  of  its  machinery,  is  obliged  to 
expend  more  than  one  and  a  half  horse-power ;  in  this 
case,  therefore,  the  useful  work  done  costs  nearly  seven 
times  as  much  as  if  it  had  been  performed  by  a  stationary 
engine.  Again,  on  so  moderate  an  ascent  as  one  in  75,  for 
each  horse-power  usefully  employed,  the  locomotive  has  to 
expend  at  40  miles  per  hour  more  than  two  horse-power, 
and  at  60  miles  per  hour  three  horse-power;  so  that 
the  useful  work  done  costs  in  the  one  case  nearly  ten 


University  or  Tcr^oNxo 

DppartM  c.  M  t  hi    C;,,,,     r^, . 


144  TIIE  ATMOSPHERIC    SYSTEM.  [a.d.  18-11. 

times,  in  tlis  otliar  tliirfceen  times,  as  mucli  as  if  it  had 
been  performed  bj  a  stationary  engine. 

This  great  advantage  of  stationary  over  locomotive 
power  was  a  sufficient  justification  for  introducing  a  sys- 
tem which  promised  to  realise  it  to  any  considerable  extent ; 
although  many  difficulties  might  have  to  be  encountered. 

As  has  been  already  stated,  Mr.  Brunei  had  satisfied 
himself  that  the  Atmospheric  System  was  theoretically 
economical,  and  that  its  trial  at  Dalkey  had  shown  that  it 
was  practically  free  from  mechanical  objections.  Mr. 
Stephenson,  indeed,  had  admitted  that  the  mechanical 
details  had  been  brought  to  a  remarkable  degree  of  per- 
fection ;  but  this  admission  was  not  any  qualification  of 
the  radical  difference  of  opinion  which  existed  between 
him  and  Mr.  Brunei,  to  which  Mr.  Brunei  drew  attention 
in  his  report  of  August  1844. 

The  subsequent  abandonment  of  the  Atmospheric  System 
led  many  to  believe  that  Mr.  Brunei  had  been  rash  in 
rejecting  the  detailed  investigations  and  conclusions  of 
Mr.  Stephenson,  and  that  the  adverse  conclusions  which 
Mr.  Brunei  had  refused  to  entertain  were  subsequently 
established. 

But,  in  fact,  the  failure  of  the  Atmospheric  System  was 
due  to  failure  in  some  of  its  mechanical  details,  and  was 
not  due  to  those  inherent  defects  in  its  principle  which 
Mr.  Stephenson  in  his  report  considered  that  his  experi- 
mental data  had  established. 

Mr.  Brunei's  opinions  were  again  brought  prominently 
into  notice  in  the  evidence  given  by  him  before  a  Select 
Committee  of  the  House  of  Commons,  which  was  ap- 
pointed in  the  Session  of  1845,  in  consequence  of  the 
number  of  projected  lines  which  it  was  proposed  to  work 
by  the  Atmospheric  System. 


;kt.  39.]  GROUNDS  OF  MR.  BRUNEL'S  RECOMMENDATION.     145 

The  following  letter,  written  by  Mr.  Brunei  to  one  of 
the  members  of  the  Committee,  explains  what  he  con- 
sidered to  be  his  position  at  this  time : — 

April  3,  1845. 

I  am  summoned  to  attend  your  Committee  on  Friday,  and   as 
it  is  known  that  I  have  expressed  opinions  favourable  to  the  Atmo- 
spheric System,  and  that  I  am  actually  applying  it  upon  a  line  of 
some  length,   it  would  be  considered  an   absurd   affectation,    and 
would,  moreover,  be  useless  to  attempt,  to  avoid  giving  evidence 
when   so  called  upon ;    but   I  am   a   most  unwilling   witness.     I 
think  it  rather   hard  upon  a  professional   man,  who  wishes  to  be 
cautious  and  prudent,  that  he   shoidd  be  called  upon   to  express 
general   opinions,    which,    if  written    even    in  the    most     studied 
and  carefvd  language,  cannot  be  so  worded  as  to  be  applicable  to 
every  case  that  may  hereafter  arise,  or  to  be  proof  against  the  unfair 
and  unscrupulous  attack  of  the  paid  writers  on  these  controversies. 
I  mention  these  difficulties,  which  I  feel  that  you  may  make  some 
allowances  for,  if  my  feehngs  should   appear  in  my  evidence,  or 
if  that  evidence  should  appear  to  fall  very  short  of  the  opinions  I  am 
known  to  entertain,  and  which  I  must  entertain  to  induce  me  to 
apply  the  system  extensively,  as  I  am  doing.     I  find  it  difficult  to 
define  the  points  upon  which  it  would  be  desirable  to   examine 
engineering  witnesses,  and  I  really  believe  that,  entering  freshly  upon 
the  subject  and  feeling  as  one  of  the  public,  you  are  more  hkely  to 
elicit  the  useful  points  than  one  who,  like  myself,  has  been  turning 
his  whole  attention  (lately,  at  least)  solely  to  the  mechanical  con- 
struction. However,  I  enclose  a  copy  of  a  letter  I  addressed  to  a  party 
interested  in  the  patent,  which  refers  to  my  opinions  on  the  several 
points — opinions,  however,  expressed  without  that  caution  to  which 
I  referred  as  so  necessary. 

{Enclosure.) 

March  31,  1845. 

I  object  very  much  to  giving  evidence  upon  the  abstract  point  of 

the  applicability  of  a  particular  system,  and  thus  furnishing  general 

opinions  which  others  are  to  apply  as  they  may  choose  to  particular 

cases ;  and  if  I  could,  I  would  refuse  to  give  evidence  at  all  before 

the  present  Committee,  whatever  might  be  the  consequence  to  the 

promoters  of  the   Atmospheric    System.     Circumstances,  however, 

render  such  a  refusal  impossible  ;  but  I  am  equally  anxious  not  to  be 

drawn  into  becoming  an  advocate  of  a  system. 

L 


146  THE  ATMOSPHERIC  SYSTEM.  [a.d.  1845. 

When  I  gave  evidence  last  year,'  although  it  was  then  very  much 
against  my  inclination,  it  was  in  support  of  a  particular  case ;  and  it 
was  only  incidentally  that  my  opinion  was  advanced  as  to  a  system. 
The  evidence  is  now  avowedly  sought  in  support  of  a  system,  and  I 
do  not,  as  I  before  stated,  intend  to  become  an  advocate  of  this  or  any 
other  system.  I  mention  these  my  views  to  prevent  disappointment. 
If  the  following  facts  and  opinions  are  likely  to  be  of  use  to  the 
Committee,  I  can  give  evidence  on  them. 

I  made  experiments  upon  the  portion  of  railway  laid  on  Worm- 
wood Scrubs.  These  experiments  were  made  for  my  own  private 
satisfaction,  and  not  made  public  in  any  way. 

They  satisfied  me  of  the  mechanical  practicability  of  the  system. 

In  1843  and  1844  I  made  several  experiments  upon  the  Dalkey 
railway. 

The  result  of  my  observations  and  of  those  experiments  is  an 
opinion  that  the  mechanical  diffictdties  attending  the  application  of 
this  system  may  be  overcome,  and  the  whole  as  a  machine  made  to 
wo!rk  in  a  very  perfect  manner  ;  that  is,  as  a  mechanical  power  for 
locomotion  it  will  generally,  but  not  in  every  case,  be  more  economical 
than  what  is  strictly  called  locomotive  power,  that  high  speeds  may 
be  more  easily  attained,  that,  from  the  absence  of  the  locomotive 
engine,  the  rails  may  be  constructed  and  maintained  in  more  perfect 
order,  and  as  a  consequence  the  carriages  may  be  constructed  and 
worked  in  a  more  perfect  manner,  and  so  as  to  run  more  smoothly, 
and  that  in  all  respects  the  travelling  may  be  rendered  more  rapid, 
more  luxurious,  and  more  safe.  As  regards  the  last,  viz.  safety,  col- 
lisions may  be  rendered  altogether  impossible,  or  most  remotely 
possible ;  while  all  other  sources  of  danger,  now  very  small,  may  be 
almost  entirely  removed  by  the  increased  perfection  of  the  rails. 

As  regards  first  <;ost,  a  single  line  may  be  made  to  answer  all  the 
purposes  of  a  double  locomotive  line  for  most  railways,  except  main 
lines  in  immediate  connection  with  the  metropolis,  or  forming  trunk 
lines  for  others  with  important  branches  not  under  the  same  control ; 
and  a  single  Atmospheric  line  will  generally  cost  as  little,  often  less, 
including  the  working  power,  than  a  double  locomotive  line  without 
the  engines.  I  am  now  constructing  a  line  of  52  miles  in  length 
entirely  for  the  Atmospheric  System.  I  already  see  many  advantages 
to  be  attained  in  the  setting  out  and  constructing  of  a  railway,  if 
originally  designed  for  this  system ;  the  principal  advantages  can 
only  be  attained,  and,  above  all,  the  principal  difficulties  in  the 

*  I.e.  before  the  Croydon  and  Epsom  Committee.     See  above,  p.  138. 


;et.  39.]  GROUNDS  OF  ME.  BRUNEL'S  RECOMMENDATION.  147 

system  can  only  be  properly  provided  against,  where  the  line  is 
originally  designed  for  the  system  ;  the  choice  of  gradients  and  curves 
and  levels,  the  position,  and,  above  all,  the  airangements  of  stations, 
will  generally  be  totally  different  in  the  two  systems,  and  the  diffi- 
ciilties  to  be  avoided  will  equally  differ. 

It  is  unnecessary  to  give  any  extracts  from  Mr.  Brunei's 
evidence,'  as  it  only  repeats  the  opinions  and  calculations 
embodied  in  his  report  of  August  1844. 

The  Committee,  while  they  allowed  that  experience 
could  alone  determine  under  what  circumstances  of  traffic 
or  of  country  the  preference  to  the  Atmospheric  or  the 
Locomotive  System  should  be  given,  reported  very  strongly 
in  favour  of  the  general  merits  of  the  Atmospheric  System. 

As  soon  as  it  had  been  decided  that  the  South  Devon 
•was  to  be  constructed  as  an  Atmospheric  line,  the  dimen- 
sions of  the  cuttings,  embankments,  and  tunnels  were 
arranged  for  a  single  line,  except  on  the  long  incline 
west  of  Totness,  and  on  that  east  of  Plympton.  In  the 
approaches  to  the  principal  summits  the  gradients  were 
made  somewhat  steeper,  so  as  to  reduce  the  excavations. 

In  December  1844,  Mr.  Brunei  prepared  a  specification 
and  drawing  of  a  steam-engine  and  vacuum  pump,  and 
a  copy  was  sent  to  the  most  eminent  engine-builders, 
together  with  a  letter  inviting  tenders  for  six  pairs  of 
engines.    The  letter  concluded  as  follows:  — 

Any  party  whose  tenders  may  be  accepted,  shall,  if  required,  furnish 
forthwith  a  more  detailed  drawing  and  specification  of  the  engines 
as  they  propose  to  furnish  them;  the  specification  and  drawing 
now  sent  being  expressly  made  very  general,  in  order  that  each 
manufacturer  may,  so  far  as  is  consistent  with  the  general  requisites 
and  conditions,  adopt  his  own  methods  of  construction,  or  use  any 
existing  patterns. 

The  economical  character  of  the  engines  which  Mr.  Brunei 

'  It  will  be  found  on  pp.  35-52  of  the  Atmosphei-ic  Committee  (ordered 
the  Minutes  of  Evidence  taken  before      to  be  printed  April  24,  1845). 

L  2 


148  THE  ATMOSPHEEIC  SYSTEM.  [a.d.  1846. 

desired  to  obtain  is  sufficiently  indicated  by  the  require- 
ment that  they  were  to  be  high-pressure  condensing 
engines,  fitted  with  double-seated  expansion  valves,  and 
having  boilers  proved  to  100  lbs.  per  square  inch,  and 
guaranteed  to  work  with  safety  valves  loaded  to  40  lbs. 
per  square  inch. 

The  tenders  accepted  were  those  of  Messrs!  Boulton 
and  Watt,  Messrs.  Rennie,  and  Messrs.  Maudslay  and 
Field. 

Mr.  Brunei  left  it  to  the  contractors  to  prepare  their 
designs  without  any  interference  on  his  part,  deeming  it 
best  to  rely  on  their  unfettered  judgment. 

The  task  of  manufacturing  and  fitting  the  cast-iron 
tube  was  one  of  some  difficulty,  the  longitudinal  slit 
allowing  of  considerable  distortion  in  the  casting.  This 
work  was  undertaken  by  Mr.  George  Hennett,  by  the  aid 
of  a  set  of  very  effective  tools  devised  by  Mr.  T.  E.  Guppy. 

The  tubes  were  supplied  at  the  rate  of  one  mile  per 
week,  and  by  the  middle  of  1846  nearly  the  whole  line 
was  laid  to  Newton,  and  the  valve  was  ready  to  be  fixed. 

In  the  autumn  of  1846,  Mr.  Joseph  Samuda  went  to 
Dawlish,  taking  with  him  a  staff  of  assistants  trained 
in  the  working  of  the  system  at  Croydon ;  and  every  effort 
was  made  to  advance  the  completion  of  the  engines  and 
the  other  parts  of  the  apparatus. 

Owing,  however,  to  vexatious  delays  in  the  erection  of 
the  engine-houses  and  engines,  it  was  not  until  the 
commencement  of  1847  that  a  piston -carriage  was  able  to 
traverse  the  first  six  miles  out  of  Exeter.  And,  though 
repeated  experimental  trains  continued  to  be  run,  no 
passengers  had  been  conveyed  by  Atmospheric  trains 
prior  to  the  general  meeting  of  the  shareholders,  at  the 
end  of  August.  Mr.  Brunei's  report  on  this  occasion 
was  as  follows  : — 


JET.  -tl.]  PREPAEATION   OF  THE  APPARATUS.  149 

August  27,  1847. 

It  is  a  subject  of  great  regret,  and  to  no  one  more  than  to  myself, 
that  we  have  as  yet  been  unable  to  open  any  portion  of  the  line  to  the 
public  with  the  Atmospheric  apparatus,  although  a  considerable 
distance  has  for  some  months  been  in  a  state  to  admit  of  frequent 
experiments  being  made  upon  it.  This  delay  has  arisen  principally, 
if  not  entirely,  in  that  part  of  the  whole  system  which  it  might  have 
been  expected  would  have  been  the  least  exposed  to  it — namely,  the 
construction  and  completion  of  the  steam-engines. 

It  is  due  to  Mr.  Samuda  that  I  should  say  that,  so  far  as  regards 
the  mere  pipe  and  valve,  and  other  details  which  may  be  said  to 
constitute  the  Atmospheric  apparatus,  we  might  long  since  have  com- 
menced. But  the  engines,  although  designed  without  any  interference 
with  their  .plans,  and  furnished  by  the  best  makers  of  the  country, 
and  although  differing  so  slightly  from  the  ordinary  construction  of 
steam-engines,  have  proved  sources  of  continued  and  most  vexatious 
delays,  both  in  the  unexpected  length  of  time  occupied  originally  in 
their  erection,  and  in  subsequent  correction  of  defects  in  minor 
parts.  While  the  engines  were  imperfect,  it  would  not  only  have 
been  unwise  to  have  commenced  working  the  line,  even  had  it  been 
practicable,  but  the  frequent  interruptions  to  the  continuous  working 
of  all  the  engines  rendered  it  impossible  to  complete  and  test  the 
different  portions  of  the  Atmospheric  apparatus.  There  are  still 
some  defects  to  be  remedied  in  one  or  two  of  the  engines,  and  I  am 
using  every  endeavour,  by  persuasion  and  by  every  other  means  in 
my  power,  to  urge  on  the  manufacturers  in  their  work  of  completion. 
Within  the  last  week  or  two  only  have  we  been  able  to  Avork  at  all 
continuously  between  Exeter  and  Teignmouth,  so  as  to  have  the 
opportunity  of  trying  the  different  parts,  and  getting  the  various 
details  requisite  for  actually  working  trains  tested  and  brought  to 
sufficient  perfection  to  ensure  efficiency  and  regularity. 

Since  the  beginning  of  last  week,  however,  four  trains  per  day 
have  been  run  regularly,  stopping  at  the  stations,  and  keeping  their 
time  as  if  working  for  traffic.  The  tube  and  valve  appear  in  good 
order,  and  the  whole  has  worked  well,  but  the  running  in  this 
manner  can  alone  show  the  deficiencies  which  may  still  exist  in  the 
details  necessary  for  stopping,  and  starting  quickly  from  the  stations, 
and  all  the  other  minor  operations  incidental  to  working  the  traffic 
in  the  ordinary  course ;  and,  until  all  these  arrangements  are  com- 
pleted, and  the  engines  in  more  perfect  order,  I  think  it  would  be 
much  better  to  defer  at  least  the  substitution  of  the  Atmospheric  for 
the  locomotive  working.     Trains,  in  addition  to  those  now  running 


150  THE  ATMOSPHERIC  SYSTEM.  [a.d.  1847. 

may  perhaps  be  advantageously  worked  for  the  public,  after  a 
further  short  continuance  of  the  present  practising. 

The  two  engines  completing  the  number  to  Newton  are  nearly 
ready  for  trial,  and  it  is  to  be  presumed  that,  after  the  experience 
of  the  past,  the  makers  will  be  enabled  to  put  them  at  once  into  an 
efficient  state. 

The  delays  and  difficulties  attending  the  bringing  into  operation 
the  Atmospheric  System  upon  this  portion  of  the  railway  have 
been  beyond  all  anticipation,  and  beyond  what  any  previous  ex- 
perience would  have  justified  anybody  in  anticipating.  The  diffi- 
culties have  all  been  seriously  aggravated  by  the  necessity  (conse- 
quent, certainly,  upon  the  original  delays)  of  working  the  line  with 
locomotives  during  the  construction  and  completion  of  the  Atmo- 
spheric apparatus.  Not  only  has  the  constant  occupation  of  the 
line  interfered  with  the  progress  of  the  work,  but  it  has  been 
necessary  to  devise  all  the  arrangements  so  as  to  admit  stations, 
sidings,  and  line  being  worked  either  by  locomotive  or  by  Atmo- 
spheric in  succession,  or  even  at  the  same  time. 

These  difficulties,  added  to  those  always  consequent  upon  the 
introduction  of  any  new  system,  have  been  most  wearying  and 
incessant,  and  I  am  not  surprised  that  the  public  and  the  proprietors 
should  have  been  impatient.  I  trust  the  ultimate  result  will  remove 
any  grounds  for  disappointment. 

The  stress  of  personal  anxiety  and  personal  fatigue,  ex- 
perienced by  Mr.  Brunei  and  by  all  who  were  engaged 
in  the  work,  was  very  severe,  and  continued  so  to  the 
end.  Not  only  was  the  progress  in  the  completion  of  the 
work  slow,  but  in  spite  of  every  exertion  the  results  were 
incessantly  marred  by  unfortunate  contingencies  which 
involved  further  delay,  discouragement,  and  expenditure. 
Moreover,  the  reaction  which  followed  the  railway  mania 
had  set  in;  calls  were  ill  responded  to,  and  great  diffi- 
culty was  experienced  in  raising  the  money  requisite  for  the 
completion  of  the  line. 

Under  these  circumstances  it  was  resolved,  on  Sep- 
tember 1,  not  to  incur  any  new  expenses  in  relation  to  the 
Atmospheric  System  beyond  Totness,  and  to  limit  any  ex- 
penditure already  contracted  for,  until  its  working  between 


mr.  42.]  REPORT  ON  STATE  OF  WORKS.  151 

Exeter  and  Totness  had  been  fairly  tried,  except  to  pro- 
vide assistant  power  up  the  two  inclines. 

On  September  8  the  Atmospheric  trains  began  to  take 
their  share  in  the  passenger  duty  of  the  line,  four  trains 
running  each  way  daily ;  and,  except  when  occasional 
mishaps  caused  delay,  the  new  mode  of  traction  was 
almost  universally  approved  of.  The  motion  of  the  train, 
relieved  of  the  impulsive  action  of  the  locomotive,  was 
singularly  smooth  and  agreeable ;  and  the  passengers  were 
freed  from  the  annoyance  of  coke  dust  and  the  sulphu- 
reous smell  from  the  engine  chimney. 

In  other  respects  the  record  of  progress  is  but  a  chequered 
one,  and  exhibits,  in  spite  of  great  and  able  efforts  and 
brightening  intervals  of  occasional  improvement,  indica- 
tions of  growing  difficulties  deepening  into  ultimate  defeat. 

In  examining  the  chronicle  of  events  which  correspon- 
dence and  memoranda  supply,  it  is  inevitable  that  refer- 
ences to  failure  and  disaster  should  be  found  relatively 
in  far  greater  abundance  than  records  of  success ;  and  this 
for  the  simple  reason  that  there  was  at  that  time  great 
use  in  taking  note  of  the  unfavourable  incidents  that 
occurred,  almost  none  in  mentioning  successful  work. 

There  is  therefore  some  danger  of  falling  into  a  mood 
of  unjust  depreciation,  such  as  Mr.  Brunei  had  in  ener- 
getic terms  urged  the  Directors  to  guard  themselves 
against.  He  protested  against  their  requiring  (as  they 
once  intended  to  do) — 

continuous  and  detailed  reports — if  true  and  honest,  of  course  con- 
taining nothing  but  accounts  of  mishaps — of  a  system  which  (he  says) 
we  are  struggling  to  render  perfect.  Why,  a  daily  account  of  our  loco- 
motive mishaps  would  ruin  the  locomotive  system,  if  it  were  new  I 
I  will  undertake  to  say  that  the  mishaps  of  yesterday  or  to-day  on 
the  Great  Western  Railway  were  as  great  as  that  of  Tuesday  on 
the  South  Devon. 


152  THE  ATMOSPHERIC  SYSTEM.  [a.d.  1847. 

The  Atmospheric  System  was  vaguely  credited  with 
every  delay  which  a  train  had  experienced  in  any  part  of 
its  journey ;  though,  in  point  of  fact,  a  large  proportion 
of  these  delays  was  really  chargeable  to  that  part  of  the 
journey  which  was  performed  with  locomotives.  It  often 
happened  that  time  thus  lost  was  made  up  on  the  Atmo- 
spheric part  of  the  line,  as  is  shown  by  a  record  of  the 
working,  which  is  still  extant.  In  the  week,  September 
20-25,  1847,  it  appears  that  the  Atmospheric  trains  are 
chargeable  with  a  delay  of  28  minutes  in  all ;  while  delays 
due  to  the  late  arrival  of  the  locomotive  trains,  amounting 
in  all  to  62  minutes,  were  made  up  by  the  extra  speed 
attainable  on  the  Atmospheric  part  of  the  line. 

ISTot  unfrequently,  however,  casualties  occurred ;  due  in- 
deed to  remediable  causes,  but  yet  of  discouraging  aspect 
in  themselves,  and  deriving  additional  weight  from  the 
manner  in  which  they  reacted  on  the  cost  of  working. 
Such,  for  instance,  were  the  frequent  and  occasionally 
very  serious  breakages  in  essential  parts  of  the  pumping- 
engines.  Again,  the  cupped  leathers  of  the  travelling- 
piston,  which  made  it  air-tight,  were  often  destroyed  while 
it  was  passing  the  various  inlet  and  outlet  valves.  Im- 
provements in  the  valves  were  introduced  to  meet  this 
difficulty ;  but  the  remedy  could  not  be  applied  at  once 
throughout  the  line,  and  much  inconvenience  was  thus 
experienced,  and  a  considerable  expense  incurred.  Another 
source  of  inconvenience  was  the  water  which  at  times 
accumulated  within  the  tube. 

In  many  respects  the  results  which  had  been  calculated 
on  were  realised,  and  the  new  arrangements  necessary 
to  the  working  of  the  system  were  successfully  brought 
into  operation. 

The  speed   of  the  trains   corresponded  fully  with  the 


^T.  42.] 


WORKING  OF  THE  SYSTEM. 


153 


degree  of  vacuum  obtained ;  that  is  to  say,  tlie  train  resist- 
ances proved  to  be  what  bad  been  anticipated.* 

After  the  trial  of  a  great  variety  of  air-pump  valves,  a 
form  was  adopted  which  was  found  to  answer  exceedingly 
well.2 

In  the  Atmospheric  tube,  the  system  of  self-acting  inlet 
and  outlet  valves,  by  which  the  piston  was  enabled  to 
leave  the  tube  on  approaching  a  station  and  enter  it 
again  on  recommencing  its  journey,  were,  on  the  whole, 
successfally  adapted  to  their  duty. 

Again,  an  arrangement  for  starting  the  train  rapidly 
from  the  station,  without  the  help  of  horses  or  of  locomo- 
tives, had  been  brought  practically  into  operation.  This 
arrangement  consisted  of  a  short  auxiliary  vacuum  tube 
containing  a  piston  which  could  be  connected  with  the 


•  This  appeared  with  sufficient  clear- 
ness from  the  general  comparison  be- 
tween vacuum,  weight  of  train,  and 
speed.  The  exact  appropriation  of  the 
force  employed  was  shown  by  some 
dynamometric  experiments  made  on 
the  line. 

The  highest  speed  recorded  was  68 
miles  per  hour,  with  a  train  of  28 
tons,  the  speed  averaging  64  miles  per 
hour  for  four  level  miles  of  the  line, 
the  vacuum  being  16  inches.  This 
speed  should  have  exhibited  a  resist- 
ance of  about  21  lbs.  per  ton,  or 
688  lbs.,  as  the  running  resistance  or 
friction,  and  645  lbs.  for  the  resist- 
ance of  the  air ;  in  all  1,233  lbs. 
Now,  the  pressure  due  to  16  inches 
of  vacuum  on  the  piston  is  1,390  lbs., 
which  gives  157  lbs.  as  the  friction 
of  the  piston ;  a  result  which  corre- 
sponds sufficiently  well  with  a  direct 
dynamometric  experiment. 

Going  to  the  other  extreme,  there 
are  numerous  records  of  trains  of  100 
tons  which  attained,  on  a  level  of  four 


miles  in  length,  average  speeds  of 
from  30  to  35  miles  per  hour,  with 
i6'5  inches  of  vacuum,  one  train  of 
103  tons  going  32-4  miles  per  hour 
with  169  inches  of  vacuum. 

*  This  valve  consisted  of  a  number 
of  long  delicate  blades  of  spring  steel, 
arranged  parallel  to  each  other,  as  in 
a  musical  box,  but  with  wider  inter- 
vals. These  plates  rested  on  a  series 
of  truly  faced  bars,  which  crossed  the 
end  of  the  air-passage.  The  slightest 
pressure  outwards  lifted  the  springs  ; 
and  as  the  area  of  opening  was 
large,  a  very  free  passage  was  given 
to  the  air.  On  the  current  ceasing, 
the  blades  instantly,  yet  without 
shock,  replaced  themselves  in  contact 
with  the  bars,  clipping  them  tightly 
under  a  very  small  reverse  pressure, 
and  effectually  closing  the  passage. 
Their  merit  consisted  in  their  being 
almost  without  weight,  and  thus 
promptly  re-closing  the  aperture  by 
a  delicate  elastic  reaction. 


154  THE  ATMOSPHERIC  SYSTEM.  [a.d.  1847. 

train  by  means  of  a  tow-rope,  and  tlius  draw  it  along 
till  the  piston  of  the  piston  carriage  entered  the  main 
Atmospheric  tube.  "  Some  accidents  at  first  occurred  in 
using  this  apparatus,  but  its  defects  were  after  a  time 
removed ;  and  it  is  hardly  to  be  doubted  that  the  various 
minor  difficulties  of  the  Atmospheric  System  could  soon 
have  been  effectually  mastered. 

It  now  remains  to  show  how  it  was  that,  in  spite  of 
much  that  was  hopeful,  a  vigorously  sustained  contest 
ended  in  defeat,  instead  of  being  prolonged  into  victory. 

In  working  the  Atmospheric  System  on  the  South 
Devon  Railway  grave  difficulties  were  throughout  encoun- 
tered, for  which  to  the  last  only  imperfect  remedies  could 
be  found. 

As  regards  the  power  consumed,  the  engines  of  each 
pumping  station  worked  up  to  about  236  indicated  horse- 
power, and  their  regulated  duty  for  each  train,  including 
the  anticipatory  pumping,  was  equivalent  to  6*5  minutes 
of  work  for  every  mile  of  the  length  of  tube  they  had  to 
exhaust.  As  the  running  speed  averaged  40  miles  per 
hour,  or  a  mUe  in  1"5  minutes,  the  236  horse-power  during 
the  5*6  minutes  of  pumping  must  be  regarded  as  equiva- 
lent to  865  horse-power  during  the  actual  passage  of  the 
train.  Now,  making  full  allowance  for  piston  friction  and 
extra  friction  on  curves,  for  the  power  expended  in  getting 
up  speed,  for  the  excess  of  air-pump  resistance  due  to  the 
changes  of  temperature  experienced  by  the  air  under 
exhaustion,  and  even  for  the  very  large  actual  amount  of 
friction  in  the  engines  employed,  the  work  done  should 
have  been  represented  by  an  expenditure  of  240  horse- 
power during  the  passage  of  the  train.  If  to  this  is  added 
an  allowance  for  leakage,  such  as  the  experiments  at 
Dalkey   indicated  would    be    amply  sufficient    with  the 


XT.  42.]  WORKING  OF  THE  SYSTEM.  155 

longitudinal  valve  in  good  condition,  it  may  be  said  that 
Mr.  Brunei  had  a  right  to  expect  that  the  duty  would 
be  performed  with  an  expenditure  of  300  horse-power; 
whereas  it  actually  required  865  horse-power,  or  nearly 
three  times  the  amount. 

The  explanation  of  this  waste  is  simple. 

Serious  and  unexpected  causes  of  failure  developed 
themselves  in  the  longitudinal  valve,  and  led  to  an  ex- 
cessive amount  of  leakage.  A  great  part  of  the  normal 
duty  of  the  engines  was,  as  has  been  stated,  to  exhaust 
the  tube  previous  to  the  entry  of  the  train ;  and  when, 
owing  to  leakage,  the  amount  of  air  to  be  so  pumped  out 
was  greatly  increased,  it  became  necessary  that  the  ope- 
ration should  be  commenced  much  earlier.  There  was  thus 
a  longer  time  during  which  the  leakage  could  take  place, 
and  a  still  greater  amount  of  air  to  be  pumped  out.  It 
therefore  followed  that  a  large  increase  of  leakage  involved 
waste  of  power  in  an  enormously  increased  proportion. 

The  length  of  time  occupied  by  the  anticipatory  pump- 
ing was  often  increased  by  the  difficulty  of  arranging 
proper  telegraphic  communication  on  the  South  Devon 
Railway,  and  by  the  absence  of  it  on  the  Bristol  and 
Exeter  Eailway.  The  Electric  Telegraph  was  in  its  in- 
fancy, and  though  Mr.  Brunei  had  been  the  first  to  apply 
it  in  connection  with  railways,  namely,  between  London 
and  Slough  on  the  Great  Western  Railway  in  the  year 
1839,  it  was  not  brought  into  perfect  working  order  on 
the  South  Devon  Railway  till  the  Atmospheric  System 
was  on  the  point  of  being  abandoned.  The  result  of  the 
defects  in  the  telegraph  was  that,  when  a  train  was  late, 
warning  was  not  received  at  the  several  engine-houses  ;  ^ 

•  Trains  frequently  arrived  late  on  London  to  Exeter,  and  having  at  its 

the  Atmospheric  portion  of  the  South  other  end  a  locomotive  line  contend- 

Devon  Eailway,  owing  to  its  being  ing  with  very  heavy  gradients. 
at  the  end  of  the  long  trunk  line  from 


156  THE  ATMOSPHEKIC  SYSTEM.  [a.d.  1848. 

and  thus,  wlien  this  was  the  case,  the  pumping-engines 
which  had  been  started  at  the  right  interval  of  time  before 
the  train  was  dne,  "had  to  be  kept  at  work  for  a  need- 
lessly long  period  pumping  out  the  air,  which  was  all  the 
while  leaking  in  through  the  deteriorated  valve.  This  in- 
efficiency of  the  telegraphic  apparatus  would  have  been 
of  trifling  importance  but  for  the  defects  of  the  valve. 
Had  the  valve  been  as  perfect  as  it  was  expected  to  be, 
the  vacuum,  after  it  had  been  formed,  could  have  been 
maintained  by  an  expenditure  of  power  very  moderate  in 
comparison  with  that  which  was  actually  required. 

As  regards  the  relative  cost  of  the  power  consumed,  it 
appears  that,  owing  to  imperfections  in  the  engines,  their 
expenditure  of  fuel  per  indicated  horse-power  was  more 
than  double  that  of  the  best  of  the  Cornish  pumping- 
engines,  to  which  they  were  analogous ;  while  the  cost 
of  working  was  more  than  three  times  as  great. 

The  defects  in  the  engines  were  for  the  most  part  such 
as  might  have  been  remedied ;  and  this  would  have  been 
done,  had  not  the  excessive  duty  imposed  on  them  by 
the  leakage  of  the  longitudinal  valve  prevented  their  being 
stopped  for  repairs  and  alterations.  In  this  way  the  defects 
of  the  different  parts  of  the  apparatus  mutually  aggravated 
each  other. 

It  appears  then  that,  chiefly  owing  to  the  defective  lon- 
gitudinal valve,  the  engines  were  expending  nearly  three 
times  the  power  which  they  should  have  done  for  a  given 
tractive  duty,  according  to  previous  experience,  and 
the  results  obtained  on  the  Dalkey  line,  and  that  they 
cost  per  horse-power  at  least  three  times  as  much  as  was 
expected. 

The  cost  of  traction,  nearly  nine  times  as  much  as  had 
been  calculated  on,  was  between  two  and  a  half  and  three 
times  what  it  would  have  been  with  locomotive  power; 


;et.  43.]      EXCESSIVE  AMOUNT   OF  POWER  CONSUMED.  157 

and  this  was  on  a  level  part  of  the  line,  where  the  com- 
parative advantages  of  the  Atmospheric  System  were  not 
exhibited  as  they  would  have  been  in  the  part  which  had 
steep  gradients. 

The  imperfections  of  the  longitudinal  valve  have  now  to 
be  described.  By  its  condition  the  Atmospheric  System 
had  to  stand  or  fall.  With  an  efficient  valve,  the  defects  of 
the  other  parts  of  the  apparatus  would  have  been  of  minor 
importance,  and  time  would  have  been  given  for  remedy- 
ing them.  When  the  leakage  became  considerable,  the 
defects  of  the  telegraph  and  the  defects  of  the  engines 
alike  assumed  a  formidable  aspect. 

The  failure  of  the  valve  was  due,  partly  to  the  compo- 
sition which  was  used  to  seal  the  joint  where  it  opened, 
and  partly  to  the  material  of  which  the  valve  consisted. 
The  difficulty  of  obtaining  a  suitable  composition  was 
the  first  which  had  to  be  encountered.  On  the  South 
Devon  a  lime  soap  was  eventually  found  to  answer 
the  purpose  well.  Its  surface,  however,  from  exposure 
to  light  and  air,  formed  into  a  hard  skin;  and  to 
remedy  this  a  thinner  and  more  fluid  material,  a  com- 
pound of  cod-oil  and  soap,  was  laid  on  to  keep  it  soft. 
This  answered  satisfactorily,  but  it  required  frequent 
renewal,  as  it  was  apt  to  be  drawn  into  the  tube  by  the 
rush  of  air  when  the  valve  was  opened.  The  renewal  of 
the  various  compositions,  and  the  careful  examination 
and  repair  which  the  valve  constantly  required,  was  a 
cause  of  great  anxiety  and  expense. 

But  in  the  materials  of  the  valve  lay  the  source  of  the 
more  serious  difficulty. 

The  ready  affinity  of  leather  for  oil  and  grease,  and  its 
suppleness  and  closeness  of  grain  when  saturated  with 
substances  of  that  nature,  had  long  been  known  and 
utilised.     It  had  not  been  .anticipated  how  readily,  with 


158  THE  ATMOSPHEEIC  SYSTEM.  [a.d.  1848. 

air-pressure  on  one  side  and  a  partial  vacuum  on  the 
other,  the  oily  matters  with  which  the  leather  was  charged 
would  escape  from  it,  especially  in  the  presence  of  water. 
Although,  while  the  leather  was  saturated  with  water,  the 
valve  was  remarkably  air-tight;  when  frost  supervened 
the  water  became  frozen,  and  gave  a  fatal  stubbornness 
of  texture,  which  rendered  the  valve  incapable  of  closing 
properly.  Again,  in  long- continued  drought  the  leather 
became  intractable  from  its  dryness ;  and  the  stiffening, 
whether  from  frost  or  drought,  rendered  it  liable  to  be 
torn.  An  immediate  application  of  seal-oil  penetrated  the 
leather,  and  relaxed  its  stiffness;  but  the  remedy  often 
could  not  be  applied  in  time,  and,  moreover,  was  expensive. 

A  still  more  grave  defect  was  all  the  while  becoming 
matured,  and  was  undermining  every  hope  that  a  suitable 
dressing  could  be  discovered,  and  that  the  longitudinal 
valve  might  be  made  perfect. 

Under  the  joint  action  of  water  in  the  leatlier,  and  of  the 
affinity  of  iron  for  tannin — and  on  the  enduring  presence  of 
tannin  within  its  texture  the  consistency  of  leather  depends 
— a  destructive  decomposition  had  long  been  at  work ;  the 
oxide,  established  in  the  iron  plates  of  the  valve  by  con- 
tinued contact  with  damp  leather,  had  been  steadily  ab- 
stracting the  tannin;  thus  the  leather  had  become  con- 
verted into  an  ink-stained  and  comparatively  decomposed 
tissue.  Large  portions  of  it  became  torn,  and  incurably 
pervious  to  air. 

It  was  not  until  early  in  June  1848  that  Mr.  Brunei 
discovered  the  condition  which  the  valve  had  assumed. 
He  then  instituted  a  careful  examination  throughout  the 
line,  and  the  extent  of  the  disorder  was  realised. 

The  state  of  things  which  existed  when  this  discovery 
was  made  in  effect  involved  the  renewal  of  the  valve  the 
whole  distance  from  Exeter  to  Newton:  so  that,  as  the 


XT.  43.]     DESTRUCTION   OF  THE  LONGITUDINAL  VALVE.      159 

cost  of  the  valve  was  1,160Z.  per  mile,  an  immediate 
outlay  of  some  25,000Z.  became  essential  to  the  mainte- 
nance of  the  system,  and  this  at  the  time  when  the  real 
difficulties  of  the  valve  question  had  become  most  ap- 
parent. By  galvanising  the  iron  plates  of  the  valve  the 
mutually  destructive  action  of  the  iron  and  the  leather 
might  have  been  prevented ;  but  a  remedy  was  also 
required  for  the  other  serious  defect  which  leather,  as  the 
material  of  the  valve,  was  found  to  exhibit,  namely,  its 
tendency  to  become  permeable  to  air  after  long-continued 
use  under  air-pressure,  owing  to  the  inward  escape  of  the 
material  with  which  it  had  been  dressed. 

These  difficulties  were  not  only  such  as  had  not  been  an- 
ticipated, but  such  as  no  one  was  justified  in  anticipating. 

It  now  became  necessary  for  Mr.  Brunei  to  consider 
what  course,  under  the  circumstances,  it  was  most  ad- 
visable for  the  Company  to  adopt. 

A  Committee  of  the  Board  was  appointed  to  examine 
the  whole  question ;  and,  at  their  desire,  Mr.  Brunei  made 
a  report  upon  it,  which  was  as  foUows  : — 

August  19,  1848. 

You  have  called  upon  me  to  report  to  you  upon  the  present 
state  of  the  Atmospheric  apparatus,  and  particularly  upon  the  cir- 
cumstances connected  Avith  the  partial  destruction  of  the  longi- 
tudinal valve  which  has  lately  occurred,  and  the  probability  of 
remedying  this  serious  defect,  and  of  keeping  the  valve  in  repair 
and  in  good  working  order. 

Such  a  report  involves  necessarily  the  consideration  of  the  whole 
question  of  our  experience  of  the  working  of  the  Atmospheric  System ; 
because,  to  arrive  at  any  clear  appreciation  of  the  present  state  of  the 
apparatus,  I  must  refer  to  the  circumstances  which  have  affected 
our  working  up  to  the  present  time,  and  particularly  to  the  several 
difficulties  which  we  have  had  to  encounter  and  their  effects. 

The  first  difficulty,  and  one  which  was  as  unexpected  as  it  was 
serious,  was  in  the  working  of  our  stationary  engines.     Upon  the 


160  THE  ATMOSPHERIC  SYSTEM.  [a.d.  1848. 

efficiency  of  these  machines  must  of  course  ultimately  depend  the 
economy  .and  efficiency  of  the  working  of  the  whole  system,  how- 
ever perfect  in  itself  might  be  the  Atmospheric  apparatus.  Accord- 
ingly, great  precautions  were  taken — precautions  which  I  still  think 
such  as  to  justify  the  expectation  that  we  should  secure  the  best 
engines  that  could  be  made. 

The  three  first  manufacturers  of  the  day  were  employed  — 
Messrs.  Maudslay  (who  had  had  some  experience  in  this  particular 
branch,  having  made  the  engines  for  the  Croydon  railway),  Messrs. 
Boulton  and  "Watts,  and  Messrs.  Rennie.  They  prepared  their  own 
designs ;  and  I  know  that  they  each  bestowed  much  thought  in  the 
preparation  of  these  designs,  and  took  considerable  interest  in  the 
results. 

Mr.  Samuda,  a  man  of  considerable  mechanical  abilities,  having 
aU  the  experience  that  could  be  had  upon  the  subject,  and  deeply 
interested  in  the  success  of  the  engines,  was  also  employed  to  super- 
intend their  manufacture. 

Notwithstanding  all  these  precautions,  notwithstanding  excellent 
workmanship,  these  engines  have  not,  on  the  whole,  proved  suc- 
cessful ;  none  of  them  have  as  yet  worked  very  economically,  and 
some  are  very  extravagant  in  the  consumption  of  fuel,  burning 
nearly  double  the  quantity  of  others,  while  the  average  is  very 
considerably  more  than  it  ought  to  be. 

The  apparent  causes  of  this  excess  are  various  in  the  different 
engines,  but  all  resulting  more  or  less  apparently  from  the  want  of 
experience  in  this  particular  application  of  power,  and  from  the 
circumstance  of  the  form  of  the  engines  being  somewhat  novel,  and 
involving  slight  differences  in  the  proportion  and  arrangement  of 
the  parts ;  and  the  consumption  of  steam  being  greater  than  was 
calculated  upon,  it  has  been  obtained  by  a  more  wasteful  expenditure 
of  fuel,  and  the  evil  has  been  aggravated. 

The  difficulty  of  remedying  this  state  of  things  has  been  increased 
by  the  consequence  of  defects  in  the  Atmospheric  apparatus,  which, 
causing  a  much  greater  demand  upon  the  working  of  the  engines, 
has  delayed,  or  has  entirely  prevented,  our  throwing  an  engine  out  of 
work,  to  introduce  the  requisite  improvements. 

Still,  so  far  as  this  defect  in  the  engines  is  concerned,  there  is  no 
doubt  that  it  is  susceptible  of  considerable,  if  not  complete  remedy, 
and  that  a  reduction  of  one-third  may  be  effected  in  the  consumption 
of  fuel. 

In  the  Atmospheric  apparatus  itself  our  difficulties  have  been  more 
numerous. 


JET.  43.]  EEPOKT  ON   FAILURE.  161 

We  have  suffered  from  extreme  cold,  particularly  when  it  followed 
quickly  upon  wet. 

We  have  suffered  from  extreme  heat,  and  also  from  heavy  falls 
of  rain.  These  difficulties  have  in  turn  been  encountered  and 
gradually  overcome,  and  I  think  the  effects  of  all  these  causes  upon 
a  valve  in  good  condition  may  now  be  obviated,  if  not  entirely,  yet 
so  much  so  as  to  render  their  opei-ation  unimportant. 

The  same  remedy  applies  to  all  three — keeping  the  leather  of  the 
valve  oiled  and  varnished,  and  rendering  it  impervious  to  the  water, 
which  otherwise  soaks  through  it  in  wet  weather,  or  which  freezes  in 
it  in  cold,  rendering  it  too  stiff  to  shut  down ;  and  the  same  pre- 
caution prevents  the  leather  being  dried  up  and  shrivelled  by  the 
heat ;  for  this,  and  not  the  melting  of  the  composition,  is  the  principal 
inconvenience  resulting  from  heat.  A  little  water  spread  on  the 
valve  from  a  tank  in  the  piston-carriage  has  also  been  found  to  be 
useful  in  very  dry  weather,  showing  that  the  dryness,  and  not  the 
heat,  was  the  cause  of  leakage ;  but  a  new  difficulty  has  arisen,  and 
a  new  defect  has  been  discovered,  one  much  more  serious  in  its  extent 
and  its  possible  consequences,  and  one  which  renders  the  operation 
of  each  of  the  previously  mentioned  causes  of  difficulty  much  more 
j)Owerful  and  mischievous. 

Within  the  last  few  months,  but  more  particularly  during  the 
dry  weather  of  last  May  and  June,  a  considerable  extent  of  longi- 
tudinal valve  failed  by  the  tearing  of  the  leather,  at  the  joints 
between  the  plates;  the  leather  first  partially  cracked  at  these  points, 
which  causes  a  considerable  leakage,  particulaily  in  dry  weather; 
after  a  time  it  tears  completely  through,  and  that  part  of  tlie 
.valve  is  destroyed,  and  requires  to  be  replaced. 

A  considerable  extent  has  thus  been  replaced,  but  the  whole  of  the 
valve  is  more  or  less  defective  from  this  cause ;  the  amount  of 
leakage  is  considerable,  and  the  working  altogether  inefficient.  I 
have  examined  carefully  portions  of  the  valve  that  have  been  re- 
moved, and  I  find  that  at  the  part  which  has  given  way  the  texture 
of  the  leather  seems  to  be  destroyed — it  is  black,  and  has  evidently 
been  acted  upon  by  the  iron  of  the  plates. 

Upon  some  parts  of  the  line  the  injury  seems  to  be  more  general 
than  upon  others ;  but  it  is  very  difficult  to  examine  the  valve  in 
place,  so  as  to  form  any  correct  opinion  of  the  extent  of  the  evil. 

As  regards  the  cause  of  this  defect,  Mr.  Samuda,  who  under  his 
contract  is  at  present  liable  for  the  repair  of  the  valve,  urges  that 
the  valve  was  kept  for  a  length  of  time  in  cases  after  it  was 
delivered  to  the  Company,  and  that,  exposed  to  damp,  and  the  oil  in 

M 


162  THE  ATMOSPHEEIC  SYSTEM,  [a.d.  1848. 

the  leather  not  being  renewed  on  the  surface,  the  iron  may  have 
rusted,  and  the  leather  hhve  been  injured;  and  he  refers  to  instances 
lately  observed,  in  wiiich  valves  taken  out  of  the  top  of  a  case 
Avhich  had  been  exjosed  to  wet  do  show  similar  signs  of  injury. 

Supposing,  however,  this  assumption  to  be  correct,  it  would  not 
seem  to  affect  the  question  of  his  liability.  He  suggests  also,  as  a 
cause,  that  the  valve  remained  for  a  length  of  time  in  place  withoiit 
been  used  and  even  worked  over  by  locomotive  engines,  which 
prevented  its  being  properly  oiled  and  attended  to ;  that  the  evil  has 
been  aggravated  by  an  attempt  to  reduce  too  much  the  use  of  oil 
to  the  leather  ;  and,  lastly,  that  the  piston-gear  has  been  allowed  to 
get  out  of  adjustment,  so  that  the  leather  of  the  valve  has  been 
strained. 

I  shall  not,  however,  here  enter  into  the  discussion  of  this  question 
of  liability,  but  confine  myself  to  the  consideration  of  the  evil,  and 
the  possibility  of  remedying  it. 

Of  the  extent  of  the  evil,  for  the  reason  I  have  given,  it  is  im- 
possible to  form  any  accurate  opinion  ;  it  is  impossible,  therefore, 
to  say  that  it  does  not  extend  more  or  less  over  the  whole  distance, 
excepting,  of  course,  that  which  has  been  already  replaced.  That 
Avhich  is  injured  cannot  be  repaired  in  place,  but  must  be  removed, 
and  the  remedy  can  only  be  applied  in  the  new  valve. 

It  is  quite  possible  that  a  valve  made  in  the  same  manner  as  the 
present,  if  properly  attended  to  from  the  first,  and  with  our  present 
experience,  might  not  be  subject  to  this  destruction,  and  Mr.  Samuda 
states  that  such  is  the  case  at  Dalkey ;  but  I  do  not  think  that  I 
could  rely  upon  this  result.  By  painting,  but,  better  still,  by 
zincing  or  galvanising  the  iron  plates,  and  making  them  overlap  a 
short  distance,  both  the  chemical  and  the  mechanical  action  of  the 
plate  upon  the  leather  appears  to  be  prevented,  and  I  believe,  there- 
fore, that  this  evil  may  be  remedied  at  a  small  increased  cost  in  any 
new  or  repaired  valve  that  might  be  laid  down :  but  of  the  existing 
valve  I  can  say  no  more  than  I  have  done.  It  is  not  now  in 
good  working  condition,  and  I  see  no  immediate  prospect  of  its 
being  rendered  so. 

From  the  foregoing  observations,  it  will  be  evident  that  I  cannot 
consider  the  result  of  our  experience  of  the  working  between  Exeter 
and  Newton  such  as  to  induce  one  to  recommend  the  extension  of 
the  system. 

I  believe  that  if  the  longitudinal  valve  were  restored,  the  working 
expenses  might  be  immensely  reduced ;  that  the  quantity  of  fuel  con- 
sumed which  is  the  great  item  of  expense,  may  be  diminished  by 


XT.  43.]  EEPORT  ON  FAILUEE.  163 

one-third;  that  the  price  of  the  fuel,  which  now  costs  18s.  per  ton  at 
the  engine-houses,  ought  to  be  reduced  at  least  12  per  cent.;  and 
that  the  total  cost  may  thiis  be  brought  down  to  a  moderate 
amount,  such  as  I  had  oi'iginally  calculated  upon.  But  the  cost 
of  construction  has  far  exceeded  our  expectations,  and  the  difficulties 
of  working  a  system  so  totally  different  from  that  to  which  every- 
body, traveller  as  well  as  workmen,  is  accustomed,  have  proved 
too  great;  and  therefore,  although,  no  doubt,  after  some  further  trial, 
great  reductions  may  be  effected  in  the  cost  of  working  the  portion 
now  laid,  I  cannot  anticipate  the  possibility  of  any  inducement  to 
continue  the  system  beyond  Newton. 

With  respect  to  the  future  working  of  the  apparatus  between 
Exeter  and  Newton,  I  feel  in  great  difficulty  as  to  expressing  any 
opinion,  seeing  that  a  very  large  expense  has  been  incurred,  and 
believing,  as  I  do,  that  the  cost  of  working  may  be  so  very  much 
reduced  ;  but  that  reduction  can  only  be  effected  by  the  almost  entire 
renewal  of  the  valve,  and  by  some  expenditure  in  the  engines.  And 
unless  Mr.  Samuda  or  the  patentees  undertake  the  first,  and  extend 
considerably  the  period  during  which  they  would  maintain  it  in 
repair,  and  unless  they  can  offer  some  guarantee  for  the  efficiepcy 
of  that  valve,  I  fear  that  the  Company  woiild  not  be  justified  in 
taking  that  upon  themselves,  or  incurring  the  expense  attending  the 
alteration  of  the  engines. 

I  believe  that  for  the  inclined  planes,  as  an  assistant  power,  the 
apparatus  will  be  found  applicable  and  efficient;  and  as  the  engines 
and  the  pipes  are  nearly  ready  at  Dainton,  it  may  be  found  desirable 
to  try  it  there,  provided  a  satisfactory  aiTangement  can  be  entered 
into  for  the  maintenance  and  efficiency  of  the  valve. 

I  have  not  referred  to  our  great  disappointment  in  not  obtaining 
the  assistance  of  the  telegraph  in  the  working  of  the  engines,  and 
the  greatly  increased  consumption  of  coal  consequent  upon  the 
working  the  engines  unnecessarily,  because  this  evil  is  now  nearly 
removed ;  but  some  further  reductions  may  still  be  made  by  using 
the  telegi'aph  by  night  as  well  as  day,  which  has  not  yet  been  in 
our  power  to  do,  but  which  I  trust  will  be  commenced  this  week. 

Tlie  Committee  to  whom  this  report  was  made,  and 
who  had  been  also  in  constant  communication  with  Mr. 
Brunei,  placed  the  result  of  their  investigation  before  the 
Board.  The  Directors,  after  carefully  considering  the 
information  given  them,  reported  as  follows : — 

H  2 


164  THE  ATMOSPHERIC   SYSTEM.  .  [a.d.  1848. 

Your  Directors,  without  pronouncing  any  judgment  as  to  the 
ultimate  succe.ss  of  tlie  Atmospheric  System,  and  while  they  are 
prepared  to  afford  to  the  patentees  and  other  parties  interested  in  it 
the  use  of  their  machinery  for  continuing  their  own  experiments, 
have  arrived  at  the  conclusion,  with  the  entire  concurrence  and  on 
the  recommendation  of  Mr.  Brunei,  that  it  is  expedient  for  them  to 
suspend  the  use  of  the  Atmospheric  System  until  the  same  shall  be 
made  efficient  at  the  expense  of  the  patentees  and  Mr,  Samuda. 

At  the  meeting  in  August,  the  proprietors  adopted  the 
Directors'  report,  and  the  line  was  worked  throughout  hj 
locomotives  on  and  after  September  9. 

In  the  following  November  Mr.  Thomas  Gill,  the  chair- 
man of  the  Board  of  Directors,  published  an  'Address 
to  the  Proprietors,'  in  which  he  strongly  deprecated 
the  abandonment  of  the  Atmospheric  System,  and  pro- 
posed that  the  Company  should  embark  on  a  further  ex- 
pefiment.  Mr.  Gill's  pamphlet  was  referred  to  three 
of  the  Directors,  Mr.  Thomas  Woollcombe,  Mr.  Charles 
Eussell,  and  Mr.  James  Wentworth  BuUer.  With  Mr. 
Brunei's  assistance,  and  to  a  great  extent  from  memo- 
randa written  by  him,  they  prepared  a  statement  which 
went  very  fully  into  all  the  points  raised  by  Mr.  Gill. 

After  combating  Mr.  Gill's  propositions,  they  observe : — 

Of  the  two  men  who  are  most  deeply  concerned  in  the  further 
trial  of  any  reasonable  experiment  to  perfect  the  Atmospheric 
System,  we  find  that  one,  Mr.  Brunei,  disapproves  of  the  pro- 
posal for  the  purpose  as  insufficient  and  unsatisfactory ;  the  other, 
Mr.  Samuda,  had  not  sufficient  confidence  in  the  result,  or  in 
Mr.  Gill's  estimates  for  its  accomplishment,  to  offer  the  only  security 
which  would  justify  the  Company  in  endeavouring  to  effect  it. 

In  conclusion  they  express  an  opinion  that  the  sus- 
pension of  the  Atmospheric  System  in  the  previous 
September  was  a  prudent  and  necessary  step,  and  that 
nothing  had  since  occurred  to  justify  its  resumption. 

The    proprietors     adopted    the    view    taken     by    the 


^T.  43.]  ABANDONMENT   OF  SYSTEM.  165 

Committee,  and  no  further  attempt  was  made  to  work  the 
railway  on  the  Atmospheric  System. 

Under  these  circumstances,  it  cannot  be  a  matter  of 
surprise  that  Mr.  Brunei  was  much  censured  for  having 
advised  the  South  Devon  Railway  Company  to  work  their 
line  on  the  Atmospheric  System. 

The  reasons  which  led  him  to  recommend  the  use 
of  the  Atmospheric  System  on  the  South  Devon,  and 
the  causes  of  its  failure,  have  been  very  fully  described, 
and  it  has  been  also  shown  that  the  most  important  of 
these  were  the  defects  of  the  pumping-engines,  and  the 
deterioration  of  the  longitudinal  valve. 

When  the  formidable  character  of  these  difficulties  had 
fully  declared  itself,  the  South  Devon  Eailway  Company 
were  not  in  a  position  to  spend  any  more  money  upon  a 
system  which,  as  the  event  had  proved,  was,  in  one  of 
its  most  important  details,  still  in  the  experimental  stage. 

There  can  be  no  doubt  that  the  abandonment  of  the 
Atmospheric  System  was  the  wisest  step  which,  under 
the  circumstances,  could  be  adopted ;  and  it  was  recom- 
mended to  the  Directors  by  Mr.  Brunei  with  a  simple 
and  self-sacrificing  disregard  of  every  consideration  except 
that  which  was  always  paramount  with  him,  the  interests 
of  those  by  whom  he  was  employed.* 

'  It  may  be  mentioned  that,  from  receive  any  remuneration  for  his  pro- 
the  date  of  the  abandonment  of  the  fessional  services  as  engineer  beyoud 
Atmospheric  System,   he  refused   to      a  nominal  retaining  fee. 


166  THE  ATMOSPHERIC  SYSTEM. 


NOTE   (p.  143). 

Comparison  of  Stationary  and  Locomotive  Power. 

In  order  clearly  to  set  forth  the  reasons  which  justify  the  statement 
made  by  Mr.  Brunei,^  that  stationary  power  if  freed  from  the  weight 
and  friction  of  any  medium  of  communication,  such  as  a  rope,  must 
be  cheaper  than  locomotive  power,  it  is  desirable  to  consider,  (l)the 
waste  of  power  which  arises  from  the  locomotive  having  to  move 
itself  as  well  as  the  train ;  and  (2)  the  excess  of  cost  at  which 
a  given  power  was  supplied  by  a  locomotive,  as  compared  with 
that  at  which  it  could  have  been  supplied  by  a  stationary  engine. 

On  the  first  point,  the  best  information  can  be  obtained  from 
experiments  made  by  Mr.  Daniel  Gooch  during  the  gauge  contro- 
versy. The  results  are  very  suitable  for  use  in  the  present  inves- 
tigation, as  the  South  Devon  was  to  be  a  broad-gauge  railway. 
Moreover,  as  the  broad-gauge  engine  with  which  these  experiments 
were  tried  was  one  of  a  class  more  powerful  for  their  weight  not 
only  than  the  contemporary  narrow-gauge  engine,  but  also  than 
the  engines  Mr.  Brunei  had  experience  of  when  he  wrote  his  report 
three  years  previously,  the  results  may  be  considered  to  represent 
very  favourably  the  then  existing  case  for  the  locomotives. 

The  engine  employed  in  the  experiments  weighed,  with  its  tender, 
about  fifty  tons.  The  maximum  power  it  was  capable  of  delivering 
by  the  pressure  of  steam  in  its  cylinders  was  represented  as  a  trac- 
tive force  of  4,900  lbs.  at  a  speed  of  60  miles  an  hour,  equivalent  to 
784  indicated  horse-power;  and  at  40  miles  an  hour  5,200  lbs., 
equivalent  to  555  indicated  horse-power. 

It  is  next  to  be  considered  how  this  power  would,  when  running 
at  the  speeds  mentioned,  be  employed  in  overcoming  the  elements 
of  resistance.     These  are  : — 

(1)  The  working  friction  of  the  machinery. 

(2)  The  rolling  resistance  of  the  engine  and  tender. 

(3)  The  air  resistance  due  to  the  engine  frontage. 

'  See  above,  p.  138. 


STATIONAKY  AND  LOCOMOTIVE  POWEE.  167 

(4)  The  rolling  resistance  of  the  train. 

(5)  The  air  resistance  on  tlie  portion  of  the  train  unprotected  by 
the  tender. 

(^6)  The  resistance  due  to  gradient. 

The  following  symbols  and  quantities  may  be  conveniently  made 

use  of  to  denote  the  various  terms  of  the  equation  between  force 

and  resistance. 

Total  available  tractive  force  in  lbs.  .  .  .      F 

Weight  of  engine  and  tender  (superfluous  load)  in  tons  .     50 

Weight  of  train  (useful  load)  in  tons  .  .  .     W 

The  sum  of  the  resistances  of  machinery,  rolling  resistance, 

and  air  resistance  of  engine  and  tender  .  .  .      R 

Rolling  resistance  of  train  in  lbs.  per  ton       .  .  .      K 

Gradient       .  .  .  .  .  .  .      G 

Speed  in  miles  per  hour         .  .  .  .  .V 

Resistance  of  air  (according  to  the  received  empirical  formula) 

= (frontage  area)  x  V^ 

Frontage  area  of  train  in  square  feet  .  .  .63 

Frontage  area  of  portion  of  train  unprotected  by  the  tender, 

in  square  feet    .  .  .  .  .  .24 

For  a  locomotive  train  therefore 

24 

F=R  +  WK+^^V2  +  (50  +  W)  2240  G. 

For  a  system  that  dispenses  with  the  locomotive 

Tractive  force=WK  +  :rS^  V2  + W  2240  G. 
400 

Therefore 

W  (K  +  2240  G)  +  -1575  V^ 

=  the  useful  tractive  force,  and 

R  +  112000G-0975  V2 
^  the  tractive  force  wasted  by  the  use  of  the  locomotive. 
Therefore 

F={R  +  112000G-'0975  V*) +{W(K  +  2240G) +  1575V2} 
and  the  useful  load 

_  F-R-tl2000  G-06  yg 
^-  K  +  2240  G 


168 


THE  ATMOSPHERIC  SYSTEM. 


The  values  which  Mr^  Gooch's  experiments  give  for  the  two  se- 
lected speeds  are  as  fcjlows ': — 


Miles  per  Hour 

E  (lbs.) 

K  (lbs.  per  ton) 

F  (lbs.) 

40 
60 

1500 
2100 

12-5 

18-6 

5200 
4900 

Using  these  values,  the  results  in  the  following  table  are  obtained, 
being  the  conditions  appropriate  to  the  two  speeds  at  successive 
ascending  gradients  : — 


Miles 

TJsefnl 

Super- 
fluous 

Gross 

Useful 

Waste 

Gross 

Ratio  of 
Waste 

per 

ing 

Load 

Load 

Horse- 

Horse- 

Horse- 

to Useful 

Hour 

Gradient 

in  tons 

in  tons 

power 

power 

power 

Horse- 

f 

power 

0 

288 

50 

338 

411 

144 

555 

•35 

_i_ 

128 

60 

178 

352 

203 

555 

•68 

71 

50 

121 

292 

263 

555 

•90 

40-1 

1 

50 

60 

100 

252 

303 

555 

1-20 

1 

23-8 

50 

73-8 

173 

382 

555 

2-21 

jL 

U-7 

50 

61-7 

113 

442 

555 

3-91 

*- 

1 

36-3 

7 

60 

57 

82 

473 

555 

6-77 

r 

0 

139 

50 

189 

504 

280 

784 

•66 

_1_ 

68 

50 

118 

415 

369 

784 

•89 

<S(\-{ 

1 

3o-7 

60 

85-7 

325 

459 

784 

1^41 

22-5 

50 

72-5 

265 

619 

784 

1-96 

L 

1 
52-3 

7 

50 

67 

160 

624 

784 

3-90 

Thus,  on  a  level  line,  the  engine,  woi-king  up  to  555  horse-power, 
could  just  draw  288  tons  of  train  at  the  rate  of  40  miles  per  hour, 
wasting  on  its  OAvn  resistance  only  one-third  of  the  power  usefully 
employed  on  the  train ;  but  when  the  speed  was  increased  to  60  miles 
per  hour,  it  could  not,  though  working  up  to  784  horse-power,  draw 
more  than  139  tons  of  train,  wasting  on  its  own  resistance  more 
than  half  the  power  usefully  employed  on  the  train.  And  again,  at 
40    miles  per  hour,  though,  as  just  stated,   it  could  draw  on  the 


'  These  quantities  are  the  result 
of  the  experiments  made  in  September 
1847.  They  agree  with  what  is  now 
the  received  opinion  of  authorities  on 
tra  in  resistances,  and  represent  favour- 
ably the  case  for  the  locomotives  at 


the  time  of  Mr;  Brunei's  report  in 
August  1844.  At  the  time  when  Mr. 
Erunel  wrote  his  report  of  August 
1844,  the  weight  of  a  locomotive,  as 
has  been  said,  bore  u  higher  ratio  to 
its  power. 


STATIONARY  AND  LOCOMOTIVE  POWER.  169 

level  288  tons,  it  could  only  draw  24  tons  of  useful  load  at  [that 
speed  up  1  in  50 ;  while  at  60  miles  per  hour,  though  it  could 
draw,  as  stated,  139  tons  of  train  on  the  level,  it  could  only  draw 
23  tons  of  useful  load  up  1  in  75  ;  and  at  the  respective  speeds 
of  40  and  60  miles  per  hour,  it  could  only  take  one  carriage  (7  tons) 
up  the  respective  gradients  of  1  in  36,  and  1  in  52. 

Hence  to  maintain  a  minimum  speed  of  40  miles  per  hour 
with  locomotive  power  on  a  line  with  long  gradients  of  1  in  40 
involved  on  those  parts  of  the  line  a  wasted  power  of  nearly  4  times 
that  usefully  employed  ;  and  if  a  minimum  limit  of  60  miles  per 
hour  were  contemplated,  a  locomotive  of  the  most  powerful  class  in 
existence  three  years  subsequent  to  Mr.  Brunei's  report  advising 
the  adoption  of  the  Atmospheric  System  would  only  have  been  able 
to  take  a  single  carriage  up  an  incline  of  1  in  52.  So  heavily  at 
high  speeds  on  steep  gradients  is  the  performance  of  a  locomotive 
taxed  by  the  resistance  due  to  its  own  dead  weight.^ 

A  comparison  has  now  to  be  made  between  the  cost  of  power  as 
developed  by  a  locomotive  and  as  developed  by  a  stationary  engine. 

From  the  well-known  experiments  made  for  the  information  of 
the  Gauge  Commissioners  in  December  1845,  taking  the  high  speed 
trials  as  the  basis  of  calculation,  it  appears  that  4*5  lbs.  of  coke  per 
horse-power  per  hour  may  be  taken  as  the  average  consumption 
of  the  engine.^ 

It  will  be  well,  however,  to  allow  for  the  improvement  which  was 
at  the  time  anticipated  in  locomotive  working,  and  to  assume  an 
expenditure  of  4  lbs.  of  coke  per  indicated  horse-power  per  hour,  as 
representing  the  case  then  for  the  locomotive  engine. 

Coke  may  be  taken  to  have  at  that  time  cost  21s.  a  ton,  or  •0094s. 
per  lb.  Moreover,  a  careful  analysis  of  the  Great  "Western  Railway 
half-yearly  reports,  for  1844  and  1845,  shows  that  for  every  shilling 
expended  in  coke,  1*44  shillings  were  expended  on  the  average  in 
wages,  oil  and  waste,  repairs,  etc. 

'  It  must  be  borne  in  mind  that  all  quisite  data  were  recorded  with   the 

the  inconveniences  attending  the  use  greatest    exactness,    and  the    horse- 

of  auxiliary  locomotives  must  be  en-  power  employed  may  be  deduced  by 

countered,  or  else  the  excessive  dead  means  of     the    scale    of   resistance 

weight  of  an  engine  powerful  enough  to  which  the  subsequent  dynamometric 

take  a  train  up  the  steepest  gradient  trials  supply.     Moreover,  the   result 

in  a  hilly  district  must  accompany  it  above  arrived  at  for  the  consumption 

for  the  whole  length  of  that  part  of  of  coke  is  verified  by  an  examination 

the  line.  of  published  indicator  diagrams  taken 

'  No  dynamometer    was   used    in  off  the  same  engine  on  another  occa  - 

these  cxporimeuts,  but  all  other  re-  sion. 


170  THE  ATMOSPHEEIC   SYSTEM. 

Putting  the  results  together,  it  appears  that  for  each  single  indi- 
cated horse-power  delivered  by  a  high-speed  locomotive,  the  cost 
per  hour  vi^as  0'0915s.'or  l'098d ;  that  is  to  say,  about  l^V^.  per 
hour. 

Let  this  now  be  compared  with  the  cost  per  horse-power  per  hour 
at  which  the  best  Cornish  pumping  engines  had  long  been  known  to 
perform  the  work.  This  comparison  is  manifestly  a  rational  one — 
with  reference  to  the  kindred  employment  of  engine  power  in 
atmospheric  pumping-engines. 

The  performances  of  nearly  all  the  pumping-engines  in  Cornwall 
were  for  many  years  so  systematically  and  exactly  reported,  and 
the  reports  of  each  were  so  critically  scrutinised  by  the  rival 
makers,  that  the  data  they  siipply  may  be  relied  on  without  hesita- 
tion. It  was  well  known  that  the  best  of  the  engines  continuously 
performed  useful  work  with  a  consumption  of  coal  at  the  rate  of 
2*33  lbs.  per  delivered  horse-power  per  hour,  or,  counting  coal  at 
I65.  per  ton  (a  fair  price  on  the  South  Devon),  at  the  cost  of  •2d., 
or  one-fifth  of  a  penny  per  horse-power  per  hour. 

But  it  was  not  in  its  consumption  of  fuel  alone  that  stationary 
power  was  the  more  economical ;  the  expenditure  in  wages,  oil,  and 
tallow  on  one  of  the  pumping-engines  above  referred  to,  when  doing 
200  horse-power  of  useful  work,  did  not  exceed  20s.  for  the  twenty- 
four  hours,  or  one-twentieth  of  a  penny  per  horse-power  per  hour, 
while  the  cost  of  repairs  was  merely  nominal. 

Thus  if  fuel,  wages,  oil,  and  tallow  be  brought  into  one  item,  it 
is  seen  that  the  cost  of  one  horse-power  in  stationary  engines  such 
as  the  then  existing  Cornish  engines  was  only  '26(1.  per  hour,  or 
less  than  one-fourth  of  its  cost  when  developed  by  a  locomotive, 
which  has  been  shown  to  have  been  l'098t?.  per  hour. 


fil,iilj;!JIS;i|iEI!ii;iill!illlti«li!liBI!lllt««;iiillllil!|i|li5|i«l!«ll       I 


o 

Q 

a: 

en 

\- 
a: 

LjJ 
CO 
_l 
< 


< 

>- 

o 
a: 

Ld 

I 

I- 


171 


CHAPTER   VII. 

liAILWAY  BRIDGES  AND    VIADUCTS. 

1.  BRICKWORK  AND  MASONRY  BRIDGES — HANWELL  VIABtfCT — MAIDENHEAD 
BRIDGE FLYING  BRIDGES LETTER  FROM  MR.  BRUNEL  ON  BRIDGE  CONSTRUC- 
TION    (DECEMBER    30,  1854)— 2.    TIMBER      BRIDGES—  SONNING    BRIDGE — BATH 

BRIDGE — STONEHOUSE  VIADUCT BOURNE    VIADUCT ST.    MARY's    VIADUCT 

VIADUCTS  ON  THE    SOI^TH    DEVON    RAILWAY — IVY-BRIDGE — VIADUCTS   ON  THE 

SOUTH  WALES  RAILWAY NEWPORT LANDORE VIADUCTS  ON  THE  CORNWALL 

RAILWAY ST.  PINNOCK VIADUCTS  ON  THK  WEST  CORNWALL  AND    TAVISTOCK 

RAILWAYS  — PRESERVATION    OF    TIMBER— 3.  CAST-IRON    BRIDGES — LETTER    ON 

USE    OF    CAST    IRON    (APRIL    18,  1849) — HANWELL     BRIDGE EXPERIMENTS    ON 

CAST-IRON    GIRDERS EXTRACT    FROM   LETTER  TO  SECRETARY   OF    COMMISSION 

ON    APPLICATION      OF    IRON    TO     RAILWAY    STRUCTURES     (MARCH     13,  1848) 

4,  WROUGHT-IBON   BRIDGES GIRDER    BRIDGES — EXPERIMENTS    ON  WROUGHT- 

lEON  GIRDER OPENING    BRIDGES TRUSSED    BRIDGES NEWPORT  VIADUCT 

WINDSOR  BRIDGE CHEPSTOW    BRIDGE METHOD    OF  SINKING  THE  CYLINDERS 

DESCRIPTION      OP   THE     MAIN     TRUSS — THE      FLOATING     OPERATIONS THE 

ROYAL  ALBERT  BRIDGE  AT  SALTASH THE  CENTRE  PIER DESCRIPTION  OF  THE 

SUPERSTRUCTURE — THE    FLOATING    AND  RAISING   OF  THE   TRUSSES OPENING 

OF  THE  BRIDGE  BY  H.   H.    H.  THE  PRINCE  CONSORT NOTE:    EXPERIMENTS    ON 

MATTERS  CONNECTED  WITH  BRIDGE  CONSTRUCTION. 

In  Chapter  IV.  a  general  history  has  been  given  of  the 
railways  of  which  Mr.  Brunei  was  the  engineer ;  but  the 
bridges  and  viaducts  designed  by  him  are  so  numerous  and 
important  that  it  has  been  thought  advisable  to  devote  a 
separate  chapter  to  their  consideration. 

The  bridges  selected  for  mention  have  been  grouped 
according  to  the  nature  of  the  material  used  in  their  super- 
structure. This  arrangement  is  the  most  convenient  one 
for  giving  a  concise  description  of  the  most  remarkable 
of  Mr.  Brunei's  bridges,  and  for  stating  the  circumstances 
which  guided  him  in  the  determination  of  the  particular 
form  of  construction  used  in  each  case. 


172 


RAILWAY  BRIDGES  AND  VIADUCTS. 


The  works  are  therefore  divided  into  four  groups,  namely, 
brickwork  and  masonry,  timber,  cast  iron,  and  wrought 
iron.* 

Brickwork  and  Masonry  Bridges.'^ 

The  viaduct  which  carries  the  Great  Western  Eailway 
over  the  valley  of  the  river  Brent  near  Hanwell  is  the 
first  of  Mr.  Brunei's  important  railway  works.^  It  is  a 
handsome  brickwork  structure,  G5  feet  high,  with  eight 
semi-elliptical  arches,  each  70  feet  span  and  17  feet  6 
inches  rise.  The  spandrils  of  the  arches  are  lightened  by 
longitudinal  spandril-walls ;  the  piers  are  also  hollow,  and 


'  It  would  of  course  be  impossible 
here  to  give  a  description  of  all  Mr. 
Brunei's  bridges,  or  even  to  refer  to 
the  most  important  of  them  with  that 
minuteness  which  would  be  required 
if  this  were  a  book  written  for  pro- 
fessional use.  The  following  publica- 
tions may  be  consulted : —  Bourne's 
History  and  Description  of  the  Great 
Western  Eailway,  1846 ;  Brees'  Hall- 
way Practice,  1837 ;  Simms'  Public 
Works  of  Great  Britaioi,  1838;  Pro- 
ceedings of  Institution  of  Civil  Engi- 
neers, vols.  14,  25,  and  generally; 
Molinos  et  Pronnier,  Construction 
des  Ponts  Metalliques,  1857;  Hum- 
ber's  Cast  and  Wrought-lron  Bridge 
Construction,  1861 ;  and  Humber's 
Eecord  of  Engineering  for  1866.  At 
the  end  of  the  description  of  many  of 
the  bridges  in  this  chapter  a  note  has 
been  given  of  publications  in  which 
the  bridge  has  been  referred  to. 

*  In  the  early  days  of  the  Great 
Western  Railway  special  designs  were 
made  for  every  one  of  the  ordinary 
bridges  over  and  under  the  railway  ; 
but  when,  in  consequence  of  the  rapid 
extension  of  the  Great  Western  system, 
tlie  number  of  bridges  to  ])&  designed 
became  very  large,  Mr.  Brunei  had  a 


set  of  '  standard  drawings '  prepared 
and  engraved,  which  embodied  the 
experience  gained,  and  contained  de- 
signs suitable  for  various  situations. 
The  contract  drawings  were  made 
by  adapting  to  the  particular  circum- 
stances of  each  case  the  standard 
drawing  which  was  most  applicable 
to  it.  This  system,  besides  securing 
uniformity  of  construction,  introduced 
a  considerable  amount  of  economy; 
since,  the  standard  drawings  being 
based  upon  the  results  arrived  at  in 
an  extensive  practice,  the  proper  struc- 
tural arrangements  and  dimensions 
were  indicated  with  far  greater  accu- 
racy than  could  be  attained  in  a 
reasonable  time  by  an  independent 
calculation  in  each  individual  case. 

^  It  was  called  the  'WharncliflFo 
'Viaduct,'  in  acknowledgment  of  the 
services  rendered  to  the  Company 
by  the  late  Lord  WharnclifFe  as  Chair- 
man of  the  Committee  in  the  House 
of  Lords.  Drawings  of  this  bridge 
are  given  in  Simms'  Public  Works 
of  Great  Britain,  1838,  pL  54, 55,  and 
56 ;  and  in  Bourne's  History  and 
Description  of  the  Great  Western  Eail- 
way, 1846. 


MAIDENHEAD  BEIDGE.  173 

the  structure  is  throughout  made  as  light  as  possible.  It 
is  on  this  account  interesting,  as  showing  the  care  taken 
by  Mr.  Brunei  from  the  commencement  of  his  practice  to 
distribute  the  material  in  the  simplest  arid  most  effective 
manner.' 

The  great  bridge  over  the  Thames  at  Maidenhead  con- 
tains two  of  the  flattest,  and  probably  the  largest  arches 
that  have  yet  been  constructed  in  brickwork.  The  river, 
which  is  about  290  feet  wide,  flows  between  low  banks ; 
in  the  middle  of  the  stream  there  is  a  small  shoal,  of 
which  Mr.  Brunei  took  advantage  in  building  the  centre 
pier. 

It  was  originally  intended  that  the  foundation  of  the 
bridge  should  be  on  the  chalk,  which  was  at  a  short 
distance  below  the  surface ;  but  it  was  found  to  be  very 
soft,  and  Mr.  Brunei  therefore  decided  to  place  the 
foundations  of  the  bridge  on  a  hard  gravel  conglomerate 
overlying  the  chalk.  The  main  arches  are  semi-elliptical, 
each  of  128  feet  span  and  24  feet  3  inches  rise.  They 
are  flanked  at  each  end  by  four  semicircular  arches,  one 
of  21  feet  span,  and  three  of  28  feet  span,  intended  to 
give  additional  water-way  during  floods.  The  radius  of 
curvature  at  the  crovm  of  the  large  arches  is  165  feet,  and 
the  horizontal  thrust  on  the  brickwork  at  that  point  is 
about  10  tons  per  square  foot. 

In  the  interior  of  the  structure  immediately  landward  of 
the  large  arches,  Mr.  Brunei  constructed  flat  arches  loaded 
with  concrete.  The  centerings  of  these  were  struck, 
and  an  active  thrust  opposed  to  the  main  arches  before 

'  At  the  back  of  retaining  walls,  corbelled  out  at  the  back  of  the  wall, 

such  as  the  abutments  and  wing  walls  The  weight  of  earth  resting  on  these 

of  bridges  which  were  subject  to  the  shelves  virtually  increased  the  weight 

pressure  of  earth  behind   them,  Mr.  of  the  back  of  the  wall,  and  assisted  it 

Brunei  introduced  what  were  termed  in  resisting  the  forward  pressure  of 

'  sailing   courses/   projecting    shelves  the  earth. 


174 


EAILWAY  BKIDGES  AND  VIADUCTS. 


their  centerings  were  eased.'  The  line  of  pressure  of 
each  main  arch  was  diverted  downwards  by  the  thrust 
of  the  flat  arch  adjoining  it  without  the  necessity  of 
employing  a  great  mass  of  brickwork  in  the  abutment. 

The  woodcut  (fig.  1)  shows  the  form  of  the  main  arches 
and  the  flat  arch  referred  to.^ 


Fig.  1.    Maidenhead  Bridge. 
Longitudinal  Section. 


f.„t.t     If    *t    *p    tf 


Scale  of/eet. 

The  Maidenhead  bridge  is  remarkable  not  only  for  the 
boldness  and  ingenuity  of  its  design,  but  also  for  the 
gracefulness  of  its  appearance.  If  Mr.  Brunei  had  erected 
this  bridge  at  a  later  period,  he  would  probably  have  em- 
ployed timber  or  iron  ;  but  it  cannot  be  a  matter  of  regret 
that  this  part  of  the  Thames,  although  subjected  to  the 
dreaded  invasion  of  a  railway,  has  been  crossed  by  a 
structure  which  enhances  the  beauty  of  the  scenery. 

There  are  two  other  large  brick  bridges  over  the  Thames, 
one  at  Gathampton  and  another  at  Moulsford,  that  at 
Moulsford  crossing  the  river  obliquely  at  an  angle  of  45°. 
In  each  of  these  bridges  there  are  four  arches,  of  62  feet 
span  on  the  square. 


'  During  the  construction  of  the 
bridge  a  part  of  the  crown  of  tlie 
eastern  arch  proved  defective,  in  con- 
eequenceof  the  cement  in  the  middle  of 
the  brickwork  not  having  set  suffi- 
ciently at  the  time  when  the  centering 
was  eased.  Apprehensions  which 
had  been  entertained  by  some  as  to 
the  safety  of  the  structure  were 
groundless,    for    when    the    defective 


part  was  taken  out  and  replaced,  no 
further  trouble  was  experienced.  The 
bridge  has  stood  well,  and  has  shown 
none  of  those  symptoms  which  an 
overstrained  structure  exhibits. 

*  Simms'  Puhlic  Works  of  Great 
Britain,  pi.  57,  58  ;  Bourne's  History 
and  JDescriptioti  of  the  Great  Western 
Bailwajj,  p.  3G. 


BRICK  AND  MASONRY   BRIDGES.  175 

Other  good  examples  of  brick  bridges  are  the  turnpike 
road  bridge,  60  feet  high,  with  three  arches,  across  the 
deep  cutting  at  Sonning  Hill,  and  the  bridge,  with  one 
opening  of  60  feet  and  four  side  arches  of  18  feet  span, 
over  the  river  Kennet  at  Eeading. 

The  bridge  over  the  Avon  at  Bathford,  of  87  feet  span, 
and  the  bridge  crossing  the  same  river  at  Bath,  with  an 
arch  of  88  feet  span,  are  handsome  Bath-stone  structures 
with  semi-elliptical  arches.  Near  Bristol  there  is  an  orna- 
mental bridge  of  masonry  with  three  Gothic  arches,  the 
centre  arch  having  a  span  of  100  feet.'  Another  bridge 
of  Gothic  design,  with  two  arches  of  66  feet  span,  carries 
the  railway  over  the  Floating  Harbour.^ 

The  bridgfes  which  have  hitherto  been  noticed  are  all  on 
the  Great  Western  Railway.  On  the  Bristol  and  Exeter 
Railway  there  is  a  large  stone  bridge  over  the  New  Cut 
at  Bristol,  built  in  1840,  which  has  a  single  segmental 
arch  of  120  feet  span,  and  20  feet  rise.  Owing  to  some  im- 
perfect workmanship  in  the  interior  masonry  of  the  arch, 
and  possibly  to  some  unequal  yielding  of  the  abutments, 
the  crown  sunk  much  more  than  had  been  expected. 

On  his  later  railways  Mr.  Brunei  did  not  build  large 
arches  of  brickwork  or  masonry,  though  he  constructed 
several  lofty  and  extensive  viaducts  of  these  materials  with 
spans  varying  from  40  to  60  feet. 

Mr.  Brunei  seldom  employed  artificially  piled  foundations 
to  support  masonry.  When  the  ground  was  soft,  he  pre- 
ferred to  rely  on  a  large  extent  of  bearing  surface,  and 

'  When  Mr.  Brunei  for  architectural  case  he  did  not   obtain   equilibrium 

eflFect  employed    Gothic    or   pointed  by  loading  the  crown,  but  he  kept  the 

arches,  he  occasionally  made  the  main  line  of  pressure  sufficiently  within  the 

part  of  the  arch  of  a  form  diiferent  tliicknoss  of  the  arch  by  strengthening 

from   the  curve  visible   on  the  face,  the  haunches, 
but  he  more  frequently  made  it  of  the  *  Brees'  liailway  Practice,  pi.  42. 

same  pointed  form  throughout.  In  this 


176  EAILWAY  BRIDGES  AND  VIADUCTS. 

ensured  uniformity  of  settlement  by  an  accurate  distribu- 
tion of  the  load.  Several  of  bis  large  viaducts  and  bridges, 
standing  on  ground  of  a  soft  and  spongy  nature,  v^ere 
constructed  on  this  principle. 

A  class  of  bridge  of  striking  outline  was  used  in 
the  cuttings  on  the  Bristol  and  Exeter  Eailway,  and  on 
the  other  railways  subsequently  made.  Bridges  of  this 
class  were  called  flying  bridges.  Instead  of  arches  resting 
on  piers  and  abutments,  the  bridge  has  a  single  arch, 
reaching  from  one  side  of  the  cutting  to  the  other,  and 
springing  from  the  slopes,  which  it  helps  in  some  measure 
to  support.  A  flying  bridge  of  large  dimensions  near 
Weston-super-Mare  carries  a  road  across  the  cutting  at 
a  height  of  60  feet  above  the  line  of  rails,  with  a  clear 
span  of  110  feet. 

The  quantity  of  masonry  in  these  bridges  is  much  less 
than  in  those  of  the  ordinary  construction ;  and  lofty  and 
expensive  centering  is  not  required,  as  the  bridge  can  be 
built  before  the  cutting  is  excavated  to  its  full  dimensions. 

This  class  of  bridge,  by  the  avoidance  of  abutments  and 
counterforts,  simplifies  the  construction  of.  skew  arches, 
while  on  sharp  curves  it  presents  but  little  obstruction 
to  the  view  along  the  line. 

A  curious  use  of  arches  of  this  construction,  as  applied 
by  Mr.  Brunei,  may  be  seen  on  the  South  Wales  Rail- 
way near  Llansamlet,  between  Neath  and  Swansea.  A 
deep  cutting  through  the  coal  measures  showed  a  ten- 
dency to  slip,  and  a  large  amount  of  excavation  would 
have  been  required  to  flatten  the  slope,  as  a  hill  rose 
immediately  above  the  side  of  the  cutting.  Four  of  these 
flying  arches  were  thrown  across  the  cutting  at  short 
intervals,  and  weighted  with  heavy  copper  slag,  so  that 
the  sides  of  the  cutting  are  kept  apart  by  the  thrust  of 
the  loaded  arches. 


FLYING  AND  SKEW   BRIDGES.  177 

Among  the  skew  bridges  on  Mr.  Brunei's  railways, 
there  are  a  few  of  extreme  obliquity.  Of  these  may  be 
mentioned  two  large  road  bridges  near  Berkeley,  over  the 
Bristol  and  Gloucester  Railway,  one  being  48°  and  the 
other  53°  off  the  square.  Both  the  bridges  are  of  brick- 
work, and  in  the  arch  of  the  first  one,  which  was  set  in 
Roman  cement,  hoop  iron  was  introduced  in  the  manner 
successfully  employed  by  Sir  Isambard  Brunei.  On  the 
South  Devon  Railway,  near  Plympton,  there  is  a  skew 
bridge  63°  off  the  square. 

On  the  Great  Western  Railway,  in  the  neighbourhood  of 
Bath  and  Bristol,  there  are  skew  bridges  of  ashlar  masonry 
built  on  the  mechanically  correct  principle  of  spiral 
tapering  courses,  the  bed-joints  in  every  part  of  the  arch 
being  made  at  right  angles  to  the  lines  of  pressure. 
By  this  method  the  arch  does  not  depend  for  its  stability 
on  the  friction  and  cohesion  of  the  materials,  as  it  does  to 
a  great  extent  in  very  skew  bridges,  built  in  the  usual 
way  with  spiral  parallel  courses,  especially  when  the  arches 
are  semi-circular  or  semi-elliptical. 

Mr.  Brunei's  bridges  of  masonry  and  brickwork  were 
well  known  for  the  comparatively  small  quantity  of  ma- 
terial used  in  them ;  and,  though  it  was  requisite  that  the 
materials  and  workmanship  should  be  of  superior  quality, 
their  cost  was  comparatively  small. 

The  specifications  he  prepared  for  aU  his  works,  and  on 
which  the  contracts  were  based,  were  noted  for  the 
completeness  with  which  they  were  drawn  up,  and  for 
their  not  requiring  a  standard  of  perfection  higher  than 
that  which  was  actually  to  be  carried  out.  The  confi- 
dence with  which  Mr.  Brunei  was  regarded  enabled  him 
to  insist  with  effect  on  the  work  being  executed  according 
to  his  interpretation  of  the  contract. 


178  RAILWAY  BRIDGES  AND  VIADUCTS. 

In  connection  with  the  design  of  engineering  works, 
and  especially  of  brickwork  and  masonry  bridges,  the 
following  letter  from  Mr.  Brunei  to  one  of  his  assistants, 
who  was  abroad,  will  be  found  interesting : — 

December  30,  1854. 
Let  me  give  you  one  general  piece  of  advice — that  while  in  all 
works  you  endeavour  to  employ  the  materials  used  in  the  most 
economical  manner,  and  to  avoid  waste,  yet  always  put  rather  an 
excess  of  material  in  quantity.  You  cannot  take  too  much  pains  in 
making  evei-y thing  in  equilibrio  ;  that  is  to  say,  that  all  forces  should 
pass  exactly  through  the  points  of  greater  resistance,  or  through  the 
centres  of  any  surfaces  of  resistance.  Thus,  in  anything  resembling  a 
column  or  strut,  whether  of  iron,  wood,  or  masonry,  take  care  that 
the  surface  of  the  base  should  be  proportioned  that  the  strain  should 
pass  through  the  centre  of  it.  Consider  all  structures,  and  all  bodies, 
and  all  materials  of  foundations  to  be  made  of  very  elastic  india-rubber, 
and  proportion  them  so  that  they  will  stand  and  keep  their  shape  : 
you  will  by  those  means  diminish  greatly  the  required  thickness : 
then  add  50  per  cent.  So  in  trussed  framework  of  wood  or  iron, 
experience  shows  that  you  cannot  refine  too  much  upon  the  perfec- 
tion of  the  designing  of  every  little  detail  by  which  all  strains  are 
carried  exactly  through  the  centres  of  the  rods  or  struts  and  the 
centres  of  the  bearing  surfaces.  And  remember,  always  in  retaining 
walls  to  give  plenty  of  batter ;  never  build  an  upright  wing- wall,  or 
retaining  wall.  To  a  man  who  has  an  instinctively  mechanical  mind 
—  and  no  other  can  be  an  engineer — the  advice  I  have  given  you 
above  is  all  T  need  say ;  but  this  advice  is  the  result  of  a  good  deal 
of  experience,  purchased  by  failures  of  my  own,  and  by  looking  at 
those  of  others,  and  is,  I  assure  you,  valuable  advice,  to  be  followed 
literally  and  strictly,  and  not  to  be  considered  as  a  mere  theoretical 
refinement,  to  be  neglected  in  practice.  Practically  too  much  at- 
tention cannot  be  paid  to  these  precautions.  I  have  found  that  there 
is  not  a  single  substance  we  have  to  deal  with,  from  cast-iron  to 
clay,  which  should  not  practically  be  treated  strictly  as  a  yielding 
elastic  substance,  and  that  the  amount  of  the  compression  or  tension, 
as  the  case  may  be,  is  by  no  means  to  be  neglected  in  practice  any 
more  than  in  theory.  Bear  in  mind  also  that  which  is  too  often 
neglected  and  involves  serious  consequences,  that  masonry  or  brick- 
work has  not  half  the  strength  which  is  generally  calculated  upon 
until  the  mortar  is  hard,  and  that  you  cannot  keep  centres  or  shores 
up  too  long. 


TIMBEE  BRIDGES  AND  VIADUCTS.  179 

Timber  Bridges  and  Viaducts. 

Mr.  Brunei's  timber  bridges  and  viaducts  are  remark- 
able on  account  of  the  extensive  scale  on  wbicb  lie  em- 
ployed that  material,  and  the  simple  and  efficient  type  of 
construction  which  he  adopted  in  the  largest  structure 
as  well  as  in  the  smallest. 

In  1841  Mr.  Brunei  constructed  a  timber  bridge  of  five 
spans  to  carry  a  public  road  over  the  Sonning  cutting  of 
the  Great  Western  Eailway,  a  short  distance  east  of 
Eeading.  The  total  width  of  the  space  across  which  the 
road  had  to  be  carried  was  240  feet.  The  superstructure 
rests  on  four  tall  frameworks  or  trestles  of  timber  forming 
the  piers.  Two  of  these  piers  are  on  either  side  of  the 
railway,  and  the  others  are  about  halfway  up  each  slope. 

The  road  rests  on  a  platform  of  timber  planking,  carried 
on  three  longitudinal  beams,  which  are  supported  at 
nearly  equal  distances  by  timber  struts  radiating  from 
points  on  the  piers  about  12  feet  below  the  level  of  the 
carriage  road.  The  system  of  arrangement  of  these  struts 
will  be  best  understood  by  a  reference  to  the  woodcut 
given  below  (fig.  5,  p.  187)  of  one  of  the  Cornwall 
viaducts,  of  which  the  Sonning  bridge  may  be  regarded 
as  in  some  measure  the  prototype.^ 

The  skew  timber  bridge  on  the  Great  Western  Railway 
near  the  Bath  Station,  carrying  the  line  over  the  river 
Avon,  was  constructed  about  the  same  time  as  the 
Sonning  bridge.  It  has  two  spans  of  36  feet  each  on  the 
square,  but  the  obliquity  is  so  great  that  the  span  on  the 
skew  is  89  feet.  Each  opening  has  six  laminated  arched 
ribs  parallel  to  the  line  of  the  railway.  These  support 
the  platform  of  the  bridge,  and  are  built  up  in  five  layers 

'  There  is  an  illustration  of  this  Description  of  the  Great  Western  Bail- 
bridge    in     Bourne's     History     and      way. 

N  2 


180  EAILWAY  BEIDGES  AND  VIADUCTS. 

of  curved  Memel  timber,  six  inches  thick,  bolted  together. 
The  thrust  is  counteracted  by  iron  ties  connecting  the 
ends  of  the  ribs.  The  inner  spandrils  are  filled  in  by 
cross-ties  and  braces,  and  those  of  the  outer  ribs  by  orna- 
mental cast  ironwork. 

The  two  bridges  already  described  are  almost  the  only 
timber  bridges  of  importance  on  the  main  line  of  the 
Great  Western  Railway  from  London  to  Bristol.  Shortly 
after  the  completion  of  this  railway  Mr.  Brunei  began 
to  make  an  extensive  use  of  timber  in  his  designs,  and 
in  so  doing  took  full  advantage  of  the  largeness  of  the 
material,  in  order  to  avoid  intricacy  of  construction. 

A  well-known  arrangement  for  forming  beams  of  greater 
strength  than  could  be  obtained  by  single  pieces  of  timber 
was  adopted  by  Mr.  Brunei  after  a  careful  investiga- 
tion of  its  merits.  This  arrangement  consists  in  joining 
together  two  beams  of  timber  placed  one  above  the  other, 
by  means  of  bolts  and  joggles,  so  as  to  form  a  beam  nearly 
equivalent  in  strength  to  a  single  piece  of  timber  of  the 
same  depth  as  the  two  pieces  united.^  By  this  plan, 
the  length  which  could  be  spanned  by  simple  beams, 
without  the  introduction  of  trussed  framework,  was  nearly 
doubled. 

The  distance  between  the  piers  of  railway  bridges  is 
generally  too  great  to  allow  of  the  superstructure  being 
constructed  of  simple  beams,  and  in  such  cases  Mr.  Brunei 
adopted  forms  of  framing  similar  in  the  arrangement  of 

'  Joggles  are  small  pieces  of  hard  pieces  of  equal   size   act  as   one   of 

wood  or  cast-iron  of  rectangular  cross  double   the   depth,  and   therefore  of 

section,  placed   between  two  beams,  four  times  the  strength  of  a  single 

and  fitted  carefully  into  notches  cut  piece.      In   1841    Mr.   Brunei  made 

across   them.     The  beams   are   then  experiments    to    satisfy    himself    of 

bolted  firmly   together.     The   object  the   strength  gained  by  this  method ; 

is  to  stop  the  slipping  which  would  and  he  afterwards  perfected  the  ar- 

occur  between  the  two  surfaces  if  the  rangement  by  ensuring  an  exact  fit  in 

beams  were  merely  laid   one  on  the  the   notches   by    tightening    up    the 

other  and  loaded,  and  so  to  make  two  joggles  with  wrought-iron  wedges. 


TIMBER  BRIDGES  AND  VIADUCTS. 


181 


^ 


Queen  Truss. 


King  Truss. 


their  parts  to  the  common  designs   of  king  and  queen 
trusses  employed  in  roofs. 

One  of  Mr.  Brunei's  early  timber  viaducts  was  that 
erected  in  1842  at  Stonehouse,  on  the  Bristol  and  Glou- 
cester Eailway.  It  consisted  of  a  series  of  five  openings 
of  queen  trusses  50  feet  span,  resting  on  piers  formed  of 
timber  trestles. 

In  the  Bourne  viaduct,  across 
the  Stroudwater  Canal,  on  the 
Cheltenham  and  Great  Western 
Union  Railway,  there  was  a  span 
of  66  feet,  with  three  timber 
trusses,  for  the  two  lines  of  way. 
Each  of  these  trusses  may  be 
described  as  a  king  truss  with  an  internal  queen  truss. 
The  inclined  timbers  or  principals  rested  in  iron  shoes 
upon  the  piers,  and  were  connected  together  by  bolts 
and  joggles. 

The  upper  horizontal  or  collar  beam  of  the  queen 
truss  carried  the  roadway  planking,  which  was  continued 
upon  beams  supported  by  the  principals.  The  timbers 
carrying  the  roadway  received  support  from  struts  radiat- 
ing from  the  feet  of  the  queen  posts,  which  were  con- 
nected with  the  apex  of  the  king  truss  by  iron  ties.  The 
horizontal  tie  bars  were  of  wrought  iron.  The  arrange- 
ment of  the  truss  is  shown  in  the  woodcut  (fig.  2). 

The  side  openings  consisted  of  four  spans  of  30  feet, 
with  trusses  of  the  Stonehouse  viaduct  type,  of  one  span 
of  25  feet  and  ten 
spans  of  20  feet,  with 
double  beams. 


rig.  2.    Bourne  Viaduct. 


t.,tM.t 


The  St.  Mary's  via- 
duct, across  the  canal  scaie  <,f/eet. 
in  the  Stroud  Valley,  was  constructed  with  one  span  of 


182 


RAILWAY  BRIDGES  AND  VIADUCTS. 


74  feet,  with  trusses  similar  to  those  at  the  Bourne 
viaduct.^ 

In  the  year  1846  Mr.  Brunei  made  an  elaborate  series 
of  experiments  on  the  strength  of  large  timber.  Some 
account  of  these  is  given  in  the  note  to  this  chapter. 

Fortified  by  the  information  thus  obtained,  he  was  able 
to  proceed  with  confidence  to  an  extensive  use  of  timber 
in  the  viaducts  of  the  South  Devon,  the  Cornwall,  and 
other  railways. 

Between  Totness    and   Plj^mpton,    the    South   Devon 

EaUway,  running  along  the  skirts  of  Dartmoor,  crosses 

four  deep  valleys,  by  lofty  viaducts,  all  of  the  same  design. 

Three  of  them  can  be  seen  at  one  time,  and  they  form 

striking  and  elegant  features  in  the  landscape. 

The  viaduct  at  Ivybridge  is  the  highest  of  these.  It 
is  on  a  curve,  and  has  eleven  openings  of  61  feet  each; 

the  extreme  height 
is  104  feet. 

The  piers  are  of 
masonry,  each  con- 
sisting of  two  slen- 
der and  slightly 
tapered  shafts 
about  7  feet  square, 
rising  to  the  level 
of  the  rails.  The 
superstructure  was 
originallydesigned 
for  a  railway  on 
^"^  ''•^•^^"-  the     Atmospheric 

System,  and  was  therefore  only  intended  to  bear  the  load 
of   a  train   of    carriages.      The  framework  was   placed 

'    A  drawing   of    this    bridge    is       Commisswn  on  the  A2->2^lication  of  Iron 
appended    to     the    Eeport    of    the      to  Eailway  Structures,  1849. 


SOUTH  DEVON  TIMBER  VIADUCTS.  183 

below  the  level  of  the  rails,  and,  as  will  be  seen  in 
the  woodcut  (fig.  3),  it  consists  of  a  polygonal  frame,  with 
a  few  subsidiary  struts,  the  feet  of  the  main  timbers 
being  tied  together  by  wrought-iron  rods.  There  are 
two  of  these  frames,  one  at  each  side  of  the  bridge,  to 
support  the  planking  of  the  roadway.  Before  the  con- 
struction of  the  viaducts  was  proceeded  with,  a  complete 
span  of  the  superstructure,  consisting  of  a  pair  of  the 
frames  with  the  planking,  was  erected  at  Bristol,  and 
tested  to  ascertain  the  efficiency  of  every  part. 

When  it  became  necessary  to  strengthen  the  super- 
structure to  enable  it  to  carry  the  weight  of  locomotives, 
a  strongly  trussed  parapet  was  added  above  the  trusses, 
as  shown  in  the  woodcut.  After  the  lapse  of  twenty  years, 
the  timber  having  begun  to  decay,  wrought-iron  girders 
have  been  inserted,  which  rest  on  the  stone  piers;  the 
framing,  however,  has  not  been  removed. 

Shortly  after  the  completion  of  the  viaducts  on  the 
South  Devon  Railway,  those  on  the  South  Wales  Railway 
were  constructed.  The  most  important  on  this  line  are 
those  at  Landore  and  Newport. 

The  viaduct  at  Landore,  near  Swansea,  is  1,760  feet 
long,  as  the  railway  here  crosses  a  wide  valley.  It  has 
37  openings,  and  there  are  a  variety  of  spans,  one  of  100 
feet,  two  of  73  feet,  two  of  64  feet,  two  of  50  feet,  and  the 
rest  of  about  40  feet  each.  Most  of  these  consist  of  a 
superstructure  of  queen  trusses.  The  piers  are  of  different 
materials,  some  being  almost  entirely  of  masonry,  some 
partly  of  masonry  and  partly  of  timber,  and  others  en- 
tirely of  timber,  according  to  the  nature  of  the  foundation.' 

•  Mr.  Brunei,  by  taking  care  in  his  feet  high  was  placed  upon  a  broad 

timber    structures   to   distribute  the  platform  resting  on  an  old  embank- 

load  uniformly,  was  frequently  able  ment  upwards  of  50  feet  in  height, 

to  dispense  with  costly  foundations.  A  similar  arrangement  was  adopted 

On  one  occasion  a  timber  viaduct  30  by  him  in  some  cases  on  slips  in  em- 


184 


KAILWAY  BRIDGES  AND  VIADUCTS. 


The  chief  feature  is>  the  centre  span,  with  an  opening  of 
100  feet,  the  superstructure  of  which  is  a  very  fine  piece 
of  timber-work.*  It  has  four  trusses,  one  on  either 
side  of  the  two  lines  of  rails,  of  the  form  shown  in  the 
woodcut  (fig.  4).  The  truss  consists  of  a  four-sided  frame 
placed  within  a  five-sided  frame,  the  angles  of  each  polygon 
being  connected  by  bolts  and  struts  with  the  middle  of  the 
sides  of  the  other  polygon. 

The  planking  of  the  roadway  rests  on  double  beams, 


Fig.  4,    Landore  Viaduct. 


■t..?....? 


Scale  of  feet. 

supported  at  several  points  in  the  manner  shown  in  the 
woodcut,  each  point  having  suspension-rods  to  connect  it 
with  the  nearest  angles  of  the  frames.  The  arrangement 
of  the  double  polygonal  frame  and  of  the  tie-rods  enables 
the  transverse  strength  of  the  timbers  to  exercise  consider- 
able resistance  to  any  distortion  of  the  shape  of  the  truss 
by  a  rolling  load.  To  prevent  any  tendency  of  the  top 
of  the  frame  to  yield  sideways  under  the   compressive 


bankments  whicli  it  would  have  been 
uncertain  and  expensive  to  make  up 
with  earthwork. 


'  For  a  description  of  this  viaduct, 
seo  Proceedings  Inst.  C.  E.,  vol.  xiv. 
for  1854-6,  p.  492. 


•SOUTH  WALES  TIMBEE  VIADUCTS.  185 

strain,  the  tops  of  the  trusses  are  connected  by  transverse 
struts  or  braces,  the  two  outside  trusses  being  steadied 
by  raking  ties  attached  to  outriggers  projecting  from 
below  the  flooring  of  the  bridge.  The  thrust  of  the 
polygonal  frames  is  resisted  by  wrought-iron  tie-bars  at 
the  level  of  the  roadway  beams.  All  the  tie-rods  in  this 
bridge  are  double,  with  one  bar  on  each  side  of  the  timbers, 
to  avoid  the  necessity  of  making  large  bolt-holes.^ 

The  viaduct  at  Newport  consists  of  eleven  spans  with 
queen  trusses,  resting  on  piles.  The  main  span,  over  the 
river  Usk,  is  100  feet,  and  was  constructed  with  timber 
trusses  very  similar  to  those  at  Landore.  Shortly  before 
it  was  finished,  the  viaduct  was  burnt  down.  In  rebuilding 
it,  wrought-iron  trusses  were  employed  for  the  main  span. 

The  works  of  the  Cornwall  Eailway  were  commenced  in 
the  year  1852.  The  district  through  which  the  line  passes 
is  very  deficient  in  the  materials  requisite  for  the  con- 
struction of  a  railway.  The  granite  of  the  country  is  for 
the  most  part  only  applicable  for  ashlar ;  and  the  slate, 
which  is  flat-bedded  and  so  far  fit  for  rubble  masonry,  is 
frequently  inferior  in  quality. 

In  consequence  of  the  number  of  valleys  that  the  rail- 
way had  to  cross,  the  aggregate  length  of  the  viaducts, 
thirty-four  in  number,  exclusive  of  the  Saltash  bridge,  is 

'  Mr.  Brunei  about  this  time  intro-  commencement  of  the  thread,  the 
duced  a  great  improvement  in  the  strength  is  not  so  great  as  that 
manufacture  of  wrought-iron  bolts  for  due  to  the  reduced  sectional  area, 
bridges,  when  these,  as  is  usually  the  The  improvement  consisted  in  swell- 
case,  are  screwed  at  the  ends.  A  ing  out  the  iron  of  the  end  of  the 
screw  cannot  be  made  on  a  bolt  with-  bolt  where  the  thread  was  to  be 
out  the  metal  being  cut  into  to  the  made,  so  that  the  diameter,  at  the 
extent  of  the  depth  of  the  thread,  deepest  part  of  the  thread,  should  be 
and  the  strength  thereby  considerably  fully  equal  to  that  of  the  bolt.  The 
reduced.  The  section,  taken  at  the  saving  of  metal  by  this  improvement, 
bottom  of  the  thread,  is  much  smaller  especially  in  the  case  of  long  bolts,  is 
than  that  of  the  bolt ;  and,  moreover,  very  considerable, 
owing  to  the  abrupt   change  at  the 


186  RAILWAY  BEIDGES  AND  VIADUCTS. 

upwards  of  four  miles  on  a  line  of  sixty  miles.  By  the 
use  of  timber,  a -great  saving  was  effected  in  tlie  first 
cost  of  the  works ;  and  though  it  is  a  material  which  in 
time  requires  renewal,  its  use  on  the  Cornwall  Eailway 
enabled  the  line  to  be  made  with  the  capital  at  the  com- 
mand of  the  Company;  while,  allowing  for  the  cost  of 
subsequent  repairs,  the  total  expenditure  did  not  differ 
much  from  what  it  would  have  been  had  the  super- 
structure of  the  viaducts  been  of  more  durable  mate- 
rials. The  comparatively  small  cost  of  these  structures 
enables  them  to  be,  in  certain  places,  economically  sub- 
stituted for  embankments,  as  was  done  on  the  Cornwall 
Railway. 

The  viaducts  are  to  be  found  over  the  whole  length  of 
the  line,  but  they  are  most  frequent  between  the  Liskeard 
and  Bodmin  Road  stations,  where  the  railway  crosses 
numerous  branches  of  the  Glynn  valley. 

Most  of  these  viaducts  are  of  one  type  of  construction. 

The  piers  are  formed  of  plain  walls,  built  up  to  thirty- 
five  feet  below  the  level  of  the  rails,  those  of  the  more 
lofty  viaducts  being  strengthened  by  buttresses.  In  the 
woodcut  (fig.  5)  is  shown  a  portion  of  the  St.  Pinnock 
viaduct,  from  which  the  form  of  these  piers  will  be  under- 
stood. 

This  viaduct  is  the  loftiest  on  the  Cornwall  Railway, 
the  rails  being  at  a  height  of  153  feet  above  the  ground. 
A  description  of  the  superstructiu-e  will  serve  to  explain 
the  design  of  the  principal  viaducts  on  the  line. 

The  roadway  planking  rests  on  three  beams,  which  run 
longitudinally  throughout  the  whole  length  of  the  viaduct. 
Each  of  these  beams  consists  of  two  pieces  of  timber,  one 
above  the  other,  fastened  together  by  bolts  and  joggles. 
The  piers  are  66  feet  apart,  centre  to  centre,  and  the 
longitudinal  beams  are   supported,  at  four  nearly  equi- 


COENWALL  TIMBER  VIADUCTS, 


187 


distant  points  in  this  space,  by  straight  single  timbers 
radiating  from  the  tops  of  the  piers.  The  feet  of  the 
timbers,  which  rest  on  the  masonry  in  cast-iron  shoes, 
are  connected  together  by  wrought-iron  tie-bars;  and 
the  framework  is  made  rigid  by  iron  diagonals. 

It  will  be  observed  in  the  transverse  section  (fig.  5)  that 


\ 

/\ 

—          — 

A 

A 

Tramvcrse  tictUm. 


Plan  of  base  of  pier. 


Plan  of  top  of  pier. 


Fig.  5.    St.  Pinnock  Viaduct. 

the  whole  weight  of  the  superstructure  is  concentrated 
immediately  over  those  points  in  the  piers  where  the  three 
buttresses  meet.  The  diagonal  braces  which  are  attached 
to  each  set  of  the  main  timbers  give  transverse  stability 
to  the  superstructure.^ 


'  An  arrangement  was  introduced 
by  Mr.  Brunei  to  prevent  any  distur- 
bance in  the  permanent  way  by  a 
settlement    of  the   embankments  at 


the  ends  of  the  viaducts.  There 
were  no  lai^e  abutments  and  wing 
walls,  but  the  end  of  the  viaduct 
was  formed  with  a  queen  truss  in  the 


188  EAILWAY  BEIDGES  AND  VIADUCTS. 

It  was  desirable,  both,  in  first  construction  and  in 
subsequent  repairs,  to  have  a  iiniform  dimension  for  the 
spans,  and  the  subdivision  of  66  feet  was  determined  on 
as  being  suitable  for  the  economic  construction  of  the 
greater  part  of  the  work.  The  subdivision  of  this  length 
was  such  as  to  allow  of  single  whole  timbers  being  sufii- 
cient  for  the  direct  supports  of  the  longitudinal  beams ; 
and  as  these  beams  were  supported  at  intervals  of  15  to  20 
feet,  no  intermediate  trussing  was  required.  As  the  inclined 
timbers  met  the  tops  of  the  piers  at  a  moderate  inclination, 
the  outward  thrust  caused  by  unequal  loading  of  the  spans 
of  the  viaduct  was  inconsiderable,  and  was  easily  counter- 
acted by  light  iron  ties. 

The  stone  for  the  piers  was  for  the  most  part  procured 
in  the  neighbourhood,  the  design  of  the  masonry  being 
sucli  as  to  enable  stone  of  the  country  to  be  used ;  and, 
as  the  timber  superstructure  was  built  in  pieces  of  mode- 
rate size,*  and  easily  obtained,  the  expenditure  was  pro- 
bably not  far  from  the  minimum  under  the  existing 
conditions.'' 

On  the  South  Devon  and  Tavistock  Railway,  the  via- 
ducts are  six  in  number,  and  from  62  to  132  feet  in  height. 
In  these  the  piers  were  made  of  a  somewhat  simpler  form 
than  those  just  described.     At  the  lofty  viaducts,   the 

parapet,  which  rested  on  a  platform  with  a  view  to  giving  facility  for  re- 

on  the  top  of  the  embankment  slope.  placing    portions  of  it,  should   they 

In  any  slight  settlement  of  the  earth,  decay. 

the  end  of  the  viaduct  sunk  with  it,  '   The  viaducts   on   the   Cornwall 

and  the  permanent  way  was  not  dis-  Eailway     between     Plymouth     and 

turbed.     Wedges  were    provided  to  Truro    are    thirty-four    in    number, 

raise  the  ends  of  the  trusses  and  re-  Of    these   there   are  nineteen   which 

adjust  their  level.     This  was  an  im-  have  from   six   to    twenty  openings, 

portant   provision,   as   it  applied   to  and    are    from    80    to    153   feet  in 

about  60  cases  on  the  Cornwall  Eail-  height.      The    aggregate    length    of 

way.  these  nineteen  viaducts  is  nearly  2f 

'  The  simple  arrangement  of  the  miles, 
timber-work   was  specially  arranged 


CORNWALL  TIMBER  VIADUCTS.  189 

buttresses  were  made  with  a  -uniform  batter  througboiit 
their  height.  The  Walkham  viaduct,  near  Tavistock,  132 
feet  high,  with  fifteen  openings  of  66  feet  span  each,  may- 
be considered  to  exhibit  the  most  matured  design  of  Mr. 
Brunei's  timber  viaducts. 

On  the  West  Cornwall  Eailway  a  type  of  viaduct  similar 
to  that  described  above  was  adopted ;  but  as  the  general 
height  was  not  so  great,  the  spans  were  50  feet  each,  and 
the  longitudinal  beams  were  supported  at  three  points  in 
each  span,  instead  of  at  four  as  on  the  Cornwall  Railway. 
In  consequence  of  the  nature  of  the  foundations,  the  piers 
of  the  nine  viaducts  on  this  line  were  for  the  most  part 
formed  of  upright  timbers  well  braced  together,  standing 
upon  masonry  footings.  The  viaduct  at  Angarrack,  98 
feet  high,  with  16  spans,  which  was  constructed  in  1851, 
was  remarkable  for  its  light  appearance,  owing  to  the 
smaU  number  of  timbers  in  the  superstructure  and  piers. 

Mr.  Brunei  paid  great  attention  to  the  preservation  of 
the  material  of  the  timber  bridges  and  viaducts.  As 
early  as  1835  he  had  been  in  communication  with  Mr. 
Faraday  as  to  the  best  method  of  testing  the  extent  to 
which  the  Kyanising  solution  penetrated  into  wood. 
Mr.  Brunei  made  a  careful  trial  of  all  the  different  methods 
of  preserving  timber,  and  employed  the  more  successful  of 
them  on  a  very  considerable  scale.  He  was  so  impressed 
with  the  importance  of  the  preserving  processes  being 
properly  applied,  that  he  on  several  occasions  preferred  to 
keep  the  operation  of  preserving  the  timber  in  the  hands 
of  the  Company,  in  order  that  it  might  be  done  thoroughly, 
and  under  his  own  supervision.  He  also  minutely  at- 
tended to  the  details  by  which  timber  structures  may  be 
protected  from  decaying  influences. 


190  RAILWAY  BRIDGES  AND  VIADUCTS. 

Cast-Iron  Bridges. 

Mr.  Brunei  did  not  make  an  extensive  use  of  cast  iron 
for  the  superstructure  of  bridges.  His  views  as  to  the 
employment  of  this  material  in  girders  are  clearly  ex- 
pressed in  the  following  extract  from  a  letter  to  one  of 
the  Directors  of  the  Great  Western  Railway : — 

April  18,  1849. 

Cast-iron  girder  bridges  are  always  giving  trouble — from  such 
cases  as  the  Chester  Bridge,  and  our  Great  "Western  road  bridge  at 
Hanwell,  which,  since  1838,  has  always  been  under  repair,  and  has 
cost  its  first  cost  three  times  over,  down  to  petty  little  ones,  which, 
either  in  frosty  weather  or  from  other  causes,  are  frequently  failing. 
I  never  use  cast  iron  if  I  can  help  it ;  but,  in  some  cases  it  is 
necessary,  and  to  meet  these  I  have  had  girders  cast  of  a  particular 
mixture  of  iron  carefully  attended  to,  and  I  have  tavight  them  at 
the  Bridgewater  foundry  to  cast  them  with  the  flange  downwards 
instead  of  sideways.  By  these  means,  and  having  somebody  always 
there,  I  ensure  better  castings,  and  have  much  lighter  girders  than  I 
should  otherwise  be  obliged  to  have.  The  number  I  have  is  but 
few,  because,  as  I  before  said,  I  dislike  them,  and  I  pay  a  price  some- 
what above  ordinary  castings,  believing  it  to  be  economy  to  do  so. 

I  won't  trust  a  bridge  of  castings  run  in  the  ordinary  way,  and  at 
foundries  where  I  have  not  a  person  always  watching;  and,  even  if  I 
did,  the  weight  requisite  in  a  beam  of  ordinary  metal  and  mode  of 
running  would  more  than  make  up  for  the  reduced  price. 

The  bridge  at  Hanwell  referred  to  in  this  letter  was  one 
on  the  main  line  of  the  Great  Western  Railway,  over  the 
Uxbridge  road.  In  1847  the  planking  caught  fire,  and 
the  cast-iron  girders  were  destroyed  by  the  heat. 

The  researches  of  Mr.  Eaton  Hodgkinson  had  drawn 
attention  to  the  importance  of  a  proper  proportionment  of 
the  top  and  bottom  flanges  of  cast-iron  girders,  and  Mr. 
Brunei  now  made  some  experiments  on  this  point.  As  part 
of  this  investigation,  eight  girders,  30  feet  long  and  16 
inches  deep,  were  tested  by  weights  until  they  gave  way. 


CAST-IEON  GIEDERS.  191 

The  comparative  areas  of  the  top  and  bottom  flanges  were 
varied  until  a  correct  proportion  between  the  two  was 
arrived  at.  The  general  result  of  these  large-scale  ex- 
periments showed  a  lower  breaking-weight  than  that 
deduced  from  Mr.  Hodgkinson's  formula. 

When  Mr.  Brunei  afterwards  had  occasion  to  use  cast- 
iron  girders,  which  was  chiefly  for  road  bridges  over  rail- 
ways, they  were  made  of  the  form  which  his  experiments 
had  shown  to  be  the  best ; '  but  he  repaired  the  Hanwell 
Bridge  with  wrought  iron. 

At  about  the  same  time  the  necessity  for  spanning  wide 
openings  had  led  to  larger  girders  being  required  than 
could  be  manufactured  in  single  castings,  and  Mr.  Brunei 
had  a  large  cast-iron  girder  made,  46  feet  long  and  4  feet 
deep,  of  five  pieces  bolted  and  keyed  together.  It  was 
tested  until  it  gave  way  with  a  load  of  92  tons  on  the 
middle.  The  result  showed  that  the  several  parts  had  been 
well  connected,  and  that  the  strength  of  the  beam  was  not 
much  less  than  the  calculated  strength  of  a  beam  of  the 
same  size  in  a  single  piece.  Mr.  Brunei  did  not,  however, 
use  girders  of  this  construction,  as  the  rapid  introduc- 
tion of  wrought  iron  rendered  it  unnecessary. 

Cast  iron  was  introduced,  though  not  for  girders,  in 
many  of  the  brick  and  stone  bridges  on  the  Great  Western 
Railway.  It  was  used  in  the  form  of  troughs  sunk  into 
the  crown  of  the  arch  in  bridges  where  the  headway  was 
very  limited.  The  rails  were  laid  along  the  bottom  of  the 
trough  within  a  few  inches  of  the  soffit  or  underside  of  the 
arch. 

Although,  after  the  careful  experiments  and  investiga- 
tions he  had  made,  and  the  experience  he  had  obtained, 
Mr.  Brunei  did  not  make  use  of  cast  iron  for  large  girders, 

'  A  drawing  showing  this  form  of  the  Commission  on  the  Application  of 
section  is  appended  to  the  Jieport  of      Iron  to  Railway  Structures,  1849. 


192  RAILWAY  BRIDGES  AND  VIADUCTS. 

he  looked  forward  to  the  possibility  of  such  improvements 
being  introduced  into  the  manufacture  as  would  enable 
sound  castings  of  considerable  size  to  be  made  of  homo- 
geneous material. 

He  expressed  this  opinion  in  a  letter  to  the  Secretary 
of  the  Commission  on  the  Application  of  Iron  to  Rail- 
way Structures.  This  Commission  (which  Mr.  Brunei 
called  '  The  Commission  for  stopping  further  improve- 
*  ments  in  bridge  building ')  was  appointed  '  for  the 
'  purpose  of  inquiring  into  the  conditions  to  be  observed 
'  by  engineers  in  the  application  of  iron  in  structures 
'  exposed  to  violent  concussions  and  vibration.'  Mr. 
Brunei,  in  common  with  most  engineers,  thought  it  would 
be  very  inexpedient  that  any  regies  de  Vart  should  be  laid 
down,  and  took  up  the  cudgels  boldly  on  behalf  of  the 
liberty  of  the  profession : — 

March  13,  1848. 
At  present  cast  iron  is  looked  upon,  to  a  certain  extent,  as  a  friable, 
treacherous,  and  uncertain  material ;  castings  of  a  limited  size  only 
can  be  safely  depended  upon ;  wrought  iron  is  considered  compara- 
tively trustworthy,  and  by  riveting,  or  welding,  there  is  no  limit  to 
the  size  of  the  parts  to  be  used.  Yet,  who  will  venture  to  say,  if  the 
direction  of  improvement  is  left  free,  that  means  may  not  be  found  of 
ensuring  sound  castings  of  almost  any  form,  and  of  twenty  or  thirty 
tons  weight,  and  of  a  perfectly  homogeneous  mixture  of  the  best  metal? 
Who  will  say  that  beams  of  great  size  of  such  a  material,  either  in 
single  pieces  or  built,  may  not  prove  stronger,  safer,  less  exposed  to 
change  of  texture  or  to  injury  from  vibration,  than  wrought-ij-on, 
which  in  large  masses  cannot  be  so  homogeneous  as  a  fused  mass 
may  be  made  and  which  when  welded  is  liable  to  sudden  fracture 
at  the  welds  ?  ' 

Wrought-Iron  Bridges. 

Notwithstanding  the  cost  of  wrought  iron,  but  a  short 
time  elapsed  between  its  introduction  into  bridge  building 

'  The  remainder  of  this  letter  is  printed  in  Chapter  XVI.  p.  486. 


WROUGHT-IEON  GIRDER  BRIDGES.  193 

and  its  use  in  structures  of  great  magnitude.  Mr.  Brunei 
had  been  long  familiar  with  the  application  of  riveted 
wrought-iron  work,  and  he  was  the  first  to  encourage  its 
use  on  a  large  scale  in  shipbuilding  by  recommending  its 
adoption  in  the  *  Great  Britain '  steam-ship  in  1838. 

Girder  Bridges. 

The  strains  on  girders  made  of  homogeneous  material 
have  been  carefully  and  ably  calculated  by  mathematicians ; 
and  the  investigations  thus  made  have  directed  inquiry 
into  the  right  channels  for  determining  the  nature  of  the 
stresses  on  the  several  parts  of  the  built-up  structures 
now  so  much  in  use.  Principles  have  by  degrees  been  laid 
down,  and  lines  of  thought  have  been  suggested  and 
followed  out  which  were  unknown  at  the  time  when 
wrought-iron  girders  were  first  introduced  in  the  con- 
struction of  railway  bridges.*  <r~^ — >* 

Shortly  after  Mr.  Brunei  began  to  use  ^^ 

wrought  iron  for  bridge  girders,  he  made  an 
experiment  in  order  to  determine  the  weak 
points  of  a  large  wrought-iron  plate-girder. 
•Mr.  Edwin  Clark,  in  his  work  on  the 
'  Britannia  and  Conway  Tubular  Bridges,' 
vol.  i.  p.  437,  gives  a  description  of  what 
he  justly  terms  *this  magnificent  experi- 
*ment.'  The  girder  was  of  the  section 
shown  in  the  woodcut  (fig.  6),  70  feet  in 
length,  and  of  ^-inch   plate  throughout.  cauoffeet 

It  was  weighted  gradually,  and  gave  way  Fig.  e. 

.,,        ,        ,/.-,„,-,  ,1  ,  1       11        Experimental  Girder. 

With  a  load  of  165  tons  on  the  centre,  by  the     Tramversestctum. 

'  Mr.  Brunei  was  thoroughly  con-  but   at   the  same  time  he  preferred, 
ersant  with  the  principles  of  mathe-  when  it  was  possible,  to  use  geometri- 
matical  analysis,  and  was   able  with  cal  methods  of  solution  for  engineer- 
great  readiness  to  apply  it  in  practice ;  ing  problems. 


IlliS L 


194  KAILWAY  BEIDGES  AND  VIADUCTS. 

tearing  apart  of  the  vertical  web  plate  near  the  ends  of 
the  girder.  When  this  portion  had  been  strengthened, 
and  the  girder  again  loaded,  it  gave  way  with  a  load 
of  188  tons  by  the  simultaneous  failure  of  the  top  and 
bottom  flanges,  that  is  to  say,  of  the  plates  forming  the 
triangles  shown  in  the  woodcut.^ 

The  superior  tensile  strength  of  wrought  iron  to  that 
of  cast  iron,  and  the  facility  with  which  pieces  could  be 
joined  together  by  riveting,  enabled  girders  of  great  size 
to  be  made.  The  thin  wrought-iron  plates  were  arranged 
so  as  to  form  the  top  and  bottom  flanges  of  the  girders  as 
well  as  the  upright  web  connecting  them.  The  metal  in 
the  top  of  a  girder  being  in  compression,  it  was  important  so 
to  dispose  it  that  it  should  resist  the  tendency  to  yield  side- 
ways under  the  strain.  This  requirement  was  met  in  the 
experimental  girder  by  the  triangular  section  of  the  top 
flange;  and  the  convenience  of  this  form  for  joining 
together  a  number  of  plates,  without  dif- 
ficulty or  the  use  of  long  rivets,  led  Mr. 
Brunei  to  use  the  triangular  section  also 
for  the  bottom  flange. 

Subsequent  improvements   in  the   faci- 
lities for  bending  wrought-iron  plates  en- 
abled him  to  use  a  form  of  cross  section 
of  wrought-iron  girder,  the  top  flange  of 
which  was  a  nearly  circular  tube,  the  best 
■f»fn     I     >     t   shape  of  strut  to  resist  longitudinal  com- 
scauoffea.        presslou.     It  is  shown  in  the  woodcut  (fig. 
cirder  on  South  Wales  7),  and  was  uscd  in  many  of  his  bridges. 

Kailway,  70  feet  span. 

Tranzverse  Section.  Thls  form  was  aftcrwards  modified  to 

that  shown  in  fig.  8.    The  semicircular  top  plate  is  stiffened 
by  occasional  cross  diaphragms,  and  while  it  was  a  good 

*  In   the  note  at  the  end  of  this      experiments  made  by  Mr.  Brunei  on 
chapter    mention    is  made  of   some      riveted  joints. 


WKOUGHT-IRON  GIRDER  BRIDGES.  195 

form  to  resist  compression,  it  was  more  easily  painted  than 
the  closed-in  top  flanges  shown  in  figs.  6  and  7. 

The  forms  of  wrought-iron  girder  already  referred 
to  are  those  known  as  plate  girders,  with  continuous 
webs  made  of  plates  riveted  together,  and  therefore 
analogous  to  the  beams  of  cast  iron  which  they  almost 
entirely  superseded.  On  Mr.  Brunei's  railways  there  are 
a   great  number  of  bridges  of  these  forms  yT^>. 

of  girder,  where  the  spans  do  not  exceed  L  j 
100  feet.  For  larger  spans  he  used  wrought 
iron,  in  large  and  deep  trussed  frames,  by 
which  means  a  great  degree  of  economy 
was  attained  in  the  employment  of  the 
material. 

The  care  which  he  had  taken  to  satisfy 
himself  of  the  action   of  the   strains   in 
plate   girders   was   of  service   in   all  the 
greater    structures    he    designed,    as    in      ' 
all   of   them  he   employed   wrought-iron        scaje  o/Mt. 
girders  to  carry  the  roadway,  of  a  type  ^'^•*- 

'^  •'  *"  -f  ^       Girder  on  Eastern  Ben- 

somewhat   similar   to    those   already    de-  fptn.^*""^*^'  ^^  ^'^^ 
scribed,   the    girders  being   supported   at     Tramvertt  section. 
frequent  intervals  by  the  main  framework  or  truss. 

Opening  Bridges. 

The  first  large  opening  bridge  which  Mr.  Brunei  con- 
structed was  a  roadway  swing  bridge,  12  feet  wide,  across 
the  new  lock  at  the  Bristol  Docks.  The  length  of  the 
overhanging  end  is  88  feet,  and  the  other,  or  tail  end, 
which  is  34  feet  long,  rests  upon  two  wheels,  which  travel 
on  a  circular  rail.  The  weight  of  the  overhanging  end 
is  rather  more  than  counterbalanced  by  large  blocks  of 
cast  iron,  forming  part  of  the  pavement  of  the  tail  end. 
Almost  the  whole  weight  is  borne  on  a  centre  pivot,  assisted 

o  2 


196  KAILWAY  BKIDGES  AND  VIADUCTS. 

by  four  wlieels  in  fixed  bearings,  upon  which  runs  an  in- 
verted circular^  rail  attached  to  the  underside  of  the 
bridge.  On  the  pivot,  which  rests  on  a  large  cast-iron 
bed-plate,  are  two  discs,  one  of  steel  and  the  other  of 
brass,  which  can  readily  be  lubricated,  or  taken  out  and 
renewed. 

On  the  sides  of  the  bridge  are  longitudinal  wrought- 

iron    plate- girders.       The    top    flange    is    pear-shaped, 

and  the  bottom  flange  triangular,  having 

three    curved    plates.      The    flanges    are 

connected    together  by    a  vertical    plate 

web   of   wrought    iron.      The   section    is 

shown  on  the  woodcut  (fig.  9).     It  admits 

of  very  simple  riveting,  without  the  use  of 

^^-K  angle   irons.     The   form   of   the    bottom 

tiiiJ — 1 — 5 — 5  flange  is  suited  to  the  compressive  strain 

Scale  of  feet.        {j^  j^as  to  bear  when  the  bridge  is  being 

Pig.    9.       Cumberland  ° 

Basin  Swing  Bridge,  moved.  The  top  flange  has  also  wrought- 
iron  tie-bars  within  the  tube.  When  the  bridge  is  across 
the  lock  and  open  for  trafiic,  the  overhanging  end  rests 
on  cams,  which  are  tightened  up  so  as  to  lift  and  support 
the  ends  of  the  girders.  As  the  bridge  rests  almost  en- 
tirely on  a  pivot  of  small  diameter,  it  turns  with  great  ease. 
^Near  Gloucester  there  are  two  skew  swing  bridges  some- 
what similar  to  each  other  in  arrangement.  Almost  all 
the  weight  while  turning  is  supported  on  the  piston  of  a 
hydraulic  press,  and  the  bridge  therefore  turns  round  on 
the  water  in  the  cylinder.  The  first  bridge  is  on  the  main 
line  of  railway  leading  to  South  Wales,  across  a  branch 
of  the  River  Severn,  and  is  for  two  lines  of  way.  It  has 
three  girders,  125  feet  long,  of  the  form  shown  in  fig.  7 
(p.  194).  The  water  pivot  is  in  the  middle  of  the  length 
of  the  bridge,  which  spans  two  openings  of  50  feet  on  the 
square.     Before  being  turned  the  bridge  was  intended  to 


OPENING  BRIDGES.  197 

be  lifted  slightly  off  its  bearings  by  the  hydraulic  press, 
and  steadied  by  four  wheels,  on  which  a  portion  of  the 
weight  was  to  be  made  to  rest  by  long  springs  within 
the  girders,  the  range  of  which  was  to  be  limited  in  one 
direction  by  a  fixed  stop.  The  central  pier  consists  of  five 
cylinders  of  cast  iron,  each  6  feet  in  diameter,  filled  with 
concrete,  surmounted  by  a  cast-  iron  ring  or  roller  path. 
The  railway  company  was  obliged  to  make  this  an  opening 
bridge  in  order  to  provide  for  the  free  navigation  of  the  river 
should  the  old  stone  bridge  lower  down  be  altered.  This 
has  not  been  done,  and  the  railway  swing  bridge,  con- 
structed in  1851,  has  not  yet  been  opened. 

The  other  swing  bridge  at  Gloucester  is  on  the  Dock 
branch,  for  one  line  of  way,  with  an  opening  of  50  feet 
on  the  square,  the  overhanging  length  of  the  girders 
being  70  feet.  While  raised  from  its  bearing  and  turning 
on  its  water  pivot  it  is  steadied  by  two  tail  wheels,  like 
the  bridge  at  the  Bristol  Docks. 

On  the  BuUo  Pill  branch  of  the  South  Wales  Eailway 
there  is  a  small  wrought-iron  drawbridge,  for  one  line  of 
way,  of  30  feet  span.  It  is  a  lifting  bridge  on  the  bascule 
principle,  like  many  bridges  over  canals  in  this  country 
and  in  Holland.  The  opening  part  turns  on  a  horizontal 
axle,  and  is  lifted  by  rods  attached  to  the  ends  of  two  large 
beams  or  levers,  turning  vertically,  which  are  supported 
above  the  railway  on  a  timber  framework.  At  the  other 
ends  of  these  beams  is  a  counterbalance  weight.  The 
bridge  is  opened  or  shut  by  pulling  down  either  end  of 
the  beams  with  a  small  chain. 

The  other  bridges  are  on  the  main  line  of  the  Soutli 
Wales  Railway,  and  are  four  in  number,  each  for  two  lines 
of  way. 

One  at  Loughor  is  a  wrought-iron  swing  bridge,  of  30 
feet  opening,  of  the  ordinary  construction,  with  girders 


Univerg!TV  of  Toronto 

DePa 


198  RAILWAY  BEIDGES  AND  VIADUCTS. 

90  feet  in  length,  resting  upon  36  rollers,  whicli  are 
secured  in  a  ring  concentric  with  the  pivot.  The  opening 
and  closing  is  effected  by  means  of  a  crab,  fixed  clear 
of  the  bridge,  near  the  centre.  A  chain  passes  from  the 
overhanging  end  of  the  bridge  to  this  crab,  and  taking 
one  or  two  turns  round  the  barrel,  to  ensure  a  sufl&- 
cient  amount  of  friction,  is  led  to  the  tail  end.  The 
bridge  can  thus  be  opened  or  shut  by  turning  the  crab 
handle  in  opposite  directions.  The  overhanging  end,  when 
across  the  river,  is  raised  upwards  to  a  small  extent 
by  weighted  levers,  and  wedges  are  then  drawn  in  under 
it  to  give  it  a  solid  bearing. 

At  Kidwelly  and  at  Haverfordwest  there  are  wrought- 
iron  lifting  bridges,  the  former  of  20  feet,  and  the  latter  of 
30  feet  span.  Each  of  these  turns  on  a  horizontal  axle 
like  the  BuUo  Pill  bridge;  but,  instead  of  being  lifted 
by  levers  overhead,  it  has  a  narrow,  heavily-weighted 
tail  end,  beneath  the  planking  of  the  viaduct,  which  is 
pulled  down  with  a  chain  worked  by  a  crab.  The  portion 
which  carries  each  line  of  way  is  made  to  open  indepen- 
dently. In  this  form  of  bridge  no  wedges  or  adjusting 
arrangements  are  required  for  the  bearings  of  the  over- 
hanging end. 

Over  the  river  at  Caermarthen  is  a  skew  bridge  of  three 
girders,  each  116  feet  long,  for  a  double  line  of  way.  It 
occupies  two  spans  and  rolls  back,  so  as  to  leave  a  50-feet 
opening  for  the  navigation.  The  swing  bridge  at  Bristol, 
already  described,  was  at  first  intended  to  be  a  rolling 
bridge,  and  to  be  furnished  with  wheels  to  run  back  on 
fixed  rails,  but  the  difficulty  of  forming  a  good  foundation 
for  the  wheel  path  led  to  the  design  being  altered.  At 
Caermarthen  the  same  difficulty  was  overcome  by  putting 
wheels  turning  in  fixed  bearings  on  the  pier  and  abutment 
of  the  bridge.   The  undersides  of  the  girders  carry  inverted 


WROUGHT- lEON   TRUSSED  BRIDGES.  199 

rails,  and  run  back  on  the  wheels.  The  bridge,  when  shut, 
is  on  an  incline  of  1  in  50.  When  about  to  be  opened  it 
is  made  to  assume  a  horizontal  position  by  turning  a  sup- 
porting cam  to  lower  the  overhanging  end,  and  the  tail  end 
then  rises  sufficiently  to  pass  clear  above  the  part  of  the 
railway  over  which  it  runs  back. 

By  this  arrangement  the  bridge,  while  in  motion,  moves 
along  a  level  path.  It  is  opened  and  closed  by  hydraulic 
machinery. 

All  these  opening  bridges  have  worked  satisfactorily 
since  they  were  constructed. 

Tnissed  Bridges. 

When  the  timber  viaduct  over  the  river  TJsk,  at  New- 
port, was  burnt  down,*  Mr.  Brunei  decided  to  form  the 
new  superstructure  of  the  centre  opening  with  three 
iron  trusses,  for  the  two  lines  of  way. 

These  are  bow  and  string  girders,  of  100  feet  span, 
and  were  made  of  considerable  height,  not  only  to  reduce 
the  strain  on  each  of  the  members  of  the  framework, 
but  also  in  order  that  the  rib  or  upper  portion  of  each 
truss  might  be  braced  diagonally  to  the  corresponding 
portion  of  the  other  trusses,  and  headway  left  for  the 
locomotive  chimneys  to  pass  underneath.  This  bracing 
counteracts  any  tendency  of  the  ribs  to  bend  sideways 
under  the  compressive  strain.  The  form  of  the  trusses 
is  shown  in  fig.  1,  PL  IV.  (p.  206).  Each  truss  is  a 
wrought-iron  polygonal  arch  of  triangular  section,  from 
which  is  suspended  a  horizontal  girder  supporting  the 
roadway.  This  girder  also  forms  the  tie  which  connects 
the  feet  of  the  arch  and  counteracts  its  thrust.  The 
diagonal  braces  shown  on  the  elevation  of  the  bridge 
prevent  the   arch  from  being  distorted  by  the  unequal 

'  See  above,  p.  185. 


200 


EAILWAY  BRIDGES  AND  VIADUCTS. 


T 


loading  caused  fey  a  passing  train.  The  middle  truss  is 
twice  tlie  strei^th  of  eacli  of  those  at  the  outside,  being 
made  so  bj  increasing  the  thickness  of  the  plates.  One 
of  the  outside  trusses  was  tested  with  a  distributed  load 
of  1|  tons  per  foot-run  of  its  length. 

At  about  the  same  time  that  the 
Newport  viaduct  was  reconstructed,  Mr. 
Brunei  designed  the  bridge  over  the 
Thames  on  the  Windsor  branch  of  the 
Great  Western  Eailwaj.  This  is  a  very 
large  example  of  the  bow  and  string 
girder,  the  span  being  202  feet,  and 
the  height  of  the  truss  23  feet.  The 
trusses  are  three  in  number,  for  two 
lines  of  way,  the  middle  one  being  twice 
the  strength  of  the  outside  trusses. 
The  elevation  of  the  Windsor  bridge  is 
shown  in  fig.  2,  PI.  lY.  (p.  206).  The 
bridge  is  oblique  to  the  river,  being  20° 
off  the  square.  To  steady  the  arched 
ribs  sideways  a  system  of  diagonal 
bracing  extends  over  the  whole  of  the 
top  of  the  trusses,  except  at  the  ends,  where  headway 
has  to  be  left  for  the  trains. 

A  section  of  the  arched  ribs  and  of  the  roadway  girders 
in  the  centre  of  one  of  the  trusses  is  given  in  the  wood- 
cut (fig.  10).  The  arched  rib,  to  resist  compression,  is  of 
triangular  section.^ 

The  borings  to  ascertain  the  nature  of  the  ground  at 
the  foundations  of  the  piers  were  made  in  1846,  but  it  was 


I  I  t  1 

Scale  of  feet. 
Fig.  10. 
Truss  of  "Windsor 

Bridge. 
Transverse  Section. 


'  A  description  of  this  bridge  is 
given  in  Humber's  Bridge' Construc- 
tion, vol.  i.  p.  228,  and  vol.  ii.  pi.  70, 


71,  72;  Molinos  et  Pronnier,  Con- 
struction dcs  Fonts  Metalliques,  p.  328, 
pi.  20,  21,  22. 


WI^DSOE  BEIDGE.  201 

not  until  1848  tlial  the  works  were  commenced.  Each 
abutment  consists  of  six  cast-iron  cylinders,  6  feet 
diameter,  which  were  sunk  by  excavating  the  gravel  from 
their  interior  by  hand  dredging  and  by  placing  weights 
on  the  top  so  as  to  force  them  down. 

When  each  cylinder  had  been  by  this  means  sunk  low 
enough  to  ensure  a  good  foundation,  it  was  filled  with  con- 
crete in  the  following  manner.  A  mixture  formed  of  Thames 
ballast  and  Portland  cement,  in  the  proportions  of  8  to  1, 
was  put  into  a  canvas  bag ;  this  was  lowered  inside  the 
cylinder  to  the  bottom,  and,  by  pulling  a  rope,  the  mouth 
of  the  bag  was  opened,  and  the  concrete  deposited  under 
water  in  the  bottom  of  the  cylinder.  Whenever  the  work 
was  interrupted,  great  care  was  taken  before  recommencing 
it  to  clean  off  any  deposit,  in  order  that  the  new  concrete 
might  adhere  well  to  the  old.  When  the  cylinder  had 
been  filled  to  such  a  height  that  there  was  no  danger  of 
its  floating  up  when  emptied,  the  water  was  pumped  out. 
The  inside  was  then  filled  with  concrete  in  the  ordinary 
manner.  On  the  top  were  placed  oak  platforms,  which 
support  the  trusses  of  the  bridge. 

One  of  the  outside  trusses  was  tested  at  Bristol  in  July 
1849,  by  loading  it  gradually  with  iron  rails,  beginning 
from  one  end,  until  the  whole  truss  was  uniformly 
weighted  with  270  tons,  or  1^  tons  per  foot-run,  observa- 
tions on  the  deflection  of  different  points  of  the  bottom 
girder  being  made  both  during  the  loading  and  unloading. 
The  results  of  this  test  were  perfectly  satisfactory. 

The  superstructure  of  the  bridge  was  erected  on  scaf- 
folding, and  the  line  was  opened  on  October  8, 1849. 

It  wiU  be  desirable  here  to  notice  one  or  two  important 
features  in  this  as  in  almost  all  Mr.  Brunei's  bridges. 
The  ordinary  permanent  way  was  laid  over  the  bridges 


202  EAILWAY  BRIDGES  AND  VIADUCTS. 

with  ballast  cl  sufl&cienfc  thickness  to  enable  the  road  to 
be  kept  in  repair  in  the  same  manner  as  the  other  parts 
of  the  line.  As  there  was  no  change  in  the  nature  of  the 
support  given  to  the  rails,  no  concussion  was  caused  on 
a  train  entering  or  leaving  a  bridge.  The  ballast  took  off 
from  the  structure  the  vibration  of  the  train  ;  and,  in  the 
event  of  carriages  or  even  engines  getting  off  the  line, 
it  helped  in  a  great  measure  to  prevent  their  ploughing 
through  the  flooring.  Where  the  flooring  was  of  timber 
the  ballast  protected  it  from  fire.  Also  in  long  bridges 
there  was  no  necessity  for  any  contrivance  of  sliding  rails 
to  allow  for  the  effects  on  the  structure  of  changes  of 
temperature.  On  the  other  hand,  the  ballast  added  to 
the  weight  on  the  bridge.  With  the  timber  viaducts 
this  was  an  advantage,  since  it  kept  the  various  parts  of 
the  framework  in  close  contact,  and  prevented  sudden 
jars  being  brought  on  them  by  the  rapidly  applied  load  of 
a  passing  train.  Even  on  the  large  bridges  the  cost  of 
the  extra  material  requisite  to  support  the  weight  of  the 
ballast  was  more  than  compensated  for  by  the  advan- 
tages above  referred  to. 

Mr.  Brunei  employed  timber  flooring,  as  being  the  safest 
in  the  case  of  carriages  getting  off  the  line,  and  also  as 
being  the  cheapest.  This  flooring  in  the  iron  bridges  was 
generally  laid  diagonally  on  wrought-iron  cross  girders, 
which  were  placed  not  at  right  angles  to  the  line,  but 
obliquely,  in  order  that  the  two  wheels"  of  the  same  axle 
of  an  engine  or  heavy  waggon  might  be  on  different  cross 
girders  at  the  same  time.  By  this  arrangement  the  cross 
girders  could  be  made  of  less  strength,  and  a  saving 
effected  in  their  cost  and  weight. 

The  bridge  over  the  Wye  at  Chepstow,  and  the  Royal 
Albert  Bridge  over  the  Tamar  at  Saltash,  are  the  largest 
and  most  important  of  Mr.  Brunei's  bridges. 


CHEPSTOW  BEIDGE.  203 

They  are  remarkable  not  only  for  their  dimensions, 
but  also  for  the  economical  character  of  the  designs,  the 
form  of  their  superstructures,  and  the  methods  by  which 
the  foundations  of  the  piers  were  made. 

At  the  part  of  the  river  Wye  where  it  is  crossed  by 
the  Chepstow  Bridge,  a  cliff  of  limestone  rock  rises  on  the 
left  bank  to  a  height  of  120  feet  above  the  bed  of  the 
river,  forming  the  precipitous  edge  of  a  broad  table-land ; 
while   on  the  right  bank  the   ground   slopes   gently  for 
a  considerable  distance,  rising  only  a  little  above    high 
water,  and  is  composed  partly  of  clay  and  partly  of  loose 
shingle  interspersed  with  large  boulder  stones.     As  it  was 
necessary  to  leave  a  clear  headway  of  50  feet  above  high 
water  for  the  navigation,  the  line  on  one  side  of  the  river 
is  on  an  embankment  of  great  height,  and  on  the  other 
side  it  penetrates  the  cliff  about  20  feet  below  the  top. 
The  whole  space  to  be  bridged  over,  600  feet  wide,  was 
divided  into   a  river  span  of  300   feet,  and  three  land 
spans  of  100  feet  each  (see  fig.  3,  PI.  V.  p.  206.)     At  one 
end  of  the  great  span  a  secure  abutment  was  offered  by 
the  cliff  of  limestone  rock  ;  but  at  the  other  end,  and  under 
the  piers  of  the  smaller  spans,  the  ground  throughout  was 
soft,  and  full  of  water.     There  was,  however,  rock  at  a 
depth  of  30  feet  below  the  bed  of  the  river. 

To  reach  this  foundation  with  masonry,  by  means  of  a 
coffer  dam,  was  almost  impracticable,  as  it  was  84  feet 
below  high  water. 

The  plan  of  building  a  stone  pier  on  a  foundation  of 
piles  was  considered,  and  abandoned  on  account  of  the 
expense. 

The  method  of  sinking  the  cast-iron  cylinders  of  the 
Windsor  bridge  has  been  already  described.  The  pneumatic 
process  of  sinking  cylinders  had  been  introduced  with 
great  success  at  the  Rochester  bridge. 


204  KAILWAY  BRIDGES  AND  VIADUCTS. 

In  this  process  the  cylinder  is  closed  at  the  top  and 
air  forced  in  \j  pumps  until  the  water  is  expelled  at 
the  bottom.  Workmen  in  the  interior  excavate  the 
ground  and  remove  any  obstacles  which  prevent  the 
cylinder  from  sinking,  weights  being  added  to  force  it 
down.  As  the  air  within  is  at  high  pressure,  the  work- 
men enter,  and  the  materials  are  passed  in  and  out, 
through  an  intermediate  chamber,  called  an  '  air  lock,' 
fitted  with  air-tight  doors.  The  pneumatic  method  was 
ultimately  employed  at  Chepstow,  to  assist  in  sinking  the 
cylinders. 

Before  he  decided  on  the  plan  for  the  foundations, 
Mr.  Brunei  had  an  experimental  cylinder  made  of  cast 
iron,  3  feet  in  diameter,  at  the  bottom  of  which  was  an 
exterior  screw  flange  12  inches  broad,  and  7  inches  pitch, 
making  one  complete  turn.  This  screw  cylinder  pene- 
trated the  ground  like  an  ordinary  screw  pile.  In  one 
instance  it  was  rapidly  sunk  to  a  depth  of  58  feet,  through 
stiff  clay  and  sand,  in  142  revolutions ;  ^  yet,  on  another 
trial,  when  boulders  were  encountered,  there  did  not 
appear  to  be  sufficient  penetrating  power.  In  one  of 
these  trials,  the  screw,  having  got  into  a  bed  of  running 
sand,  had  no  hold,  and  failed  to  descend.  Mr.  Brunei 
then  had  the  cylinder  partly  raised,  and  another  screw 
added  at  some  distance  above  the  lower  one.  It  was  then 
successfully  screwed  down. 

Mr.  Brunei,  however,  ultimately  decided  on  forming  the 
piers  of  cast-iron  cylinders  forced  down  by  loading  and 
afterwards  filled  with  concrete,  and  the  work  was  com- 
menced in  the  spring  of  1849. 

With  this  form  of  construction  all  uncertainty  of  ob- 
taining a  secure  . foundation  was  removed,  as  the  pneu- 

>  See  Proccedwgs  Inst.  C.E.,  for  18i7-8,  vol.  vii.  p.  138. 


CHEPSTOW  BRIDGE.  205 

matic  method  was  in  reserve,  in  case  of  excessive  influx 
of  water,  to  sink  the  cylinders  to  the  rock,  if  it  could 
not  be  reached  by  simpler  means ;  and  additional  cylinders 
could  be  added,  so  as  to  obtain  any  amount  of  area  of 
base  that  might  be  thought  necessary. 

The  land  piers  for  the  100  feet  spans  consist  each 
of  three  cylinders,  which  are  6  feet  in  diameter,  joined 
together  in  lengths  of  7  feet.  The  main  pier,  which 
supports  one  end  of  the  great  truss,  consists  of  a  double 
row  of  cylinders,  six  in  all,  the  lower  parts  of  which  are 
8  feet  in  diameter,  joined  together  in  lengths  of  6  feet. 
The  bottom  of  each  cylinder  was  made  with  a  cutting 
edge,  so  as  to  penetrate  the  ground  easily. 

Most  of  the  cylinders  were  sunk  by  the  process  of  ex- 
cavating the  ground  within  them  and  weighting  the  top, 
the  water  being  kept  down  by  pumping.  As  the  ground 
consisted  chiefly  of  wet  sand  and  shingle,  danger  was 
apprehended  from  its  tendency  to  run  in  from  the  out- 
side, while  the  excavation  was  in  progress.  This  would 
have  diminished  the  lateral  stability  of  the  cylinders ; 
and  great  care  was  taken  not  to  excavate  too  near  the 
bottom,  but  merely  to  loosen  the  ground  round  the  cutting 
edge  and  to  force  the  cylinder  down  by  weights.  Stiff 
clay  was  sometimes  used  to  prevent  the  wet  sand  and 
gravel  from  being  squeezed  in  from  the  outside.  When 
the  cylinders  had  been  sunk  to  the  rock,  and  it  had 
been  dressed  off  to  form  a  level  foundation,  they  were 
filled  with  concrete  in  the  same  manner  as  at  the  Windsor 
bridge. 

In  sinking  the  cylinders  of  the  main  pier,  much  greater 
difficulties  were  encountered  than  with  those  of  the  land 
piers,  owing  to  large  boulders  and  pieces  of  timber 
being  met  with  near  the  bottom.  When  still  at  some 
distance  from  the  rock,  a  length  of  one  of  these  large 


206  EAILWAY  BRIDGES  AND  VIADUCTS. 

cylinders  cracked,  from  its  having  met  with,  an  obstruc- 
tion. Timber  struts  were  then  fixed  within  it,  until 
the  obstacle  was  passed,  when  it  was  strengthened  by  a 
strong  wrought-iron  hoop,  and  forced  down  to  the  rock. 

In  April  1851,  when  the  greater  number  of  the  cylinders 
had  been  sunk,  it  was  apparent  that,  from  delays  due  to 
the  influx  of  water  and  other  causes,  some  of  them  could 
not  be  completed  by  the  time  that  the  superstructure 
would  be  ready.  Mr.  Brunei  then  decided  to  employ  the 
pneumatic  method,  and  by  means  of  this  apparatus  some 
of  the  remaining  cylinders  were  sunk.  In  the  main  pier 
four  auxiliary  columns,  formed  of  7-feet  cylinders,  were 
placed  close  to  the  others.  They  were  connected  to  the 
8 -feet  cylinders  by  strong  brackets,  and  supplied  a  great 
additional  bearing  surface.  Any  slight  inaccuracy  of 
position  in  the  cylinders  was  corrected  by  adjusting  cones 
at  the  level  of  the  ground ;  on  these  cones  6-feet  cylinders 
were  built  up  to  the  level  of  the  railway. 

The  depth  to  which  the  cylinders  were  sunk  and 
their  position  are  shown  in  fig.  3,  PI.  IV.  From  this 
drawing  also  the  general  form  of  the  superstructure  will 
be  understood. 

The  bridge  is  for  two  lines  of  way ;  each  line  is  carried 
between  two  longitudinal  girders  7^  feet  deep,  of  the 
section  given  in  the  woodcut,  fig.  11  (p.  208).  Each 
girder  has  a  triangular  top  flange  with  a  plate  iron  verti- 
cal web,  and  a  slightly  curved  plate  for  the  bottom,  flange. 
The  roadway  girders  over  the  three  land  spans  of  100  feet 
are  in  one  piece,  and  are  therefore  continuous  girders, 
300  feet  long,  supported  at '  two  intermediate  points. 
Those  across  the  main  span  are  also  300  feet  long,  and 
are  supported  by  the  main  truss. 

The  truss  for  each  line  of  way  consists  of  two  suspension 
chains,  one  on  each  side  of  the  roadway,  hung  from  either 


X, 

" 

c 

",T 

VZ 

01 

:> 

H 

0/ 

^ 

'A 

> 

CHEPSTOW  BEIDGE.  207 

side  of  the  ends  of  a  horizontal  circular  tube,  arched 
slightly  for  the  sake  of  appearance,  which  rests*  on  piers 
rising  about  60  feet  above  the  level  of  the  rails.  The 
pier  at  the  land  end  is  of  masonry,  and  the  upper  part 
of  the  middle  pier  is  of  cast  iron,  resting  on  the  cylinders 
abeady  mentioned.  Each  pier  has  two  archways  for  the 
trains  to  pass  through.  The  chains  carry  the  roadway 
girders  at  four  points,  and  the  tube  is  supported  at  two 
intermediate  points  in  its  length  by  upright  standards 
resting  on  the  chains.  Thus,  while  the  weight  of  the 
structure  is  supported  somewhat  in  the  same  manner  as 
in  a  suspension  bridge,  the  inward  drag  of  the  chains  is 
resisted  by  the  tube.  To  prevent  the  framework  from 
being  distorted  by  unequal  loading,  it  is  made  rigid  by 
diagonal  chains  connecting  the  upper  and  lower  ends  of 
the  two  upright  standards. 

The  main  truss  may  be  described  as  an  inverted  queen 
truss.  The  tube  which  has  to  resist  the  compressive 
strain  due  to  the  inward  pull  of  the  chains  is  9  feet  in 
diameter,  and  is  made  of  boiler  plate  f  and  f  of  an  inch 
thick,  stiffened  at  intervals  by  diaphragms.  The  chains 
are  like  those  of  suspension  bridges,  each  formed  of  12 
and  14  links  alternately,  these  being  10  inches  deep,  and 
varying  from  f  to  JL-L  of  an  inch  thick.  ^ 

At  the  ends  of  the  tube,  where  the  chains  are  con- 
nected to  it,  there  are  several  thicknesses  of  plate, 
between  which  the  links  of  the  chains  are  introduced, 
and  a  round  pin,  7  inches  in  diameter,  passes  through 
both  plates  and  links.  The  strain  is  thus  conveyed  from 
the  chains  to  the  ends  of  the  tube. 

Though  the  trusses  for  the  two  lines  of  way  are  com- 

'  After    some    perseverance,    Mr.  without  welding  on  the  eyes.    He  had 

Brunei    succeeded    in   getting   these  to  go  down  himself  to  the  manufactory 

unusually  large  links,  which  were  20  in  order  to  get  the  men  into  the  way 

feet  long,   rolled  in   a   single  piece  of  doing  the  work. 


208 


EAILWAY  BEIDGES  AND  VIADUCTS. 


pletely  distinct,  the  tubes  are  braced  together  horizontally, 
to  increase  their  stiJffness  sideways. 

The  woodcut  (fig.  11)  represents 
a  transverse  section  of  the  truss 
for  one  line  of  way,  and  shows  the 
circular  tube  with  the  internal  dia- 
phragms, the  upright  standards 
which  support  it,  the  roadway 
girders,  and  the  chains. 

In  consequence  of  the  great 
depth  of  the  truss,  which  is  about 
60  feet,  or  one-sixth  of  the  length, 
the  strains  on  the  several  parts 
are  comparatively  small  for  such  a 
large  span. 

The  weight  of  wrought-iron 
work  in  each  of  the  trusses  of  the 
main  opening  is  460  tons,  inclu- 
sive of  the  longitudinal  and  cross 
girders,  which  weigh  130  tons. 
At  the  points  where  the  roadway  girders  are  intersected 
by  the  inclined  chains,  they  are  not  fixed  to  the  chains, 
but  rest  upon  them,  rollers  and  saddles  being  placed 
between ;  and  at  the  ends  of  the  short  horizontal  links, 
in  the  middle  of  the  span,  there  are  screws  for  adjusting 
the  level  of  the  girders. 

These  arrangements  were  made  in  order  that  the  road- 
way girders  might  not  be  strained  by  the  slight  alteration 
in  the  form  of  the  truss  which  takes  place  when  a  load 
comes  on  the  bridge. 

The  continuous  roadway  girders  were,  in  the  case  of 
the  large  span,  supported  at  six  points,  and  in  those  over 
the  three  land  spans  at  four  points.  As  the  strains  on  con- 
tinuous beams,  supported  at  so  many  points,  had  not  at 


Fig.  11. 


Sca7e  of/eet. 
Truss  of  Chepstow  Bridge. 
Transverse  Section. 


CHEPSTOW  BEIDGE.  209 

that  time  been  fully  investigated,  Mr.  Brunei  had  the 
subject  carefully  enquired  into  both  by  calculation  and 
experiment,  and  was  thus  enabled  to  proportion  the  sec- 
tion of  the  girders  to  the  strains  at  each  point  in  their 
length.  Some  account  of  this  investigation  is  given  in 
the  note  at  the  end  of  this  chapter. 

As  soon  as  the  ironwork  for  the  first  truss  was  com- 
pleted, it  was  put  together  parallel  to  the  river  bank  close 
to  the  site  of  the  bridge.  The  ends  were  supported  on 
temporary  piers,  and  the  structure  was  uniformly  weighted 
with  a  load  of  770  tons,  or  2|  tons  per  foot  run.  In  unload- 
ing it,  the  weight  was  taken  off  from  one  end  of  the  truss, 
so  as  to  test  its  strength  when  unequally  loaded.  The  test- 
ing having  been  satisfactorily  completed,  the  truss  was  taken 
to  pieces,  and  preparations  were  made  for  erecting  it. 

It  was  necessary  that  the  river  traffic  should  not  be 
interrupted  for  any  long  period;  this  circumstance  ma- 
terially influenced  the  nature  of  the  design  of  the  super- 
structure, which  was  such  that  no  scaffolding  was  required 
in  its  erection,  nor  was  there  any  interference  with  the 
navigation  for  more  than  a  single  tide.  The  truss  was 
made  so  that  it  could  be  divided  into  parts,  each  of  which 
could  be  lifted  separately  and  quickly.  For  the  operation 
of  lifting  Mr.  Brunei  determined  to  use  chain  purchases 
worked  by  crabs. ^     The  tube  was  temporarily  stiffened  by 

'  See  note  at  the  end  of  this  chapter  case  had  a  single-barrelled  crab  been 

for  experiments  on  ropes  and  chains,  used. 

The  crabs  were   designed  and   made  These  crabs  were  subsequently  used 

specially  for   this   duty.      Each   had  at  the  floating  of  the  Saltash  trusses, 

two   barrels,   grooved  to  receive  the  and    at    the    launch    of    the    'Great 

chain,  which  was  passed  several  times  'Eastern.' 

round  both  barrels,  so  as  to  get  suffi-  A  similar  arrangement  was  applied 

cient  grip ;    and  it  was  in  this  way  in  the  paying-out  machinery  of  the 

possible   to  wind  in  with   the  crabs  Atlantic  cable,  and  is  still  used  for 

any  length  of  chain  without  having  to  the  picking-up    gear  in    the   '  Great 

stop  to  fleet,  as  would  have  been  the  '  Eastern.* 


210  EAILWAY  BEIDGES  AND  VIADUCTS. 

portions  of  the  main  chains,  arranged  so  as  to  form  a 
truss.  With  this"  assistance  it  was  able  to  carry  its  own 
weight  when  suspended  by  the  two  ends. 

The  preliminary  operation  of  slewing  the  tube  to  its 
position  on  a  platform  at  right  angles  to  the  river,  was  a 
work  requiring  a  good  deal  of  careful  contrivance.  When 
this  had  been  accomplished,  a  pontoon,  consisting  of  six 
wrought-iron  barges,  was  placed  opposite  the  end  of  the 
tube,  and  all  was  ready  for  floating  it  across  the  river. 

The  floating  took  place  on  Thursday  morning,  April  8, 
1852.  The  tube  had  been  rolled  forward  on  two  trucks 
till  its  end  overhung  the  pontoon ;  and,  as  the  tide  rose, 
the  pontoon  floated  with  the  end  of  the  tube  resting  on  it. 
In  order  to  guide  it  in  a  straight  line  across  the  river, 
hawsers  were  attached  to  points  on  the  bank  up  and 
down  the  stream,  and  were  led  to  crabs  on  the  pontoon, 
so  that  by  hauling  on  either  hawser  the  tube  was  kept  in 
its  right  course.  As  spring  tides  at  Chepstow  rise  40  feet, 
there  is  a  rapid  current  except  for  a  very  short  time. 

The  operation  of  drawing  the  tube  across  was  com- 
menced at  a  little  after  nine  o'clock,  and  by  a  quarter 
to  ten  the  pontoon  had  reached  the  other  side  safely, 
and  the  tube  spanned  the  river.  All  proceeded  with 
perfect  quiet  and  regularity  under  the  management  of 
Mr.  Brunei,  who  was  assisted  by  Mr.  Brereton  and  Captain 
Claxton.  As  soon  as  the  pontoon  reached  the  further 
shore,  the  chains  of  the  lifting  tackles  were  attached 
to  the  tube.  The  tube  was  lifted  in  the  course  of  the  day 
to  the  level  of  the  railway,  and  afterwards  to  its  place  on 
the  top  of  the  piers,  when  the  suspension  chains  and  the 
rest  of  the  truss  were  attached  to  it.  The  bridge  was 
opened  for  a  single  line  of  way  on  July  14,  1852.  The 
second  tube  was  floated  in  n,  similar  manner  to  the  first, 
and  the  bridge  was  completed  shortly  afterwards. 


ROYAL  ALBERT  BRIDGE.  211 

The  total  cost  of  the  Chepstow  bridge  was  77,OOOL' 

The  Royal  Albert  Bridge,  which  carries  the  Cornwall 
Railway  across  the  River  Tamar  at  Saltash,  is  the  last 
and  greatest  of  Mr.  Brunei's  railway  works. 

A  railway  into  Cornwall,  crossing  the  river  Tamar,  was 
proposed  as  early  as  1844.  Mr.  Brunei  at  one  time 
thought  of  carrying  the  trains  across  on  a  steam  ferry 
similar  to  those  which  had  been  successfully  introduced 
by  Mr.  Rendel. 

In  1845  a  company  was  formed  and  an  application  made 
for  an  Act  to  construct  the  railway  either  with  a  steam 
ferry  at  Torpoint  or  by  a  bridge  at  Saltash.  The  latter 
plan  was  sanctioned  by  Parliament. 

The  height  of  the  line  shown  on  the  section  at  the 
crossing  of  the  Tamar  was  80  feet  above  high  water.  The 
Admiralty,  however,  required  that  this  height  should  be 
increased.  No  further  steps  were  taken  till  the  beginning 
of  1847,  when  some  preliminary  borings  and  sections  were 
made,  in  order  to  prepare  definite  plans  for  the  bridge. 
The  facts  then  ascertained  were  so  encouraging  as  to 
strengthen  Mr.  Brunei  in  his  opinion  that  the  difficulties 
to  be  encountered  would  not  be  found  greater  than  had 
been  anticipated. 

The  river  at  Saltash  is  1,100  feet  wide,  with  a  depth 
in  the  middle  of  about  70  feet  at  high  water.  It  had 
at  first  been  intended  to  construct  the  bridge  with  one 
span  of  255  feet,  and  six  of  105  feet,  with  superstructures 
of    timber-trussed    arches.'^      In    compliance    with    the 

'     See     Encjiclopadia    Britannica,  ^  These  would  have  been  magnifi- 

'  Iron    Bridges,'     vol.    xii.    p.    601;  cent  specimens  of  timber-work,  and 

Molinos  et  Pronnicr,  Construction  des  a  design  for  somewhat  similar  trusses 

Pants   Mitalliques,    p.   320,    pi.    23,  had  at   one   time  been  prepared  for 

24,  25.  the  Chepstow  Bi-dge.     It  is  worthy 

p  2 


212 


EAILWAY   BRIDGES  AND   VIADUCTS. 


requirements  of  the  Admiralty,  the  design  was  altered  to 
two  spans  of  300  feet,  and  two  of  200  feet,  with  a  clear 
headway  of  100  feet.  This  arrangement  would  have 
required  three  piers  in  deep  water.  Mr.  Brunei  sub- 
sequently decided  to  have  only  one  pier  in  deep  water, 
and  to  have  two  spans  of  465  feet  each.  It  was  afterwards 
found  that  these  could  be  reduced  to  455  feet.^ 


of  mention  that  Sir  Isambard  Brunei 
at  one  time  designed  a  timber  arched 
bridge  of  800  feet  span  to  cross  the 
Neva  at  St.  Petersburg. 

■  Before  the  work  was  begun  Mr. 
Brunei  made  calculations  to  determine 
whether  or  not  it  might  be  desirable 
to  cross  the  river  with  one  span  of  850 
feet,  in  order  to  avoid  the  great  depth 
at  the  centre  pier. " 

A  few  extracts  from  letters  relating 
to  bridges  of  large  span  will  be  in- 
teresting : 

'  January  31 ,  1852. 

'  I  have  revised  my  calculation  as 
'  to  a  span  of  1,000  feet,  and  find  that 
'  even  with  the  loads  and  limitations 
'  of  strains  which  I  adopt — namely  a 
'  proper  thickness  of  ballast,  and  a 
'  possible  load  of  a  train  of  engines 
'  without  tenders,  and  a  limitation 
'  under  such  a  load  of  6  tons'  strain 
'  per  square  inch,  that  a  span  of  1,000 
'  feet  may  be  made  in  England  of  the 
•  very  best  workmanship,  and  sent  out 
'  and  erected  for  I  should  say  safely 
'  250,000^.,  of  course  a  single  way — 
'  another  250,000Z.  ought,  I  should 
'  think,  to  cover  the  rest  of  the 
'  bridge. 

'  I  should  like  to  explain  to  you  the 
'  mode  I  should  propose  for  raising 
'  such  a  bridge,  weighing  7,000  tons. 

'  December  1, 1852. 
'  As  you  ask  me  my  opinion  of  the 
'  advisability  of  patenting  your  bridge, 
'  I  give  it  you ;  though  you  will  prob- 
'  ably  be  the  first  person  who  will 
'  have  followed  such  advice  if  you  do 


'  so,  and  might  safely  patent  such  a 
'  novel  mode  of  using  advice. 

'  In  my  opinion  you  cannot  patent 
'  the  bridge.  Without  detracting  in  the 
'  least  from  your  merit  of  invention, 
'  the  form  has  been  so  frequently  and 
'  exactly  applied  that  no  patent  could 
'  hold.  The  Saltash  bridge  now  just 
'  advertised  for  letting  is  exactly  on 
'  the  same  principle  as  regards  form  ; 
'  and  this  is  so  old  to  my  knowledge 
'  that  I  can  claim  no  invention,  and 
'  the  use  of  cast  iron  for  such  purpose 
'  is  also  incapable  of  being  patented. 
'  There  is  much  that  is  good  in  your 
'  bridge,  and  you  deserve  credit,  but 
'  you  would  find  innumerable  claim- 
'  ants  to  dispute,  and  successfully, 
'  your  attempt  to  claim  a  monopoly 
'  by  a  patent — I  myself  for  one. 
'  Besides,  I  see  it  published  in  a  book. 

'  May  30,  1854. 

'As  to  your  present  enquiry,  I  do  not 
'  think  that  what  I  am  doing  at 
'  Saltash  would  be  applicable  in  tliis 
'  case;  but  withoutbeingguilty  of  great 
'  presumption,  I  think  I  may  say  that 
'  if  the  same  plan  will  not  do,  it  is 
'  fair  to  assume  that  the  same  brains 
'  which  concocted  the  plan  to  suit  the 
'  difficulties  of  the  Tamar  might  very 
'  likely  find  the  means  of  overcoming 
'  those  of  the  Severn. 

'  If  I  should  be  able  to  suggest  a 
'  feasible  plan,  and  there  should  be 
'  found  people  ready  to  make  it,  I 
'  shall  have  the  satisfaction  of  bridg- 
'  ing  the  Severn  as  well  as  the 
'  Tamar.' 


ROYAL  ALBERT  BRIDGE.  213 

Twenty  years  before,  while  engaged  with  his  father  on 
the  Thames  Tunnel,  he  had  conceived  the  idea  of  working 
under  a  diving-bell  of  great  dimensions.  Sir  Isambard 
approved  of  the  suggestion,  and  thought  of  applying  it  in 
sinking  the  shafts  of  the  Tunnel.  Drawings  were  prepared, 
but  the  circumstance  of  a  patent  for  a  similar  idea  having 
been  taken  out  by  Lord  Cochrane  partly  deterred  him 
from  carrying  out  the  project,  though  some  sketches  were 
afterwards  made  for  constructing  a  lighthouse  by  means 
of  this  arrangement.  When  the  construction  of  the  Corn- 
wall Eailway  had  to  be  considered,  Mr.  Brunei  thought 
that  his  old  idea  would  be  applicable  to  the  difficulties  to 
be  encountered  at  Saltash. 

Although  the  plan  of  using  a  large  diving-bell  was 
one  which  was  nearly  certain  to  be  successful,  Mr.  Brunei 
thought  it  probable  that  a  large  cylinder  of  wrought  iron 
could  be  constructed  to  serve  as  a  coffer-dam,  and  that 
after  sinking  it  through  the  mud,  the  bottom  edge  might 
be  sufficiently  water-tight  to  admit  of  the  water  being 
pumped  out,  and  the  masonry  of  the  pier  built  in  the 
ordinary  manner. 

A  trial  cylinder,  6  feet  diameter  and  85  feet  long,  was 
made,  partly  to  ascertain  whether  or  not  this  plan  was  prac- 
ticable, but  mainly  for  the  purpose  of  thoroughly  examin- 
ing the  site  of  the  centre  pier,  where  the  surface  of  the 
rock  was  80  feet  below  high  water. 

A  strong  framework  was  fitted  on  two  gun-brig  hulks, 
with  powerful  tackle  for  lowering  and  raising  the  cylinder. 
After  it  had  been  lowered  to  the  bottom,  five  borings  were 
taken  within  it,  reaching  through  the  mud  to  the  rock. 
The  cylinder  was  then  shifted  and  similar  borings  made. 

The  positions  of  the  borings,  one  hundred  and  seventy 
five  in  all,  were  carefully  recorded ;  and  thus  a  minute  and 
accurate  survey  was  obtained  of  the  surface  of  the  rock. 


214  EAILWAY  BEIDGES   AND   VIADUCTS. 

The  site  of  the  pder  was  afterwards  determined  by  means 
of  a  model  constructed  from  these  observations.  In 
January  1849,  when  sufficient  information  had  been  ob- 
tained, the  water  was  pumped  out  of  the  trial  cylinder, 
and  the  mud  excavated  down  to  the  rock.  A  short  piece 
of  masonry  was  then  built,  to  demonstrate  the  practica- 
bility of  building  a  pier  in  such  a  situation. 

The  expenditure  of  the  Company  for  works  of  all  kinds 
was  shortly  afterwards  curtailed  as  much  as  possible,  and 
no  further  progress  was  made  for  upwards  of  three  years. 
However,  information  had  been  gained  which  proved  that 
a  masonry  pier  could  be  built  in  the  middle  of  the  river, 
on  a  good  rock  foundation  which  was  there  covered  by  a 
thickness  of  about  16  feet  of  mud. 

During  the  suspension  of  the  works,  all  the  plans  were 
revised,  with  the  view  of  reducing  the  first  cost  wherever 
practicable;  and  Mr.  Brunei  decided  not  to  make  the 
bridge  for  a  double  line,  even  if  there  were  money  forth- 
coming to  do  so.  His  reason  for  this  is  given  in  the 
following  report  to  the  Board  of  Trade,  made  in  1852  : — 

This  bridge  had  been  always  assumed  to  be  constructed  for  a 
double  line  of  railway  as  well  as  the  rest  of  the  line.  In  constructing 
the  whole  of  the  line  at  present  with  a  single  line  of  rails,  except  at 
certain  places,  the  prospect  of  doubling  it  hereafter  is  not  wholly 
abandoned,  but  with  respect  to  the  bridge  it  is  otherwise. 

It  is  now  universally  admitted  that  when  a  sufficient  object  is  to 
be  attained,  arrangements  may  easily  be  made  by  which  a  short 
piece  of  single  line  can  be  worked  without  any  appreciable  incon- 
venience.    .     .     .     This  will  make  a  reduction  of  at  least  100,000/. 

In  the  summer  of  1852  the  designs  of  the  bridge  were 
matured,  and  by  the  beginning  of  1853  the  Admiralty 
had  approved  of  them  ;  the  work  of  constructing  the  great 
cylinder  for  the  centre  pier  was  then  commenced. 

It  was  determined  to  provide  for  the  possibility  of  having 
to  emijloy  the  pneumatic  process.     The  cylinder  had  a 


ROYAL  ALBERT  BRIDGE.  215 

diameter  of  35  feet  at  tlie  bottom,  and  about  20  feet 
above  the  lower  end  of  it  a  dome  was  made  to  form  the 
roof  of  the  diving-bell ;  from  the  centre  of  the  dome  rose  a 
tube  10  feet  in  diameter  to  the  level  of  the  top  of  the 
great  cylinder.  As  a  diving-bell  of  this  size,  under  80 
feet  of  water,  might  have  proved  unmanageable,  an 
annular  space,  forming  a  gallery  or  jacket  of  4  feet  in 
width  and  20  feet  high,  was  formed  round  the  inner  cir- 
cumference of  the  bottom  of  the  cylinder  below  the  dome. 
This  annular  space  was  divided  by  radial  vertical  partitions 
into  eleven  compartments,  and  was  connected  at  the  top  by 
an  air-passage  with  a  6-foot  cylinder,  which  was  placed 
eccentrically  inside  the  10-foot  cylinder  already  mentioned, 
and  served  as  a  communication  between  the  outside  and 
the  annulus.  On  the  top  of  the  6-foot  cylinder  were  placed 
the  air-locks  of  the  pneumatic  apparatus  which  had  been 
used  at  Chepstow.  Thus  air  might  be  pumped  into  the 
annular  space,  the  water  expelled,  and  the  work  carried  on 
without  having  to  use  air  pressure  under  the  whole  of  the 
dome.  In  "that  part  of  the  10-foot  cylinder  which  was  not 
occupied  by  the  6-foot  cylinder  a  powerful  set  of  pumps 
were  fixed  to  keep  down  the  water  in  the  central  space,  and 
diminish  the  pressure  under  which  the  men  worked,  thus 
utilising  whatever  advantage  could  be  gained  from  the 
great  cylinder  acting  as  a  coffer-dam.  As  it  had  been 
ascertained  that  the  surface  of  the  rock  dipped  to  the 
south-west  to  the  extent  of  about  6  feet  in  the  width  of 
the  pier,  the  bottom  of  the  cylinder  was  made  oblique,  so 
as  to  fit  the  surface  of  the  rock.  These  arrangements  are 
represented  in  the  transverse  section  of  the  great  cylinder 
(PI.  V.  p.  218).' 

'  It  has  of  course  been  impossible  to  ants;  but  it  may  be  mentioned  here 

refer  to  the   points   on    which   Mr.  that,   as   appears    from  one   of   Mr. 

BruDiel  was   aided,   in   his  different  Bninel's  letters,  the  plan  of  working 

works,  by  the  suggestions  of  his  assist-  under  a  diving-bell  had  been  proposed 


216  KAIL  WAY  BEIDGES  AND  VIADUCTS. 

The  great  cylinder,  having  been  constructed  on  the  river- 
bank,  was  moved  down  to  low  water  on  launching- ways, 
and  floated  off  by  the  rising  tide.  Guided  between  four 
pontoons,  it  was  finally  sunk  in  correct  position  in  June 
1854. 

Some  delay  in  penetrating  the  mud  was  caused  by  a 
bed  of  oyster  shells,  which  had  to  be  cut  through  by  one 
edge  of  the  cylinder.  In  consequence  of  some  irregularities 
of  the  surface  of  the  rock,  the  cylinder  at  first  deviated 
considerably  from  an  upright  position ;  and  it  was  neces- 
sary to  use  the  pneumatic  apparatus  to  gain  access  to  the 
rock,  and  excavate  it.  The  height  of  the  annulus  below 
the  dome  was  such  that  it  was  not  quite  filled  by  the  mud 
when  the  cylinder  rested  on  the  bottom.  The  work  of 
getting  the  mud  out  of  the  annular  space  was  much  facili- 
tated by  the  division  of  it  into  compartments. 

By  February  1855,  the  cylinder  had  been  sunk  to  its 
full  depth  in  an  upright  position,  and  it  then  rested 
everywhere  on  the  rock,  its  lowest  point  being  87  feet  6 
inches  below  high  water. 

Much  trouble  was^iven  by  a  spring  of  water  issuing  out 
of  a  fissure  in  the  rock,  in  one  of  the  compartments,  but 
the  flow  was  stopped  by  driving  close  sheet  piles  into  the 
fissure.  The  rock  in  the  annulus  was  dressed,  and  the 
space  filled  by  a  ring  of  granite  ashlar  masonry  which  was 
built  to  a  height  of  about  7  feet  all  round.  The  state  of  the 
work  at  this  time  is  that  represented  in  the  section  of  the 
cylinder,  (PI.  V.  p.  218). 

The  rock  consisted  of  greenstone  trap,  so  hard  that  tools 

by  Mr,  William  Glennie,  his  assistant,  matic  apparatus,  by  forming  the  an- 

before  he  knew  that  Mr.  Brunei  had  nukr  space  round  the  circumference 

decided  to  adopt  it.  of  the  bottom  of  the  cylinder,  was 

Mr.  Brunei  also  mentions  in  another  suggested  to   him  by  Mr.  Brereton, 

letter  that  the  '  very  simple  and  effec-  when  the  method  of  constructing  the 

'  tual  manner '  of  applying  the  pneu-  cylinder  was  being  finally  settled. 


EOYAL  ALBERT  BRIDGE,  217 

could  with  difficulty  be  got  to  work  it.  When  the  ring  of 
masonry  was  completed,  it  was  expected  that  the  bottom 
might  be  sufficiently  water-tight  to  act  as  a  coffer-dam,  and 
allow  of  the  mud  being  taken  out  from  the  central  part 
of  the  cylinder,  below  the  dome.  But  the  pumping 
power  was  not  at  first  sufficient  for  this  purpose,  and  it 
was  thought  that  it  would  be  necessary  to  employ  the 
pneumatic  process  in  this  space  also. 

However,  by  rapid  and  incessant  pumping  the  water 
was  lowered  so  as  to  allow  of  the  mud  and  rock  being 
excavated,  and  the  masonry  in  the  central  space  built 
without  having  again  recourse  to  the  use  of  air  pressure. 
The  leakage  water  was  conveyed  to  two  wells,  formed  of 
cast-iron  pipes  built  into  the  masonry,  from  which  the 
water  was  pumped.  The  inner  plates  of  the  annulus  were 
cut  out,  and  the  work  in  the  centre  which  consisted  of 
granite  ashlar  set  in  cement  was  thoroughly  bonded  into 
the  ring  of  masonry  already  built.  When  the  work  was 
carried  up  to  the  level  of  the  dome,  both  the  dome  and 
the  internal  10-foot  cylinder  were  cut  out  and  removed. 
When  the  building  had  been  carried  up  some  height,  the 
pump  wells  were  filled  with  cement  concrete,  and  the  influx 
of  water  stopped.  Finally,  about  the  end  of  1856,  when 
the  masonry  was  completed  to  the  cap  of  the  pier,  the 
upper  part  of  the  great  cylinder  was  unbolted  and  taken 
ashore,  it  having  been  made  in  two  halves  with  that 
object.  Thus  the  most  difficult  part  of  the  undertakmg 
was  successfully  completed.^ 

The  centre  pier  of  the  Saltash  bridge  is,  like  many 
great  engineering  works,  out  of  sight,  and  little  regarded 
by  any  but  professional  men.     The  rest  of  the  bridge 

•  In  the  Proceedings  of  the  In-  Brereton,  giving  a  detailed  description 
siitution  of  Ciml  Enginetrs,  vol.  xxi.  of  the  means  employed  for  the  con- 
1861-2,  will  bo  found  a  paper  by  Mr.       struction  of  the  central  pier. 


218  EAILWAY  BRIDGES  AND  VIADUCTS. 

forms  a  striking  feature  in  a  beautiful  landscape,  and  its 
appearance  is  well  known. 

Tlie  whole  length  of  the  bridge  is  about  2,200  feet, 
and  is  divided  into  two  great  spans  over  the  river  of 
455  feet  each  and  seventeen  side  spans,  varying  from 
70  to  90  feet,  which  are  on  sharp  curves.  The  piers  of 
the  side  spans,  as  well  as  the  two  large  piers  carrying  the 
land  ends  of  the  main  trusses,  are  of  masonry.  The 
masonry  of  the  centre  pier  is  35  feet  in  diameter,  and  is 
carried  up  about  12  feet  above  high  water  level.  On  it 
stand  four  cast-iron  octagonal  columns,  rising  up  to  the 
level  of  the  railway.  The  piers  which  support  the  ends 
of  the  great  trusses  are  constructed  with  arched  openings, 
through  which  the  trains  pass. 

The  transverse  elevation  of  the  centre  pier  (PI.  Y.) 
shows  the  octagonal  columns  connected  by  cast-iron 
open-work,  and  the  arched  opening.  The  upper  part 
of  the  centre  pier  is  a  cast-iron  standard,  and  that  of  the 
land  piers  is  of  masonry  cased  with  cast  iron.^ 

The  elevation  shows  the  great  height  of  the  structure, 
the  rails  being  190  feet  and  the  highest  part  of  the  truss 
260  feet  above  the  lowest  point  of  the  foundations. 

The  railway  is  carried  over  each  of  the  smaller  openings 
between  two  longitudinal  girders,  and  over  the  main 
spans  it  is  carried  between  similar  longitudinal  girders, 
which  are  suspended  at  intervals  from  the  main  truss. 

Each  truss  consists  of  a  wrought-iron  oval  tube,  which 
forms  an  arch,  and  of  two  suspension  chains,^  one  on 
either  side  of  the  tube,  connecting  its  two  ends.     The 


'  Shortly  after  Mr.  Brimel's  death  engineer,  1859. 

some  of  his  friends  on  the  Board  of  ^  A    portion   of   the   chains    used 

the  Cornwall  Eailway  placed  the  fol-  were   those   which    had    been   made 

lowing   inscription,  in  raised   letters,  for   the    Clifton    Suspension   Bridge, 

over  the  laid  archways — i.  k.  ueunel,  Mr.  Bnanel's  earliest  design. 


EOYAL  ALBERT  BRIDGE. 


219 


rise  of  the  arched  tube  above  its  abutments  on  the  top  of 
the  piers  is  the  same  as  the  fall  of  the  suspension  chains 
below  the  same  level.  At  eleven 
points  in  the  length  of  the  truss 
the  chains  are  connected  to  the 
tube  by  upright  standards,  vrhich 
are  braced  together  by  diagonal 
bars,  in  order  to  resist  the  strains 
due  to  unequal  loading.  The  road- 
way girders  are  suspended  from 
the  truss  at  the  upright  standards 
already  mentioned,  and  at  an  in- 
termediate point  between  each  of 
them. 

The  truss  has  the  great  depth  of 
56  feet  in  the  centre;  this  con- 
duces materially  to  the  economy 
of  the  construction,  as  it  diminishes 
the  strain  upon  the  principal  parts, 
the  tube  and  the  chains,  and  so 
enables  them  to  be  made  of  smaller 
dimensions. 

The      woodcut       (fig.      12)       is      a    F^g- 12.    Truss  of  Salta^h  Bridge. 
\     ~  1  Transverse  section. 

transverse    section    in  the   centre  ?.i..? s f      «      » 

of    the  truss,    showing   the    oval 

tube,  the  chains,  the  upright  and  standards,  the  roadway 

girders. 

The  tube  is  made  oval  in  section  with  the  greater  dia- 
meter horizontal,  in  order  that  it  may  have  stiffness 
sideways  under  the  compressive  strain,  and  that  the  main 
chains  may  hang  vertically  at  such  a  distance  as  to  leave 
room  for  the  roadway  between  them.  The  tube  is  16  feet 
9  inches  broad  and  12  feet  3  inches  in  height.  Each  chain 
consists  of  two  tiers  of  links,  each  tier  formed  of  14  and  15 


220  RAILWAY  BRIDGES  AND  VIADUCTS. 

links  alternate!]^.  These  are  7  inches  deep  and  about  1 
inch  thick.  The  arrangements  of  the  ironwork  of  the 
tube  and  its  connections  with  the  main  chains  are  gene- 
rally similar  to  those  at  Chepstow. 

The  truss  may  be  described  as  a  combination  of  an  arch 
and  a  suspension  bridge,  half  the  weight  being  placed 
on  the  one  and  half  on  the  other,  the  outward  thrust  of 
the  arch  on  the  abutments  being  counterbalanced  by  the 
inward  drag  of  the  chains. 

The  mechanical  arrangement  of  the  Saltash  truss  is 
similar  to  that  of  the  one  at  Chepstow.^  The  tube, 
resting  on  standards,  the  railway  passing  beneath,  the 
suspension  chains  hung  from  either  side  of  the  tube, 
the  upright  standards,  and  the  diagonal  bracing  are 
common  to  the  two  structures. 

The  difference  in  the  form  of  the  two  trusses  is  prin- 
cipally the  result  of  the  difference  in  the  circumstances 
attending  the  construction  of  the  bridges  at  Chepstow  and 
Saltash.  The  design  of  the  Chepstow  truss  was  chiefly 
determined  by  the  necessity  of  lifting  up  the  separate 
parts  of  it  under  conditions  of  peculiar  difficulty ;  while  at 
Saltash  the  mode  of  floating  and  lifting  the  superstructure 
had  great  influence  in  the  preparation  of  the  design. 

On  Plate  V.  (p.  2 J  8)  is  given  an  elevation  of  one  span 
of  the  Saltash  bridge,  and  a  general  elevation  on  a  smaller 
scale  of  the  whole  bridge. 

The  total  weight  of  wrought  ironwork  in  the  super- 
structure of  each  span  is  1,060  tons.^ 

The  trusses  at  Saltash  were  not  lifted  in  parts,  as  at 

'  Though  it  is  convenient  to  explain  one  at  Chepstow,  for  in  both  the  strain 

the  nature  of  the  strains  in  the  Salt-  on  the  tube  counteracts  the  strain  on 

ash  bridge  as  an  arch  and  suspension  the  chains,  though   the  one  tube  is 

bridge  combined,  it  is  not  intended  curved  and  the  other  straight, 
to    imply   that  there  is  any  virtual  -  Humber's    Bridge     Construction, 

difference  between  this  truss  and  the  vol.  i.  p.  231 ;  vol.  ii.  pi.  78,  79,  80. 


ROYAL  ALBERT  BRIDGE.  221 

Chepstow ;  for,  as  the  river  was  divided  by  the  centre  pier 
into  two  openings,  one  of  them  could  be  left  clear  for  the 
navigation,  and  each  truss,  with  its  roadway  girders  at- 
tached, could  be  raised  to  its  position  slowly  and  in  one 
piece.  The  trusses  were  constructed  parallel  to  the  river 
on  the  Devonshire-  side,  close  to  the  site  of  the  bridge. 
When  the  truss  for  the  Cornwall  or  western  span  was 
completed,  temporary  piers  were  erected  to  support  the 
ends,  and  the  scaffolding  having  been  removed,  the  road- 
way was  loaded  with  1,190  tons,  uniformly  distributed.^ 

This  test  having  proved  satisfactory,  preparations  were 
made  for  floating  the  truss.  Docks  were  made  under- 
neath it  near  the  two  ends,  and  in  each  of  these  docks 
two  iron  pontoons  were  placed.  Yalves  were  then  opened 
to  admit  water,  and  the  pontoons  were  allowed  to  sink 
on  timbers  prepared  to  receive  them. 

Upon  each  pair  of  pontoons  was  erected  an  elaborate 
framework  of  timber  to  carry  the  weight  of  half  the 
truss,  or  between  500  and  600  tons.  The  framework  con- 
sisted of  stout  timber  props,  some  of  them  40  feet  long, 
extending  from  the  pontoon  to  the  arched  tube,  and 
was  attached  to  the  tube  by  iron  suspension  rods,  so  that 
when  the  operation  of  floating  was  completed,  the  pon- 
toons would  be  free  to  pass  from  underneath  the  truss. 

Mr.  Brunei  had  previously  taken  part  in  operations  of 
this  nature.  When  Mr.  Robert  Stephenson  was  about 
to  undertake  the  floating  of  the  tubes  of  the  Conway 
and  Britannia  bridges,  he  asked  his  friends  Mr.  Brunei 

'  This  load  amounted  to  two  and  and  of  the  chains  with  a  load  of  one 

three  quarter  tons  per  foot   run,   in  ton  per  foot  run,  in  addition  to  the 

addition  to  the  weight  of  the  truss.  weight  of  the  truss,  flooring,  and  bal- 

Under  this  load   the  central  deflcc-  last,  is  under  four  tons  per   square 

tion  was  about  5  inches.  inch. 

The  strain  on  the  iron  of  the  tube 


222  RAILWAY  BRIDGES  AND  VIADUCTS. 

and  Mr.  Locke  to  give  him  their  assistance.  They  were 
present  at  all,  or  nearly  all,  these  difficult  operations,  and 
Mr.  Brunei  had  an  active  share  in  the  work,  especially  in 
the  floating  of  the  first  Conway  tube.  By  Mr.  Brunei's 
advice  Mr.  Stephenson  had  obtained  the  services  of  Captain 
Claxton  to  superintend  the  nautical  part  of  the  work ;  and 
Captain  Claxton  was,  as  a  matter  of  course,  with  Mr.  Brunei 
in  a  similar  capacity  at  Chepstow  and  Saltash. 

Ai  Saltash  fortunately  there  was  not  so  swift  a  tide  as 
there  had  been  at  the  Britannia  and  Conway  floatings. 

In  order  to  haul  the  truss  out,  warps  were  laid  from 
the  pontoons  to  a  gun-brig  hulk  near  the  centre  pier,  and 
to  a  barge  higher  up  the  river.  On  this  barge  were  also 
placed  ready  for  use  the  ends  of  four  warps,  leading  to 
capstans  and  crabs  on  board  vessels  moored  at  various 
points.  To  keep  the  truss  from  being  drifted  up  or 
down  the  river  while  being  moved  out,  radius  lines  were 
laid  from  the  pontoons  to  moorings,  with  arrangements 
for  hauling  in  on  them  if  required. 

In  order  to  ensure  his  directions  being  clearly  under- 
stood and  promptly  attended  to,  Mr.  Brunei  assembled  a 
number  of  his  assistants,  one  of  whom  was  placed  as 
*  Captain '  in  each  of  the  vessels  containing  the  hauling 
capstans,  to  superintend  the  men,  and  to  execute  orders. 
These  orders  were  given  by  signals. 

It  was  most  important  that  the  attention  of  the  captain 
should  not  be  diverted  by  looking  out  for  the  signals, 
and  that  there  should  be  no  chance  of  a  signal  not  being 
seen  by  him  because  he  was  attending  to  some  other  of  his 
duties.  There  was,  therefore,  in  each  vessel  an  assistant 
whose  sole  duty  it  was  to  watch  for  the  signals,  to  give 
the  appropriate  interpretation  to  the  captain,  and  to 
acknowledge  the  signal  by  a  flag  corresponding  to  that 
by  which  it  was  given. 


ROYAL  ALBERT  BRIDGE.  223 

Mr.  Brunei  directed  the  operations  from  a  platform 
in  the  centre  of  the  truss.  The  signals  were  given  from 
a  smaller  platform  immediatel}'"  above,  and  were  made  by 
red  and  white  flags,  held  in  front  of  black  boards,  which 
were  turned  towards  the  vessel  signalled  to.  Printed 
papers  containing  instructions  were  distributed  to  all 
engaged ;  the  signalling  was  carefully  rehearsed,  as  also 
was  every  other  part  of  the  operations  which  could  be 
tried  beforehand. 

September  1,  1857,  was  the  day  fixed  for  the  floating. 
During  the  morning,  the  men,  about  500  in  number,  assem- 
bled at  their  stations  on  the  vessels  and  pontoons.  Captain 
Claxton  had  command  of  the  arrangements  afloat,  and 
as  a  reserve  force  to  act  in  any  emergency  several  boats 
were  lent  from  H.M.S.  'Ajax'  and  the  Dockyard.  With 
Mr.  Brunei  were  Mr.  Brereton  and  Captain  Harrison,  the 
commander  of  the  'Great  Eastern.'  Mr.  Eobert  Stephen- 
son was  expected,  but  a  serious  attack  of  illness  pre- 
vented him  from  being  present. 

At  about  one  o'clock  in  the  afternoon  signals  from  the 
tops  of  the  temporary  piers  on  which  the  truss  rested, 
showed  that  the  ends  had  been  lifted  three  inches  clear. 
Mr.  Brunei  then  gave  the  signal  for  the  men  in  the  pon- 
toons to  haul  on  the  warps,  and  the  great  structure  glided 
slowly  out  to  the  centre  of  the  river.  A  pause  was  then 
made,  while  the  warps  which  were  to  swing  the  truss  round 
into  its  place  were  being  attached  to  the  pontoon  which 
was  farthest  from  the  centre  pier.  When  this  was  done, 
the  different  ropes  were  hauled  upon  in  obedience  to 
signals,  so  as  to  keep  the  other  pontoon  close  to  the 
centre  pier,  upon  which,  as  a  pivot,  the  truss  swung  round 
in  a  quarter  circle  till  it  occupied  the  whole  of  the 
western  half  of  the  river,  and  was  brought  close   to  its 


224  RAILWAY  BRIDGES  AND  VIADUCTS. 

appointed  resting-place.  It  was  finally  adjusted  to  its 
exact  position  by  strong  tackles  attached  to  the  piers. 
Water  was  then  admitted  into  the  pontoons ;  and,  as  the 
tide  fell,  they  were  allowed  to  drift  away,  leaving  the 
truss  resting  on  the  piers,  the  roadway  girders  being  but 
a  few  feet  above  the  water. 

The  whole  operation  was  conducted  with  the  most  perfect 
order  and  regularity.  The  beauty  of  the  scenery  and  the 
changing  effect  produced  by  the  truss  in  the  various  posi- 
tions it  assumed  as  it  was  being  moved  forward  and  swung 
round  into  its  place,  rendered  the  operation  as  interest- 
ing to  the  spectators  as  its  results  were  satisfactory  to  Mr. 
Brunei  and  to  those  who  assisted  him.^ 

In  the  task  of  lifting  the  truss,  as  well  as  in  that  of 
floating  it,  Mr.  Brunei  had  the  great  advantage  of  the 
experience  gained  at  the  Britannia  Bridge.  There  the 
piers  were  built  first,  and  the  tubes  hauled  up  with  link 
chains  by  hydraulic  presses  placed  on  the  tops  of  the 
towers.  The  design  of  the  piers  at  Saltash  did  not  allow 
of  this  plan  being  adopted,  and  they  were  built  up 
under  the  truss  as  it  was  lifted.  Under  each  end  of  the 
truss  were  three  hydraulic  presses  j  the  two  outside 
presses  combined,  or  the  middle  one  by  itself,  were  suffi- 
cient to  lift  the  weight.  Mr.  Brunei  had  also  at  first  in- 
tended to  have  strong  screw-jacks,  which  were-  to  be  kept 
screwed  up  underneath  the  truss,  and  so  to  support  the 
weight,  if  by  any  accident  the  presses  failed.  A  modifi- 
cation of  this  plan  was  adopted ;  the  rams  of  the  presses 
had  a  screw  thread  cut  on  them,  and  a  large  nut  on  each 
was  kept  screwed  up  hard  against  the  top  of  the  press  as 

'  The  difficult  operations  of  floating  and   his   assistants,   there   being   no 

and  lifting  the  superstructures  of  the  contractor  engaged  in,  or  responsible 

Chepstow   and   Saltash  bridges  were  for,  the  work  in  either  case. 
carried   out  entirely  by  Mr.  Brunei 


ROYAL  ALBEET  BRIDGE.  225 

the  ram  emerged  from  it.  As  an  additional  precaution, 
timber  packing,  in  thin  layers,  was  placed  in  the  space 
between  the  completed  portion  of  the  pier  and  the  end 
of  the  truss  as  it  was  lifted.  Great  care  was  thus  taken 
to  guard  against  any  mishap. 

The  tube  was  lifted  3  feet  at  a  time  at  each  end.  The 
operation  went  on  slowly,  in  order  to  allow  the  masonry  of 
the  land  pier  to  set  after  it  had  been  bailt  up  underneath 
the  truss.  The  work  was  carried  on  with  great  system  and 
care  under  the  immediate  superintendence  of  Mr.  Brereton. 
Mr.  Brunei  was  only  able  to  be  present  during  one  of  the 
lifting  operations,  as  he  was  then  engaged  in  the  launch  of 
the  *  Great  Eastern.' 

By  July  1858,  the  first  truss  had  been  lifted  to  its  full 
height,  and  the  second  truss  was  ready  for  floating.  The 
arrangements  were  generally  similar  to  those  on  the 
previous  occasion  ;  the  course,  however,  to  be  traversed  by 
the  pontoons  was  more  intricate  than  on  the  previous 
occasion,  as  the  land  pier  on  the  Devonshire  side  of  the 
river,  over  which  the  first  truss  had  passed,  had  been  built 
up  to  receive  the  end  of  the  second. 

This  truss  had,  therefore,  to  be  moved  first  outwards 
till  the  pontoons  were  clear  of  the  docks,  then  it  had  to 
move  endways  up  the  river,  and  to  swing  round  into  posi- 
tion. Mr.  Brunei  was  obliged  to  remain  abroad  from 
ill-health,  and  Mr.  Brereton  conducted  the  operations. 
Although  the  weather  was  not  favourable,  and  the  wind 
high,  the  truss  was  safely  landed  on  the  piers ;  and  was 
afterwards  raised  in  the  same  manner  as  the  first  one.^ 

The  general  elevation,  Plate  V.,  shows  the  proportions 
of  the  bridge.     On  the  Devonshire  side,  the  side  spans 

'  A  photograph  taken  shortly  after  the  frontispiece  of  the  first  rolume  of 
the  floating  of  the  second  tube  forms       Humber's  Bridge  Construction. 


226  RAILWAY  BRIDGES   AKD  VIADUCTS. 

pass  over  fields^  and  on  the  Cornwall  side  over  the  town  of 
Saltash. 

The  general  effect  of  the  bridge  is  in  no  way  heightened 
by  an  expenditure  of  money  on  architectural  ornament ; 
for,  with  the  exception  of  a  few  unimportant  mouldings, 
the  bridge  is  absolutely  unadorned.  The  total  cost  was 
225,000Z. — a  very  moderate  expenditure,  especially  when 
the  difficult  work  at  the  centre  pier  is  taken  into  account. 
This  result  is  due  not  only  to  the  careful  manner  in 
which  all  the  details  of  the  design  were  prepared,  but  also 
to  the  great  attention  given  throughout  to  the  construc- 
tion. 

His  Royal  Highness  the  Prince  Consort,  as  Lord 
Warden  of  the  Stannaries,  permitted  the  bridge  to  be 
called  the  Royal  Albert  Bridge,  and  consented  to  open  it 
in  person.  The  ceremony  was  performed  on  May  3, 1859. 
Mr.  Brunei  was  compelled  to  be  absent  on  the  Continent, 
for  the  sake  of  his  health,  and  was  represented  on  the 
occasion  by  Mr.  Brereton. 

After  Mr.  Brunei's  return  to  England,  he  paid  a  hurried 
visit  to  the  Cornwall  Railway,  and,  for  the  first  and  last 
time,  saw  in  its  completed  state  the  great  work  on  which 
he  had  expended  so  much  thought  and  care. 


EXPERIMENTS.  227 

NOTE,  (pp.  182,  194,  209). 

Experiments  on  Matters  connected  with  Bridge  Construction. 

No  account  of  the  structures  designed  by  Mr.  Brunei  would  be 
complete  without  a  reference  to  the  elaborate  care  he  always  took, 
wherever  it  was  practicable,  to  satisfy  himself  by  experiment  of  the 
qualities  of  the  materials  employed,  and  of  the  correctness  of  the 
principles  followed.  It  would  not  here  be  possible  to  give  a  detailed 
record  of  all  his  experiments,  but  an  account  of  some  of  the  methods 
employed  by  him  will  be  interesting. 

Some  of  the  larger  of  Mr.  Brunei's  experiments  on  cast  and 
wrought-iron  girders  have  already  been  mentioned.^  He  scarcely 
ever  made  any  large  girder  or  framework  without  having  it  fully 
tested,  and  he  made  extensive  and  elaborate  experiments,  most  of 
them  on  a  very  large  scale,  on  the  strength  of  some  of  the  materials 
and  component  parts  of  his  different  structures. 

Among  the  large  scale  experiments  tried  by  Mr.  Brunei,  were 
those  on  the  compressive  strength  of  yellow  pine-timber,  which 
were  made  at  Bristol  in  1846,  and  were  on  specimens  from  10  to 
40  feet  in  length,  afid  from  6  to  15  inches  square.  A  framework 
of  four  upright  pieces  of  whole  timber,  nearly  50  feet  high,  con- 
tained four  strong  bars  of  wrought  iron,  placed  vertically,  and 
attached  at  their  lower  ends  to  the  cylinder  of  a  hydraulic  press. 
Along  these  bars,  a  casting  could  be  moved,  and  fastened  at  dif- 
ferent heights  by  keys,  in  such  a  manner  as  to  have  its  under- 
surface,  which  was  planed,  perfectly  horizontal.  The  ends  of  a 
specimen  having  been  made  exactly  square  to  its  length,  it  was  put 
in  this  apparatus,  with  the  upper  end  bearing  against  the  lower 
surface  of  the  movable  casting,  and  the  lower  end  resting  on  the 
top-surface  of  the  ram  of  the  hydraulic  press,  which  was  also  planed 
and  adjusted  so  as  to  be  horizontal.  The  keys,  which  attached  the 
movable  casting  to  the  bars,  were  now  driven  tight,  and  the  pump 
of  the  press  worked,  weights  being  placed  on  the  end  of  the  lever, 
to  correspond  with  increments  of  pressure  on  the  ram.  These  weights 
were  added  gradually,  until  the  specimen  gave  way.  The  accu- 
racy of  this  mode  of  meastiring  the  pressure  was  tested  by  direct 
loading  of  the  ram  with  rails,  which  was  repeated  several  times 

»  See  above  pp.  190  and  193. 
Q  2 


228  RAILWAY  BKIDGES  AND   VIADUCTS. 

during  the  course -of  the  experiments,  so  as  to  guard  against  any 
change  in  the  amount  of  friction  of  the  press.  For  each  increment 
of  weight,  the  compression  of  the  specimen  was  measured  on  its  four 
faces,  and  its  deflection,  or  amount  of  bending,  on  two  adjacent  faces. 
The  transverse  stiffness  of  long  specimens  was  also  tried,  by  supporting 
them  at  each  end,  and  loading  them  in  the  middle.  The  deflec- 
tion in  the  middle  thus  observed  corresponded  very  closely  with 
what  might  have  been  expected  from  the  observations  on  the 
direct  compression  ;  and  from  the  constants  so  obtained,  the  strength 
of  those  specimens,  whose  length  was  very  great  as  compared  with 
their  transverse  dimensions,  could  be  obtained  by  Euler's  theory,  but 
for  the  stouter  specimens  the  strength  per  square  inch  was  found  to 
be  nearly  constant.  From  these  experiments,  a  complete  practical 
knowledge  of  the  properties  of  yellow  pine  timber,  when  subjected 
to  end  pressures,  was  obtained,  knowledge  new  at  the  time,  and 
almost  essential  to  Mr.  Brunei  in  designing  the  many  viaducts 
which  he  afterwards  constructed. 

Mr.  Brunei  also  made  experiments  on  the  strength  of  pine  timber 
when  exposed  to  pressure  on  the  side  or  at  right  angles  to  the  fibre. 
By  this  means  he  determined  the  area  which  it  was  desirable  to 
provide  for  the  washers  of  bolts,  and  the  weight  which  might 
safely  be  placed  on  transverse  timbers  or  sills  of  viaducts. 

Mr.  Brunei's  experiments  on  riveting  were  also  important.  Most 
of  these  were  made  with  specimens  20  inches  wide,  and  half  an 
inch  thick.  They  were  compared  with  specimens  of  solid  iron, 
of  the  same  quality  and  thickness  as  the  riveted  specimens,  and  also 
the  same  width  minus  the  rivet  holes,  so  as  to  have  equal  efficient 
sectional  areas.  Double  covering  plates  and  double  riveting  were 
used  in  all  cases,  the  variation  being  in  the  widths  of  the  covering 
plates,  and  the  number  and  arrangement  of  the  rivets.  The  experi- 
ments were  continued  until  thirty  in  all  had  been  made,  and  the 
strongest  form  of  joint  was  considered  to  have  been  arrived  at. 

In  connection  with  the  lifting  of  the  parts  of  the  Chepstow 
Bridge,  an  elaborate  series  of  experiments  was  made  on  ropes,  chains, 
and  wire-rope,  so  as  to  ascertain  which  of  these  it  was  desirable  to 
employ,  as  possessing  the  greatest  advantages.  The  experiments 
made  were  of  two  kinds,  one  to  determine  the  absolute  strength 
of  the  specimen  when  subjected  to  a  straight  pull,  and  the  other 
to  observe  what  took  place  when  it  was  worked  over  a  sheave. 
In  the  first  set  the  specimen  was  held  at  each  end  in   the  jaws 


EXPEEIMENTS.  229 

of  a  pair  of  wrought-iron  clamps,  which  we^-e  tightened  up  by 
means  of  screws.  One  of  the  clamps  was  attached  to  a  fixed 
beam,  and  from  the  other  was  suspended  a  large  cylindrical  tank, 
which  was  gradually  filled  with  water  until  the  specimen  gave  way, 
the  breaking  strain  being  the  weight  of  the  tank  and  water.  This 
weight  was  ascertained  by  actual  weighing  with  a  steelyard  when 
the  water  in  the  tank  was  at  different  heights.  Observations  on 
the  extension,  shrinkage  of  the  circumference,  and  change  in  the 
pitch  of  the  spiral  of  the  rope  were  made  with  different  loads,  and 
the  strength  of  a  sufficient  number  of  the  yarns  of  which  the  rope 
Avas  composed  was  tried  to  ascertain  the  loss  of  strength  by  com- 
bining the  yarns  into  a  rope.  In  the  second  set  the  specimen,  clamped 
as  before,  was  passed  over  a  sheave,  the  axle  of  which  rolled  horizon- 
tally on  planed  cast-iron  plates,  in  order  to  diminish  friction.  To 
each  clamp  was  attached  a  cylindrical  iron  tank.  Water  being  ad- 
mitted to  the  highest  tank  iintil  downward  motion  commenced,  its 
influx  was  stopped,  and  the  tank  descended,  the  other  one  rising. 
Water  was  then  admitted  to  the  now  highest  tank  until  motion  again 
commenced,  and  this  process  was  repeated  until  the  specimen  gave 
way,  the  tanks  getting  fuller  of  water  at  each  movement,  at  which 
times  the  difference  of  weight  of  the  two  tanks  was  observed.  This, 
minus  the  slight  friction  of  the  apparatus,  represented  the  rigidity 
of  the  rope.  The  extensions  were  observed  as  in  the  first  set  of 
experiments. 

The  specimens  consisted  of  hemp,  manilla,  shroud  laid  and 
hawser  laid  ropes,  from  8  to  10  inches  in  circumference,  round  and 
flat  wire  ropes,  and  chains  of  different  sizes  of  about  the  same 
strength  as  the  ropes.  The  sheaves  also  were  of  different  diameters. 
These  experiments  resulted  in  Mr.  Brunei  deciding  to  use  chains 
for  lifting  the  bridge,  and  this  mainly  from  the  circumstance  that 
chains  work  more  satisfactorily  over  a  sheave  than  cither  hemp 
or  wire  ropes. 

Some  small  scale  experiments  made  by  Mr.  Brunei  are  deserving 
of  notice.  These  were  made  to  verify  calculations  on  the  longitu- 
dinal girders  of  the  Chepstow  truss,  which  are  virtually  continu- 
ous beams  of  five  unequal  spans.  It  was  desirable  to  test  the 
results  of  analysis  by  experiment,  in  order  to  be  assured  that 
no  errors  had  been  committed  in  its  application.  Mr.  Brunei 
accordingly  devised  the  following  simple  form  of  experiment  for 
this  purpose.  A  deal  rod,  exactly  half  an  inch  square  and  38  feet 
long,  quite  free  from  knots,  was  supported  on  props  of  equal 
height,  above  the  perfectly  horizontal  and  planed  surface  of  a  large 


230  RAILWAY  BRIDGES  AND  VIADUCTS. 

beam  of  timber.  ^  The  props  were  placed  so  as  to  correspond  rela- 
tively to  the  actual  spans,  and  the  rod  was  loaded  uniformly  by 
means  of  a  ch^iin.  It  was  thus  bent  into  an  elastic  curve,  the 
ordinates  of  which  were  very  carefully  measured,  at  every  foot  along 
the  length,  by  a  finely  divided  scale  and  magnifier.  The  pressure 
on  each  prop  was  also  determined,  by  removing  any  particular  one, 
and  suspending  the  point  of  the  rod  immediately  over  it  to  a  steel- 
yard, the  weight  being  observed  when  the  point  of  the  rod  was 
exactly  at  the  same  level  as  before  the  prop  was  removed.  The 
obvious  condition,  that  the  sum  of  the  pressures  on  the  props  should 
be  equal  to  the  weight  of  the  rod  and  its  load,  furnished  a  satis- 
factory means  of  testing  the  results  of  these  weighings.  The  rod 
being  turned  over  on  each  of  its  four  sides,  the  experiments  were 
repeated,  and  the  average  taken,  in  order  to  eliminate  the  effects  of 
initial  curvature,  or  of  unequal  elasticity.  Diagrams  of  the  elastic 
curves  were  then  made,  showing  the  correspondence  of  theory  with 
experiment,  and  this  Avas  so  close  as  to  leave  no  doubt  that  a  true 
knowledge  of  the  nature  of  the  strains  had  been  arrived  at.  One  of 
these  diagrams  is  given  by  Mr.  Edwin  Clark  in  his  work  on  the 
'  Britannia  and  Conway  Tubular  Bridges,'  vol.  i.  p.  462. 

By  modifications  of  the  plan  Mr.  Brunei  adopted  in  this  experi- 
ment, the  strains  on  continuous  beams  of  varying  section  may  be 
ascertained  with  considerable  accuracy. 


231 


CHAPTER  VIII. 

STEAM  NAVIGATION.     THE  '  GBEAT  WESTERN'   STEAM- SHIP. 
A.D.  1835—1847.     ^TATis  30—42. 

INTEODTJCTION  TO  THE  CHAPTBB3  ON  STEAM  NAVIGATION — FOBMATION  OF 
THE  GBEAT  ■WESTEBN  STEAM-SHIP  COMPANY — COMMENCEMENT  OF  THE 
BUILDING  OP  THE  '  GBEAT  "WESTEBN '  — ■  REPOBT  ON  SELECTION  OP 
THE  BUILDERS  OF  THE  ENGINES  (jUNE  18,  183G) — STATEMENTS  OF  DR. 
LAEDNEB  ON  THE  PEOBABLE  FAILURE  OF  A  LINE  OF  STEAM-SHIPS 
BETWEEN  ENGLAND  AND  AMEBICA — VOYAGE  OF  THE  '  GREAT  WESTEBN ' 
TO  LONDON — ^COMPLETION  OF  THE  ENGINES — HEB  RETURN  TO  BRISTOL — - 
FIRE   ON  BOARD   AND   ACCIDENT   TO   MB.  BEUNEL — VOYAGE   TO   NEW  YORK 

COMPABISON    BETWEEN    THE    PEBFOBMANCES    OF    THE  '  GBEAT  WESTEBN  ' 

AND  THE  '  SIEIUS '—SUBSEQUENT  HISTOEY  OP  THE  'GREAT  WESTEBN*— 
note:    DIMENSIONS   OF  THE   SHIP  AND  ENGINES. 

It  will  readily  be  conceded  that  Mr.  Brunei's  railway 
works,  wliich  have  formed  the  subject  of  the  five  preced- 
ing chapters,  would  have  given  him  ample  employment 
for  the  thirty  years  of  his  professional  life. 

Nevertheless,  during  almost  the  whole  of  that  period — 
namely,  from  1835,  the  year  of  the  passing  of  the  Great 
Western  Railway  Bill,  to  his  death  in  1859 — he  was  also 
engaged  in  the  accomplishment  of  undertakings  which 
had  for  their  object  the  systematic  development  of  Ocean 
Steam  Navigation.* 

The  *  Great  Western,'  the  first  steam-ship  which  made 
regular  voyages  across  the  Atlantic,  the  '  Great  Britain,* 

'  It  Ras  been  observed  with  much  '  Address   of  George  Parker  Bidder, 

truth  that  full  justice  has  not  been  '  Esq.,  on  his  election  as  President  of 

done  to  ]VIr.  Brunei's  exertions  in  this  '  the  Institution  of  Civil  Engineers, 

department  of  practical  science. — See  '  January  10,  I860.' 


232  THE  'GREAT   WESTERN'   STEAM-SHIP.        [a.d.  1835. 

the  first  large  iron  steam-ship,  and  the  first  large  ship  in 
which  the  screw  propeller  was  used,  and,  lastly,  the '  Great 
*  Eastern,'  were  Mr.  Brunei's  works,  built  under  his 
direction,  in  the  midst  of  his  other  engrossing  occupa- 
tions, and  at  the  sacrifice  of  his  health  and  life. 

The  history  of  these  projects  will  contain  records  of 
many  disappointments  as  well  as  of  success ;  for  no  great 
and  novel  undertaking  can  be  perfected  at  once  and  with- 
out changes  of  plan  and  arrangement.  As  engineer  to 
the  Companies  which  built  these  steam-ships,  Mr.  Brunei 
advised  the  adoption  of  measures  strongly  in  opposition  to 
current  popular  opinion,  and  far  bolder  and  more  daring 
than  even  his  recommendation  of  the  broad  gauge  and 
the  atmospheric  system.  Thej;esults  obtained  have  veri- 
fied his  calculations^_ajQd__the  conclusions  he  sought  to 
establish  are  now  so  generally  accepted  that  it  is  difiicult 
to  believe  that  they  were  e:£fiiL.cmestioned.  No  one  now 
has  any  doubt  that  large  vessels  can  with  safety  be  built 
of  iron,  or  that  the  screw  propeller  can  be  advantageously 
employed  in  ships  of  war  and  the  mercantile  navy;  no 
one  can  now  deny  that  it  is  practicable  for  steam-ships 
to  make  long  voyages  across  the  ocean  with  regularity 
and  speed. 

A  detailed  account  will  now  be  given  of  the  ships  whose 
performances  first  demonstrated  the  truth  of  these  pro- 
positions. 

Although  the  '  Great  Western '  was  the  first  steamer 
which  was  built  for  regular  voyages  between  Europe  and 
America,  the  first  attempt  to  use  steam  in  the  direct 
voyage  across  the  Atlantic  was  made  by  an  American  ship 
of  300  tons  burden,  called  the  ^  Savannah,'  and  built  at 
New  York.  Her  engines  were  of  small  power,  with 
paddles  made  to  ship  and  unship.     She  made  only  two 


JET.  30.]  INTRODUCTORY   REMARKS.  233 

voyages  to  and  from  Europe  :  in  the  first  of  these  she 
left  the  port  of  Savannah  on  May  25,  and  anchored  at 
Liverpool  on  June  20,  1819. 

No  further  advance  in  Ocean  Steam  Navigation  seems 
to  have  been  attempted  until  1835.  In  the  October  of 
that  year,  at  a  meeting  of  the  Directors  of  the  Great 
Western  Railway  Company,  at  Radley's  Hotel,  in  Bridge 
Street,  Blackfriars,  one  of  the  party  spoke  of  the  enormous 
length,  as  it  then  appeared,  of  the  proposed  railway  from 
London  to  Bristol.  Mr.  Brunei  exclaimed,  '  Why  not 
'  make  it  longer,  and  have  a  steamboat  to  go  from  Bristol 
'  to  New  York,  and  call  it  the  "  Great  Western  ?  " '  This 
suggestion  was  treated  as  a  joke  by  most  of  those  who 
heard  it ;  but  at  night  Mr.  Brunei  and  Mr.  T.  R.  Guppy, 
one  of  the  Directors,  talked  it  over,  and  afterwards  con- 
sulted three  of  the  leading  members  of  the  Board — 
Mr.  Scott,  Mr.  Py croft,  and  Mr.  Robert  Bright.  They 
took  up  the  idea  warmly,  and  a  committee  was  formed 
to  carry  out  the  project. 

As  a  preliminary  measure,  Mr.  Guppy  and  Captain 
Christopher  Claxton,  R.N.,  made  a  tour  of  the  great 
ship-building  ports  of  the  kingdom,  in  order  to  collect 
information.  The  results  of  their  inquiries  were  embodied 
in  a  report,  dated  January  1,  1836,  which  describes  at 
great  length  the  advantages  to  be  gained  in  large  vessels. 
The  manuscript  was  submitted  to  Mr.  Brunei  previously  to 
its  publication,  and  he  inserted  the  following  passage : — 

The  resistance  of  vessels  in  the  water  does  not  increase  in  direct 
proportion  to  their  tonnage.  This  is  easily  explained ;  the  tonnage 
increases  as  the  cubes  of  their  dimensions,  while  the  resistance 
increases  about  as  their  squares ;  so  that  a  vessel  of  double  the 
tonnage  of  another,  capable  of  containing  an  engine  of  twice  the 
power,  does  not  really  meet  with  do.uble  the  resistance.  Speed 
therefore  will  be  greater  with  the  large  vessel,  or  the  proportionate 
power  of  the  engine  and  consumption  of  fuel  may  be  reduced. 

•     i   ■/     ' '  ,: 

'  '  .'.c.NT  OF  Civil  ENGiNEhfiiNG 


234  THE   'GREAT   WESTERN'   STEAM-SHIP.        [a.o.  1835. 

This  was  anjmportant  addition  to  the  report,  for  it  enun- 
ciates the  principle  which  governed  Mr.  Brunei  in  deter- 
niining  the  dimensions  and  power,  not  only  of  the  '  Great 

*  Western,'  but  also  of  the  '  Great  Britain '  and  '  Great 

*  Eastern '  steam-ships. 

Immediately  after  the  publication  of  this  report  a  Com- 
pany was  formed  in  Bristol  called  'The  Great  Western 

*  Steam-Ship  Company,'  Mr.  Peter  Maze  being  the  Chair- 
man, and  Captain  Claxton  the  Managing  Director.  Cap- 
tain Claxton's  exertions  in  the  service  of  the  Company 
from  its  formation  to  its  dissolution  were  unremitting  and 
invaluable.  He  was  also,  from  the  date  of  Mr.  Brunei's 
first  connection  with  Bristol,  one  of  his  most  intimate 
friends,  and  his  confidential  adviser  on  all  points  on  which 
nautical  experience  was  of  value.  ^ 

Mr.  Patterson  (an  eminent  ship-builder  of  Bristol)  was 
selected  to  superintend  the  building  of  the  first  ship, 
under  the  direction  of  a  'Building  Committee'  consist- 
ing of  Captain  Claxton,  Mr.  Guppy,  and  Mr.  Brunei. 
Whenever  railway  business  called  Mr,  Brunei  to  Bristol, 
which  at  this  time  was  at  least  once  in  every  week,  the 
Committee  and  Mr.  Patterson  used  to  meet  at  the  office, 
or  at  Captain  Claxton's  or  Mr.  Guppy's  house,  and  often 
sat  far  into  the  night  discussing  the  details  of  the  design 
of  the  ship.* 

'  Captain  Claxton  died  on  March  great  longitudinal  strength.  The  ribs 
27,  1868,  in  his  79th  year.  The  were  of  oak,  of  scantling  equal  to  that 
manuscript  of  this  and  the  three  fol-  of  line-of-battle  ships.  They  were 
lowing  chapters  was  fortunately  com-  placed  close  together,  and  caulked 
pleted  in  time  to  be  submitted  to  him.  within  and  without  before  the  plank- 
He  spared  no  trouble  either  in  giving  ing  was  put  on.  They  were  dowelled 
or  procuring  original  documents  and  and  bolted  in  pairs ;  and  there  were 
other  materials  for  all  parts  of  this  also  four  rows  of  H-inch  iron  bolts, 
book,  in  the  preparation  of  which  he  24  feet  long,  and  scarfing  about  4  feet, 
took  the  liveliest  interest,  which  ran  longitudinally  through  the 

*  To  enable  the  ship  to  resist  the  whole  length  of  the  bottom  frames  of 

action  of  the  heavy  Atlantic  waves,  the   ship.      She  was  closely  trussed 

especial  pains  were  taken  to  give  her  with  iron  and  wooden  diagonals  and 


JET.  30.]  CONSTRUCTION  OF  THE  SHIP.  235 

One  of  the  most  important  questions  which  occupied 
Mr.  Brunei's  attention  was  the  selection  of  the  builders 
of  the  engines.  Tenders  were  invited ;  and  on  receiving 
them,  he  addressed  the  following  report  to  Captain 
Claxton,  the  Managing  Director : — 

June  18,  1836. 

In  considering  the  three  tenders  for  the  supply  of  marine  engines 
for  your  first  vessel,  which  you  have  submitted  to  me  for  my 
opinion,  I  have  as.sumed  that  the  interests  of  the  company  are 
paramount,  and  that  all  feelings  of  partiality  towards  any  particu- 
lar manufacturer  or  any  local  interest  must  yield  to  the  absolute  ne- 
cessity, in  this  the  first  and  the  boldest  attempt  of  the  kind  yet 
made,  of  not  merely  satisfying  yourselves  that  you  will  obtain  a 
good  engine,  but  also  of  taking  all  those  means  of  securing  the  best 
which  in  the  eyes  of  the  public  may  be  unquestionable.  In  this 
view  of  the  case,  if  you  agree  with  me,  I  think  you  will  consider 
that,  provided  the  prices  are  fair  individually,  the  relative  araoimt 
of  the  tenders  is  a  secondary  consideration. 

I  assume,  also,  that  the  high  respectability  of  all  these  parties 
would  ensure  equally  from  either  the  best  materials  and  workman- 
ship, and  I  shall  confine  myself  simply  to  pointing  out  a  few  of  the 
conditions  peculiar  to  the  engines  which  you  require,  and  the  means 
which  the  different  parties  have  of  complying  with  these  conditions. 

I  need  hardly  remind  you  that,  owing  to  the  lateness  of  the 
season,  you  will  require  that  the  vessel  should  be  prepared  to  run 
her  first  voyage  almost  immediately  after  the  engines  are  fixed. 
You  will  remember,  also,  that  it  will  be  the  longest  voyage  yet  run ; 
that  in  the  event  of  unfavourable  weather  a  total  failure  might  be 
the  result  of  the  engine  not  working  to  its  full  power,  or  consuming 
too  great  a  quantity  of  coals — a  very  common  occurrence  with 
engines  apparently  well  made,  after  six  or  eight  days'  constant  work ; 
and,  lastly,  that  the  future  success  of  the  boat  as  a  passenger  ship 
— nay,  even  of  the  company's  boats  generally,  and,  to  a  great  ex- 
tent, and  for  some  time,  the  reputation  of  Bristol  as  an  American 
steamboat  station,  may  depend  upon  the  success  of  this  first  voyage. 
It  is  indispensable,  therefore,  to  secure  as  far  as  possible  a  machine 
which  shall  be  perfect  in  all  its  details  from  the  moment  of  its  cora- 

shelf  pieces,  which,  with  the  whole  of  practice, 

her  upper  works,  were  fastened  with  The  principal  dimensions  of  the  hull 

bolts   and  nuts   to   a   much   greater  and  engines  are  given  in  the  note  to 

extent  than   had  hitherto   been  the  this  chapter  (p.  245). 


236  THE   '  GREAT   WESTERN  '   STEAM-SHIP.         [a.d.  1836. 

pletion.  There  may  be  time  for  a  few  trials  for  ascertaining  the  fact 
of  its  completion,  but  there  will  be  none  for  effecting  any  alterations 
should  they  be  found  necessary,  or  for  making  any  experiments. 
The  machinery  which  you  require  to  be  so  perfect  is  by  no  means 
an  ordinary  steam-engine. 

Marine  engines  of  80  or  90,  and  even  some  of  100  horse-power, 
are  mere  models  on  a  large  scale  of  the  ordinary-sized  engines. 
Engines  of  160  or  180  horse-power  each  would  be  unmanageable 
without  many  material  modifications  in  the  details  ;  the  arrangement 
must  be  different,  and,  as  the  strength  of  materials  remains  the  same, 
the  proportionate  dimensions  of  the  parts  must  be  modified.  Many 
contrivances  of  this  description  have  been  introduced  into  the  large 
engines  of  110  horse-power  each  made  for  the  Navy.  From  110  to 
160  is  still  another  and  a  very  great  stride.  Those  who  have  led  the 
way  in  the  first  step  are  certainly  the  most  likely  to  be  aware  of  the 
difficulties  of  the  second,  and  to  be  able  to  appreciate  them  better, 
and  be  more  prepared  to  overcome  them  than  those  who  have  as  yet 
only  manufactured,  however  successfully,  engines  of  the  ordinary 
class.  Of  three  parties  tendering  ....  Messrs.  Maudslay  have 
made  by  far  the  largest  number,  and  have  for  some  years  led  the 
way  in  the  introduction  of  the  largest  anned  steamboats ;  and  there 
can  be  no  question  as  to  the  fact  that  they  are  the  oldest  manufac- 
turers of  marine  engines,  that  they  are  themselves  the  originators  of 
the  greatest  number  of  the  improvements  of  the  day,  that  they  have 
made  the  largest  engines  yet  made,  and  the  greatest  number  of  large 
engines  of  all  sizes  ;  and,  lastly,  that  they  have  the  principal  supply 
of  engines  for  the  large  war  ships  now  used  for  the  Navy,  and  have 
had  hitherto  the  sole  supply  of  all  above  70  horse-power.  With 
these  facts  before  you,  it  remains  only  for  you  to  consider  how  far 
you  agree  with  me  in  the  conclusion  I  have  come  to,  and  which  I 
have  no  hesitation  in  expressing — that  I  think  you  will  be  safest,  in 
the  peculiar  case  of  the  first  ship,  in  the  hands  of  the  parties  who 
have  had  most  experience,  and  that  Messrs.  Maudslay  are  those 
persons.     Their  price  is,  I  think,  moderate. 

This  report  was  read  by  Mr.  Brunei  at  a  meeting  of 
the  Board,  summoned  at  his  request;  the  Directors 
adopted  his  advice,  and  accepted  the  offer  of  Messrs. 
Maudslay  &  Field,  of  Lambeth.^ 

'  The  engines  as  designed  by  although  Mr.  Brunei  had  strongly 
Messrs.  Maudslay  were  beam  engines,       urged  them  to  adopt  the  more  compact 


JET.  31.]  CONSTRUCTION   OF  THE  ENGINES.  237 

The  '  Great  Western,'  for  so  the  ship  was  called,  had 
not  been  long  commenced  when  a  somewhat  celebrated 
controversy  arose,  in  which  the  correctness  of  Mr.  Brunei's 
views  was  questioned  by  the  late  Dr.  Dionysius  Lardner. 

The  circumstances  which  led  to  this  discussion  were  as 
follows  : — 

The  British  Association  for  the  Advancement  of  Science 
held  its  sixth  meeting  at  Bristol  in  August  1836 ;  and, 
as  Dr.  Lardner  was  announced  to  lecture  on  Trans- 
atlantic Steam  Navigation,  great  interest  was  felt  in 
Bristol  on  the  occasion. 

After  some  postponement,  he  delivered  his  lecture 
on  August  25,  to  a  crowded  meeting  of  the  Mechanical 
Section.  The  proceedings  of  the  Association  unfortunately 
do  not  give  any  report  of  Dr.  Lardner's  observations  ;  but, 
as  in  his  latest  work  on  the  subject  ^  he  speaks  in 
commendatory  terms  of  the  report  given  in  the  '  Times  ' 
newspaper,  that  account  may  be  relied  on  as  correct. 

In  the  'Times  '  of  August  27,  1836,  it  is  stated  that  in 
the  course  of  his  lecture  Dr.  Lardner  said, — 

Let  tliem  take  a  vessel  of  1,600  tons,  provided  with  400  horse- 
power engines.  They  must  take  2^  tons  for  each  horse-power,  the 
vessel  must  have  1,348  tons  of  coal,  and  to  that  add  400  tons,  and 
the  vessel  must  carry  a  burden  of  1 ,748  tons.  He  thought  it  would  be 
a  waste  of  time,  under  all  the  circumstances,  to  say  much  more  to 
convince  them  of  the  inexpediency  of  attempting  a  direct  voyage  to 
New  York,  for  in  this  case  2,080  miles  was  the  longest  run  a  steamer 
could  encounter  :  at  the  end  of  that  distance  she  would  require  a 
relay  of  coals. 

There  is  no  detailed  report  remaining  of  the  animated 
discussion  which  followed  the  lecture,  and  in  which  Mr. 

form  of  direct-acting  engines.     They,  '  Steam  and  its  Uses,  by  Dr.  Lard- 
however,  thought  it  better  not  to  de-  ner,  1856.     Chapter  on  'Steam  Navi- 
part  from  what  was  then  the  usual  '  gation,'  section  10. 
form. 


238  THE  'GREAT  WESTERN'  STEAM-SHIP.       [a.u.  1836. 

Brunei  took  .part.  He  exposed  several  errors  in  Dr. 
Lardner's  calculations,  but  failed  to  produce  any  effect 
upon  tlie  majority  of  those  present,  who  were  powerfully 
impressed  by  the  lecturer's  dogmatic  assertions. 

Those  assertions  seem  to  have  had  a  wide  circulation 
beyond  the  walls  of  the  lecture-room;  and  if  Dr.  Lardner's 
arguments  were  sound,  and  if  transatlantic  steamers  ought 
to  have  taken  their  departure  from   *  the   most   western 

*  shore  of  the  British  Isles,'  the  enthusiastic  advocate  of 
a  railway  scheme  in  Ireland  might  well  exclaim, — 

The  promoters  of  this  vast  object  stand  forewarned  of  defeat. 
Dr.  Lardner,  who  has  bestowed  a  great  deal  of  pains  in  arguing  the 
bearings  of  this  undertaking,  has  pronounced  it  impracticable  ;  and 
I  entirely  agree  with  him  in  his  conclusions.  The  effort,  neverthe- 
less, will  be  made  ;  the  genius  of  English  enterprise  will  hazard  the 
consequences ;  and  every  honest  spirit  that  shall  hear  of  the  brave 
British  crew  which  will  embark  upon  that  perilous  expedition  will 
feel  his  heart  beating  high  for  the  merchant-sailoi-,  Avhom  nothing 
can  deter.  He  will  sail ;  but,  though  dangers  will  encompass  him, 
and  destruction  appear,  there  is  yet  a  hope  for  his  ultimate  success. 
Let  us  cheer  ourselves  with  the  expectation  that,  as  the  exhausted 
mariner  returns,  he  will  fall  in  with  the  western  shores  of  Ireland  ; 
that,  worn  out  and  hopeless  of  home  and  comfort  upon  earth,  the 
Shannon  will  win  him  to  her  bosom;  that,  invited  by  the  graceful 
sinuosities  of  that  noble  stream,  and  the  rich  and  fertile  lands  around, 
he  will  advance  to  this  convenient  and  improving  city ;  and  as  he 
rests  within  its  walls  that  he  will  exclaim,  '  This  is  the  place  from 

*  which  I  ought  to  have  set  out,  for  here  have  I  returned  with  ease 

*  and  safety  ! '  ^ 

Dr.  Lardner's  views  are  repeated  in  an  article  in  the 

*  Edinburgh  Eeview'  for  April  1837  (vol.  Ixv.) ;  and  in 
the  report  of  the  proceedings  of  the  British  Association 
for  1836  (p.  130  of  the  proceedings  of  the  sections),  the 
reader  is  referred  to  this  article,  apparently  as  a  substitute 
for  an  abstract  of  the  lecture. 

'  '  An  pxpositiou  of  the  advantages  of  the  proposed  Railway  from  Limerick  to 
Wiiterford.' 


^T.  31.]  DE.  LARDISER'S  OPINIONS.  239 

The  following  resume  is  there  given  of  the  lecture  : — 

The  conclusions  at  which  he  arrived  were  briefly  these :  that, 
in  the  present  state  of  the  steam-engine  as  applied  to  nautical 
purposes,  he  regarded  a  permanent  and  profitable  communication 
between  Great  Britain  and  New  York  by  steam-vessels  making 
the  voyage  in  one  trip  as  in  a  high  degree  improbable ;  that  since 
the  length  of  the  voyage  exceeds  the  present  limits  of  steam-power, 
it  Avould  be  advisable  to  resolve  it  into  the  shortest  practicable 
stages;  and  that,  therefore,  the  most  eligible  point  of  departure 
would  be  the  most  western  shores  of  the  British  Isles,  and  the  first 
point  of  arrival  the  most  eastern  available  parts  of  the  western 
continent;  and  that,  under  such  circumstances,  the  length  of  the 
trip,  though  it  would  come  fully  up  to  the  present  limit  of  this 
application  of  steam-power,  would,  nevertheless,  not  exceed  it,  and 
that  we  might  reasonably  look  for  such  a  degree  of  improvement 
in  the  efficiency  of  marine  engines  as  would  render  such  an 
enterprise  permanent  and  profitable.     (P.  119.) 

Among  other  objections  to  long  voyages  the  reviewer 
enumerates  the  incrustation  of  boilers,  and  the  choking  of 
smoke  flues ;  and  then,  with  reference  to  the  quantity  of 
fuel  required,  he  proceeds  : — 

In  proportion  as  the  capacity  of  the  vessel  is  increased,  in  the 
same  ratio  or  nearly  so  must  the  mechanical  power  of  the  engines  be 
enlarged,  and  the  consumption  of  fuel  augmented.  ...  It  is 
therefore  demonstrable  that,  in  the  present  state  of  steam  navigation, 
if  this  voyage  shall  be  accomplished  in  one  uninterrupted  trip,  the 
vessel  which  performs  it  must,  whatever  may  be  her  power  and 
tonnage,  be  capable  of  extracting  from  coals  a  greater  mechanical 
virtue,  in  the  proportion  of  three  to  two,  than  can  be  obtained 
from  them  by  the  combined  nautical  and  mechanical  skill  of 
Mr.  Lang,  the  builder  of  the  'Medea,'  and  Messrs.  Maudslay  and 

Field That  the  passage  from  Liverpool  to  New  York  cannot 

on  any  occasion  be  made  in  one  run  by  a  steam- ship  we  do  not 
maintain.  .  .  .  The  average  time  of  the  outward  voyage  to  New  York 
is  thirty-six  days,  and  Ave  say  that  when  the  circumstances  of  wind 
.  and  water  are  such  that  a  sailing  vessel  would  require  that  time  to 
make  the  passage,  a  steamer  cannot  make  it  without  an  intermediatG 
supply  of  fuel.     (Pp.  127,  139,  143.) 


240 


THE   'GREAT   WESTERN'   STEAM-SHIP.       [a.d.  1836. 


To  sum  up  Dr.  Lardner's  views  in  liis  own  words  written 
at  about  this  time/  '  We  have  as  an  extreme  limit  of  a 
'  steamer's  practicable  voyage,  without  receiving  a  relay 
*  of  coals,  a  run  of  about  2,000  miles.'  ^ 
■I  It  will  be  seen  from  these  extracts  that  the  proposition 
iDr.  Lardner  laid  down  as  the  basis  of  his  '  demonstration ' 

as,  that  the  power  of  the  engines  must  be  increased  as 
he  size  of  the  vessel.  Were  this  true  his  conclusion 
would  also  be  true — namely,  that  the  capacity  of  a  given 
vessel  regularly  to  accomplish  a  given  voyage  does  not 
increase  with  the  increase  of  size,  since  the  consumption 
of  fuel  is  augmented  in  about  the  same  ratio. 

This  assumption  is  directly  opposed  to  the  opinion  held 
by  Mr.  Brunei,  and  acted  on  by  him  in  his  recom- 
mendations to  the  Steam- Ship  Company — namely,  that 
while  the  tonnage  of  a  ship  is  increased  as  the  cube  of 


'  The  Steam  Engine:  its  Applica- 
tion to  Navigation  and  Eailways, 
with  Plain  Maxims  for  Eailway  Spe- 
culators, 5th  edition,  1836,  p.  307. 

"  It  is  right  to  add  that,  according 
to  the  report  given  in  the  Athencetim 
newspaper  of  the  meetings  of  the 
British  Association  at  Liverpool  in 
September  1837,  'Dr.  Lardner  ad- 
'  dressed  the  section  (Mechanical)  on 
'  his  old  subject,  the  appliciition  of 
'  steam  to  long  voyages.  His  remarks 
'  and  calculations  were  to  a  great 
'extent  identical  with  those  brought 
'  forward  by  him  last  year  at  Bristol, 
'  and  published  long  since  in  his  work 
'  on  the  steam-engine,  but  the  conclu- 
'  sions  were  somewhat  varied.  The 
'  Doctor  did  not  now  deny  that  the 
'  voyage  might  be  practicable,  but  he 
'  did  not  believe  that  it  would  be  profit- 
able' {Athenaum, Septemhp,r23, 1837). 
Dr.  Lardner  was  answered  by  several 
speakers,  and  among  them  by  Mr. 
Guppy,   who  pointed   out    in    much 


detail  the  unreliable  character  of  Dr. 
Lardner's  data ;  while  nothing  was 
suggested  about  commercial  profits  or 
subsidies.  It  may  therefore  be  in- 
ferred that  Dr.  Lardner's  arguments 
as  to  the  consumption  of  fuel  remained 
the  same,  although  he  may  have 
abandoned  the  conclusion  which  legi- 
timately followed  from  them — namely, 
that  the  long  voyages  were  practically 
impossible. 

The  Report  in  the  Bristol  Mirror 
newspaper  of  the  same  date  (copied 
from  the  Liverpool  Standard)  is  as 
follows  : — '  Dr.  Lardner's  speech  was 
'  little  beyond  a  repetition  of  his  dis- 
'  course  last  year  in  Bristol,  re-pub- 
'lished  by  him  in  the  Edinburgh 
'  JReview.  The  voyage  to  America  by 
'  steam  he  treated  as  practicable,  but 
'  so  uncertain  as  to  render  a  profitable 
'  result  hopeless.  .  .  .  During  nearly 
'all  the  year  there  was  an  adverse 
'  west  wind,  and  the  Gulf  Stream  was 
'  to  be  avoided.' 


XT.  31.]  AREIVAL  IN   THE   THAMES.  241 

her  dimensions,  the  resistance  is  increased  only  about  as 
the  square. 

This  question  was  the  main  point  at  issue  between 
Dr.  Lardner  and  Mr.  Brunei ;  and  the  proposition  which 
Mr.  Brunei  then  asserted  is  at  the  present  time  the 
basis  of  the  calculations  which  determine  the  proportion 
between  the  tonnage  of  a  steam-ship  and  the  length  of 
voyage  she  has  to  perform  without  a  relay  of  fuel. 

The  history  of  the  'Great  Western'  steam-ship  has  been 
interrupted  by  this  examination  of  Dr.  Lardner's  proposi- 
tions. The  weight  at  one  time  attached  to  his  opinions, 
the  sinister  influence  they  exercised  over  the  early  efforts 
of  those  who  differed  from  him,  and  the  great  and  enduring 
importance  of  the  points  at  issue,  have  made  it  necessary 
to  refer  to  them  at  length. 

The  ship  had  been  steadily  proceeded  with,  notwith- 
standing the  adverse  criticism  of  philosophers,  and  she 
was  launched  on  July  19,  1837.  On  August  18  she  left 
with  a  tug-boat  for  London  to  take  her  engines  on  board, 
and  arrived  in  the  Thames  after  a  passage  of  four  days, 
four-fifths  of  the  way  under  sail. 

When  anchored  in  the  river  she  was  crowded  with 
visitors,  who,  according  to  the  newspapers  of  the  day, 
were  astonished  at  *  her  magnificent  proportions  and 
*  stupendous  machinery.' 

The  engines  were  at  length  completed,  and  received  in 
every  detail  Mr.  Brunei's  constant  supervision. 

Extraordinary  efforts  were  made  to  get  the  ship  back 
to  Bristol  and  to  start  her  on  her  voyage  across  the 
Atlantic  before  the  departure  of  the  *  Sirius  ' — a  vessel  of 
about  700  tons  and  320  horse-power,  bought  by  the  St. 
George's  Steam  Packet  Company  in  order  to  anticipate 
the  *  Great  Western.' 


242  THE  'GEEAT  WESTERN'  STEAM-SHIP.       [a.d.  1838. 

At  length  the  *  Great  Western '  left  Blackwall  for 
Bristol,  at  6.10  a.m.  on  Saturday,  March  31,  1838,  having 
on  board  Captain  Claxton,  Mr.  Guppy,  Mr.  Brunei,  and 
many  other  persons  interested  in  her  success.  All  went 
well  at  first,  but  at  about  half-past  eight  o'clock  a  very 
alarming  fire  broke  out.  The  felt  which  covered  the 
boilers  had  been  carried  up  too  high,  and  the  red  lead 
which  fastened  it  became  hot ;  oil  gas  was  generated,  and 
it  burst  into  a  fearful  flame,  setting  fire  to  the  beams  and 
under  part  of  the  deck.  The  ship  was  immediately  run 
ashore  on  a  mud-bank  not  far  from  the  Chapman  Beacon, 
while  Captain  Claxton,  Captain  Hosken  (the  commander), 
and  Mr.  Pearne  (the  chief  engineer)  endeavoured  to  ex- 
tinguish the  fire. 

Captain  Claxton  went  below  through  the  engine-rooms, 
and  forward  between  the  boilers  to  the  fore-hatch,  and  in 
a  stifling  atmosphere  of  burning  paint  and  felt  he  directed 
the  nozzle  of  the  fire-hose  against  the  flames.  While  he 
was  at  work,  something  heavy  fell  on  him  from  above. 
On  recovering  from  the  blow,  he  stooped  down,  and  found 
the  body  of  a  man,  who  was  lying  insensible,  with  his 
head  covered  to  the  ears  with  the  water  which  had 
collected  on  the  floor.  Captain  Claxton  called  for  a  rope, 
and  the  almost  lifeless  body  was  hauled  up.  It  was  not 
till  he  went  on  deck  some  time  afterwards  that  he  learnt 
that  the  person  who  had  fallen  on  him  was  Mr.  Brunei, 
and  that  he  had  saved  the  life  of  his  friend. 

It  appeared  that  Mr.  Brunei  was  going  down  to  Captain 
Claxton's  assistance  by  the  long  ladder  which  reached 
from  the  fore-hatch  to  the  keelson,  and  put  his  foot  on  a 
burnt  rung.  He  fell  about  18  feet,  striking  an  iron  bar 
in  his  descent.  Had  he  not  fallen  on  Captain  Claxton  he 
must  have  struck  the  keelson  or  floor  and-  been  killed, 
and  had  not  his  head  been  raised  at  once  he  would  have 


^T.  32.]  FIEE  ON   BOARD.  243 

been  suffocated  by  the  water  into  which  he  fell.  He  was 
so  severely  hurt  that  he  could  not  move,  and  he  was  laid 
on  a  saU  on  deck  until  the  fire  was  extinguished,  and  then 
lowered  into  a  boat,  and  landed  on  Canvy  Island,  where 
he  remained  some  weeks.  Although  his  sufferings  were 
very  great,  he  was  able,  within  three  days  of  the  accident, 
to  dictate  a  long  letter  to  Captain  Claxton  on  the  state 
of  the  ship  and  engines. 

The  fire  was  soon  got  under,  the  ship  resumed  her 
voyage  to  Bristol,  and  anchored  at  Kingroad  in  the 
afternoon  of  Monday,  April  2,  to  the  great  surprise  of  the 
good  people  of  Bristol,  who  had  heard  that  she  had  been 
burnt  in  the  Thames.  Their  astonishment  was  increased 
by  finding  no  outward  signs  of  the  disaster ;  but,  as  a 
fact,  the  deck  above  the  boiler  was  charred  a  fourth  of  its 
thickness,  and  so  remained  till  the  ship  was  broken  up. 

The  '  Great  Western '  started  on  her  first  voyage  to  New 
York  on  Sunday,  April  8,  at  10  a.m.,^  and  struck  soundings 
off  Newfoundland  on  the  ninth  day.  She  arrived  at  New 
York  at  2  p.m.  on  Monday,  the  23rd,  having  consumed 
three-fourths  of  the  coal  she  had  taken  on  board. 

She  found  that  the  *  Sirius '  had  arrived  before  her ;  but 
under  all  the  circumstances  the  palm  was  due  to  the '  Great 
'Western,'  for  the  '  Sirius  '  had  left  Cork  eight  hours  before 
the  '  Great  Western '  left  Bristol  (which  lies  a  whole  day's 
run  further  from  New  York),  and  had  only  arrived  at 
New  York  in  the  morning  of  the  day  in  the  afternoon  of 
which  the  '  Great  Western '  came  in ;  and,  what  is  after 
all  the  most  important  point  for  comparison,  the  *  Great 
*  Western '  had  nearly  200  tons  of  coal  left,  while  the 
'Sirius,'  when  she  dropped  her  anchor  at  Sandy  Hook,  had 
not  only  consumed  all  her  coal,  but  also  all  the  combus- 

•  She  had  only  seven  passengers  on  from  going  in  her  by  hearing  of  ths 
board  ;  fifty,  it  is  stated,  were  deterred      fire. 

B  2 


244  THE  'GREAT  WESTERN'  STEAM-SHIP.  [a.d.  1838. 

tible  articles  which,  could  possibly  be  thrown  on  the  fire, 
including  (to' repeat  the  well-known  anecdote)  a  child's 
doU! 

The  *  Great  Western '  was  received  at  New  York  with 
well-deserved  honour.  According  to  the  journal  of  one 
of  her  passengers,  *  Myriads  were  collected,  boats  had 
'gathered  round  us   in   countless   confusion,  flags  were 

*  flying,  guns  were  firing,  and  cheering  rose  from  the  shore, 

*  the  boats,  and  all  around  loudly  and  gloriously,  as  though 

*  it  would  never  have  done.    It  was  an  exciting  moment,  a 

*  moment  of  triumph.' 

The  ship  started  on  her  return  home  on  May  7,  1838, 
with  sixty-eight  passengers  on  board.  She  made  the 
voyage  in  fourteen  days,  although  twenty-four  hours  were 
lost  by  a  stoppage  at  sea. 

After  this  she  ran  regularly  between  Bristol  and  New 
York  till  the  end  of  1846.  In  April  1847  she  was  sold  to 
the  West  India  Mail  Steam  Packet  Company,  and  became 
one  of  their  best  vessels. 

At  length  in  1857  she  was  broken  up  by  Messrs.  Castle, 
of  Yauxhall.  Among  those  who  went  there  to  take  a 
farewell  of  her  before  she  finally  disajDpeared  was  Mr. 
Brunei  j  thus  he  saw  the  last  of  his  famous  ship. 


245 


[NOTE   (p.  235). 
Dimensions  of  the  '  Great  Western '  Steam-Ship. 


Length  from  fore-part  of  figurehead  to  after- 
part  of  taffrail 
Length  between  the  perpendiculars 
Length  of  keel 
Breadth 

Breadth  over  paddle-boxes 
Depth  of  hold 
Draught  of  water 
Length  of  engine-room 
Tonnage  by  measurement 
Displacement  at  load  draught 


Feet    Inch 


236 

0 

212 

0 

205 

0 

35 

4 

59 

8 

23 

2 

16 

8 

72 

0 

1,340  tons 

2,300    „ 

Dimensions  of  Engines,  ^c 

Diameter  of  cylinders  . 

Length  of  stroke 

Weight  of  engines,  wheels,  &c 

Weight  of  boilers 

Water  20  tons  to  each  boiler 

Diameter  of  wheel 

Width  of  floats 


73^  inches 

7  feet 

310  tons 

90    „ 

80    „ 

28  feet  9  inches 

10  feet 

246  [a.d.  1838. 


CHAPTEE  IX. 

8TEAM  NAVIGATION.     THE  'GREAT  BBITAIN'   STEAMSHIP. 
A.D.  1838—1847.     JETATis  33—42. 

COMMENCEMENT    OP   THE   BUILDING     OF    THE    'GREAT    BRITAIN* REPORT 

ON  THE  ENGINES  (JUNE  13,  1839) — EXPERIMENTS   ON  THE  SCREW  PROPELLER 

ITS    ADOPTION   IN     THE    '  GREAT     BRITAIN  ' COMPLETION  OF  THE  SHIP 

HEK     VOYAGE     ACROSS      THE      ATLANTIC STRANDING      OF     THE      '  GREAT 

'  BRITAIN  '    IN   DUNDRUM   BAY  LETTER    TO    CAPTAIN    CLAXTON    ON    THE 

CONDITION      OF     THE     '  GREAT     BRITAIN,'     AND      ON     THE     MEANS      TO     BE 

ADOPTED  FOR  SAVING  HER  (DECEMBER  10,  1846) REPORT  TO  THE  DIRECTORS 

ON   THE   SAME  SUBJECT    (DECEMBER    14,1846) APPOINTMENT    OF     CAPTAIN 

CLAXTON    TO    SUPERINTEND     THE    EXECUTION     OF    MR.    BRUNEl's    PLANS 

LETTER   TO    CAPTAIN     CLAXTON    ON    THE    DIFFICULTIES    TO    BE    OVERCOME 
(DECEMBER  29,  1846) — REPORT  ENCLOSING  CAPTAIN  CLAXTON's  ACCOUNT    OF 

THE  ERECTION  OF  THE  BREAKWATER  (FEBRUARY  27,  1847) REPORT    ON  THE 

ARRANGEMENTS    FOR   FLOATING    OFF    THE  SHIP    (mAY  4,  1847) SUCCESSFUL 

ACCOMPLISHMENT    OF    THE    FLOATING    OPERATIONS — SUBSEQUENT    HISTORY 

OF      THE      'GREAT     BRITAIN* NOTE;   DIMENSIONS      OF     THE     SHIP     AND 

ENGINES. 

The  Directors  of  the  Great  Western  Steam-Ship  Com- 
pany, encouraged  by  the  success  of  the  '  Great  Western,' 
determined  shortly  after  her  first  return  to  England  to  lay 
down  a  second  ship  of  not  less  than  2,000  tons  burden. 
As  they  did  not  at  that  time  contemplate  the  use  of  iron, 
a  portion  of  the  timber  was  purchased,  and  drawings  were 
put  in  hand  for  a  wooden  ship.  The  proposed  vessel 
was  intended  to  be  in  all  respects  a  companion  ship  to 
the  *  Great  Western ; '  only  she  was  to  be  of  larger  dimen- 
sions, as  it  was  found  that  additional  cargo  space  would 
be  remunerative. 

In  October  1838,  Mr.  Guppy  (one  of  the  Directors)  com- 


JET.  33.]  COI^IMENCEMENT   OF  THE  SHIP.  247 

municated  to  the  Board  the  results  of  some  calculations 
Mr.  Brunei  had  made  relative  to  the  cost  and  efficiency 
of  iron  vessels  as  compared  with  wooden  ones.  Mr. 
Brunei  then  suggested  that  Captain  Claxton  and  Mr. 
Patterson,  accompanied  by  one  of  his  assistants,  should 
make  a  voyage  to  Antwerp  and  back  in  the  *  Rainbow,' 
an  iron  steam-boat  of  407  tons  burden,  and  report  on  the 
subject.  On  receiving  their  report,  which  was  revised  by 
Mr.  Brunei,  and  which  was  strongly  in  favour  of  the 
adoption  of  iron,  the  Directors  resolved  to  build  their  shij) 
of  that  material,  and  of  not  less  than  2,000  tons  measure- 
ment, the  same  size  as  that  which  they  had  intended  for 
their  wooden  ship.  They  also  determined  to  erect  the 
shops,  and  provide  the  tools  for  building  her  themselves. 

As  in  the  case  of  the  *  Great  Western,'  the  details  of 
construction  were  settled  by  the  Building  Committee — 
Captain  Claxton,  Mr.  Guppy,  and  Mr.  Brunei — who  were 
assisted  by  Mr.  Patterson. 

The  preparation  of  the  design  occupied  some  time.  In 
each  succeeding  drawing  an  increased  size  was  proposed  ; 
at  length  the  fifth  design,  showing  a  ship  of  3,443  tons 
burden,  was  finally  approved  of.  On  July  19,  1839,  the 
flat  keel  plates  were  laid,  and  the  construction  of  the  hull 
was  commenced. 

It  will  be  necessary  to  enter  with  some  detail  into  the 
history  of  the  construction  of  the  engines  of  the  '  Great 

*  Britain,'  as  it  has  often  been  stated  that  it  was  on  Mr. 
Brunei's  recommendation  that  the  Company  built  their 
own  engines.  It  appears,  however,  that  Mr.  Brunei  re- 
peatedly urged  upon  the  Directors  the  utmost  caution 
and  economy,  and  that  they  ultimately  acted  '  against  his 

*  suggestion.' 

When  the  Directors  determined,  in  May  1838,  to  build 


248  THE  '  GKEAT  BEITAIN '  STEAM-SHIP.        [a.d.  1838. 

a  second  sliipj  they  did  not  entertain  any  idea  of  under- 
taking so  great  a  responsibility  as  tlie  manufacture  of  the 
engines ;  nor  had  they  any  intention  of  doing  so,  even 
when,  towards  the  end  of  the  same  year,  they  resolved 
to  build  the  ship  themselves,  and  to  construct  her  of  iron. 

The  dimensions  of  the  proposed  paddle  engines  (for  at 
this  date  the  use  of  the  screw  propeller  was  not  contem- 
plated) were  sent,  in  November  1838,  to  Messrs.  Maudslay 
and  Field,  Messrs.  Hall,  and  Messrs.  Seaward.' 

Messrs.  Maudslay  declined  to  tender,  and  the  negotia- 
tions seem  to  have  fallen  through  at  the  time ;  but  they 
were  renewed  in  April  1839,  when  estimates  for  engines 
(with  cylinders  of  100  inches  diameter  and  seven  feet 
stroke)  were  again  invited  from  several  makers. 

The  contest  lay  eventually  between  Messrs.  Maudslay 
and  Mr.  Humphrys  (whose  patent  for  trunk  engines  was 
worked  by  Messrs.  Hall).  At  Mr.  Brunei's  desire  they 
prepared  designs  for  engines  with  cylinders  of  120  inches 
diameter.  He  twice  induced  the  Directors  to  postpone 
coming  to  a  decision  on  the  subject,  in  order  that  Messrs. 
Maudslay  might  mature  their  new  patent  for  double- 
cylinder  engines. 

When  their  tender  was  placed  before  the  Board,  the 
Directors  were  of  opinion  that  it  largely  exceeded  the 
estimate  of  Mr.  Humphrys.  Mr.  Humphrys'  estimate, 
however,  had  been  more  than  once  sent  back  to  him 
for  revision,  at  the  suggestion  of  Mr.  Brunei,  who  ex- 
pressed doubts  as  to  the  possibility  of  Mr.  Humphrys 
being  able  to  construct  his  engines  within  the  sum  named 
by  him. 

Messrs.  Hall  stated  that  if  they  tendered  for  the  supply 
of  engines  on  Mr.  Humphrys'  plan,  large  tools  would  have 
to  be  purchased  by  them,  and  the  cost  charged  on  the  one 

'  These  engines  were  to  have  had  two  cylinders  of  88  inches  diameter. 


;et.  33.]  CONSTRUCTION  OF  ENGINES.  249 

pair  of  engines ;  they  therefore  strongly  recommended  the 
Company  to  become  their  own  engine  makers. 

Influenced  by  these  considerations,  the  Directors  deter- 
mined to  adopt  the  plan  of  Mr.  Humphrys,  and  to  con- 
struct their  own  engines ;  and  they  appointed  him  the 
superintending  engineer  of  their  works. 

It  appears  from  a  report  by  the  secretary,  Captain 
Claxton,  dated  March  23,  1840,  that  *  previous  to  coming 

*  to  this  decision,  Mr.  Brunei  succinctly  laid  before  the 

*  Directors  his  views  of  the  matter,  and  his  opinion  of  the 

*  great  responsibility  they  would  incur  if  they  made  their 

*  own  engines ;  and  doubtless  the  Directors  would  have 
'  yielded  to  his  suggestions,  but  for  the  report  of  Mr. 

*  Humphrys,  showing  the  utter  hopelessness  of  getting  the 
'engines  made  piecemeal  in  Bristol.' 

The  following  is  the  report  of  Mr.  Brunei  on  the  sub- 
ject :— 

June  12,  1839. 

At  the  request  of  Mr,  Maze  and  Mr.  Scott,  whom  I  had  the 
pleasure  of  meeting  on  Saturday  last,  I  send  you  the  following  ob- 
servations on  the  two  plans  and  the  estimates  of  Messrs.  Maudslay, 
and  of  our  Mr.  Humphrys. 

I  have  a  copy  of  Messrs.  Maudslay's  letter  of  the  29th  ult.  con- 
taining their  tender,  and  a  subsequent  letter  of  the  11th  inst.  in 
reply  to  some  enquiries  of  mine  respecting  their  tender  and  Mr. 
Humphrys'  estimates,  according  to  which  the  total  cost  of  a  pair  of 
engines  of  110  inches  diameter  and  8  feet  stroke,  upon  his  plan,  and 
I  presume  modified  as  last  recommended  by  Mr.  Guppy  and  myself, 
including  boilers  and  fixing  on  board,  would  be  29,296/.,  or,  as 
stated  by  Captain  Claxton  in  a  letter  to  me  of  the  1st  inst.,  30,700/. 

First,  as  to  the  comparative  merits  of  the  plans,  I  consider  them 
both  excellently  adapted  to  our  particular  case,  and  that  the  choice 
will  depend  upon  other  circumstances  than  the  construction  of  the 
engines,  and  these  circumstances,  I  consider,  would  be,  the  relative 
cost  and  the  advantages  of  forming  an  establishment  which  will 
eventually  become  necessary  for  the  repair  and  maintenance  of  our 
engines,  contrasted  with  all  the  advantages  to  be  derived  from  the 


260  THE  '  GEEAT  BEITAIN '  STEAM-SHIP.        [a.d.  1839. 

responsibility  and  experience  in  all  the  details  of  a  first-rate  manu- 
facturer, and  to  which  I  attach  very  great  value,  particularly  in  the 
earl}'-  proceedings  of  a  Company  like  ours.  As  regards  the  cost,  I 
understand  Messrs.  Maudslay's  tender  to  be  for  an  engine  of  four  75- 
inch  cylinders,  which  is  equal  to  a  pair  of  ordinary  engines  of  about 
106  inches. 

Engine,   boiler,  and   paddle-wheels,  fixed   on   board,   supposing  the  £ 

vessel  in  London,  and  with  reduced  size  of  boiler     .             .             .  41,400 

Deduct  allowance  for  coal-boxes  and  combings  for  hatchways  as  pro- 
posed by  Messrs.  Maudslay  ......  500 

40,900 
Additional  expense  incurred  by  Messrs.  Maudslay  in  consequence  of 
the  engines  being  fixed  on  board  at  Bristol  instead  of  London,  I 
estimate  at    .  .  .  .  .  .  .  .         250 


Total  amount  to  be  paid  Messrs.  Maudslay      .  .  .  .41,150 

In  addition  to  this  will  be  the  freight  and  insurance,  which  we  are  to 
pay,  and  also  the  unloading  at  Bristol  and  placing  in  the  vessel, 
which  I  take  at  Captain  Claxton's  estimate  ....       2,000 

Making  a  total  of  .  .  .  .  .43,150 

It  is  to  be  observed  that  this  includes  Mr.  Field's  apparatus 
for  changing  water,  Kingston's  cocks,  casing  the  cylinders,  and  all 
those  extras  which  were  applied  to  the  '  Great  Western,'  and  also 
the  paddle-beams  and  paddle-wheels.  Without  these  latter  the  nett 
cost  of  the  engine,  fixed  in  place,  and  including  all  other  extras, 
would  appear  to  be  about  40,000/.  or  40,500/.  If  the  cylinders  be 
increased  to  77f ,  which  would  be  equivalent  to  the  pair  of  110  inch, 
and  supposing  the  cost  of  the  engines  to  increase  in  the  same  ratio 
as  the  power  resulting  from  this  increase,  but  which  ought  not  to 
be  the  case,  the  total  cost,  according  to  Messrs.  Maudslay's  esti- 
mate, will  be  46,500/.,  and  deducting  the  paddle-beams  or  frame- 
work for  carrying  the  paddles,  which  do  not,  I  think,  form  part  of 
Mr.  Humphrys'  estimate,  probably  about  45,500/.  as  compared  with 
Mr.  Humphrys'  estimate  of  30,700/.  With  respect  to  this  latter 
estimate,  I  cannot  help  expressing  the  fears  I  entertain  that  Mr. 
Humphrys  is  over- sanguine,  and  that  the  cost  would  greatly  exceed 
the  sum  named.  The  items  seem  to  me  to  be  moderate  prices  only 
for  each  article  named,  and  I  see  no  allowance  for  those  alterations, 
damages,  and  waste  of  parts,  and  a  variety  of  other  contingencies, 
which  in  a  piece  of  machinery  of  this  magnitude  and  novelty  is  cer- 
tain to  amount  to  a  very  large  sum. 

In  his  estimate  of  the  fittings  and  smaller  parts,  I  think  also  he 
has  greatly  underrated  them. 


JET.  34.]  EEPORT   ON  ENGINES.  261 

The  outlay  for  tools  and  tackle  would,  I  think,  also  be  greater 
than  he  seems  to  anticipate,  and  on  the  whole  I  cannot  but  come  to 
the  conclusion  in  my  own  mind,  and  I  should  not  act  rightly  if  I 
did  not  communicate  that  opinion  to  you,  that  the  first  outlay  will 
be  fully  as  large  and  probably  larger  by  adopting  the  plan  of  making 
our  own  engines  than  by  employing  a  manufacturer.     It  is  true  we 
shall  have  some  valuable  and  costly  tools  and  shops  included  in 
this  outlay,  and  a  fine  establishment  formed,  which  may  be  rendered 
fully  competent  in  point  of  means  to  continue  the  manufacture  of 
engines  for  others,  and  to  keep  up  the  repairs  of  any  number  of 
engines  which  the  Company  are  likely  to  have  at  work.     My  only 
fear  would  be  that  of  the  risk  of  the  undertaking  being  too  great  for 
a  newly-formed  establishment.     The  making  of  the  vessel  itself  is 
no  mean  effort,  and  to  superadd  the  construction  of  the  largest  pair 
of  engines  and  boilers  yet  made,  and  upon  a  new  plan,  is  calculating 
very  much  upon  every  effort  being  successful,  and  particularly  upon 
the  continued  assistance  of  those  who  have  hitherto  attended  to  the 
subject;  as  it  must  be  well  known  to  the  Directors  that  if  Mr.  Guppy, 
for  instance,  should  be  prevented  from  giving  his  time  as  he  has 
hitherto  done,  or  if  Mr.  Humphry s  should,  from  illness  or  other 
causes,  leave  us,  the  manufactory  would  be  brought  to  a  stand,  and 
the  loss  would  be  serious.     I  have  no  wish  to  deter  the  Company 
from  becoming  their  own  manufacturers — I  think  it  a  course  which 
must  ultimately  be  adopted  if  the  Company  thrive — but  I  should  have 
much  preferred  that  it  had  been  adopted  gradually,  that  we  had 
commenced  with  a  vessel,  and  then  proceeded  with  boilers  and  re- 
pairs ;  and,  as  our  establishment  became  formed  and  matured,  and 
when  we  might  no  longer  depend  entirely  upon  the  engineering 
talents  and  assistance  of  one  Director,  who  may  be  unable  to  attend 
to  it,  or  upon  the  health  of  one  superintendent  who,  as  yet,  is  alone 
in  possession  of  all  our  plans  and  ideas,  and  at  present  is  alone 
capable  of  carrying  them  out,  we  might  then  have  ventured  upon 
making  the  engines  perhaps  for  the  third  vessel.      Circumstances 
may,  however,  render  it  necessary  that  we    should  proceed  more 
expeditiously,  and  I  am  only  anxious  that  the  Directors  should  be 
aware  of  the  difficulties  that  we  may  have  to  encounter,  and  that 
they  should  not  form  expectations  as  regards  economy  in  which  they 
may  be  disappointed.     The  result  of  the  best  consideration  I  have 
been  able  to  give  to  it  is,  that  the  question  does  not  seem  to  be 
one   of  cost.     In   that   respect,   according   to  my  view,  the   two 
modes  of  proceeding  would  be  nearly  balanced,  but  it  resolves  itself 
into  the  following  question: — Is  it  better  in  our  present  position  to 


252  THE  '  GEEAT  BEITAIN '  STEAM-SHIP.        [a.d.  1839. 

enter  at  once  uppn  the  manufacture  of  the  engines  and  boilers,  in 
doing  which  we  shall  in  part  repay  the  cost  of  tools  and  shops, 
which  must  eventually  be  required,  and  by  which  we  shall  be  more 
independent,  and  more  capable  of  expediting  the  works,  should  it 
become  desirable  to  incur  any  additional  expense  for  that  purpose, 
or  to  throw  all  the  responsibility  and  risk  on  another  party  or  con- 
tractor— the  vessel,  for  which  we  could  not  easily  contract,  being 
still  made  in  the  Company's  yard  ? 

I  have  thus  reduced  the  question  to  that  state  in  which  I  can  offer 
no  further  opinion  or  advice ;  it  is  now  for  you  to  determine.  The 
question  is  one  which  has  frequently  to  be  decided  upon  by  the 
Directors  of  public  works;  it  is  very  much  a  matter  of  feeling, 
but  it  is  simplified  in  the  present  instance  by  the  circumstance 
that  the  expense  in  either  case  will  be,  to  my  view  at  least,  about 
the  same,  and  the  work,  I  have  no  doubt,  equally  good  in  either 
case. 

Upon  this  point,  as  perhaps  upon  the  subject  of  cost,  I  have 
no  doubt  there  will  be  some  difference  of  opinion.  It  will  be 
said  that  the  work  done  under  our  own  superintendence  can  be 
more  relied  upon  than  the  work  of  a  manufacturer,  and  that  even 
in  the  engines  of  the  *  Great  Western '  steam-  ship,  coming  from 
one  of  the  most  experienced  manufacturers,  many  defects  may  be 
pointed  out. 

I  shoiild  agree  fully  with  both  these  arguments,  but  I  think  these 
advantages  are  fully  counterbalanced  by  that  of  the  experience  in  all 
the  details  which  is  brought  into  operation  in  an  old-established 
manufactory,  and  the  great  relief  from  responsibility  and  risk  ob- 
tained by  contracting  for  the  whole  work. 

The  Directors  having  determined  to  make  the  engines, 
erected  shops  and  fitted  them  up  with  proper  tools.  The 
services  rendered  to  them  by  Mr.  Brunei  at  this  period 
were  fully  acknowledged  at  the  next  meeting  of  the 
shareholders.^ 

'  It  is  interesting,  in  connection  To  accomplish  this  forging  Mr. 
with  this  subject,  to  mention  the  fol-  Nasmyth  designed  his  steam-ham- 
lowing  circumstance.  At  Mr.  Brunei's  mer,  and  though  it  was  not  then 
recommendation,  Mr.  Humphrys  con-  erected  in  Bristol,  in  consequence  of 
suited  Mr.  James  Nasmyth  as  to  the  the  alteration  of  the  form  of  the 
best  means  of  forging  the  large  engines  of  the  'Great  Britain,'  it 
paddle-shaft ;  as  they  could  not  get  soon  afterwards  came  into  general 
any   manufacturer    to   undertake   it.  use. 


^T.  84.]  THE  '  ARCHIMEDES.'  253 

Mr.  Brunei's  attention  was  now  anxiously  devoted  to 
the  consideration  of  tlie  numerous  questions  involved  in 
the  construction  of  the  ship  and  her  engines;  and,  in  order 
to  obtain  reliable  information  on  many  points,  he  sent  one 
of  his  assistants,  Mr.  Berkeley  Claxton,  in  the  *  Great 
*  Western.'  His  sole  occupation  during  six  voyages  Avas 
to  note  the  amount  of  rolling  and  pitching,  and  the  exact 
performance  of  her  engines,  with  the  effect  of  the  use  of 
the  expansion  valves  on  her  speed,  and  on  the  consumption 
of  fuel.  These  reports  furnished  Mr.  Brunei  with  in- 
formation which  was  of  great  value,  especially  when, 
shortly  afterwards,  he  advised  the  Directors  to  adopt  the 
screw  propeller  instead  of  paddlewheels. 

The  circumstances  which  led  to  the  adoption  of  the 
screw  propeller  in  the  '  Great  Britain '  instead  of  paddle- 
wheels  were  as  follows: — 

In  the  early  part  of  the  year  1840,  the  performances  of 
the  '  Archimedes  *  steamer  began  to  attract  the  attention 
of  scientific  men.  This  vessel,  which  was  fitted  with  the 
screw  propeller  patented  by  Mr.  Francis  Pettitt  Smith, 
arrived  at  Bristol  in  May.  A  few  trips  were  made  up  and 
down  the  Float,  but  the  advantages  of  the  screw  propeller 
were  not  fully  appreciated  by  those  to  whom  they  were 
explained. 

But  Mr.  Guppy,  who  had  attended  some  of  these  trials, 
went  round  in  the  ship  to  Liverpool.  On  his  return 
he  made  a  report  to  the  Building  Committee,  and  the 
Directors,  on  Mr.  Brunei's  advice,  passed  a  resolution 
delaying  the  progress  of  the  engines  of  the  '  Great  Britain,' 
and  of  those  parts  of  the  frame  which  would  be  affected  by 
any  change  of  plans.  Mr.  Brunei  was  also  requested  by 
them  to  give  his  attention  to  the  question  of  the  adoption 
of  the  screw,  and  to  report  thereon. 


254  THE   'GEEAT  BEITAIN'  STEAM-SHIP.        [a.d.  1840. 

During  the  next  three  months  experiments  were  made 
by  Mr.  Brunei,  assisted  bj  Mr.  Guppy  and  Captain 
Claxton,  on  the  screw  propeller  in  the  '  Archimedes.' ' 
These  experiments  afforded  ample  opportunity  of  trying 
the  performances  of  several  forms  of  screws.^ 

On  October  1,  Mr.  Broinel  attended  a  special  meeting  of 
the  Board,  and  read  and  explained  a  report  he  had  drawn 
up,  in  which  he  laid  before  the  Directors  at  great  length 
the  results  of  the  different  experiments  he  had  made,  and 
the  advantages  which  he  believed  would  attend  the  use  of 
the  screw  propeller.'  A  resolution  was  passed  adopting  it 
for  the  '  Great  Britain.' 

Mr.  Brunei  at  first  thought  that  he  would  be  able  to 
retain  the  form  of  engines  which  had  been  originally 
determined  on  for  working  the  paddle  wheels;  but,  on  con- 
sideration, this  was  found  impracticable.  As  the  Com- 
pany had  by  this  time  erected  complete  engine  works,  there 
could  now  be  no  question  as  to  their  undertaking  the  con- 
struction of  the  new  description  of  engines  required  for 
working  the  screw  propeller.^ 

Mr.  Humphrys  resigned  the  post  of  superintendent  of 
the  works,  and  Mr.  Harman  was  appointed  assistant  engi- 
neer under  Mr.  Guppy,  to  whom  the  Directors,  on  the 
advice  of  Mr.  Brunei,  entrusted  the  supreme  control  of 
their  manufacturing  establishment. 

The  duties  and  responsibilities  which  devolved  on  the 
Building  Committee — Captain  Claxton,  Mr.  Guppy,  and 
Mr.  Brunei  —  were  most  arduous.     To  design  and  con- 

'  In  the  Minute  Book  of  this  date  dix  II.    p.  539.     The  paragraphs  in 

it  is  mentioned  as  a  reason  for  post-  which  Mr.  Brunei  describes  the  ad- 

poning  any  decision  on   the  subject,  vantages  of  tlie  screw  propeller  will 

that  Mr.  Brunei  was  making  '  final,'  be  found  at  page  552j_ 
and  afterwards  '  further,'  experiments.  *  A  description  of  Mr.  Humphrys* 

*  See  Mr.  Guppy's  paper,  printed  trunk  engines  is  given  in  Tredgold's 

in  the   Proceedings  of  the  Institution  work  on  the  steam  engine  (ed.  1838), 

of  Civil  Engineers  for  1845,  p.  151.  p.  390. 

'  This  report  is  printed  in  Appen- 


XT.  35.]        ADOPTION  OF  THE  SCEEW  PROPELLER.  255 

struct  a  steam-ship  larger  than  any  that  had,  up  to  that 
time,  been  launched,  to  make  this  ship  of  a  material 
which  had  but  lately  been  introduced  into  shipbuilding, 
and  which  had  never  before  been  employed  on  a  large 
scale,  to  adapt  to  this  ship  a  novel  form  of  propeller  which 
had  not  previously  been  used  save  in  a  merely  experi- 
mental steamer,  and  to  build  in  a  newly  opened  manu- 
factory marine  engines  of  a  much  greater  size  than  any 
that  had  hitherto  been  contemplated,  and  of  a  totally  dif- 
ferent character,  was  indeed  a  bold  enterprise.  Mr.  Brunei 
had,  as  has  been  shown,  recommended  the  Company  not 
to  undertake  one  part  of  the  work,  that,  namely,  of  the 
manufacture  of  the  engines,  which  he  thought  would  have 
been  better  entrusted  to  the  most  experienced  engine 
builders.  But  although  the  Directors  had  acted  contrary 
to  his  advice,  this  circumstance  in  no  way  diminished  the 
zeal  with  which  he  and  his  coadjutors  entered  upon  their 
task. 

A  short  statement  of  the  principal  dimensions  of  the 
vessel  and  engines  is  given  in  a  note  to  this  chapter  ;  but 
some  of  the  more  remarkable  features  in  the  design  may 
be  mentioned  here. 

In  the  construction  of  the  *  Great  Britain,'  the  same 
care  which  had  been  spent  in  securing  longitudinal 
strength  in  the  Wooden  hull  of  the  *  Great  Western,' 
was  now  given  to  the  suitable  distribution  of  the  metal. 
Over  the  transverse  angle  iron  ribs  at  the  bottom  of  the 
ship  were  laid  ten  deep  longitudinal  beams  (see  woodcut, 
fig.  13,  a),  which,  over  the  greater  part  of  the  bottom  of  the 
ship,  were  covered  with  an  iron  deck  (h)  riveted  to  their 
upper  edges  by  angle  irons,  thus  forming  a  cellular  struc- 
ture which  added  greatly  to  the  strength  of  the  ship.  It 
does  not  appear  that  this  deck  was  designed  to  be  water- 
tight, so  that  it  did  not  form  the  same  security  against 


256  THE  'GEEAT  BKITAIN'  STEAM-SHIP,        [a.d.  1840. 

accident  as  tlie  inner  skin  of  tlie  cellular  structure 
wiiich  Mr.  -  Brunei  afterwards  adopted  in  the  '  Great 
*  Eastern.'- 

The  upper  part  of  the  sides  of  the  ship,  in  the  middle 
of  her  length,  were  carefully  designed  so  as  to  give  her 
longitudinal  strength.  The  side  plates  were  thickened, 
and  were  riveted  to  iron  shelf-plates  three  feet  broad  (c) ; 
and  two  bands  of  iron,  six  inches  wide  and  one  inch  thick, 
with  the  joints  strengthened,  ran  along  the  top  of  the 
ship's  side.  There  were  bands  of  iron  riveted  to  the 
shelf-plate,  and  iron  deck  beams  crossed  diagonally  under 
the  planking  of  the  upper  and  main  decks.  Also  at 
the  junction  of  the  ship's  side  with  the  shelf-plate  there 
ran  longitudinally  a  tie  of  Baltic  pine  timber,  340  square 
inches  in  section  [d) ;  this  being  well  secured  to  the 
shelf-plate  and  ribs,  added  considerably  to  the  strength  of 
this  portion  of  the  hull. 

The  ship  had  five  watertight  bulkheads,  and  was  thus 
separated  into  six  compartments. 


y...,f,...f 


ScaU  of  feet. 

Fig.  13.    '  Great  Britain'  Steam-Ship. 

Transverse  Section. 


She  had  no  keel,  as  there  did  not  appear  to  be  sufficient 
advantage  gained  by  such  an  appendage  to  make  up  for 
the  increase  of  the  ship's  draught  by  the  amount  of  the 


jer.  35.]  CONSTRUCTION  OF  THE  SHIP.  257 

depth  of  the  keel.  There  were  two  side  or  bilge  keels  (e), 
reaching  down  to  the  level  of  the  keel  plate  of  the  ship, 
so  that  when  gi'ounded  in  dock  she  might  rest  on  three 
points  in  her  width. 

The  '  Great  Britain '  had  what  is  termed  a  balanced 
rudder,  a  portion  of  the  rudder  (in  this  case  about  one 
third)  being  in  advance  of  the  pivot  on  which  it  turned. 
The  result  of  this  arrangement  was  that,  the  pressures  on 
either  side  of  the  pivot  nearly  balancing  one  another,  there 
was  no  difficulty  in  putting  the  helm  over  rapidly.  This 
rudder  was  knocked  away  when  the  ship  ran  ashore  at 
D  and  rum,  and  was  subsequently  replaced  by  an  ordinary 
rudder.^ 

In  the  construction  of  the  hull  of  the  ship,  instead  of 
a  mere  imitation  of  the  arrangements  of  the  timber  in 
wooden  ships,  the  proper  distribution  of  the  material  to 
receive  the  strains  that  would  come  upon  it  was  carefully 
considered.  In  the  result,  the  ship  contained,  in  the 
structure  of  her  bottom,  bulkheads,  deck  shelves,  and 
longitudinal  kelsons,  the  longitudinal  principle  of  con- 
struction which  Mr.  Brunei  afterwards  so  fully  developed 
in  the  '  Great  Eastern.' 

Apart  from  their  size,  the  design  of  the  engines  of 
the  '  Great  Britain '  necessarily  presented  many  pecu- 
liarities. The  boilers,  which  were  six  in  number,  were 
placed  touching  each  other,  so  as  to  form  one  large  boiler 
about  thirty-three  feet  square,  divided  by  one  transverse 
and  two  longitudinal  partitions.  This  boiler,  which  was 
fitted  in  between  the  longitudinal  bulkheads  of  the  ship, 
had  a  double  set  of  furnaces,  and  therefore  of  stoke-holes, 

'  The   balanced  rudder,   which   is      duced  by  Mr.  E.  J.  Reed,  C.B.,  into 
peculiarly  applicable  to  screw  ships,       vessels  designed  by  him  for  the  Royal 
has  encountered  much  opposition  ;  but       Navy, 
it  has  lately  been  successfully  intro- 

S 


258  TnE  '  GREAT  BRITAIN '  STEAM-SHIP.        [a.d.  1840. 

one  at  the  fore  end,  and  the  other  at  the  after  end,  next 
the  engine  room. 

It  would  seem  that  the  boiler  was  only  worked  with  a 
pressure  of  about  eight  pounds  on  the  square  inch. 

The  feed  water  for  the  boiler  was  passed  through  a 
casing  surrounding  the  funnel,  in  which  it  was  heated 
before  passing  into  the  boiler.  This  casing  was  open  at 
the  top,  and  the  water  flowed  thence  into  the  boiler  by- 
gravitation.  A  similar  arrangement  was  adopted  by  Mr. 
Brunei  in  the  '  Great  Eastern.' 

The  condensers  were  made  of  wrought  iron,  being  in 
fact  part  of  the  frame  of  the  ship.  The  main  shaft  of 
the  engine  had  a  crank  at  either  end  of  it,  and  was  made 
hollow,  a  stream  of  water  being  kept  running  through  it 
so  as  to  prevent  heating  in  the  bearings.  An  important 
point  in  the  design  was  the  method  by  which  the  motion 
was  transmitted  from  the  engine-shaft  to  the  screw-shaft, 
for  the  screw  was  arranged  to  go  three  revolutions  to 
each  revolution  of  the  engines.  Where  the  engines  do 
not  drive  the  screw  directly,  this  is  now  universally 
effected  by  means  of  toothed  gearing ;  but,  when  the 
engines  of  the  '  Great  Britain '  were  made,  it  was  thought 
that  this  arrangement  would  be  too  jarring  and  noisy. 
After  much  consideration,  chains  were  used,  working 
round  different-sized  drums  with  notches  in  them,  into 
which  fitted  projections  on  the  chains.  The  greater  part 
of  the  length  of  the  screw-shaft  consisted  of  a  hollow 
wrought-iron  boiler-plate  tube,  the  metal  being  thus  very 
advantageously  placed  for  taking  torsional  strain,  and 
the  shaft  was  in  this  way  made  very  light.  The  engines 
were  designed  to  work  expansively,  the  steam  being  cut 
off  at  one-sixth  of  the  stroke. 

The  completion  of  the  *  Great  Britain '  was  delayed 
many  months,  owing  to  the  financial  difficulties  in  which 


JET.  35.]  COMPLETION  OF  THE  SHIP.  259 

the  Great  Western  Steam- Ship  Company  had  become 
involved ;  the  profit  on  working  the  '  Great  Western ' 
having  been  seriously  diminished  in  consequence  of  the 
competition  of  the  Cunard  steamers. 

At  length,  however,  the  ship  was  finished;  and  she 
was  floated  out  of  dock  into  the  Floating  Harbour  on 
July  19,  1843,  in  the  presence  of  His  Eoyal  Highness 
Prince  Albert. 

This  seems  a  fitting  place  to  insert  the  following  letter 
from  Mr.  Brunei  to  Mr.  Guppy,  written  at  the  beginning 
of  August  1843:— 

I  have  been  thinking  a  great  deal  of  your  plans  for  iron-ship 
building,  and  have  come  to  a  conclusion  which  I  believe  agrees  with 
your  ideas ;  but  I  will  state  mine  without  reference  to  yours.  At 
'bottom  and  at  top  I  would  give  longitudinal  strength  and  stiffness, 
gaining  the  latter  by  the  former,  [Fig.  u.\ 

so  that  all  the  metal  used  should  ..j^  ==«=.-_- 

add   to    the    longitudinal    tie,      F  '\ 

while  in  the  neutral   axis  and     E— — —-.J 

along  the  sides,  and   to  resist    [I  | 

swells  from  seas,  I  would  have     V..,—- — J 

vertical    strength  by  ribs   and      \  J 

shell -pieces,   thus :    the    black         ^^'-        ■        ■ • p     .^'^^ 

lines   being   sections  of  longi-  ^"^•l*.^^ i^*^ 

tudinal  pieces,  the  dotted  lines 

vertical  and  transverse  diagonal  plates,  throwing  the  metal  as 
much  as  possible  into  the  outside  bottom  plates,  and  getting  the 
strength  inside  by  form,  that  is,  depth  of  beams,  &c.,  the  former 
being  liable  to  injury  from  blows,  &c.,the  latter  being  protected. 

And  now  for  the  screw  of  which  I  am  constantly  thinking,  and  in 
the  success  of  which  for  the '  Great  Britain,'  remember,  I  am  even  moro 
deeply  interested  than  you. 

If  all  goes  well  we  shall  all  gain  credit,  but  *  quod  scriptnm  est 
manet^  if  the  result  disappoint  anybody,  my  written  report  will  be 
remembered  by  everybody,  and  I  shall  have  to  bear  the  storm — 
and  all  that  spite  and  revenge  can  do  at  the  Admiralty  will  be  done ! 
The  words  '  better  sailing  qualities  than  could  be  given  to  the 
' "  Polyphemus," '  which  I  used  in  my  first  report  to  the  Admiralty, 
I  believe  have  never  been  forgotten. 

s  2 


260  THE   'GKEAT   BKITAIN'  STEAM-SHIP.         [a.d.  1813. 

"Well,  the  result  of  all  my  anxious  thouglits— for  I  assure  you  I  feel 
more  anxious  about  this  than  about  most  things  I  have  had  to  do 
with — is  first  that  we  must  adopt  as  a  'principle  not  to  be  departed 
from,  that  all  mechanical  difficulties  of  construction  must  give 
way,  must  in  fact  be  lost  sight  of  in  determining  the  most  perfect 
form — if  we  find  that  the  screw  determined  upon  cannot  be  made 
(but  what  cannot  be  done?),  then  it  is  quite  time  enough  to  try 
another  form  ;  though  even  then  my  rule  would  be  to  try  again  at 
making  it.  .     . 

The  *  Great  Britain  '  w^as  built  wider  tlian  the  locks 
through  which  she  would  have  to  pass,  as  it  was  supposed 
that  the  Dock  Company  would  allow  them  to  be  tem- 
porarily widened.' 

After  a  good  deal  of  discussion,  negotiations  were  satis- 
factorily concluded,  and  the  requisite  alterations  were 
made :  the  ship  passed  through  into  Cumberland  Basin, 
and  the  upper  lock  was  restored  to  its  original  state  in 
a  few  days. 

On  December  10,  everything  was  ready  for  her  passing 
into  the  Avon  through  the  lower  lock.  A  steam-tug 
commenced  towing  her  at  high  water,  but,  before  she 
had  moved  half  her  length  in  the  lock,  it  became  evident 
to  Captain  Claxton,  who  was  on  board  the  tug,  that 
there  was  not  an  inch  to  spare;  she  was  touching  the 
lock  walls  on  either  side— in  fact,  she  had  stuck  between 
the  copings.  Upon  this  he  gave  orders  to  haul  her  back 
again  as  quickly  as  possible.  This  was  hardly  effected 
before  the  tide  began  to  fall ;  a  few  minutes  later,  and 
the  ship  would  have  remained  jammed  in  the  entrance. 

As  the  tides  had  passed  their  highest,  it  was  necessary 
immediately  to  widen  the  lock,  in  order  not  to  lose  the 

'  It  maybe  convenient  here  to  state  channel  of  the  river  Avon  closed  in. 

that   the  dock  in  which  the  'Great  The  Floating  Harbour  communicates 

'  Britain '  was  built  led  into  the  Float-  through  the  Cumberland  Basin  with 

ing  Harbour,  which  is  a  portion  of  the  the  river. 


^:t.  38.]  DEPAKTURE  FROM  BRISTOL.  261 

spring  tide ;  and  this  was  accomplished  under  Mr.  Brunei's 
superintendence,  just  in  time  to  get  the  vessel  through 
that  night. 

Mr.  Brunei  described  this  occurrence  in  the  following 
letter,  written  to  excuse  himself  from  keeping  an  impor- 
tant engagement  in  Wales  : — 

December  11,  1844. 

We  have  had  an  unexpected  difficulty  with  the  *  Great  Britain  ' 
this  morning.  She  stuck  in  the  lock ;  we  did  get  her  back.  I 
have  been  hard  at  work  all  day  altering  the  masonry  of  the  lock. 
To  night,  our  last  tide,  Ave  have  succeeded  in  getting  her  through; 
but,  being  dark,  we  have  been  obliged  to  ground  her  outside,  and  I 
confess  I  cannot  leave  her  till  I  see  her  afloat  again,  and  all  clear  of 
her  difficulties.  1  have,  as  you  will  admit,  much  at  stake  here,  and 
,  I  am  too  anxious  about  it  to  leave  her. 

The  *  Great  Britain,'  after  making  several  experimental 
trips,  sailed  for  London  on  January  23, 1845,  and,  although 
she  experienced  very  severe  weather,  made  an  average 
speed  of  12^  knots  an  hour. 

The  excitement  caused  by  her  arrival  at  Blackwall  was 
very  great.  Thousands  of  persons  flocked  to  see  her,  and 
she  was  honoured  by  a  visit  from  Her  Majesty  and  His 
Royal  Highness  Prince  Albert. 

She  left  Liverpool  on  her  first  voyage  on  August 
26,  and  arrived  at  New  York  on  September  10,  having 
made  the  passage  out  in  fourteen  days  and  twenty-one 
hours.  She  made  her  return  passage  in  fifteen  days  and 
a  half. 

She  started  again  in  October,  taking  sixteen  days  and 
a  half  across.  On  her  homeward  passage,  she  broke 
her  screw,  and  got  home  under  canvas  after  eighteen 
days  of  rough  weather  which  fully  tested  her  sailing 
qualities. 

The  experience  of  these  voyages  showed  that  the  supply 
of  steam  from  the  boilers  was  defective ;   the  necessary 


262  THE  'GREAT  BRITAIN'  STEAM-SHIP.        [a.d.  1846. 

alterations  were  carried  out  during  the  winter  months,  and 
the  ship  was  fitted  with  a  new  screw. 

In  the  Beginning  of  1846,  everything  seemed  to  promise 
well  for  the  success  of  the  '  Great  Britain.'  She  started 
on  May  9,  with  her  full  complement  of  passengers  and 
cargo,  but  again  an  accident  happened,  which  prevented 
this  passage  from  affording  a  trial  of  her  steaming  power. 
On  May  13,  the  guard  of  the  after  air-pump  broke ; 
but  up  to  that  time  her  speed  had  averaged  eleven  and 
three-quarters  knots. 

She  returned  from  New  York  in  thirteen  days  and  six 
hours,  against  adverse  winds  for  ten  days,  with  a  speed 
varying  from  eight  and  a  half  to  twelve  knots.  On  one  day 
of  her  voyage,  June  13,  she  ran  330  knots  in  the  twenty- 
four  hours,  or  nearly  sixteen  statute  miles  an  hour.  This 
was  said  to  have  been  the  quickest  passage  which  had,  up  to 
that  time,  been  made  under  similar  circumstances  of  wind 
and  weather. 

She  left  Liverpool  again  at  the  beginning  of  July,  and 
arrived  at  New  York  in  thirteen  days  and  eight  hours,  or, 
deducting  stoppages,  in  twelve  days  and  eleven  hours — 
the  shortest  passage  then  and  for  some  time  afterwards 
recorded.  Her  homeward  passage  was  accomplished  in 
thirteen  days,  including  a  stoppage  of  eighteen  hours  to 
repair  the  driving  chains  which  had  been  damaged. 

She  started  again  from  Liverpool  on  her  outward  voyage 
on  the  morning  of  September  22,  1846,  having  on  board 
180  passengers  (a  larger  nximber  than  had  ever  before 
started  to  cross  the  Atlantic  in  a  steamer),  and  a  con- 
siderable quantity  of  freight.  A  few  hours  after  her 
departure,  and  at  a  time  when  it  was  supposed  that  she 
was  rounding  the  Isle  of  Man,  the  ship  ran  ashore,  and 
all  immediate  efforts  to  get  her  off  were  unavailing. 
When  daylight  came,  the  captain  found,  to  his  surprise. 


XT.  41.]  STKANDING  IN   DUNDKUM  BAY.  263 

that  slie  was  in  Dundruni  Bay,  on  tlie  north-east  coast 
of  Ireland.  The  passengers  were  landed  safely  when  the 
tide  ebbed. 

Captain  Claxton,  the  managing  Director  of  the  Com- 
pany, went  at  once  to  the  ship.  He  found  her  lying  at 
the  bottom  of  a  deep  and  extensive  bay ;  the  ground  on 
which  she  rested  had  an  upper  surface  of  sand,  but  under- 
neath this  were  numerous  detached  rocks.  The  ship  had 
settled  down  upon  two  of  them,  and  had  knocked  holes  in 
her  bottom.  Her  head  lay  NW.,  leaving  her  stern  and 
port  quarter  exposed  to  a  heavy  sea,  which,  at  Dundrum, 
always  accompanies  southerly  gales. 

When  Captain  Claxton  got  to  the  ship,  he  made  arrange- 
ments for  trying  to  get  her  off  at  the  next  spring  tides, 
which  were  on  the  following  Monday  (September  28) ;  but 
on  the  Sunday,  a  gale  of  wind  from  the  southward  sprung 
up,  and  at  the  night  flood-tide  the  water  broke  over 
her ;  nothing  remained  to  be  done  but  to  drive  the  ship 
higher  up  the  beach  into  a  position  of  greater  safety. 
Sails  were  therefore  set,  and  she  was  driven  forward  a 
considerable  distance. 

Mr.  Patterson  was  sent  by  the  Directors  to  Dundrum 
with  Mr.  Alexander  Bremner  (who  had  had  considerable 
experience  in  floating  stranded  ships),  and  they  endea- 
voured to  protect  the  vessel  by  breakwaters.  These, 
however,  were  soon  carried  away;  and,  after  this  mis- 
fortune, the  Directors  seem  for  a  time  to  have  lost  all 
hope  of  saving  their  ship. 

On  December  8,  when  the  immediate  pressure  of  Par- 
liamentary work  was  over,  Mr.  Brunei  went  to  Dundrum, 
having  some  time  before  been  requested  by  the  Directors 
and  underwriters  to  examine  and  report  on  the  ship. 
He  was  delighted,  he  said,  in  spite  of  all  the  discouraging 
accounts  he  had  received,  to   find  the    'Great  Britain' 


264  THE  'GEEAT  BEITAIN'   STEAM-SHIP.         [a.d.  1846. 

*  almost  as  sound  as  the  day  she  was  launched,  and  ten 
'  times  stronger  and  sounder  in  character,'  though  at  the 
same  time  Jbe  was  grieved  to  see  her  *  lying  unprotected, 

*  deserted,  and  abandoned.' 

Whatever  may  have  been  the  misgivings  of  others,  he 
felt  no  doubt  as  to  the  possibility  of  saving  the  ship,  by  at 
once  protecting  her  by  a  breakwater  made  of  fagots ;  and 
before  he  left  Dundrum  he  set  Captain  Hosken  at  work  at 
the  new  arrangements,  and  he  guaranteed  the  immediate 
expense  in  the  event  of  the  Directors  not  sanctioning 
the  measure. 

Immediately  on  his  return  to  town,  he  wrote  the  fol- 
lowing somewhat  vigorous  letter  to  Captain  Claxton  : — 

December  10,  1846. 
I  have  returned  from  Dundrum  with  very  mixed  feelings  of  satis- 
faction and  pain,  almost  amounting  to  anger,  with  whom  I  don't 
know.  I  was  delighted  to  find  our  fine  ship,  in  spite  of  all  the 
discouraging  accounts  received,  even  from  you,  almost  as  sound  as 
the  day  she  was  launched,  and  ten  times  stronger  and  sounder  in 
character.  I  was  grieved  to  see  this  fine  ship  lying  improtected, 
deserted  and  abandoned  by  all  those  who  ought  to  know  her  value, 
and  ought  to  have  protected  her,  instead  of  being  humbugged  by 
schemers  and  underwriters.  Don't  let  me  be  understood  as  wishing 
to  read  a  lecture  to  our  Directors ;  but  the  result,  whoever  is  to 
blame,  is,  at  least  in  my  opinion,  that  the  finest  ship  in  the  world, 
in  excellent  condition,  such  that  4,000/.  or  5,000/.  would  repair  all 
the  damage  done,  has  been  left,  and  is  lying,  like  a  useless  saucepan 
kicking  about  on  the  most  exposed  shore  that  you  can  imagine,  with 
no  more  effort  or  skill  applied  to  protect  the  property  than  the  sjiid 
saucepan  would  have  received  on  the  beach  at  Brighton.  Does  the 
ship  belong  to  the  Company?  For  protection,  if  not  for  removal,  is 
the  Company  free  to  act  without  the  underwriters  ?  If  we  are  in  this 
position,  and  if  we  have  ordinary  luck  from  storms  for  the  next  three 
weeks,  I  have  little  or  no  anxiety  about  the  ship  ;  but  if  the  Company 
is  not  free  to  act  as  they  like  in  protecting  her,  and  in  preventing 
oTir  property  being  thrown  away  by  trusting  to  schemers,  then  please 
write  oflf  immediately  to  Hosken  to  stop  his  proceeding  with  my 
plans,  because  I  took  the  pecuniary  responsibility  of  the  cost  of  what 


iET.  41.]  LETTER   ON   CONDITION   OF  THfe  SHIP.  265 

I  ordered  until  lie  could  hear  from  you,  and  of  course  I  do  not  want 
to  incur  useless  expense,  but  still  more  I  do  not  w  ish  any  proceeding 
taken  as  from  me  to  be  afterwards  stopped.  I  will  now  describe 
as  nearly  as  I  can  what  I  have  seen,  and  what  I  think. 

As  to  the  state  of  the  ship,  she  is  as  straight  and  as  sound  as  she 
ever  was,  as  a  wliole.  She  is  resting  and  working  upon  rocks,  which 
have  broken  in  at  several  places,  and  forced  up  perhaps  12  to  18 
inches  many  parts  of  the  bottom,  from  the  fore  stoke-hole  to  about 
the  centre  of  the  engines,  lifting  the  boilers  about  15  inches  and 
the  condenser  of  the  fore  engine  about  6  or  8  inches ;  the  after-con- 
denser, perhaps,  half  an  inch.  The  lifting  of  the  fore-condenser  has 
broken  that  air-pump,  the  connecting  rod  having  been  unwisely  left 
in,  and  the  crank  being  at  the  bottom  of  the  stroke.  Of  course  the 
air-pump  could  not  help  being  broken;  except  this,  the  whole  vessel, 
machinery,  &c.,  are  perfect.  I  told  you  that  Hosken's  drawing  was  a 
proof,  to  my  eye,  that  the  ship  was  not  broken  :  the  first  glimpse 
■  of  her  satisfied  me  that  all  the  part  above  her  5  or  6  feet  water 
line  is  as  true  as  ever.  It  is  beautiful  to  look  at,  and  really  how 
she  can  be  talked  of  in  the  way  she  has  been,  even  by  you,  I 
cannot  understand.  It  is  positively  cruel ;  it  wovdd  be  like  talking 
away  the  character  of  a  young  woman  without  any  grounds  what- 
ever. 

The  ship  is  perfect,  except  that  at  one  part  the  bottom  is  much 
bruised,  and  knocked  in  holes  in  several  places.  But  even  within 
three  feet  of  the  damaged  part  there  is  no  strain  or  injury  whatever. 
I  think  it  very  likely  that  she  may  have  started  leaks  where  she  has 
been  pounding  away  upon  the  rocks,  but  nothing  more ;  and  as  I  «iid 
before,  all  above  her  5  or  6  feet  water  line  is  uninjured,  except  her 
overhanging  stern  ;  there  is  some  slight  damage  to  this,  not  otherwise 
important  than  as  pointing  out  the  necessity  of  some  precautions  if 
she  is  to  be  saved.  I  say  '  if,'  for  really  when  I  saw  a  vessel  still  in 
perfect  condition  left  to  the  tender  mercies  of  an  awfully  exposed 
shore  for  weeks,  while  a  parcel  of  quacks  are  amusing  you  with 
schemes  for  getting  her  off,  she  in  the  meantime  being  left  to  go 
to  pieces,  I  could  hardly  help  feeling  as  if  her  own  parents  and 
guardians  meant  her  to  die  there. 

Why,  no  man  in  his  senses  can  dream  of  calculating  upon  less  than 
three  months  for  the  execution  of  any  rational  scheme  of  getting  her 
off;  and  no  man  in  his  senses,  I  should  think,  would  dream  of  taking 
her  across  the  channel  in  the  winter  months,  even  if  he  had  got 
the  camels  or  floats  fast.  Of  this  I  don't  feel  so  competent  to  foma 
an  opinion,  though  I  think  I  can  judge,  and  I  should  consider  it  a 


266  THE  'GREAT  BRITAIN'  STEAM-SHIP.        [a.d.  1846. 

wanton  throwing  away  of  my  shares  if  the  Directors  allowed  her  to  be 
taken  out,  eves  if  afloat ;  but  at  all  events  I  am  competent  to  judge 
of  the  probable  time  occupied  in  getting  means  to  float  her,  and  I 
maintain  thalt  it  would  be  absurd  to  calculate  upon  less  than  two  or 
three  months.  It  is  not  therefore  the  mode  of  getting  her  off  that 
we  ought  to  have  been  all  this  time  thinking  of,  but  how  to  keep  her 
where  she  is.  I  feel  so  strongly  on  this  point  that  I  feel  quite  angry. 
What  are  we  doing  ?  What  are  Ave  wasting  precious  time  about  ? 
The  steed  is  being  quietly  stolen  while  we  are  discussing  the  relative 
merits  of  a  Bramah  or  a  Chubb's  lock  to  be  put  on  at  some  future 
time  !     It  is  really  shocking. 

Having  expended  a  little  of  my  feeling,  I  will  tell  you  what  I  have 
done,  and  what  I  should  recommend. 

First,  instantly  to  disconnect  the  engines  and  air-pumps,  and  remove 
all  the  working  gear,  so  at  least  to  leave  the  mischief  to  the  lower 
part.  By  the  bye,  the  cylinders  are  not  disturbed  or  hurt  in  any  way 
at  present,  but  with  the  engines  exactly  at  the  bottom  of  the  stroke, 
and  the  connecting  rods  on,  it  is  a  wonder  they  are  not.  If  the  air- 
pump  had  been  disconnected  it  would  not  have  been  broken.  I 
have  taken  upon  myself  to  order  this. 

Secondly,  I  suggested  to  Hosken,  in  which  he  quite  agreed  with 
me,  to  take  off  all  strain  from  her  extreme  stern.  At  present  she 
has  cables  out  from  this  prodigious  mass  overhanging  nearly  30  feet 
from  any  part  capable  of  bearing  the  strain. 

I  recommend  his  taking  the  chain  cables  through  the  ship's  side, 
and  making  them  fast  with  a  spar  or  timber  outside  the  starboard 
side,  about  as  far  forward  as  the  capstan.  At  present  she  is  canted 
seaward. 

I  thought  she  was  better  so  than  presenting  the  hollow  lines  of 
her  quarter  to  the  sea,  and  both  Hosken  and  Bremner  came  round 
to  my  opinion. 

Thirdly,  there  is  a  stream  of  water  which  now  washes  away  the 
sand  from  her  bottom.  I  think  it  essential  this  should  be  diverted, 
and  kept  so. 

Fourthly,  my  plan  for  protecting  her  is  totally  different  from  any 
that  have  been  proposed,  and  if  we  have  not  such  excessively  bad 
weather  as  would  prevent  anything  being  done,  I  believe  it  may 
easily  be  done.  And  if  done  Avill,  I  am  convinced,  be  perfectly  good ; 
while  any  solid  timbering,  even  if  made,  would,  I  think,  be  most 
likely  the  cause  itself  of  tremendous  damage,  if  once  beat  by  the 
sea.     I  will  only  premise  by  saying  that  both  Hosken  and  Bremner 


;et.  41.]  LETTER  ON  CONDITION  OF  THfc  SHIP.  267 

came  to  tlie  conclusion  that  it  was  the  best  thing  that  could  be 
done. 

I  should  stack  a  mass  of  large  sti'ong  fagots  lashed  together, 
skewered  together  with  iron  rods,  weighted  down  with  iron,  sand- 
bags, (Src,  wrapping  the  whole  round  with  chains,  just  like  a  huge 
poultice  under  her  quarters,  round  under  her  stern,  and  half  way  up 
her  length  on  the  sea  side. 

The  detail  of  the  mode,  and  the  precautions  of  detail,  I  have  not 
time  now  to  describe.  I  am  as  certain  as  I  can  be  of  anything  that, 
once  made,  such  a  mass  of  fagots  would  stand  any  sea  for  the  next 
six  months,  and  the  chances  of  making  it  (after  one  or  two  failures, 
no  doubt)  are  so  good,  that  if  properly  taken  in  hand,  I  look  upon 
it  as  certain.  I  will  write  more  fully  to-morrow — in  the  meantime 
I  have  ordered  the  fagots  to  be  begun  delivering.  I  went  myself 
with  Hosken  to  Lord  Roden's  agent  about  it,  and  I  hope  they  are 
already  beginning  to  deliver  them.  Write  and  stop  them  or  not — 
if  not,  of  course  my  responsibility  ceases.  I  will  write  again  to- 
morrow, but  let  me  know  by  train  how  we  stand  with  the  under- 
writers. 

This  letter  was  a  few  days  later  supplemented  by  the 
following  formal  report  to  the  Directors,  which  was  printed 
and  circulated  amongst  the  proprietors. 

December  U,  1846. 

According  to  your  request  I  have,  as  soon  as  my  engagements 
would  allow  of  my  leaving  London,  paid  a  visit  to  the  '  Great 
Britain,'  and  I  now  beg  to  report  to  you  the  state  in  which  I  found 
the  vessel,  and  my  opinion  of  the  best  means  to  be  taken  for  re- 
covering the  largest  possible  amount  of  the  property  invested  in  her. 
If  I  state  these  opinions  concisely,  and  without  any  qualifications, 
you  will  not  suppose  that  I  have  the  presumption  to  think  them 
infallible,  but  merely  that  I  am  compelled,  by  the  shortness  of  the 
time  left  me  to  write  to  you,  to  avoid  all  circumlocution,  and  to  give 
you  as  simply  and  briefly  as  possible  the  opinions  I  have  formed — 
at  the  same  time  I  am  bound  to  say  that  I  have  not  formed  them 
hastily,  and  that  my  convictions  upon  the  several  points  upon  which 
I  may  express  my  feelings  are  very  strong. 

First,  as  regards  the  present  state  of  the  vessel,  I  was  agreeably 
disappointed,  after  the  reports  that  had  reached  me,  to  find  her  as  a 
whole,  and,  independently  of  the  mere  local  damages  of  which  I  will 


268  THE  'GREAT  BRITAIN'  STEAM-SHIP.  [a.d.  1816. 

speak  presently,  perfectly  soimd,  and  as  strong  and  as  perfect  in  form 
as  on  the  day  ^she  was  launched.  (/ 

In  receiving  this  statement  you  must  bear  in  mind  the  great 
difference  helween  an  iron  vessel  and  a  timber-built  ship.  In  the 
former,  parts  may  be  considerably  damaged  or  even  destroyed, 
and  the  remainder  may  not  only  be  untouched,  but  may  be  left 
imstrained  and  uninjured.  In  a  timber  ship  this  can  hardly  be 
the  case ;  if  any  considerable  portion  of  a  ship's  bottom  is  stove 
in,  the  timbers  or  ribs  completely  across  the  ship  and  the  plank- 
ing longitudinally,  cannot  fail  to  be  strained  to  a  very  con- 
siderable distance  in  both  directions.  You  must  therefore  remove 
from  your  minds  all  impressions  derived  from  your  experience  of 
damages  sustained  by  timber-built  ships  in  order  to  understand  my 
statement,  which  is  strictly  coiTect  : — that,  except  the  parts  actually 
damaged,  the  extent  of  which  is  comparatively  small,  the  ship  is 
perfectly  sound,  and  as  good  as  at  the  hour  when  she  struck.  This 
soundness  and  freedom  from  any  damage  extends  from  about  the 
5  feet  water  line  to  the  top  (with  the  exception  of  the  injury  sus- 
tained by  the  knocking  away  of  the  rudder  post  and  a  blow  under 
the  stern);  nearly  the  whole  of  the  vessel  is  therefore  sound:  the 
principal  injury  is  in  her  bottom  under  the  boilers  and  engines.  The 
vessel  has  evidently  been  thumping  upon  the  rocks,  and  almost  en- 
tirely upon  this  part  of  the  bottom  from  the  first  few  days  after  she 
grounded ;  and  at  present  in  all  probability  her  whole  weight  is 
resting  upon  this  part ;  yet  notwithstanding  this  she  is  perfectly 
straight,  and  has  not  broken  nor  even  sprung  an  inch  in  the  whole 
length.  The  boilers  have  been  forced  up  about  15  inches,  and 
one  of  the  condensers  has  been  lifted  about  8  inches,  breaking 
the  air-pump.  At  present  this  is  nearly  the  extent  of  the  damage 
done ;  all  of  which  could  easily  be  repaired  if  the  vessel  were  in 
dock. 

I  will  now  state  my  opinion  of  the  best  means  of  recovering  the 
largest  possible  amount  of  the  property  which  has  been  invested  in 
her.  In  this  vieAv  I  can  only  imagine  two  alternatives — the  one  to 
break  her  up  on  the  spot  and  make  the  most  of  the  materials ;  the 
other  to  get  her  afloat  and  into  port,  and  restore  her  into  good  con- 
dition, or  sell  her  to  those  who  would  so  restore  her. 

The  first  alternative  may  I  think  be  discarded  at  once ;  the  plates 
and  ribs  of  an  iron  vessel  are  difficult  enough  to  convert  into  useful 
materials  for  any  other  purposes,  even  in  the  midst  of  workshops 
and  with  tools  and  appliances  at  hand.  In  such  a  place  as  Dundrum 
Bay  I  do  not  believe  the  materials  would  pay  the  expense  of  cutting 


.T.T.  41.]  IlEPORT  ON  CONDITION  OF  THE  SHIP.  269 

up ;  the  masts,  spars,  chains,  &c.,  in  fact  the  stores  and  perhaps  a 
few  of  the  lighter  part  of  the  engines,  might  repay  the  cost  of  removal, 
but  the  whole  would  certainly  not  amount  to  many  thousands  ;  pro- 
bably hundreds  would  be  a  safer  estimate  of  the  amount  to  be 
realised  clear  of  all  expenses.  To  remove  the  vessel  and  take  her 
into  port,  and  either  restore  her  or  sell  her,  is  then  the  only  means 
of  recovering  any  part  of  the  whole  of  the  capital  invested  in  this 
ship.  If  she  is  so  brought  into  port  she  may  be  worth,  unrepaired, 
40,000/.,  50,000/.,  or  60,000/.,  according  to  the  opportunities  that 
may  offer  themselves  of  employing  her  useiully  or  selling  her.  The 
only  question  is,  then,  how  at  the  least  expense,  and  at  the  smallest 
risk,  is  the  vessel  to  be  got  into  port  ?  But,  as  I  will  now  endeavour 
to  prove  to  you,  the  mode  of  getting  the  vessel  off  the  shore  and  into 
jjort  is  again  quite  secondary  to  the  consideration  of  how  to  preserve 
her  where  she  is  so  that  she  may  be  in  a  condition  to  be  removed,  and 
to  be  worth  removing,  when  the  means  of  doing  this  are  ready,  and 
the  proper  time  is  arrived  for  attempting  it. 

In  the  first  place  I  assert  unhesitatingly,  that  no  man  in  his  senses 
and  who  thoroughly  imderstands  the  circumstances  of  the  case,  the 
Vi'eight  and  position  of  the  vessel,  the  amount  of  the  rise  and  fall  of 
the  tide,  and  the  draught  of  water  around  her,  and  the  extraordinarily 
exposed  situation,  would  dream  of  calculating  upon  completing  the 
requisite  means  for  floating  her  under  three  months. 

In  the  meantime  the  ship  mnst  be  protected.  Even  if  it  were  prac- 
ticable to  construct  the  necessary  apparatus,  and  to  float  the  vessel 
to-morrow,  it  would  be  little  short  of  madness  to  go  to  sea  with  her 
at  this  time  of  the  year ;  but  I  am  doing  wrong  to  discuss  a  case 
which  cannot  arise.  The  vessel  cannot,  according  to  any  rational 
calculation  of  chances,  be  got  off  under  three  months,  and  it  is  equally 
against  all  probability  that,  if  left  unprotected,  there  would  be  any- 
thing worth  taking  off  at  that  time.  It  is  useless,  therefore,  at  this 
moment  discussing  the  best  mode  of  floating  the  vessel ;  and  I  think, 
under  such  circumstances,  it  would  be  most  unwise  hastily  to  deter- 
mine upon  any  plan.  The  first  thing  is  to  know  whether  there  are 
any  means  of  preserving  the  vessel,  and  whether  any  such  plans  can 
be  carried  into  effect  at  some  reasonable  cost,  which  it  may  be  worth 
incurring.  I  have  looked  at  the  vessel,  and  considered  the  very 
exposed  situation  in  which  she  is  placed  (and  a  more  exposed  one 
could  hardly  be  found),  and  T  am  convinced  that  no  fixed  breakwater 
of  ordinary  construction  could  be  n)ade  at  any  reasonable  expense, 
or  in  time  to  prevent  mischief.  There  is  no  depth  of  sand  into 
which  to  drive  piles,  and  the  rock  is  too  uneven  and  broken  to  allow 


270  THE  'GREAT  BRITAIN'  STEAM-SHIP.       [a.d.  1846. 

of  any  framing  being  constructed  and  secured  to  it ;  and  any  frame- 
work would  be  liable  to  be  destroyed  during  the  progress  of  its  con- 
struction, as  that  already  attempted  has  been,  and  the  timber  might 
be  the  cause  of  serious  damage  to  the  ship.  The  plan  I  should 
recommend  would  at  least  be  free  from  these  objections,  would 
be  comparatively  inexpensive,  and  I  am  firmly  convinced  would  be 
perfectly  effectual  as  a  protection.  At  the  same  time  few  persons 
who  have  not  seen  the  effect  of  a  sea  beating  against  fagots  will 
share  in  that  conviction ;  what  I  recommend  is,  to  form  under  the 
stern  and  along  the  exposed  side  of  the  vessel  a  mass  of  fagots 
made  of  strong  and  long  sticks,  and  used  in  the  manner  which  has 
been  so  successfully  practised  in  Holland  and  elsewhere,  for  the 
repair  and  protection  of  banks  against  the  sea.  The  fagots  should 
be  packed  closely,  and  for  a  considerable  thickness  against  the  ship's 
side  and  up  to  the  level  of  the  decks,  and  secured  Avith  rods  run  verti- 
cally through  the  mass,  and  chains  laid  horizontally  and  binding  the 
whole  tightly  to  the  ship.  The  heaviest  sea  has  no  effect  upon  such  a 
mass,  and  I  believe  the  vessel  would  remain  as  uninjured  and  indeed 
as  unaffected  by  the  sea  as  if  in  dock ;  8,000  or  10,000  fagots,  300 
or  400  fathoms  of  1  inch  or  ^  inch  second-hand  chain  cable,  none  of 
which  need  be  lost,  300  or  400  f  inch  rods  sharpened  at  the  ends, 
1,000  bags  to  fill  with  sand,  with  what  stores  you  have  on  board, 
would  suffice  ;  and,  if  next  coming  springs  and  the  gales  which  have 
hitherto  accompanied  them  are  safely  passed,  I  cannot  foresee  any 
difficulty  whatever  in  the  way  of  completing  the  protection  I  propose. 
Of  course,  in  all  works  dependent  upon  wind,  weather,  and  tides, 
certainty  cannot  be  obtained ;  but  of  one  thing  I  am  quite  certain, 
that  no  other  plan  offers  the  same  chance  of  success,  or  at  so  small 
a  cost.  I  have  communicated  to  Captain  Claxton  the  steps  which 
I  took,  in  conjunction  with  Captain  Hosken,  for  procuring  the  fagots 
before  I  left  Dundrvmi ;  I  have  also  communicated  to  him  the 
directions  which  I  gave  with  respect  to  the  engines,  &c.,  and  it  is 
unnecessary  therefore  that  I  should  repeat  them.  I  will  only  re- 
capitulate in  a  few  words  the  substance  of  the  advice  I  have  above 
given,  and  of  my  reasoning.  You  have  a  valuable  piece  of  property 
lying  on  a  most  exposed  shore ;  if  preserved  for  a  few  months  that 
property  will  in  all  probability  be  worth  40,000/.  or  50,000Z. ;  if 
neglected  for  a  few  weeks  longer  it  will  probably  be  worth  nothing. 
Can  you,  as  men  of  business,  under  such  circumstances,  waste  your 
time  at  this  moment  in  discussing  what  you  will  do  in  three  months 
hence,  and  what  plan  you  will  then  adopt  to  take  your  property  to 
market,  but  will  you  not  rather  first  and  immediately  adopt  decisive 


;et.  41.]     REPORT  ON  CONDITION  OF  THE'  SHIP.       271 

steps  for  preserving  that  property,  and  then  consider  what  you  had 
best  do  with  it  ? 

I  have  no  wish  to  escape  the  responsibility  of  advising  you,  as  you 
request  me  to  do  so,  as  to  my  opinion  of  the  best  plan  to  be  adopted 
hereafter  for  removing  the  ship;  but  adhering  to  the  principle  that  I 
have  laid  down,  I  should  decline  to  do  so  at  present,  did  I  not  see 
reason  to  fear  that  you  might  be  losing  time  and  money  by  relying 
upon  expectations  wliich  I  am  convinced  would  be  disappointed.  I 
would  strongly  urge  upon  you  not  to  place  your  reliance  upon  any  plan 
which  depends  upon  floating  the  vessel  by  camels,  and  taking  her  to 
sea  unrepaired,  and  therefore  entirely  dependent  upon  those  camels. 
The  immense  breadth  of  these  floating  camels,  and  the  risk  of  taking 
such  an  unmanageable  floating  ill-connected  mass  to  sea,  cannot  have 
been  correctly  or  sufficiently  estimated ;  and  the  certainty  of  the 
whole  going  to  the  bottom,  in  the  event  of  even  a  very  moderate  gale 
of  wind  or  a  slight  swell,  has  been  apparently  quite  lost  sight  of  I 
am  also  of  opinion  that  the  difficulty  of  lifting  the  vessel  at  all  by 
auxiliary  floats  has  been  underrated.  The  vessel  has  worked  her- 
self about  5  or  6  feet  into  the  solid  rock  and  sand,  and  may  very 
probably  get  a  little  deeper  before  the  time  for  lifting  arrives.  She 
must  therefore  be  lifted,  say  at  least  4  feet  to  4  feet  6  inches,  before 
she  could  be  got  out  of  the  dock  she  has  made ;  and  the  floating 
power  must  therefore  be  calculated  at  least  to  raise  her  5  feet  6 
inches,  so  as  to  be  quite  sure  of  moving  her.  Now  there  is  not  more 
than  10  feet  water  around  the  vessel  even  at  high  water  of  ordinary 
springs,  and  it  would  be  impossible  to  calculate  upon  more  than  9 
feet  as  a  certainty.  No  floating  power  worth  having  can  be  got  in 
the  vessel,  and  the  floating  vessels  must  therefore  be  capable  of  sus- 
taining the  whole  weight,  with  a  draught  when  the  vessel  is  lifted  of 
only  about  4  feet.  The  weight  to  be  sustained  is  2,000  tons,  and  to  do 
this  with  vessels  drawing  only  4  feet  would  require  that  they  should 
be  upwards  of  30  feet  in  breadth  on  each  side,  forming  with  the  ship 
a  total  width  of  upwards  of  100  to  120  feet,  and  upwards  of  300  feet 
in  length.  I  do  not  say  that  this  operation  is  impracticable,  but  it 
is  at  least  a  very  diflScult  one,  and  must  be  almost  entirely  dependent 
tipon  weather,  and,  unless  in  perfectly  smooth  water,  a  very  hazardous 
one.  My  belief  and  conviction  is  that  the  safe  mode  of  proceeding, 
and  by  far  the  cheapest,  will  be  to  lift  the  vessel  by  mechanical 
means,  to  lay  ways  under  her,  and  to  haul  her  up  sufficiently  far  for 
her  to  be  safe  fiom  the  sea ;  to  repair  her  just  sufficiently  to  make 
her  water-tight,  then  launch  and  bring  her  to  Liverpool  or  Bristol. 
But,  as  I  have  before  stated,  there  is  time  to  consider  these  points,  if 


272  THE  'GREAT  BRITAIN'  STEAM-SHIP.        [x.n.  1846. 

in  the  meantime  we  feike  steps  to  preserve  the  ship.  If  the  property 
is  not  even  npw  worth  protectinfr,  it  will  indeed  be  waste  of  money  to 
be  preparing  at  some  considerable  expense  to  remove  what  will  in  all 
probability*be  only  then  a  valueless  carcase. 

If  the  Directors  should  determine  upon  adopting  the  course  I  have 
recommended,  I  must  remind  them  that  the  plan  is  one  depending 
entirely  on  the  skill,  the  vigour,  the  aptitude  for  expedients,  and 
possibly,  if  bad  weather  should  come  on,  and  day  after  day  the  Avork 
be  destroyed,  on  the  unwearying  perseverance  and  determined  con- 
fidence in  the  plan  of  the  person  directing  it,  and  the  sufficiency  of 
means  at  his  command. 

I  cannot  conclude  without  doing  justice  to  Mr.  Bremner,  whom  I 
met  on  board,  and  acknowledging  the  friendly  and  liberal  manner  in 
which  he  discussed  the  various  means  to  be  adopted,  and  assisted  me 
with  his  valuable  advice ;  and-,  although  I  may  have  somewhat  differed 
with  him  as  to  the  advisability  of  attempting  to  float  the  vessel  away 
to  sea  without  first  repairing  her,  yet  upon  most  points  we  were  per- 
fectly agreed ;  and  I  firmly  believe  that  if  any  man  could  take  her 
off  (and  if  it  would  be  prudent  to  let  him  do  so),  Mr.  Bremner's 
great  experience  and  sound  practical  knowledge  and  good  sense  in 
devising  any  plan,  and  his  energy  and  skill  in  carrying  it  out,  would 
ensure  every  chance  of  success  which  the  circumstances  admit  of.' 

The  Directors  adopted  Mr.  Brunei's  suggestions;  and, 
at  his  urgent  request,  they  appointed  Captain  Claxton  to 
superintend  the  execution  of  his  plans. 

Captain  Claxton  thereupon  went  to  Dundrum,  where  he 
took  sole  charge  of  all  the  subsequent  operations. 

The  following  is  selected  from  the  many  letters  written 
by  Mr.  Brunei  to  Captain  Claxton  at  this  time. 

December  29,  1846. 

You  have  failed,  I  think,  in  sinking  and  keeping  down  the  fagots 

from  that  which  causes  nine-tenths  of  all  failures  in  this  Avorld,  from 

not  doing  quite  enough.    Two  and  a  half  hundredweight  of  sandbags, 

weighing  barely  one  hundredweight  [m  ivater^,  would  not  of  course 

'  One  of  the  consequences  of  the  to  have  a  circular  letter  printed  de- 
publication  of  this  report  was,  that  dining  assistance;  and  more  than  four 
Mr.  Brunei  received  so  many  letters  hundred  letters  were  also  received  by 
containing  suggestions  for  lifting  and  the  Company's  secretary, 
floating  the  ship,  that  he  was  obliged 


;et.  41.]  LETTEE  ON  BREAK WATEE.  273 

keep  quiet  a  large  fagot  of  five  bundles,  and  two  and  a  half  hundred- 
weight of  fire-bars,  I  should  think,  would  only  barely  do.  The  load 
must  always  be  excessive,  to  make  sure  of  a  thing  ...  I  would  only 
impress  upon  you  one  principle  of  action  which  I  have  always  found 
very  successful,  which  is  to  stick  obstinately  to  one  plan  (until  I  believe 
it  wrong),  and  to  devote  all  my  scheming  to  that  one  plan,  and,  on  the 
same  principle,  to  stick  to  one  method,  and  push  that  to  the  utmostlitnits 
before  I  allow  myself  to  wander  into  others ;  in  fact,  to  use  a  simile, 
to  stick  to  the  one  point  of  attack,  however  defended,  and  if  the  force 
first  brought  up  is  not  sufficient,  to  bring  ten  times  as  much  ;  but  never 
to  try  back  upon  another  point  in  the  hope  of  finding  it  easier.  So 
with  the  fagots — if  a  six-bundle  fagot  wont  reach  out  of  water,  try  a 
twenty-bundle  one;  if  hundredweights  wont  keep  it  down,  try  tons. 

The  able  manner  in  which.  Captain  Claxton  carried  out 
Mr.  Brunei's  plans,  and  suggested  important  modifica- 
tions of  them,  is  acknowledged  by  Mr.  Brunei,  in  a  report 
to  the  Directors,  written  after  the  successful  completion 
of  the  breakwater. 

February  27,  1847. 

I  beg  to  enclose  Captain  Claxton's  account  of  the  proceedings  at 
Dundrum  Bay  during  the  time  that  he  has  been  engaged  in  forming 
the  breakwater  or  protection  to  the  ship  in  the  manner  recommended 
by  me. 

Notwithstanding  the  great  difficulties  he  has  had  to  contend  with 
from  almost  incessant  bad  weather,  with  the  wind  blowing  dead  on 
shore  nearly  the  whole  of  the  month  of  January,  and  consequently 
preventing  the  tides  from  ebbing  suflBciently  out  to  allow  of  the  work 
being  properly  proceeded  with,  and  notwithstanding  the  occurrence 
of  more  than  one  storm  at  the  most  critical  period  of  the  work,  he 
has,  as  I  fully  relied  upon  his  doing,  succeeded  in  so  far  protecting 
the  ship,  that  she  has  been  comparatively  unaffected  by  violent  seas, 
which,  there  is  no  doubt  whatever,  would  otherwise  have  seriously 
damaged  her.  "We  may  now  calculate  with  tolerable  certainty  upon 
preserving  her  without  further  injury  until  the  finer  or  at  least  more 
settled  weather  sets  in. 

In  the  work  which  Captain  Claxton  undertook,  and  has  so  success- 
fully completed,  he  has  been  compelled  to  vary  very  materially  the 
mode  of  proceeding  first  laid  down ;  he  has,  in  fact,  been  obliged  to 
adapt  his  plans  to  his  means  of  execution,  and  almost  from  day  to 

T 


274  THE  'GREAT   ERITAIN '   STEAM-SHIP.        [a.d.  1847. 

day  to  devise  modes  of  proceeding  with  only  the  experience  of  the 
past  day  to  guide  him.  Numerous  unforeseen  difficulties  have 
occurred,  upon  which  he  kept  me  daily  informed ;  and  simple  as  my 
plan  might  have  appeared  to  others,  it  required  much  skill,  contrivance, 
and  unwearying  perseverance  to  carry  out  so  many  alterations  and 
improvements  as  it  progressed.  I  had  relied  confidently  on  success 
when  my  friend  Captain  Claxton  undertook  the  work,  and  the  result 
has  fully  confirmed  my  expectations. 

It  is  now  necessary  to  turn  our  attention  to  the  best  mode  of 
removing  the  ship.  I  hope  in  about  a  fortnight  from  the  present 
time  to  be  able  to  give  you  some  opinion  upon  this  point,  but  it  is 
one  requiring  much  consideration  ;  and  until  I  had  the  opportimity 
of  conferring  with  Captain  Claxton  on  the  subject,  and  also  had 
before  me  all  the  measurements  and  data  which  he  has  collected,  it 
was  useless  to  attempt  it. 

The  construction  of  the  breakwater  will  be  understood 
by  the  following  extracts  from  a  report  made  by  Captain 
Claxton  to  the  Admiralty. 

'  Great  Britain,'  July  16,  1847. 

.  .  .  Mr.  Brunei's  instructions  to  me  were  principally  by  word 
of  mouth ;  the  difficulty  to  be  got  over,  in  his  opinion,  being  the 
foundation  upon  sand,  varying  in  depth  according  to  the  points  or 
hollow  of  a  substratum  of  rock,  and  according  to  the  quarter  from 
which  the  wind  blew. 

The  foundation  could  only  be  made  at  low  water,  and  as  fast  as 
a  layer  of  fagots  was  laid,  it  was  rapidly  pinned  down  with  iron 
rods,  bent  at  the  heads,  varying  from  9  to  6  feet  in  length,  and 
driven  to  the  rock  under,  loaded  with  stones  quarried  from  the 
nearest  reefs,  and  upon  these,  the  last  thing  as  the  flood  came  in, 
chain  cables,  air-pump  covers,  fire-bars  in  large  bundles,  and  the 
ship's  guns  were  dropped,  care  being  always  taken  to  have  the  ends 
of  the  chains,  and  the  slings  of  other  heavy  matters,  fast  to  the  ship. 
As  the  tide  in  smooth  water  began  to  recede,  or  in  heavy  seas  began 
to  lose  effect  in  striking,  these  iron  weights  were  lifted,  and  the  fagots 
which  were  ready  were  .  .  .  placed;  and  the  same  process  followed  tide 
after  tide  when  the  water  ebbed  sufficiently,  which  upon  the  neaps 
it  never  did  at  all,  and  upon  the  springs  it  only  did  for  about  an  hour, 
unless  there  was  either  no  wind  at  all,  or  unless  the  wind  blew  off 
the  land,  or  from  the  West  round  by  the  North  to  ESE.  It  is 
neceissary,  to  a  proper  understanding  of  the  nature  of  this  really 


XT.  41.]  DESCRIPTION   OF  BREAKWATER.  275 

large  work,  to  describe  a  bundle  of  fagots,  lest  an  idea  should  be 
formed  that  it  is  a  small  thing  and  easily  handled.  They  averaged 
11  feet  in  length,  and  5  feet  in  circumference  near  the  butts,  which 
all  pointed  one  way.  When  tied  in  Lord  Roden's  wood,  many  were 
13  feet  long,  and  none  were  taken  under  10  feet.  A  cart  of  the 
country  with  one  horse  could  carry  about  ten  bundles  when  well 
lashed,  and  as  they  came  down  there  was  rarely  more  than  the  head 
of  the  horse  to  be  seen.  Sixpence  per  bundle,  and  sixpence  for 
delivery,  was  the  contract ;  the  distance  at  high  water  nine  miles, 
at  low  water  six  miles ;  and  our  sailors  made  them  into  large 
bundles  of  twos,  threes,  and  fours ;  now  and  then  we  experimented 
with  bundles  of  eight  or  even  ten,  in  the  middle  of  which  were  bags 
of  sand  (old  guano  bags),  varying  in  number,  of  2  cwt.  each,  and 
sometimes  as  many  as  amounted  to  a  ton  in  weight.  These  large 
bundles  stood  if  the  water  remained  smooth  ;  but  if,  before  we  could 
build  up  to  their  height  with  smaller  bundles,  and,  as  it  were,  prop 
-or  shoulder  them  fore  and  aft,  we  were  caught  by  a  breeze  and  sea, 
we  found  them  rolled  up  to  high  Avater  mark,  or  on  spring  tides  four 
hundred  yards;  while  some  are  now  being  hove  out  of  the  sand 
entire,  and  with  the  sand  bags  and  sand  complete     . 

Having  got  the  foundation,  on  which,  I  may  mention,  we  placed 
one  of  the  ship's  iron  life-boats,  30  feet  long,  8  feet  wide,  and  5  feet 
deep,  and  loaded  her  with  stones,  and  which  also,  although  over 
bundles  of  fagots,  went  bodily  down,  until  only  the  gunwale  was 
above  the  level  of  the  strand,  we  began  to  build  the  part  which  was 
to  save  the  ship  from  the  blows  of  the  sea,  and  which  I  was  in- 
structed by  Mr.  Brunei  to  bring  up  to  a  point  to  the  ship's  gunwale 
in  the  form  of  a  large  poultice,  occupying  the  whole  space  under 
her  counter,  the  whole  of  the  exposed  quarter  (the  port  quarter), 
and  inclining  inwards  from  the  outside,  and  declining  from  the  top  to 
the  same  point  forward,  to  the  after  end  of  the  bilge  keel.  I  was  to  be, 
and  was,  as  careful  as  I  could  be  to  secure  as  well  as  to  weight  down 
as  we  built.  Chains  were  secured  in  many  places  to  the  lower 
bundles  of  fire-bars  simk  in  the  sand  outside  all,  and  these  were 
brought  into  the  arms  of  the  screw,  and  to  ring  bolts  let  into  the 
ship ;  and  rarely  were  two  layers  placed  without  a  repetition  of  the 
securing  and  weighting  process  all  the  while  we  had  chains  to  use  .  .  . 

We  were  frequently  beaten  ;  whole  masses  were  capsized,  but  it 
was  found  that  even  the  foundation  broke  the  ground  swell,  which, 
instead  of  having  a  fair  run  as  it  has  over  the  strand,  seemed  stopped, 
and  to  break  differently ;  and  certainly  the  ship  was  daily  eased  of 

T  2 


276  THE  ■*  GREAT  BEITAIN '  STEAM-SHIP.        [a.d.  1847. 

the  blows  of  the  sea  .  .  .  Finding  the  wind  keeping  on  shore, 
the  fagots  we  placed  shrinking,  sinking,  or  settling  down,  and,  not- 
withstanding the  weights  and  lashings,  commonly  breaking  away,  I 
proposed  to  try  spars.  Mr.  Brunei  acceded,  and  recommended  my 
trying  four  long  ones,  to  the  heels  of  which  were  to  be  attached 
chains  with  a  spread  of  eight  feet,  the  spars  being  pointed  at  the 
heels,  the  slack  of  the  chains,  and  the  height  at  which  they  were 
stopped  to  the  spars,  being  intended  to  be  sufBcient  to  embrace  about 
a  dozen  bundles  of  fagots,  the  points  of  the  spars  sticking  through 
the  foundation  below  the  level  of  the  sand.  After  placing  the  first 
pair  of  spars  at  an  angle  from  the  gunwale  of  about  70  degrees,  and 
before  the  second  pair  with  its  fagots  could  be  got  in  place,  and  after 
heaving  them  down  tight  with  a  tackle  to  each  from  the  head  to  the 
gunwale,  a  heavy  sea  came  with  the  flood  dead  on,  and  although 
the  spars  were  seven  inches  square,  they  stood  the  blows  of  the  sea, 
bending  in  the  middle  full  five  feet  when  heavily  struck.  This 
gave  me  the  idea  of  green  trees :  firs  being  the  first  that  occurred  to 
me ;  first  because  of  their  height,  and  next  because  in  Lord  DoAvn- 
shire's  grounds  at  Dundrum  the  castle  wood  consisted  of  them  only, 
and  lastly,  because  they  were  cheap  and  at  hand.  The  spars  we 
fortunately  placed,  and  which  stood  so  well,  were  American  elm,  a 
large  balk  of  which  had  been  sawed  in  four  lengths  of  42  feet  for 
framing,  for  Mr.  Bremner's  breakwater  .  .  .  The  lengths  required  to 
allow  the  application  of  a  tackle  to  the  head  to  heave  them  tight 
down  to  the  gunwale,  or  to  the  scuttle-holes  of  the  ship,  were  from 
45  to  50  feet.  I  found  that  the  firs  of  this  length  were  scarce,  and 
too  fine  at  the  head ;  but  on  looking  in  Lord  Rodents  wood,  a  better 
substitute  was  offered  in  the  form  of  beech  trees  of  any  size,  and  a 
contract  was  speedily  made,  and  as  speedily  completed ;  the  carts  of 
the  country  bringing  in  one  tree  at  a  time,  until  about  eighty  were 
placed  at  the  most  exposed  point,  the  quarter,  in  three  rows,  the 
outside  row  at  an  angle  of  45  degrees.  Beech-trees  were  found 
decidedly  better  than  firs,  or,  I  believe,  than  any  other  description 
of  tree,  as  their  weight  was  soon  found  sufficient  to  keep  them  in 
place  without  the  heaving  down  tackles.  They  can  be  got  of  great 
length,  without  being  so  large  and  (carting,  pointing,  and  handling 
considered)  so  unwieldy  a  butt  as  firs,  and  they  are  of  greater  dia- 
meter aloft,  consequently  stronger,  and  altogether  tougher  than  firs. 
Having  got  the  whole  stem  surrounded,  and  having  continued 
them  at  from  4  to  5  feet  apart  up  to  the  bilge  keel,  or  about  80  feet 
of  the  ship  from  the  screw,  I  applied  smaller  spars  (easily  and  eco- 
nomically obtained  from  the  Tyrella  domain,  or  within  half  a  mile 


JET.  41.]  DESCRirTION  OF  BREAKWATER..  277 

of  the  ship)  laterally  and  diagonally,  and  about  a  foot  apart  in  the 
former  case,  and  3  or  4  feet  in  the  latter ;  the  number  about  300,  of 
all  or  any  lengths  between  15  and  30  feet.  While  this  was  abeut, 
the  fagot  process  was  going  on ;  and  before  that  was  completed,  I 
found  the  foimdation  with  the  boat,  and  its  40  tons  of  stones, 
and  even  the  spars,  although  pointed  at  the  angles,  indicated  an 
inclination  to  move  forward-  through  the  sheer  force  of  the  rollers. 
To  check  this,  tackles  were  made  fast  to  three  warps  out  to  sea- 
ward, with  two  anchors  to  each,  and  brought  to  the  spars  with  four 
spans  to  the  inner  block.  Thus  twelve  of  the  largest  spars  were 
grappled,  the  falls  taken  on  board,  and  all  hove  tight;  the  whole 
of  the  spars  having  first  been  attached  to  one  another  by  a  round 
turn  of  a  half-inch  chain  with  strong  staples,  and  of  course  by  the 
lateral  spars  or  spreaders,  and  their  innumerable  seizings.  Suffice 
it  to  say,  as  regards  the  spars,  that  when  struck  by  violent  seaa 
from  half-flood  to  half-ebb,  they  bend  in  a  body  from  3  to- 
'4  feet,  and  spring  back  after  the  blow;  and  this  is,  I  believe, 
the  whole  secret  of  the  efficiency  of  the  spar  part  of  the  breakwater,, 
which  has  stood  the  whole  winter,  only  one  having  broken,  and 
that  because  the  head  took  against  the  topsail  yard,  lashed  along 
stanchions  of  the  rails  as  a  hold-down  for  the  tackles  attached  to 
their  heads.  As  a  proof  that  this  is  the  probable  cause  of  its 
standing  so  well,  I  may  refer  to  Mr.  Bremner's  breakwater,  which 
went  with  the  first  heavy  gale  and  sea,  although  made  of  balks  of 
from  17  inches  to  13  inches  thick :  also  to  our  having  ourselves 
placed  a  pine  spar  9  inches  diameter  down  by  the  side  of  the  outside 
tree  on  the  starboard  quarter,  and  which  broke  in  two  right  in  the 
middle  with  the  first  sea  that  struck  it.  The  sea  struck  very  hard 
against  the  spars  and  framework,  from  which  it  was  received  by 
the  fagots  without  any  shock  to  the  ship  worth  speaking  of.  "With 
respect  to  the  fagots,  I  could  not  find  materials  to  go  on  weighting 
down  as  we  went  on  piling  up  ...  I  therefore  ran  the  re- 
maining fagots  up  light.  No  sooner,  however,  was  this  done,  and  a 
gale  came  on,  than  we  were  compelled  to  let  go  the  lashings,  and  ta 
help  some  of  the  top  ones  to  escape,  as  the  whole  of  the  unloaded 
body  rose  and  fell  full  three  feet  with  the  sea,  and  would  have  done 
mischief  to  the  spars  and  to  the  ^ip,  by  shouldering  her  quarter; 
and  twisting  her.  About  200  bundles  broke  away  in  this  gale-. 
They  were,  however,  all  recovered,  and  placed  further  forward 
and  low  down,  and  then  loaded  with  stones ;  about  one  third  of 
the  top  space  having  after  this  been  left  open,  or  one  third  down 
from  the  apex  levelled.     Shrinkage  did  much  towards  this,  and 


278  THE  'GREAT  BRITAIN'  STEAM-SHIP.        [a.d.  1847. 

breakmg  in  pieces  a  good  deal ;  so  it  was  not  deemed  advisable  to 
iill  that  space  again. 

About  the  1st  of  May  the  progress  made  in  lifting  the  diip  by 
tightening  her  from  the  inside,  and  by  lightening  her  of  everything 
moveable,  led  me  to  believe  that  Vfe  should  be  about  getting  her 
off  towards  the  end  of  this  month.  I  therefore  felt  that  it  was  time 
to  begin  removing  the  fagot  portion  of  the  breakwater  .  .  .  The 
process  of  levelling  went  on  for  about  three  weeks,  when  all  above 
the  loaded  portion  was  taken  away.  We  commenced  on  that  portion 
from  necessity,  and  found  that  by  no  contrivance  of  purchases  and 
levers  could  our  ten  men  get  up  or  out  more  than  four  or  five  bun- 
dles per  tide.  This  became,  and  even  now  is,  a  serious  matter.  We 
have  got  up  all  our  chains  and  weights,  and  nothing  remains  but  the 
fagots  and  stones,  which  are  so  embedded  in  sand  as  to  form  a  mass 
which  is  more  difficult  to  move  than  granite  rock  would  be,  as  we 
cannot  blast.  Twenty  labourers  have  been  twenty-one  tides  at  work, 
by  contract,  and  certainly  they  have  made  an  impression ;  but  it  is  not 
lowered  over  two  feet.  The  lower  portion  was  made  of  furze  bun- 
dles, here  called  whins,  and  they  are  great  collectors  of  sand,  and  only 
come  up  at  all  by  being  cut  to  pieces.  I  mention  this  to  show  that 
furze  and  fagots  loaded  with  stones  on  sand  500  yards  from  high- 
water  mark,  exposed  to  the  sea,  will  form  a  foundation  on  which  a 
building  of  any  weight  might  be  erected.     .     .     . 

Mr.  Brunei  informed  me,  when  I  undertook  to  carry  out  his  views, 
that  there  was  nothing  new  in  using  fagots  to  stop  breaches  in  sea- 
walls, as  in  Holland  ;  and  that  he  saw  no  reason  why  they  should  not 
stop  the  force  of  the  sea  in  protecting  ships  as  well,  provided  they 
could  be  secured,  and  a  foundation  got.  They  were  to  be  made  of 
alders,  ash,  hollj',  laurel,  oak,  or  anything  tough,  to  be  cut  down,  and 
made  up  green,  to  be  placed  with  all  their  leaves  on,  to  be  pointed 
to  the  sea  at  their  butts  ;  and  inside  the  walls  of  them,  if  I  may  so 
speak,  whin  (furze)  bundles  were  to  be  weighted  down,  the  fagots 
placed  in  steps  or  rows  of  about  4  feet  from  the  outside  to  the  ship's 
gunwale. 

As  the  summer  came  on,  the  mode  of  lifting  and 
jEloating  the  ship  had  to  be  decided.  On  this  point 
Mr.  Brunei  wrote  to  the  Directors  : — 

May  4,  1847. 
You  have  heard  from  time  to  time  from  Captain  Claxton  of  the  re- 
sult of  the  means  adopted  by  him  for  protecting  the  '  Great  Britain  ' 
li-om  the  effects  of  the  sea,  and  which,  I  am  happy  to  say,  have  been 


*T.  42.]  EEPORT  ON  FLOATING.'  279 

quite  successful ;  and  you  will  have  heard  also  generally  from  him 
of  the  steps  which  we  have  since  taken,  preparatory  to  getting  oiF 
the  ship. 

I  will  now  explain  to  you  the  object  I  have  kept  in  view  in  these 
preparations,  and  the  course  I  should  now  advise  you  to  follow. 

After  completing  the  works  for  the  protection  of  the  ship,  and 
before  determining  upon  any  mode  to  be  recommended  to  you  lor 
getting  her  off,  I  thought  it  would  be  desirable  to  lighten  her  of  all 
that  could  be  easily  removed,  and  to  ascertain  how  much  of  the 
vessel  could  be  made  water-tight,  and  what  extent  of  buoyancy 
could  be  obtained  in  the  vessel  herself,  as,  in  my  opinion,  upon  our 
success  in  this  would  depend  altogether  the  practicability  of  lifting 
the  ship  by  camels.  If  no  great  extent  of  buoyancy  could  have 
been  obtained,  I  should  certainly  have  recommended  lifting  the 
vessel  by  mechanical  means,  as  I  do  not  consider  that,  with  the  draft 
of  water  which  could  be  calculated  upon  around  her  on  ordinary 
tides,  sufficient  floating  poAver  by  camels  could  be  obtained  in  an 
easy  practicable  manner.  It  was  also  quite  possible  that  we  might 
succeed  in  making  the  vessel  alone  sufficiently  buoyant  to  lift  high 
enough  on  the  spring  tides ;  and  by  shifting  her  position,  or  by  other 
means,  to  maintain  the  lift  thus  got,  to  allow  of  getting  under  her 
bottom  to  repair  her. 

By  great  exertion  nearly  the  whole  of  the  compartments  forward 
and  aft  of  the  engine  space,  and  part  of  the  coal  bunkers,  have  been 
made  tight ;  and  if  the  tides  had  ebbed  as  low  as  usual,  the  other 
bunkers  and  the  boilers,  fireplace  and  flues,  would  also  have  been 
made  water-tight  by  these  last  springs. 

Unfortunately,  from  the  direction  of  the  wind  and  other  causes, 
these  tides  have  neither  ebbed  nor  flowed  to  their  full  extent ;  still, 
the  vessel  has  been  lifted,  and  some  of  this  lift  has  been  maintained, 
and  if  we  were  fortunate,  it  is  evidently  quite  possible  that  our 
utmost  expectations  might  be  realized,  and  possibly  the  vessel  might 
be  lifted  sufficiently  to  be  made  tight  without  any  external  assistance. 
This,  however,  would  be  too  much  to  calculate  upon,  and  the  weight 
to  be  lifted  having  been  reduced  to  one-half  what  it  was,  and  being 
capable  of  still  further  reduction,  the  operation  of  lifting  by  camels 
becomes  a  much  more  practicable  undertaking. 

I  should  now  therefore  recommend  that  application  be  made  to 
some  parties  who  have  had  the  most  experience  in  such  work,  to  lay 
their  proposals  before  the  Directors ;  and  that  in  the  meantime  we 
should  continue  to  make  every  effort  to  add  to  the  buoyancy  of  the 
ship.     .     .     . 


280  THE  '  GREAT  BRITAIN '  STEAM-SHIP.        [a.d.  1847. 

I  believe  that,  in  such  a  case,  qtiiet,  sober  consideration,  assisted 
by  experience,  and  by  careful  examination  of  all  the  circumstances 
on  the  spot,  will  be  infinitely  more  valuable  than  the  most  ingenious 
and  brilliant  schemes.  And  I  believe  we  are  most  likely  to  obtain 
these  conditions  by  calling  in  a  man  like  Mr.  Bremner,  and  leaving 
him  to  confer  with  Captain  Claxton,  and  that  he  should  have  the 
benefit  of  our  advice  and  assistance,  and  then  lay  his  plans  and  pro- 
posals before  the  Directors. 

Mr.  Bremner  and  his  son,  assisted  by  Captain  Claxton, 
made  preparations  for  releasing  the  ship.  The  system 
followed  was  that  sketched  out  by  Mr.  Brunei — namely, 
that  of  lifting  the  ship  by  mechanical  arrangements,  and 
then  making  good  the  leaks.  The  difficulties  they  had  to 
contend  with  are  graphically  described  in  the  reports 
which  were  sent  almost  daily  by  Captain  Claxton  to 
Mr.  Brunei,  and  which  were  afterwards  printed  by  the 
Directors  at  Mr.  Brunei's  suggestion.* 

The  principal  leak  was  stopped,  and  the  ship's  head 
raised  8  feet  7  inches  by  ramming  wedges  and  stones 
under  her  at  high  water.  At  last,  on  August  27,  the  ship 
was  floated,  and  Captain  Claxton  wrote  to  Mr.  Brunei : — 

Huzza !  huzza !  you  know  what  that  means  ...  I  made  up  my  mind 
to  stop  her  at  the  edge  of  low  water,  and  then  examine  and  secure 
all  that  might  discover  itself.  The  tide  rose  to  15  feet  8  inches. 
She  rose  therefore  easily  over  the  rock,  but  was  clear  of  it  by  only 
just  five  inches,  which  shows  hoAv  near  a  squeak  we  had — it  was  a 

' 'The  "Great  Britain  "Steam-Ship.  In  publishing  the  correspondence 

'  Extracts  from  the  letters  of  Captain  to  which  reference  has  been  made,  the 

'  Claxton,  K.N.,  to  I.  K.  Brunei,  Esq.,  Directors   acknowledge  their  obliga- 

•  and  the  Directors.    Bristol,  1847.'  tions  to  all  concerned  in  the  arduous 

Mr.  Bremner's  apparatus  is  also  de-  task  of  saving  the  '  Great  Britain ; '  and 
scribed  in  a  paper  read  by  him  at  the  they  add — '  to  Mr.  Brunei  above  all 
Institution  of  Civil  Engineers,  and  • '  their  thanks  are  most  due,  for  open- 
printed  in  the  twenty-first  volume  of  '  ing  their  eyes  to  what  might  be 
the  Transactions,  p.  160.  'accomplished,    and  for  taking  upon 

Accurate  illustrations  of  the  break-  '  himself  the  responsibility  of  her  re- 
water  and  floating  apparatus  will  be  '  lease,  provided  that  Captain  Claxton 
found  in  the  Illustrated  London  News  '  was  employed  to  carry  out  his  views.' 
of  August  21,  1847. 


JET.  42.]  FLOATING  OF  THE  SHIP."  281 

most  anxious  affair,  but  it  is  over.  I  marked  170  yards  in  the 
sand  and  on  our  warp,  and  at  that  extent  I  stopped  her  ...  I  have 
no  doubt  that  to-morrow  we  shall  see  her  free. 

The  following  day  they  started  for  Liverpool.  One 
hundred  and  twenty  labourers  were  hired  to  work  at 
the  pumps,  but  only  thirty-six  came  on  board,  and  their 
services  were  unavailable,  as  they  spent  their  time  in 
discussing  how  much  they  were  to  be  paid.  Consequently, 
when  the  ship  was  taken  in  tow  at  4  a.m.  on  the  28th 
there  was  6  feet  of  water  in  the  engine  room  and  5 
feet  in  the  fore  hold,  and  she  was  making  16  inches 
an  hour.  Men  from  Her  Majesty's  ships  *  Birkenhead ' 
and  *  Victory,'  which  had  been  sent  by  the  Admiralty  to 
assist,  were  drafted  on  board,  and  the  influx  of  water 
was  reduced  to  four  inches  an  hour.  It  was  evident  that 
Liverpool  could  not  be  attempted,  so  they  made  for  Strang- 
ford  Lough.  A  dense  fog  came  on  when  they  were  off 
the  entrance,  and  they  pushed  on  to  Belfast  Lough,  where 
the  ship  was  grounded.  During  the  night  she  was  cleared 
of  water,  and  the  next  day  she  started  for  Liverpool.  The 
landsmen  who  had  been  hired  the  previous  night  to 
work  the  pumps  were  incapacitated  by  sea-sickness ; 
and  the  ship  was  only  kept  afloat  by  the  exertions  of 
Captain  Claxton  and  the  dockyard  hands  who  had  been 
sent  to  assist  in  navigating  her  across.  When  she 
arrived  at  Liverpool  she  was  placed  over  a  gridiron,  on 
which  she  sank  when  her  pumps  were  stopped. 

Notwithstanding  the  successful  result  of  the  efforts 
made  for  her  rescue,  the  stranding  of  the  *  Great  Britain ' 
in  Dundrum  Bay  led  to  the  ruin  of  the  Company; 
and  she  was  some  time  afterwards  sold  to  Messrs.  Gibbs, 
Bright,  &  Co.,  of  Liverpool,  by  whom  she  was  repaired, 
and  fitted  with  auxiliary  engines  of  500  nominal  horse- 
power.    On  a  general  survey  being  made,  it  was  found 


282 


THE   '  GEEAT   BRITAIN  '   STEAM-SHIP.  [a.d.  1847. 


that  she  had  not  suffered  any  alteration  of  form,  nor  was 
she  at  all  strained.  She  was  taken  out  of  dock  in  October 
1851,  and  since  that  time  she  has  made  regular  voyages 
between  Liverpool  and  Australia. 

She  is  known  as  one  of  the  fastest  vessels  on  that  line; 
and  remains  to  testify  to  the  ability  and  wisdom  of  those 
who,  more  than  thirty  years  ago,  were  daring  enough  to 
build  so  large  a  ship  of  iron,  and  to  fit  her  with  the  screw 
propeller. 


NOTE  (p.  255). 

Dimensions  of  the  '  Great  Britain '  Steam-Ship. 

feet    inches 

Totallength       .             .             .             .             .     322     0 

The  length  of  keel         .             .             .             .     289     0 

Beam    .             .             .             .             .             .       51     0 

Depth    .             .             .             .             .             .       32     6 

Feet  of  water     .             .             .             .             ,       16     0 

Tonnage  measurement    ....     3,443  tons 

Displacement     .....     2,984     „ 

Dimensions  of  original  Engines,  ^c. 

Number  of  cylinders    . 

.     4 

Diameter  of  cylinders  . 

88  inches 

Length  of  stroke 

6  feet 

Weight  of  engines 

340  tons 

Weight  of  boilers 

200    „ 

Water  in  boilers 

200    „ 

Weight  of  screw- shaft  . 

•     38    „ 

Diameter  of  screw 

15  ft.  6  in. 

Pitch  of  screw 

25  ft. 

Weight  of  screw 

4  tons 

Diameter  of  main  drum 

18  feet 

Diameter  of  screw-shaft  drum 

6    „ 

Weight  of  coal 

] 

1,200  tons 

283 


CHAPTER   X. 

•  STEAM  NAVIGATION.      INTRODUCTION  OF  THE  SCREW 

PROPELLER  INTO   THE  ROYAL  NAVY. 

A.D.  1841—1844.     JETATis  36—39. 

APPOINTMENT      OF     MB.     BRUNEL     TO     CONDUCT     EXPERIMENTS      FOB      THE 
ADMIRALTY     WITH     VARIOUS     FORMS     OF     THE     SCBE-W     PROPELLER,    APRIL 

1841 TRIALS    WITH     THE    '  POLYPHEMUS  ' OPPOSITION     TO     MR.    BRUNEl's 

EXPEHIMBNTS  — TRIALS  WITH  THE    '  BATTLER,'  OCTOBER  1843-OCTOBER  1844. 

Soon  after  Mr.  Brunei  had  taken  the  bold  step  of  recom- 
mending the  adoption   of  the    screw  propeller    in    the 

*  Great  Britain,'  he  was  asked  to  send  a  copy  of  his  report 
to  the  Admiralty,  He  did  so  ;  and  in  the  course  of  a  few 
months  was  invited  to  attend  the  Board  on  the  subject  of 
some  experiments  their  Lordships  proposed  to  make. 

An  interview  took  place  on  April  27,  1841 ;  of  which 
Mr.  Brunei  gives  the  following  account : — 

I  attended  the  Board :  Lord  Minto  stated  that  he  wished  a 
complete  experiment  to  be  made  on  the  applicability  of  the  screw 
to  Government  boats,  and  he  proposed  to  place  the  conduct  of  the 
experiments  in  my  hands  as  a  professional  man.  I  stated  that  I 
should  have  great  pleasure  in  doing  it,  and  should  take  great  interest 
in  it,  provided  they  intended  to  make  a  good  experiment  and  would 
place  it  entirely  in  my  hands,  vrithout  the  intervention  of  any 
Government  officers,  but  that  I  should  communicate  direct  with  the 
Lords,  and  of  course  with  Sir  E.  Pariy.'  He  said  he  proposed  to 
build  a  vessel  and  engines  on  purpose,  and  that  he  particularly 
wished  it  to  be  left  entirely  in  my  hands,  and  took  me  apart  to  the 
window  to  impress  this  last  condition  on  me. 

'  Sir  E.  Parry  was  at  that  time  Con-  supporter  of  those  who  desired  to  make 
trollerof  Steam  Machinery,  and  a  warm    a  fair  trial  of  the  screw  propeller. 


284        INTRODUCTION  OF  THE  SCREW  PROPELLER.      [a.».  1841. 

Within  a  fortniglit  of  Ms  appointment,  Mr.  Brunei 
invited  Messrs.  Maudslay  and  Field  and  Messrs.  Seaward 
to  send  him  designs  for  the  engines :  they  were  to  have 
been  of  200-horse  power,  with  a  stroke  of  4  feet.  The 
engines  were  to  make  a  smaller  number  of  revolutions 
than  the  screw,  the  motion  being  communicated  from  the 
engine  shaft  to  the  screw  shaft  by  drums  and  straps. 
This  arrangement  was  adopted  in  preference  to  tooth- 
gearing,  in  order  to  facilitate  the  variation  of  the  number 
of  revolutions,  in  the  experiments  with  different  screws. 

The  designs  ultimately  sent  to  Mr.  Brunei  for  his  ap- 
proval were  those  of  Messrs.  Maudslay  and  Messrs.  For- 
rester. He  reported  to  the  Admiralty  in  favour  of  Messrs. 
Maudslay's  engines. 

Before  drawing  up  the  detailed  specifications,  Mr. 
Brunei  was  desirous  of  procuring  data  for  estimating  the 
surface  of  the  screw  required  to  obtain  the  same  resist- 
ance as  that  offered  by  the  paddles  of  a  ship  similar  to 
the  new  vessel.  With  this  object  he  applied  to  the  Admi- 
ralty for  permission  to  make  an  accurate  trial  of  the  per- 
formances of  the  paddle  steamer  ^  Polyphemus '  at  various 
speeds.  This  permission  was  granted ;  the  trial,  however, 
was  fixed  for  such  an  early  day  that  Mr.  Brunei  had 
barely  time  to  make  the  preliminary  arrangements,  with 
the  assistance  of  his  friend  Captain  Claxton. 

When  Captain  Claxton  arrived  at  Southampton,  the 
day  before  the  trial,  he  found  that  there  was  no  measured 
mile  set  out.  He  immediately  hired  men,  got  chains, 
staffs,  and  flags,  and  set  out  both  a  nautical  mile  and  a 
statute  mile.  They  made  half  a  dozen  runs  each  way 
with  the  '  Polyphemus,'  noting  carefully  all  particulars  of 
speed,  revolutions,  &c. ;  and  the  results  obtained  were  con- 
sidered very  satisfactory. 

On  October  1,  Mr.  Brunei  received  information  from  the 


JET.  36.]       COMMUNICATIONS  WITH  THE  ADMIKALTY.  285 

Admiralty  (now  under  the  administration  of  the  Earl  of 
Haddington)  that  Messrs.  Maudslay  and  Field's  tender 
was  accepted.  The  engines  were  immediately  put  in  hand, 
under  Mr.  Brunei's  supervision. 

When  they  were  approaching  completion,  he  became 
anxious  to  learn  something  about  the  progress  of  the 
ship  which  was  to  have  been  built  for  them.  Nowhere 
could  she  be  found.  The  minutes  were  searched  at  the 
Admiralty,  and  it  was  ascertained  that  the  ship  was 
ordered,  but  that  no  ship  had  been  laid  down.  This 
discovery,  as  might  be  supposed,  excited  considerable 
surprise.  Mr.  Brunei  was  sent  for  to  the  Admiralty  to 
see  Sir  George  Cockbum,  the  First  Naval  Lord.  Almost 
the  first  words  to  him  were :  *  Do  you  mean  to  suppose 

*  that  we    shall   cut  up   Her  Majesty's  ships  after  this 

*  fashion,  sir?' — Sir  George  at  the  same  time  pointing  to 
a  model  of  the  stem  of  an  old-fashioned  three-decker, 
in  which  large  slices  were  taken  off  to  give  room  for  the 
screw,  and  the  whole  of  the  lower  deck  exposed  to  view, 
thus  making  the  application  of  the  screw  look  very  ridicu- 
lous. On  the  model  was  written,  *  Mr.  Brunei's  mode 
'  of  applying  the  screw  to  Her  Majesty's  ships.'  Mr. 
Brunei  smiled,  and  denied  its  being  his  idea  at  all ;  he 
had  never  seen  it  before,  and  knew  nothing  about  it. 
'  Why,  sir,  you  sent  it  to  the  Admiralty.'  This  also  Mr. 
Brunei  denied  having  done.  While  an  enquiry  was  being 
made  as  to  where  the  model  came  from,  Mr.  Brunei 
employed  himself  in  effacing  the  inscription  with  his 
knife.  When  the  messenger  returned,  he  reported  that 
the  model  had  come  from  the  office  of  the  Surveyor  of 
the  Navy.  He  was  sent  for,  but  did  not  appear.  Mr. 
Brunei,  to  terminate  this  awkward  interview,  pleaded 
business,  and  bowed  himself  out. 

Mr.  Brunei  often  told  this  anecdote,  and  spoke  of  the 


286         INTRODUCTION  OF  THE  SCREW  PROPELLER,      [a.d.  1812. 

adverse  influence  which  had  been  exerted  in  some  depart- 
ment of  the  Admiralty  to  prevent  the  successful  issue  of 
these  experiments. 

Soon  afterwards  Mr.  Brunei  was  informed  that  the 
*  Acheron  '  would  be  prepared  for  the  screw.  He  there- 
upon represented  to  their  Lordships  that  the  *  Acheron ' 
could  not,  from  her  full  after-body  and  other  defects,  be 
converted  into  such  a  ship  as  the  Board  had  originally 
determined  to  construct  for  trying  the  screw ;  and, 
indeed,  her  unfitness  was  admitted  by  the  authorities 
themselves. 

To  a  letter  on  this  subject,  in  which  he  stated  that  the 
attempt  to  apply  the  screw  propeller  to  the  *  Acheron' 
would  not  answer  any  of  the  objects  which  their  Lord- 
ships had  in  view,  Mr.  Brunei  received  no  reply,  and  for 
the  next  four  months  was  kept  quite  in  the  dark  as  to 
what  was  going  on.  At  length  he  made  enquiries  as  to 
the  cause  of  a  treatment  which,  he  said,  he  had  never 
before  experienced  from  any  public  body. 

These  enquiries  proving  fruitless,  he  at  last  wrote  to 
the  Admiralty,  declining  further  interference,  as  it  had 
appeared  on  investigation  that  the  condition  on  which  he 
had  accepted  his  position  from  Lord  Minto — namely,  that 
he  should  have  the  entire  superintendence  of  the  experi- 
ments— had  not  been  observed. 

On  the  receipt  of  his  resignation,  Mr.  Brunei  was  sum- 
moned to  the  Admiralty.  He  thus  described  his  interview 
in  a  letter  to  a  friend : — 

Not  a  word  was  said  about  my  complaint  of  the  past,  but  they 
said  they  wished  me  to  continue  the  experiments,  and  that  my  screw 
was  to  be  tried  first.  I  said  that  was  not  at  all  what  would  suit  me ; 
that  I  would,  if  they  wished  it,  conduct  an  experiment  as  originally 
proposed  ;  that  I  h^d  no  screw,  that  I  was  no  competitor,  but  an  arbi- 
trator in  whom  the  Admiralty  had  perfect  confidence;  that  I  was  this 
or  nothing.      Then  commenced  a  tedious  fencing  .  .  .  HoAvever,  it 


MT.  36.]  TRIALS  WITH  THE  '  EATTLER.'  287 

ended  in  all  parties  being  written  to,  and  told  that  they  wex-e  to  follow 
ray  directions,  and  that  I  was  to  proceed  to  give  such  instructions 
as  should  enable  a  full  experiment  to  be  made  of  all  screws  generally. 
I  then  requested  that  this  time  I  might  have  my  instructions  in 
writing. 

In  a  few  days  Mr.  Brunei  received  an  official  intimation 
that  tlie  '  Rattler  '  vras  to  be  adapted  for  the  screw,  under 
his  directions. 

The  ^Eattler  '  was  a  vessel  of  888  tons  burden,  176  feet 
6  inches  between  the  perpendiculars,  and  32  feet  8|  inches 
beam.^  She  had  been  commenced  for  a  paddle-wheel 
steamer  shortly  before,  and  was  of  nearly  the  same  ton- 
nage and  midship  section  as  the  *  Polyphemus,'  but  she 
had  not  the  fine  lines  afb  which  were  so  important  for  the 
use  of  the  screw. 

She  was  not  launched  until  April  13,  1843,  just  two 
years  after  Mr.  Brunei's  first  interview  with  Lord  Minto ; 
and  she  was  then  delivered  to  Messrs.  Maudslay  in  the 
roughest  possible  state. 

Except  during  the  time  that  Mr.  Brunei  was  prevented 
from  attending  to  business  by  the  half-sovereign  accident, 
he  was  in  constant  communication  with  the  dockyard 
authorities  on  matters  relating  to  the  construction  of  the 
ship,  with  Messrs.  Maudslay  as  to  the  multiply ing-gear 
and  engines,  and  with  Mr.  F.  P.  Smith  as  to  the  forms  of 
the  various  screws  to  be  tried. 

The  engines  and  screw  were  fitted  in  the  ship,  after 
considerable  delay ;  and,  on  October  24,  1843,  Mr.  Brunei 
reported  on  them  in  their  completed  state.  On  the  30th, 
the  experiments  were  commenced. 

More  than  twenty  trials  were  made  between  that  date 
and  the  following  October,  when  the  '  Rattler  '  went  to  sea, 
and  Mr.  Brunei  could  not  of  course  any  longer  personally 

'  Bourne,  on  the  Screw  Propeller,  ed.  1867,  p.  263. 


288       INTKODUCTION  OF  THE  SCREW  PROPELLER.       [a.d.  1843. 

superintend  the  experiments ;  but,  except  on  one  or  two 
occasions  when  his  place  was  supplied  by  an  assistant,  all 
the  trials  that  were  made  during  the  first  year  were  con- 
ducted in  his  presence,  and  he  transmitted  the  results 
from  time  to  time  to  the  Admiralty.^ 

The  performance  of  the  'Rattler'  was  found  to  be  satis- 
factory ;  and  the  position  of  the  engines  and  screw  being 
below  the  water  line  was  so  pre-eminent  an  advantage,  that 
in  1845  the  Lords  of  the  Admiralty  ordered  more  than 
twenty  vessels  to  be  fitted  with  the  screw  ;^  and  since 
that  time  it  has  gradually  superseded  the  paddlewheel  for 
ships  of  war. 

The  services  which  Mr.  Brunei  rendered  to  the  country 
during  the  whole  of  these  proceedings  were  given  entirely 
without  pecuniary  recompense,  and  in  the  face  of  oppo- 
sition and  discouragement ;  but  he  had  the  satisfaction  of 
knowing  that  he  had  been  mainly  instrumental,  not  only 
in  introducing  the  screw  propeller  into  the  mercantile 
navy,  but  also  in  securing  its  adoption  in  Her  Majesty's 
fleet. 


'  The  records  of  these  trials,  found  at  p.   284  of  his  work  on  the  Screw 

among  Mr.  Brunei's  papers,  show  re-  Fropeller,  ed.  1867. 
suits  which   coincide   in  all  material         *  Bourne,  Appendix,  p.  xxxiii. 
points  with  those  given  by  Mr.  Bourne 


289 


CHAPTER  XI. 

STEAM  NAVIGATION  —  THE  'GREAT  EASTERN'  STEAM-SHIP, 
FROM  THE  COMMENCEMENT  OF  THE  UNDERTAKING  TO 
THE  LAUNCH. 

A.D.  1851—1857.     JETATis  46—52. 

IKTRODTJCTOEY  OBSERVATIONS — THE  AUSTRALIAN  STEAM  NAVIGATION  COM- 
PANY—  STATEMENT  OF  MR.  BRUNEL's  PROJECT  OF  A  LINE  OF  LARGE  SHIPS 
(jUNE  10,  1852) ADOPTION  OF  HIS  PLANS  BY  THE  EASTERN  STEAM  NAVIGA- 
TION COMPANY — EXTRACT  FROM  A  LETTER  DESCRIBING  THE  SCHEME    (jULY 

1,  1852) LETTER  TO  J.  SCOTT  RUSSELL,  ESQ.,  ON  THE  FORM  AND  DIMENSIONS 

OF  THE  GREAT  SHIP  (jULY  13,  1852) REPORT  ON  MODE  OF  PROCEEDING  (jULY 

21,  1852)— REPORT    ON   ENQUIRIES  RELATING    TO    THE    DRAUGHT   AND    FORM 

OF  THE  VESSEL  (OCTOBER  6,  1852) REPORT    ON    THE   PROCEEDINGS    OF    THE 

COMMITTEE  APPOINTED  TO  CONSIDER  MR.  BRUNEl's  PLANS  (mARCH  21,  1863) 

TENDERS  INVITED  FOR  THE  SHIP  AND  ENGINES — REPORT  ON  TENDERS  (mAY 

18,  1853)— PREPARATION  OF  THE  CONTRACTS  AND  SPECIFICATIONS EXTRACTS 

FROM   MR.    BRUNEl's    MEMORANDA    (A.  D.   1852,  1853,  1854)— LETTER    ON    HIS 

POSITION  AND  DUTIES  AS  ENGINEER  OF  THE    COMPANY  (AUGUST    16,  1854) 

LETTER    ON    AN    ARTICLE    IN    A  NEWSPAPER    (nOVEMBEE  16,  1854) — REPORT 

ON  THE  U-NDERTAKING  (FEBRUARY  5,  1855) ARRANGEMENTS  PROPOSED    FOR 

OBTAINING   ASTRONOMICAL    OBSERVATIONS — LETTER    TO    G.    B.    AIRY,    ESQ., 

ASTRONOMER    ROYAL    (OCTOBER     6,  1852) APPOINTMENT    OF   ME.    WILLIAM 

HARBISON  TO  THE  COMMAND  OF  THE  SHIP MEMORANDUM  ON  THE  MAN- 
AGEMENT OF  THE  GRF-AT  SHIP  (OCTOBER,  1855) — LETTER  ON  THE  DUTIES 
OF  THE  CHIEF  ENGINEER  (MARCH  19,  1857) — SUSPENSION  AND  RESUMPTION 
OF  THE  WORKS. 

Mr.  Beunel's  earlier  labours  in  connection  with,  the  pro- 
gress of  Ocean  Steam  Navigation  have  been  described  in 
the  chapters  on  the  '  Great  Western  '  and  '  Great  Britain  ' 
steam-ships.^  The  '  Great  Eastern '  is  but  the  result  of 
the  application,  under  different  circumstances,  of  the  same 
principles  which  had  guided  him  in  his  previous  under- 

■  ThelettertoMr.Guppy  of  August  upon  iron  shipbuilding,  subsequent  to 
1843  (given  above,  p.  259)  contains  a  the  date  of  the  design  of  the  'Great 
reference  to  some  of  Mr.  Brunei's  ideas       '  Britain.' 


290  THE  'GEEAT  EASTERN'  STEAM-SHIP.        [a.d.  1851. 

takings,  the  practical  working  out  of  tlie  *  idea  which  he 

*  had  frequently  entertained,  that,  to  make  long  voyages 

*  economically  and  speedily  by  steam,  required  the  vessels 
'  to  be  large  enough  to  carry  the  coal  for  the  entire  voyage 

*  at  least  outwards ;  and,  unless  the  facility  for  obtaining 

*  coal  was  very  great  at  the  out  port,  then  for  the  return 

*  voyage  also ;  and  that  vessels  much  larger  than  had  been 
'  previously  built  could  be  navigated  with  great  advantage 

*  from  the  mere  effect  of  size.'  ^ 

In  1851,  four  years  after  the  release  of  the  *  Great 
'  Britain  '  from  Dundrum  Bay,  Mr.  Brunei  became  again 
connected  with  the  construction  of  steam-ships.  In  that 
year  he  was  consulted  by  the  Directors  of  the  Australian 
Mail  Company  upon  the  class  of  vessels  which  it  would 
be  advantageous  for  them  to  purchase,  in  order  to  carry 
out  their  contract  for  the  conveyance  of  the  mails  to  Aus- 
tralia. He  advised  them  to  have  ships  of  from  5,000  to 
6,000  tons  burden,  in  order  that  they  might  only  have 
to  touch  for  coal  at  the  Cape. 

Some  of  the  Directors  would  not  hear  of  so  startling: 
a  proposition ;  but  they  nevertheless  asked  Mr.  Brunei 
to  become  their  Engineer ;  and  he  retained  the  post  till 
February  1853.  Two  ships  were  built  under  his  direc- 
tion by  Mr.  J.   Scott   Eussell— the   'Victoria'   and  the 

*  Adelaide.' 

It  was,  no  doubt,  his  connection  with  the  Australian 
Mail  Company  that  led  Mr.  Brunei  to  work  out  into 
practical  shape  the  idea  of  '  a  great  ship '  for  the  Indian 
or  Australian  service,  which  had  so  long  occupied  his 
mind  ;  and  it  appears  that  in  the  latter  part  of  1851  and 
the  beginning  of  1852  he  devoted  much  time  and  thought 
to  the  subject.  He  collected  facts  relating  to  the  trade 
with  India  and  Australia  which  demonstrated  the  advan- 

'  Extract  from  a  memorandum  by  Mr.  Brunei  (dated  Febniary  25,  1854)  on 
the  early  history  of  the  great  ship. 


JET.  46.]  ORIGIN  OF  THE  PROJECT.  291 

tages  to  be  gained  by  a  rapid  and  direct  communication 
for  the  conveyance  of  passengers  and  troops,  as  well  as 
of  merchandise.  It  was  with,  these  enlarged  views  that 
Mr.  Brunei  entered  upon  the  construction  of  the  '  Great 

*  Eastern.'  He  writes  in  February  1854,  '  In  February 
'  and  March  1852  I  matured  my  ideas  of  the  large  ship 

*  with  nearly  all  my  present  details,  and  in  March  I 
'  made  my  first  sketch  of  one  with  paddles  and  screw. 

*  The  size  I  then  proposed  was  600  x  70,  and  in  June  and 
'  July  I  determined  on  the  mode  of  construction  now 
'  adopted  of  cellular  bottom ;  intending  then  to  make  the 
'  outer  skin  of  wood  for  the  sake  of  coppering.' 

In  the  spring  of  1852  he  communicated  the  results  at 
which  he  had  arrived  to  Mr.  John  Scott  Russell,  Captain 
Claxton,  and  other  scientific  friends,  and  also  to  several 
Directors  of  the  Eastern  Steam  Navigation  Company. 

This  Company  had  been  formed  in  January  1851  for  the 
purpose  of  establishing  an  additional  line  of  steam  commu- 
nication by  the  overland  route,  for  the  conveyance  of  mails, 
passengers,  &c.,  between  England,  India,  and  China,  with 
a  branch  to  Australia.  However,  in  March  1852  the 
Government  determined  to  grant  the  contract  for  the 
whole  service  to  the  Peninsular  and  Oriental  Company. 
The  Directors  of  the  Eastern  Steam  Company  were  there- 
fore obliged  to  report  to  their  shareholders  that  the  object 
for  which  the  Company  had  been  incorporated  could  not 
be  carried  out. 

At  about  this  time  Mr.  Brunei's  scheme  was  brought 
before  the  Directors,  and  he  submitted  to  them  a  detailed 
statement  of  his  project. 

After  describing  the  size  and  capacities  of  the  vessels 
then  used  on  the  route  between  England  and  the  East, 
and  the  amount  and  cost  of  the  coals  they  consumed,  he 
continued : — 

TJ  2 


292  THE   '  GEE  AT  EASTERN '  STEAM-SHIP.        [a.b.  1852. 

June  10,  1852. 
The  same  amount  of  capital  and  the  same  expenditure  in  money 
for  fuel  now  required  for  a  line  of  ships  of  the  present  dimensions 
would  build  and  work  ships  to  carry  in  the  year  double  the  number 
of  passengers,  with  far  superior  accommodation,  and  in  about  half  the- 
time,  and  two  or  three  times  the  amount  of  cargo  ;  the  whole  dif- 
ference being  produced  simply  by  making  the  vessel  large  enough  to 
carry  its  own  coal,  exactly  as  when  the  '  Great  Western '  was  projected 
for  the  New  York  line,  the  passage  had  been  considered  an  im- 
possible one  for  steamboats,  or,  if  possible,  only  at  a  total  sacrifice 
of  all  return  for  the  cost.  Certainly,  no  steamboat  then  built  could 
get  across  except  by  a  chance  fair  weather  passage,  and  then  only  by 
being  completely  filled  with  coals  and  leaving  no  room  for  passengers 
or  cargo.  Simply  by  building  a  ship  of  the  size  necessary  to  take 
the  coal,  over  and  above  the  accommodation  required  for  a  due 
number  of  passengers  and  a  reasonable  quantity  of  cargo,  the 
passage  was  rendered  perfectly  easy  and  certain,  and  has  since 
become  a  mere  matter  of  course,  and  an  ordinary  and  profitable 
trading  voyage. 

The  increased  size,  instead  of  being  a  disadvantage,  was  found, 
as  predicted  by  the  projectors,  to  be  a  great  benefit,  and  gave  in- 
creased speed,  even  beyond  that  proportionate  to  the  power ;  and 
this  steamboat,  built  in  1836,  is  still  as  good  as  any  of  her  size  afloat. 
Nothing  more  novel  is  proposed  now,  but  again  to  build  a  vessel 
of  the  size  required  to  carry  her  own  coals  for  the  voyage.  The  use 
of  iron,  which  has  since  1836  become  common,  removes  all  difficulty 
in  the  construction,  and  the  experience  of  several  years  has  proved, 
what  was  believed  before  by  most  unprejudiced  persons,  that  size 
in  a  ship  is  an  element  of  speed,  and  of  strength,  and  of  safety,  and 
of  great  relative  economy,  instead  of  a  disadvantage  ;  and  that  it  is 
limited  only  by  the  extent  of  demand  for  freight,  and  by  the  circum- 
stances of  the  ports  to  be  frequented. 

A  Committee  was  appointed  to  confer  with  Mr.  Brunei 
and  with  Mr.  Scott  Russell,  'who  was  fully  acquainted 
'  with  all  Mr.  Brunei's  plans,  and  had  ably  assisted  him 
*  in  maturing  them.'  * 

The  Committee  reported  to  the  Directors  that  thej  had 
met  on  the  day  after  their  appointment,  when,  Mr.  Brunei 

'  So  Mr.  Brunei  wrote  to  the  secretary  when  excusing  his  own  absence 
from  the  meeting  on  account  of  illness. 


JET,  47.]  STATEMENT   OF  THK  SCHEME,  293 

being  unavoidably  absent,  Mr.  Eussell  bad  attended  and 
entered  into  a  very  full  explanation  of  Mr.  Brunei's  plans, 
and  tbat  a  long  investigation  of  his  proposition  bad  taken 
place ;  tbat  a  few  days  later  they  had  met  again,  when  Mr. 
Brunei  attended,  and  that  after  a  further  and  most  satisfac- 
tory investigation,  they  had  come  to  an  unanimous  decision 
in  favour  of  the  scheme.  This  resolution  was  adopted, 
and  Mr.  Brunei  was  appointed  Engineer  to  the  Company. 

The  following  extracts  from  his  reports  and  corre- 
spondence carry  on  the  narrative  till  the  date  of  the  next 
meeting  of  the  shareholders  (December  1,  1852),  when 
the  details  of  the  project  were  laid  before  them : — 

Extract  from  a  Letter  describing  the  Scheme. 

July  1,  18.52. 
The  principle  is,  as  I  explained  to  you,  a  very  simple  one — that  of 
building  ships  to  carry  their  own  coals,  instead  of  incurring  large 
expenses  and  great  delay  in  coaling  at  numerous  intermediate 
stations  ;  and  the  result  is  a  large  vessel  certainly,  but  one  which,  at 
the  same  cost  of  fuel  as  is  now  required  for  small  ones,  has,  besides 
that  room,  for  4,000  or  even  5,000  tons  (measurement)  of  cargo, 
and  as  many  passengers  as  offer.  Thus  the  capital  embarked  in  the 
one  vessel  is  not  so  great  in  proportion  to  the  tonnage  space  for 
cargo  as  the  capital  embarked  in  several  smaller  vessels  carrying  the 
same  amount ;  while  the  current  expenses  are  greatly  less,  and  the 
speed,  and  economy  of  time  by  that  speed  and  by  avoiding  tedious 
stoppages,  greatly  in  favour  of  the  large  one.  Practical  men  concur 
with  me,  not  merely  in  the  practicability  of  constructing  the  vessel, 
but  in  the  great  advantage  as  regards  speed,  seaworthiness,  and 
safety  resulting  merely  from  the  increased  size ;  while  all  the  mer- 
cantile men  concur  in  the  opinion  that  if  goods  can  be  carried  direct 
in  thirty  to  thirty-five  days,  the  certainty  of  freight  ensiu:es  a  return 
far  beyond  all  present  proportion  of  return  to  cost.  .  ,  .  On  these 
points,  of  covu"se,  I  quote  only  the  opinions  of  the  Directors.  On  the 
mechanical  part  I  offer  my  own  opinion,  and  may  quote  tliose  of  the 
first  practical  men  of  the  day — Messrs,  Maudslay,  Messrs.  Watt  and 
Co.,  and  J.  Scott  Russell,  all  of  whom  have  assisted  me  in  the  pro- 
ject, and  are  prepared  to  join  in  it. 


:VERS!TY    OF     i  Or:ON'T- 


294  THE   '  GEEAT  EASTEKN '  STEAM-SHIP.        [a.d.  1852. 


Letter  to  J.  Scott  Russell,  Esq.,  on  the  Form  and 
Dimensions  of  the  Great  Ship. 

July  13,  1852. 

The  adoption  of  this  plan  being  now  determined  upon,  we  must 
proceed  to  determine  the  details,  and  the  first  step  unquestionably 
is  the  determination  of  the  size  and  form  of  the  ship.  Now,  in  pre- 
paring the  general  design,  I  think  the  following  conditions  should  be 
strictly  complied  with.  If  any  of  them  appear  to  involve  any  great 
sacrifice  in  cost,  or  to  involve  any  other  peculiar  difificulties,  these 
difficulties  can  be  considered  afterwards ;  but  the  wisest  and  safest 
plan  in  striking  out  a  new  path  is  to  go  straight  in  the  direction 
which  we  believe  to  be  right,  disregarding  the  small  impediments 
which  may  appear  to  be  in  our  way — to  design  everything  in  the 
first  instance  for  the  best  possible  results  strictly  according  to  the 
principles  which  theory,  so  far  as  it  is  supported  by  practice,  teaches 
us,  and  without  yielding  in  the  least  to  any  prejudices  now  existing 
unsupported  by  theory  and  practice,  or  any  fear  of  the  consequences ; 
we  can  then  afterwards  weigh  and  balance  deliberately  the  advan- 
tages of  adhering  to  or  giving  up  this  or  that  particular  part,  or 
modifying  dimensions,  either  from  motives  of  economy,  or  as  yield- 
ing to  public  opinion  from  motives  of  policy. 

In  determining  the  lines  of  the  ship,  for  instance,  I  should  adopt 
that  which  we  have  reason  to  believe  the  best  possible  without  any 
concession,  or  any  compromise  or  regard  to  any  assumed  difficulties 
of  construction,  or  regard  to  assumed  opinions ;  these  difficulties  will 
very  likely  vanish  afterwards  if  disregarded  in  the  first  instance,  as 
in  the  case  of  the  continuous  curve,  in  which  my  fresh  ideas  had  the 
advantage  even  of  your  much  greater  knowledge,  hampered  by  a 
little  preconceived  idea.  With  respect  to  the  size,  to  arrive  at  it  by 
constructive  -calculations  from  the  fixed  conditions  that  we  can  lay 
down  is  perhaps  possible,  but  rather  difficult,  and  I  think  we  know 
sufficiently  nearly  now  what  the  minimum  size  must  be  to  work 
upon ;  that,  and  a  trifling  alteration  afterwards  in  the  scale,  will 
suffice  to  bring  it  to  the  exact  required  capacity. 

The  positive  conditions,  then,  are  a  maximum  draught  of  water  of 
24  feet,  when  leaving  the  Hooghly  with  the  coals  for  the  voyage 
home  ;  and  the  capacity  must  be  at  least  21,000  tons  of  displacement 
at  this  draught  of  24  feet. 

I  think  you  will  find  that  to  effect  this  comfortably  you  mu.st 
give  fi  length  of  650  feet  at  least,  and  an  extreme  breadth  of  80  feet. 


,i;t.  47.]  LETTEE  ON  DIMENSIONS  OF  THE  SHIP.  295 

but  this  beam  of  80  feet  requiring  no  fuller  entrance  than  you  would 
make  with  a  beam  of  70  feet,  the  80  feet  being  obtained  entirely  by 
continuing  a  gentle  curvature  throughout  the  whole  length,  instead 
of  having  any  parallel  lines. 

If  the  experiments  upon  the  friction  of  surfaces  turn  out  as  I  hope, 
and  give  us  reason  to  expect  a  very  much  less  resistance  from 
a  copper  surface  than  that  now  created  by  painted  iron,  I  suspect  we 
may  be  led  rather  to  increase  our  length  and  diminish  the  proportion 
of  beam ;  but  this  is  a  very  serious  question,  not  entirely  dependent 
on  the  consideration  of  the  form  of  least  resistance  including  friction, 
but  also  materially  affected  by  the  consideration  of  the  advantages 
of  the  extreme  steadiness  of  motion  which  length  seems  to  give.  It 
is  a  subject  which  must  be  Avell  discussed  and  well  considered,  with 
the  assistance  of  all  those  whose  opinions  and  experience  are  likely 
to  be  of  use  to  us.  My  own  impressions,  I  confess,  derived  from 
considering  the  cases  which  we  have,  even  after  the  striking  result 
of  the  '  Ocean  Queen,'  are  that  positive  length,  independently  of 
relative  length,  has  much  to  do  with  it.  When  I  see  that  the 
*  Great  Britain,'  although  with  a  beam  of  about  one-sixth  of  her 
length  at  the  water  line,  and  a  midship  section  favourable  to  rolling, 
is  nevertheless  steady,  I  must  conclude  that  positive  length  may 
compensate  very  greatly  for  a  relatively  wide  beam.  Now,  we  shall 
unquestionably  have  abundance  of  positive  length.  We  must  then  be 
careful  not  to  sacrifice  much  to  keep  a  small  beam,  without  being 
veiy  sure  that  there  are  very  great  advantages ;  and,  except  for  the 
assumed  advantages  of  the  long  parallel  or  equal  bearings,  the 
form  of  least  resistance,  including  friction,  with  a  draught  limited  to 
24  feet,  and  a  required  displacement  of  21,000  tons,  would,  I  appre- 
hend, give  us  a  beam  nearer  90  feet  than  70  feet.  I  should  like  to 
know  exactly  what  the  proportion  would  be  without  regard  to  the 
theory  of  the  long  narrow  parallel  forms  ;  and  then  let  us  consider 
how  much,  if  anything,  should  be  sacrificed  to  attain  the  advantage 
assumed  to  be  attained  by  relative  length. 

Let  us  therefore  have  at  once  the  draft  of  a  vessel  of  21,000  tons 
displacement  at  the  24  feet  water  line,  and  of  such  form  as  will  in 
your  opinion  give  the  greatest  speed  in  smooth  water,  without  seeking 
to  make  it  narrow. 

We  must,  of  course,  also  bear  in  mind  the  comparative  weakness 
of  form  caused  by  length,  and  the  consequent  increased  thickness  of 
material  required,  besides  an  actual  increase  of  surface,  involving  a 
very  considerably  greater  quantity  and  weight  of  material  in  the 
eihip,  which  last  consideration  is  very  greatly  in  favour  of  breadth  of 


296  THE   '  GEEAT  EASTEKN '  STEAM-SHIP.        [a.d.  1852. 

beam ;  for  I  think  you  will  find  that  the  quantity  of  iron  in  two 
ships  of  600  and  700  feet  in  length  respectively,  with  the  same  dis- 
placement and  the  same  ultimate  strength  to  resist  strains,  will  be 
fully  in  the  ratio  of  their  length. 


Report  to  the  Directors  on  Mode  of  Proceeding. 

July  21,  1852. 

Since  the  adoption  by  the  general  meeting  of  the  plan  recom- 
mended by  the  Directors,  I  have  been  engaged  very  constantly  in 
maturing  the  details  of  that  plan,  and  considering  the  course  which 
it  would  be  necessary  to  follow  in  order  to  carry  them  out  in  the 
surest,  safest,  and  most  efficient  manner. 

The  steps  which  are  about  to  be  taken  are  unquestionably  in  the 
right  direction,  but  they  are  considerable  ones,  and  must  be  taken 
with  deliberation  and  certainty,  and  without  leaving  anything 
doubtful ;  and,  when  determined  upon,  they  must  be  followed  up 
with  decision. 

Although  you  will  probably  determine  upon  constructing  not  less 
than  two  vessels  in  the  first  instance,  yet  they  must  both  be  pro- 
ceeded with  at  once,  and  must  in  fact  be  exact  duplicates  of  each 
other.  The  success  of  the  two,  therefore,  depends  upon  that  of 
each ;  there  can  be  no  average  struck  in  such  a  case,  but  the  two 
ships  must  be  designed  and  executed  on  such  principles  and  with 
such  perfection  that  no  doubt  can  exist  of  the  result. 

By  well  considering  all  that  has  been  done,  by  selecting  all  that 
has  been  most  successful,  and  by  a  judicious  application  of  such 
results  to  the  peculiar  circumstances  of  our  case,  all  this  certainly 
can,  I  think,  be  assured,  but  it  can  be  assured  only  by  proceeding 
with  the  caution  and  the  decision  which  the  circumstances  demand. 

In  the  fir.st  place,  as  to  the  designing  of  the  whole,  the  principle 
being  determined  upon,  much  may  be  ascertained  by  mere  calcula- 
tion, but  for  these  calculations  data  are  required,  which  nothing  but 
experience  can  furnish.  I  have,  therefore,  avaHed'TnyBHifoT'the 
assistanceo?TFToSETHrJSt  competent  to  afford  the  required  information. 
I  have  called  in  to  my  assistance  the  gentlemen  whom  I  had  already 
named  to  you  as  best  able  to  give  strength  to  our  position  by  the 
value  of  their  opinions,  and  best  able  to  execute  the  various  parts  of 
the  work  with  that  experience  and  perfection  which  are  essential  to 
our  success. 

With  respect  to  the  form  and  construction  of  the  vessel  itself, 


JET.  47.]  REPOKT  ON  MODE  OF  PEOCEEDING.  297 

nobody  can,  in  my  opinion,  bring  more  scientific  and  practical 
knowledge  to  bear  than  Mr.  Scott  Russell.  As  to  the  proportion  of 
power  to  be  adopted,  the  form  and  construction  of  the  engines, 
screw,  and  paddles,  besides  Mr.  Scott  Eussell,  I  have  had  the 
benefit  of  the  deliberate  consideration  and  advice  of  Mr.  Field,  of  the 
firm  of  Maudslay  and  Field,  and  of  Mr.  Blake,  of  the  firm  of  Watt 
and  Co,  I  have  written  also  to  my  friend  Mr.  F.  P.  Smith,  to  whom 
the  public  are  indebted  for  the  success  of  the  screw,  for  his  advice  on 
the  subject.  With  such  assistance  I  think  we  may  rely  upon  the 
certainty  of  being  able  to  design  and  to  execute  all  that  is  best  in 
the  mechanical  and  ship-building  department.  In  the  naval  depart- 
ment I  have  had  the  opportunity  also  of  consulting  two  gentlemen. 
Captain  Claxton  and  Captain  Robert  Ford,  who  possess  special 
knowledge  and  experience  on  the  subject.  I  have  had  several  con- 
ferences with  all  these  gentlemen,  I  have  explained  fully  my  views, 
and,  with  their  assistance,  settled  preliminarily  some  of  the  principal 
points  of  detail.  What  I  should  propose  to  the  Directors  now  is, 
that  with  that  assistance  I  should  proceed  to  prepare  in  detail  the 
design  of  the  ship,  and  the  exact  dimensions  and  form  of  the 
engines ;  that,  in  the  meantime,  I  should  obtain  information  upon 
certain  points  which  will  govern  you  as  to  the  mode  of  contracting 
for  the  construction  of  the  ships,  and  also  that  I  should  be  au- 
thorised to  adopt  some  means  of  determining  one  or  two  most  im- 
portant points  which  must  govern  some  of  the  principal  dimensions.* 


Report  to  the  Directors  on  Enquiries  relating  to  the 
Draught  and  Form  of  the  Vessel. 

October  6,  1852. 
Since  the  date  of  my  last  letter  to  you,  recommending  that  certain 
enquiries  and  investigations  should  be  set  on  foot  to  determine 
several  points  which  would  materially  influence  the  plans  I  should 
have  to  submit  to  you,  many  circumstances  have  occurred  to  delay 
these  investigations.  Not  having  sent  any  competent  person  ex- 
pressly to  Calcutta  to  ascertain  with  certainty  the  draught  of  water 
that  might  be  adopted,  I  have  endeavoured  to  obtain  as  much  in- 
formation as  possible  upon  this  point  from  persons  capable  of 
affording  it,  who  might  be  in  England. 

'  Mr.  Brunei  concludes  this  report  ship  and  engines,  and  suggests  that  an 
by  indicating  the  best  mode  of  con-  examination  should  be  made  of  the 
tracting  for  the  construction  of  the      river  Hooghly. 


298  THE  '  GREAT  EASTERN '  STEAM-SHIR        [a.d.  1852. 

Several  very  competent  men,  captains  of  long  experience  in  that 
particular  navigation,  and  even  local  pilots  of  the  first  standing, 
happened  to  be  within  reach,  and  I  have  had  personal  communi- 
cation with  these  gentlemen.  Notwithstanding,  however,  these  for- 
tunate opportunities  of  obtaining  information  from  the  best  existing 
authorities,  we  are  left  in  pretty  nearly  the  same  state  of  doubt  as  to 
the  maximum  depth  as  we  should  be  by  a  mere  inspection  of  the 
charts,  the  opinion  of  very  competent  men  varying  so  much  as  to 
fix  this  maximum  as  low  as  21  and  as  high  as  23^  and  even  24  feet. 
They  all  concur,  however,  in  fixing  Diamond  Harbour  as  the  point 
in  the  Hooghly  which  may  easily  be  reached,  but  beyond  which  it 
would  be  almost  impossible  to  go. 

A  question  as  to  the  extent  of  swell  which  in  so  large  a  ship 
might  be  given  to  the  sides,  increasing  the  capacity  without  mate- 
rially increasing  the  resistance,  involved  one  of  the  experiments  to 
which  I  referred  in  my  former  letter ;  these  experiments  have  been 
made,  and  the  result,  such  as  it  was,  of  the  enquiries  before  referred 
to  as  to  the  navigation  of  the  Hooghly,  led  me  to  direct  the  prepa- 
ration of  draughts  of  three  different  models  of  ships,  and  upon  further 
consideration  of  these  three,  and  under  the  circumstances,  I  have 
come  to  the  conclusion  of  recommending  one  which  will  have  the 
following  dimensions  : — namely,  670  feet  in  length,  85  feet  beam, 
and  a  deep  water  draught  of  30  feet. 

Such  a  vessel  would  be  able  to  carry  her  own  coal  for  the  voyage 
home  out  of  the  Hooghly  with  about  23  feet  draught;  but  if 
between  now  .and  the  period  when  the  exact  arrangement  must  be 
determined,  it  is  found  expedient  not  to  attempt  so  great  a  draught  in 
the  Hooghly,  the  same  vessel  will,  by  coaling  at  Trincomalee  on  the 
return  voyage,  be  exactly  adapted  to  work  out  of  the  Hooghly  with  a 
good  cargo  of  goods  and  coals  for  Trincomalee  with  only  20  to  21 
feet  draught. 

I  have  been  in  communication  with  the  eminent  engine  builders 
whose  names  I  have  mentioned  on  a  former  occasion,  and  with 
Mr.  F.  P.  Smith,  the  inventor  of  the  screw  propeller.  Some  trials  and 
investigations  are  still  in  progress  to  determine  the  relative  advan- 
tages of  a  copper  and  iron  bottom,  on  which  question  may  depend 
the  arrangements  which  may  be  requisite  to  provide  for  docking  or 
rather  laying  up  for  cleaning,  and  when  these  points  are  determined 
I  shall  be  prepared  to  lay  before  you  a  complete  design  of  ship  and 
engines  for  your  consideration. 

Efforts  were  made  to  induce  tlie  public  to  assist  in 


XT.  47.]  REPOET   ON  MODE  OF  PROCEEDING.  299 

carrying  out  the  project.  In  February  1853,  the  Chair- 
man (the  late  Mr.  Henry  Thomas  Hope)  and  several 
of  his  colleagues  formed  themselves  into  a  committee 
for  the  purpose  of  communicating  with  Mr.  Brunei  on  the 
subject  of  his  plans,  and  reporting  to  the  Board  thereon. 

The  results  of  this  conference  were  embodied  in  the 
following  report  which  Mr.  Brunei  addressed  to  the 
Directors : — 


Bej)ort  on  the  Proceedings  of  the  Committee. 

March  21,  1853. 
To  enable  the  Committee  to  arrive  at  a  correct  conclusion  on  this 
difficult  question,  I  had  gone  through  rather  lengthy  calculations  of 
the  minimum  dimensions  and  the  comparative  estimated  cost  of  the 
ships  which  Avould  in  each  case  answer  the  purpose  under  the 
several  different  circumstances  which  might  be  assumed ;  and  the 
results  of  these  calculations  were  laid  before  the  Committee,  and  the 
relative  advantages  and  disadvantages  of  each  assumed  case  dis- 
cussed.'    .     . 

After  much  discussion,  and  comparing  the  probable  receipts  with 
the  estimated  expenditure,  and  allowing  fully  for  interest  of  capital 
embarked,  I  think  it  appeared  to  the  Committee  that  as  a  mere 
mercantile  transaction,  and  with  reference  only  to  the  Australian 
trade,  the  larger  vessel  would  be  the  most  economical,  showing  not 
merely  the  means  of  securing  the  largest  return,  but  involving  an 
actual  diminution  of  annual  expenditure.     .     .     . 

The  Committee  were  unanimously  of  opinion  that  the  largest  size 
of  the  first  class  would  be  the  best,  and  would  in  every  way  answer 
the  objects  of  the  Company. 

The  dimensions  arrived  at  by  calculation  for  this  ship  would  be 
in  round  numbers,  670  feet  long,  80  feet  beam. 

This  sized  vessel  would  combine  most  of  the  advantages  which 
we  seek  to  obtain.  It  would  carry  coal  to  Diamond  Harbour  and 
back  to  Trincomalee ;  it  would  afford  room  for  about  800  separate 
cabins  larger  than  those  now  fitted  up  in  packet  ships,  with  large 
saloons,  capable  of  accommodating  1,000  or  1,500  first  and  second- 

'  From  the  great  length  of  this  report  it  has  been  necessary  to  omit  the  less 
important  paragraphs. 


300  THE  'GEEAT  EASTEEN"  STEAM-SHIP.        [a.d.  1853. 

class  passengers ;  and  would  carry  3,000  tons  weight  of  cargo,  with- 
out making  any  allowance  for  that  increase  of  speed  proportionate 
to  the  mere  increase  of  size  of  which  we  see  every  day  fresh  proofs ; 
the  average  speed  of  the  ship,  with  the  proposed  power  of  engine 
and  calculated  consumption  of  coal,  would  be  14  knots  at  the  average, 
making  the  passage  out  in  34^  days,  say  36  ;  but  with  that  increased 
speed  which  has  been  shown  to  take  place  with  increased  dimen- 
sions, we  may  speculate  upon  the  voyage  being  performed  in  30 
days. 

This  same  vessel,  fitted  up  for  the  Australian  voyage,  and  loaded 
deeper,  would  carry  coals  to  Australia  and  back,  would  take  out 
3,000  passengers  easily,  and  a  small  amount  of  cargo  only,  but 
could  bring  back  any  amount  that  could  be  conveniently  collected, 
or  if  provision  were  made  for  taking  in  3,000  or  4,000  tons  of  coal 
in  Australia,  that  additional  amount  of  cargo  might  be  taken  in  the 
passage  out.  The  passage  out  to  Port  Philip  should  be  made  easily 
in  36  days,  and  home  by  Cape  Horn  in  the  same  time. 

The  Committee  having  come  to  the  conclusion  that  this  class  ot 
vessel  would  best  fulfil  the  several  conditions  which  the  circum- 
stances imposed,  I  have  been  engaged  in  determining  the  several 
details  consequent  upon  this  selection  of  size,  and  have  put  in  hand 
drawings  of  the  ship,  which  will  enable  me  to  arrive  more 
correctly  at  the  cost,  and  will  enable  us  to  obtain  tenders  for  the 
construction.  These  details  involve  a  great  deal  of  study  and  con- 
sideration, and  the  making  of  the  drawings  alone  requires  some  con- 
siderable time,  so  that  I  do  not  think  much  advance  can  be  made 
under  three  weeks  from  the  present  date,  but  I  will  endeavour  to 
expedite  the  work  as  much  as  possible. 

Mr.  Brunei  was  authorized  to  continue  his  commu- 
nications -with  engine-makers  and  ship-builders,  and  to 
invite  tenders. 

After  very  detailed  and  careful  calculations  of  the 
smallest  capacity  that  would  secure  the  attainment  of  the 
objects  sought  for,  the  dimensions  of  the  vessel  and  the 
power  of  the  engines  were  finally  determined ;  tenders  were 
received  from  Mr.  Scott  Eussell,  Messrs.  Watt  and  Co., 
and  Messrs.  Humphrys  and  Co.  for  both  sets  of  engines, 
and  from  Mr.  Russell  for  the  construction  of  the  hull 
.■>f  the  ship  and  for  placing  her  afloat. 


iET.  47.]  INVITATION   OF   TENDERS.  301 

A  meeting  of  the  Directors  was  held  on  May  18,  when 
Mr.  Brunei  submitted  the  various  tenders  he  had  received. 
The  Board  agreed  to  adopt  his  recommendations,  and  to 
accept  the  tenders  of  Mr.  Scott  Russell  for  the  ship  and 
paddle  engines,  and  that  of  Messrs.  James  Watt  and  Co. 
for  the  screw  engines. 

The  following  report,  which  Mr.  Brunei  placed  before 
the  Directors,  gives  a  detailed  account  of  the  steps  he  had 
taken  to  procure  the  tenders,  and  the  grounds  on  which 
he  had  formed  his  judgment  of  them  : — 


Report  on  Tenders.^ 

May  18,  1853, 

According  to  yotir  instructions,  I  applied  to  the  several  parties 
with  whom  I  had  previously  been  in  communication  on  the  subject 
of  the  engines  and  ship,  for  tenders  for  their  supply.  As  regards  the 
engines,  I  drew  up  a  short  specification,  defining  generally  what  was 
reqiiired,  and  leaving  the  parties  to  make  their  own  designs  and 
propose  to  me  the  form  of  engine  they  would  adopt. 

With  respect  to  the  ship,  where  no  such  variation  could  be  per- 
mitted, I  have  had  very  detailed  drawings  and  specifications  pre- 
pared. 

Copies  of  the  specifications  are  annexed. 

In  defining  the  power  of  the  engines  and  boilers,  I  have,  in  con- 
formity with  my  own  views  and  of  those  of  several  of  the  Directors, 
who  have  expressed  themselves  strongly  on  the  subject,  required  a 
very  full  amount  of  power,  without  naming  the  nominal  horse-power, 
which  is  a  very  vague  mode  of  defining  anything  but  the  cost  which 
by  custom  is  made  dependent  upon  that  nominal  power ;  but  I  have 
defined  dimensions  of  parts  and  surface  of  boilers  which  will  ensure 
the  means  of  exerting  a  very  large  amount  ©f  power. 

As  regards  the  ship,  I  have  not  spared  strength  of  materials,  and 
have  required  the  best  workmanship. 

The  result  of  this  application  for  designs  and  tenders  is,  upon  the 
whole,  very  satisfactory,  although  two  of  the  parties  from  whom  I 

'  The  passages  which  are  omitted  refer  to  the  relative  cost  and  merits  of  the 
different  tenders. 


302  THE  'GKEAT  EASTERN'  STEAM-SHIP.        [a.d.  1853. 

had  hoped  to  have  received  proposals  have  not  been  able  to  send 
any.     .     .     . 

Mr.  Blake,  of  the  firm  ofWatt  and  Co.,  and  Mr.  J.  S.  Eussell  and 
Mr.  Humphrys,  have,  as  I  had  before  reported,  devoted  much  atten- 
tion to  the  subject :  from  these  gentlemen  I  have  received  distinct 
well-considered  designs  of  the  screw  and  paddle-engines. 

I  have  been  in  frequent  communication  with  these  gentlemen,  and 
have  seen  their  plans  while  in  progress,  and  have  made  my  sugges- 
tions upon  them,  and  assisted  more  or  less  in  maturing  them,  and  at 
all  events  in  preventing  the  adoption  of  any  principle  or  arrangement 
that  I  should  afterwards  object  to.  Notwithstanding  this,  the  three 
designs,  particularly  for  the  screw  engines,  are  totally  dissimilar,  and 
I  am  placed  in  the  difficulty  of  having  to  choose  between  three 
totally  different  plans,  each  designed  by  skilful  and  experienced  men, 
and  each  possessing  many  known  and  acknowledged  advantages. 

I  should  also  observe  that,  although  I  have  known  the  general 
arrangement  which  each  would  adopt,  I  did  not  receive  the  plans  or 
the  tenders  which  I  now  forward  until  last  evening,  and  that  of  Mr. 
Humphrys  as  late  as  10  o'clock  this  morning,  and  that  I  have  not 
therefore  had  time  to  draw  up  any  very  detailed  report  upon  them. 

The  following  are,  however,  the  principal  considerations  which 
influence  me  in  the  selection  which  I  am  disposed  to  recommend. 

It  must  be  borne  in  mind  that  the  screw  engines  will  be  the  largest 
engines  that  have  yet  been  made.  The  principal  part  of  the  pro- 
pelling power  of  the  ship  will  be  thro^vn  upon  the  screw ;  and  upon 
these  engines  therefore  will  mainly  depend  the  performance  of  the 
ship,  and  particularly  upon  their  constant  never-failing  working,  pro- 
bably for  thirty  or  forty  days  and  nights,  must  depend  the  certainty 
of  the  ship's  performance. *  Under  all  these  circumstances,  the  com- 
pactness and  stiffness  of  framing,  the  greatest  possible  simplicity  of 
construction,  and  the  fewest  possible  number  of  parts,  and,  finally,  the 
absence  of  any  novelty,  however  promising,  that  can  introduce  any 
unforeseen  difficulties,  are  conditions  which  would  outweigh  in  my 
mind  many  advantages  that  might,  and  I  think  would,  be  attained  by 
several  arrangements  which  have  been  suggested. 

All  the  designs  now  submitted  comply  with  these  conditions  to  a 
very  considerable  extent  .  .  .  but  the  extreme  simplicity  of 
Mr.  Blake's  engine  leads  me  to  prefer  it. 

As  regards  the  paddle  engine,  I  unhesitatingly  give  the  preference 
to  that  proposed  by  Mr.  Eussell.     I  believe  it  to  be  as  simple  an 

'  Two  years  later  Mr.  Brunei  spoke  '  a  most  grave  question  upon  which 
of  the  success  of  the  screw  engines  as       '  hangs  I  fear  to  think  how  much.' 


JET.  48.]  EEPORT  ON  TENDEES.  303 

arrangement  as  can  be  adopted  for  engines  with  such  a  slow  motion 
and  so  long  a  stroke  as  these  must  have,  and  the  single  crank  in  the 
centre  I  consider  a  great  advantage.     .     .     . 

As  regards  a  contract  for  the  ship,  I  have  found  it  more  difficult 
to  proceed  in  the  ordinary  course.  The  conditions  which  we  must 
ensure  of  quality  of  workmanship  and  execution,  under  close  inspec- 
tion and  within  reach  of  one's  own  supervision,  are  not  easily 
attained ;  and,  though  as  a  matter  of  course  readily  promised  and 
undertaken  by  all  ship- builders,  they  are  rarely  secured.  It  is 
essential  also  that  the  ship  should  be  built  where  the  engines  can  be 
readily  fixed  on  board  before  launching,  and  in  a  yard  which  can 
be  devoted  to  the  purposes  of  the  ship,  and  whence  the  launching 
can  be  effected  with  the  engines  and  boilers  on  board. 

All  these  are  conditions  not  easily  secured.  I  have  been  in  com- 
munication with  one  or  two  parties,  and  the  result  is  a  tender  from  Mr. 
J.  Scott  Russell,  which  I  enclose,  and  which  has  in  fact  been  framed 
upon  my  calculations.  Owing  to  the  recent  rise  in  iron  it  is  some- 
what, but  not  materially,  above  the  amount  at  which  I  had  originally 
estimated  the  vessels ;  but  the  tender,  founded  upon  the  supposition 
of  two  such  vessels  being  ultimately  ordered,  is  as  nearly  as  may  be 
the  same  as  my  original  estimate,  and  upon  the  whole  I  consider 
the  tenders  both  for  engines  and  ships  very  satisfactory  and  con- 
firming fully  our  previous  calculations. 

These  tenders  do  not  include,  in  the  case  of  the  engines,  either 
the  screw  itself  or  the  paddle  wheels,  nor,  in  the  case  of  the  vessel, 
the  cabin  fittings,  masts,  and  rigging,  boats,  or  stores.  I  should 
estimate  these  roughly  at  50,000/.  more, — at  least  such  an  allowance 
ought  to  be  ample ;  but  these  details  will  require  a  great  deal  of 
consideration,  and  could  not  be  included  in  the  original  contracts ; 
while  at  the  same  time  they  can  mostly  be  better  and  more  eco- 
nomically supplied  by  competition  or  by  arrangement  with  the  special 
makers  of  the  respective  articles.     .     . 

During  the  next  six  months  Mr.  Brunei  was  engaged  in 
preparing  the  formal  contracts  and  specifications.  These 
documents  were  settled  with  much  care,  and  after  frequent 
communications  with  the  contractors,  who  consented  to 
the  insertion  of  clauses  which  gave  the  full  control  and 
supervision  over  every  part  of  the  work  to  the  Engineer, 
with  very  large  powers  of  interpretation.     They  required, 


304  THE   'GREAT   EASTERN'   STEAM-SHIP.         [a.d.  1853. 

however,  that,  should  Mr.  Briinel  cease  to  act  as  Engineer, 
any  disputed  point  should  be  settled  bj  arbitration,  and 
not  by  his  successor. 

Besides  the  delay  occasioned  by  the  magnitude  and 
novelty  of  the  undertaking,  there  were  other  difficulties 
which  helped  to  postpone  the  commencement  of  the 
works.  The  Directors  were  unable,  under  their  charter, 
to  enter  into  any  contracts  until  a  certain  amount  of 
their  capital  was  actually  paid  up ;  and,  as  several 
shareholders  had  retired  when  the  change  of  plans  was 
determined  upon,  it  was  no  easy  work  to  get  the  shares 
taken.  That  this  was  eventually  accomplished  was  due 
mainly  to  the  exertions  of  Mr.  Brunei  and  Mr.  Charles 
Geach,  one  of  the  Directors.^  'Could  I  have  foreseen,' 
Mr.  Brunei  writes,  '  the  work  I  have  had  to  go  through, 

*  I  would  never  have  entered  upon  it ;  but  I  never  flinch 

*  when  I  have  once  begun,  and  do  it  we  will.' 

Several  times  they  nearly  broke  down,  but  at  length  the 
contracts  were  signed,  and  on  the  same  day,  December  22, 
Mr.  Brunei  gave  the  formal  notice  to  the  contractors 
to  proceed  with  the  works.  '  After  two  years'  exertions 
(he  wrote),  '  we  are  set  going,  the  contracts  entered  into, 
'  and  the  work  commenced.' 

Extracts  from  Mr.  Brunei's  Memoranda,  a.d.  1852 — 1853. 

July  11,  1852. — The  dimensions  I  commenced  with  in  March 
last,  of  650  X  70  X  30  appear  after  all  to  be  not  far  wrong,  according 
to  present  views.  I  make  them  now  700  x  70  x  24  about ;  but 
much  depends  upon  the  last  dimension,  the  draught.  If  another  foot 
or  two  can  be  safely  taken  it  will  be  of  great  advantage.  .  .  . 
With  this  size  of  vessel,  having  a  midship  section  of  about  1,800,  and 
a  length  of  700,  I  assume  a  nominal  horse-power  of  about  2,500. 

'  Mr.  Geach  wa^  one  of  the  most      commencement  of  the  work,  was  the 
zealous   friends   of   the    great   ship.      first  of  her  many  misfortunes. 
His   death,  within   a   year  after  the 


;kt.  4 8. J  COlilMENCEMENT    OF  THE  WORKS.  305 

The  first  question  of  importance  is,  in  what  proportion  shall  this 
'  be  divided  between  the  screw  and  paddles  ?  .  .  .  My  present 
impression  is  to  halve  the  power  between  the  two. 

In  both  the  engines  every  known  means  must  be  adopted  to 
secure  efficiency : — 1.  An  excess  of  boiler  power;  2,  expansion 
permanently,  say  at  ^ ;  3,  steam  of  not  less  pressure  than  20  lbs., 
and  I  sliould  prefer  25  lbs. ;  4,  that  cylinders,  particularly  top 
and  bottom,  slide  chest,  and  steam  pipes,  be  all  jacketed,  and 
the  jacket  supplied  with  steam  from  an  auxiliary  boiler  of  at  least 
10  lbs,  more  pressure  than  that  of  main  boilers ;  and  it  would  be  very 
desirable  to  make  some  experiments  to  determine  whether  it  is  not 
worth  having  a  heating  apparatus  to  heat  the  steam  immediately 
before  it  enters  the  cylinders.^ 

July  17. — After  a  long  conference  with  Mr.  Field,  I  continue 
of  the  opinion  that  it  would  be  well  to  apply  about  three-fifths 
of  the  power  to  the  screw  and  two-fifths  to  the  paddles,  and  pro- 
bably, as  the  vessel  gets  light,  diminishing  a  little  the  expen- 
diture of  power  on  the  paddles,  and  keeping  up  the  full  power 
on  the  screw.  Mr.  Field  is  not  in  favour  of  increasing  the  pressure 
of  steam  beyond  12  lbs.  or  15  lbs.,  on  the  ground  that  all  the  mecha- 
nical diflSculties  increase  rapidly  without  a  corresponding  advantage, 
particularly  where  size  and  weight  are  not  so  important.  There 
seems  much  truth  in  this.  .  .  .  The  possible  advantages  of  a 
slight  increase  are  not  suflicient  to  justiiy  the  risk  of  the  possible 
new  difficulties  in  a  work  on  so  large  a  scale.  Nothing  uncertain 
must  be  risked.  These  arguments  do  not  apply  to  the  jacketing 
and  heating,  which  Mr.  Field  also  deprecated,  or  rather  discouraged, 
simply  on  the  ground  of  the  trouble  and  difficulty  of  effecting  it, 
but  he  admitted  that  all  experience  went  to  show  the  advantages  of 
it ;  and  as  to  the  difficulties,  which  I  could  not  see,  they  involve  no 
other  risk  than  that  of  being  useless  :  they  cannot  do  mischief.  The 
heating  of  the  top  and  bottom  of  the  cylinders,  I  think,  must  be 
particularly  important  in  a  short-stroked  engine  working  expansively. 
In  a  cylinder  of  80  inches  diameter  and  40  inches  stroke,  having 
regard  to  the  time  of  contact,  the  area  of  the  bottom  will  be  nearly 
equal  in  effect  to  the  surface  of  the  cylinder. 

July  19. — After  much  consideration,  I  think  I  feel  satisfied  that 
the  best  construction  will  be  to  have  strong  bulkheads  every  30 

A 
'  Stringent  conditions  as  to  jacket-       by  Mr.  Bnineli  in  deference  to  the 
ing  were   introduced    into  the   con-       strong  objections  urged  by  the  makeis. 
tracts ;    but  they  were  not  enforced       He  much  regretted  this  concession. 


306  THE   •  GREAT   EASTERN  '   STEAM-SHIP.         [a.d.  18»3. 

feet  or  thereabouts,  this  distance  being  dependent  on  what  is  re- 
quired for  one  set  of  boilers  and  its  stock  of  coals  ;  these  bulkheads 
being  carried  right  up  wherever  practicable — I  think  every  alter- 
nate one  may  be — and  then  place  the  main  ribs  of  the  ship,  and 
even  at  least  two  main  deck  beams,  longitudinal  instead  of  ^ransyerse. 

February  2,  1853. — Several  drafts  of  ships  have  been  made  and 
much  consideration  given  to  the  subject,  and  frequent  discussions 
with  various  parties.  The  result  of  all  is  that  my  present  views  are 
as  follows : — 

The  ship,  all  iron,  double  bottom,  and  sides  up  to  water  line, 
with  ribs  longitudinal  like  the  Britannia  tube.  I  have  not  been 
able  to  devise  any  good  mode  of  determining  the  relative  amount 
of  friction  of  a  copper  and  an  iron  surface ;  and,  although  I  believe  in 
copper,  it  would  not  do  to  act  on  mere  belief  I  therefore  at  present 
settle  iron,  the  surface  being  carefully  made  smooth.  Doubtd  have 
come  across  me  also  as  to  whether  with  a  very  long  surface  the  differ- 
ence between  the  smoothness  will  so  much  affect  the  total  resistance. 
Is  not  a  film  of  water,  after  a  certain  distance,  carried  with  the  body  ? 
and,  if  so,  its  greater  or  less  roughness,  if  not  producing  currents,  is 
almost  unimportant.  Would  there  be  any  difference  in  the  resist- 
ance of  a  jSne  file  or  a  rough  one  drawn  through  tallow,  if  they  both 
covered  themselves  with  grease  ?  Is  there  any  similarity  ?  As  to 
size,  if  we  are  to  go  round  the  world,^  I  do  not  think  we  can  do  with 
less  than — length,  730  ;  beam,  85  ;  draught  deep,  34  ;  and  I  assume  a 
nominal  horse-power  of  engines  equal  to  1|-  of  the  sectional  area  at  30 
feet ;  but,  taking  consumption  as  a  better  measure,  and  assuming  that 
every  possible  economy  is  practised,  and  every  refinement  introduced 
that  can  produce  economy,  I  shall  assvime  7-g  lbs,  per  hour  per  nomi- 
nal horse-power,  or  say  0'08  ton  per  day  per  horse-power ;  and  as 
I  assume  the  horse-poAver  to  be  1^  sectional  area,  it  makes  the  con- 
sumption =0"1  ton  per  day  per  foot  of  sectional  area.  And  this  is 
a  very  large  allowance  and  ought  to  ensure  a  very  high  speed.  In 
order  to  effect  the  utmost  economy,  I  should  work  up  to  20  lbs. 
steam  (calling  it  16  lbs.),  cutting  off  certainly  at  ^  the  stroke,  and 
adopting  every  precaution  to  keep  the  steam  hot  and  the  condenser 
cool.  The  latter  depends,  I  believe,  solely  upon  the  perfect  disper- 
sion of  the  injection  water,  so  that  the  condensation  of  the  steam 
may  take  place  suddenly,  otherwise  the  same  amount  of  Avater 
may  condense  the  steam  in  time,  the  same  amount  of  heat  be  given 
off,  the  same  quantity  of  injection  Avater  used,  and  yet  the  condenser 

'  The  destination  of  the  ship  as  proposed  at  this  time  was  Australia. 


h. 


48.]  EXTRACTS  FEOM  ME.  BRUNEL'S  MEMORANDA.    307 

be  always  full  of  steam  at  a  good  pressure.  It  might  be  well 
worth  the  experiment  to  try  the  effect  of  a  large  injection  at  the 
moment  of  the  exhaust  port  being  opened ;  but  above  all  things 
I  believe  the  heating  of  the  steam  to  be  important ;  and  for  this  pur- 
pose I  should  jacket  the  steam  pipes  and  cylinders  top  and  bottom, 
and  heat  with  high  pressure  steam,  say  at  GO  lbs. — I  have  increased 
this  pressure  the  more  I  think  of  it ;  60  lbs.  would  be  above  300 
degrees,  and  20  lbs.  not  quite  260  degrees ;  therefore  there  would  be 
a  full  40  degrees  of  surplus  to  ensure  the  temperature.  I  have  a 
great  tendency  to  believe  in  the  advantage  of  further  heating  even, 
which  might  be  done  by  a  Perkins'  arrangement  of  hot  water ;  but 
possibly  the  new  conditions,  as  regards  oiling,  &c.,  might  involve 
difficulties  not  desirable  to  introduce  in  this  case.  In  the  boilers  it 
will  also  be  necessary  to  adopt  every  refinement  which  has  been 
found  really  to  answer,  although  not  always  adopted  ;  above  all,  every 
means  of  keeping  them  clean — scum  pans,  and  Field's  exchanging 
apparatus.  But  what  would  be  even  more  elFectual  would  be  some 
easy  means  of  removing  a  whole  bundle  of  tubes  and  replacing  them 
by  clean  ones  ;  and  surely  this  would  not  be  difficult,  the  tubes  being 
large  and  with  plenty  of  space,  so  that  a  man  could  pass  his  arm 
between.  A  rather  important  addition  to  boilers  would  also  be  a 
means  of  blowing  off  without  noise.  Several  modes  would  seem  to 
be  possible,  but  whatever  plan  is  adopted,  it  should  be  one  which  is 
completely  self-acting,  and  perfectly  effectual  when  used  suddenly 
and  without  any  preparation,  and  at  a  moment  of  confusion  and 
alarm.  Blowing  through  a  wire  gauze  pipe  would  probably  be  as 
likely  a  way  as  any.' 

The  more  consideration  I  give  to  the  subject  the  more  disposed  I 
am  to  adopt  oscillating  engines  for  both  screw  and  paddles.  The  ex- 
treme simplicity  and  small  number  of  parts,  and  compactness,  and  the 
direct  action  of  every  resistance  to  the  force  which  it  is  wanted  to 
resist,  seem  to  leave  nothing  to  be  desired,  and  would  seem  to  make 
it  a  better  and  more  mechanical  arrangement  of  a  cylinder  and  crank 
than  any  other,  quite  independently  of  the  object  for  which  it  was 
originally  designed,  which  was  simply  '  stumpiness.' 

February  21. — The  original  line  (to  Calcutta)  seems  likely,  after 
all,  aa  usual  with  most  original  ideas,  to  be  the  best ;  at  all  events, 

'  The  power  of  blowing  off  the  engines  of  a  ship  are  stopped  for  fear 
steam  without  noise  is  of  great  im-  of  an  impending  collision  or  other 
portance,  and  Mr.  Brunei  made  many  accident,  is  so  great,  that  it  is  almost 
experiments  on  the  point.  The  noise  impossible  to  hear  any  orders  that 
of  the  steam  blowing  off,  when  the      may  be  given. 

X  2 


808  THE   '  GREAT   EASTERN '  STEAM-SHIP.         [a.d.  1853. 

SO  good  that  the  vessel  must  be  btiilt  to  be  able  to  go  there.  The 
dimensions  best  fitted  for  this  would  seem  to  be — length,  700  feet; 
beam,  85  feet;  depth  of  hold,  58  feet;  screw,  24  feet;  paddle  60  feet. 
If  arranged  for  Calcutta,  we  must  arrive  there  on  an  even  keel,  and 
therefore,  to  maintain  the  most  equal  level  for  the  paddles,  they  must 
be  kept  well  forward,  and  the  change  principally  at  the  stem. 
Engines  indicated  horse-power  8,000;  steam  at  25  lbs.;  auxiliary 
steam  at  60  lbs. 

The  ship  to  be  lighted  with  gas,  to  be  thoroughly  ventilated  by 
mechanical  means,  having  large  air  trunks,  with  small  pipes  and 
valves  to  each  cabin,  with  the  means  of  warming  this  air  in  cold 
latitudes  and  seasons,  and  cooling  it  in  the  more  frequent  cases  of 
hot  climates.  The  ship  must  be  steered  from  the  forecastle,  whence 
a  perfect  look-out  must  be  kept  with  fixed  telescope,  &c.,  and  speaking 
pipes  and  bells  to  the  engine  rooms. 

March  14. — At  a  meeting  of  the  Committee,  held  this  evening 
here,  the  several  costs  and  qualities  of  four  different  sizes  of  ships,  of 
which  all  the  calculations  had  been  made  by  me,  namely  : — • 


No. 

Length 

Breadth 

Mid.  Sec. 

Draught 

1 

663 

79-9 

1,646 

24 

2 

634 

76-39 

1,640 

25 

3 

609 

73-5 

1,639 

26 

4 

730 

87 

2,090 

28 

were  discussed,  and  the  No.  1  determined  upon  as  the  best  under 
all  the  circumstances.  I  should  propose,  therefore,  to  make  the 
dimensions  of  No.  1  : — length,  680  feet;  beam,  81  feet,  to  be  swelled 
to 83 feet;  extreme  draught,  30  feet;  mean,  24  feet;  daily  consumption, 
say  200  tons. 

This  ship  can  carry  her  coal  to  Calcutta,  and  arrive  and  leave  with 
only  21  feet  6  inches  draught,  having  9  days'  coal  and  3,000  tons  cargo; 
or  she  could  first  go  to  Australia  and  back,  without  or  with  very 
little  cargo  out,  and  consequently  would  take  out  as  much  cargo  as 
you  might  choose  to  send  coal  for  her  to  Australia.     .     .     . 

These  dimensions  are  worked  out  in  the  design  No.  5  (April  9, 
1853),  but  they  would  be  better  for  a  slight  increase,  if  the  83  feet 
were  made  85  feet,  and  the  680  feet  were  made  700.  We  should 
have  an  increase  in  capacity  of  83  x  680=56,440  to  85  x  700=59,500, 
or  6  per  cent,  of  displacement.  This  would  bring  the  displacement 
at  32  feet  draught  up  to  31,250  tons. 

March  22. — Settled  the  various  dimensions  of  scantlings  with 
S.  Russell  to  enable  him  to  direct  drawings  of  all  details  to  be  got  out, 

April  28. — We  are  now  seeking  tenders  for  engines  and   ship 


JBT.  48.]   EXTRACTS  FROM  MR.  BRUNEL'S  MEMORANDA.   309 

of  the  following  dimensions  : — Length,  680  feet ;  beam,  83  feet ; 
mean  draught,  about  25  feet ;  screw  engine,  indicated  horse-power 
4,000  ;  nominal  hor.se-power,  1,600  ;  paddle,  indicated  horse-power, 
2,600  ;  nominal  horse-power,  1,000  ;  to  work  with  steam  15  lbs.  to 
25  lbs. ;  speed  of  screw,  45  to  55  revolutions;  paddle,  10  to  12. 

Among  the  details  of  improvements  still  to  be  considered  are  the 
receiving  through  measures  the  coal  from  the  bunkers,  and  running 
it  on  tramways  and  waggons  to  the  front  of  the  fires,  thus  at  the  same 
time  measuring  out  accurately  the  hourly  consumption,  and  saving 
labour  ;  but  a  still  more  important  object,  the  use  of  clean  water — 
1  that  is,  using  the  same  water  over  again — is  well  worth  considering  ; 
and  it  is  well  worth  the  experiment,  whether  cooling  down  the  water 
of  condensation  to  use  again  is  not  in  fact  the  easiest  way.  With 
an  unlimited  supply  of  cooling  water  this  ought  to  be  easy. 

August  7. — Memoranda  for  engines. — Very  sensitive  governors 
to  be  applied  to  both  engines  to  prevent  running  away. 

November  18. — It  is  curious  that  the  above  should  be  the  last 
memorandum,  as  I  now  open  the  book  to  make  the  same  in  con- 
sequence of  the  accident  to  the  *  Agamemnon.'  ^ 

There  can  be  no  reason  why  a  sensitive  governor  should  not  act 
in  less  than  one  revolution  of  the  crank,  and  act  upon  a  tumbler 
which  should  shut  off  instantly  the  expansion  valve.  There  should 
be  two  such  governors,  one  to  each  end  of  the  crank  shaft,  and 
they  should  work  direct  from  a  spur  wheel  from  the  shaft  without 
any  intermediate  shafting,  to  give  elasticity,  or  to  risk  breaking. 
(Query,  hydraulic  governors?) 

The  auxiliary  engine  and  boiler  to  be  at  least  20  feet  from  bottom, 
and,  better  still,  above  load  water  line,  or  so  boxed  as  to  be  out  of 
reach  of  water ;  so  that  if  the  ship  grounded  and  filled,  this  engine 
would  remain  serviceable  for  pumping  or  anything  else. 

The  history  of  the  *  Great  Eastern '  has  now  been 
traced  up  to  the  date  of  the  contracts  for  the  construction 
of  the  ship  and  her  engines. 

The  following  selections  from  Mr.  Brunei's  memoranda 
illustrate  the  progress  of  the  design  during  the  early- 
months  of  the  year  1 854 :  — 

'  The     screw     propeller    of     the  that,  from  not  having  efficient  gover- 

*  Agamemnon '  was  broken  in  a  trial  nors,  the  engines  flew  round  at   an 

trip  outside  Plymouth  Sound,  on  No-  alarming  speed, 
vembor  9,  1853;  and  the  result  was 


310  THE   'GEEAT   EASTERN'   STEAM-SHIP.         [a.d.  1854. 

February  25,  1854. — The  details  of  construction,  both  of  engines 
and  ship,  involve  an  immense  amount  of  thought  and  labour,  I 
have  devoted  a  great  deal  of  time  to  it  already,  and  yet  even  the 
preliminary  details  either  of  engines  or  ship  are  far  from  being  satis- 
factorily settled.  I  have  no  record  of  the  many  consultations  hitherto 
held  on  the  subject,  but  shall  hope  to  keep  one  hereafter.  On  the 
6th  inst,  some  of  the  drawings  of  the  ship  and  of  parts  of  the 
engines,  having  been  several  times  revised  and  altered,  being  ready, 
I  spent  the  greater  part  of  the  day  at  Millwall  ^  in  going  again  into 
them,  and  settled  some  parts,  such  as  the  dimensions,  &c.,  of  cranks, 
and  bearings,  general  form  of  engine  frame,  and  some  of  the  general 
principles  of  framing  and  plating  of  the  ship.  Some  other  consul- 
tations have  been  held,  and  again  to-day  (February  26)  I  have 
spent  some  hours  at  Millwall.  .  .  Discussed  the  details  of  a  midship 
section,  the  drawings  of  which  were  in  a  forward  state ;  directed 
that  the  cabins  should  positively  be  made  6  feet  6  inches  each  in 
the  clear,  and  the  bulkheads  made  subordinate  to  this  ;  found  that  it 
could  be  done  without  difficulty,  and  without  causing  any  me- 
chanical objections  in  construction.  I  am  anxious  to  have  some 
approximate  estimates  of  weights. 

It  is  evident  that  large  weights  may  most  easily  be  wasted  or 
saved  by  a  careless  or  close  consideration  of  the  best  application  of 
iron  in  every  single  detail.  I  found,  for  instance,  an  unnecessary 
introduction  of  a  filling  piece  or  strip,  such  as  is  frequently  used  in 
ship-building  to  avoid  bending  to  angle  irons  ;  made  a  slight  altera- 
tion in  the  disposition  of  the  plates  that  rendered  this  unnecessary ; 
found  that  we  thus  saved  40  tons  weight  of  iron,  or  say  1,200/.  of 
money  in  first  cost,  and  40  tons  of  cargo  freight — at  least  3,000/.  a 
year.  The  principle  of  construction  of  the  ship  is  in  fact  entirely 
new,  if  merely  from  the  rule  which  I  have  laid  down,  and  shall 
rigidly  preserve,  that  no  materials  shall  be  employed  on  any  part 
except  at  the  place,  and  in  the  direction,  and  in  the  proportion,  in 
which  it  is  required,  and  can  be  usefully  employed  for  the  strength 
of  the  ship,  and  none  merely  for  the  purpose  of  facilitating  the 
framing  and  first  construction. 

In  the  present  construction  of  iron  ships  the  plates  are  not  propor- 
tioned to  the  strength  required  at  different  parts,  and  nearly  20  per 
Went,  of  the  total  weight  is  expended  in  angle  irons  or  frames, 
which  may  be  useful  or  convenient  in  the  mere  putting  together  of 

'  Mr.  Eusselfs  works.      The   ship  was  built  in   a  yard  immediately  ad- 
joining them. 


jiT.  48.]   EXTEACTS  FEOM  MR.  BEUNEL'S  MEMOEANDA.   311 

the  whole  as  a  great  box,  but  is  almost  useless,  or  very  much  mis- 
applied, in  affecting  the  strength  of  the  structure  as  a  ship. 

All  this  misconstruction  I  forbid,  and  the  consequence  is  that 
every  part  has  to  be  considered  and  designed  as  if  an  iron  ship  had 
never  before  been  built ;  indeed  I  believe  we  should  get  on  much 
quicker  if  we  had  no  previous  habits  and  prejudices  on  the  subject. 

March  3. — Mr.  Blake  [of  the  Jinn  of  Messrs.  James  Watt  and 
Co.],  called,  and  went  fully  into  the  general  drawings  which  he 
brought.  On  the  necessity  of  large  surfaces  he  quite  concurred  with 
me.  The  extent  to  which  such  a  general  principle  should  be  car- 
ried is  of  course  very  difficult  to  determine ;  my  idea  is  that  it  has 
never  yet  been  approached.     .     . 

March  10. — Engaged  all  the  afternoon  at  Millwall.  .  .  Settled 
and  signed  the  drawings  of  crank  and  piston  rods.  Went  into  many 
details  of  ship. 

The  extracts  from  Mr.  Brunei's  correspondence  which, 
follow,  have  been  selected  as  containing  a  definition  in 
his  own  words  of  the  position  he  held  as  Engineer  to  the 
Company  by  which  the  great  ship  was  built. 

Letter  to  the  Secretary  of  the  Eastern  Steam  Navigation 
Company. 

[This  letter  was  written  in  consequence  of  a  resolution  of  the 
Directors,  asking  Mr.  Brunei  to  recommend  them  a  resident  en- 
gineer, in  order  that  constant  supervision  might  be  exercised  over 
the  works,  and  frequent  reports  made  to  the  Board. 

The  Directors  rescinded  their  resolution ;  but  this  letter  is 
inserted  as  showing,  in  clear  and  forcible  language,  Mr.  Brunei's 
view  of  the  nature  of  his  duties  and  responsibilities,  and  as 
laying  down  what  in  his  opinion  ought  to  be  the  relations  between 
the  Directors  of  a  Company  and  their  Engineer.] 

August  16,  1854. 
.  .  .  It  surely  cannot  be  necessary  to  remind  the  Directors  that 
the  very  xanusual  stake  which  as  a  professional  man  I  have  been 
willing,  perhaps  imprudently,  to  risk  on  the  success  of  this  project 
—I  mean  stake  of  professional  character,  not  mere  pecuniary  risk — 
must  secure  a  much  greater  amount  of  attention  to  any  step,  and 
supervision  of  any  detail  on  my  part,  than  any  ordinary  professional 
engagement  would  obtain;  the  heavy  responsibility  of  having  in- 


312  THE   '  GREAT  EASTERN '   STEAM-SHIP.        [a.d.  18o4. 

duced  more  than  half  of  the  present  Directors  of  the  Company  to 
join,,  and  the  equally  heavy  responsibility  towards  the  holders  of 
nearly  half  of  the  capital,  must  ensure  on  my  part  an  amount  of 
anxious  and  constant  attention  to  the  whole  business  of  the  Com- 
pany which  is  rarely  given  by  a  professional  man  to  any  one 
subject,  and,  as  it  seems  to  me,  ought  to  command  a  proportionate 
degree  of  confidence,  or  rather  command  entire  confidence,  in  me, 
if  any  at  all,  for  in  such  a  case  there  can  hardly  be  any  medium. 
The  fact  is,  that  I  never  embarked  in  any  one  thing  to  which  I  have 
so  entirely  devoted  myself,  and  to  which  I  have  devoted  so  much 
time,  thought,  and  labour,  on  the  success  of  which  I  have  staked 
so  much  reputation,  and  to  which  I  have  so  largely  committed 
myself  and  those  who  were  disposed  to  place  faith  in  me  ;  nor  was 
I  ever  engaged  in  a  work  which  from  its  nature  required  for  its  con- 
duct and  success  that  it  should  be  entrusted  so  entirely  to  my 
individual  management  and  control.     .     .     . 

The  Directors  have  a  right  to  expect,  and  will  ever  receive,  from 
me  the  fullest  information  and  the  most  unreserved  communication 
upon  all  points  as  they  arise,  as  from  one  who  feels  the  responsibility 
of  being  their  sole  professional  adviser  in  a  very  important  and 
serious  business,  in  which  we  are  all  embarked,  and  all  deeply  inter- 
ested ;  but  I  cannot  act  under  any  supervision,  or  form  part  of  any 
system  which  recognises  any  other  adviser  than  myself,  or  any  other 
source  of  information  than  mine,  on  any  question  connected  with 
the  construction  or  mode  of  carrying  out  practically  this  great  pro- 
ject, on  which  I  have  staked  my  character ;  nor  could  I  continue  to 
act  if  it  could  be  assumed  for  a  moment  that  the  work  required  to 
be  looked  after  by  a  Director,  or  by  anybody  but  myself  or  those 
employed  directly  by  me  and  for  me  personally  for  that  purpose. 

If  any  doubt  ever  arises  on  these  points  I  must  cease  to  be 
responsible,  and  cease  to  act. 

Letter  to  the  Secretary  of  the  Eastern  Steam  Navigation 
Company. 

[In  explanation  of  the  following  letter  it  need  only  be  stated  that 
an  elaborate  article  on  the  great  ship  appeared  in  one  of  the  Lon- 
don newspapers  of  November  1854.  Mr.  Brunei's  name  was  only 
once  mentioned  throughout  the  whole  of  it,  and  in  these  words : 

*  Mr.  Brunei,  the  Engineer  of  the  Eastern  Steam  Navigation  Com- 

*  pany,  approved  of  the  project,  and  Mr.  Scott  Eussell  undertook  to 

*  carry  out  the  design.'] 


JET.  49.]  LliTTER  ON   POSITION  AS  ENaiNEER.  313 

November  16,  1854. 

Since  I  wrote  to  you  I  have  taken  the  trouble  to  read  through 

the   long  article  in  the  ,  and  am  much  annoyed   by  it.     I 

have  always  made  it  a  rule,  which  I  have  found  by  some  years' 
experience  a  safe  and  profitable  one,  to  have  nothing  to  do  with 
newspaper  articles  ;  but  then,  if  on  the  one  hand  the  works  I  have 
been  connected  with  have  rarely  been  puffed  (never  by  me),  they 
have  also  been  rarely  affected  by  misstatements ;  as  such  notices, 
when  not  inserted  by  interested  parties,  are  always  slight  and 
unauthentic,  and  drop  without  producing  any  effect.  This  article 
in  the  ,  however,  bears  rather  evidently  a  stamp  of  au- 
thority, or  at  least  it  professes  to  give  an  amount  of  detail  which 
could  only  be  obtained  from  ourselves  ;  and  if,  as  I  think  is  the  case, 
copies  of  it  have  been  circulated  by  us,  it  may  acquire  the  character 
of  being  an  authorized  statement ;  and,  as  such,  I  am  individually 
much  annoyed  by  a  great  deal  that  is  in  it,  and  by  the  omission  of 
much  that  might  with  propriety  have  been  introduced. 

What  is  constantly  repeated  or  implied,  and  remains  uncontradicted, 
is  at  last  received  almost  unconsciously  as  fact  even  by  those  who 
have  the  means  of  knowing  it  to  be  incorrect,  if  they  thought  about 
it ;  and,  although  from  system  I  have  never  interfered  with  newspaper 
statements,  it  has  not  been  from  any  affected  or  real  indifference  to 
public  opinion,  perhaps  it  was  more  from  pride  than  modesty,  and 
therefore  I  am  by  no  means  indifferent  to  a  statement  which  would 
lead  the  public,  and  perhaps  by  degrees  our  own  friends,  to  forget 
the  origin  of  our  present  scheme,  and  to  believe  that  I,  happening  at 
the  time  to  be  the  consulting  Engineer  of  this  Company,  which  I 
was  not,  and  having  had  no  peculiar  connection  with  previous 
successful  improvements  in  steam  navigation,  allowed  them  to  adopt 
some  plan  suggested  by  others,  who  I  suspect,  if  even  such  were  the 
case,  would  never  appear  to  share  with  me  the  responsibility  if  any 
failure  should  result.  Of  this  certainly  I  have  no  fear,  but  at  the 
same  time  I  am  desirovis  of  something  more  than  mere  immunity 
from  blame. 

I  not  only  read  this  article  once,  but  I  was  so  struck  by  the 
marked  care  shown  in  depreciating  those  efforts  which  I  had 
successfully  made  in  advancing  steam  navigation,  and  mainly  on  the 
strength  of  which  no  doubt  I  originally  obtained  the  confidence  of 
the  Directors,  which  induced  them  to  enter  upon  our  present  bold 
undertaking,  that  I  read  the  paper  a  second  time,  and  for  the  very 
reason  that  I  have  for  so  many  years  shunned  public  writings, 
namely,  to  escape  misstatements,  I  feel  compelled  on  the  present 


314  THE   '  GEEAT  EASTEEN '  STEAM-SHIP.        [a.d.  1864, 

occasion  to  take  some  steps  publicly  to  correct  those  erroneous 
impressions,  which  must  be  created  by  a  document  having  the 
appearance  of  emanating  from  ourselves.     .     .     . 

The  objectionable  points  that  I  refer  to  evidently  did  not  strike 
you,  and  that  is  a  strong  proof  how  easily  incorrect  impressions 
insinuate  themselves  unawares ;  but  I  feel  strongly  that  a  judicious 
friend  would  not  have  failed  to  do  justice  to  the  spirited  merchants 
of  Bristol,  who,  in  spite  of  the  strongest  condemnation  of  the 
plan  by  the  highest  authorities,  and  the  ridicule  of  others,  perse- 
vered in  building  and  starting  the  first  transatlantic  steamer.  The 
circumstances  as  regards  the  '  Sirius '  are  coloured  so  as  to  be  quite 
incorrect ;  and  the  same  friendly  hand  would  not  have  thrown 
ridicule,  and  that  by  a  positive  false  statement,  upon  that  which  he 
at  the  same  time  admits  to  have  been  the  means  of  almost  intro- 
ducing two  of  the  greatest  improvements  in  steam  navigation.  A 
writer  wishing  success  to  our  enterprise  would  not  have  omitted  to 
mention  that  I  had  a  claim  to  public  confidence  on  this  occasion,  for 
the  reason  that  I  was  at  least  the  principal  adviser  in  those  previously 
successful  attempts. 

And  lastly,  I  cannot  allow  it  to  be  stated,  apparently  on  authority, 
while  I  have  the  whole  heavy  responsibility  of  its  success  resting  on 
my  shoulders,  that  I  am  a  mere  passive  approver  of  the  project  of 
another,  which  in  fact  originated  solely  with  me,  and  has  been  worked 
out  by  me  at  great  cost  of  labour  and  thought  devoted  to  it  now  for 
not  less  than  three  years.     .     .     . 

The  works  liad  been  commenced  in  the  spring  of  the 
year  1854,  and  the  progress  of  the  ship  towards  com- 
pletion was  eagerly  watched,  both  by  scientific  men  and  by 
the  general  public. 

The  newspapers  and  periodicals  of  the  day  frequently 
contained  descriptions  of  the  work,  and  statements  of  the 
anticipated  performances  of  the  ship,  often  very  much  ex- 
aggerated. The  writers  seem  to  have  been  quite  at  a  loss 
how  to  convey  to  their  readers  any  idea  of  her  size,  and 
they  generally  attempted  to  do  so  by  comparing  her 
dimensions  with  those  of  some  of  the  weU-known  streets 
and  squares  in  London. ^ 

'  See,  for  example,  an  article  in  entitled  'The  Triton  and  the  Min- 
the  Quarterly  BeviiW  of  March  1856,       '  news.' 


JET   49.]  PROGEESS   OF  THE   WORKS.  315 

In  the  beginning  of  the  year  1855,  the  longitudinal 
and  transverse  bulkheads,  which  formed  the  main  frame- 
work of  the  ship,  were  completed  for  nearly  400  feet  of 
the  centre  portion,  and  the  plating  was  being  fixed  in  place. 

As  the  general  design  was  now  settled,  it  was  thought 
that  the  time  had  arrived  when  it  would  be  desirable 
for  Mr.  Brunei  to  describe  at  some  length  the  nature  of 
the  undertaking,  and  the  manner  in  which  it  was  being 
carried  out. 


Rejport  to  the  Directors  of  the  Eastern  Steam  Navigation 
Company. 

[This  Report  was  published  at  the  time  and  excited  much  atten- 
tion.' The  paragraphs  which  describe  the  arrangements  proposed 
for  launching  the  ship  have  been  omitted,  as  they  will  more  con- 
veniently be  inserted  in  the  following  chapter.] 

February  5,  1855. 

Although  the  simple  description  of  the  present  state  of  the  works 
of  the  ship  and  engines,  and  of  what  has  been  done  during  the  last 
six  months,  may  be  summed  up  in  a  few  words,  I  shall,  in  compli- 
ance with  the  request  of  the  Directors,  embody  in  thi^  the  substance 
of  the  several  other  reports  which  I  have  from  time  to  time  made 
to  the  Court  of  Directors  during  this  half  year,  and  take  this  oppor- 
tunity of  laying  before  the  proprietors  the  fullest  information  upon 
our  plans  and  proceedings.  In  doing  this  it  may  be  difficult  to  avoid 
some  appearance  of  repetition  of  statements  previously  made ;  but  I 
have  thought  it  better,  even  at  the  risk  of  this,  to  refer  to  the  objects 
we  have  had  in  view,  and  explain  fully  the  nature  of  the  works  we 
have  undertaken,  and  the  manner  in  which  we  are  carrying  them  out. 

The  construction  of  the  vessel  is  the  portion  of  our  work  which, 
without  being  actually  novel,  involved  in  all  its  details  the  greatest 
amount  of  special  consideration  and  contrivance. 

The  unusual  dimensions,  the  general  form  and  the  mode  of  con- 
struction of  all  the  parts  involved  by  these  dimensions,  the  necessity 

'  It  must  be  remembered  that  this  report  describes  the  ship  as  she  was  at 
that  time  designed  by  Mr.  Brunei. 


316  THE   '  GEE  AT   EASTEEN '   STEAM-SHIP.        [a.d.  ISoo. 

of  studying  each  part  in  detail,  so  as  to  obtain,  by  judicious  mode 
of  construction  alone,  the  greatest  amount  of  strength  with  the 
minimum  amount  of  material ;  all  these  circumstances,  and  particu- 
larly the  last,  have  rendered  necessary  a  very  large,  though  unseen, 
amount  of  labour  in  the  preliminary  plans  and  stages  of  the  work  ; 
and,  although  I  had  for  nearly  two  years  before  the  contracts  were 
entered  into,  devoted  a  great  deal  of  time  and  thought  to  the  subject, 
yet  of  course  until  the  exact  size  of  the  vessel,  and  the  general  plans 
of  the  Company,  had  been  finally  determined  upon  none  of  these 
matters  could  be  entered  into  in  detail.  Much  time  has  conse- 
quently been  required  to  mature  and  prepare  these  plans  ;  and  as  I 
have  made  it  a  rule  from  the  first  that  no  part  of  the  work  should 
be  commenced  until  it  had  been  specially  considered  and  determined 
upon,  and  working  drawings  in  full  detail  prepared,  and,  after  due 
deliberation,  formally  settled  and  signed,  the  work  did  not  make  at 
the  onset  that  display  of  progress  which  might  have  been  made,  if 
less  regard  had  been  paid  to  establishing  a  good  system  which  would 
prevent  delays  hereafter,  and  ensure  a  more  perfect  and  satisfactory 
result.  I  am  not  prepared  to  say  that  the  work  is  in  that  state  of 
progress  which  will  ensure  its  completion  within  the  period  fixed  in 
the  contract ;  but  I  am  quite  certain  that  if  we  had  proceeded  with 
less  system  we  should  have  considerably  delayed  the  final  completion. 

I  shall  now  refer  to  a  few  of  the  principal  peculiarities  in  the  con- 
struction of  the  ship. 

In  the  preparation  of  the  detailed  plans,  I  have  carried  out  fully 
those  principles  which  I  originally  described  as  leading  features  of 
the  construction. 

The  whole  of  the  vessel  is  divided  transversely  into  ten  separate 
perfectly  water-tight  compartments  by  bulkheads  carried  up  to  the 
upper-deck,  and  consequently  far  above  the  deepest  water  lines,  even 
if  the  ship  were  water-logged,  so  far  as  such  a  ship  could  be ;  and 
these  are  not  nominal  divisions,  but  complete  substantial  bulkheads, 
water-tight,  and  of  strength  sufficient  to  bear  the  pressure  of  the 
water,  should  a  compartment  be  even  filled  with  water ;  so  that  if 
the  ship  were  supposed  to  be  cut  in  two,  the  separate  portions  would 
float ;  and  no  damage,  however  great,  to  the  ship's  bottom,  in  one  or 
even  two  of  these  compartments  would  endanger  the  floating  of  the 
whole,  or  even  damage  the  cargo  in  the  rest  of  the  ship,  or  above 
the  main-decks  of  the  compartment  in  question,  and  all  damageable 
cargo  would  be  stowed  above  that  deck.  Besides  these  principal 
bulkheads  there  is  in  each  compartment  a  second  intermediate  bulk- 
head, forming  a  coal  bunker,  and  carried  up  to   the  main-deck, 


;et.  49.]  REPOKT   DESCRIBING   THE  SHIP.  317 

which  can,  on  on  emergency,  also  be  closed.  There  are  no  openings 
Tinder  the  deep-water  line  through  the  principal  bulkheads,  except 
one  continuous  gallery  or  pipe  near  the  water  line,  through  which 
the  steam  pipes  pass,  and  which  will  be  so  constructed  as  to  remain 
closed,  the  opening  being  the  exception,  and  the  closing  again  being 
easy,  and  the  height  being  such  that,  under  the  most  improbable 
circumstances  of  damage  to  the  ship,  ample  time  would  be  aiforded 
to  close  it  leisurely,  and  to  make  it  perfectly  water-tight.  I  have 
also  adopted  the  system,  to  be  followed  rigidly  and  without  excep- 
tion, of  making  no  openings  whatever — even  by  pipes  and  cocks — 
through  the  ship's  bottom,  or  through  the  inner  skin  below  the 
load  water  line,  and  I  attach  much  importance  to  this  system. 

In  the  majority  of  cases  in  which  steamboats  are  compelled  to  put 
into  port  from  failure  of  bilge-pumps  and  other  really  trifling  defects, 
no  such  serious  consequence  would  have  resulted,  but  from  the 
difficulty  and  almost  impossibility  of  remedying  at  sea  any  defects 
in  the  numerous  pipes  and  openings  now  carried  through  the  ship's 
bottom,  wherever  convenient,  and  without  much  regard  to  the 
danger  of  doing  so. 

I  have  foimd  no  great  difficulty  in  carrying  out  this  system  com- 
pletely, and  the  advantages,  both  as  regards  safety  and  the  facility 
of  remedying  defects  without  delaying  the  ship  on  her  voyage,  must 
be  obvious. 

Independently  of  the  security  attained  by  the  perfect  division  of 
the  ship  into  really  water-tight  compartments  of  a  sufficient  number, 
so  that  the  entire  filling  of  one  or  even  two  of  them  will  not  endanger 
the  buoyancy  of  the  whole,  the  chances  of  any  such  damage  as  can 
cause  the  filling  of  one  of  them  are  greatly  diminished  by  the  mode 
adopted  in  the  construction  of  the  ship's  bottom.  The  whole  of  the 
vessel  (except  the  extreme  stem  and  stern,  the  whole  buoyancy  of 
which  is  comparatively  unimportant  from  the  fineness  of  the  lines), 
up  to  a  height  considerably  above  the  deepest  water  line,  is  formed 
with  a  double  skin,  with  an  intervening  space  of  about  three  feet. 
This  arrangement  resulted  originally  from  the  system  of  construction 
I  adopted,  in  which  the  bulkheads,  placed  at  intervals  of  twenty 
feet,  form  the  main  transverse  frames  or  ribs  of  the  ship,  and  in  the 
intermediate  space  the  material  is  disposed  longitudinally  in  webs 
connecting  the  two  skins,  giving  to  the  whole  much  greater  strength 
•with  the  same  amount  of  material ;  i)ut  one  of  the  most  important 
results  has  been  the  great  increased  security  attained,  as  the  outer 
skin  may  be  torn  or  rent  against  a  rock  without  causing  the  ship  to 
leak. 


318  THE   'GREAT   EASTERN'   STEAM-SHIP.         [a.d.  1855. 

The  space  between  these  two  skins  is  thus  divided,  by  the  longi- 
tudinal beams  or  webs  and  the  principal  bulkheads,  into  some  fifty 
sepai"ate  water-tight  compartments,  any  one  or  more  of  which  may 
be  allowed  to  fill  without  materially  affecting  the  immersion  of  the 
ship. 

Besides  the  main  transverse  bulkheads,  at  about  60  feet  intervals, 
there  are  two  longitudinal  bulkheads  of  iron  running  fore  and  aft,  at 
about  40  feet  in  width,  adding  greatly  to  the  strength  of  the  whole, 
and  forming,  with  the  transverse  bulkheads,  being  all  carried  up  to 
the  upper  deck,  fire-proof  party  walls,  cutting  up  the  whole  into 
so  many  separate  parts,  that  any  danger  from  fire  may  be  almost 
entirely  prevented. 

The  transverse  bulkheads  being  perfect,  there  being  only  one 
door — and  that  of  iron — in  each,  at  one  of  the  upper  decks,  all 
currents  of  air  or  means  of  communicating  fire  may  be  completely 
cut  off;  and  with  an  additional  precaution,  which  I  will  refer  to 
afterwards,  besides  the  most  ample  means  of  supplying  water,  I 
believe  that  all  possibility  of  danger  from  fire  may  be  completely 
prevented. 

All  these  principles  of  construction  being  kept  in  view,  the  details 
of  construction — that  is,  the  arrangement  and  due  apportionment  of 
the  strength  and  size.s  of  all  the  plates,  and  the  mode  of  fastening 
them — having  been  determined  separately,  the  plates  have  been 
made  at  once  of  the  required  dimensions,  and  the  work  has  proceeded 
systematically.  This  system  is  the  most  important,  as  securing  not 
only  good  work,  but  affecting,  to  a  much  greater  extent  than  might 
at  first  be  supposed,  the  total  weight  of  the  ship  ;  which,  although  the 
terms  of  the  contract  protect  the  Company  against  any  excess  of 
expenditure  beyond  a  certain  fixed  sum,  is  yet  of  the  greatest 
importance,  as  will  be  easily  understood  when  I  mention  the  fact 
that  several  merely  trifling  alterations  in  the  modes  of  arranging 
the  plates  and  other  details  have  caused  an  economy  of  20  to  50 
tons  each,  and  that  the  vessel  may  thus  be  made  capable  of  carrying 
200  to  300  tons  more  of  coal,  cargo,  or  provisions ;  or  iron  to  the 
same  amount  may  be  usefully  applied  to  strengthen  other  parts  or 
effect  useful  additions. 

The  details  of  the  engines  have  all  been  settled;  and  the  principal 
parts,  as  already  stated,  are  in  an  advanced  state  of  completion. 

In  considering  the  plans  of  those  engines,  the  largest  that  have 
yet  been  manufactured,  I  have  endeavoured  to  ascertain  what  may 
be  termed  the  weak  points  of  the  best  engines  hitherto  constructed 
by  the  same  or  by  other  makers — those  points  in  which  experience 


MT.  40.]  KEPORT  DESCRIBING  THE  SHIP.  319 

has  pointed  out  deficiencies — and  to  provide  fully  against  similar 
defects  in  our  case. 

Before  commencing  the  boilers,  I  have  taken  every  means  in  my 
power  of  profiting  by  the  experience  of  others,  and  have  collected 
all  the  evidence  and  opinions  as  to  the  precise  form  and  proportions 
which  have  been  found  most  efficient ;  and  particularly  such  as  have 
been  found  best  suited  to  the  combustion  of  anthracite  coal.  A 
very  great  difference  is  found  to  exist  in  the  useful  and  economical 
results  of  boilers,  even  of  good  manufacture.  Some  are  noted  for 
the  power  of  producing  rapidly  abundance  of  steam,  at  the  cost  of 
great  consumption  of  fuel ;  others  have  the  opposite  qualities,  and 
some  combine  successfully  both  those  qualities  which  are  desirable. 
It  might  have  been  supposed  that  all  points  of  such  a  simple  subject 
would  have  been  long  since  settled,  and  that  no  boiler  would  be  made 
inferior  to  the  best.  Such  is  not,  however,  the  case ;  and  although 
the  differences  of  construction  are  in  themselves  sUght,  the  difference 
of  result  is  often  considerable. 

I  have  taken  some  pains  to  satisfy  myself  on  these  points,  and 
have  endeavoured  to  select  and  to  copy  the  most  successful  boilers  ; 
and  in  order  to  remove  all  doubts  as  to  their  fitness  for  the  use  of 
anthracite,  I  have  made  an  experimental  boiler,  and,  after  numerous 
trials,  determined  upon  the  form  and  dimensions  to  be  adopted. 

In  the  consideration  of  these  details,  as  indeed  on  all  other  points 
affecting  the  success  of  this  undertaking,  I  have  not  hesitated  to  con- 
sult everybody  whose  opinions  I  considered  valuable,  and  to  bring 
the  result  of  their  opinions  in  aid  of  my  own  and  the  manufacturer's 
experience. 

I  have  only  to  add,  that  after  giving  much  consideration  to  the 
question  of  the  diameter  of  the  paddle-wheels  and  screw,  I  have 
determined  them  sufficiently  for  fixing  the  position  of  the  shafts,  and 
am  now  engaged  in  considering  the  best  form  and  construction  of 
the  propeller  itself,  and  also  the  construction  of  the  stern-frame  and 
rudder  of  the  ship. 

The  position  of  the  paddle-shaft,  and  the  diameter  of  the  paddles, 
have  been  questions  of  some  difficulty.  It  being  necessary  to  pro- 
vide for  a  considerable  variation  in  the  draught  of  water,  though  not 
proportionably  so  great  as  Avith  many  existing  large  steamers,  and  to 
balance  well  the  relative  advantages  of  securing  the  highest  average 
speed,  at  all  the  various  draughts,  or  thehighest  speed  at  a  lightdraught, 
and  to  combine  as  far  as  possible  the  two,  so  that  the  vessel  may  be 
as  well  adapted  to  perform  comparatively  short  and  very  quick  pas- 
sages to  ports  not  affording  a  great  draught  of  water,  as  long  voyages, 


320  THE   '  GREAT   EASTEEN  '   STEAM-SHIP.        [a.d.  1855. 

heavily  laden,  at  a  more  moderate  maximum,  but  still  a  large  average 
rate  of  speed.  Although  the  full  advantage  of  the  great  capacity  of 
the  vessel  for  carrying  coal  for  long  voyages  would  not  be  felt  in  a 
voyage,  for  instance,  to  New  York,  or  in  other  short  voyages,  yet, 
unquestionably,  she  would  exceed  all  other  vessels  in  speed  and 
extent  of  accommodation ;  and  if  it  should  be  found  desirable  to  make 
such  voyages,  your  vessels  ought  to  be  able  to  command  almost  a 
monopoly  by  their  superior  capabilities,  and  I  have  therefore  endea- 
voured so  to  place  the  paddle-shaft,  and  so  to  construct  the  wheels, 
that  they  may  be  adapted  to  the  convenient  application  of  the  full 
power  of  the  engine  at  a  light  draught  of  Avater  and  at  very  high  speed. 

As  regards  the  screw,  the  same  points  have  to  be  considered, 
and  a  choice  made  amongst  the  various  forms  and  proportions  more 
or  less  successfully  adopted  at  the  present  time.  I  have  always 
found  the  reports  made  upon  the  results  of  various  forms  of  screws 
and  propellers,  and  the  performance  of  diiFerent  vessels,  so  little  to  be 
depended  upon,  even  when  apparently  made  in  good  faith,  and  the 
results  obtained  from  good  authority,  that  I  have  been  long  since 
compelled  to  adopt  no  conclusion,  unless  from  results  witnessed  by 
myself  or  by  persons  observing  for  me.  I  have  for  some  time  past 
availed  myself  of  every  opportunity  that  offered  of  observing  and 
obtaining  something  like  accurate  results  upon  the  various  points 
affecting  immersion  of  paddles  or  screw,  and  I  am  engaged  in  con- 
sidering those  results. 

I  have  referred  to  the  subject  of  protection  from  fire  ;  it  is  one  of 
considerable  importance,  and  I  have  some  hopes  that  a  process,  which 
has  been  recently  patented  by  Lieutenant  Jackson,  may  be  success- 
fully applied  to  rendering  wood  uninflammable.  Some  door  panels 
have  been  already  experimented  upon  with  results  which  have  in- 
duced me  to  pursue  the  experiments,  and  I  am  about  to  try  the 
comparative  inflammability  of  various  qualities  of  wood,  both  pre- 
pared and  unprepared ;  and  if  we  can  succeed  in  preventing  the 
wood  producing  a  flame,  and  thus  communicating  the  fire  ;  with  the 
numerous  metallic  subdivisions  we  shall  have  in  the  ship,  the 
spreading  of  fire,  even  from  cargo  or  furniture,  would  become  impos- 
sible. I  am  also  engaged  in  determining  the  character  and  extent 
of  mast  and  sail  to  be  carried,  as  provision  must  now  be  made  in  the 
construction  of  the  ship  for  receiving  the  masts. 

The  Directors  are  aware  that  I  have  been  in  communication  with 
Professor  Airy  as  to  the  instruments  which  may  be  used  in  such  a 
ship,  to  ensure  more  accurate  and  frequent  observations,  and  as  to 
the  nature  of  these  observations ;   an  enquiry  into  which  he  has 


JET.  49.J  REPOET   DESCEIBING  THE  SHIP.  321 

entered  with  that  liberahty  and  desire  to  assist  all  improvements,  in 
navigation  especially,  for  which  he  is  so  well  known.  Several  new 
instriunenta  are  now  making  for  trials. 

Sir  W.  Snow  Harris  has  promised  to  turn  his  attention  to  the 
subject  of  the  lightning  conductors  ;  and  as  soon  as  the  iron  work  is 
a  little  more  advanced,  and  while  the  form  and  position  of  all  the 
principal  masses  are  visible,  the  subject  of  local  attraction  and  the 
adjustment  of  the  compasses  will  be  considered  by  those  most  com- 
petent to  advise;  and  I  am  not  without  hope  that  the  means  of 
cori'ection  may  be  rendered  much  more  certain  and  perfect  than 
usual.  I  mention  these,  as  some  of  the  numerous  points  which  re- 
quire and  are  receiving  attention. 

In  tlie  last  paragraph  but  one  of  this  report  Mr.  Brunei 
mentions  that  he  proposed  to  adopt  a  system  for  obtain- 
ing continuous  observations  in  order  to  determine  the 
position  of  the  ship.^ 

His  first  letter  to  the  Astronomer  Royal,  which  is  dated 
as  early  as  October  1852,  explains  the  object  with  which 
he  began  his  investigations  : — 

October  5,  1852. 
You  may  possibly  have  heard  of  a  project  in  which  I  am  engaged, 
of  building  some  vay  large  steamboats.  ,  .  .  Among  the 
several  requirements,  which  it  appears  to  me  are  involved  in  such  a 
large  project,  is  one  in  which  I  hope  for  your  advice  and  assistance, 
and  I  trust  you  will  consider  the  subject  worthy  of  your  attention. 
In  such  a  voyage,  where  so  much  depends  upon  perfect  navigation, 
and  with  such  a  capital  at  stake,  no  means  can  be  too  perfect  and  no 
expense  or  trouble  must  be  spared  to  ensure  the  constant  determina- 
tion, with  the  greatest  attainable  accuracy,  of  the  ship's  position  and 
course.  The  determination  of  her  speed,  the  effect  of  winds  and 
currents,  and  the  variation  ef  her  compasses,  together  with  meteoro- 
logical observations,  are  all  involved  in  this  ;  and  I  propose  to  have 

'  Extract  from  memoranda  of  Oc-  '  carried,  &c. 

tober  5,  1 855 : —  '  Temperature  and  peculiarities  of 

'  By  constant  observation,   to   lay  '  sea  water, 

'  down  position  and   course  of  ship,  '  As  the  result  of  these  observations, 

'  and  correct  compasses.  '  to    plot   down    hour    by   hour    the 

'  To  record  speed  of  ship  through  '  position   of    the    ship,   to  compute 

'  water  by  logs.  '  the    speed,   variations    of  compass, 

'  Revolution  of  engines.  '  the  direction  and  force  of   current, 

'  Force  and  direction  of  wind.  'and  true  direction  and  force  of  the 

'  Draught  and  trim  of  ship,   sails  '  wind.' 


322  THE  '  GEEAT  EASTERN '  STEAM-SHIP.        [a.d.  1855. 

ail  observatory  and  establishment  of  observers,  whose  duty  it  "will  be 
to  be  constantly  engaged,  day  and  night,  at  any  moment  when  any- 
thing can  be  visible  in  the  heavens,  in  taking  such  obsei'vations  as 
will  determine  more  or  less  accurately,  according  to  the  nature  of 
the  observations  that  the  state  of  the  weather  or  other  circumstances 
may  admit  of,  the  several  points  to  be  ascertained.  Now,  the  questions 
to  be  determined  are,  what  is  the  nature  of  the  various  observations 
that  can  best  be  made  under  all  the.  different,  and  the  favourable 
and  unfavourable  circumstances  that  may  daily  arise  ?  what  the 
instruments  required,  and  what  the  character  and  extent  of  the  staff 
of  observers  required ;  and  even  whether  any,  and  if  any  what,  new 
tables  might  be  useful  for  such  a  purpo.se  ?  The  primary  object 
being  to  be  constantly  determining  either  correctly  or  approximately 
the  ship's  true  position,  and  in  like  manner  constantly  checking  the 
compasses  and  giving  her  true  course.  I  will  not  unnecessarily 
expose  my  ignorance  in  such  matters  by  stating  what  I  haA^e  assumed 
to  be  practicable.  I  will  only  remind  you  that  experience  proves 
that  in  a  vessel  of  such  size  there  will  be  great  steadiness  of  motion, 
and  therefore  unusual  facilities  for  accurate  observation. 

Mr.  Airy  entered  very  warmly  into  the  subject,  as  did 
also  Professor  Piazzi  Smyth,  the  Astronomer  Eoyal  for 
Scotland ;  and  a  long  and  interesting  correspondence  passed 
between  them  and  Mr.  Brunei.  Experiments  were  con- 
ducted, principally  with  the  view  of  obtaining  a  stand  for 
astronomical  instruments  by  means  of  the  contrivance 
known  as  the  gyroscope,  the  principle  of  which  had  been 
already  adopted  by  Mr.  Brunei  in  a  level  designed  by 
him  in  1829. 

In  connection  with  the  observers'  department,  Mr. 
Brunei  paid  much  attention  to  designs  of  sounding  ap- 
paratus and  means  for  accurately  measuring  the  speed 
of  the  ship.  He  also  intended  to  have  a  stream  of  surface 
water  constantly  pumped  up  through  the  observers'  cabin, 
which  should,  by  its  change  of  temperature,  immediately 
indicate  the  presence  of  icebergs,  instead  of  the  plan  of  an 
occasional  bucketful  being  hauled  up  on  to  the  deck  ac- 
cording to  the  humour  of  the  officer  of  the  watch. 


^T.  49.]  >  OBSERVERS'  DEPARTMENT.  323 

Mr.  Brunei  made  a  very  curious  contrivance  for  enabling 
the  man  on  the  look-out  to  keep  his  eyes  open  in  a  gale  of 
wind.  This  consisted  of  two  sets  of  vertical  plates  of  tin 
placed  one  behind  another,  diverging  from  the  direction 
of  the  wind,  with  a  clear  wide  passage  between  the  two 
sets  of  plates.  The  wind,  entering  at  the  end  of  the 
apparatus,  became  separated  by  the  first  two  inclined 
plates,  and  the  residue  that  passed  on  in  the  direct  line 
was  again  subdivided,  so  that  at  the  end  of  the  last  set 
of  plates  there  was  no  rush  of  air  between  them,  and  a 
man  looking  through  the  aperture,  with  his  face  to  the 
wind,  was  in  a  perfect  calm.  This  was  a  useful  arrange- 
ment, the  look-out  man's  eyes  being  as  well  protected  as 
though  behind  a  glass.  A  glass  would  not  answer  the 
purpose,  as  it  would  become  obscured  with  spray. 

The  unfortunate  circumstances  which  attended  the  com- 
pletion of  the  ship  prevented  the  introduction  of  these  and 
many  other  arrangements  which  Mr.  Brunei  had  originally 
proposed.' 

In  November  1855,  the  Directors  proceeded  to  appoint 
a  commander  to  the  ship  ;  and  their  choice  fell  upon  Mr, 
William  Harrison,  one  of  the  most  distinguished  of  the 
captains  of  the  Cunard  Company's  steamers. 

This  appointment  gave  Mr.  Brunei  great  satisfaction ; 
he  found  in  Captain  Harrison  a  warm  and  faithful  friend, 
and  an  able  adviser  on  all  matters  connected  with  the 
completion  and  equipment  of  the  ship." 

'  Mr.  Brunei  also  proposed  to  have  '  drawn  and  engraved  of  the  sea  (that 

charts  prepared  for  the  route  of  the  '  is,  the  lines  of  latitude  and  longitude, 

great   ship    to    Australia    and    Cal-  '  and  the  bearings  of  the  compass,  and 

cutta,   similar  in  character  to  some  '  the  coast  and  soundings)  on  a  cylin- 

which  were   made   under   his   diiec-  '  drical  projection  of  a  great  circle  from 

tions   for  the   route    of    the   'Great  '  Bristol  to  Now  York;  and  we  found  it 

*  Western  *  to   New  York,  which  he  '  very  useful  for  the  captain  to  see  his 

described  as  follows  : —  '  great  circle  sailing,  and  to  see  how 

•  When  we  started  the  "  Great  West-  '  much  he  was  deviating  from  it.' 

'  "  em "  to  New  York,  I  had  a  chart  *  Captain  Harrison's  command  of 

T  2 


324  THE   '  GREAT   EASTERN  '   STEAM-SHIP.        [a.p.  1865 

Before  they  came  to  a  decision,  tlie  Directors  asked  Mr. 
Brunei  to  communicate  to  them  his  views  on  the  considera- 
tions which  ought  to  influence  them  in  their  choice. 

The  memorandum  he  drew  up  on  the  management  of 
the  great  ship,  and  a  letter  on  the  duties  of  the  chief 
engineer,  are  inserted  at  length,  as  forming  a  complete 
record  of  the  principles  which,  in  his  opinion,  should  be 
followed  '  in  the  use  of  this  new  machine,'  while  em- 
ployed on  the  voyages  which  she  was  specially  designed 
to  make. 

Memorandum  on  the  Management  of  the  Great  Ship. 

October,  1855. 

The  question  of  the  principles  to  be  followed  in  the  use  of  this 
new  machine,  for  such  it  must  be  considered,  and  the  character  and 
the  qualifications  of  the  man  to  whom  it  is  to  be  entrusted,  and  the 
points  to  which  his  attention  must  be  particularly  devoted,  have  long 
been  subjects  of  deep  and  serious  consideration  with  me.^ 

the  '  Great  Eastern '  after  she  left  the  '  doubts  of  his  ability,  could  have  no 

river  was  unhappily  of  but  short  dura-  '  such  feeling  (if  he  is  a  sensible  man 

tion,  as  he  was  drowned  by  the  acci-  '  and  fit  for  the  position)  if  bis  atten- 

dental  upsetting  of  his  boat  in  South-  '  tion  had  been  drawn  to  these  views 

ampton  "Water  on  January  21,  1860,  'before   his   appointment,  and   if  he 

four  months  after  Mr.  Brunei's  death.  '  accepts  the  trust  reposed  in  him  on 

'  With  this  paper  Mr.  Brunei  en-  '  the  understanding  that  he  is  expected 

closed  a  letter,  in  which  he  points  out  '  to  pay  attention  to  these  opinions, 

with  great  earnestness  the  responsi-  '  and  if,  as  I  shall  urge  upon  the  Di- 

bility  of  his  own  position.  '  rectors  to  ascertain,  he  entertains  no 

After  calling  the  Directors'  atten-  '  objection  to  the  adoption  of  them, 

tion  to  the  important  step  they  were  '  and  agi-ees  to  follow  the  principles  of 

about  to  take,  he  proceeds : —  '  action  which  I  hope  to  induce  the 

'  I  am  not  pointing  out  a  danger  '  Directors  to  adopt  as  rules  in  the 

'  vdthout  being  prepared   to  propose  '  naA-igation  of  the  ship. 
'  a  remedy.    The  same  man  who,  after  '  I  propose  therefore  to  lay  before 

'  he  has  been  selected  and  appointed  '  the  Directors  the  result  of  my  anx- 

'  on  account  of  his  previous  character  '  ious   consideration   of  this   subject, 

'  as  a  sailor,  and  as  an  experienced  '  to  urge  upon  them  the  adoption  of 

'  naval  man,  would  probably  feel  dis-  '  my  views,  and,  if  they  adopt  them, 

'posed  to  reject  advice  coming  from  'to  urge  that  they  should  make  it  a 

'  those   who    do   not    profess    to    be  '  condition  in  the  selection   and  ap- 

'  sailors,  and  to  resist  directions  which  '  pointment  of  a  commander  that  such 

'  might  appear  to  him   as  ti-enching  '  views  are  approved  of  and  adopted 

'upon  his  authority,  or  as  implying  '  by  him. 


JET.  50.]  REPORT  ON   MANAGEMENT   OF  SHIP.  325 

And  the  difBculties  are  complicated  by  the  consideration  that 
public  opinion,  and  those  established  and  universally  received 
opinions  which,  being  the  result  of  experience,  cannot  be  called  pre- 
judices, have  to  be  considered,  and  must  be  yielded  to  to  a  great 
extent,  even  when  somewhat  opposed  to  sound  reasoning,  or  to  con- 
clusions deliberately  formed  upon  a  due  consideration  of  the  novel 
circumstances  under  which  we  have  to  act ;  but,  while  conceding 
much  to  past  experience,  and  to  preconceived  opinions,  the  real 
requirements  of  the  case  must  have  the  first  consideration. 

Thus,  as  it  is  a  ship  that  we  have  to  navigate,  public  opinion,  if 
nothing  else,  requires  that  we  should  have  a  sailor  of  undoubted 
experience  and  skill  to  command  her ;  but  although  seamanship  may 
be  one  of  the  essential  conditions  or  qualifications  for  the  commander, 
I  think  we  shall  find,  upon  examination,  that  the  work  we  have  to  do, 
and  the  duties  to  be  performed,  and  the  qualifications  we  conse- 
quently require  in  the  man  who  is  to  conduct  this  work,  are  so  pecu- 
liar that  mere  seamanship,  in  the  ordinary  sense  of  the  term,  if  it 
were  to  be  solely  relied  upon,  would  be  even  a  disadvantage  rather 
than  otherwise,  and  that  we  require  much  that  is  not  necessarily 
found  in  the  most  perfect  specimen  of  a  seaman,  and  much  that  is 
far  more  diflScult  to  find  than  the  ordinary  qualifications. 

I  wish  pju-ticularly  to  impress  this  upon  you :  the  subject  has 
occupied  long,  frequent,  and  serious  deliberations.     I  have  come  to 

'  This  is  a  strong  and  plainly  stated  '  me   in   the   credit  of  our  success  ; 

'  request,  but  not  more  strongly  put  '  yet  there  is  no  doubt  that  I  should 

'  than  I   feel   that  the  occasion  re-  '  have  to  bear  solely  and  very  heavily 

♦quires.  'the   blame    of   a  failure.     On  this 

'  I  have  an  immense  stake  in  the  '  ground  alone,   therefore,  the  Direc- 

'  success  of  this  enterprise.     I  do  not  '  tors,  I  am  sure,  will  willingly  allow 

'  refer  merely  to  my  pecuniary  invest-  '  me  to  urge  my  views  strongly,  and 

♦  ment ;    but,  as  affecting  my  profes-  '  will  excuse  the  length  at  which  I  do 

«  sional  reputation,  my  stake  is  much  '  so.    But  I  shall  rely  upon  satisfying 

'  deeper ;  as,  although  I  was  accident-  '  them   that  my   views   and    opinion 

'  ally  led  by  circumstances  into  pro-  '  should   command  their   concurrence 

'posing   the  plan  we   have   adopted,  '  on  their  own  merits;  and  with  this 

'  and  the  Company  was  not  originally  •  preface,  which  has  already  reached 

'  formed  to  carry  it  out,  and  although  '  an  undue  length,  I  will  lay  before 

'  the   plan  when   proposed  was  well  '  them  a  paper  on  the  subject,  most  of 

'  weighed    and    considered    by    men  '  which   has   been  written   for  some 

'  competent  to  judge,  at  all   events,  '  time  in  anticipation  of  the  present 

'  upon  the  prospects  as  a  commercial  '  circumstances,  and  having  been  thug 

'  speculation,   and    although    it    was  *  written  at  different  periods  is,  I  fear, 

'  adopted  by  them,  and  therefore  they  '  somewhat  disjointed,  and  wanting  in 

'  must   share   iu    the    responsibility,  '  arrangement,   and    therefore    much 

'  and  although  many  may  share  with  '  longer  than  it  might  have  been.' 


326  THE  '  GEEAT  EASTEKN '  STEAM-SHIP.        [a.d.  1855. 

the  conclusion  which  you  will  no  doubt  readily  acquiesce  in,  that 
our  first  practical  mechanical  success,  upon  which  so  much  of  our 
financial  success  hangs  (although  others  might  reap  the  benefit  even 
of  our  failure  in  the  first  instance),  will  depend  mainly  upon  the 
skilful  management  in  our  earliest  voyages  of  the  machine  we  are 
about  to  set  afloat ;  but  I  have  also  come  to  the  conclusion,  the 
correctness  of  which  may  not  be  so  immediately  apparent  to  you, 
that  this  machine,  though  nominally  a  ship,  not  only  admits  of,  but 
requires,  a  totally  diflferent  management  from  that  which  may  have 
successfully  navigated  ordinary  ships,  and  that  most  of  the  habits, 
feelings,  and  sensations,  amounting  to  instinct,  possessed  by  a  good 
sailor,  and  the  peculiar  power  of  skilful  adaptation  of  expedients  to 
emergencies,  which  constitute  the  merits  of  a  first-rate  sailor,  have  to 
be  put  aside  for  a  time  rather  than  applied  in  the  first  instance  to 
make  a  successful  commander  of  the  vessel. 

In  navigating  a  small  vessel,  a  man  has  to  study  the  appearance 
of  the  weather,  the  direction  of  the  wind,  and  that  of  the  seas ;  to 
consider  the  probabilities  of  change  ;  to  vary  his  course  more  or  less 
with  reference  to  any  of  these  causes,  and  according  not  only  to  the 
then  state  of  all  these  operating  causes,  but  also  with  reference  to 
the  probabilities  of  change  ;  and  with  their  consideration  his  mind 
is  principally  occupied,  and  it  is  in  the  exercise  of  judgment  and 
foresight  in  these  points  that  he  shows  his  skill. 

Steam  navigation,  and  the  gradual  increase  in  the  size  of  vessels, 
have  no  doubt  materially  modified  this,  but  much  still  remains  to 
occupy  the  mind  of  the  commander  of  a  steamer,  with  which  not 
only  we  shall  have  nothing  to  do,  but  too  much  attention  to  which, 
from  previous  habits,  would  divert  his  attention  from  that  which, 
under  the  different  circumstances,  will  become  much  more  important. 

In  the  same  manner,  in  manoeuvring  such  a  vessel  in  harbour,  the 
ordinary  modes  would  be  totally  inapplicable ;  whereas,  by  entirely 
discarding  all  previous  practices,  and  keeping  in  his  mind  and 
making  use  of  the  peculiar  powers  which  are  at  command  in  this 
vessel,  and  judiciously  attending  to  the  immense  effect  of  the  vis 
inertice,  or  momentum  of  such  a  mass,  so  far  beyond  that  of  anything 
now  afloat  that  it  becomes  a  totally  new  influence,  this  machine 
may  be  managed  by  a  skilful  man  with  a  facility  which  is  not 
attainable  with  small  craft ;  while  such  a  mass  would  be  destruc- 
tion to  itself  or  to  anything  that  comes  in  contact  with  it,  if  treated 
at  all  in  the  same  manner  as  even  the  largest  steamers  are  now 
handled. 

Another  peculiarity  to  be  attended  to  in  the  management  c  _  .his 


JET.  50.]  EEPOET  ON  MANAGEMENT  OF  SHIP.  827 

mighty  mass  is  that  by  no  possibility  must  she  be  allowed  to  touch , 
the  ground. 

Our  ship  will  be  found,  I  believe,  if  tried,  to  possess  unusual 
strength :  no  combination  of  circumstances  within  the  range  of 
ordinary  probabilities  can  cause  such  damage  to  her  as  to  sink  her, 
even  if  she  were  to  be  run  on  sharp  rocks  with  deep  water  around ; 
and  1  believe  she  might  remain  for  months  aground,  exposed  to  the 
heaviest  seas  without  serious  damage.  The  lives  of  the  passengers, 
and  even  the  cargo  generally,  will  be  safe,  almost  perfectly  safe,  and 
so  far  she  will  be  very  different  from  and  very  superior  to  any 
vessel  now  afloat ;  but  there  will  also  be  another  great  difference, 
although  she  may  remain  safely  aground,  she  will  probably  remain 
so  for  a  long  time. 

If  she  were  to  ground  at  high  water  or  where  there  is  a  little  tide, 
and  when  she  happens  to  be  rather  light  of  coal,  and  should  take  in 
any  water  so  as  to  deepen  her,  no  ordinary  appliances  in  the  power 
of  the  crew  will  get  her  off,  or,  at  all  events,  not  without  great  loss  of 
time,  and  at  very  heavy  sacrifices.  Such  an  event  in  tlie  first  year  of 
her  career  would  probably  ruin  our  Company,  as  the  grounding  of 
the  *  Great  Britain '  did  the  Great  Western  Steam-Ship  Company, 
although  it  proved  the  good  qualities  of  that  ship,  and  thus  advanced 
iron  ship-building.  A  sailor  will  no  doubt  receive  with  disgust  and 
as  an  insult  the  suggestion  of  the  possibility  of  his  running  his  ship 
ashore.  We  cannot  afford,  however,  to  rest  contented  with  this 
expression  of  feeling,  natural  and  praiseworthy  as  it  may  be :  our 
circumstances  are  totally  different ;  and  that  which  is  considered  cer- 
tainly as  a  serious  evil,  but  still  only  an  evil  more  or  less  serious, 
would  be  to  us  fatal ;  it  is  no  longer  a  question  of  degree  of  injury — 
it  is  death.  I  have  had  some  costly  experience ;  I  have  had  to  do 
with  many  steamers — several  remarkable  for  their  size  and  their  value, 
according  to  the  ideas  of  the  time,  and  two  of  them  each  in  their 
day  considered  Leviathans,  more  wondered  at  than  even  ours,  and 
exciting  much  more  anxiety  on  the  part  of  their  promoters,  and  there 
was  as  much  care  taken  in  the  selection  of  commanders  as  I  ask  you 
to  take  now  ;  nevertheless  both  of  these,  to  the  ruin  of  the  Company 
in  one  case,  and  almost  every  other  steamer  I  have  had  anything  to 
do  with,  has  not  merely  touched,  but  been  aground.  Not  a  season 
hardly  passes  without  a  case  of  even  a  Queen's  ship  going  ashore, 
although  navigated  by  men  educated  for  the  purpose,  with  the  ad- 
vantage of  every  appliance  hitherto  thought  necessary  and  sufficient, 
and  with  fearful  responsibility  attached  to  them.  All  these  are 
published  cases  known  to  the  world ;  and  if  the  log  books  of  all 


828  THE   '  GREAT  EASTERN '  STEAM-SHIP.        [a.d.  1855. 

the  steamers  were  searched,  I  believe  the  result  would  be  a  list  ia 
which  the  ships  that  had  not  been  aground  would  form  the  excep- 
tions, and,  in  the  majority  of  cases,  the  blunder  is  so  gross,  that  the 
most  far-fetched  excuses  of  errors  of  compass  and  unknown  currents, 
although  in  well-known  channels,  are  obliged  to  be  invented. 

The  real  explanation  is  a  simple  one.  Ships  are  navigated  with 
far  too  reckless  a  confidence  in  the  mere  personal  instinct  and  skill  of 
those  in  command,  and  in  their  ability  to  get  out  of  a  scrape  in  time. 
Methodical  systems  and  mechanical  means  of  ensuring  accuracy 
are  far  too  much  neglected,  or  rather  have  not  kept  pace  at  all  with 
the  great  improvements  in  speed  and  the  power  of  locomotion  which 
science  has  introduced,  whether  in  the  construction  of  steam  vessels 
or  even  of  sailing  ships,  and  which  the  advance  of  the  day  now  calls 
for.  There  are  no  means  at  present  used  of  taking  soundings  worth 
having  while  a  ship  is  going  fast  through  the  water,  or  in  time  to  be 
of  any  use  if  the  soundings  shoal  rapidly  ;  the  trouble  is  so  great  and. 
the  operation  so  slow  that  it  is  not  resorted  to  sufficiently  often.  The 
steering  by  compass  is  so  rough  and  so  coarse,  that  no  real  accuracy 
is  attained.  Good  observations  to  determine  position  are  taken  at  too 
long  intervals  of  distance  run,  and  consequently  are  subject  to  be 
interrupted  for  too  long  a  period  by  what  is  called  and  supposed  to 
be  continual  bad  weather  ;  although  it  would  rarely  happen,  if  persons 
were  continually  on  the  watch,  who  had  nothing  else  to  do  or  to  think 
of,  that  twenty-four  hoTirs  would  pass  without  some  glimpses  of  a  star 
or  of  the  sun.  Thus  with  a  speed  of  ten  or  fifteen  knots,  and  cloudy 
weather,  and,  above  all,  with  that  xmfortunate  confidence  of  seamen  to 
which  I  have  referred,  there  is  never  any  certainty  just  at  the  time 
when  it  is  really  required.  No  doubt,  skilful  seamen  do  generally 
arrive  at  an  astonishing  approximation  in  their  estimates,  and  the 
results  on  the  average  are  most  successful,  and  remarkable  proofs  of 
the  skill  brought  into  action.  But  the  instrumental  means  of 
attaining  accuracy  are  lamentably  in  rear  of  the  improvements  that 
have  been  made  in  the  means  of  locomotion,  and  have  not  at  all  kept 
pace  with  the  vast  increase  of  capital  embarked  in  each  individual 
case. 

All  these  deficiencies  are,  however,  easily  remedied ;  the  means  do 
exist,  or  can  be  devised,  and  might  be  applied  if  Ave  insisted  on  their 
application.  We  have  seen  numerous  instances  where  the  difficulties 
are  admitted  and  grappled  with  systematically,  and  with  what 
patience  and  skill  a  fleet  has  been  piloted  up  unknown  ri  -^irs  full  of 
shoals  in  China,  and  through  intricate  channels  with  covered  rocks 
in  the  Baltic.    In  our  case,  the  object  to  be  attained  is  a  vital  one  to 


JET.  50.]  .EEPOET  ON  MANAGEMENT  OF  SHIP.  329 

us ;  and  what  I  most  dread  is  the  confidence  of  our  commander 
resulting  from  his  previous  experience  preventing  his  appreciating 
the  peculiarities  of  the  case,  and  applying  that  greatly  increased 
amount  of  method  and  system  which  is  essential  to  change  that, 
which  is  now  rendered  only  highly  probable  by  the  skill  of  man, 
into  mechanical  certainty.  The  man  who  takes  charge  of  such  a 
machine,  in  which  is  embarked  so  large  a  capital,  must  have  a  mind 
capable  of  setting  aside,  without  forgetting,  all  his  previous  experience 
and  habits,  and  must  be  prepared  to  commence  as  an  observer 
of  new  facts,  and  seize  rapidly  the  results.  A  man  of  sense  and 
observation,  with  a  good  mechanical  head,  and  with  decision  and 
courage,  would  succeed  without  much  previous  nautical  knowledge ; 
but,  unquestionably,  a  man.  familiar  with  all  that  is  going  on  around 
would  be  much  more  competent,  provided  he  does  not  allow  his 
habits  derived  from  former  experience  to  induce  him  to  neglect  any 
of  the  new  means  of  information  in  his  power,  to  all  which  his 
former  knowledge  should  be  made  subservient. 

If  much  has  to  be  unlearnt,  or  rather  carefully  set  aside  for  the 
time,  as  generally  inapplicable  in  its  present  shape,  there  is  also  much 
to  be  learnt  in  the  navigation  of  such  a  vessel ;  and  one  of  the  most 
essential  qualifications  of  the  commander  would  be  a  belief  in  his 
want  of  experience,  and  a  readiness  to  see  the  novelty  of  his  position, 
and  a  cautious  and  sound  but  quick  perception  of  the  new  and 
powerful  influences  and  new  effects  of  those  same  causes  with  which 
he  may  have  been  familiar  under  very  different  circumstances. 

The  great  mass  and  size  of  this  vessel  must  necessarily  render  it 
so  much  less  affected  by  the  ordinary  disturbing  causes  of  wind  and 
sea,  that,  practically,  little  attention  ought  to  be  paid  to  these,  at 
least  not  as  expecting  the  ordinary  results  ;  but  other  effects  may  be 
produced  which  must  be  carefully  studied  and  learnt  in  the  early 
voyages,  so  that  they  may  be  met  and  counteracted  as  they  have 
been  by  experienced  men  under  the  present  system.  Thus,  as  an 
example  of  this  class  of  effects  to  which  I  would  refer,  there  is 
reason  to  believe  that  this  vessel,  although  apparently  unaffected  by 
a  wind  on  the  beam,  or  a  cross  sea,  which  would  be  very  noticeable 
even  with  the  largest  of  the  present  steamers,  would  nevertheless 
have  a  steady  and  rather  strong  tendency  to  come  up  to  the  wind. 
A  certain  direction  of  a  cross  sea  is  not  unlikely  to  produce  a 
contrary  efi'ect.  It  is  quite  possible  also  that  the  apparent  lee- 
way, or  the  deviation  of  the  axis  (or  keel)  of  the  ship  from  the 
line  of  the  course,  will  be  greater  with  the  wind  on  the  beam 
than  with  smaller  vessels,  although   the   actual   drift  or  lee-way 


330  THE  '  GEEAT  EASTEKN '  STEAM-SHIP.        [a.d.  1855. 

may  be  less ;  and  all  these  effects  will  result  from  her  great  length 
(unless  counteracted  by  causes  I  do  not  now  foresee),  and  will  pro- 
bably be  totally  different  in  degree  from  any  similar  effects  now 
felt.  These  effects  must  be  carefully  studied,  and  with  a  mind  pre- 
pared to  consider  them  as  new,  for  they  will  be  new  and  distinct 
I'rom  anything  now  experienced.  In  the  same  manner,  and  to  a 
much  greater  degree,  the  effects  of  the  speed  which  we  must  hope  to 
attain  will  upset  all  the  usual  methods  of  determining  accurately  the 
position  and  the  course  of  the  vessel,  and  still  more  the  precautions 
to  be  taken  in  approaching  land.  A  24  hours'  run,  at  20  miles  per 
hour,  without  a  good  observation,  and  with  a  possible  error  of  esti- 
mate, or  a  doubt,  at  all  events,  of  the  exact  effect  of  the  set  of  cuiTents 
or  of  the  speed  of  the  ship  through  the  water,  or  of  the  precise 
amount  of  lee- way,  may  easily  make  an  error  of  20  or  30  miles  in 
position  at  the  end  of  the  day's  run. 

On  the  other  hand,  by  almost  abandoning  the  present  modes,  and 
adopting  measures  which  I  shall  point  out  presently,  adapted  to  the 
new  circumstances,  a  much  greater  degree  of  certainty  and  accuracy 
may  be  attained  than  is  now  even  sought  for.  I  have  had  the  best 
advice  on  these  points,  both  astronomical  and  nautical :  the  Astro- 
nomer Eoyal,  Mr.  Airy,  who  both  as  a  man  of  science  and  a  practical 
man,  and  by  his  official  position,  is  the  first  authority  on  such 
matters,  and  Professor  Smyth,  of  the  Edinburgh  Observatory, 
Captain  Beecher  of  the  Admiralty,  and  several  other  scientific  naval 
men,  have  assisted  me ;  and,  under  their  advice,  instruments  are 
being  constructed,  and  a  system  devised,  which  will  admit  of  con- 
tinuous observations  being  made  with  great  accuracy  at  all  times  of 
the  day,  and  particularly  at  night,  and  by  means  of  which  also  a 
continuous  correction  of  the  ship's  compasses  with  the  most  minute 
accuracy  can  be  kept  up,  and  her  position  be  ascertained  with  almost 
the  same  accuracy  as  a  point  on  land  ;  and  I  have  their  authority 
for  saying  that  such  improved  means  are  desirable,  and  are  attainable. 
The  importance  and  advantage  of  continuous  observation  through- 
out the  twenty-four  hours,  whenever  a  glimpse  can  be  obtained  of 
any  object  which  will  answer  the  purpose,  and  even  Avhen  the  horizon 
is  invisible,  may  not  at  first  be  evident,  but  it  cannot  be  over- 
estimated. An  exact  knowledge  of  the  ship's  movements  wiU  be 
soon  acquired  that  would  almost  replace  observation,  and  the  average 
of  numerous  observations  secures  an  accuracy  which  cannot  be  ap- 
proached by  any  other  method. 

By  a  careful  and  continuous  comparison  of  the  exact  distances 
run,  with  accurate  records  of  the  sjjeed  of  the  engine  and  of  the 


JET.  50.J  EEPOET   ON  MANAGEMENT   OF  SHIP.  331 

ship  tlirough  the  water,  registered  by  good  instruments  (the  per- 
formance of  which  has  been  tested,  and  which  are  being  made),  and 
having  proper  reference  to  the  varying  draught  of  water  of  the  vessel, 
the  most  precise  measure  of  the  speed  of  the  vessel  through  the 
water  can  be  learnt ;  and  by  careful  observation  of  the  force  and 
direction  of  the  wind,  the  effect  of  any  given  wind,  and  an  accurate 
measure  of  her  drift  or  lee-way,  may  be  obtained ;  and  then,  by  ad- 
hering strictly,  without  regard  to  wind  or  weather,  to  a  course  pre- 
viously laid  down  on  good  charts,  having  upon  them  the  sets  of 
ciurrents,  as  already  observed,  the  true  position  of  the  ship  may  be 
determined  at  any  moment,  and  there  need  never  be  the  slightest 
hesitation,  or  any  time  or  distance  lost  by  doubts. 

In  addition  to  the  instruments  above  named,  I  hope  to  be  able  to 
provide  the  means  of  sounding  at  moderate  depths  while  the  ship  is 
going  her  full  speed. 

Having  the  means,  then,  of  determining  the  ship's  course  and 
position  with  much  greater  accuracy  than  is  now  practised,  we  must 
seek  to  make  that  course,  or  the  distance  to  be  run,  the  shortest 
possible,  that  is  to  say,  the  course  which  will  occupy  the  least  time. 

The  exact  coiu-se  to  be  taken  by  such  a  vessel  must  be  determined 
upon  and  laid  down  upon  the  charts  after  a  due  consideration  of  all 
the  circumstances  which  can  posisibly  affect  the  time  occupied  in  the 
voyage  between  any  two  points,  and  particularly  by  examining  and 
considering  well  all  the  information  which  scientific  observers  have 
collected  and  recorded  as  to  the  ciu'rents,  probabilities  of  fogs,  or  of 
ice,  and  other  impediments,  the  chances  of  meeting  vessels,  which 
must  be  avoided  as  much  as  possible,  the  average  direction  of  prevail- 
ing winds,  varying  such  course,  perhaps,  in  certain  latitudes  with 
the  season  of  the  year,  but  certainly  not  with  the  temporary  direction 
or  force  of  the  winds  or  state  of  weather  at  the  moment ;  for  the 
speed  which  we  shall  attain  renders  these  causes  of  secondary  con- 
sideration, and  would  interfere  with  all  ordinary  calculations  derived 
from  present  experience  of  the  probable  state  of  the  wind  in  the  new 
position  which  the  ship  would  attain  after  a  few  hours'  run.  The 
business  of  the  commander  would  be,  therefore,  to  adhere  rigidly 
to  the  exact  course  previously  deliberately  determined  upon,  and 
not  to  be  tempted  to  deviate  except  slightly,  and  even  then  only 
according  to  rules  which  he  shall  have  previously  laid  down  for 
himself. 

The  importance  of  adhering  strictly  to  this  rule  cannot  be  over- 
estimated. The  period  occupied  in  a  voyage  will  be  materially 
influenced  by  the  exact  course  followed,  and  as  such  course  must  be 


332  THE  'GREAT  EASTERN'  STEAM-SHIP.  [a.d.   1855. 

-determined  upon  only  by  a  calm  and  somewhat  laborions  study  of 
documents,  it  cannot  be  safely  determined  upon  except  in  the  closet, 
that  is,  before  the  voyage,  and  uninfluenced  by  the  excitement  of 
hopes  or  by  disappointments  caused  by  difficulties. 

The  safety  of  the  ship  and  of  the  enterprise  may  also  mainly 
depend  upon  the  rigid  adherence  to  this  rule. 

With  the  means  at  his  disposal  for  checking  that  coui'se,  and  with 
the  method  and  regularity  involved  by  a  rigid  adherence  to  it,  and 
a  correction  at  once  of  any  departure  from  it,  a  degree  of  certainty 
will  be  attained  as  to  the  ship's  position  which  will  almost  preclude 
the  possibility  of  an  accident,  and  which  I  consider  practically  in- 
valuable as  affecting  the  safety  of  our  vessel.  This  rigid  adherence 
to  an  exactly  prescribed  course  will  prevent  any  risk  of  that  which 
is  the  cause  of  the  greater  number  of  losses.  No  inducement  of  fine 
weather,  or  a  happy  state  of  mind  and  body  of  the  captain,  or  a 
desire  to  save  time,  or  to  show  the  beauties  of  a  coast,  or  any  other 
temporary  cause,  will  lead  to  a  nearer  approach  to  dangerous  points 
than  had  been  previously  determined  upon  as  safe.  The  shortest 
and  best  route,  the  safest  from  all  dangers,  and  giving  the  widest 
berth  to  all  shores  or  shoals,  having  been  laid  down,  must  be  kept 
to  against  all  temptations. 

Economy  of  fuel  is  another  consideration  of  the  highest  impor- 
tance. The  engines  are  of  power  sufficient,  if  fidly  worked,  to  con- 
sume considerably  more  than  the  cargo  provided.  Large  as  may  be 
the  supply  which  the  ship  is  capable  of  carrying,  it  is  no  more  than 
that  which  is  calculated  as  necessary  for  the  voyage  intended,  with  a 
moderate  allowance  for  contingencies  ;  and  it  must  be  borne  in  mind 
that  the  ordinary  means  of  making  up  any  deficiencies  would  be 
totally  inapplicable  in  our  case,  since  no  supply  capable  of  being 
drawn  in  an  emergency  from  other  sources  woidd  be  sufficient. 

The  precise  quantity  calculated  and  provided  must  be  made  suffi- 
cient, or  the  conseqxiences  would  be  serious.  The  usual  practice, 
therefore,  of  going  ahead  as  fast  as  the  engines  will  take  the  ship 
must  be  entirely  abandoned.  Careful  observations,  systematically 
pursued,  will  show  the  speed  which,  under  different  states  of  immer- 
sion, can  be  attained  without  a  disj)roportionate  expenditure  of 
power,  and  to  this  speed  the  engines  must  be  limited.  A  little  expe- 
rience will  probably  show  that,  under  certain  circumstances  of 
immersion  of  the  ship,  or  of  the  state  of  the  sea,  it  may  be  economical 
to  force  the  screw  or  the  paddle  engine,  the  one  more  than  the 
other.  This  can  only  be  determined  by  somewhat  delicate  and  very 
precise  au,d  accurate  obsei^vations.     These  must  be  made.     It  is  not 


;et.  50.]  REPORT  ON  MANAGEMENT  OF  SHIP,  333 

merely  a  question  of  degree,  but  our  whole  success  depends  upon 
the  application,  not  of  one,  but  of  all  these  refinements. 

A  close  study  of  the  relative  speed  of  the  ship,  as  ascertained  by 
the  self-registering  logs,  and  by  continuous  astronomical  observations, 
compared  with  the  expenditure  of  power  in  the  engines  as  indicated 
by  the  number  of  revolutions  constantly  registered,  and  the  power 
expended  as  measured  and  recorded  by  the  chief  engineer,  will  be 
necessary  for  some  time  to  come,  and  until  indeed  the  management 
of  such  large  ships  becomes  as  much  a  matter  of  rule  as  it  is  now,  or 
perhaps  ought  to  be  more  than  it  is,  with  smaller  ones. 

As  to  the  use  of  the  sails,  while  the  engines  are  nevertheless  in  full 
action,  it  must  be  entirely  a  matter  of  experiment,  and  an  experi- 
ment in  which,  again,  all  previous  habits  and  prejudices  must  be  set 
aside. 

"Whether  a  sail  steadies  such  a  ship  usefully  or  not  can  be,  and 
must  therefore  be,  positively  determined  by  measurement  with 
proper  instruments,  and  not  by  the  sensations ;  and  the  result  upon 
the  speed  of  the  vessel  as  compared  Avith  the  power  expended  must, 
in  like  manner,  be  ascertained  by  positive  observations  and  mea- 
surements. No  past  experience  can  do  other  than  mislead.  It  is 
quite  possible  that  the  same  means  which  improve  the  rate  of  the 
present  large  steamers  may  be  prejudicial  to  our  performance. 

The  commander  must  appreciate  the  necessity  of  all  this  study 
and  attention  to  what  is  rather  mechanical  than  nautical,  or  our 
voyage  will  be  a  failure.  The  difference  between  the  peculiar 
qualities  of  such  a  floating  mass  as  compared  with  those  of  the 
largest  steamer  now  afloat,  is  likely  to  be  as  great  as  between  the 
last  and  a  100-ton  cutter  ;  and  the  most  prejudiced  believer  in  the 
acquired  skill  of  an  old  sailor  who  had  learnt  to  manage  the  small 
vessel  in  the  most  perfect  and  masterly  manner,  would  not  expect 
him  to  be  able  to  handle  one  of  the  present  large  steamers,  still  less 
to  elicit  the  best  performance  out  of  her.  In  the  same  degree  the 
man  who  takes  the  command  of  our  ship  must,  if  he  is  to  succeed, 
enter  upon  his  duties  with  a  belief  that  he  has  nearly  all  to  learn,  at 
the  same  time  that  this  feeling  is  perfectly  consistent  with  a  proper 
confidence  in  his  own  powers  to  master  the  new  circumstances,  and 
to  succeed  with  this  as  he  may  have  done  with  other  vessels. 

Finally,  the  commander's  attention  must  be  devoted  exclusively 
to  the  general  management  of  the  whole  system  under  his  control, 
and  his  attention  must  not  be  diverted  by  frivolous  pursuits  and 
unimportant  occupations.  I  believe  that  even  in  the  present  large 
steamers  much  advantage  would  result  from  relieving  the  captain 

University  of  Toronto         \ 

Department  of  Civil  Engineering  I 


334  THE  '  GREAT  EASTERN '  STEAM-SHIP.        [a.d.  1855. 

from  all  care  of  the  passengers  and  cargo  ;  but  in  our  case,  where  we 
may  have  to  provide  for  thousands  instead  of  hundreds,  and 
arranged  in  different  classes,  and  living  in  completely  separate 
j/saloons  and  compartments,  the  present  system  of  a  captain  dining 
I  at  the  table  and  associating  with  the  passengers  would  be  impracti- 
^  cable,  even  if  it  were  desirable.  But  for  much  more  important  rea- 
I  sons,  and  on  general  grounds,  I  think  that  while  the  commander  is  of 
course  supreme  over  every  department,  he  should  not  be  embarrassed 
by  undertaking  any  one,  still  less  should  he  have  his  mind  occupied 
with  the  troublesome  and  frivolous  concerns  of  a  vast  hotel,  nor 
should  he  be  hampered  by  the  necessity  of  attending  to  the  hours 
and  the  forms  of  a  large  society.  Moreover,  I  consider  it  essential  that 
he  should  by  his  presence  and  control  keep  up  the  position  and  the 
sense  of  responsibility  of  the  chief  officers  under  him,  by  living  and 
messing  with  them ;  the  commander  and  those  acting  immediately 
under  him  must  occupy  a  more  dignified  position  than  they  now  do. 
The  result  of  all  these  general  views  is,  that  the  command  of  this 
ship  must  be  considered  to  consist  mainly  in  the  superintending 
and  keeping  up  in  a  high  state  of  order  the  perfect  working  of  a 
highly  methodical  pre-arranged  system,  by  means  of  which  the  ship 
is  to  be  made  to  go  like  a  piece  of  verj'  accurate  machinery,  pre- 
cisely in  the  course  which  has  been  pre-arranged,  and  precisely  at 
the  speed,  and  with  the  consumption  of  power,  which  has  been 
ascertained  to  be  the  highest  attainable  with  the  requisite  economy  ; 
and  there  must  be  a  proper  establishment  of  assistants,  competent 
to  control  each  department  of  this  system.  As  regards  the  constitu- 
tion of  this  establishment,  I  consider  the  commander  should  have  a 
staff  of  chief  officers  or  captains.  I  believe  three  will  be  necessary, 
with  a  fourth  performing  general  duties  and  ready  to  take  the  place 
of  any  one  of  the  three  ;  that  one  of  them  should  always  be  in  com- 
mand of  the  ship  (under  the  commander)  ;  that,  besides  these  chief 
officers,  there  should  be  a  master,  corresponding  to  a  master  in  a 
Queen's  ship,  who  would  have  assistants  and  calculators  or  clerks, 
whose  duties  would  be  to  keep  the  ship's  reckoning,  to  keep  up 
perfect  and  continvious  observations,  to  calculate  with  precision  and 
set  from  hour  to  hour  the  exact  course  by  compass  which  has  to  be 
followed,  to  keep  in  the  coixrse  determined  upon  by  the  captain,  to 
keep  a  series  of  accurate  observations  and  records  of  all  matters 
that  can  affect  the  ship's  movements — duties  involving  an  amount  of 
science  and  practical  astronomical  and  mathematical  knowledge 
which  requires  a  superior  education,  and  which  is  found  only  in 
this  class  of  men.     The  duty  of  the  master  would  be  therefore  to 


XT.  50.]  EEPORT   ON  MANAGEMENT  OF  SHIP.  835 

supply  the  science  necessary  for  the  conduct  of  the  ship,  and  to  be 
the  commander's  cyclopsedia  and  book  of  reference,  to  be  able 
at  any  moment  to  report  to  the  commander  the  exact  position 
of  the  ship  and  her  course,  and  the  variation  of  her  compasses, 
and  take  the  soundings,  if  any,  to  note  the  fact  of  a  change  in 
the  temperature  of  the  water,  indicating  approach  of  ice,  and  any 
other  symptom  or  fact  which  can  affect  the  ship's  movements — all 
which  should  be  determined  by  continuous  observations  methodi- 
cally and  mechanically  made,  and  not  be  dependent  upon  the  chance 
of  the  commander's  anxiety  or  greater  or  less  forethought.  The 
chief  engineer  should  also  be  a  superior  man,  selected  more  for 
his  general  qualifications  as  a  good  director  of  men  and  machinery, 
than  as  a  mere  marine  engineer.  These  should  form  a  staff,  and 
be  of  a  standing  to  live  and  mess  with  the  commander  ;  so  that  each 
dejiartment  should  thus  be  furnished  with  a  chief  competent  for  the 
special  duties  of  his  department,  and  reporting  to  and  acting  under 
the  general  control  of  the  commander. 

That  the  principles  thus  laid  down  as  to  following  exactly  a 
prescribed  and  predetermined  course,  and  as  to  regulating  exactly 
the  consumption  of  power  and  consequently  of  fuel,  and  the  keeping 
up  a  system  of  what  may  be  termed  scientific  observation  for  the 
purpose  of  ensuring  this  regularity,  I  submit  should  be  rigidly 
enforced;  and  the  commander  should  be  required  to  adopt  these 
principles  as  the  guide  of  his  conduct,  and  to  use  the  measures  that 
are  placed  at  his  disposal  for  working  this  machine  in  the  manner  and 
with  the  precision  pointed  out. 


Letter  on  the  Duties  of  the  Chief  Engineer. 

March  19,  1857. 
The  duties  which  I  apprehend  will  devolve  upon  the  chief 
engineer  of  our  ship  will  be,  firstly,  the  supreme  direction  and 
management  of  both  the  principal  engines,  and  all  the  auxiliary 
engines  and  machinery  worked  by  them  in  the  ship ;  and  as  the  con- 
struction of  such  a  ship,  and  of  many  of  its  adjuncts,  such  as  the  iron 
masts  and  yards,  steering  apparatus,  and  other  parts,  are  strictly  of 
an  engineering  character,  and  such  as  in  the  event  of  repairs,  par- 
ticularly at  sea  or  in  foreign  ports,  would  require  a  mechanical 
engineer  rather  than  a  shipwright,  I  think  it  must  be  made  part  of 
your  duty,  as  the  most  competent  officer,  to  make  yourself  tho- 
roughly acquainted  with  the  construction  of  the  ship  and  all  its  parts, 


336  THE  '  GEEAT  EASTERN '  STEAM-SHIP.  [a.d.  1857. 

and  all  mechanism  within  it,  so  as  to  be  prepared  to  take  such  share 
of  responsibility  as  to  the  state  of  the  structure  of  the  ship  as 
it  may  be  found  desirable  to  throw  iipon  you  as  chief  engineer,  and 
at  all  events  to  be  prepared  to  be  the  captain's  chief  authority  and 
responsible  adviser  on  all  matters  of  mechanical  engineering. 

The  principal  duty,  however,  will  of  course  be  the  management 
of  the  engines,  including  the  care  of  the  paddle,  screw,  and  otlier 
machinery  immediately  connected  with  the  engines,  or  worked  by 
them ;  and  as  the  success  of  the  ship  as  a  steamboat  will  depend 
entirely  upon  the  amount  of  power  developed  by  the  engines,  in  pro- 
portion to  the  fuel  consumed,  there  is  no  limit  to  the  degree  of 
attention,  of  judgment,  and  of  skill,  that  not  only  may  be  usefully 
applied,  but  that  must  be  applied  to  ensure  success. 

I  have  no  wish  to  alarm  you  as  to  the  amount  of  work  or  respon- 
sibility that  will  devolve  upon  you;  my  object  is  rather  to  show  you 
the  opportunity  afforded  of  displaying  judgment,  skill,  and  assiduous 
attention,  and  thus,  as  1  hope,  to  excite  your  ambition,  when  I  seek 
to  draw  your  attention  very  strongly  to  the  peculiarities  of  this 
case. 

In  ordinary  steam  navigation,  whatever  perfection  has  as  yet  been 
sought  for  or  attained,  the  business  of  the  engineer  has  been  mainly 
to  keep  the  engines  in  perfect  order,  and  to  develope  the  greatest 
amount  of  power  possible,  and,  secondly,  to  effect  as  great  economy 
as  possible  in  the  consumption  of  fuel ;  but  the  latter  has  been 
merely  a  question  of  economy  in  a  pecuniary  point  of  view,  and  not 
of  necessity,  and  has  been  entirely  secondary  to  the  first  condition, 
so  much  so  that  the  most  successful  ships  have  not  been  by  any 
means  the  most  economical,  on  the  contrary,  they  have  been  rather 
extravagant  consumers. 

In  the  present  case,  the  circumstances  are  totally  different,  and  it 
will  be  essential  that  you  should  change  altogether  your  accustomed 
views  on  this  subject. 

This  ship  is  built  to  go  rotmd  the  world  with  a  defined  and  limited 
amount  of  fuel,  Avhich  you  have  no  power  to  exceed,  or  rather,  if  you 
exceed  it,  at  any  part  of  the  voyage,  the  whole  is  a  failure.  The 
circTxmstances  are  therefore  reversed,  with  this  additional  condition, 
that  there  is  no  medium  or  partial  success.  In  the  ordinary  cases 
you  have  a  limited  power  of  engine  and  an  excess  of  fuel,  in  which 
it  is  desirable  but  not  essential  that  you  should  effect  economy ;  in 
the  present  case  you  have  a  limited  and  defined  quantity  of  fuel  to 
consume,  with  an  excess  of  engine  power,  and  the  art  will  be  to 
obtain  the  largest  total  amount  of  power  from  this  fuel,  expending  it 


>  r.  51.]    LETTEE  ON  DUTIES  OF  CHIEF  ENGINEEE.     337 

]  irogressively,  and  in  such  a  manner  as  to  reach  a  given  point.  To 
effect  this,  and  obtain  the  best  possible  results,  will  require  of  course 
that  the  engines  should  be  kept  in  the  best  possible  order  ;  but  this, 
although  a  preliminary  condition,  is  an  ordinary  one,  requiring  no 
peculiar  duties  or  exercise  of  judgment,  and  must  be  assumed,  as  on 
all  occasions,  a  matter  of  course.  The  peculiar  duties  in  our  case 
will  be  the  continuous  study  in  every  trifling  detail  that  can  effect 
the  result  of  the  means  of  obtaining  the  largest  amount  of  steam 
from  the  defined  expenditure  of  fuel  and  the  use  of  this  steam,  so  as 
to  obtain  the  largest  amount  of  power,  and  the  largest  amount  of 
result. 

The  mere  study  of  this  question  must  necessarily  occupy  some 
time,  and  for  several  voyages  it  will  be  a  siibject  of  experiment ; 
but  the  more  rapidly  positive  information  can  be  obtained,  the 
more  prompt  and  certain  will  be  our  success.  To  attain  success 
will  require  a  degree  of  attention  to  every  minute  detail,  which 
it  has  never  yet  been  necessary  or  profitable  to  devote  to  this 
branch. 

The  continuous  weighing  out  of  coals  and  measure  of  the  products 
of  each  boiler  (for  which  means  will  be  provided),  the  continual 
observation  of  the  extent  to  which  blowing-ofF  is  desirable,  the  con- 
tinuous measure  by  indicator  of  the  performance  of  the  engines  under 
different  pressures  and  degrees  of  expansion,  so  that  you  can  at  all 
times  furnish  the  captain  with  the  exact  performances  of  the  two 
engines,  and  the  cost  of  fuel  required  to  produce  given  results  in  each ; 
so  that  he  may  have  the  means  of  comparing  your  expenditure  with 
the  results  he  obtained  in  the  speed  of  the  ship,  and  of  learning  the 
relative  beneficial  effects  of  employing  more  or  less  the  paddle  or  the 
screw  in  different  states  of  weather,  or  different  immersions  of  the 
ship,  will  be  required ;  and  every  method  of  increasing  the  performance 
of  each  gang  of  stokers,  and  of  stimulating  their  skill  and  care,  and 
every  refinement  in  each  separate  branch  of  the  work,  to  effect 
economy  of  fuel,  or  rather,  development  of  power  with  a  given 
amount  of  fuel,  will  be  necessary.  We  all  know  full  well  how,  if 
every  effort  is  continuously  made  and  every  possible  care  is  con- 
tinuously bestowed  in  each  department,  4  or  5  per  cent,  can  be  saved 
or  gained  in  many  points,  and  at  many  times  in  the  24  hours, 
between  the  drawing  of  the  coals  from  the  bunkers  and  the  develop- 
ment of  power  at  the  paddle  board  or  the  screw  blades ;  and  if  only 
1  per  cent,  can  be  thus  gained  jn  a  few  points,  the  aggregate  will 
soon  amount  to  10  per  cent.,  which  with  us  may  make  the  difference 
between  success  and  failure.     All  these  things  will  require  judgment, 

z 


il 


338  THE  •  GEEAT  EASTERN '   STEAM-SHIP.  [a.d.  1857. 

thought  and  attention,  rather  than  labour,  and,  above  all,  close  watching 
and  method,  and  good  management  of  men. 

Besides  these  more  than  ordinary  duties  during  the  voyage,  the 
only  peculiarity  in  the  service  will  be  that,  with'  such  a  costly 
machine,  the  mere  interest  of  money  and  fixed  expenditure  upon 
which  will  not  be  short  of  2001.  a  day,  and  the  perfect  state  of  which 
is  so  essential,  you  will  be  required  to  give  more  attention  to  the 
machinery  when  in  port  than  is  usually  required. 

I  trust  that  this  strong  but  not  exaggerated  statement  of  what 
would  be  expected  of  the  chief  engineer,  will  excite  your  desire  to 
undertake  the  duties,  rather  than  deter  you  from  seeking  the  post; 
and  that,  if  the  Directors  should  accept  the  offer  of  your  services, 
you  will  enter  upon  the  duties  with  confidence,  though  with  a  sense 
of  their  serious  importance.  In  the  event  of  your  appointment,  it 
will  be  a  necessary  condition  that  you  should  be  able  to  commence 
at  once  the  supervision  of  the  erection  of  the  engines.  This  work  is 
already  much  farther  advanced  than  I  should  have  wislied  it  to  bo 
before  the  chief  engineer  had  taken  charge  of  it.  I  attach  great 
importance  to  his  having  that  familiar  knowledge  of  all  the  parts 
and  their  condition,  which  no  study  of  drawings  can  give  so  well  as 
actual  inspection  during  erection,  and  I  wish  also  that  he  should 
satisfy  himself  of  the  perfect  truth  of  every  adjustment. 

It  will  be  seen  from  the  documents  which  have  been 
printed  in  this  chapter  how  'deeply  and  seriously' 
Mr.  Brunei  had  considered  all  the  conditions  which  were, 
in  his  opinion,  necessary  for  the  economical  construction, 
and  the  successful  employment,  of  the  great  ship ;  but  it 
is  hardly  possible,  by  means  of  extracts  from  his  corre- 
spondence, to  convey  an  adequate  impression  of  the 
amount  of  labour  he  expended — from  the  year  1852 
to  the  last  days  of  his  life — on  the  supervision  of  every 
detail  of  the  work.     '  The   fact   is,'   he   said,  '  I   never 

*  embarked  in  any  one  thing  to  which  I  have  so  entirely 

*  devoted  myself,  and  to  which  I  have  devoted  so  much 

*  time,  thought,  and  labour,  and  on  the  success  of  which 

*  I  have  staked  so  much  reputation.' 

Heavy  as  Mr.  Brunei's  duties  were  in  October  1854, 


-T.  51.]  PROGRESS  TO  SEPTEMBER   1857.  339 

when  lie  wrote  these   words,   a  far   greater   amount   of 
labour  was  subsequently  imposed  upon  him. 

During  the  year  1855  financial  difficulties  arose  which 
interfered  with  the  progress  of  the  ship;  and  at  last, 
in  February  1856,  although  Mr.  Brunei  had  done  every- 
thing in  his  power  to  prevent  the  necessity  of  such  a 
step,  the  works  were  suspended;  and  they  were  not 
resumed  till  the  end  of  May,  after  which  date  they  were 
carried  on  by  the  Company  under  the  supervision  of  the 
existing  staff.  It  was  greatly  against  Mr.  Brunei's  wishes 
that  this  was  attempted,  except  as  a  temporary  measure, 
as  he  considered  it  impossible  for  a  company  to  carry  on 
such  a  work  efficiently  and  economically. 

Notwithstanding  all  these  difficulties,  that  which  seemed 
at  first  only  a  confused  mass  of  iron  assumed  by  slow 
degrees  the  graceful  proportions  of  a  '  great  ship ' ;  and 
the  hull  of  the  vessel  was  completed  by  the  end  of  the 
summer  of  1857,  so  far  as  it  was  desirable  to  proceed 
before  the  commencement  of  the  launching  operations. 


z  2 


340  [a.d.  1857. 


CHAPTER  XII. 

STEAM  NAVIGATION— THE  'GREAT  EASTERN'  STEAM-SHIP. 
THE  LAUNCH. 

A.D.  1857—1858.     JETATis  62. 

REASONS      FOB     DETERMINATION    THAT     THE     SHIP      SHOULD     BE     LAUNCHED 

BROADSIDE    TO    THE    RIVER AND     THAT     THE    LAUNCH     SHOULD     BE    SLOW 

EXTRACTS    FROM    MR.    BRUNEl's    REPORT    OF    FEBRUARY    1855 REASONS    FOR 

THE    ADOPTION     OF     IRON      SLIDING-SURFACES DESCRIPTION    OF    THE    'WATS 

AND     CRADLES — AND     OF     THE   MOTIVE    POWER    PROVIDED     FOR    LAUNCHING 

THE    SHIP MEMORANDUM     ON    PROPOSED    ARRANGEMENTS   FOR     THE   LAUNCH 

(SEPTEMBER     26,  1857) LETTER     TO     CAPTAIN    HARRISON    ON    RIVER     TACKLE 

(SEPTEMBER      30,    1857) LETTER      ON      THE     NATURE     OF     THE      OPERATIONS 

(OCTOBER    23,  1857) — MEMORANDUM     ON    GENERAL    ARRANGEMENTS   AND    IN- 
TENDED MODE  OF  PROCEEDING  (OCTOBER  30,   1857) HISTORY  OF  THE  LAUNCH, 

NOVEMBER   3,  1857-JANUARY    31,    1858 LETTER    TO    THE    DIRECTORS,    NOVEM- 
BER   26,  1857 REPORT   AND    MEMORANDUM    ON   THE   LAUNCHING    OPERATIONS 

(DECEMBER      17,    1857) — FLOATING     THE    SHIP NOTE  A:     EXPERIMENTS     AND 

OBSERVATIONS       ON       FRICTION. NOTED:     LETTER     TO      W.       FROUDB,      ESQ. 

(FEBRUARY  2, 1868). 

The  mode  in  which  the  great  ship  was  to  be  launched  had 
necessarily  to  be  determined  before  she  was  commenced. 
In  May  1853,  when  the  contract  for  her  construction  was 
entered  into,  the  question  was  left  open,  and  the  contractor 
was  either  to  launch  her,  or  to  build  her  in  a  dock  *  if  it 
*  be  found  preferable.'  With  Mr.  Brunei's  full  concurrence, 
Mr.  Russell  determined  to  build  the  ship  on  the  river-bank, 
broadside  to  the  river. 

The  reasons  which  led  to  this  determination  were  fully 
described  by  Mr.  Brunei  in  his  report  of  February  5,  1855. 
This  report  has,  with  the  exception  of  the  parts  relating 
to  the  launching  operations,  been  printed  above,  p.  315. 
The  passages  there  omitted  are  as  follows : — 


E 


52.]      REPORT  ON  PLAN  OF  LAUNCHING.        341 


One  of  the  first  points  to  be  decided  was  the  mode  of  launching 
the  vessel,  which  of  course  would  determine  the  position  in  which  it 
was  to  be  built ;  and  I  wish  to  take  this  opportunity  of  explaining  my 
reason  for  adopting  the  plan  I  have  decided  upon,  which,  being 
unusual,  might  be  supposed  to  be  unnecessary. 

Vessels  are  generally  built  above  the  level  of  high  water,  and  then 
allowed  to  slide  down  an  inclined  plane  into  the  water  ;  occasionally, 
as  in  the  case  of  the  '  Great  Britain,'  they  are  built  in  a  dry  dock, 
into  which  the  water  is  afterwards  admitted,  and  they  are  floated 
out. 

Both  plans  Avere  well  considered  in  the  present  case ;  but  the  size 
of  the  dock  required,  the  difficulty  of  finding  a  proper  site  for  such 
a  dock,  the  depth  required  for  floating  a  ship  with  her  engines  and 
boilers,  which  it  was  most  desirable  to  introduce  while  building  the 
hull,  and  the  depth  of  channel  required  to  communicate  between 
such  a  dock  and  the  deep  water  of  the  river,  all  combined  to  render 
the  dock  plan  a  very  expensive,  and,  considering  the  nature  of  the 
soil  in  which  it  would  have  to  be  formed,  a  somewhat  hazardous 
proceeding.  Launching  seems  to  offer  the  fewest  difficulties  and  the 
greatest  certainty  ;  but  the  dimensions  of  the  vessel  required  some 
modifications  of  the  usual  modes  of  proceeding. 

Launching  is  generally  effected  by  building  the  ship  on  an  inclined 
plane,  which  experience  has  determined  should  be  at  an  inclination 
of  about  1  in  12,  to  1  in  15,  the  keel  of  the  ship  being  laid  at  that 
angle,  and  the  head  consequently  raised  above  the  stern,  say  one 
fifteenth  of  the  whole  length  of  the  ship.  In  the  present  case  this 
would  have  involved  raising  the  fore  part  of  the  keel,  or  the  forefoot, 
about  40  feet  in  the  air,  and  the  forecastle  would  have  been  nearly 
100  feet  from  the  ground ;  the  whole  vessel  would  have  been  on  an 
average  22  feet  higher  than  if  built  on  an  even  keel. 

The  inconvenience  and  cost  of  building  at  such  a  great  height 
above  ground  may  be  easily  imagined ;  but  another  difficulty  pre- 
sented itself  which  almost  amounted  to  an  impossibility,  and  which 
has  been  sensibly  felt  with  the  larger  vessels  hitherto  launched,  and 
will  probably,  ere  long,  prevent  launching  longitudinally  vessels  of 
great  length.  The  angle  required  for  the  inclined  plane  to  ensure 
the  vessel  moving  by  gravity  being,  say  1  in  14,  or  even  if  diminished 
by  improved  construction  in  ways  to  1  in  25,  is  such  that  the  end 
first  immersed  would  become  water-borne,  or  would  require  a  very 
great  depth  of  water  before  the  forepart  of  the  ship  would  even  reach 
the  water's  edge.  Vessels  of  450  or  500  feet  in  length  would  be 
difficult  to  lavmch  in  the  Thames  unless  kept  as  light  as  possible  ; 


342  LAUNCH  OF  THE  '  GKEAT  EASTERN.'         [a.d.  1857. 

but  our  ship  could  not  be  so  launched,  the  heel  of  the  sternpost  being 
required  to  be,  as  I  before  said,  about  40  feet  below  the  level  of  the 
fore-foot.  Some  mitigation  of  the  difficulty  might  be  obtained  by  an 
improved  construction  of  the  ways;  but  the  great  length  of  ways  to 
be  carried  out  into  the  river  would,  under  any  circumstances,  be  a 
serious  difficulty. 

These  considerations  led  me  to  examine  into  the  practicability  of 
launching  or  lowering  the  vessel  sideways ;  and  I  found  that  sucli  a 
mode  would  be  attended  with  every  advantage,  and,  so  far  as  I  can 
see,  it  involves  no  countervailing  disadvantages.  This  plaa  has  been 
accordingly  determined  upon,  and  the  vessel  is  building  parallel  to 
the  river,  and  in  such  a  position  as  to  ^dmit  of  the  easy  construction 
of  an  inclined  plane  at  the  proper  angle  down  to  low- water  mark. 

In  constructing  the  foundation  of  the  floor  on  which  the  ship  is 
being  built,  provision  is  made  at  two  points  to  ensure  sufficient 
.strength  to  bear  the  whole  weight  of  the  ship  Avhen  completed.  At 
these  two  points,  when  the  laimching  has  to  be  effected,  two  cradles 
will  be  introduced,  and  the  whole  will  probably  be  lowered  down 
gradually  to  low- water  mark  ;  whence,  on  the  ensuing  tide,  the  vessel 
will  be  floated  off.  The  operation  may  thus  be  performed  as  slowly 
as  may  be  found  convenient ;  or,  if  upon  further  consideration  more 
rapid  launching  should  be  thought  preferable,  it  may  be  adopted. 

I  have  entered  at  some  length  into  an  explanation  of  all  the  reasons 
which  led  to  the  adoption  of  this  plan  ;  as  I  am  anxious  that  they 
should  be  knoAvn,  and  particularly  that  it  should  be  well  understood 
by  the  proprietors  and  those  interested  in  our  success,  that  I  am  not 
adopting  any  novelties  ;  unless,  so  far  as  those  modifications  of  the 
more  usual  practices  which  experience  points  out  as  necessary  to 
meet  the  peculiarities  of  a  particular  case  may  be  deemed  such. 

I  should  add  that  the  necessity,  arising  from  the  same  causes,  of 
launching  transversely  has  been  felt  with  long  vessels  of  another 
description,  namely,  pontoons,  or  floating  piers ;  one  of  300  feet  in 
length,  which  I  have  built  at  Plymouth,  was  so  launched,  and  pre- 
viously to  this,  one  of  400  feet  in  length  by  Mr.  Fowler  on  the 
Humber.^ 

'  Shortly  after  the  publication  of  lakes  wore  launched.    In  the  course 

this  report,   Mr.   Brunei  received   a  of  a    correspondence  which   ensued, 

letter  from  Mr.  Gr.  W.  Bull,  of  Buifalo,  Mr.  Bull  gave  much  information  as  to 

U.S.A.,    encouraging    him    to    adopt  the  manner  in  which  these  launches 

the  plan   of  launching   sidewaj's,  as  were   effected.     He  advocated  a  frco 

that    was    the    way    in    which    the  launch  for  the  '  Great  Eastern.' 
large   steamboats    of  the    American 


;et.  52.]  EEPOKT  ON  PLAN  OF  LAUNCHING.  343 

I  hope  to  be  able  to  arrange  that  the  machinery,  which  is  to  be 
provided  by  the  contractor,  for  lowering  the  vessel  down  the  ways 
will  be  also  fitted  to  form  a  '  patent  slip  '  arrangement  for  hauling 
the  ship  up  for  repairs  ;  so  that,  if  it  should  be  found  desirable  to  do 
so,  such  apparatus  may  be  purchased  for  that  purpose,  and  fitted  up 
at  the  port  which  the  ship  will  frequent.  With  the  view  of  facili- 
tating such  an  operation,  or  the  grounding  of  the  ship  on  a  gridiron 
for  examination  at  low  water,  a  sufficient  extent  of  the  floor  of  the 
ship  is  formed  perfectly  flat,  and  is  so  strengthened  as  to  allow  the 
ship  when  loaded  to  be  grounded  without  being  unduly  strained. 

After  it  was  determinea  that  the  ship  should  be  built 
on  the  river-bank  instead  of  in  a  dock,  and  parallel  to 
the  river  instead  of  at  right  angles  to  it,  the  next  point 
for  consideration  was,  whether  the  ship  should  be  lowered 
gradually  to  low- water  mark,  or  whether  a  free  launch 
should  be  attempted. 

In  a  free  launch  the  ship  is  allowed  by  the  action  of  the 
force  of  gravity  to  run  down  the  ways  at  a  considerable 
velocity.  In  the  case  of  the  *  Great  Eastern '  there  were 
insurmountable  objections  to  this  plan.  Some  of  them 
might  have  been  overcome  by  mechanical  appliances ;  but 
these  would  have  introduced  complication  and  additional 
elements  of  risk. 

In  accordance  with  the  opinion  which  he  had  from  the 
first  entertained,  Mr.  Brunei  determined  to  move  the  ship 
slowly  down  the  wa.ys. 

Subsequently  to  his  determination  to  launch  slowly,  Mr. 
Brunei  decided  to  employ  sliding-surfaces  of  iron  instead 
of  greased  wood. 

In  ordinary  launches  the  ways  are  thickly  greased,  so 
that  there  is  between  the  ways  and  the  cradles  a  thick 
stratum  of  grease,  which  renders  the  friction  verj'  small. 
The  conditions,  however,  do  not  remain  the  same  through- 
out the  passage  of  a  ship  down  the  ways ;  for,  when  she 


344  LAUNCH   OF  THE   '  GREAT   EASTERN.'  [a.d.  1857- 

has  moved  some  distance,  the  cradle  has  been  rubbing- 
away  and  squeezing  out  the  grease ;  and  therefore  the 
part  of  the  cradle  which  supports  the  middle  and  bows 
of  the  ship  meets  with  increasing  resistance  from  friction. 
Another  and  more  serious  cause  of  the  destruction  of  the 
lubrication  arises  from  unevenness  in  the  ways. 

The  result  of  the  action  of  the  friction  between  the 
wooden  surfaces  after  the  destruction  of  the  grease  is 
sometimes  so  great  that  they  become  mutually  imbedded, 
the  fibres  of  the  wood  being  rolled  up  together  to  such 
an  extent  that  it  has  been  found  difl&cult  afterwards  to 
separate  the  timbers.  The  increased  friction  due  to  the 
deterioration  of  the  sliding- surfaces  of  grease  does  not 
often  produce  failure  in  ordinary  ship  launches,  because 
the  vessel,  while  still  on  the  fresh  grease,  acquires  a  mo- 
mentum sufficient  to  carry  it  over  the  lower  part  of  the 
ways,  notwithstanding  the  retardation  resulting  from  in- 
creased friction. 

It  was  from  a  legitimate  fear  of  the  development  of  a 
retarding  force  due  to  the  destruction  of  the  grease,  that 
Mr.  Brunei  hesitated  to  employ  wooden  sliding-surfaces. 
The  ground  was  far  from  solid  ;  and  the  use  of  piles  as  a 
foundation  for  the  ways  would  not  have  prevented  the 
possibility  of  excessive  local  pressure  being  brought  on 
parts  of  the  surfaces.  The  heat  produced  by  undue  pres- 
sure at  any  point  under  the  great  area  covered  by  the 
cradles  would  tend  to  spread  and  aggravate  the  evil ;  and, 
had  any  considerable  portion  of  the  sliding-surfaces  become 
wood-bound,  the  difficulty  would  have  been  far  less  remedi- 
able than  in  the  case  of  an  ordinary  launch,  where  the 
cradles  and  ways  are  throughout  accessible.  But  in  the 
case  of  the  *  Great  Eastern '  the  space  between  the  ship 
and  the  ways,  over  a  considerable  portion  of  the  area 
covered  by  the  cradles,  was  very  confined,  and  it  would 


*T.  52.]        ADOPTION   OF  IKON  SLIDING-SURFACES.  345 

have  been  a  most  tedious,  if  not  a  hopeless,  task  to  get 
at  the  injured  part  so  as  to  repair  it  properly. 

At  the  end  of  the  year  1856,  when  the  construction  of 
the  ways  had  to  be  commenced,  Mr.  Brunei  acted  upon  his 
views  as  to  the  dangers  attendant  on  the  use  of  wooden 
sliding- surfaces,  and  adopted  iron.  By  this  step,  although 
there  might  be  some  fresh  difficulties  to  be  encountered,  the 
disastrous  consequences  were  avoided  which  might  have 
followed  from  employing  wooden  surfaces. 

Under  two  places  in  the  length  of  the  ship  the  ground 
had  been  prepared  for  the  reception  of  the  launching  ways. 
These  ways  or  inclined  planes  were  two  in  number,  and 
reached  to  low-water  mark.  They  were  placed  at  such 
positions  as  best  to  carry  the  weight  of  the  ship  without 
straining  her.  The  ways,  as  originally  designed  by  Mr. 
Brunei,  were  each  80  feet  wide ;  but,  with  the  desire  of 
spreading  the  weight  of  the  ship  over  a  still  larger  area, 
he  decided  to  add  20  feet  to  each  side  of  each  way,  thus 
increasing  their  breadth  to  120  feet.  The  ship's  head 
pointed  down  the  river;  180  feet  of  the  bow  projected 
beyond  the  forward  way,  110  feet  were  unsupported  be- 
tween the  two  ways,  and  150  feet  of  the  stem  projected 
beyond  the  after  way.  The  distance  from  the  starboard 
side,  the  side  next  to  the  river,  down  to  low-water  mark, 
was  about  240  feet ;  and  the  actual  length  of  the  ways, 
including  the  portion  under  the  ship,  was  about  330  feet. 

At  the  same  time  that  he  decided  to  use  iron  as  the 
sliding-surface,  Mr.  Brunei  adopted  means  for  ensuring, 
as  far  as  possible,  the  even  distribution  of  the  weight  upon 
the  ways.  With  this  object  he  did  not  attempt  to  make 
them  unyielding,  but  allowed  them  to  yield  slightly,  so  that, 
like  a  cushion,  they  might  adapt  themselves  to  the  under 
surface  of  all  parts  of  the  cradles  with  a  sufficient  upward 


346  LAUNCH  OF  THE  '  GKEAT  EASTERN.'         [a.d.  1857. 

pressure.  Tlie  ways  rested  on  the  river-bank,  and  piles 
were  used  to  prevent  the  earth  under  the  edges  of  the 
ways  from  swelling  out  at  the  sides,  and  yielding  more 
than  the  ground  under  the  middle  portion. 

The  ground  having  been  prepared  to  the  slope  of  1  in 
12,  a  layer  of  concrete  of  about  two  feet  in  thickness  was 
laid  over  the  area  of  the  ways.  On  the  concrete  were 
placed  timbers  running  at  right  angles  to  the  ship.  These 
timbers,  which  were  imbedded  in  the  concrete,  were  1  foot 
square,  with  a  space  of  2  feet  6  inches  between  them. 
Across  these  timbers,  and  parallel  to  the  ship,  were  placed 
other  timbers,  with  intervals  of  2  feet  between  them ;  and 
upon  these  again  were  laid  rails  18  inches  apart,  parallel 
to  the  ways,  and  at  right  angles  to  the  ship.  The  rails 
were  of  the  ordinary  kind  used  on  the  Great  Western 
Railway. 

Thus  the  ways  consisted  of  a  network  of  timber  resting 
on  a  thin  bed  of  concrete  ;  and  on  the  top  of  the  timber 
network  were  placed  the  rails  which  formed  the  actual 
sliding-surface. 

The  under  side  of  the  cradles  consisted  of  iron  bars, 
which  were  laid  parallel  to  the  ship,  and  therefore  across  the 
rails  of  the  ways.  These  bars  were  each  1  inch  thick  and 
7  inches  broad,  with  an  interval  of  11  inches  between 
the  bars.  Upon  these  bars  was  fixed  6  inches  of  hard  wood 
planking  (see  fig.  15,  a),  and  on  this  again  came  the 
framing  of  the  cradles.  Tapered  timbers  (6)  were  driven 
in,  so  as  to  fill  up  the  wedge-shaped  space  between  the 
hard  wood  over  the  bars  and  the  flat  bottom  of  the  ship. 
On  the  side  next  the  river,  between  these  timbers  and  the 
rounded  part  of  the  under  side  of  the  ship,  were  driven  in 
separate  wedge-shaped  pieces  (c),  which  were  secured  to 
the  timbers  below  by  long  bolts,  arranged  so  as  to  allow 


iET.  52.]  WAYS  AND  CRADLES,  347 

the  removal  of  the  wedge-pieces  when  required.  The 
means  of  unbolting  the  wedge-pieces  was  an  essential 
provision  for  floating  off  the  ship,  as  they  had  to  be  re- 
moved before  she  could  move  sideways  off  the  cradles. 


Fig.  16.  Transverse  Section  of  Ship,  showing  Ways  and  Cradles. 

^n^     y      I 5» ip  a/t f 0  *p  «o  gy  ay 

Scale  of  feet. 

Resting  on  the  lower  timbers  of  the  cradle  were  stout 
props  {d),  which  pressed  against  the  ship's  side  higher  up 
than  the  wedge-pieces,  and  took  part  of  the  weight,  and 
spread  it  over  the  outer  part  of  the  cradle.  There  were 
similar  props  (e)  on  the  landward  side  of  the  cradles. 

There  were  80  rails  on  each  of  the  ways,  and  nearly 
GO  transverse  bars  under  each  cradle  ;  so  that  there  were 
9,000  intersections  of  the  bars  and  rails.  As  the  ship 
and  the  cradles  weighed  12,000  tons,  each  intersection 
carried  on  the  average  a  weight  of  1^  tons. 

After  the  construction  of  the  ways  was  settled,  the 
amount  of  power  required  to  move  the  ship  down  had  to 
be  determined. 


348  LAUNCH  'OF  THE  '  GEEAT  EASTEEN.'         [a.o.  1857. 

The  motive  power  was  not  simply  tlie  chains,  tackle, 
presses,  &c. ;  but  there  was  also  the  action  of  gravity. 
One  motive  power,  then,  was  not  only  available,  but  was 
inevitably  present ;  and,  as  the  ways  were  at  an  inclination 
of  1  in  12,  the  motive  power  of  gravity  upon  the  weight 
of  12,000  tons  was  1,000  tons.  The  question  to  be  de- 
cided was,  whether  the  1,000  tons  of  motive  force  was 
sufl&cient  to  overcome  the  friction ;  and,  if  not,  then  what 
additional  force  would  be  required  to  do  so. 

In  January  1857,  immediately  upon  the  adoption  of  iron 
sliding-surfaces,  an  experiment  was  arranged  on  a  con- 
siderable scale,  in  order  to  form  some  idea  on  this 
important  point.  Two  rails  were  laid  at  an  inclination  of 
1  in  12,  and  upon  them  an  experimental  cradle  was  placed, 
weighing  some  8  tons,  and  representing  a  small  portion  of 
the  actual  cradle. 

The  effect  of  the  friction  of  iron  sliding-surfaces  may 
be  summed  up  very  simply.  It  appeared  that  the  motive 
power  need  not,  at  most,  be  more  than  would  have 
been  given  by  placing  the  ways  at  an  inclination  of  1 
in  8,  and  that  restraining  power  could  not  have  been 
safely  dispensed  with  if  the  ways  had  been  placed  at  a 
greater  inclination  than  1  in  16;  as  it  was  observed  that, 
contrary  to  received  notions,  the  friction  became  less  as 
the  velocity  increased,  and  that,  in  case  any  considerable 
velocity  were  attained,  a  great  force  would  be  required 
merely  to  overcome  the  motive  power  of  gravity  down  the 
incline,  independently  of  that  required  to  destroy  the 
velocity.^ 

The  task  of  getting  the  ship  from  the  place  where  she 
was   built  to   her  moorings   in   the   river  divided  itself 


'  For  an  account  of  this  and  other      tion,  see  note  A  at  the  end  of  this 
experiments  and  observations  on  fric-       chapter. 


JET.  52.]  MOTIVE  POWER  349 

naturally  into  two  parts — the  moving  of  the  ship  down 
the  ways,  and  the  floating  her  from  off  her  cradles. 

This  subdivision  of  the  whole  undertaking  of  the  launch 
into  two  almost  distinct  operations  is  of  great  importance 
in  considering  the  manner  in  which  Mr.  Brunei  conducted 
them ;  especially  when  it  is  borne  in  mind  that  one,  the 
moving  down  the  ways,  was  capable  of  being,  by  careful 
precautions,  rendered  almost  safe;  whereas  the  other, 
the  floating  the  ship  off,  was  dependent  on  the  successful 
issue  of  various  minor  operations,  in  the  management  of 
which  the  fallible  human  element  had  a  greater  share,  and 
where  small  accidents,  though,  in  their  primary  effects, 
productive  only  of  delay,  might  cause  irretrievable  disaster. 

In  the  operation  of  lowering  the  ship,  there  had  to  be 
provided  both  power  to  move  her  and  power  to  check  her 
motion.  In  floating,  but  one  force  was  necessary,  namely, 
that  required  to  pull  the  ship  off  if  she  got  jammed  on 
the  cradles. 

With  a  desire  to  provide  for  the  possibility  of  an 
extreme  amomit  of  resistance  on  the  ways,  Mr.  Brunei 
designed  a  complete  hydraulic  apparatus,  which  would 
have  been  sufficiently  powerful  to  move  the  ship  down 
without  inteiTuption  or  delay.  It  is  much  to  be  regretted 
that  he  did  not  persist  in  carrying  out  his  original  intention. 

In  the  operation  of  floating,  chains  and  tackle  were  the 
best  means  of  supplying  the  tractive  force  that  might  be 
required;  and  Mr.  Brunei  decided  to  have  a  very  large 
amount  of  available  power.  If  the  weather  were  fine, 
and  the  tide  at  its  calculated  height,  if  no  part  of  the 
cradles  got  disarranged,  if  the  calculations  as  to  the  ship's 
draught  of  water  were  correct — if  everything  went  right, 
there  would  be  no  necessity  for  any  great  hauling  power ; 
a  few  tug-boats  would  suffice  to  take  the   ship  to  her 


350  LAUNCH  OF  THE  '  GREAT  EASTERN.'         [a.d.  1857. 

moorings.  But  Mr.  Brunei  determined  that  in  this 
critical  operation  of  floating  he  would  not  trust  to  good 
fortune,  when  the  absence  of  it  might  produce  grave 
injury.  The  power  which  he  thought  it  desirable  to 
provide  in  chain  purchases  for  the  floating  was  very- 
considerable,  being  equal  to  a  pull  of  500  tons. 

As  it  seemed  probable  that  the  ship  would  not  require 
much  force  to  move  her  down  the  ways,  it  seemed  also 
probable  that  the  river  tackle  (as  the  chains  and  appli- 
ances for  hauling  the  ship  off  were  called)  would  be  suffi- 
cient for  both  purposes.  This  being  the  case,  it  at  the 
time  appeared  right,  in  the  embarrassed  state  of  the  Com- 
pany's finances,  to  dispense  with  the  more  powerful  and 
costly  apparatus  which  Mr.  Brunei  had  proposed  for 
moving  the  ship  down ;  there  being  no  fatal  consequences 
to  be  apprehended  from  a  defect  of  power. 

Influenced  by  these  considerations,  Mr.  Brunei  resolved 
to  trust  to  the  river  tackle  alone. 

He  referred  to  this  decision  in  a  letter  to  the  Secretary  of 
the  Company  written  during  the  launch : — 

November  26,  1857. 
My  original  intention,  the  right  one,  was  to  fit  up  properly  such 
an  hydraulic  apparatus  as  should  be  fitted  to  move  the  ship  the 
whole  length  of  the  ways,  and  to  depend  upon  the  whole  river  tackle 
only  in  the  event  of  her  moving  very  easily,  and  for  getting  her  off 
the  ways  at  the  end.  From  an  xmwise  attempt  to  economise  I 
determined  to  dispense  with  the  immediate  costly  apparatus  for 
pushing,  and  by  suflScient  power  merely  to  move  the  ship  at 
starting  or  in  the  event  of  sticking,^  and  to  depend  upon  the  same 
river  tackle  to  keep  her  moving  down  the  ways. 

The  experiments  made  with  the  trial  cradle  had  shown 
the  necessity  of  providing  a  certain  amount  of  restraining 

'  The  power  mentioned  here  as  adhesion  at  the  first  start.  The  river 
applied  for  starting  the  ship  was  tackle  was  relied  on  to  overcome  the 
two   hydraulic  presses,  to  overcome      friction. 


iET.  52.]  CHECKING  GEAR.  351 

force.  As  will  be  seen  in  the  description  of  the  launch, 
it  was  only  used  once,  but  it  must  not  therefore  be  sup- 
posed that  there  was  no  necessity  for  providing  it.^ 

The  arrangement  of  the  checking  gear  was  the  same  at 
each  of  the  ways.  Attached  to  the  land  side  of  the  cradle, 
by  means  of  bolts,  was  a  strong  iron  framework  which 
held  two  large  horizontal  wheels  or  sheaves.  At  the 
upper  end  of  the  ways  another  sheave  was  fixed  in  a 
strong  timber  framing;  and  opposite  the  middle  of  the 
upper  end  of  the  ways  was  placed  a  large  windlass  or 
drum. 

This  drum  was  a  cylinder,  about  20  feet  long  and  6^ 
feet  in  diameter,  of  solid  timbers,  strongly  bolted  together, 
and  secured  at  each  end  in  a  broad  cast-iron  disc,  12  feet 
in  diameter. 

To  a  point  in  the  framing  was  attached  one  end  of  a 
2|-inch  chain  cable ;  this  chain  was  passed  round  one  of 
the  sheaves  attached  to  the  cradle,  then  round  the  sheave 
attached  to  the  upper  end  of  the  ways,  then  round  the 
second  sheave  attached  to  the  cradle ;  and  its  end  was 
coiled  round  the  drum.  Thus,  as  one  end  of  the  chain 
was  secm'ed,  it  was  necessary,  before  the  ship  could  move 
down  the  ways,  that  the  drum  should  revolve,  and  slacken 
the  end  of  the  chain  coiled  round  it. 

Round  the  discs  of  the  drum  were  wrought-iron  straps  ; 
these,  when  tightened  by  levers,  formed  brakes  by  "which  the 
revolution  of  the  drum  could  be  retarded.  Gearing  was 
provided  with  a  train  of  toothed  wheels,  so  that  the 
dram  could  be  turned  round  by  handles,  and  the  chain 
wound  on  to  it. 

The  following  paragraph  is  from  the  commencement 
of  a  memorandum  'by  Mr.  Brunei  on  the  launching 
arrangements,  written  about  five  weeks  before  the  launch 
began : — 

'  See  below,  note  A,  p.  389. 


352  LAUNCH   OF  THE  '  GREAT  EASTERN.'         [a.d.  1857, 

September  26,  1857. 
It  is  expected  that,  with  the  present  construction  of  the  wayp,  tlie 
friction  and  the  tendency  to  descend  by  gravity  will  be  about  balanced ; 
so  that  when  once  in  motion  no  very  great  amount  of  power  (at  least, 
in  proportion  to  the  mass  to  be  moved)  will  be  required  to  keep  the 
vessel  in  motion,  or  to  check  it  if  disposed  to  move  too  quick,  or 
quicker  at  one  end  than  at  the  other  ;  still  the  forces  which  may  be 
required  either  to  help  it  on  or  to  check  it,  though  relatively  small 
as  compared  with  the  mass  to  be  operated  upon,  will  be  very  large 
as  compared  with  forces  usually  obtained  by  the  ordinary  means  of 
rope  or  chain  purchases,  and  at  the  first  start,  or  after  any  accidental 
or  intentional  stoppage,  a  still  larger  power  may  be  required. 

The  apparatus  which.  Mr.  Brunei  prepared  for  performing 
the  double  duty  of  moving  the  ship  down  the  ways  and 
hauling  her  off  the  cradles  was  as  follows  : — At  each  end  of 
the  ship  was  a  powerful  chain  tackle.  One  end  of  a  chain 
cable  was  secured  to  a  mooring  in  the  river,  and  it  was 
passed  round  a  large  sheave  attached  to  the  ship,  then 
round  a  sheave  fixed  on  a  barge  about  300  feet  from  the 
ship,  and  the  end  brought  on  shore,  where  it  was  hauled  on 
by  a  chain  tackle  worked  by  a  steam  crab.  The  sheave 
attached  to  the  ship  at  the  bow  was  slung  by  chains  about 
80  feet  from  the  stem.  The  sheave  at  the  stern  was  fixed 
on  the  end  of  the  screw  shaft.  These  purchases  were 
intended  to  be  good  for  80  and  100  tons  respectively,  and 
were  to  be  able  to  follow  up  the  ship  quickly  if  she  moved. 

In  addition  to  these  purchases,  Mr.  Brunei  desired  to 
have  *  the  means  of  bringing  a  considerable  strain  to  bear 

*  in  the  event  of  the  ship  sticking  at  starting,  or  at  any 

*  subsequent  time,  and  particularly  at  the  last ; '  and  he 
considered  that '  nothing  under  250  or  300  tons  would  be 
'  of  any  use  for  the  purpose.'  This  power  he  desired  to 
apply  to  the  centre  of  the  ship  between  the  two  cradles 
by  means  of  double  crabs  and  treble  purchase  blocks  on 
four  barges. 

One  of  the  double  crabs  was  mounted  on  each  of  the 


52.]  RIVER  TACKLE.  353 

four  centre  barges,  and  was  placed  on  a  platform,  elevated 
so  that  tlie  blocks  of  the  chain  tackle  could  pass  under- 
neath it.  This  tackle  was  made  fast  to  a  chain  attached 
to  the  ship ;  and  the  mooring  chain  extending  across  the 
river  was  hauled  on  by  the  tackle. 

Each  of  these  four  crabs  and  tackle  was  to  be  capable  of 
working  up  to  a  strain  of  80  tons.  The  strain  which 
Mr.  Brunei  intended  to  be  able  to  put  on  the  ship  by  the 
river  tackle,  in  the  form  of  a  good  continuous  pull,  was 
in  all  500  tons. 

Two  hydraulic  presses  were  also  provided,  one  at  each 
of  the  cradles,  to  overcome  adhesion  in  first  moving  the 
ship.  Each  of  these  presses  should  have  been  able  to  exert 
a  strain  of  300  tons.  Therefore,  including  the  force  of 
gravitation,  the  power  which  Mr.  Brunei  hoped  to  have 
to  start  the  ship  was  2,100  tons,  or  more  than  one-sixth 
of  the  weight  to  be  moved ;  and  for  a  continuous  steady 
pull  to  keep  her  moving,  1,500  tons,  or  one-eighth  of  the 
weight. 

It  was  at  one  time  thought  possible  that  the  launch 
might  be  effected  in  October.  But  it  was  found  that 
it  would  be  impossible  to  be  ready  before  the  spring- 
tides at  the  beginning  of  November;  and  even  then, 
when  the  time  came,  there  was  considerable  hurry,  and 
important  matters  were,  as  will  be  seen,  insufficiently 
attended  to. 

The  cradles  were  put  together  and  wedged  up  under 
the  ship,  and  every  effort  was  made  at  low  water  to 
extend  the  ways  as  far  as  possible;  so  that,  by  moving 
her  farther  down  the  slope,  a  greater  margin  might 
be  obtained,  to  allow  for  any  falling  off  in  the  expected 
level  of  the  tide,  or  for  any  miscalculation  in  the  ship's 
draught. 

A   A 


354.  LAUNCH  OF  THE  '  GREAT  EASTERN.'        [a.d.  1857 

In  the  memorandum  already  referred  to  on  the  launching 
arrangements  Mr.  Brunei  instructed  Captain  Harrison  to 
superintend  the  moorings  for  the  river  tackle,  and  to 
satisfy  himself  of  their  sufl&ciency.  A  few  days  afterwards 
he  wrote  to  Captain  Harrison  on  the  subject : — 

September  30,  1857. 

I  fancy  (I  may  be  wrong)  that  you  hardly  estimate  sufficiently 
highly  the  forces  that  we  may  require  to  get  the  ship  down  if  she 
sticks  at  all,  or  to  drag  the  cradle  from  under  her,  or  to  force  her  off' 
the  cradle  at  the  last.  She  may  move  down  pretty  easily,  and  the 
cradles  may  possibly  not  stick  ;  but  if  she  does  stick  at  all,  it  is  as 
likely  to  require  a  dead  pull  of  500  tons  as  not,  and  we  must  not 
shut  our  eyes  to  the  real  exact  amount  of  strain  which  may  and  will 
come  upon  purchases  and  moorings,  e^c,  if  this  force  is  required 
and  is  exerted ;  but  we  must  provide  for  it.  The  several  moorings 
must  really  be  good  for  the  80  and  100  tons  respectively  mentioned 
in  the  memorandum — and  we  must  not  rest  satisfied  with  the  feeling 
that  the  moorings  are  stronger  than  any  generally  sold  or  than 
common  tackle  will  effect,  but  must  apply  purchases  that  will 
produce  the  strain,  and  if  necessary  we  must  strain  them  to  it ;  and 
our  moorings  ought  to  be  beyond  a  doubt. 

We  are  going  to  move  11,000  tons,  a  far  greater  weight  than  ever 
was  moved  before,  and  we  must  not  hesitate  at  providing  a  clear 
pull  of  500  tons ;  but  bear  in  mind  that  500  tons  clear  pull  is  some- 
thing much  beyond  what  one  is  accustomed  to.  The  power  usually 
brought  to  bear  with  purchases,  chain  cables,  &c.,  is  never 
measured,  but  is  very  small ;  and  we  must  take  care  and  not  be 
misled  by  comparison  with  them.  80  tons  is  a  heavy  pull,  and 
nothing  under  2  or  1\  chain  will  be  safe.     .     .     . 

These  are  great  strains  we  have  to  deal  with,  but  they  must  be 
had,  and  therefore  we  must  meet  them  boldly. 

Frequent  enquiries  were  now  made  relative  to  the  time 
of  launching;  and  the  number  of  applications  which 
poured  in  for  admission  to  the  yard  led  Mr.  Brunei  to 
write  the  following  letter  to  the  Directors  of  the  Company, 
and  it  was  published  by  them  in  the  newspapers.  In  it 
he  not  only  removed  current  misapprehensions  as  to  the 


.T.T.  52.]  LETTER  ON   NATUEE  OF  OPERATIONS.  355 

nature  of  the  proposed  operations,  but  he  also  took  the 
opportunity  of  pointing  out  that  there  would  be  no  risk  to 
the  ship  in  the  mode  of  launching  adopted,  and  that, 
although  it  might  at  first  be  unsuccessful,  further  power 
could  be  applied,  and  the  ship  safelj  launched. 

October  23,  1857. 

The  difficulty  of  replying  to  the  numerous  enquiries  made  re- 
specting the  period  at  which  the  ship  will  be  launched  seems  to 
render  it  desirable  that  some  means  should  be  taken  of  giving  the 
information  generally,  that  it  may  be  uncertain,  up  to  the  end  of 
next  week,  whether  the  ship  will  be  launched  on  the  3rd  proximo 
or  the  2nd  of  December,  and  also  of  correcting  the  eiToneous 
impressions  which  exist  as  to  the  nature  of  the  operation,  which  can 
only  lead  to  the  disappointment  of  those  who  are  erroneously 
anticipating  a  display,  on  an  unusually  large  scale,  of  that  which  is  a 
beautiful  spectacle  with  ships  of  ordinary  dimensions. 

As  regards  the  period  of  the  launch  I  have,  for  some  time  past, 
calculated  upon  being  ready  by  the  first  tides  of  next  month,  and  by 
the  unwearied  exertions  of  those  on  whose  assistance  I  have  de- 
pended, with  the  advantage  of  unusually  fine  weather,  the  principal 
works  required  are  so  far  advanced  that  there  seems  every  prospect  of 
success;  but  a  change  in  theweather  is  tlireatening,the  time  remaining 
is  short,  and  comparatively  small  causes  may  create  such  delay  as  to 
render  it  more  prudent,  if  not  unavoidable,  to  postpone  the  operation 
until  the  following  available  tide,  namely,  that  of  December  2. 
As  no  mere  desire  to  launch  on  the  day  supposed  to  have  been  fixed 
will  induce  me  to  hurry  an  operation  of  such  importance,  or  to  emit 
the  precaution  of  a  careful  and  deliberate  examination  of  all  the 
parts  of  the  arrangements  after  all  the  principal  works  of  preparation 
shall  have  been  completed,  should  such  postponement  prove  ne- 
cessary or  be  adopted  from  prudence,  everything  having  been  now 
prepared,  the  launch  would  be  on  December  2. 

As  regards  the  nature  of  the  operation,  it  has  frequently  been 
stated,  but  it  seems  neces.sary  to  repeat  it,  that  the  ship  will  not  be 
*  launched,'  in  the  ordinary  sense  of  the  term,  but  merely  lowered  or 
drawn  down  to  low-water  mark,  to  be  thence  floated  off  by  a  slow 
and  laborious  operation,  requiring  two  and  possibly  three  tides,  and 
very  probably  effected  partly  in  the  night,  and  at  no  one  time 
offering  any  particularly  interesting  spectacle,  or  even  the  excite- 
ment of  risk  ;  as  I  am  happy  to  feel  that,  even  assuming  accidents  to 

A  A  2 


356  LAUNCH  OF  THE  '  GREAT  EASTERN.'        [a.d.  1857. 

occur  or  miscalculations  to  have  been  made,  rendering  the  operation 
unsuccessful— the  ship  may  stop  halfway  or  not  move  at  all,  more 
power  or  other  remedies  may  have  to  be  applied — but  no  injury  to 
the  ship  can  result  from  any  failure  in  the  course  of  proceeding  in 
this  mode  of  launching.. 

Throughout  October  an  immense  amount  of  work  had 
to  be  done,  and  the  multiplicity  of  matters  to  be  attended 
to  pressed  heavily  on  Mr.  Brunei  and  his  assistants. 

With  the  check  tackle  he  had  reason  to  be  content. 
The  chains,  which  were  the  ship's  cables,  had  been  very 
carefully  made ;  and,  in  addition  to  the  usual  tests,  pieces 
had  been  taken  at  hazard,  and  were  found  to  bear  a 
good  breaking-strain. 

The  river  tackle  was  not  so  satisfactory.  In  operations 
that  have  to  be  conducted  afloat  unexpected  delays  arise, 
and  all  the  work  may  be  suspended  by  bad  weather,  and 
it  is  moreover  frequently  dependent  on  tides.  In  the  pre- 
sent case  the  work  to  be  done  was  not  easy.  Heavy  chain 
cables  had  to  be  laid  out,  and  moorings  picked  up  and 
connected  to  the  tackles ;  one  work  having  often  to  wait 
for  the  completion  of  another. 

Mr.  Brunei  had  determined  that  each  purchase  should 
be  tested  by  being  strained  to  the  utmost  stress  for  which 
it  was  intended;  but,  owing  to  the  delays  which  had 
occurred  in  preparing  the  river  tackle,  this  was  not  done. 

A  few  days  before  the  launch  Mr.  Brunei  addressed  the 
following  memorandum  to  all  who  were  to  take  part  in 
the  operation : — 

General  Arrangements  and  intended  Mode  of  Proceeding. 

October  30,  1857. 

It  is  desirable  that  all  engaged  in  directing  any  part  of  the  work 
should  understand  the  general  course  of  proceeding  which  it  is  in- 
tended to  pursue,  so  far  as  may  be  found  practicable;  circumstances 
may  modify  these  pre-arranged  plans,  and  may  compel  a  total  de- 


JET.  52.]      MEMOEANDUM  ON  AKRANGEMENTS.        357 

parture  from  them,  but  every  endeavour  will  be  made  to  adhere  to 
them. 

General  Course  of  Proceeding. 
I  propose  to  commence  operations  about  two  hours  before  high 
water,  or  about  noon,  and  to  endeavour  to  get  the  ship  To  atart 

'  '  1-1  about  noon 

down  as  quickly  as  I  can  into  the  Avater,  and  down  to  of  Tuesday. 
within  about  36  feet  of  the  bottom  of  the  ways. 

My  object  in  starting  at  this  particular  time  of  tide  would  be  to  get 
the  ship  into  the  water,  and  waterborne  to  some  extent  as  soon  as  I 
could. 

I  propose  to  stop  short  of  the  end,  in  order  to  avoid  the  necessity 
of  having  to  knock  away  all  the  shores,  and  clear  the  stop  short 
cradle  at  the  evening  tide,  when  it  would  be  dark,  and  to  ways, 
float  on  the  morning  tide,  when  it  would  be  also  dark. 

I  should  propose  then  to  stop  about  36  feet  short  of  the  end.* 

At  low  water,  although  dark,  I  shall  endeavour  to  knock  Evening. 

'  ,,  ^   1  Clear  away 

away  the  shores  of  the  20-feet  cradles,  or  as  many  of  them  shores  of  tue 
as  possible,  and  clear  all  from  these  cradles  except  the  cradles. 
unbolting  of  the  filling-pieces. 

If  the  operations  have  proceeded  easily,  and  the  ways  under  fa- 
have  not  sxmk  much,  I  shall  also  knock  away  all  the  long  liZivia- 
shores  on  the  inshore  or  port  side  of  the  ship,  so  as  to  away^aiso'^'^ 
leave  less  to  do  on  the  following  day.  «^'  ^^J^^  '^"^ 

I  shall  then  prepare  at  leisure  to  place  the  barges  to  get  side. 
one  pull  of  36  feet,  or  as  much  more  as  I  can  (asj  shall  ^^f^frther""^ 
not  hesitate  to  pull  the  cradles  20  feet  off  the  ways")  after  p^ih  a*  tiie 

*  .  •'    '  night's  high 

high  water  of  that  night.  water. 

Soon  after  the  high  water  of  that  night,  and  when  the  water  has 
fallen  sufficiently  to  prevent  any  risk  of  floating,  but  while  the  ship 
is  still  waterborne,  probably  about  4  or  half-past  4  Last  move 
A.M.,  I  shall  make  the  last  pull ;  and  although  it  will  be  in  *''  *  ^-^'• 
the  dark,  yet  having  only  one  pull  to  make,  and  plenty  of  time  to 
prepare,  and  no  expedition  required  in  the  operation,  I  think  it  may 
be  easily  done. 

The  ship  will  then  be  left  till  low  water,  when  we  shall  pioat  on 
clear  away  everything  we  can  fi-om  the  cradles,  and  get  wSdn^y 
all  ready  for  floating  at  high  water  on  the  afternoon  of  afternoon. 
Wednesday. 

Provided  the  mechanical  arrangements  should  prove  efficient,  the 

'  The  reason  for  stopping  was  lest  the  ship.shqHW-loat  la^  Uighrv^ter  fiuyingv 
the  night.  | 

OEPA 


358  LAUNCH  OF  THE  '  GREAT  EASTERN.'        [a.d.  1857. 

success  of  the  operation  will  depend  entirely  upon  the  perfect  regu- 
larity and  absence  of  all  haste  or  confusion  in  each  stage  of  the  pro- 
ceeding and  in  every  department,  and  to  attain  this  nothing  is  more 
essential  than  perfect  silence.  I  would  earnestly  request,  therefore,  that 
the  most  positive  orders  be  given  to  the  men  not  to  speak  a  word, 
and  that  every  endeavour  should  be  made  to  prevent  a  sound  being 
heard,  except  the  simple  orders  quietly  and  deliberately  given  by 
those  few  who  will  direct. 

In  a  memorandum  of  '  Particular  Instructions,'  dated 
the  next  day,  October  31,  there  is  the  following  passage : — 

Starting. — A  strain  being  brought  upon  all  the  purchases,  and 
the  holding-back  purchase  being  slack,  if  the  ship  does  not  move, 
the  two  presses  will  then  be  worked ;  if  she  does  not  then  move,  or 
if,  when  moved,  she  stops  and  each  time  requires  the  presses,  the 
att('mf)t  will  be  postponed,  and  more  moving  power  applied  for  the 
next  time. 

If,  after  being  started  by  the  presses,  the  river  purchases  are 
found  sufficient  to  move  her,  the  operations  will  proceed. 

In  another  part  of  these  *  Instructions '  Mr.  Brunei 
again  shows  that  he  was  not,  as  has  sometimes  been 
supposed,  under  the  impression  that  the  friction  would  he 
so  small  that  the  only  important  thing  to  be  thought  of 
was  to  check  the  ship  from  rushing  too  fast. 

On  the  contrary,  he  foresaw  the  possibility  of  her  not 
moving  at  all,  even  with  the  presses,  that  is  to  say,  with 
a  force  of  1,100  tons  over  and  above  the  action  of  gravity. 
If  after  moving  she  stopped,  and  then  required  the  presses 
again  to  move  her,  this  would  show  that  the  operation 
could  not  be  properly  carried  out,  and  that  the  work  must 
be  suspended  till  more  motive  power  was  applied.  If, 
again,  the  river  tackle  were  sufficient  to  move  her,  then 
the  work  was  to  proceed,  but  the  friction  might  even 
then  be  so  great  as  to  render  it  desirable  to  remove  all 
retarding  force.  He  says,  in  another  passage  in  his  '  In- 
'  structions  : ' — 


JET.  52.]  FINAL  PREPAEATIONS.  359 

It  is  very  likely  that  no  checking  whatever  at  the  drums  will  be 
found  necessary,  but  that,  on  the  contrary,  it  will  be  found  desirable 
to  get  rid  of  any  resistance  by  overhauling  the  heavy  chains  through 
the  sheaves. 

The  best  day  on  which  to  begin  the  launch  was 
Tuesday,  November  3,  as  it  left  two  or  three  days  of  the 
high  full  moon  spring-tides  for  the  operations,  should 
they  be  prolonged. 

On  Monday,  November  2,  the  chief  work  remaining 
to  be  done  was  stowing  kentledge  or  iron  ballast  on  the 
cradles,  to  prevent  the  timbers  floating  when  the  ship 
should  be  moved  off  them.  All  the  appliances  were  ready, 
and,  except  the  river  tackle,  had  been  carefully  examined. 
This,  as  has  been  already  said,  had  not  been  tested. 

It  was  now  for  Mr.  Brunei  to  consider  whether,  in  con- 
sequence of  the  river  tackle  not  having  been  properly  tested, 
he  should  postpone  the  launch  till  the  following  month. 

It  was  most  important  for  the  Company  that  the 
ship  should  be  afloat  as  soon  as  possible;  and,  as  any 
defects  which  might  exist  in  the  river  tackle  would  almost 
certainly  declare  themselves  in  the  earlier  part  of  the 
operation,  when  nothing  worse  than  delay  could  be  ap- 
prehended, Mr.  Brunei,  after  a  careful  review  of  all  the 
circumstances,  determined  to  attempt  the  launch. 

On  the  morning  of  November  3,  the  work  of  putting 
kentledge  on  to  the  cradles  was  completed  by  firelight, 
and  the  rails  were  rubbed  over  with  a  mixture  of  oil  and 
black-lead.  All  the  shores  a-nd  props  which  supported  the 
weight  of  the  ship  had  been  removed,  and  she  was  now 
resting  entirely  on  the  cradles. 

Later  on  in  the  morning  the  brakes  of  the  drums  were 
tightened  down,  and  the  dogshores  were  removed  from 
the  ways  in  front  of  the  cradles.  Mr.  Brunei,  who  had 
been  engaged   from  an  early  hour  in  exainining  all  the 


360  LAUNCH  OF  THE  '  GREAT  EASTERN.'        [a.d.  1857. 

preparations,  superintended  this  operation,  and,  having 
satisfied  himself  that  all  was  clear  and  ready,  returned 
to  the  upper  part  of  the  yard. 

By  this  time  it  was  crowded  with  people.  The  Direc- 
tors, contrary  to  Mr.  Brunei's  expressed  wish,  and  without 
informing  him  of  their  intention,  had  issued  a  large 
number  of  tickets  of  admission.  A  few  days  before,  Mr. 
Brunei  had  suggested  that  four  policenien  should  be  ob- 
tained, thinking  that  all  they  would  have  to  do  would  be 
to  contend  with  trespassers.  The  police  force  actually 
present  were  ignorant  of  the  portions  of  the  yard  to  be 
kept  clear,  and  Mr.  Brunei  had  himself  to  go  and  assist 
in  ordering  visitors  away  from  the  neighbourhood  of  the 
path  prepared  for  the  tackle  of  the  stern  hauling  gear. 
The  crowd  soon  became  so  great  that  it  was  almost 
impossible  for  the  men  in  charge  of  the  hauling-engine 
at  the  stern  to  see  the  signals  given  from  the  middle  of 
the  yard,  or  for  those  in  the  middle  of  the  yard  to  see 
what  was  happening  at  the  stern. 

At  about  half-past  12  o'clock  the  fastenings  of  the  ship 
at  the  bow  and  stern  were  let  go,  and  Mr.  Brunei  ordered 
a  small  amount  of  slack  to  be  given  off  from  each  drum. 
This  was  done  by  men  turning  the  handles  of  the  gearing 
which  had  been  provided  for  winding  the  chain  on  to  the 
drums.  The  order  was  then  given  to  haul  on  the  bow 
and  stern  tackle,  and  to  pump  at  the  hydraulic  presses. 
It  is  doubtful  what  amount  of  strain  was  put  on  by  the 
tackle  and  the  presses,  but  it  was  probably  not  very  great. 

Presently  a  shout  from  the  forward  cradle  announced 
that  it  was  moving,  and  almost  immediately  the  stern 
cradle  also  started  with  what  appeared  to  be  a  consider- 
able speed.  The  men  who  had  been  engaged  in  turning 
the  handles  of  the  gearing  had  remained  leaning  against 
them.     As  soon  as  the  ship  had  moved  a  few  inches,  she 


3ii.  52.]  COMMENCEMENT  OF  LAUNCH,  NOVEMBER  3,  1857.    861 

took  up  all  the  slact  chain.  This  made  the  drum  revolve, 
and  the  handles  of  the  gearing  spun  round  very  rapidly, 
striking  the  men,  and  throwing  them  into  the  air.  The 
men  who  were  at  the  brake-handle  next  to  the  gearing 
ran  away.  Mr.  Brunei,  who  was  standing  near  the  drum 
when  the  accident  happened,  shouted  to  the  men  to 
hold  on  to  the  brakes,  and  ran  to  the  spot.  The  men 
who  had  remained  at  the  other  brake-handle  hauled  it 
down  with  the  tackle.  A  great  restraining  force  was 
thereby  brought  upon  the  ship,  and  her  progress  ceased; 
the  forward  cradle  having  moved  8  feet,  and  the  after 
cradle  4  feet  3  inches. 

Five  men  were  injured.  On  the  death  of  one  of  them 
it  was  stated  at  the  inquest,  by  the  foreman  of  the  drum, 
that,  after  the  slack  had  been  paid  out,  he  had  ordered 
the  men  to  stand  clear.  Be  this  as  it  may,  it  cannot  be 
denied  that  the  handles  should  not  have  been  used  after 
the  securing  chains  had  been  let  go;  and  indeed  Mr. 
Brunei  said  at  the  inquest,  *  I  may  blame  myself,  for  I  did 

*  not  anticipate  that  the  handles  would  have  revolved  so 

*  rapidly.' 

After  this  accident,  Mr.  Brunei  determined  to  wait 
till  high  water  before  recommencing  the  operations.  In 
the  meantime  the  gearing  was  removed  from  both  drums. 

A  more  important  change  was  also  made  in  the  arrange- 
ments. When  the  ship  moved,  the  men  on  the  four 
middle  barges  became  frightened,  thinking  she  was  about 
to  overwhelm  them;  a  rush  was  made,  and  one  man, 
jumping  into  a  small  boat,  shoved  off,  leaving  the  rest  to 
their  fate.  A  report  was  at  once  sent  to  Mr.  Brunei  that 
the  men  were  untrustworthy,  and  that  they  would  not 
remain;  and  that,  as  the  barges  would  be  of  no  use 
without  the  men,  the  chains  had  better  be  dropped  and 
the  barges  removed.     To  this  Mr.  Brunei  consented. 


362  LAUNCH  OF  THE   '  GEEAT  EASTERN.'        [a.u.  1857. 

It  would,  however,  have  been  sufficient  to  take  the 
men  off,  leaving  a  tug-boat  and  a  few  steady  men  to  keep 
the  barges  out  of  the  way  of  the  ship ;  they  would  then 
have  been  available  if  required.  Mr.  Brunei,  a  short  time 
after  he  had  given  the  order,  ran  round  the  bow  with 
Captain  Harrison  to  countermand  it ;  but  it  was  too  late, 
as  it  had  been  already  acted  upon.  As  events  turned  out 
no  harm  was  done,  as  the  centre  barges  alone  would  not 
have  been  sufficient  to  go  on  with,  after  the  rest  of  the 
tackle  failed. 

The  result  of  these  changes  was  that  when  the  opera- 
tions were  recommenced,  the  only  hauling  gear  was  the 
bow  and  stern  purchases ;  the  hydraulic  presses  were  also 
available  to  start  the  ship. 

At  a  little  after  2  o'clock  the  signal  was  given  to  haul 
on  the  bow  and  stem  tackle,  the  presses  being  at  the  same 
time  pumped  up.  The  brakes  of  the  drums  were  slackened, 
but  kept  all  ready  for  tightening. 

Not  long  after  the  strain  had  been  brought  on  the 
tackle,  several  of  the  teeth  of  one  of  the  wheels  of  the 
bow  steam  crab  gave  way,  and  the  chief  anchor  at  the 
stem  began  to  drag,  so  that  no  efficient  strain  could  be 
obtained.  On  this  being  reported,  the  operations  were 
discontinued ;  and,  as  there  was  no  possibility  of  getting 
things  ready  by  the  next  day,  the  launching  operations 
were  postponed  till  December  2,  the  next  full  moon  spring- 
tides. 

As  soon  as  this  was  known  the  visitors  rushed  in  on 
the  works,  crowding  about  the  cradles  and  ways ;  and 
Mr.  Brunei  had  to  postpone  those  investigations  which 
he  wished  to  make  at  once.'     The  whole  yard  was  thrown 

•  It  remained    a    doubtful    point       experience  favoured  the  opinion  that 
whether  or  not  the  bow  cradle  was       it  had  stopped  of  itself, 
stopped  by  the  brakes.     Subsequent 


^.  52.]  FAILUKE  OF  FIRST  ATTEMPT.  363 

into  confusion  by  a  struggling  mob,  and  there  was  nothing 
to  be  done  but  to  see  that  the  ship  was  properly  secured, 
and  to  wait  till  the  following  morningJ 

The  next  day  was  devoted  to  an  examination  of  what 
had  gone  wrong,  and  to  the  consideration  of  what  should 
be  altered  before  another  attempt  was  made. 

At  the  stem  mooring  the  anchor  was  bedded  into  the 
ground  on  the  further  side  of  the  river. 

The  difficulty  with  regard  to  the  four  centre  barges 
was  got  over  by  placing  the  four  crabs  with  their  tackles 
in  the  yard,  on  the  landward  side  of  the  ship.  The  four 
chains  attached  to  the  ship,  which  had  before  been  hauled 
on  directly  from  the  barges,  were  now  passed  round 
sheaves  on  the  barges,  and  brought  back  under  the 
ship's  bottom  to  the  tackles  in  the  yard. 

The  chief  alteration,  however,  was  in  the  arrangement 
of  the  hydraulic  presses.  On  November  3,  there  were,  as 
has  been  said,  two  presses.  Two  additional  presses  were 
now  provided ;  each  of  these  consisted  of  two  7-inch 
cylinders,  and  was  equivalent  to  a  10-inch  press. 

With  the  object  of  being  able  to  employ  the  presses 
continuously  during  the  descent  of  the  ship,  they  were 
arranged  to  point  down  the  ways  at  an  inclination  of  1 
in  12.     The  four  presses  were  placed  one  on  either  side 

'     The    ship     had    always    been  fastidious  person  suggested  that  the 

spoken  of  as  the  '  Great  Eastern,'  and  name  was  objectionable,  as  consisting 

this  name  was  specially  agreeable  to  of  two  adjectives.     A  list   of  names 

Mr.  Brunei.     It  was  not  a  point  on  was  prepared  and  submitted  to  Mr. 

which  he  set  much  store,  but  his  views  Brunei  on   the    day   of    the   launch 

were  pretty  well  known  ;  and,  as  the  at  the  moment  when  he  was  busiest, 

name  hjid  not  been  of  his  choosing,  He  said  ofF-hand  that  they  might  call 

but  had  rather  grown  out  of  the  name  it  '  Tom  Thumb '  if  they  liked.     The 

of  the  Company,  and  the  natural  as-  Directors,  however,  selected  the  name 

Bociation  of  ideas  with  his  first  ship,  'Leviathan,'   and   so    the    ship   was 

the  '  Great  Western,'   it   might  rea-  christened.      The    new   name   never 

sonably  have    been  supposed  that  it  stuck  to  the  ship,  and  she  was  regis- 

would  have  been  adopted.    But  some  tered  as  the  '  Great  Eastern^' 


364  LAUNCH  OF  THE  '  GREAT  EASTERN.'        [a.d.  1857. 

of  the  check  tackle  at  the  two  ways,  and  were  supported 
by  abutments  of  timber-work.  These  abutments  each 
consisted  of  four  rows  of  piles,  one  behind  the  other  at 
intervals  of  about  8  feet.  The  press  abutted  against  the 
row  of  piles  nearest  to  the  ship,  which  were  connected 
by  wooden  struts  to  the  piles  behind  them.  Long  balks 
of  timber  of  various  lengths  were  prepared  to  transmit 
the  pressure  to  the  cradles.' 

The  four  presses  might  be  considered  equivalent,  at 
their  full  power,  to  a  force  of  800  tons  ;  this  was  so  much 
in  excess  of  the  small  force  that  had  moved  the  ship  on 
November  3,  that,  even  making  every  allowance  for  the 
advantage  of  the  fresh  lubrication  in  the  first  instance, 
it  seemed  reasonable  to  suppose  that  with  this  force  the 
ship  could  be  moved  down  easily. 

As  the  process  of  moving  the  ship  with  the  presses  would 
naturally  be  a  slow  one,  Mr.  Brunei  determined  to  pro- 
ceed with  the  operations  as  soon  as  everything  was  ready. 
On  November  19  the  work  was  commenced.^  The  bow 
tackle  was  hauled  upon  first,  as  the  forward  cradle  was 
more  than  a  foot  behind  the  after  one,  and  the  men 
at  the  forward  presses  were  set  to  work.  After  a  short 
time  the  timber  backing  of  the  presses  began  to  crack 
and  *  cry  out ' ;  and,  without  much  stress  on  them,  the 
abutments  were  forced  back  some  3  or  4  inches.     The 


*  The  action  of  an  hydraulic  press  in    another    length    of    timher   was 

is   limited  to   the  length   of    stroke  called   '  fleeting '  the  press,    a   term 

of  the  ram.     Hence,  as  soon  as  the  used  in  many  mechanical  operations 

ship  moved  a  distance  equal  to  the  when   the   motive   arrangements   are 

length  of  the  stroke,  it  became  neces-  reinstated  in  their  primary  position 

sary  to  relieve  the  water  pressure  in  ready  for  a  further  advance  in  the 

the  cylinder,  to  pull  back  the  ram  into  work. 

it,  and  to  insert  between  the  ram  of  '  On  this  occasion  Mr.  Brunei  had 

the  press  and  the  cradle  an.  additional  his  way,  and  there  were  not  a  dozen 

length   of    timber.      This    operation  spectators  in  the  yard, 
of  pulling  back  the  ram  and  putting 


XT.  52.]  SECOND  ATTEMPT,  NOVEMBER   19,   1857.  365 

mooring  chain  of  the  bow  tackle  also  gave  way,  althougli 
there  was  not  any  excessive  strain  on  it.  On  examining 
the  abutments,  Mr.  Brunei  saw  the  cause  of  their  failure, 
and  ordered  the  strain  to  be  taken  oflF.  The  number  of 
piles  was  sufficient,  but  the  way  in  which  the  strain  was 
communicated  to  them  did  not  enable  them  to  exert  the 
proper  amount  of  resisting  power. 

This  defect  was  cured  by  tying  the  heads  of  the  rear- 
ward piles  with  bolts  to  the  foremost  piles.  The  ship 
being  secured,  each  press  was  tested  to  a  full  strain,  and 
the  adequacy  of  its  abutments  ascertained. 

It  was  different,  however,  with  the  river  tackle.  The 
chain  which  had  parted  was  an  old  river  mooring-chain 
of  great  size.  Much  delay  in  replacing  it  was  caused 
by  dense  fogs,  which  made  it  almost  impossible  to  work 
on  the  river.  Moreover,  there  seemed  a  fatality  about 
every  attempt  to  get  a  regular  trial  of  any  part  of  the 
tackle.  Wlien,  at  last,  a  trial  took  place,  and  a  strain  was 
put  on,  a  mooring-chain  gave  way;  then  this  had  to  be 
fished  up  from  the  bottom  of  the  river,  and  pieced  to- 
gether, the  accident  being 'ascribed  to  a  defective  link  in 
the  chain.  The  trials  were,  therefore,  so  few  that  it  was 
only  proved  by  degrees  that  all  the  regular  moorings  were 
worthless ;  although  they  had  large  chains  which  ought 
to  have  been  good  for  three  times  the  strain  put  on 
them. 

The  stubbornness  of  the  ship  on  November  19  gave 
Mr.  Brunei  great  anxiety ;  not  from  any  fear  of  being 
unable  to  apply  sufficient  power  to  move  her,  but  be- 
cause, on  continued  consideration  of  the  subject,  he  appre- 
hended that  a  serious  difficulty  might  arise,  if  there  should 
be  a  prolonged  delay  at  a  particular  part  of  the  ship's 
progress. 


366  LAUNCH  OF  THE   '  GKEAT  EASTERN.'        [a.d.  1857. 

It  has  been  explained  that  Mr.  Brunei,  with  a  view  of 
obtaining  uniformity  of  bearing  over  the  surface  of  the 
ways,  had  not  attempted  to  support  them  rigidly  on  piles, 
but  had  rested  them  on  the  river-bank.  As,  however, 
the  foundation  of  the  building  slip  was  comparatively 
rigid,  he  feared  lest  an  unequal  subsidence  might  cause 
injury  to  the  ship,  if  she  were  stopped  for  any  length  of 
time  before  she  had  completely  left  the  ground  on  which 
she  was  built.  He  thought  that  if  the  ways  sank  at 
this  point  they  would  assume  a  slightly  convex  form, 
and  tend  to  force  upwards  the  flat  bottom  of  the 
ship.  The  main  part  of  the  ship's  bottom,  between  the 
longitudinal  bulkheads,  could  bend  in  slightly  under  a 
heavy  upward  pressure;  but  this  action  could  not  take 
place  at  the  transverse  bulkheads,  as  they  would  not 
yield  without  injury.  Mr.  Brunei  shrank  from  proceeding 
with  the  launch  without  having  in  reserve  such  an  ampli- 
tude of  power  as  would  prevent  the  ship's  being  stopped 
at  this  critical  point.  This  consideration,  together  with 
the  continued  failure  of  the  river  tackle  under  such  tests 
as  were  applied  to  it,  led  him  to  address  the  following 
communication  to  the  Directors  : — 

November  26,  1857. 
We  proved  two  of  the  presses  yesterday  afteraoon  up  to  the  full 
pressure.  A  third,  the  largest,  Avas  proved  partially  ;  it  required  some 
additions,  vjrhich  are  nearly  completed,  and  will  be  in  a  few  hours. 
The  fourth  may,  I  think,  also  be  relied  on  to  the  same  extent, 
nevertheless,  after  a  careful  examination  of  the  effects  of  these  strains 
and  other  circumstances,  I  have,  after  a  night's  consideration,  come 
to  the  conclusion  that  our  means  are  too  imperfect  to  justify  my 
moving  the  ship  with  them  in  their  present  form.  The  presses 
would  start  the  ship,  but  it  is  evident  that  if  required  to  be  used 
constantly,  that  is  repeatedly,  the  piles  would  become  loosened  so  as 
to  draw  and  rise;  this  again  might  be  remedied  by  loading,  but 
clumsily,  and  with  other  contingencies,  which  I  will  report,  combine 
to  render  it  hazardous  to  depend  upon  them.    My  original  intention, 


.>:t.  52.]  REPORT  ON   OPERATIONS.  3C7 

the  right  one,  was  to  fit  up  properly  such  an  hydraulic  apparatus  as 
should  be  fitted  to  move  the  ship  the  whole  length  of  the  ways,  and 
to  depend  upon  the  whole  river  tackle  only  in  the  event  of  her 
moving  very  easily  and  for  getting  her  off  the  ways  at  the  end. 
From  an  unwise  attempt  to  economise  I  determined  to  dispense 
with  the  immediate  costly  apparatus  for  pushing,  and  by  sufficient 
power  merely  to  move  the  ship  at  starting  or  in  the  event  of  sticking, 
and  to  depend  upon  the  same  river  tackle  to  keep  her  moving  down 
the  ways.  The  power  originally  calculated  upon  for  the  river  tackle 
has  gradually,  step  by  step,  failed  us ;  the  moorings  supposed  to  be 
sufficient  for  certain  strains  have  failed  us  at  one-third  of  those  strains, 
another  has  parted  since  our  last  attempt,  and,  instead  of  full  350 
tons  of  power  from  this  source,  we  cannot  now  depend  upon  200,  and 
this,  added  to  the  inefficiency  of  the  pushing  power,  would  risk  the 
sticking  of  the  ship,  which  might  occur  exactly  at  a  point  which 
would  involve  serious  difficulty  to  remedy.  I  am  assuming  a  com- 
bination of  adverse  circumstances,  perhaps  not  likely  to  occur,  but 
quite  possible ;  and  the  conclusion  I  am  compelled  to  come  to  is  that 
our  apparatus  is  too  defective,  and  that  the  original  plan  of  a  proper 
and  sufficient  hydraulic  apparatus,  arranged  in  a  complete  well-con- 
structed mechanical  manner,  to  push  the  sliip  continuously  down  the 
ways,  ought  to  have  been  followed  out,  and  is  now  the  only  mode  of 
doing  the  work  safely,  that  is,  without  the  risk  of  being  involved  in 
a  difficulty  much  greater  and  more  costly. 

I  have  only  to  add  that  bad  as  this  report  of  our  condition  is,  it  is 
at  any  rate  the  worst  that  can  be  made  of  it,  that  nothing  whatever 
has  occurred  to  show  that  any  new  difficulty  has  arisen  or  anything 
whatever  to  create  any  new  difficulty.  We  could  move  the  ship 
now  if  it  were  wise  to  do  so,  but  with  great  doubts  whether  our 
pushing  apparatus  in  its  present  form,  imperfect  and  unmechanical, 
would  continue  effective  if  repeatedly  used,  and  the  certainty  that 
our  river  tackle  is  far  inferior  to  what  is  required,  and  also  of  doubt- 
ful and  more  than  doubtflil  permanency  for  repeated  strains,  it  would 
not  be  right  to  commence.     .     .     . 

Mr.  Brunei  at  the  same  time  determined  to  obtain,  on 
a  large  scale,  a  measure  of  the  deflection  that  might  be 
expected  from  the  weight  of  the  ship  coming  on  the  ways. 
More  than  100  tons  of  kentledge  was  piled  on  a  portion  of 
the  ways  10  feet  square,  in  such  a  manner  as  to  give  a 


368  LAUNCH  OF  THE  '  GREAT  EASTERN.'        [a.d.  1857. 

pressure  thereon  of  about  double  that  which  would  be 
produced  by  the  weight  of  the  ship. 

It  was  necessary  that  this  test  should  not  be  tried 
on  too  small  a  scale,  as  a  weight  resting  on  an  isolated 
patch  would  receive  support  from  the  surrounding  ground, 
which  it  could  not  of  course  do  if  that  ground  was  equally 
loaded.  The  ways  sunk  so  little  under  the  test  as  com- 
pletely to  reassure  Mr.  Brunei,  and  to  show  that  no  serious 
evil  need  be  contemplated  in  the  passage  of  the  ship  from 
off  the  place  where  she  was  built  on  to  the  newly  made 
ways,  even  though  she  might  be  again  stopped  for  some 
time.  He  therefore  determined  to  go  on  at  once  with  the 
launching  operations. 

The  result  of  the  test  was  very  satisfactory  to  him, 
and  it  enabled  him  to  carry  on  the  work  with  the  same 
confidence  as  he  had   at  the  first   felt — *that  the  ship 

*  may   stop   halfway   or  not  move   at   all    ...    .    but 

*  no  injury  to  the  ship  can  result  from  any  failure  in  the 

*  course  of  proceeding  in  this  mode  of  launching.' 

Shortly  before  the  second  attempt  to  move  the  ship, 
on  November  19,  the  experimental  cradle  had  been  again 
put  up  with  a  view  of  obtaining  some  additional  data 
as  to  the  hauling  strain  that  might  be  required.  The 
deductions  made  from  them  were  the  same  as  those 
obtained  in  the  commencement  of  the  year,  and  en- 
couraged the  hope  that  the  motive  power  required  would 
not  be  excessive.* 

By  Saturday,  November  28,  the  four  presses  had  been 
got  ready;  and  the  river  tackle,  though  still  far  from 
being  beyond  reproach,  had  been  got  into  place,  and 
partly  tested. 

The  brakes  were  eased,  and  a  small  amount  of  slack 

*  See  note  A  at  the  end  of  the  chapter. 


35T.  52.]  PROGEESS  TO  NOVEMBER  28,    18.57.  369 

was  overhauled  on  the  check-tackle  chains  by  the  men 
stationed  on  the  ways  for  that  purpose.  As  on  the  previous 
occasion,  the  pressure  was  to  be  first  put  on  the  presses 
at  the  foremost  cradle. 

Arrangements  were  made  for  promptly  following  up  the 
ship  if  she  moved  freely.  A  black  board  was  placed  on 
each  cradle  for  recording  the  progress  of  the  ship. 

Mr.  Brunei  stood  on  a  low  platform  in  the  centre  of 
the  yard,  as  a  convenient  position  from  which  to  watch 
and  command  the  operations.  A  little  before  ten  he  gave 
the  order  to  commence  pumping,  and  the  men  at  the 
hydraulic  presses  got  to  work.  When  the  pressure  came 
on  the  timber  framing  which  formed  the  abutments,  there 
was  considerable  noise  of  creaking  and  crushing  as  the 
several  parts  subjected  to  strain  came  in  to  their  proper 
bearing.  The  men  soon  changed  from  the  large  plunger 
handle  to  the  small  one  which  put  on  the  full  pressure  ; 
the  timbers  of  the  abutments  kept  on  crying  out,  but 
it  was  evident  that  they  were  not  yielding  as  they  had 
done  before.  Presently,  while  the  noise  of  the  timber- 
work  was  still  attracting  attention,  the  man  in  charge  of 
the  measuring  apparatus  recorded  on  his  black  board  a 
movement  of  one  inch ;  the  ship  was  again  in  motion. 

She  moved  steadily,  but  slowly,  under  the  force  of 
the  presses,  at  a  rate  of  about  one  inch  a  minute,  and 
as  soon  as  the  forward  cradle  had  been  moved  about  a  foot 
in  this  way,  the  presses  at  the  after- ways  were  set  to  work, 
and  the  river  tackle  was  put  into  operation,  first  the  bow 
and  stern  tackle,  and  then  the  four  middle  purchases. 
All  went  well  with  the  presses,  but  the  strain  had  not 
been  put  on  long,  when  the  stern  mooring-chain  and 
one  of  the  two  chains  at  the  bow  broke ;  an  anchor  at 
the  bow  had  also  begun  to  drag. 

Later  in  the  day  part  of  the  moorings  of  the  centre 

B  B 


870  LAUNCH  OF  THE  '  GREAT  EASTERN.'         [a.d.  1857. 

barges  also  gave  way.  Captain  Harrison  set  to  work 
to  repair  these  defects  as  fast  as  they  occurred ;  in  no 
way  dismayed  that,  as  he  was  at  work  remedying  one 
mishap,  the  news  of  another  was  brought  to  him. 
Barges  had  to  be  got  into  place,  the  broken  ends  of 
cables  fished  up  or  under-run  and  pieced  together,  and  this 
often  in  the  dark;  for  it  must  be  remembered  that  the 
work  was  going  on  at  the  end  of  November,  when  the  sun 
rose,  invisible  for  fog,  at  half-past  seven,  and  set  at  half- 
past  four. 

With  the  exception  of  the  river  tackle,  all  had  gone 
well ;  the  presses  and  their  abutments  had  acted  efficiently, 
and  the  ship  had  been  moved  easily  down  the  ways,  about 
14  feet  before  work  was  suspended  at  night. 

Though  the  progress  had  not  been  great,  there  still 
seemed  a  reasonable  hope  that,  by  pushing  on,  the  sliii3 
might  be  got  down  to  the  bottom  of  the  ways  in  time  for 
floating  her  off  at  the  next  spring- tides,  namely,  on 
December  2.  Mr.  Brunei  therefore  decided  to  go  on 
with  the  operation  on  the  Sunday.  Early  in  the-  morning 
the  presses  and  crabs  were  again  set  to  work.  The  river 
tackle  soon  gave  way ;  and,  indeed,  there  was  no  reason 
why  it  should  be  superior  to  that  used  the  day  before,  as 
almost  all  that  could  be  done  in  the  night  was  to  piece 
together  the  broken  chains,  and  to  replace  the  anchors. 
The  moorings  at  the  bow  and  stern  began  at  once  to 
drag,  and  two  of  the  mooring-chains  amidships  parted. 
The  hydraulic  presses  were  then  the  only  available  power ; 
and,  although  the  full  pressure  was  put  on,  the  ship  did 
not  move.  This  was  very  disheartening ;  it  was,  however, 
thought  that  the  resistance  was  due  to  some  excep- 
tional adhesion.  Every  effort  was  therefore  made  to  get 
together  the  means  of  giving  the  ship  a  first  start. 

It  was  not  till  the  afternoon  that  a  large  number  of 


JKT.  52.]      PROGRESS  TO  NOVEMBER  30,  18.57.        371 

screw-jacks  and  hydraulic  jacks  which  had  been  procured 
were  got  into  place;  they  were  then  screwed  up  hard, 
and  the  hydraulic  presses  being  set  to  work,  the  ship 
began  to  move  in  a  manner  very  similar  to  that  of  the 
day  before.  There  was  not,  however,  much  daylight  left ; 
and,  when  night  came  on,  the  distance  traversed  was  only 
about  8  feet.  The  comparative  facility  with  which  the 
ship  moved  when  once  started  gave  hopes  that  good  pro- 
gress might  be  made  the  next  day. 

On  Monday  morning  the  ship  moved  without  more 
difficulty  than  when  she  had  stopped  the  evening  before, 
and  the  work  went  on  quite  satisfactorily.  She  continued 
to  move  slowly,  and  by  dinner-time  had  gone  about  8^  feet. 
Three  feet  an  hour  was  not  much,  but  still  if  it  could  be 
kept  up  it  would  suffice  to  get  the  ship  down  by  the 
next  spring-tides.  Arirangements  were  therefore  com- 
menced for  lighting  up  the  ways  and  pumping  machinery, 
so  that  the  work  might  be  continued  through  the  night. 
The  repairs  of  the  river  tackle  were  pushed  on,  the  ship's 
anchors,  which  had  just  been  finished  and  tested,  were 
laid  down  for  part  of  the  moorings,  and  some  of  the 
chains  were  replaced  with  chains  lent  by  the  Government 
and  by  Messrs.  Brown  and  Lenox. 

When  work  was  recommenced  after  dinner  the  ship 
made  a  short  slip  of  about  7  inches.  On  pressure  being 
again  applied  the  10-inch  press  at  the  forward  cradle 
burst.  This  put  an  end  to  all  work  for  the  day,  and  it 
was  then  determined  to  replace  the  broken  press  and  to 
add  two  more  presses  to  each  cradle,  before  proceeding 
with  the  launch. 

The  preparations  for  the  new  presses  were  pushed  on 
vigorously,  but  it  was  not  till  the  afternoon  of  Thursday, 
December  3,  that  things  wore  again  ready  for  a  start. 

B    B    2 


372  LAUNCH  OF  THE  '  GEEAT  EASTEEN,'        [a.d.  1857. 

The  pumps  were  set  to  work  and  the  tackle  hauled  upon. 
The  ship  made  several  short  slips  of  a  foot  or  so,  and 
then  moved  more  than  5  feet  at  one  slide.  When  dark- 
ness set  in  she  had  moved  about  14  feet,  in  slips  of  greater 
or  less  length.' 

On  Friday,  December  4,  all  was  ready  early,  and  during 
the  morning  everything  went  as  well  as  on  the  day 
before ;  but  in  the  afternoon  increased  difficulty  was  found 
in  getting  the  ship  to  move,  and  the  14-inch  press  at  the 
after  cradle  burst,  as  did  also  a  7-inch  cylinder  of  one  of 
the  coupled  presses. 

Notwithstanding  the  delay  due  to  the  bursting  of  the 
presses,  the  ship  was  moved  some  30  feet ;  but  there 
was  no  longer  any  chance  of  getting  her  afloat  at  the 
spring-tides,  and  the  increased  adhesion  gave  cause  for 
the  fear  that  still  more  power  would  have  to  be  applied. 

On  the  next  day,  Saturday,  December  5,  the  ship  made 
a  short  slip ;  but,  although  the  pressure  was  kept  con- 
stantly on,  no  further  advance  was  made  until  late  in  the 
afternoon.  Mr.  Brunei  then  tried  suddenly  letting  go  the 
strain  on  the  stern  tackle.  The  sudden  relief  of  the  side- 
way  strain  on  the  end  of  the  ship  sent  a  tremor  through 
the  hull,  which  served  to  destroy  the  adhesion,  and  she 
slid  several  inches.  This  operation  was  several  times 
repeated,  and  although  there  were  a  number  of  vexatious 
delays  from  pushing-pieces  giving  way  and  other  mishaps. 


'  At  this  time  the  friction  when  the  in  giving  her  velocity,  and  therefore 

ship  was;  in  motion   was   not  much  she  moved  by  short  slips,  instead  of 

greater  than  it  had  been  on  previous  by  a  gradual  motion,  as  had  been  the 

occasions ;  but,   the    adhesion    being  case  previously,  when  the  resistance 

greatly  increased,  a   large  excess  of  due  to  friction  and  that  due  to  adhe- 

power  became  stored  up  in  the  elas-  sion  had  been  more  nearly  equal.  For 

ticity  of  the  abutments  and  the  chains.  observations  on  the  friction,  see  note 

This   excess   of  power,   on   the  ship  A  at  the  end  of  the  chapter, 
commencing  to  move,  discharged  itself 


^T.  52.J  PROGRESS  TO  DECEMBER   10,    1857.  373 

she  was  moved  by  the  evening  a  distance  of  about  7  feet, 
the  resistance  due  to  adhesion  being  very  great. 

On  Sunday  some  of  the  presses  farthest  from  the 
cradles  were  moved  down  the  ways  nearer  to  the  ship,  so 
as  to  avoid  the  necessity  of  using  long  pushing-pieces, 
which  required  much  attention  to  prevent  their  bulging 
sideways.  The  river  tackle  now  consisted  of  the  bow  and 
stern  steam-engine  purchases,  and  two  crabs  and  tackle, 
one  at  each  end  of  the  ship.  The  moorings  opposite  the 
centre  of  the  ship  having  proved  worthless,  it  was  neces- 
sar}'^  to  lay  down  new  moorings,  and  it  was  found  more 
convenient  to  lay  them  opposite  the  ends  of  the  ship. 

The  next  day,  Monday  the  7th,  after  the  commencement 
of  operations,  considerable  delay  was  caused  by  the  failure 
of  some  of  the  feed  pipes  of  the  presses.  These  defects 
were  not  cured  till  after  dinner-time,  when  the  operations 
were  resumed,  and  before  dark  the  ship  was  moved  about 
6  feet. 

On  the  following  morning  several  short  slips  were  made, 
and  the  ship  had  been  moved  about  4^  feet ;  but,  at  10 
o'clock,  a  dense  fog  came  on,  and  rendered  it  impossible  to 
proceed.  The  next  day  was  occupied  in  re-arranging  the 
tackle  and  presses. 

These  were  not  ready  till  the  morning  of  Thursday, 
December  10  ;  when,  on  the  presses  being  again  set  to 
work,  and  one  of  the  chains  being  as  before  suddenly 
slackened,  the  ship  made  one  slip  of  a  little  over  a  foot ; 
but,  on  the  strain  being  again  applied,  two  of  the  anchors 
began  to  drag.  As  it  was  now  essential  to  have  the  river 
tackle,  in  order  by  shaking  the  ship  to  destroy  the 
adhesion,  and  by  the  drag  of  the  catenaries  to  increase  the 
length  of  the  slides,  Mr.  Brunei  determined  to  dispense 


374  LAUNCH  OF  THE  '  GREAT  EASTERN.*        [a.d.  1857. 

with  the  anchors,  and  to  attach  the  chain  cables  to  piles 
connected  by  framework.  These  abutments  or  pulling 
points  for  the  chains  were  now  constructed  on  the  other 
side  of  the  river,  opposite  the  bow  and  stern  of  the  ship. 

The  launching  operations  last  described,  namely,  from 
December  3  to  December  10,  were  full  of  incident.  Nor 
was  the  scene  wanting  in  that  animation  which  agree- 
ably interests  a  bystander,  the  more  so  if  he  is  not 
thoroughly  conversant  with  the  meaning  of  all  he  sees 
and  hears,  so  that  he  mistakes  a  loudly  spoken  word, 
loudly  spoken  merely  that  it  may  be  plainly  heard,  for  a 
prompt  and  urgent  command. 

The  labourers  at  the  pumps  relieved  the  monotony  of 
their  work,  and  shook  off  the  cold,  by  taking  a  lively  and 
talkative  interest  in  the  progress  of  the  launch,  and 
echoed  the  orders  given  them  to  pump  with  the  '  big 
'  plunger,'  or  'little  plunger'  of  the  pumps,  or  to  'fleet'  the 
press.  This  and  the  singing  of  the  gangs,  which  were  con- 
stantly at  work  moving  chains  for  the  repair  of  the 
river  tackle,  or  rolling  logs  of  timber  on  to  the  ways  to 
serve  as  pushing-pieces  for  the  presses,  gave  plenty  of  life 
to  the  operations ;  and  then  when  the  pressure  had  been 
got  on  the  presses,  and  shouts  from  the  bow  and  stern  of 
the  ship  passed  the  word  that  the  river  tackle  was  hauled 
taut,  the  order  would  be  given  to  '  let  go '  the  chain  at 
one  end  of  the  ship.  Immediately  the  rattling  noise 
announced  that  this  had  been  done,  and,  after  a  second  or 
two  of  anxious  watching,  the  ship  slid  ojff,  the  timbers, 
abutments,  and  pushing-pieces  creaking  and  groaning 
as  the  strain  was  suddenly  relieved.  While  the  ship  was 
in  motion,  the  whole  of  the  ground  forming  the  yard 
would  perceptibly  shake,  or  rather  sway,  on  the  dis- 
charge of  the  power  stored  up  in  the  presses  and  their 


iET.  52.]  PROGRESS  TO  DECEMBER   15,   1857.  375 

abutments.  The  appearance  of  the  ship  moving  sideways 
in  these  short  slips,  when  seen  from  the  ways,  was  very 
imposing. 

All  these  somewhat  striking  surroundings  of  the  opera- 
tions were  naturally  heightened  in  effect,  when  the  work 
was  being  carried  on  in  the  early  morning  or  late  in  the 
afternoon  ;  and  when  the  timber-framing  and  the  groups 
of  men  at  work  were  illuminated  by  the  glare  from  the 
0]3en  fires  which  were  kept  burning  near  the  pumps  and 
presses. 

The  preparations  already  described  were  not  completed 
till  December  15.  In  the  meantime  Mr.  Brunei  had 
been  joined  by  his  friend  Mr.  Eobert  Stephenson.  Mr. 
Stephenson  had  not  been  aware  of  many  vexatious  circum- 
stances which  had  even  prevented  Mr.  Brunei  from  making 
full  use  of  his  own  staff  of  assistants.  Mr.  Stephenson 
expressed  to  a  common  friend  his  regret  that  Mr.  Brunei 
had  not  invited  him  down  to  the  ship,  and  said  that  he 
should  have  gone  down  uninvited,  but  that  he  thought 
Mr.  Brunei  had  reasons  for  not  wishing  it.  On  the  state 
of  affairs  being  explained  to  him,  Mr.  Stephenson  said^ 
'  I'll  go  down  to  him  at  once ; '  he  did  so,  and  his  arrival 
at  Mill  wall  was  very  welcome  to  Mr.  Brunei.^ 

Mr.   Stephenson   agreed   with   Mr.   Brunei   as   to  the 

'  Mr.   Stephenson  went  with   Mr.  should  cause  a  large  amount  of  stored- 

Brunel  into  all  the  facts   relative  to  up  power,  which  might  give  the  ship 

the  operations  and  all  the  experience  such    a   velocity   that    the    force   of 

gained  therefrom,  and  examined  care-  gravity   might    exceed    that    of    the 

fully  the  investigations  which  had  been  friction.     The   brakes  had  not  been 

made  by  means  of  self-recording  ap-  hitherto  neglected ;  but,  in  conformity 

paratus,  and  which  showed  that  the  with  Mr.  Stephenson's  suggestion,  it 

friction  diminished   as   the   velocity  was  thenceforward  made  a  rule  that, 

increased.       So  struck  was   Mr.  Ste-  when   a  moderate   amoimt  of  slack, 

phenson    at    these    results    that    he  had  been  overhauled  from  the  drums, 

urged  Mr.  Brunei  on  no  account  to  the  brakes  should  be  put  down,  on 

neglect  having  the   brakes  properly  a  signal  being  given  that  the  pressure 

attended  to ;  lest  the  great  adhesion  in  the  presses  was  rising. 


376  LAUNCH  OF  THE  'GREAT  EASTEEN.'         [a.b.  1857. 

expediency  of  suspending  operations  until  an  ample  ex- 
cess of  power  was  applied.  Fortified  by  the  support  of 
Mr.  Stephenson,  Mr.  Brunei  was  prepared  to  advise  the 
Directors  to  adopt  this  course ;  but,  as  the  preparations  for 
recommencing  the  work  were  just  completed,  it  was  de- 
termined to  make  a  trial  on  the  afternoon  of  December  15. 
The  presses  were  all  pumped  up,  and  the  river  tackle 
hauled  on ;  but,  although  the  force  applied  was  at  least 
300  or  400  tons  greater  than  that  which  had  last  moved 
her,  the  ship  did  not  yield,  and  the  attempt  was 
abandoned.  After  a  careful  consultation  on  the  de- 
pressing result  of  this  day's  work,  it  was  determined  to 
make  another  attempt  the  next  morning,  in  order  to 
see  if  any  new  form  of  difficulty  had  arisen;  and  that 
after  this  operations  should  be  suspended,  and  an  ample 
number  of  additional  presses  provided. 

The  following  day,  December  16,  as  soon  as  Mr. 
Brunei  and  Mr.  Stephenson  had  arrived,  the  pressure 
was  again  put  on  the  presses,  and  the  river  tackle 
having  been  hauled  taut,  the  chains  at  the  bow  were 
let  go,  and,  to  the  great  satisfaction  of  all  present,  the 
ship  made  a  short  slide.  The  record  of  her  movement 
showed  that,  although  the  adhesion  was  much  greater, 
the  retarding  force  of  friction  was  about  the  same  as 
before,  and  that  therefore  there  was  no  reason  to  assume 
the  existence  of  any  special  obstacle.  Another  short  slip 
was  made ;  but,  in  getting  up  the  pressure  again,  a 
press  was  burst,  and  the  work  was  then  stopped.* 

'  Mr.  Brunei  received  a  great  many  persons  who  were  wishing  to  do  him 

suggestions   for  launching   the   ship,  a  service,  Mr.  Brunei  adopted  a  plan 

Puncheons,  gas,   artillery,  and  espe-  similar  to  that  which  he  had  found  use- 

cially  levers,  were  among  the  appli-  ful  when  the  'Great  Britain'  was  on 

anees  recommended.     Witli  the  desire  shore.  He  had  a  circular  letter  printed, 

of  behaving   civilly  to  well-meaning  thanking  his  correspondents  for  their 


JET.  52.]  REPOET   ON   OPERATIONS,  DECEMBER   17,   1857.        377 

Mr.  Brunei's  decision  to  suspend  the  launching  opera- 
tions at  this  point  was  approved  at  a  meeting  of  the 
principal  shareholders  held  the  next  day.  His  report 
to  the  Directors,  and  a  memorandum  of  a  verbal  state- 
ment which  he  made  to  the  meeting,  are  as  follows : — 

December  17,  1857. 
In  my  letter  of  October  23,  which  was  published  at  the  time  in, 
the  daily  papers,  I  referred  to  the  possible  contingency  of  the  power 
provided  to  move  the  vessel  down  the  ways  proving  insufficient,  and 
the  operation  then  about  to  be  attempted  being  so  far  unsuccessful ; 
and,  referring  to  what  I  considered  a  countervailing  advantage  in  the 
absence  of  risk,  I  stated,  '  the  ship  may  stop  half-way,  or  may  not 

*  move  at  all,  more  power  may  have  to  be  applied,  but  no  injury  to 
'  the  ship  can  result  foni  any  failure  in  the  course  of  proceeding  in 

*  this  mode  of  launching.' 

The  result  has  been  that  after  moving  the  vessel  nearly  half  the 
distance  to  low  water,  it  has  become  necessary  to  increase  very  con- 
siderably the  power  which  has  effected  this  much,  although  it  had 
already  been  much  added  to  during  the  operation. 

This  will  unavoidably  be  attended  with  some  expense  and  delay, 
but  not  considerable,  as  the  requisite  hydraulic  presses  can  be  ob- 
tained ready  made,  and  their  application  is  simple,  and  the  result 
cannot,  I  apprehend,  be  doubtful. 

I  do  not  mean  to  imply  that  I  contemplated  any  such  great 
increase  of  resistance  as  probable,  such  experiments  as  could  be  made 
before  moving  the  ship  having  given  me  good  reason  to  hope  for  a 
different  result ;  but  the  possibility  of  it  was  contemplated,  and  I 
refer  to  this  merely  as  explaining  the  statement  I  now  make,  that  the 
difficulty  is  simply  one  of  degree,  of  more  or  less  poAver  being  re- 
quired, and  that  nothing  whatever  has  occurred  to  create  any  new 
class  of  difficulty.     The  launching  ways,  about  which  anxiety  had 

suggestions,  but  saying  that  the  number  that  their  letters  had  had  no  better 
of  such  communications  had  become  effect  than  to  be  classed  with  the 
so  great  that  it  was  impossible  for  him  numerous  communications  which  Mr. 
to  do  more  than  cause  the  receipt  to  Brunei  said  he  had  received  on  the 
be  acknowledged,  with  thanks  for  the  same  subject,  which  had  seemed  un- 
kind intentions  of  the  parties  writing.  worthy  ofhis  notice;  and  they  explained 
This  plan  had,  however,  the  effect  that  though  other  people's  schemes 
of  increasing  the  number  of  his  cor-  were,  no  doubt,  worthless,  still  that 
respondents,  as  several  of  them  wrote  their  own,  if  adopted,  would  launch 
a  second  time  to  express  their  regret  the  ship. 


378  LAUNCH  OF  THE  '  GEEAT  EASTEEN.'        [a.d.  1857. 

been  expressed,  and  not  unnaturally,  have  stood  perfectly  and  without 
any  settlement  or  any  derangement  by  being  passed  over.  There  is 
no  change  of  gradient  or  inclination  in  the  ways  capable  of  producing 
any  effect,  as  has  been  supposed ;  the  upper  part  of  the  ways  having 
an  inclination  of  1"025  inches  per  foot,  and  the  lower  part,  where  the 
ship  now  is,  one  of  1  '000  per  foot,  a  difference  too  small  to  be  ap- 
preciable, but  which  possibly  by  some  mistake  of  figures  may  have 
led  to  the  erroneous  impression  referred  to. 

The  amount  of  resistance  upon  the  ways  in  their  present  condition 
and  inclination  has  now  been  positively  ascertained,  and  an  ample 
excess  of  power  being  applied,  there  can  be  no  reason  to  doubt  the 
result.  I  propose  to  apply  that  excess  by  going  considerably  beyond 
the  amount  which  the  calculation  founded  upon  the  results  actually 
obtained  would  give  as  the  maximum,  and  to  double  the  power 
which  has  last  moved  the  vessel. 

Memorandum  of  a  verbal  Rejport  made  to  the  Directors, 
and  a  small  Meeting  of  the  Principal  Proprietors. 

December  17,  1857. 
That  after  full  consideration  of  all  the  circumstances,  and  assisted 
by  the  best  advice  I  could  call  in  to  my  aid,  namely,  that  of  my 
friend  Mr.  Eobert  Stephenson,  I  considered  that  the  only  mode  of 
proceeding,  and  one  which  there  appeared  no  reason  to  doubt  would 
succeed,  was  to  apply  considerably  more  press  power ;  that  I  pro- 
posed to  double  what  we  had ;  that  I  believed  I  was  able  to  put  my 
hands  upon  the  requisite  presses ;  that  the  river  tackle  so  far  as  it 
went  might  now  be  considered  good,  but  that  unfortunately  we  were 
obliged  to  take  up  the  principal  part  of  the  chains,  which  with  great 
kindness  and  liberality  Messrs.  Brown  and  Lenox  had  lent  us,  and 
were  now  peremptorily  called  upon  to  deliver  up ;  but  that  with 
their  assistance  I  could  replace  them. 

A  large  number  of  presses  were  obtained,  tlie  owners 
for  the  most  part  lending  them  free  of  charge.  Among 
these  presses  was  the  large  one,  with  a  20-inch  cylinder, 
which  had  been  used  for  lifting  the  tubes  of  the  Britannia 
Bridge. 

On  each  of  the  ways  were  placed  nine  presses.  The 
total  sectional  area  of  the  cylinders  at  the  forward  cradle 
was  1,066  circular  inches,  and  that  of  the  cylinders  at  the 


j:t.  52.]  PROGRESS  TO  JANUARY  5,   1858.  879 

after  cradle  was  1,358  circular  inches ;  but  the  Britannia 
press  was  not  to  be  worked  to  its  full  power,  so  the  total 
area  of  the  cylinders  may  be  taken  as  2,300  circular  inches, 
or  1,800  square  inches.  The  presses  might  be  considered 
as  good  for  at  least  2^  tons  on  the  square  inch ;  this  gave 
a  power  of  4,500  tons,  which,  with  the  1,000  tons  due  to 
gravity,  gave  5,500  tons,  or  equal  to  nearly  half  the  weight 
of  the  ship.  The  presses  were  now  coupled  together  in 
groups,  in  order  to  ensure  that  an  equal  pressure  should 
be  brought  on  them;  and  to  each  of  these  groups  an 
accurate  pressure  gauge  was  attached. 

All  the  presses  having  been  tested,  it  was  determined 
to  recommence  the  actual  operation  of  launching  on 
Tuesday,  January  5. 

So  much  of  the  water  in  the  pipes  had  been  frozen 
that  it  was  eleven  o'clock  before  the  order  was  given  to 
the  men  to  pump.  When  at  one  group  after  another  the 
pressure  was  shown  to  be  one  ton  on  the  circular  inch,  the 
j)umps  were  stopped.  As  the  backing  of  the  presses 
continued  to  yield  slightly,  a  stroke  or  two  of  the  handles 
had  to  be  made  from  time  to  time,  to  keep  up  the  required 
strain.  For  six  minutes  there  was  perfect  silence,  and  then 
the  ship  moved,  sliding  down  about  3  inches. 

The  same  process  was  repeated  at  the  stem  cradle  once 
or  twice,  and  then  at  both  cradles.  After  this  the  order 
was  given  that  the  pumps  should  be  kept  going  tiU 
she  moved.  This  was  accordingly  done,  and  when  the 
pressure  amounted  to  1^  ton  on  the  circular  inch  the  ship 
made  a  slide  of  about  4  inches.  In  this  manner  she 
was  moved  about  5  feet  before  work  was  stopped  in  the 
evening.^ 

'  The  number  of  the  presses  being  the  ship  not  being  much  greater  than 
almost  doubled,  but  the  resistance  of      before,  the  elastic  compression  of  the 


380  LAUNCH   OF  THE   '  GREAT  EASTERN.'        [a.d.  1858. 

On  January  6,  tliere  was  a  singular  change  in  the 
behaviour  of  the  ship.  During  the  whole  of  the  forenoon 
she  moved  gradually,  yielding  to  the  pressure  at  a  rate  of 
about  an  inch  in  four  minutes.  In  the  afternoon,  however, 
she  moved  in  short  slides. 

During  this  and  the  three  following  days  her  progress 

was  about  10  feet  each  day.     After  this  the  ship,  being 

^     to  a   considerable   extent  waterborne,   was   moved   with 

*     grea,ter  ease,  and  on  Tuesday,  January  12,  20  feet  was 

accomplished  in  less  than  four  hours. 

By  Thursday,  the  14th,  the  ship  had  traversed  a  distance 
of  197  feet  at  the  forward  cradle,  and  207  feet  at  the 
after  cradle.  It  was  thought  unwise  to  advance  further 
till  the  coming  spring- tides  on  the  19th  of  the  month 
were  past,  lest  an  exceptionally  high  tide  might  come 
unexpectedly,  and  partially  float  her.  As  soon  as  the 
spring-tides  had  passed,  she  was  moved  on  cautiously,  a 
short  distance  at  a  time,  and  the  depression  of  the  ways 
was  carefully  observed.  This  was  found  to  be  incon- 
siderable, and  the  cradles  were  gradually  pushed  25  feet 
off  the  ways.  As  the  spring-tides  came  on,  water  was  run 
into  the  ship,  to  prevent  her  from  floating  prematurely. 

The  upright  struts  of  the  cradle  on  the  side  next  to 
the  river  were  all  removed,  and  the  wedge-pieces  had 
chains  fastened  to  them,  with  the  ends  brought  on  deck  ; 
so  that,  if  any  of  the  wedge-pieces  got  jammed  and  did 
not  come  out  when  the  ship  floated,  they  might  be  hauled 
out  by  the  chains. 

The  river  tackle  now  consisted  of  two  purchases  at 
the  bow  and  two  at  the  stern.     To  keep  the  ship,  when 

abutments  was  less  than  it  had  been  stored  up  to  give  it  velocity ;  there- 
previously,  so  that  when  the  ship  fore  the  slides  were  shorter  than  they 
moved    there  was    much    less   work      had  been  before. 


JET.  52.]  I>KEPARATIONS  FOR   FLOATING.  3S1 

she  floated,  from  being  drifted  by  the  tide  or  wind,  chains 
were  carried  from  the  bow  and  stern  to  moorings,  by 
which  her  movement  up  and  down  stream  might  be 
regulated.  Tour  tugs  were  in  attendance  to  tow  the 
ship  to  her  berth,  and  a  floating  fire-engine  was  also 
ready  to  pump  water  into  her,  should  this  be  necessary 
owing  to  any  sudden  postponement  of  the  launch. 

Nothing  now  remained  but  to  watch  carefully  for  a 
suitable  tide. 

It  was  determined  that,  if  the  weather  were  favourable, 
the  floating  should  be  effected  on  Saturday,  January  30. 
The  tides  had  been  below  the  average,  and  on  the  Friday 
matters  did  not  look  promising ;  the  tides  had  continued 
low,  and  the  weather  was  bad.  A  careful  watch  was  kept 
on  the  tide,  observations  being  taken  every  half  hour,  and 
plotted  on  a  diagram  so  as  to  show  at  a  glance  the  probable 
height  to  which  it  would  rise. 

The  tides  showed  signs  of  improvement,  and  they 
commenced  to  pump  water  out  of  the  ship  on  Friday 
night ;  but,  as  time  went  on,  the  weather  did  not  mend, 
and  the  wind  was  blowing  from  the  south-west  against 
her  broadside ;  therefore  in  the  early  morning  Mr.  Brunei, 
who  was  in  person  attending  each  turn  of  affairs,  ordered 
water  to  be  pumped  in  by  the  fire-engine.  There  was 
hard  rain  and  strong  wind ;  and  telegrams  which,  accord- 
ing to  arrangement,  were  being  frequently  sent  from 
Liverpool  and  Plymouth,  showed  similar  weather.  This 
continued  throughout  the  Saturday,  and  the  tide  was  low; 
but,  when  it  began  to  rise  in  the  evening,  it  gave 
indications  of  being  a  very  high  one.  As  soon  as  the  tide 
reached  the  Kingston  valves,  Mr.  Brunei  had  water  run 
into  the  ship.  Although  she  rested  uneasUy  on  the 
cradles,  she  remained  safely  in  her  position. 


382  LAUNCH  OF   THE  '  GREAT  EASTERN.'        [a.d.  1858. 

In  the  evening  tlie  rain  came  down  in  torrents ;  never- 
theless, after  midnight  the  weather  mended,  and  the  wind 
went  round  to  the  north-east.  As  the  telegraph  gave 
the  same  report  from  Liverpool,  Mr.  Brunei,  encouraged 
by  every  sign  of  fine  weather,  and  having  the  good  pro- 
mise given  by  the  high  tide  of  the  night  before,  determined 
early  on  the  morning  of  Sunday,  January  31,  to  float  the 
ship  on  that  day. 

The  pumps  were  immediately  started  to  discharge  the 
water  from  the  ship.  The  bolts  securing  the  wedge-pieces 
of  the  cradles  were  unfastened  at  daybreak,  and  the  ship 
was  then  ready. 

The  morning  broke  with  great  splendour  after  the 
gloom  of  the  previous  days,  and  the  tide,  as  soon  as  it 
had  turned,  began  to  rise  with  unusual  rapidity.  It  had 
been  arranged  that  all  the  men  should  be  at  their  posts 
at  the  presses  and  crabs  by  eleven  o'clock ;  but  the  tide 
was  not  only  very  high,  but  exceptionally  early ;  and,  al- 
though a  considerable  margin  had  been  allowed,  it  was 
not  sufficient.  Mr.  Brunei  and  his  assistants  hurried  the 
men  to  their  places,  the  presses  were  set  to  work,  and  the 
ship  was  put  in  motion  down  the  ways  for  the  last  time. 

At  a  little  before  one  o'clock  observations  taken  by 
levels  showed  that  the  ship  had  ceased  to  descend,  al- 
though she  was  still  being  pushed  forward.  Shortly 
afterwards  Captain  Harrison,  who  had  gone  on  board,  sent 
Mr.  Brunei  word  that  all  the  wedge-pieces  had  floated  up 
on  the  outer  side  of  the  ship ;  and  at  twenty  minutes  past 
one  the  stern  was  seen  to  be  afloat.  Mr.  Brunei  had 
been  loath  to  haul  out  the  ship  by  the  river  tackle,  lest 
the  wedge-pieces  might  get  jammed  ;  but,  as  soon  as  he 
was  informed  that  they  had  floated  up,  he  sent  orders  for 
a  strain  to  be  put  on  the  bow  tackle.     This  was  at  once 


JET.  52.]  THE  FLOATING.  383 

done,  and  by  twenty  minutes  to  two  the  bow  rose  from  the 
cradle. 

Mr.  Brunei  then  ordered  the  checking  gear  to  be 
secured,  that  the  ship  might  be  sooner  hauled  clear  of 
the  cradles,  and  he  went  on  board.  He  had  scarcely 
done  so  when  a  serious  difificulty  arose.  It  has  been 
already  said,  that  in  order  to  keep  the  ship  from  moving 
up  or  down  stream,  cables  had  been  carried  out  to  moor- 
ings ahead  and  astern ;  and  both  these  chains  had  been 
hauled  up  tolerably  taut,  at  least  the  slack  had  been 
taken  out  of  them,  so  that  if  required  they  might  be  at 
once  available.  Now  when  Mr.  Brunei  had  given  the 
order  for  the  bow  out-haul  tackle  to  be  hauled  upon. 
Captain  Harrison,  in  order  to  supplement  it,  ordered  the 
tug-boats  to  haul  the  bow  off.  This  order  was  by  some 
one  conceived  to  have  been  given  with  the  object  of 
hauling  the  ship  ahead ;  and  to  facilitate  this  the  stern 
mooring-chain  was  let  go. 

By  this  time,  though  the  tide  was  still  running  up  the 
river,  its  strength  was  much  diminished ;  and  the  drag 
of  the  chain  at  the  bow  of  the  ship  was  sufficient  to  pull 
her  forward  against  the  tide.  The  paddlewheel  on  the 
shore  side  then  came  in  contact  with  the  upright  timbers 
of  the  forward  cradle.  Mr.  Brunei  ran  down  from  the 
ship  into  a  boat  and  examined  the  place  where  the  wheel 
was  fouled.  He  then  hurried  back  on  board,  where,  as 
through  some  blunder  the  stern  outhaul  had  also  been  let 
go,  he  had  now  little  but  the  tug-boats  to  depend  upon. 
They  were  of  course  of  bat  small  value  for  a  dead  pull 
as  compared  with  the  chain  tackle.  He  had  the  bow 
chain  veered  out  and  the  tugs  all  set  to  work,  assisted  by 
the  tide,  to  haul  the  ship  up  the  river. 

In  about  twenty  minutes  time,  the  paddlewheel  was  got 
clear  of  the  cradle,  and  this  great  difficulty  was  overcome. 


384  LAUNCH  OF  THE   '  GEEAT  EASTEEN.'         [a.d.  1858.] 

Fortunately,  the  tide  was  an  extraordinarily  liigli  one,  and 
the  time  of  available  high  water  was  long. 

The  ship  had  not  been  moved  far  towards  her  berth 
when  another  mishap  delayed  her  progress.  The  barge  of 
the  bow  purchase  came  foul  of  the  starboard  paddlewheel, 
and  the  only  way  of  freeing  the  ship  was  to  scuttle  the 
barge.  When  this  was  done  it  sank  away  clear  of  the 
wheel,  and  the  ship  proceeded  to  her  berth  on  the  Deptford 
side  of  the  river.^ 

By.  about  seven  o'clock  she  was  safely  moored ;  and  the 
cheers  of  the  men,  as  Mr.  Brunei  went  down  her  side, 
announced  that  the  launch  of  the  '  Great  Eastern  '  was  at 
length  accomplished. 

*  Among  the  many  congratulations  all  day,   but  my  doctor  would  not 

which  Mr.  Brunei  received  on  the  com-  permit  me  to  venture  so  far  away  as 

pletion  of  the  launch,  there  was  perhaps  Mill  wall. 

none  which  pleased  him  more  than  I  do,  my  good   friend,  most   sin- 

the  following  letter  from  Mr.  Eobert  cerely  congratulate  you  on  the  arrival 

Stephenson,  who  had  been  prevented  of  the  conclusion  of  your  anxiety, 
by  illness  from  being  present  at  the  Yours  sincerely, 

concluding    operations,    the    critical  Eobeet  Stephenson. 

character  of  which  he  had  fully  appre- 
ciated : — 

February  1, 1858.  A  letter  from  Mr.  Brunei  to  his 

My  DEA.K   Brunel,  —  I   slept  last  friend    Mr.   Froude,    describing    the 

night  like  a  top,  after  I  received  your  floating,  is  given  in  note  B  to  this 

message.     I  got  desperately  anxious  chapter. 


385 


NOTE   A  (pp.  348,  368,  372). 
Experiments  and  Observations  on  Friction. 

In  January  1857,  Mr.  Brunei  took  steps  to  form  an  estimate  of 
the  amount  of  hauling  or  of  retarding  force  that  would  probably  be 
required  in  the  launch. 

Two  rails  were  laid  at  an  inclination  of  1  in  12,  and  upon  them 
an  experimental  cradle  was  placed,  with  three  cross-bars  similar  to 
those  which  were  to  form  the  under  surface  of  the  cradles.  The 
three  cross-bars  therefore  made  six  intersections  on  the  two  rails,  and 
the  small  cradle  was  loaded  with  about  8  tons,  so  that  the  weight 
on  each  intersection  was  about  equal  to  that  which  would  come  on 
each  of  the  intersections  of  the  actual  cradle.  This  arrangement 
was  not  therefore  a  model,  but  a  correct  representation  of  a  part  of 
the  cradles,  and  which  might,  with  an  exception  to  be  noted 
presently,  be  taken  to  exactly  represent,  by  its  conduct,  the  con- 
duct of  every  similar  part  of  the  actual  cradles.  Experiments  were 
made  with  one  or  two  kinds  of  unguents,  and,  what  was  a  more 
correct  representation  of  what  was  likely  to  occur,  with  the  rails 
and  bars  clean  but  not  bright,  and  without  lubrication. 

The  experiments  with  lubrication  were  useful  rather  as  com- 
paring the  various  lubricants  one  with  another  than  as  representing, 
by  a  mere  process  of  multipKcation,  what  would  be  the  behaviour 
of  the  ship  on  her  cradles,  because,  for  the  reason  already  pointed 
out  in  the  case  of  wooden  sliding- surfaces,  the  lubrication  would  be 
more  and  more  rubbed  away  as  more  of  the  cradle  passed  over  it ; 
thus  the  experimental  cradle,  when  tried  with  lubrication,  repre- 
sented rather  the  behaviovu-  of  the  front  part  of  the  cradle  than  that 
of  the  whole.  Had  the  sliip  herself  been  moved  uninterruptedly 
down  the  ways,  the  state  of  things  would  have  been  something 
between  good  lubrication  and  none  at  all.  As  the  under  sides  of 
the  bars  were  lubricated,  any  motion  of  one  end  of  the  ship  before 
the  other  would  tend  to  move  the  bars  sideways  over  the  rails, 
and  so  to  spread  the  lubrication,  and  to  pick  it  up  and  re-deposit 
it.  Mr.  Brunei  thought  but  little  of  the  black-leading  of  the  ways, 
considering  that  it  would  be  rubbed  off  by  the  leading  bars  of  the 
cradles ;  but  a  very  little  lubrication  on  metal  surfaces  is  sufficient ; 
and  doubtless,  had  the  ship  been  moved  continuously  down  the 
ways,  considerable  assistance  would  have  been  derived  from  the 
lubrication  which  was  applied. 

C  C 


386       LAUNCH  OF  THE  'GREAT  EASTERN.' 

The  results  of  the  experiment  were  curious.  The  generally- 
received  notion  is,  that  friction  between  rubbing  surfaces  is  inde- 
pendent of  the  velocity ;  that  is  to  say,  that  whether  a  body  be 
moving  fast  or  slow  within  reasonable  limits,  the  retardation  due 
to  friction  is  the  same ;  that  if  a  body  be  sliding  at  a  given  velocity, 
whether  that  velocity  be  great  or  small,  a  drag  of  a  certain  number 
of  pounds  will  keep  it  moving  at  that  velocity.  It  was,  however, 
always  understood  that  a  greater  force  was  necessary  to  start  a  body 
from  rest,  to  overcome  adhesion.  The  experiments  made  with  the 
experimental  cradle  distinctly  showed  that  any  rule  as  to  friction 
being  constant  at  different  velocities  was  untrue.  It  was  evident 
that,  as  the  speed  increased,  the  power  required  to  overcome  the 
friction  became  less.  No  exact  records  are  extant  of  the  experi- 
ments made  with  this  experimental  cradle  before  the  launch ;  they 
were,  however,  repeated  during  the  launch  with  great  care,  and  the 
results  very  carefully  analysed.  The  experiments  showed  generally 
that  the  tractive  force,  including  the  action  of  gravity,  was  never 
more  than  ^,  or  less  than  ^,  of  the  weight. 

Although  the  experiments  showed  that  the  amount  of  friction  in 
the  case  of  the  actual  launch  would  lie  between  the  limits  above 
mentioned,  they  at  the  same  time  indicated  that  it  would  not 
probably  approach  either  of  those  limits. 

Shortly  after  the  commencement  of  the  launch,  Mr.  Brunei  had 
the  experimental  cradle  and  ways  re-erected.  A  very  simple  ar- 
rangement was  fitted  up,  by  which  the  forces  at  work  at  each 
period  of  the  progress  of  the  cradle  in  each  experiment  might  be 
deduced.  The  results  of  these  experiments,  which,  as  may  be 
supposed,  were  similar  to  those  obtained  in  the  commencement  of 
the  year,  were  most  instructive ;  they  showed  quantitatively  the 
decided  diminution  in  friction  which  took  place  as  the  velocity 
increased,  and  the  amount  of  that  diminution.  The  apparatus  was 
very  simple.  The  experimental  cradle,  which  has  already  been 
described,  was  made  to  slide  down  its  ways  by  a  chain  attached  to 
a  suspended  weight.  The  weight  employed  was  generally  about 
5  cwt.  After  the  cradle  had  run  a  certain  distance,  the  weight 
reached  the  ground  and  the  cradle  proceeded  with  the  momentum 
it  had  obtained.  The  velocity  given  to  the  cradle  down  the  ways 
was  measured  in  the  following  manner.  A  long  piece  of  tape  was 
coiled  round  a  reel  placed  at  the  top  of  the  inclined  rails  or  experi- 
mental ways,  so  that  it  could  revolve  freely  and  pay  out  the 
tape  as   required.     One   end   of  this  tape   was    attached   to   the 


EXPERIMENTS  ON   FRICTION. 


387 


cradle,  so  as  to  be  drawn  after  it  as  it  ran  down  the  rails.  The 
tape,  as  it  ran  off  the  reel,  passed  over  a  guiding  board  over  which 
swung  transversely  a  pendulum  aiTanged  to  swing  once  every  quar- 
ter of  a  second.  At  the  lower  end  of  this  pendulum  was  attached 
a  brush  which  was  filled  with  paint;  and  as  soon  as  the  model 
cradle  moved,  the  pendulum  was  set  oscillating  by  a  self-acting 
trigger  ai-rangement.  The  pendulum  in  its  oscillations  made  marks 
on  the  tape  as  it  ran  out  at  every  quarter  of  a  second  of  time. 
Thus,  by  an  examination  of  the  tape,  could  be  determined  the 
exact  distance  which  had  been  passed  over  by  the  cradle  during 
each  quarter  of  a  second  of  the  time  during  which  it  was  moving. 
The  rate  of  progress  being  thus  known,  and  the  actuating  force 
(gravity  acting  on  the  cradle  and  on  the  suspended  weight)  being 
also  known,  it  will  be  understood  that  the  exact  amount  of  the  resist- 
ing force,  namely,  friction,  could  be  calculated  exactly,  and  this  for 
each  moment  and  position  of  the  descent  of  the  experimental  cradle. 
The  following  results  of  these  experiments  were  recorded  in  terms 
of  the  corresponding  amounts  of  tractive  force  that  would  be  re- 
quired to  produce  similar  results  in  the  case  of  the  ship  and  cradles, 
a  weight  of  12,000  tons. 


Force  in  tons  required 

Force  in  tons  required  to  move 

to  move  or  restrain  ship  on 

a  weigiit  equal  to  tlie  ship  on 

incline  of  1  in  12 

similar  ways,  but  on  the  level 

Velocity,  feet  per  second 

0 

Otol 

•75 

1 

1-5 

2to5 
Retard- 

0 

Otol 

•75   I     1 

1-5      |2to5J 

Rails  ako  Cradle  Bars. 

ing 
(110 

890 

No.  1.  Ample  lubrication 

60 

0 

to 
1200 

..    |1,0«0 

1,000- 

to 
800 

No.  2.  Medium  lubrication     . 

120 

0 

60 

1,220     ..    1    .. 

1,000 

940 

No.  3.  Very  little  lubrication 

400 

200 

0 

1,400 

..     1,200     .. 

1,000 

f 

560 

1,560 

No.  4.  No  lubrication      ,         h 

to 
400 

" 

0 

to 
1,400 

•  • 

1,000 

In  every  case  where  a  velocity  approaching  to  3  feet  per  second 
was  attained,  whether  the  ways  were  lubricated  or  were  quite  dry, 
the  model,  though  there  was  no  tractive  force  acting  on  it  other 
than  that  of  gravity  down  the  incline  of  1  in  1 2,  rapidly  increased 
its  speed  till  it  reached  the  end  of  the  ways. 

These  experiments  are  worthy  of  note  for  the  contradiction, 
already  referred  to,  which  they  gave  to  the  received  rules  relative 
to  friction.  It  will  be  seen  by  these  experiments,  and  as  will 
hereinafter  appear  from  the  results  of  the  movements  of  the  ship 
herself  during  the  launch,  that  with  different  degrees  of  velocity 

c  c  2 


388        LAUNCH  OF  THE  'GREAT  EASTERN.' 

veiy  great  variation  in  the  friction  was  apparent,  amonnting  to  a 
difference  of  about  thirty  per  cent,  in  the  case  of  unlubricated 
surfaces,  according  as  the  velocity  was  nearly  nil  or  was  1'5  feet 
per  second,  which  is  a  comparatively  small  velocity.  The  friction 
in  this  case  was,  on  a  weight  of  12,000  tons,  l,5uO  tons  at  a  very 
low  velocity,  and  but  1,000  tons  at  a  velocity  of  1-5  feet  a  second 
or  about  one  mile  an  hour,  the  friction  at  the  very  low  velocity 
being  fifty  per  cent,  greater  than  that  at  one  mile  an  hour. 

As  soon  as  the  ship  began  to  move  by  slides,  the  recording 
•apparatus  of  tape  and  pendulum  was  applied  to  record  the  nature  of 
the  ship's  movements.  This  apparatus  was  similar  to  that  already 
described.  The  tape  was  attached  to  the  bottom  of  the  ship  under 
her  centre  of  gravity,  and  recorded  the  rate  of  retardation  of  the 
ship  when  left  to  herself  after  the  motive  appliances  had,  with  the 
exception  of  gravity,  ceased  to  act ;  and  the  amount  of  friction 
acting  to  retard  the  ship  was  determined  with  a  very  considerable 
amount  of  accuracy. 

The  best  experiments  made  were  on  December  7,  8,  and  10 ;  and 
the  results  are  very  interesting.  The  dirt  and  rust  of  the  sliding 
surfaces  had  increased  the  adhesion  very  much,  and  a  considerable 
force  was  necessary  to  start  the  ship.  There  being  no  good  pressiu-e 
gauges  to  the  presses,  it  was  impossible  to  decide  exactly  what  was 
the  force  required  to  start  the  ship,  for  of  course  the  tape  record 
gave  no  information  on  this  point ;  but  there  is  no  doubt  it  was  con- 
siderable, probably  800  or  1,000  tons  in  addition  to  gravity,  and 
was  thus  far  greater  than  the  force  to  start  that  had  been  observed 
with  the  experimental  cradle. 

But  the  remarkable  fact  was  that,  notwithstanding  the  deteriora- 
tion of  the  sliding-surfaces  as  evinced  in  the  increased  difficulty  in 
starting,  the  friction,  when  once  motion  was  established,  was  proved 
not  to  be  very  largely  in  excess  of  that  which  had  been  exhibited 
in  the  experiments. 

In  the  various  experiments  tried,  it  was  shown  that  when  the 
ship  had  a  velocity  of  between  6  and  8  inches  per  second,  the 
amount  of  friction  was  only  about  100  tons  in  excess  of  the  action 
of  gravity  down  the  incline ;  while  as  the  velocity  became  less, 
the  friction  became  greater,  till,  as  the  velocity  became  smaller,  the 
friction  increased  from  200  to  300  tons  in  excess  of  the  action  of 
gravity. 

The  results  obtained  by  the  observations  made  on  the  motion  of 
the  ship  having  shown  that  its  behaviour  when  in  motion  accorded 
with  that  of  the  experimental  cradle,  there  is  every  reason  to  believe 


EXPEKIMENTS   ON   FRICTION.  389 

that  if  the  ship  had  ever  attained  a  velocity  of  1^  to  2  feet  per 
second,  which  might  have  liappened  had  the  river  tackle  acted  well, 
the  friction  would,  as  in  the  experimental  cradle,  have  become  less 
than  the  action  of  gravity  down  the  slope,  and  the  brakes  would 
have  had  to  be  employed  to  check  the  motion. 


NOTE   B   (p.  384). 
Letter  from  Mr.  Brunei  to  W.  Froude,  Esq. 

February  2,  1858. 

My  dear  Froude, — It  is  no  news  to  you  to  tell  you  that  we  have 
floated,  but  still  you  will  perhaps  feel  sympathetically  some  pleasure  in 
hearing  of  it  from  me,  as  I  do  in  writing  to  you  upon  it. 

We  have  in  fact  gone  on  well  and  without  mishap  since  we  have 
resumed  operations  with  plenty  of  power;  we  have  not  gone  very 
quickly  because  our  jumps  have  been  small,  or  we  have  gone  by  a 
continuous  motion — we  have  had  a  great  deal  of  this,  and  all  the  last 
30  or  40  feet  I  think,  or  more,  has  been  so,  the  power  being  with 
gravity  about  a  quarter  of  the  weight,  sometimes  less — occasionally, 
when  the  water  was  high,  considerably  less — buoyancy  being  of 
course  taken  duly  into  the  calculation.  Once,  when  still  weighing 
fully  3,500  tons,  and  with  1,200  tons  of  water  in  her,  making  4,700, 
less  some  buoyancy  of  the  cradle,  she  moved  so  easily  that  they  came 
running  to  me  from  the  other  cradle,  to  say  that  she  was  moving  of 
herself,  and  asking  what  to  do. 

She  certainly  had  not  much  more  pressure  on  than  we  had  assumed 
to  be  nece&sary  to  overcome  all  the  friction  of  thrust  timbers,  &c., 
certainly  could  not  have  had  above  300  tons  of  real  push  to  move 

2,000  tons,  2,00O-?2^  (gravity)  =1,833  tons. 

I  think  that  when  the  load  became  much  lighter  on  the  rails,  that 
the  mud  and  even  the  sand  of  the  Thames  form  a  lubricator  and 
rollers  which  offered  less  resistance'  than  the  dry  rail,  or  the  rail 
with  pressure  enough  to  displace  the  mud  or  imbed  the  sand. 

Having  at  last  jjushed  the  cradles  beyond  the  rail,  and  found  her 
stand  well,  and  moved  a  few  feet  more  and  still  stand  upright,  I 
waited  for  a  tide,  and  arranged  a  good  commimication  with  Liver- 


390       LAUNCH  OF  THE  'GREAT  EASTERN.' 

pool  and  Plymouth  to  telegraph  up  wind  and  weather,  morning  and 
night,  so  aa  to  help  in  foreseeing  a  tide. 

On  Friday  morning,  at  3  a.m.,  the  tide  began  to  improve,  but  the 
wind  was  still  in  the  wrong  quarter  for  a  good  tide,  and  as  I  think  I 
have  told  you  the  tides  of  this  month,  and  of  the  whole  year  of  '58, 
are  very  poor.  Besides  this,  it  blew  a  gale.  I  therefore  began 
pumping  out  the  water,  but  stopped  at  1,200  tons,  and  at  10  a.m., 
seeing  no  improvement  in  the  weather,  I  filled  in  by  the  fire-engine 
about  1,300  or  1,400  more,  and  gave  up  the  attempt,  and  very  for- 
tunately, as  the  tide  did  not  rise  high  enough,  and  the  wind  right  on 
her  broadside  increased. 

On  Saturday  night  things  grew  worse,  and  the  wind  at  Liverpool 
and  Falmouth  finished  in  the  evening  still  SSW.  About  midnight 
the  wind  lulled,  the  rain  came  down  in  torrents ;  the  wind  gradually 
stole  round  to  the  northward,  and  the  tide  came  rolling  up  uncom- 
fortably quick.  I  admitted  water  as  soon  as  it  would  run  in,  and 
only  just  prevented  her  floating;  when,  if  she  had,  we  should  have 
been  in  a  mess,  as  our  wedge-pieces  were  not  yet  unbolted  from  the 
bottom,  nor  could  we  in  the  night  have  managed  the  floating,  even 
if  all  had  been  ready,  which  nothing  was.  Under  these  circumstances, 
the  wedge-piece  being  bolted  was  perhaps  our  security,  as  she  all 
but  floated ;  the  stern  rose  3  inches  though  we  had  3,000  tons  of 
water  in  her,  the  tide  rose  so  high  ;  we  began  pumping  immediately 
on  the  turn  of  tide,  and  by  half-past  6  a.m.  the  wind  was  gentle  from 
the  NNE.,  and  telegraphs  came  to  announce  the  same  in  Liverpool, 
&c.     I  therefore  determined  upon  floating. 

We  pumped  away,  and  at  10  a.ji.  cleared  everything  away,  and 
began  our  preparations.  I  had  fixed  12  o'clock  to  begin  forcing  her 
further  down,  thinking  half-past  12  would  have  been  as  early  as  she 
would  have  moved  easily,  but  the  tide  came  rushing  up  an  hour  and  a 
half  before  its  time  ;  and,  although  I  hurried  the  men  to  their  posts, 
we  were  rather  caught  napping.  The  instant  we  began  pressing,  she 
moved  easily,  and  by  a  quarter  past  1  we  had  pushed  her  centre  past 
the  ways,  and  she  began  lifting  with  the  tide. 

I  had  a  centre  station  with  a  chalk  board,  giving  me  the  curve  of 
the  tide,  and  two  good  levels  reading  off"  her  stem  and  stem  water 
marks.  Our  calcvdations  had  proved  very  correct.  In  the  skew 
position  I  had  pushed  her  to,  she  began  lifting  at  the  stern  first,  as 
she  ought  to  have  done,  and  her  bows  soon  followed  the  example. 
We  stopped  pushing  the  cradles,  made  them  fast,  and  began  hauling 
out  the  ship — she  moved  very  slowly  of  course. 

When  she  began  to  move  out,  our  first  difficulty  occurred  by  a 


LETTER  DESCRIBING  THE  FLOATINa.  391 

little  mismanagement,  or  over  confidence,  on  board  ;  our  stem  chain 
was  let  go,  and  she  forged  ahead  against  the  tide  by  the  elastic  strain 
of  the  bow  chain,  and  /  tJiink  also  by  the  tug-boats  pulling  too 
much,  which  ought  not  to  have  been  done,  and  in  going  ahead  her 
port  paddles  caught  hold  of  some  cradle  timber  rising,  with  long  2^ 
inch  bolts  holding  them  to  the  bottom  of  cradle.  No  tug  power 
would  have  had  any  effect  upon  them.  But  we  had  two  hours 
before  us,  with  a  promise  of  an  unusual  tide ;  I  hurried  on  board,  and 
we  succeeded  in  about  twenty  minutes  in  getting  a  little  astern  a 
little  out,  and  getting  clear. 

We  had  some  mishaps  after  this,  such  as  fouling  one  of  our  barges, 
getting  it  jammed  xmder  the  paddlewheels,  and  the  barge  fast  by 
the  chain  tackle  dropt  overboard.  However,  we  scuttled  and  sunk 
the  barge,  and  got  safely  across.  "We  had  an  extraordinary  tide,  and 
several  assistances  from  nature  to  counteract  any  of  our  own  bungling, 
and  got  safely  across,  and  she  is  now  moored  in  her  right  place. 

Yours  faithfully, 

I.  K.  Brunel. 

William  Froude,  Esq. 


392  [a.d.  1858. 


CHAPTER  XIII. 

STEAM  NAVIGATION— THE  '  GBEAT  EASTERN'  STEAM-SHIP. 
COMPLETION  AND  SUBSEQUENT  HISTORY. 

A.D.  1858—1859  :  ^tatis  52-64. 
A.D.  1859—1870. 

PREPARATIONS  FOR  COMPLETING   THE    SHIP FORMATION    OF  THE  GREAT  SHIP 

COMPANY MR.     BRUNEl's     ABSENCE     FROM     ENGLAND — PROGRESS     OF     THE 

■WORKS    FROM    HIS    RETURN  TO    HIS   LAST    ILLNESS VOYAGE  TO  WEYMOUTH 

EXPLOSION     OF     -WATER-HEATER — STORM     AT     HOLYHEAD — DESCRIPTION      OF 

THE    SHIP HER   FIRST  VOYAGE   TO    NEW  YORK,    JUNE    1860 — SECOND    VOYAGE 

TO   NEW  YORK,    MAY    1861 — VOYAGE   WITH    TROOPS    TO    QUEBEC,    JUNE    1861 

FRACTURE  OF  RUDDER-HEAD  AND  DESTRUCTION  OF  PADDLEWHEELS,  SEPTEM- 
BER 1861 VOYAGES  IN  18G2  —  ACCIDENT   OFF  MONTAUK  POINT,  AUGUST  27,  1862 

VOYAGES  IN  1863 FORMATION  OF  THE  GREAT  EASTERN  STEAM-SHIP  COM- 
PANY— REMARKS  ON  THE  HISTORY  OF  THE  '  GREAT  EASTERN '  PREVIOUS  TO 
HER   EMPLOYMENT    IN    LAYING    SUBMARINE    TELEGRAPH    CABLES — TELEGRAPH 

EXPEDITIONS  OF  1865  AND  1866 — FRENCH  CABLE  EXPEDITION  OF  1869 VOYAGE 

TO  BOMBAY  AND  ADEN,  1869-70  —  CONCLUDING  REMARKS  — WOrs  ;  DIMENSIONS 
OF  THE  SHIP    AND  ENGINES. 

Soon  after  the  launch  of  the  '  Great  Eastern,'  efforts 
were  made  to  obtain  funds  for  finishing  her,  and  Mr. 
Brunei  proceeded  to  prepare  designs  with  the  view  of 
obtaijiing  tenders  for  the  execution  of  the  decks,  skylights, 
fittings,  rigging,  &c.  He  obtained  advice  from  persons 
thoroughly  conversant  with  this  class  of  work;  and  a 
specification  was  carefully  prepared,  providing  for  the 
completion  of  the  ship  in  a  perfect  manner. 

Meanwhile  it  had  been  considered  that,  large  as  the  ship 
was,  she  might  be  profitably  employed  in  the  American 
trade,  and  that  it  might  be  expedient  to  run  her  on  that 
line  for  a  few  voyages  before  placing  her  on  the  Eastern 
route.    Captain  Harrison  went  to  America  to  examine  the 


r.  52.]  COMPLETION   OF  THE  SHIP.  393 

harbour  at  Portland,  and  brought  back  a  favourable  report 
of  it. 

.All  efforts  to  raise  the  funds  for  finishing  the  ship  proved 
unavailing ;  and  it  was  determined  to  reconstitute  the 
company. 

The  new  company,  which  was  called  the  '  Great  Ship 
*  Company,'  was  formed  towards  the  end  of  the  year  1858. 
In  the  beginning  of  December,  Mr.  Brunei  was  compelled 
by  ill-health  to  go  to  Egypt  for  the  winter.  On  leaving 
England,  he  strongly  urged  the  Directors  on  no  account  to 
fail  to  make  a  strict  contract,  distinctly  defining  the  work 
to  be  done,  and  the  manner  of  its  execution,  as  provided 
for  by  the  specifications  he  had  drawn  out.  But  his  advice 
was  not  followed. 

After  Mr.  Brunei's  return  to  England  in  May  1859, 
he  continued  to  give  the  greater  part  of  his  time  to  the 
ship.  The  difficulties  which  he  had  to  encounter  were 
certainly  neither  fewer  nor  less  vexatious  than  those  which 
had  arisen  at  earlier  periods  in  her  history ;  but  they  were 
the  last  with  which  he  had  to  contend. 

On  September  5  he  left  her  in  the  morning,  feeling  the 
commencement  of  the  illness  which  ten  days  afterwards 
terminated  fatally. 

The  ship  left  her  moorings  on  September  7,  and  vsdth 
the  assistance  of  several  tugs  steamed  down  the  river. 
She  stopped  for  a  night  at  Purfleet,  and  again  at  the  Nore, 
and  then  left  for  Weymouth. 

On  the  voyage  a  serious  accident  happened,  which 
was  made  the  subject  of  much  misrepresentation. 

Round  each  of  the  funnels  of  the  paddle  engines  was 
what  was  termed  a  water-casing,  or  jacket,  consisting  of 
an  outer  cylinder,  about  6  inches  from  the  inner  cylinder 

I  iVl  iiiJirt  n  n  1     ..  .     .      ,-,  I 


394  THE  '  GREAT  EASTERN  '  STEAM-SHIP.  [a.d.  1859. 

which  formed  the  funnel.  The  top  of  the  annular  space 
between  the  cylinders  was  at  about  the  level  of  the  deck. 
From  it  a  stand-pipe  was  carried  up,  which,  after  rising  to 
a  certain  height,  was  turned  over,  and  the  end  brought 
down  into  the  stokehole.  The  object  of  this  arrangement 
was  to  heat  the  feed-water  before  it  entered  the  boiler, 
and  at  the  same  time  to  keep  the  saloons  cool,  through 
which  the  funnels  passed.  The  arrangement  of  the  stand- 
pipe  gave  this  advantage,  that  when  the  head  of  water 
in  the  heater  and  stand-pipe  together  became  equivalent 
to  the  pressure  in  the  boiler,  the  water  could  be  run  into 
the  boiler  by  gravitation.  The  stand-pipe  at  the  same 
time,  being  open  to  the  air  at  the  top,  formed  a  safety- 
valve  to  the  water-heater. 

For  the  purpose  of  testing  the  joints  of  the  jacket 
with  water  pressure,  while  the  ship  was  being  finished, 
a  stop-cock  had  been  placed  on  the  stand-pipe,  which  un- 
fortunately had  not  been  afterwards  removed.  While  the 
ship  was  proceeding  down  Channel,  the  donkey  feed- 
pumps were  not  working  well,  and  to  ease  them  it  was 
thought  better  to  cut  off  the  water-heater,  and  to  force 
the  water  direct  into  the  boiler.  The  communication  of 
the  water-heater  with  the  boiler  was  therefore  cut  off; 
and,  as  was  afterwards  ascertained,  the  stop-cock  at  the 
top  of  the  water-heater  had  been  also  closed.  The  water 
confined  in  the  heater  soon  produced  steam,  and  when 
the  ship  was  off  Hastings  the  casing  exploded.  The 
funnel  was  thrown  up  on  to  the  deck,  and  a  body  of 
boiling  water  and  steam  was  driven  down  into  the  boiler 
room,  severely  injuring  several  of  the  firemen,  who  after- 
wards died. 

That  the  effects  of  this  accident  were  confined  to  one 
compartment  of  the  ship,  was  due  to  the  complete  pro- 
tection afforded  by  the  transverse  bulkheads. 


*T.  54.]  EXPLOSION   OF  WATEE-HEATER.  395 

After  she  arrived  at  Weymouth  the  funnel  was  re- 
paired; but  as  an  outcry  was  raised  against  the  water- 
heaters,  it  was  thought  desirable,  from  deference  to 
public  opinion,  to  discontinue  their  use;  although  this 
accident  had  not  in  any  way  proved  them  to  be  objection- 
able, and  they  are  now  generally  adopted. 

While  the  *  Great  Eastern'  was  at  Weymouth  Mr. 
Brunei  died. 

Many  visitors  went  in  the  ship  when  she  left  Weymouth 
on  a  trial  trip  to  Holyhead.  At  Holyhead  she  lay  in  a 
somewhat  exposed  situation ;  and  the  sudden  storm  came 
on  in  which  the  *Eoyal  Charter'  was  lost.  The  great 
advantage  of  having  both  paddle  and  screw  was  now,  for 
I  the  first  time,  felt.  A  portion  of  the  temporary  staging 
'  erected  by  the  contractor  at  the  breakwater  was  carried 
away,  and  drifted  down  upon  the  ship.  During  the 
gale  her  engines  were  kept  going,  in  order  to  relieve 
the  strain  on  the  cables.  The  timbers  of  the  staging- 
got  foul  of  both  paddlewheels  and  screw;  but,  as  it  was 
always  possible  to  keep  one  of  the  engines  at  work,  the 
ship  was  saved  from  drifting. 

The  season  being  now  too  far  advanced  for  a  profitable 
voyage  to  America,  the  ship  left  Holyhead  and  went  to 
Southampton  Water  for  the  winter,  where  several  altera- 
tions and  additions  were  made. 

In  Mr.  Brunei's  report  of  February  6,  1855,  printed 
above,  at  p.  315,  he  describes  the  leading  features  of  the 
'  Great  Eastern  '  as  she  was  then  being  constructed,  but 
a  more  detailed  account  of  them  will  fitly  precede  the 
history  of  her  career  as  a  passenger-ship. 

The  main  arrangements  of  the  ship  are  shown  in  the 
woodcut  (fig.  16,  p.  397).^ 

•  The  principal  dimensions  of  the  ship  and  engines  are  given  in  the  note  to 
this  chapter,  p.  416. 


396  THE   '  GKEAT   EASTEEN '   STEAM-SHIP.         [a.d.  1860. 

The  ship  is  680  feet  long,  83  feet  wide,  and  58  feet 
deep.  Her  gross  tonnage  is  18,915  tons.  She  is  di- 
vided into  water-tight  compartments  by  ten  bulkheads 
(a  and  &),  all  of  which,  except  two  (6),  extend  completely 
across  the  ship,  and  up  to  the  upper  deck.  These  two  are 
complete  to  6  feet  above  the  28-foot  water  line.  In 
addition  there  are  partial  bulkheads  (c),  which  form  the 
ends  of  coal  bunkers,  and  aid  materially  in  strengthening 
the  flat  bottom  of  the  ship.  The  more  remarkable  parts 
of  the  construction  of  the  ship  will  be  understood  by 
means  of  the  transverse  section.  The  bottom  is  made 
double,  and  between  the  two  skins  are  webs,  running 
longitudinally.  Mr.  Brunei  considered  that  the  double 
skin  would  greatly  diminish  the  chance  of  such  an 
accident  occurring  as  would  cause  any  of  the  compart- 
ments to  be  filled  with  water.  The  material  being  arranged 
in  the  direction  of  the  length  of  the  ship  is  all  capable  of 
taking  part  in  the  strains  that  are  thrown  on  the  bottom, 
as  well  as  on  the  top,  by  forces  tending  to  bend  the  ship. 
//  Mr.  Brunei  also  made  the  upper  deck  cellular^hi  order 
to  resist  the  compressive  strain  that  would  come  on  it 
when  the  ship  was  heavily  loaded  in  the  middle  of  her 
length.  Great  additional  strength  to  the  ship,  considered 
as  a  girder,  is  given  by  two  longitudinal  bulkheads,  36  feet 
apart,  extending  for  350  feet.  These  bulkheads,  with  the 
sides  of  the  ship,  form  the  vertical  web  plates  of  the 
girder.  Her  structure  resembles  the  tubes  of  the  Britannia 
bridge ;  the  cellular  top  flange  being  connected  with  the 
cellular  bottom  flange  by  plate-iron  webs. 

The  two  skins  of  the  ship,  with  the  web  plates  between 
them,  forming  the  cellular  bottom  of  the  great  girdei', 
may  also  be  considered  as  a  number  of  smaller  girders 
placed  side  by  side,  each  resisting  the  excess  of  the  pressure 
of  the  water  over  the  load  that  may  happen  to  be  resting 


.».  I860.] 


DESCRIPTION   OF  SHIP. 


397 


13  Ul   IL    (3 


398  THE  'GKEAT  EASTEEN'  STEAM-SHIP.        [a.d.  1860. 

on  it  inside  the  ship.  The  difference  of  pressure  or 
upward  strain  is  transmitted  by  the  cross  bulkheads 
{a,  h,  c)  from  the  bottom  of  the  ship  to  the  sides  and 
longitudinal  bulkheads. 

The  double  skin  extends  up  to  about  6  feet  above  the 
water  level  throughout  the  whole  length  of  the  ship,  with 
the  exception  of  the  extreme  ends. 

The  foremost  compartment  next  the  bow  has  two  cable 
decks  (e),  with  capstans  and  all  the  necessary  riding-bitts, 
stoppers,  and  other  appliances  for  working  the  cables. 
These  arrangements  answer  well,  and  the  3  -  inch 
chain  cables  are  worked  with  great  facility.  The  cap- 
stans were  originally  driven  by  a  shaft  from  the  paddle 
auxiliary  engines,  but  this  was  found  inconvenient,  and 
a  small  independent  engine  has  been  put  to  work  them. 
The  cables  are  stowed  in  chain  lockers  on  a  deck  (f) 
below  the  cable  decks,  and  below  this  (g)  are  ice-houses 
and  store-rooms.  The  next  compartment  of  the  ship  (h) 
is  intended  for  cargo.  It  is  at  present  occupied  by  the 
forward  cable  tank. 

The  main  part  of  the  ship,  350  feet  in  length,  up  to 
the  level  of  the  lower  deck,  34  feet  above  the  bottom,  is 
occupied  with  her  engines,  boilers,  and  coal  bunkers. 
The  space  above  the  lower  deck  was  occupied  with  saloons 
and  cabins  for  passengers,  except  at  the  paddle  engine 
room  (j).  The  boilers,  four  in  number,  two  in  each  boiler 
room  ( I ),  which  supply  steam  to  the  paddle  engines,  are 
placed  forward  of  the  engines ;  and  forward  of  the  boiler 
rooms  is  a  coal  bunker  (k),  20  feet  long ;  and  abaft  of  the 
paddle  engines  are  the  six  boilers,  two  in  each  boiler 
room  (m),  that  supply  steam  to  the  screw  engines  (n). 
These  three  boiler  rooms  are  separated  by  coal  bunkers 
(k),  20  feet  long.  On  either  side  of  the  boilers  and 
engines,  and  also  upon  plate  iron  arches  above  the  boilers. 


A.D.  I860.]  DESCRIPTION  OF  SHIP.  399 

are  bunkers  for  coal.  This  will  be  seen  on  the  transverse 
section  of  the  ship.  Between  the  paddle  engines  and 
boilers  is  a  water-tight  compartment,  10  feet  long  (l),  in 
which  are  placed  a  pair  of  auxiliary  engines  of  sixty  horse- 
power, which  pump  water  out  of  the  ship  and  also  work 
fire-pumps.  There  are  two  other  auxiliary  engines  of 
sixty  horse-power  in  a  compartment  (o)  aft  of  the  screw 
engines,  intended  to  keep  the  screw  propeller  turning 
round,  either  when  the  ship  is  at  anchor,  to  relieve  the 
strain  on  the  cables,  or  when,  for  any  reason,  she  is  only 
using  her  paddle  engines.  They  also  work  bilge-pumps 
and  fire-pumps.  Each  set  of  auxiliary  engines  has  two 
independent  high-pressure  boilers.  Throughout  the  bottom 
of  the  ship  there  are  two  bilge-pipes,  fitted  with  valves, 
with  branch-pipes  leading  to  the  various  compartments  of 
the  double  skin.  These  bilge-pipes  can  be  connected  with 
either  of  the  auxiliary  engines,  and  so  the  water  can  be 
pumped  out  of  any  part  of  the  ship. 

The  paddle  engines,  of  1,000  nominal  horse-power,  con- 
sist of  four  inclined  oscillating  cylinders,  14  feet  stroke 
and  6  feet  2  inches  diameter,  each  pair  of  which  work  on 
-to  a  single  crank.  There  are  means  for  disengaging  either 
paddlewheel  from  the  engines. 

The  screw  engines,  of  1,600  nominal  horse-power,  consist 
of  four  fixed  horizontal  cylinders,  4  feet  stroke  and  7  feet 
diameter,  the  two  cylinders  of  each  pair  working  opposite 
to  each  other  on  one  crank. 

In  each  boiler  room  are  two  donkey  engines  for  sup- 
plying the  boilers  with  water,  and  the  main  engines  are 
also  fitted  with  feed-pumps.  Each  of  the  donkey  engines 
is  capable  of  pumping  water  out  of  the  ship,  and  of  being 
used  in  case  of  fire. 

The  screw  shaft  passes  along  what  is  termed  a  screw 
alley  (p).     The  weight  of  the  screw  rests  on  the  bearing 


400  THE   'GREAT   EASTERN'   STEAM-SHIP.         [a.d.  1860. 

where  the  screw  shaft  passes  out  through  the  stern-post  of 
the  ship.  To  prevent  the  water  that  leaks  in  through  this 
bearing  from  penetrating  into  the  screw  alley,  there  is 
a  bulkhead  with  a  stuffing-box  round  the  screw  shaft,  a 
short  distance  forward  of  the  stern-post.  To  enable  access 
to  be  gained  to  the  bearing,  a  tube  was  provided  leading 
down  from  the  main-deck.  This  was  intended  to  be  fitted 
with  appliances  for  pumping  air  in  so  as  to  drive  the 
water  out,  and  to  admit  men  to  get  at  the  bearing  under 
air  pressure. 

Another  arrangement  was  also  provided  for  the  same 
purpose.  On  the  after  side  of  the  stern-post  was  placed 
a  ring  of  india-rubber ;  and,  by  pulling  in  the  screw-shaft, 
the  screw  was  pressed  tightly  against  the  india-rubber 
ring,  which  prevented  the  water  from  entering.  By 
means  of  this  arrangement  the  stern-bearing  was  ex- 
amined and  repaired  at  Southampton. 

The  screw  propeller  has  four  blades,  and  is  24  feet  in 
diameter  and  44  feet  pitch.  The  paddlewheels  were 
66  feet  in  diameter,  with  30  floats,  each  13  feet  broad  and 
3  feet  deep. 

Over  the  boiler  rooms  run  two  tunnels ;  one  of  them 
(v)  serves  as  a  passage  to  enable  the  engineers  to  pass 
from  one  compartment  to  another  throughout  the  part 
of  the  ship  occupied  by  the  boilers  and  engines.  The 
openings  leading  from  the  tunnel  to  the  engine  or  boiler 
rooms  are  provided  with  watertight  doors,  which  can  be 
shut  in  the  event  of  any  of  the  compartments  getting  full 
of  water.  The  other  tunnel  (w)  serves  as  a  passage  for 
the  steampipe,  which  leads  from  the  boilers  to  the  engines. 
Though  the  boilers  are  divided  into  two  sets,  one  for  the 
paddle  engines  and  one  for  the  screw,  the  steampipes  are 
connected,  so  that  the  whole  of  the  ten  boilers,  or  any  of 
them,  may  be  used  to  supply  steam  for  either  of  the 
engines. 


A.D.  I860.]  PESCKIPTION  OF  SHIP.  401 

In  one  point  a  deviation  was  made  from  Mr.  Brunei's 
ai'rangements.  It  was  his  intention  that  there  should  be 
no  apertures  in  the  water-tight  bulkheads  except  at  the 
tunnel  (v),  from  which  the  various  boiler  and  engine  rooms 
were  to  be  entered  by  openings,  to  be  closed  by  water-tight 
doors.  The  tunnel  was  placed  high  up,  so  that  in  the  event 
of  a  leak  there  might  be  ample  time  to  close  the  door.  The 
inconvenience  of  ascending  and  descending  by  ladders  was, 
however,  considered  an  evil;  and  it  was  found  necessary 
at  times  to  carry  coals  from  one  compartment  to  another. 
For  these  reasons,  upon  the  requirement  of  the  Board  of 
Trade,  doorways,  fitted  with  sliding  doors,  which  can  be 
closed  by  handles  on  the  upper  deck,  have  been  cut  in  the 
bulkheads  between  the  boiler  rooms.  This  arrangement 
exists  in  other  ships ;  and  in  the  '  Great  Eastern,'  even 
without  closing  these  doors,  there  are  eight  watertight 
compartments. 

At  the  stern  of  the  ship  (y)  on  the  main-deck  are  ar- 
rangements for  working  cables,  similar  to  those  at  the 
bow. 

These  appliances  are  required  when  the  ship  has  to  be 
moored  so  as  not  to  swing  with  the  tide  ;  and  they  would 
allow  of  the  ship's  riding  by  the  stern  instead  of  by  the 
bow,  which  it  might  often  be  useful  for  her  to  do  in 
narrow  waters.  On  the  lower  deck  {\'),  at  the  stem  of 
the  ship,  is  a  spare  tiller  and  wheel  for  working  the 
rudder,  in  case  anything  goes  wrong  with  the  main  tiller, 
which  is  on  the  upper  deck.  The  weight  of  the  rudder 
is  carried  on  the  lower  deck  by  a  grooved  collar,  resting 
on  a  ring  of  cannon  balls. 

The  compartment  (x)  immediately  aft  of  the  screw 
engine  room  is  for  cargo. 

The  saloons  and  cabins  are  all  in  the  middle  of  the 
length  of  the   ship,  where  there  is   least  motion.      The 

D  D 


,   402  THE  '  GREAT  EASTEEN '  STEAM-SHIP.        [a.d.  1860. 

M 

:|  usual  plan  of  putting  tlie  first-class  passengers  at  the 
stern  was  not  adopted,  and  they  were  placed  forward. 
As  the  smoke  generally  drifts  towards  the  stern  of  a 
ship,  the  first-class  passengers  in  the  '  Great  Eastern ' 
are  not  annoyed  by  the  smoke,  or  by  the  dust  and  smell 
from  the  boiler  and  engine  rooms. 

The  transverse  section  shows  the  arrangement  of  the 
cabins. 

Mr.  Brunei  intended  that  the  upper  saloons  (t)  should 
be  used  as  sitting-rooms,  and  the  lower  saloons  (s  and  u) 
as  dining-rooms.  These  were  to  be  lit  and  ventilated  by 
jiM^'  I  shafts  on  either  side  of  the  upper  saloons,  rising  up  to 
the  skylights  on  deck.  The  smell  of  dinner  was  thus  to  be 
kept  away  from  the  sitting-rooms.  The  cabins  (z)  on  either 
side  were  to  be  approached  from  the  saloons  by  passages 
and  steps,  as  shown  on  the  section.  The  saloon  marked 
(q)  is  the  first-class,  and  (r)  the  ladies'  saloon. 

The  ship  is  rigged  with  six  masts.  The  arrangements 
of  the  masts  and  rigging  were  especially  intended  for  the 
Eastern  voyages.  At  the  extreme  bow  and  stern  are  low 
masts,  which  carry  trysails  and  staysails.  The  sails  on 
these  masts  were  chiefly  intended  for  manoeuvring  the 
ship.  She  also  has  three  large  masts,  the  lower  masts 
being  of  iron.  The  two  foremost  of  these  are  square- 
rigged,  and  all  three  of  them  have  trysails  and  staysails. 
The  aftermost  of  the  three  was  also  made  strong  enough 
to  be  fitted  with  square  yards,  in  the  event  of  its  being 
desirable  to  rig  it  in  that  manner.  Aft  of  the  three  prin- 
cipal masts  is  a  large  mast,  only  intended  to  be  rigged 
with  fore-and-aft  canvas.  The  ship  has  no  bowsprit,  the 
stay  of  the  foremost  mast  being  attached  to  the  stem 
inside  the  bulwarks. 

In  the  beginning  of  June  1860,  the  ship  made  a  trip 


A.D.  I860.]  FIRST  VOYAGES  TO  NEW  YORK.  403 

from  Southampton  down  the  Channel,  as  far  as  the  Start 
Lighthouse  and  back,  to  try  her  engines  ;  and  on  June  17 
she  sailed  for  New  York,  under  the  command  of  Captain 
Vine  Hall,  who  had  succeeded  Captain  Harrison.  She 
arrived  there,  after  a  prosperous  voyage,  on  June  28,  and 
was  received  with  great  enthusiasm.  The  ship  left  New 
York  on  August  16,  and,  having  called  at  Halifax,  arrived 
at  Milford  Haven  on  August  26. 

In  the  course  of  these  two  voyages  the  stern-bearing 
of  the  screw-shaft,  which  was  in  white  metal,  had  worn 
down  between  two  and  three  inches.  With  the  view  of 
allowing  for  any  depression  of  the  stern -bearing,  the 
lengths  of  the  screw-shaft  were  not  rigidly  connected 
throughout,  but  the  end  length,  attached  to  the  screw, 
was  coupled  to  the  remainder  of  the  shaft  by  a  universal 
joint,  consisting  of  two  double  cranks.  Thus  the  two 
shafts  might  be,  to  a  considerable  extent,  out  of  line,  and 
yet  revolve  efficiently. 

When  the  ship  returned  to  Milford  Haven,  a  gridiron 
was  prepared  on  the  beach,  and  she  was  grounded  on  it ; 
I  and  the  screw-shaft  was  drawn  in.  By  this  time  it  had 
'  become  the  general  opinion  that  a  shaft  cased  with 
brass,  and  running  in  lignum-vitse  bearings,  was  the  best. 
A  lathe  and  machinery  for  making  the  shaft  revolve  were 
provided,  and  fixed  in  the  stern  of  the  ship ;  the  shaft  was 
turned,  and  brass  collars  shrunk  on.  The  bearing  was 
made  with  lignum  vitae,  and  the  brass-covered  shaft  re- 
placed in  it.  It  has  since  worked  well,  and  has  shown  no 
signs  of  wear. 

The  ship,  commanded  by  Captain  William  Thompson, 
left  Milford  Haven  for  New  York  on  May  1,  1861,  and 
returned  to  Liverpool  from  New  York  on  June  4,  having 
made  an  average  speed  of  13|  knots  on  the  outward 
and  14  knots  on  the  homew^ard  voyage. 

D   D   2 


404  THE   •  GREAT  EASTERN '  STEAM-SHIP.        [a.d.  1861. 

At  this  time  the  Government  determined  to  send  her 
out  with  troops  to  Quebec,  and  she  was  fitted  up  for 
that  purpose.  She  took  upwards  of  2,500  troops,  and 
about  40  passengers.  There  were,  altogether,  about  3,000 
persons  on  board,  and  200  artillery  horses.  Scarcely  any 
of  the  troops  were  placed  in  the  regular  passenger  part 
of  the  ship,  as  they  were  accommodated  in  the  cargo 
departments  (h,  x).  Thus  a  much  greater  number  of  men 
might  have  been  carried  in  her  with  perfect  comfort. 
She  was  commanded  on  this  voyage  by  Captain  James 
Kennedy,  of  the  Inman  service.  She  left  Liverpool  on 
June  27,  and  arrived  at  Quebec  on  July  7.  She  returned 
to  Liverpool  with  about  500  passengers  in  August. 

By  this  time  her  superiority  had  become  recognised  by 
the  regular  travellers  between  England  and  America.  Those 
who  had  been  in  her  found  that,  while  they  passed  other 
ships  rolling  and  pitching  in  the  sea,  the  deck  of  the  'Great 
*  Eastern '  was  so  steady  that  it  was  difficult  to  believe  that 
there  was  a  gale  blowing ;  ^  and  when,  after  a  continuance 
of  heavy  weather,  she  began  to  roll,  the  motion  was  so 
slow  and  easy  as  to  be  comparatively  unimportant. 

When  she  left  Liverpool  again,  there  were  a  consider- 
able number  of  passengers,  and  it  seemed  as  if  her  success 
was  ensured.     She  started  under  the  command  of  Captain 
;    James  Walker,  on  September  10,  and  three  days  afterwards 
y'    \  encountered  a  severe  Atlantic  gale. 

The  ship  was  behaving  well,  when  one  of  the  boats, 
which  hung  on  davits  outside  the  ship  forward  of  the 

'  During  the  last-mentioned  voyage,  having  got  more  swell  on,  the  ship 

returning  from  Quebec,  a  north-east-  began   to   roll    slowly  and  sedately, 

erly  wind  blew  with  a  velocity  of  from  the  rolls  gradually  increasing  up  to 

30  to   40   miles   an  hour.     For   the  about  9  degrees  on  either  side  of  the 

first  24  hours  the  ship  paid  no  atten-  perpendicular,  and  dying  out   again  , 

tion  to  the   sea ;  the  next  day,   the  and  then  recommencing, 
wind  remaining  the  same,  but  the  sea 


A.D.  1861.]         VOYAGE  TO   QUEBEC  WITH  TROOPS.  405 

paddlewlieels,  got  adrift  on  the  weather  side.  Fears  were 
entertained  that  it  might  foul  the  paddlewheel,  and  the 
captain  determined  to  cut  it  away.  The  direction  of  the 
ship  was  altered,  in  order  that  the  boat  might  float  clear. 
The  ship  then  resumed  her  course  ;  but  shortly  afterwards 
fell  off,  with  her  broadside  to  the  sea. 

Relieving  tackles  having  been  put  to  assist  the  men  at 
the  wheel,  the  tiller  was  kept  hard  over,  to  bring  the 
ship's  head  to  the  wind;  but  with  no  effect.  Towards 
evening,  as  the  seas  beat  heavily  against  her  side,  first 
one  paddlewheel  and  then  the  other  was  destroyed,  being 
completely  torn  away  from  the  central  bosses.  During  the 
night  she  lay  in  a  helpless  condition.  The  gale  had  been 
of  some  duration,  and  the  waves  being  large  and  long,  the 
ship  was  placed  in  a  very  unfavourable  position  to  receive 
them  ;  and  she  rolled  considerably. 

The  next  morning,  when  an  officer  went  to  examine 
the  auxiliary  tiller  on  the  lower  deck,  he  discovered  that 
the  rudder-head  was  twisted  short  off,  just  above  the 
point  where  it  entered  the  ship.  The  rudder  was  still  in 
its  place.  The  accident  had  most  likely  happened  on 
the  previous  evening,  when  the  ship  fell  off  her  course. 
It  had  not  been  noticed  by  the  men  at  the  helm,  perhaps 
because  there  were  so  many  of  them  at  the  wheel  and 
relieving-tackles  that  they  held  one  against  the  other ; 
and  the  broken  parts  of  the  rudder-head,  grinding  together, 
threw  jerks  on  to  the  tiller.  The  fracture  of  the  rudder- 
head  was  caused  by  the  badness  of  the  workmanship  in 
the  interior  of  the  forging. 

Attempts  were  made  to  get  sail  on  the  ship,  but  with- 
out much  success ;  and  with  the  hope  of  bringing  her  head 
to  wind,  the  screw  engines  were  reversed. 

As  soon  as  the  ship  was  driven  astern  by  the  screw,  the 
rudder,  being  uncontrolled,  was  forced  round  by  the  rush 


406  THE   '  GREAT  EASTERN '   STEAM-SHIP.        [a.d.  1861. 

of  water,  and  it  knocked  away  the  after  stem-post.'  No 
other  harm  was  done,  as  the  rudder  is  secured  by  a  pin 
into  the  heel  of  the  ship,  and  by  a  collar  round  the  rudder- 
head,  attached  to  the  hull  above  water. 

Steps  were  then  taken  to  get  command  over  the  rudder. 
Chains  were  wrapped  round  the  stump  of  the  rudder-head 
inside  the  ship,  and  a  certain  amount  of  control  was  thus 
obtained.  A  more  effective  plan  was  at  the  same  time 
carried  into  execution.  A  man  was  lowered  by  a  rope 
from  the  stern  of  the  ship,  who  hove  a  piece  of  wood, 
with  a  line  attached  to  it,  through  the  screw-opening. 
The  wood  with  the  end  of  the  line  was  caught  with  a 
boat-hook ;  and  a  rope,  and  afterwards  a  hawser,  and  then 
a  piece  of  the  ship's  chain  cable  were  passed  through 
behind  the  rudder.  The  two  ends  of  the  chain  cable  were 
brought  together  at  the  stern  of  the  ship,  and  a  large 
shackle  put  round  both  parts  of  the  chain,  and  shaken 
down  till  it  held  them  together.  In  the  edge  of  the  rudder- 
blade  a  notch  had  been  made  by  the  rudder  striking 
against  the  screw,  and  into  this  notch  the  shackle  was 
made  to  drop.  In  this  way  two  chains  or  pennants  had 
been  attached  to  the  back  of  the  rudder.  One  of  these 
was  brought  to  each  side  of  the  ship,  and  they  were  hauled 
on  by  means  of  the  stern  capstan. 

The  ship  then  turned  homeward,  and  the  weather  having 
moderated,  she  arrived  off  Cork  harbour  on  the  afternoon 
of  September  17.  By  this  time  the  chains  round  the 
rudder  had  shifted,  and  were  of  little  service;  and 
before  night  it  began  to  blow  heavily  towards  the 
shore.  It  was  dangerous  for  the  ship  to  remain  on  a  lee 
shore ;  and,  although  the  steering-gear  was  out  of  order, 

'  Between  the  screw  and  the  rudder       except  to  steady  the  heel  of  the  ship, 
was  what  was  termed  the  after  stern-      into  which  the  rudder  was  stepped, 
post,  which  had  no  duty  to  perform 


A.u.  1861.]         LOSS  OF  KUDDER-HEAD  AND  PADDLES.  407 

the  captain  wisely  determined  to  take  advantage  of  the 
ship's  head  pointing  in  the  right  direction,  and  steamed 
out  to  sea. 

Three  days  afterwards  the  ship,  assisted  by  several  small 
steamers,  was  got  safely  into  Cork  harbour,  a  temporary 
tiller  was  attached  to  the  stump  of  the  rudder-head,  and 
she  proceeded  to  Milford  Haven,  where  she  was  placed  on 
the  gridiron,  and  her  after  stern-post  and  paddlewheels 
replaced.  The  accident  had  proved  that  the  original 
paddlewheels  might  with  advantage  have  been  made 
stronger,  and  in  the  new  wheels  the  bracing  was  increased. 

The  ship,  under  the  command  of  Captain  Walter  Paton, 
left  Milford  Haven  for  New  York  on  May  7,  1862,  and 
returned  to  Liverpool  on  June  11.  She  left  again  on 
July  1,  and  returned  on  August  6.  Besides  the  number  of 
passengers  the  ship  accommodated,  she  carried  a  con- 
siderable amount  of  cargo  ;  she  brought  over  large 
quantities  of  grain  and  provisions.  The  custom  of 
carrying  this  class  of  freight  in  steam-ships  received  a 
great  impulse  from  the  success  of  the  *  Great  Eastern '  in 
the  traffic.  As  it  was  found  that  the  shallowness  of  the 
bar  at  Sandy  Hook  prevented  her  taking  full  advantage 
of  her  carrying  power,  she  had  on  this  voyage  followed 
the  route  along  Long  Island  Sound,  so  as  to  arrive  close  to 
New  York  in  deep  water,  and  on  her  return  voyage  she 
brought  as  much  as  5,300  tons  of  cargo  in  bulk,  which 
with  4,350  tons  of  coal  gave  her  a  mean  draught  of  28 
feet. 

She  left  Liverpool  on  August  17,  and  arrived  off  Montauk 
Point,  at  the  entrance  to  Long  Island  Sound,  at  about  two 
in  the  morning  of  the  27th,  to  take  in  the  pilot.  While 
stopping,  a  loud  rumbling  noise  was  heard,  and  presently 
the  ship  heeled  slightly  over  to  one  side.    The  pilot,  when 


'^r    -' ■ 

408  THE   'GREAT   EASTERN'   STEAM-SHIP.         [a.d.  18C2. 

he  came  on  board,  said  tliat  tlie  ship  had  passed  over  a 

reef  of  sunken  rocks,  which  was  not  marked  on  the  charts. 

It  was  at  the  same  time  found  that  many  of  the  spaces 

,  between  the  double  skins  were  full  of  water.     The  ship 

i  went  on  to  New  York,  and  most  of  the  passengers  landed 

in  ignorance  of  an  accident  which   in  any  other   vessel 

would  have  been  fatal. 

Steps  were  at  once  taken  to  examine  the  damage,  and 
the  divers  reported  a  large  fracture  in  the  outer  skin  80 
feet  long  and  about  10  feet  broad.  They  also  discovered 
afterwards  several  smaller  fractures.  It  was  considered 
that  this  damage  might  be  mended  while  the  vessel  was 
afloat,  and  a  very  skilful  arrangement,  contrived  by  Messrs. 
Eenwick,  of  New  York,  was  adopted.  A  large  wooden 
barge  was  made  with  a  gunwale  shaped  to  fit  the  ship's 
side,  and  two  wooden  passages  leading  down  into  the 
barge.  It  was  placed  so  as  to  cover  the  large  fracture, 
and  was  secured  by  chains  passed  round  the  bottom 
of  the  ship.  The  joint  between  the  gunwale  of  the 
barge  and  the  ship's  side  was  made  water-tight;  the 
water  was  pumped  out,  and  men  and  materials  passed 
down  through  the  shafts.  By  the  exertions  of  those 
engaged  in  this  difl&cult  operation,  the  great  fracture  was 
repaired,  and  the  ship  returned  to  England  in  the  be- 
ginning of  1863. 

A  gridiron  was  made  at  Birkenhead;  the  ship  was 
placed  on  it,  and  the  repairs  were  proceeded  with  under 
the  direction  of  Mr.  Brereton,  who  at  Mr.  Brunei's  death 
succeeded  him  as  engineer  to  the  Great  Ship  Company. 
On  examination,  it  was  found  that  fractures  had  been 
made  in  ten  separate  places  in  the  outer  skin. 

The  ship  started  again  in  May  1863,  and  made  three 
voyages  to  New  York  and  home.     At  this  time,  however, 


A.D.  18G3.]  ACCIDENT  OFF  MONTAUK  POINT.  409 

tliere  was  a  severe  com^e^tioiLjvith  other  vessels,  and  the 
Company  could  not  afford  to  run  the  ship  unremunera- 
tivelyfor  any  length  of  time.  In  1864  she  passed  into  the 
hands  of  a  new  company,  which  consisted  almost  entirely  of 
those  who,  from  their  belief  in  the  capabilities  of  the  ship, 
had  found  the  money  for  starting  her  again  after  each 
of  her  successive  misfortunes. 

The  ship  lay  idle  for  some  months,  and  was  then 
chartered  by  the  Telegraph  Construction  and  Maintenance 
Company. 

The  *  Great  Eastern '  had  in  the  course  of  the  four  years 
from  1860  to  1863  made  nine  voyages  across  the  Atlantic 
and  back.  Though  this  was  not  the  route  for  which  she 
had  been  intended,  it  had  given  her  many  opportunities  of 
showing  her  merits.  Adverse  fortune  had  added  to  these 
[Opportunities,  and  had  at  the  same  time  demonstrated 
^the  necessity  of  many  of  the  precautions  which  Mr.  Brunei 
lad  taken  to  ensure  her  safety. 

The  construction  of  the  hull  of  the  ship  has  been 
proved  by  experience  to  possess  the  advantages  anti- 
cipated by  Mr.  Brunei. 

Its  strength  as  a  whole  has  been  proved  by  the  absence 
of  all  signs  of  weakness  in  the  heavy  weather  she  en- 
countered on  several  occasions,  and  especially  in  the  gale 
of  1861,  when  her  rudder  was  disabled.  The  strength  of 
the  ship  has  since  been  fully  tested  by  the  enormous  loads 
she  has  carried  while  on  telegraph  cable  expeditions. 

The  importance  of  the  double  skin  was  shown  on  the 
occasion  of  her  grinding  over  the  rocks  at  Montauk 
Point,  when  so  large  a  number  of  leaks  were  made  in 
all  parts  of  her  bottom  that  no  ordinary  system  of  bulk- 
heads would  have  saved  her  from  foundering.  Moreover, 
the  space  between  the  two  skins  was  sufficient  to  allow 


410  THE   'GEEAT   EASTERN'  STEAM-SHIP.        [a.d.  18G3. 

of  the  outer  skin  and  tlie  webs  being  crusbed  to  tbe  extent 
of  three  feet,  while  they  at  the  same  time  acted  as  a 
buffer  and  prevented  the  inner  skin  from  coming  in  contact 
with  the  rock. 

The  engines  have  not  had  any  opportunity  of  working 
at  high  speed  in  the  long  voyages  for  which  they  were 
intended,  but  in  the  rapid  and  comparatively  short  pas- 
sages made  by  the  ship  across  the  Atlantic  they  worked 
with  great  regularity  and  success.  Although  they  were 
commenced  seventeen  years  ago,  they  are  still  fine  speci- 
mens of  marine  engines,  and  bear  witness  to  the  care 
taken  by  their  builders  in  their  design  and  manufacture. 

Of  the  points  on  which  Mr.  Brunei  laid  stress,  and 
which,  as  he  remarked,  '  involve  ho  other  risk  than  that 
*  of  being  useless ;  they  cannot  do  mischief,'  many  have 
now  come  to  be  considered  essential  parts  of  good  marine 
engines.  He  thought  it  of  great  importance  that  the 
steam  cylinders  sbould  be  jacketed,  especially  at  the 
ends ;  and  it  was  intended  that  the  high-pressure  steam 
for  this  purpose  should  be  taken  from  the  auxiliary  boilers. 
This  plan  was,  however,  not  adopted. 

Mr.  Brunei  was  also  anxious  that  the  steam  should  be 
heated  immediately  before  it  entered  the  cylinders,  and 
that  fresh  water  should  be  supplied  for  the  boilers  by 
using  the  same  water  over  again.  Arrangements  for 
effecting  these  objects  have  since  been  brought  into  general 
use. 

The  advantage  of  having  several  cylinders  to  each 
engine  was  shown  while  the  ship  was  running  to  America. 
Part  of  the  valve-gear  of  one  of  the  paddle-engine 
cylinders  gave  way,  the  engines  were  stopped  for  four 
hours,  and  the  ship  was  propelled  by  the  screw  alone. 
The  cylinder  was  disconnected  and  turned  back  out  of 


A.D.  1863.]  PEKFOKMANCE  OF  SHIP.  4U 

the  way,  and  the  engines  worked  efficiently  with  three 
cylinders  for  four  passages  across  the  Atlantic. 

The  average  speed  of  the  ship  on  those  voyages  in 
which  her  performances  were  fairly  tested  was  about  13^ 
knots.  On  two  occasions  she  made  the  voyage  from 
New  York  to  Liverpool  at  an  average  speed  of  14  knots  ; 
and  she  maintained  her  speed  in  rough  weather  and 
head  winds  to  a  much  greater  extent  than  is  the  case 
in  smaller  vessels. 

By  having  two  sets  of  engines,  the  ship  was  saved  from 
serious  disaster  at  Holyhead,  and  again  in  the  gale  of 
September  1861. 

The  great  handiness  of  the  ship  is  one  of  the  many 
beneficial  results  of  the  use  of  both  paddles  and  screw. 
By  working  the  paddlewheels  astern  and  the  screw 
ahead,  she  can  be  kept  from  moving  forward  or  back- 
ward, and  at  the  same  time  the  stream  of  water  from 
the  screw,  acting  on  the  rudder,  makes  her  answer 
her  helm  and  turn  round  on  her  centre.  By  modifying 
the  speed  of  the  two  engines,  she  may  be  made  to  creep 
slowly  forward ;  and  as  the  rudder  is  in  the  full  rush  of 
the  water  driven  back  by  the  screw,  the  ship  has  prac- 
tically as  much  steering  power  as  she  has  when  moving 
rapidly.  The  importance  of  this  power  of  controlling  her 
when  passing  through  narrow  channels,  in  entering  and 
leaving  port,  can  scarcely  be  over-estimated. 

The  career  of  the  '  Great  Eastern '  since  the  formation 
of  the  present  Great  Eastern  Steam- Ship  Company,  has 
been  prosperous. 

In  the  commencement  of  the  year  1864,  when  Mr.  Cyrus 
Field  had  succeeded  in  reviving  the  project  of  laying 
the  Atlantic  cable,  the  Telegraph  Construction  and  Main- 
tenance Company  took   the   contract  for  laying  it,  and 


412  THE   'GREAT-EASTERN'   STEAM-SHIP.        [a.d.  1865. 

hired  the  'Great  Eastern.'  She  was  brought  round  to 
Sheerness,  where  the  cable  tanks  were  fitted  into  her. 
One  tank  was  placed  in  the  forward  cargo  compartment, 
and  another  in  the  after  cargo  compartment ;  and  the 
largest  tank  was  placed  over  the  middle  screw  boiler 
room,  the  funnel  being  removed.  Therefore,  during  the 
cable-laying  expeditions,  the  ship  only  used  eight  of  her 
boilers. 

The  history  of  the  laying  of  the  Atlantic  cable  is  well 
known.  The  '  Great  Eastern '  started  from  Yalentia  on 
June  23,  1865,  under  the  command  of  Captain  (now  Sir 
James)  Anderson,  and  the  cable  was  laid  more  than  half 
way  across  the  Atlantic ;  but,  on  hauling  in  to  recover  a 
fault,  it  was  broken,  and  dropped  to  the  bottom  of  the  sea. 

The  grappling  tackle  was  not  sufficiently  strong.  The 
cable  was  three  times  partially  raised,  and  each  time  lost ; 
and  the  expedition  returned  to  England  defeated,  but  with 
the  knowledge  that  ultimate  success  was  certain. 

The  engineers  and  scientific  men  on  board  the  '  Great 

*  Eastern '  drew  up  a  memorandum  as  to  the  results  of 
this  expedition,  and,  among  other  things,  stated — 'That 

*  the  steam-ship  "  Great  Eastern,"  from  her  size  and  con- 
'  stant  steadiness,  and  from  the  control  over  her  afforded 
'  by  the  joint  use  of  paddles  and  screw,  renders  it  safe  to 
'  lay  an  Atlantic  cable  in  any  weather.'^ 

'  Before  the  ship  was  finished,  Mr.  were  verified.  It  was  determined  that 
Brunei  had  her  stability  and  rolling  the  ship  would  make  a  single  roll 
carefully  investigated.  Calculations  from  one  side  to  the  other  in  about 
were  made  to  ascertain  the  position  six  seconds.  While  she  was  in  the 
of  her  centre  of  gravity  and  the  Thames  a  steamer  struck  the  hulk 
other  necessary  elements  for  deter-  alongside  and  gave  the  great  ship  a 
mining  her  stability  and  period  of  slight  impulse.  Mr.  Brunei,  who  was 
rolling.  on  board,  took  advantage  of  the  op- 
He  also  had  a  model  made,  with  portunity  to  observe  the  period  of 
arrangements  for  altering  the  levels  the  roll  she  made,  and  was  pleased  at 
of  weights  placed  inside.  By  this  finding  it  agree  with  the  calculated 
means  the  results  of  the  calculations  period.      It  is  to   the   investigations 


A.D.  1866.]  ATLANTIC  CABLE  EXPEDITIONS.  413 

Sufficient  additional  cable  was  made  to  lay  a  second 
one  and  to  finish  the  old  cable  when  it  should  be  re- 
covered. The  ship  started  again  on  July  13,  1866,  and 
laid  the  cable  across  the  Atlantic  without  the  slightest 
mishap.  She  then  returned,  and  after  three  weeks  of 
hard  work,  the  end  of  the  cable  which  had  been  lost  the 
year  before  was  picked  up,  and  completed  to  Newfound- 
land. 

On  her  return  to  England  there  did  not  seem  to  be 
any  immediate  employment  for  her  in  cable  laying,  and 
the  tanks  were  taken  out.  In  the  following  year 
a  company  was  formed  in  France  to  charter  the  ship, 
and  to  work  her  between  New  York  and  Brest  during 
the  French  Exhibition.  She  made  one  voyage  from 
Liverpool  to  New  York  and  back  to  Brest  and  Liverpool ; 
but  the  undertaking  was  a  commercial  failure. 

She  remained  at  Liverpool  till  October  1868,  when  it 
was  proposed  to  lay  a  cable  from  France  to  America; 
and  she  came  round  to  her  former  berth  at  Sheerness. 
Tanks  were  made  in  the  fore  and  aft  cargo  spaces,  and  a 
very  large  tank,  75  feet  in  diameter,  was  placed  amid- 
ships.    The  bulkheads  were  cut  partially  away  to  make 


initiated  at  that  time  by  Mr.  Brunei  method  of  noting  down  the  swings  of 

that  are  due  the  great  steps  since  made  a  pendulum. 

in  the  knowledge  of  the  laws  which  \]      The  'Great  Eastern'  remains  al- 

govem  the  rolling  of  ships.     Had  Mr.  Imost    perfectly    steady    in   ordinary 

Brunei  lived  he  would  no  doubt  have  I  rough  seas.     When  the  seas  become 

taken  the  same  pains  to  record  the  ;  very  long,  so    that    their    period    is 

rolling  of  the  '  Great  Eastern  '  as  he  nearly  the  same  as  that  of  the  ship, 

had  in  the  case  of  the  '  Great  Western'  she  rolls;  though  the  number  of  degrees 

when,  in  1839,   he  sent  an  assistant  on  either  side  of  the  perpendicular  is 

to  America  and  back,  who  took  obser-  not  large.     By  stowing  the  weights  of 

vations  of  the   rolling  and  pitching  cargo  high  in  the  ship,  the  tendency 

of  that    vessel   in    several   voyages.  to  roll  has  been  much  diminished,  and 

These  observations  were  made  by  a  when  engaged  in  cable  laying,  with 

simple   angle-measuring    instrument,  the   enormous    weights  in  the    cable 

adjusted  by  the  visible  level  line  of  tanks  all  placed  above  the  lower  deck, 

the  horizon,  and  not  by  the  fallacious  she  is  remarkably  steady. 


414  THE   '  GREAT  EASTERN  '  STEAM-SHIP.       [a.d.  1868. 

room  for  it,  the  ship  being  strengthened  above  and  below. 
She  started  on  this  expedition  from  Brest  under  the  com- 
mand of  Captain  Robert  Halpin,  and  encountered  very 
heavy  weather.     The  cable  was  laid  successfully. 

The  ship  then  returned  to  England,  and  was  fitted  out 
for  the  greatest  adventure  she  has  yet  undertaken.  She 
was  to  proceed  with  a  full  cargo  of  cable  round  the  Cape 
of  Good  Hope  to  Bombay,  to  lay  it  thence  to  Aden,  and 
from  Aden  a  portion  of  the  way  up  the  Red  Sea.  With 
her  cable  and  coals,  on  leaving  England,  she  drew  34  feet 
6  inches,  with  the  enormous  displacement  of  32,724  tons. 
She  laid  the  cable  with  perfect  success,  and  returned  to 
England. 

Throughout  all  these  cable-laying  expeditions,  and  espe- 
cially in  the  work  of  picking  up  the  Atlantic  cable  of  1865, 
the  good  qualities  of  the  ship  have  been  fully  exhibited. 

The  later  voyages  of  the  '  Great  Eastern '  were  under- 
taken for  the  accomplishment  of  a  work  in  which  Mr. 
Brunei  had  felt  a  great  interest. 

In  1856,  Mr.  Cyrus  Field  came  over  to  this  country  in 
order  to  consult  English  engineers  and  scientific  men  upon 
his  project  of  an  Atlantic  cable.  It  is  stated  in  a  work 
written  by  Dr.  Eield,^  that — 

From  the  beginning  Mr.  Brunei  showed  the  warmest  interest  in 
the  undertaking,  and  made  many  suggestions  in  regard  to  the  form 
of  the  cable  and  the  manner  in  which  it  should  be  laid.  He  was 
then  building  the  *  Great  Eastern,'  and  one  day  he  took  Mr.  Field 
down  to  Blackwall  to  see  it,  and  said,  '  There  is  the  ship  to  lay 
*  the  Atlantic  cable.' 

It  appears,  however,  from  drawings  in  Mr.  Brunei's 
sketch-books   that  at  this   time,  and  again  in  1858,  he 

'  History  of  the  Atlantic  Telegraph :  New  York,  1 866. 


A.D.  1870.]  INDIAN  CABLE  EXPEDITION.  415 

thought  that  it  would  be  better  to  have  a  vessel  specially 
built  for  the  work. 

He  was  throughout  sanguine  as  to  the  ultimate  success 
of  the  undertaking,  as  is  shown  by  the  following  extract 
from  a  letter  written  in  December  1856  : — 

I  would  suggest  a  more  moderate  expression  of  doubts  of  the  suc- 
cessful results  of  the  American  cable.  The  impossibility  of  running 
steamers  profitably  over  the  surface  of  the  same  sea  was,  though  it  is 
now  denied,  asserted  and  proved  from  established  facts  just  as  clearly 
as  the  impossibility  asserted  now  to  exist  in  respect  of  the  electric 
telegraph.  It  is  a  pity  in  these  days  to  lay  down  any  such  dogma. 
Every  day's  experience  proves  that  nine-tenths  of  them  are  refuted  ; 
that  the  circumstances  do  not  prove  to  be  such  as  are  assumed,  or 
the  difficulties  are  overcome ;  and  however  correct  the  arguments 
may  have  been,  the  result  is  not  as  predicted. 

/|     The  *  Great  Eastern '  has  not  yet  been  engaged  on  the 
/work  for  which  she  was  originally  designed  by  Mr.  Brunei ; 
but  her  employment  in  the  promotion  of  great  scientific 
I  enterprises  has  been  an  occupation  worthy  of  her  connec::_ 
1  tion  with  his  name. 


416 


THE  'GKEAT  EASTEEN '  STEAM-SHIP. 


NOTE  (p.  395). 
Dimensions  of  the  *  Great  Eastern '  Steam-ship. 


Extreme  length         .             .     -^       . 

693  feet 

Length  between  perpendiculars 

680    „ 

Breadth        .... 

83    „ 

Depth           .... 

58    „ 

Greatest  draught  of  water     . 

30    „ 

Kegistered  tonnage  .              .              .              . 

13,343  tons 

Gross  tonnage 

18,915    „ 

Displacement  at  30  feet  draught 

27,419    „ 

Dimensions  of  Paddle-Engines. 
(1,000  nominal  horse-power.) 

Number  of  cylinders 
Diameter  of  cylinders 
Length  of  stroke 
Number  of  boilers    . 


6  feet  2  inches 

14  feet 

4 


Dimensions  of  Screw-Engines. 
(1, GOO  nominal  horse-power.) 

Number  of  cylinders  .  .  .  .4 

Diameter  of  cylinders  ...  7  feet 

Length  of  stroke       .  .  .  .  4    „ 

Number  of  boilers    .  .  .  .  .6 


417 


CHAPTER  XIV. 

DOCK  AND  PIER  WORKS. 
A.D.  1831—1859.     *TATis  26—54. 

MONK-VVEARlaOUTJl     DOCKS,    1831 BRISTOI,   DOCKS,    FLOATING   HAEBOUR,    1832 

PROPOSKD     -WORKS      AT     PORTISHEAD NEW     LOCK      AT      BRISTOL,      1845 

PLYMOUTH     GREAT     WESTERN     DOCKS,     1847 — BRITON      FERRY      DOCKS,      1851 
BRENTFORD    DOCK,  1856 PIEB   AT   MILFORD   HAVEN,  186Tk 

Mr.  Brunel's  dock  and  pier  works  are  interesting,  not 
only  in  their  general  features,  but  also  in  tlie  details  of 
their  construction;  and  the  plans  he  made  for  large 
docks  at  Monkwearmouth  in  1831,  which  he  carried 
out  on  a  smaller  scale  shortly  afterwards,  were  among 
the  earliest  of  his  independent  designs* 

With  the  exception  of  the  gates  of  this  dock,  which  are 
of  timber,  all  the  dock  gates  Mr.  Brunei  constructed  are 
of  wrought  iron.  This  material  had  been  employed  in 
ship-building  before  Mr.  Brunei  adopted  it  for  the  gates  of 
the  new  lock  at  Bristol,  and  it  was  also  beginning  to  be 
extensively  used  for  bridge  girders. 

At  the  same  time  that  he  introduced  the  use  of  wrought 
iron  into  dock  gates,  he  constructed  them  with  a  large 
amount  of  buoyancy,  in  order  that  they  might  be  moved 
easily,  while  being  opened  and  shut. 

The  dock  and  pier  works  which  he  constructed  are  at 
Monkwearmouth,  Bristol,  Plymouth,  Briton  Ferry,  Brent- 
ford, and  at  Neyland,  Milford  Haven.     They  will  be  de- 

E  E 


418  DOCK  AND  PIEE  WOKKS. 

scribed  in  this  order,  which,  is  nearly  that  of  the  dates  of 
their  construction. 


3Ionhwearmouth  Docks. 

The  tovm  of  Monkwearmouth  is  situated  at  the  mouth 
of  the  river  Wear,  on  the  north  side,  and  opposite  to  the 
towns  of  Sunderland  and  Bishopwearmouth,  which  extend 
for  about  a  mile  along  the  south  side.  In  order  to  im- 
prove the  entrance  of  the  river,  and  to  diminish  the 
sand-banks  which  lay  near  its  mouth,  piers  were  proposed 
as  early  as  the  middle  of  the  last  century,  and  were  partly 
built  on  both  sides  of  the  river  before  the  year  1800. 
Trom  that  date  untU  1831,  although  the  question  of 
making  docks  had  been  considered,  and  designs  proposed 
by  different  engineers,  no  steps  had  been  taken  for  their 
construction,  and  the  only  works  executed  for  the  im- 
provement of  the  port  were  the  extension  and  alteration 
of  the  piers  already  existing.  In  1831  designs  for  docks  to 
accommodate  the  increasing  trafl&c  were  made  simulta- 
neously by  Mr.  Brunei  and  Mr.  Giles.  Mr.  Brunei's 
docks  were  to  have  been  on  the  north  side  of  the  river, 
and  to  have  had  an  area  of  25  acres,  with  quays,  ware- 
houses, &c.  Mr.  Giles's  were  to  have  been  on  the  south 
side. 

Neither  of  these  schemes  was  approved  of  by  Par- 
liament ;  but  shortly  afterwards  a  private  company  was 
formed  for  the  construction  of  a  dock  on  a  plan  designed 
by  Mr.  Brunei,  though  on  a  much  smaller  scale  than  his 
scheme  of  1831,  the  dock  being  only  about  6  acres  in 
area,  with  a  tidal  basin  of  about  an  acre  and  a  half.  The 
company  encountered  considerable  opposition  from  the 
authorities  of  the  town  of  Sunderland,  but  succeeded  in 
obtaining  a  royal  charter  for  the  construction  of  the  dock. 


MONKWEARMOUTH   DOCKS.  419 

They  subsequently  obtained  an  Act  of  Parliament  empower- 
ing them  to  make  the  entrance  from  the  dock  to  the  river. 
The  dock  was  constructed,  and  eventually  became  the 
property  of  the  iSTorth  Eastern  Railway  Company,  to  whom 
it  now  belongs ;  they  have  erected  coal  drops  along  the 
quay,  and  have  made  it  a  shipping  place  for  collieries 
connected  with  their  railway. 

The  work  was  begun  in  1834,  and  the  dock  and  tidal 
basin  occupy  part  of  the  site  chosen  by  Mr.  Brunei  for  his 
larger  scheme  of  1831. 

The  quay  wall  was  built  with  a  curved  batter,  the  chord 
line  joining  the  top  and  bottom  having  an  inclination  of 
1  in  5.  The  masonry  was  carried  up  in  courses,  and 
made  solid  by  filling  every  part  thoroughly  with  mortar. 
A  course  at  the  face  and  at  the  back  of  the  wall  was  built 
up ;  an  abundance  of  mortar  was  then  spread  in  the  heart 
of  the  wall,  and  the  stones  built  in  the  mortar.  Thus  no 
crevices  could  be  lefb  in  any  part  of  the  work,  and  the 
back  of  the  wall  was  soundly  built  throughout. 

The  entrance  to  the  dock  is  45  feet  wide,  with  side 
walls  of  the  same  profile  as  the  quay  wall.  Except  at 
the  gate  floors,  there  is  a  segmental  invert  of  dressed  stone 
of  such  curvature  that  it  is  6  feet  6  inches  lower  in  the 
middle  than  at  the  side  walls.  The  gate  floors  are  formed 
with  inverts,  curved  to  correspond  with  the  under  sides  of 
the  gates. 

The  masonry  of  the  entrance  was  executed  within  a 
four-sided  coffer-dam,  the  sides  of  which  were  slightly 
convex  outwards.  This  coffer-dam  was  constructed  in  the 
usual  way,  there  being  two  rows  of  close  piling  with 
puddle  between  them ;  and  it  was  strengthened  by  internal 
horizontal  shores  which  connected  the  opposite  sides,  and 
by  diagonal  bracing.  The  piles  were  driven  until  they 
met  with  so  much  resistance  as  to  render  it  unsafe  to 

E   E   2 


420  DOCK  AND  PIER  WORKS. 

drive  them  farther.  When  the  ground  inside  the  coffer- 
dam was  excavated,  it  was  found  that  the  piles  had  been 
driven  into  sand  and  gravel,  and  that,  to  enable  the 
masonry  to  be  built  on  a  good  foundation,  it  would  be 
necessary  to  excavate  about  7  or  8  feet  below  the  piles. 
They  were  therefore  driven  down  gradually,  as  the  ground 
was  removed  from  the  inside,  until  the  requisite  depth 
was  obtained.  The  whole  coffer-dam  was  thus  an  im- 
mense caisson,  the  sides  of  which  were  lowered  by  gradual 
driving,  instead  of  being  simultaneously  forced  down  by 
weights. 

The  masonry  of  the  walls  of  the  tidal  basin  is  similar 
to  that  of  the  walls  of  the  dock ;  some  parts  of  the  foun- 
dation were  laid  by  means  of  a  diving-bell. 

In  the  entrance  between  the  dock  and  the  tidal  basin 
there  is  a  pair  of  gates  pointing  inwards,  which  serves  to 
retain  the  water  in  the  dock  during  the  fall  of  the  tide, 
and  there  is  also  a  pair  of  storm  gates  pointing  outwards, 
which  protects  the  inner  pair  from  the  force  of  the  waves. 

The  construction  of  both  pairs  of  gates  is  similar. 

The  two  leaves  of  each  pair  meet  at  an  angle  of  125°. 
Each  leaf  is  about  30  feet  long ;  the  bottom  beams  are 
curved  to  the  form  of  the  segment  of  a  circle ;  the  height 
at  the  meeting-post  is  27  feet,  and  at  the  heel  post 
22  feet  (see  woodcut,  fig.  17).  This  arrangement  is,  to  a 
greater  or  less  extent,  followed  in  the  dock  gates  Mr.  Brunei 
afterwards  constructed.  By  raising  the  pivot,  the  gate 
floor  can  be  made  of  ample  strength,  and  the  cills  and 
heel-posts  are  free  from  mud  and  deposit.  The  gates  are 
constructed  of  horizontal  beams  of  yellow  pine  timber, 
21  inches  thick,  placed  close  together  for  a  height  of  12 
feet  above  the  bottom.  Above  this  there  are  beams  of 
timber  and  of  cast  iron  at  intervals.  The  whole  is  planked 
over  on  the  inner  side  with  4-inch  planking.     The  heel- 


MONKWEAKMOUTH  DOCK  GATES. 


421 


post  and  meeting-post  are  socketed  into  cast-iron  up- 
rights, which  also  receive  the  ends  of  the  horizontal  beams. 
To  preserve  the  gate  from  any  change  of  form,  a  diagonal 
iron  tie-bar  extends  from  the  top  of  the  heel-post  to  the 
timber  beams  forming  the  lov^rer  part  of  the  gate. 


Fig.  17.    Monkweannoutlj  Dock  Gatos, 
Elevation. 


'""^""? 


Scale  of  feet. 


Nearly  under  each  meeting-post  is  placed  a  bevelled 
cast-iron  wheel,  18  inches  in  diameter,  which  supports  part 
of  the  weight  of  the  gate. 

There  are  four  sluices  in  each  leaf,  placed  in  pairs,  with  a 
small  interval  between  them.  Each  pair  of  sluices  counter- 
balances the  weight  of  the  other  pair  by  being  attached 
to  opposite  ends  of  a  lever  at  the  top  of  the  gate. 
A  screw  works  in  the  segment  of  a  large  worm-wheel 
formed  on  the  end  of  the  lever,  and,  being  turned  round, 
opens  and  shuts  the  sluices.  After  the  timber  work 
of  the  gate  had  been  fitted  together,  it  was  taken  to 
pieces,  and  subjected  to  the  preserving  process  called 
Kyanising,  which  consists  in  immersing  the  wood  in  a 
solution  of  corrosive  sublimate.  This  process  has  been 
so  successful,  that  when  the  gates   were  recently  taken 


422  DOCK  AND  PIEE  WOEKS. 

out  for  examination  the  timber  was  found  to  be  nearly 
perfect,  only  slight  surface  repairs  being  required  in  one 
or  two  places. 

The  great  bulk  of  light  wood  at  the  bottom  of  these 
gates  gives  them  a  certain  amount  of  flotation  at  all 
times  of  tide.  After  the  gates  had  been  in  use  many 
years  it  was  found  that  one  of  the  wheels  had  been  detached 
for  some  time,  but  the  buoyancy  of  the  gate  had  prevented 
any  mischief  resulting.  The  buoyancy  of  the  lower  part 
of  the  gate  is  somewhat  analogous  to  that  of  the  air- 
chamber  which  Mr.  Brunei  introduced  afterwards  in  his 
wrought-iron  dock  gates. 


Bristol  Bocks. 

About  the  year  1804  that  portion  of  the  river  Avon 
which  flows  in  a  serpentine  course  through  the  city  of 
Bristol  was  enclosed,  and  the  water  in  it  retained  at  a  con- 
stant level,  a  new  cut  or  shorter  channel  being  made  for 
the  river.  The  portion  separated,  called  the  Floating 
Harbour,  or  Float,  is  about  two  miles  long  and  100 
yards  broad.  At  its  lower  end  it  is  connected  with  the 
river  by  the  Cumberland  Basin,  a  half-tide  basin,  with  two 
locks,  and  at  its  upper  end  by  a  feeder,  which  brings  the 
water  of  the  Avon  into  it,  the  river  in  dry  weather  being 
stopped  from  passing  into  the  new  cut  by  the  Neetham 
Dam,  About  half-way  up,  the  Float  is  entered  on  the 
north  side  by  the  river  Frome ;  and,  a  little  above  this 
junction,  it  is  crossed  by  the  Prince's  Street  drawbridge, 
which  divides  it  into  two  parts.  About  170  feet  above 
the  bridge  the  Float  is  connected  with  the  new  cut  by 
another  basin  with  a  lock,  called  Bathurst  Basin. 

Mud  and  other  deposits  had  accumulated  to  such  an 


WOEKS  AT   BEISTOL  FLOATING  HAEBOUE.  423 

extent  in  the  Floating  Harbour,  that  at  the  end  of  the 
year  1832  the  directors  of  the  Dock  Company  employed 
Mr.  Brunei  to  suggest  remedial  measures. 

In  order  to  effect  his  object  at  the  least  possible  cost,  he 
proposed  certain  works,  together  with  an  improved  system 
of  managing  the  water  of  the  river,  so  as  to  allow  more  of 
it  to  pass  through  the  Floating  Harbour,  by  means  of 
which  great  benefit  might  fairly  be  anticipated.'  He 
remarked  that, — 

By  systematically  following  this  course,  the  object  of  which  is 
simply  to  keep  in  continual  action  all  the  means,  however  small, 
which  can  at  the  moment  be  brought  to  bear,  and  thus  day  by  day 
to  remove  or  neutralise,  or  merely  diminish  (as  the  case  may  be),  the 
continual  deposit  which  is  going  on — in  fact,  by  applying  a  con- 
stantly acting  remedy  to  oppose  a  constantly  acting  evil — I  have  little 
doubt  that  the  formation  of  shoals  similar  to  the  existing  ones  may 
be  entirely  prevented,  or  at  all  events  that  they  will  be  of  such  a 
nature  as  to  be  easily  removed  by  two  or  three  yearly  scourings,  and 

'  It  may  be   desirable  to   give  a  steam-engine  which  worked   a  large 

shortexplanation  of  these  works,  which  windlass   with   three    compartments, 

consisted   principally   of  a   sluice,  a  round  two  of  which  chains  were  passed 

trunk,  and  a  drag-boat.  and  fixed  to  posts  on  the  quays,  and 

The  Sluice  was  made  in  the  abut-  the  boat  was  dragged  backwards  and 

ment  of  Prince's  Street  Bridge,  and  forwards.      The    third    compartment 

was  intended  to  create  a  scour  after  of  the  windlass  worked  a  chain  which 

the  water  had  been  let  off  from  either  elevated    or     depressed    a     scraper, 

side  of  the  float,  the  opening  at  the  attached  to  a  long  pole  at  the  stern, 

bridge  being  closed  by  a  caisson  which  and   secured    from     swerving    by    a 

had  long  been  in  use  when  (as  was  chain-bridle  which  passed  under  the 

formerly  the    case)   the    upper  part  boat.      The   scraper   stirred    up    the 

of   the   float    was    scoured    through  mud,  and  deposited   the   more  solid 

Bathurst  Basin.  parts  at  the  entrance  of  the  trunk. 

The  Trunk,  near  the  entrance  from  Mr.  Brunei  also   desired  that  the 

Cumberland  Basin,  is  a  wooden  cul-  float  boards   of   the   Neetham   Dam 

vert  between   the    floating    harbour  should  be  put   into   proper  working 

and  the  river.     As  much  of  the  mud  order  ;  and  that  they  should  be  altered 

as  could  be  dragged  there  was  de-  so  that,  in  times  of  land  floods,  the 

posited  at  the  entrance  of  the  trunk,  whole  or  a  considerable  portion  of  the 

and,  when  the  tide  was  low  in  the  excess  of  water  should  be  retained, 

new  channel  of  the  Avon,  sluices  were  and  passed  through  the  feeder ;  and 

opened,  and  the  m  ater  rushed  through  that  even  the  water  of  spring  tides 

from   the  floating   harbour,  carrying  should  be  allowed  to  pass  the  dam, 

the  mud  with  it.  and  then  be  stopped  back  for  the  same 

The  Drag-Boat  was  fitted  with  a  purpose. 


424  DOCK  AND  PIER  WOEKS. 

•without  that  time  and  labour  which  are  now  expended  with  so  little 
effect. 

It  should  be  observed  that  the  yearly  scourings,  which 
became  so  objectionable  to  the  trade,  were  not  introduced 
by  Mr.  Brunei,  but  were  part  of  the  original  arrangements 
of  the  docks. 

After  the  reception  of  Mr.  Brunei's  report,  the  Dock 
Compan^  executed  the  works  which  he  required,  namely, 
the  Sluice,  Trunk,  and  Drag-Boat;  but  his  other  recom- 
mendations, as  to  scouring  and  increased  supply  of  water, 
were  only  acted  upon  to  a  limited  extent. 

In  1842  the  Directors  again  asked  Mr.  Brunei  to  report, 
in  conjunction  with  Captain  Claxton,  upon  '  what  further 

*  measures  are  requisite  for  keeping  the  Floating  Harbour 

*  more  clear  of  mud  than  it  has  been  for  a  few  years.' 

Mr.  Brunei  thereupon  made  a  report  to  the  Directors. 
After  having  referred  to  his  previous  reports  of  1833 
and  1834,  he  remarked  that  *  the  efficiency  of  the  whole 

*  system  then  recommended  and  adopted,  and  subsequently 
'  partially  carried  out,  depended  entirely  and  was  founded 

*  on  the  supposition  of  the  then  existing  mud-banks  and 
<  shoals  being  first  removed,  and  the  Float  deepened  at 

*  once  to  the  full  extent  required,'  according  to  the  plans 
which  he  had  pointed  out ;  and  that  *  the  increasing  the 
^  supply  of  water  through  the  Float  was  one  of  those  means 

*  on  which  he  had  most  insisted '  as  necessary  for  keeping 
it  clean  and  preventing  its  becoming  a  settling  reservoir. 
He  then  continued, — 

The  sluice  at  Prince's  Street  Bridge,  the  trunk — or  syphon,  as  it 
was  originally,  and  perhaps  more  correctly,  called — at  the  underfalls, 
and  the  drag-boat  have  alone  been  brought  into  operation.  These 
were  originally  intended  as  mere  aids,  which,  in  conjunction  with  the 
increased  supiily  of  water,  were  expected,  after  the  complete  deepen- 
ing of  the  Float,  to  be  sufficientj  with  two  or  three  yearhj  scourings,  to 


WORKS  AT   BRISTOL  FLOATING  HARBOUR.  425 

keep  it  to  the  required  depth  :  these  were  (perhaps  tinfortunately) 
found  so  effective  as  to  induce  a  hope  that  they  might  be  depended 
upon  solely  for  the  removal  of  the  evil.  The  permanent  interests  of 
the  port  were,  I  cannot  but  think,  sacrificed  to  temporary  convenience  : 
the  scourings  which  were  required  as  a  preliminary  step  to  restore 
the  Float  to  its  original  state,  or  to  that  which  was  said  to  have  been 
its  former  state,  and  which  is  now  required,  were  indefinitely 
postponed. 

A  material  improvement  being  notwithstanding  soon  perceptible 
from  the  first  effects  of  the  drag-boat  and  the  removal  of  mud  through 
the  trunk,  the  periodical  scourings  which  formed  part  of  the  system 
approved  of  for  adoption  were  in  a  great  measure  given  up  to  the 
objections  of  tlie  traders.  The  precautions  actually  necessary  against 
admitting  into  the  Float  the  tide  water  of  the  Avon,  heavily  charged 
with  mud,  were  gradually  sacrificed  for  the  same  reasons.  From  all 
these  and  many  other,  but  very  similar,  circumstances  no  further 
progress  has  been  made  since  the  first  improvement,  which  was  felt 
to  be,  and  which  unquestionably  was  at  the  time,  very  considerable. 
For  until  this  period  it  had  been  the  general  practice  to  lighten  all 
deeply  laden  vessels  at  the  entrance  of  the  Float ;  and,  notwithstand- 
ing this  precaution,  it  must  be  in  the  recollection  of  everybody  that 
it  was  a  common  sight  to  see  several  large  vessels  aground  at  various 
shoals  in  the  Float,  and  unable,  without  further  discharging  the 
cargoes,  and  without  great  consumption  of  time,  labour,  and  ropes,  to 
get  up  to  the  quays.  For  several  years  past  the  grounding  of  the 
deepest  vessels  has  been  the  exception,  not  the  rule,  but  during  all 
this  period  it  has  been  one  continued  and  almost  vain  attempt  to 
struggle  against  the  old  difficulties  with  insufficient  means.     .     .     . 

For  the  removal  of  such  deposits  as  will  still  be  formed,  I  propose 
two  means  ;  and  first  as  regards  those  deposits  Avhich  are  continually 
going  on.  These  are  formed  almost  entirely  of  mud,  which,  from  its 
want  of  consistency  when  first  deposited,  the  great  quantity  and  the 
large  surface  over  which  it  extends,  as  well  as  the  great  depth  of 
water,  cannot,  as  I  have  frequently  explained,  be  easily  or  economi- 
cally removed  by  the  ordinary  process  of  dredging  :  for  this  reason 
I  originally  proposed  the  drag-boat  in  conjunction  with  the  trunk  at 
the  underfalls,  and  which  has,  so  far  as  it  has  been  applied,  com- 
pletely answered  my  expectations. 

I  should  now  propose  a  similar  arrangement  for  the  upper  float.  .  . 

I  should  propose  to  make  the -additional  .dragrJjQat  .thus  rec[uke4 

Department  of  Civil  Eng(me€r,ng  I 

I  M  II  n  i  r  ;  r-  .,  I     -  .,  ,1      f  .. 


426  DOCK  AND  PIEE  WORKS. 

of  rather  greater  power  than  that  now  in  use,  and  to  construct  it  so 
that  a  chain  of  dredging-buckets  could  be  hereafter  attached  to  the 
shaft ;  and,  secondly,  for  the  purposes  of  deepening  the  hard  bottom 
of  the  float,  and  of  removing  those  banks  of  hard  materials  which 
have  either  always  existed,  or  have  been  allowed  to  accumulate, 
dredging  must  be  resorted  to.  But  I  should  be  disposed  to  attempt 
hand  dredging  or  spooning  in  the  first  instance ;  for,  although  the 
depth  of  water  is  great,  I  believe  the  work  could  be  executed  as 
cheaply,  or  nearly  so,  as  by  the  steam  dredging,  as  the  original 
outlay  of  capital  would  of  course  be  much  less,  while  the  facility  of 
Avorking  at  several  points  at  once,  or  of  moving  from  one  berth  to 
another  as  the  convenience  of  the  trade  would  best  allow,  would  be 
much  greater ;  the  operation  also  would  be  much  more  under  com- 
mand, which,  taking  into  consideration  the  possibility  of  undermining 
the  foundations  of  the  quay  walls  or  buildings,  is  not  an  unimportant 
advantage. 

When  the  required  depths  are  once  obtained,  the  natural  deposits 
even  of  the  harder  description  may  probably  be  easily  removed  by 
the  drag-boat  or  by  the  occasional  use  of  hand  dredging. 

The  recommendations  contained  in  tliis  report  were  not 
adopted. 

In  1839  Mr.  Brunei,  in  a  report  to  a  Committee  of 
the  Council  of  the  Citj  of  Bristol,  suggested  several  im- 
provements connected  with  the  Port,  almost  all  of  which 
have  since  been  undertaken.  He  proposed  to  straighten 
and  widen  the  course  of  the  river,  and  to  make  new  locks, 
both  from  the  river  to  Cumberland  Basin  and  from  that 
basin  to  the  Floating  Harbour,  or,  as  an  alternative,  to 
construct  docks  at  Sea  Mills,  a  creek  on  the  Avon,  about 
two  miles  below  Bristol. 

He  also  proposed  to  construct  a  large  pier  at  Portishead. 
The  rise  of  tide  is  there  sometimes  45  feet,  and  the 
velocity  of  rise  or  fall  as  much  as  10  feet  per  hour. 
There  is  also  a  great  deposit  of  mud  by  the  Severn.  Mr. 
Brunei  considered  that  these  circumstances  rendered  a 
fixed  structure  undesirable,  and  he  therefore  recommended 
a  floating  pier.     He  said  :  — 


NEW   LOCK — BRISTOL.  427 

I  propose  two  or  three  vessels  of  300  or  200  feet  of  length,  built 
ol"  iron,  as  the  material  cheapest  and  best  adapted  to  the  purpose,  of 
16-feet  or  20-feet  draft  of  water,  and  about  30  feet  beam,  moored 
close  stem  and  stern,  so  as  to  form  one  continuous  floating  body. 
Any  steamboat  or  other  vessel  alongside  will  of  course  be  on  the 
same  level  as  the  pier ;  the  passengers,  on  disembarking,  will  at 
once  be  on  a  level  platform  or  deck,  under  shelter,  where  the  lug- 
gage or  goods  can  also  be  placed ;  and  the  communication  with  the 

shore  will   be  effected  without  steps Such  a  pier  would 

aiFord  stowage  for  almost  any   quantity  of  coals,  fresh  water,  and 
general  goods,  which  could  be  stored  here  for  embarkation. 

In  1847,  after  an  Act  liad  been  obtained  for  making  a 
railway  from  Bristol  to  Portishead,  with  a  pier  at  the  latter 
place,  Mr.  Brunei  designed  the  pier  on  the  plan  described 
in  his  report  of  1839 ;  but  the  project  was  not  carried  out. 

As  has  been  already  mentioned,  the  communication 
between  the  lower  part  of  the  Floating  Harbour  and  the 
river  Avon  is  through  the  Cumberland  Basin ;  between 
this  basin  and  the  river  were  two  locks,  made  at  the  time 
that  the  Floating  Harbour  was  constructed. 

Owing  to  the  increased  size  of  merchant  vessels,  it  had 
long  been  in  contemplation  to  enlarge  the  entrance.  At 
the  time  when  the  '  Great  Britain  '  was  built,  the  northern 
lock  was  so  narrow  that  a  portion  of  the  upper  masonry 
had  to  be  removed  in  order  to  give  room  for  the  ship  to 
pass  from  the  basin  to  the  river  on  a  spring  tide.  It 
was  then  felt  that  the  enlargement  of  one  of  the  locks 
could  no  longer  be  delayed,  and  Mr,  Brunei  was  asked 
to  adapt  the  narrower  or  southern  entrance  lock  to  the 
passage  of  the  largest  vessels. 

Between  the  two  locks  was  a  pier,  from  which  vessels 
were  guided,  and  the  gates  opened  or  shut.  The 
elongation  of  the  lock  was  limited  by  the  length  of  this 
pier,  as  it  could  not  be  extended  towards  the  river  with- 
out diminishing   the  area   of  entrance,  nor  could  it  be 


428  DOCK  AND  PIEE  WORKS. 

extended  upwards  without  lessening  the  area  of  Cum- 
berland Basin.  Mr.  Brunei,  although  hampered  by  this 
restriction,  succeeded  in  obtaining  a  lock  of  considerable 
length.  He  constructed  the  gates  of  a  single  leaf,  and 
placed  the  upper  gate  outside  the  lock  so  as  to  shut  against 
the  upper  end  of  the  middle  pier,  and  to  swing  back  when 
opened  into  a  recess  in  the  side  wall  of  the  Cumberland 
Basin.  He  thus  avoided  the  necessity  of  finding  room  on 
the  pier  for  the  machinery  to  open  one  of  the  leaves  of 
the  upper  gate.  Had  the  gate  been  in  two  leaves,  the 
lock  would  have  been  shortened  from  30  to  40  feet.  At 
the  lower  end  he  placed  the  gate  as  near  the  river  as 
possible ;  and,  lest  the  end  of  the  middle  pier  should  not 
be  strong  enough  to  withstand  the  pressure,  he  secured 
the  quoin  stones,  against  which  the  gate  closed,  by  hori- 
zontal wrought-iron  bars  at  different  levels,  built  into  the 
side  wall  of  the  lock. 

The  lock  is  262  feet  in  length  between  the  gates,  and  54 
feet  wide  at  the  narrowest  part. 

The  masonry  is  of  plain  character,  all  the  part  below 
the  ashlar  coping  being  of  ordinary  fitted  rubble  of 
great  thickness,  solidly  built  with  hydraulic  lime  mortar. 
The  ground  behind  the  wall  consisted  of  a  wet  silty 
clay,  causing  a  great  pressure  against  the  masonry. 
The  under  part  of  the  body  of  the  lock  is  formed  to  a  semi- 
oval  cross,  section. 

The  works  were  commenced  by  the  construction  of 
coffer-dams  at  each  end.  In  1846,  when  the  masonry  was 
approaching  completion,  a  very  high  tide  took  place,  and 
a  portion  of  the  upper  dam  gave  way.  As  some  work  still 
remained  to  be  done  at  the  sill  and  apron  of  the  lower 
gate,  Mr.  Brunei  decided  to  make  a  brick  dam  in  the 
middle  of  the  lock,  where  the  masonry  had  been  com- 
pleted.    This  brick  dam  was   a  horizontal  arch  built  on 


IRON  DOCK  GATES— BRISTOL.  420 

the  bottom  of  the  lock,  up  to  the  level  of  the  water 
in  the  Floating  Harbour.  The  abutments  were  formed 
by  the  masonry  of  the  lock  walls,  which  was  notched  to 
receive  the  bricks  of  the  arch  rings.  The  dam  was  28  feet 
high,  only  8  feet  thick  at  the  bottom,  and  3  feet  thick  at 
the  top.  It  was  set  in  Roman  cement,  and  was  completely 
water-tight.  It  was  easily  and  rapidly  made,  and  the 
cost  was  small,  as  compared  with  what  would  have  been 
the  cost  of  repairing  the  upper  dam. 

In  this  lock  the  chief  point  of  interest  consists  in  its 
being  the  first  in  which  wrought-iron  gates  were  intro- 
duced, these  gates  being  at  the  same  time  made  buoyant. 

Floating  caissons  had  been  previously  used  at  the 
entrances  to  graving  docks,  and  in  similar  situations ; 
indeed  at  Bristol,  a  caisson  had  long  been  employed  at 
Prince's  Street  Bridge,  to  separate  one  part  of  the  Float- 
ing Harbour  from  the  other.  The  buoyant  gates  of  the 
Bristol  Docks  differ  essentially  from  these  vessels,  inas- 
much as,  instead  of  requiring  to  be  floated  into  their 
places,  they  turn  on  a  hinge,  and  do  not  rise  or  fall  verti- 
cally. 

The  gates  are  provided  with  wheels,  but  only  a  small 
part  of  the  weight  rests  on  them,  as  the  gates  are  rendered 
buoyant  by  large  air-chamberS)  formed  in  the  lower  part 
of  them. 

The  upper  and  lower  gates  are  alike  in  construction  and 
dimensions,  so  that  it  is  only  necessary  to  describe  one  of 
them.     (See  woodcut,  fig.  18.) 

The  extreme  length  of  the  gate  is  58  feet,  and  the  ex- 
treme height  29  feet.  In  the  middle  it  is  about  10  feet 
wide,  the  width  diminishing  to  3  feet  at  the  top.  In 
plan  it  is  curved  to  resist  the  pressure  of  the  water. 
The  gate  when  closed  is  not  at  right  angles  to  the  direc- 
tion of  the  length   of  the  lock,   but   is  at  an  angle  of 


430 


DOCK  AND  PIER  WORKS. 


about  12°.     The  length  is  thus  scarcely  increased,  while 
the  travel  in  being  opened  and   shut  is   much  reduced. 


Pig.  18.    Bristol  Dock  Gate. 
Elevation. 


Section  A .  B.       Section  C.  D. 


Scale  of  feet. 

The  top  is  at  the  level  of  the  water  in  the  Floating 
Harbour ;  so  that,  when  the  tide  falls,  the  water  in  the 
Cumberland  Basin  may  be  retained  at  the  same  height 
as  in  the  Float. 

The  air-chamber  is  formed  by  two  water-tight  decks  of 
wrought-iron  plating,  one  at  the  level  of  half- tide,  the 
other  a  short  distance  above  the  bottom  of  the  gate. 
Above  the  deck  forming  the  top  of  the  air-chamber,  the 
water,  as  the  tide  rises,  flows  freely  into  the  interior  of 
the  gate,  through  openings  in  the  face  next  the  dock,  so 
that  when  the  water  is  level  with  the  top  of  the  gate, 
the  part  above  the  air-chamber  is  full  of  water,  which 
flows  out  again  if  the  level  of  the  water  falls. 

In  ordinary  working  the  gate  only  needs  to  be  opened 
or  shut  when  the  water  is  above  the  level  of  half-tide,  and 
therefore  at  these  times  the  whole  of  the  air-chamber  is 
immersed.     To   whatever   height  the   water  rises  above 


IRON  DOCK  GATES—BRISTOL.  431 

this  level,  the  buoyancy  remains  almost  the  same,  the 
only  change  being  caused  by  the  displacement  of  the  iron 
of  the  upper  part.  This  displacement,  when  the  water 
is  level  with  the  top  of  the  gate,  amounts  to  about  six 
tons. 

The  size  of  the  air-chamber  is  so  arranged  that  when 
the  water  is  level  with  the  top  of  the  gate  it  is  just 
afloat ;  and  at  half- tide,  when  the  water  is  at  the  level  of 
the  top  of  the  air-chamber,  there  is  a  weight  of  about  six 
tons  on  the  wheels.* 

The  gate  is  provided  with  a  sluice,  by  which  water  may 
be  admitted  into  the  air-chamber,  or  allowed  to  escape 
when  the  water  outside  is  at  a  lower  level ;  there  is  also  a 
pump,  by  which  leakage  water  may  be  extracted.  The 
volume  of  the  air-chamber  may  thus  be  altered  at  will, 
and  the  buoyancy  may  be  modified  so  as  to  counteract 
the  effect  of  the  weight  of  any  mud  which  may  be  de- 
posited upon  the  decks  of  the  gate. 

There  are  in  each  gate  two  very  large  double  sluices, 
which  are  used  for  working  the  lock,  and  for  lowering  the 
water  in  the  Cumberland  Basin  to  meet  the  tide.  They  are 
also  used  for  scouring  away  the  mud.  The  shutting  pieces 
of  the  gates,  which  bear  against  the  granite  masonry  and 
forma  water-tight  joint,  were  made  of  Honduras  mahogany, 
a  very  durable  wood  for  the  purpose.  The  timber  is 
bedded  in  creosoted  felt  and  bolted  to  the  gates ;  and  the 
pieces  are  still  sound,  after  the  lapse  of  more  than  twenty 
years. 

Underneath  the  gate  are  two  wheels,  slightly  conical, 
3^  feet  diameter  and  1  foot  wide,  which  travel  on  level 

•  The  advantage  of  forming  an  air-  air-chamber   is  properly  adjusted  to 

chamber    in  the   lower  part  of  the  the  weight  of  the  gate,  there  need  not 

gate,  and  allowing  the  water  to  enter  come   on  the  wheels,  while  moving, 

above  it,  is  that  when  the  size  of  the  more  than  a  trifling  amount  of  weight. 


432  DOCK  AND  PIER  WORKS. 

cast-iron  rails  let  into  the  masonry  of  the  gate  floor. 
There  is  no  heel-post  such  as  is  usual  in  dock  gates, 
but  the  gate  is  hinged  to  the  masonry  by  wrought-iron 
collars  and  a  wrought-iron  pin  about  8  inches  diameter, 
which  is  passed  through  them.  Any  portion  of  the 
weight  of  the  gate  which  is  not  supported  by  the  flota- 
tion of  the  air-chamber  is  borne  entirely  by  the  wheels, 
the  arrangement  at  the  hinge  being  merely  for  the  pur- 
pose of  retaining  the  gate  in  its  position  and  guiding  it  in 
opening  or  shutting.  The  gate  is  moved  by  chains,  which 
are  attached  to  the  barrels  of  powerful  crabs,  and  conveyed 
through  passages  formed  in  the  masonry  ;  at  the  lower  ends 
of  these  are  chain  rollers  or  broad  sheaves,  round  which 
the  chains  pass.  The  sheaves  are  fluted  on  the  circum- 
ference, to  ensure  their  turning  readily.  When  the  gates 
are  nearly  afloat,  they  can  be  moved  with  great  ease;  but 
at  the  time  of  their  construction  it  was  considered  essential 
to  provide  machinery  sufficiently  powerful  to  open  and  close 
them  at  low  water,  when  the  whole  weight  of  each  gate, 
nearly  one  hundred  tons,  rests  on  the  wheels.  The  crabs 
and  chains  were  therefore  made  much  stronger,  and  were 
more  difficult  to  move,  than  if  they  had  been  merely 
designed  to  work  the  gate  under  ordinary  conditions. 

The  gates  were  constructed  in  Bristol  at  the  Great 
Western  Steamship  Works  in  1847.  After  the  lower  gate 
had  been  tested  and  proved  to  be  water-tight,  it  was 
launched,  and  floated  with  the  front  surface  nearly  level. 
The  positions  it  would  assume  under  different  conditions 
had  been  calculated  beforehand.  Before  it  was  fixed, 
the  gate  was  made  to  float  nearly  upright  by  the  admission 
of  water ;  it  was  then  towed  to  its  place,  and  brought  into 
correct  position.  The  hinge-pin  was  dropped  through  the 
collars,  and  by  admitting  water  into  it,  the  gate  was 
sunk,  so  that  it  rested  upon  its  wheels.     This  operation 


PLYMOUTH  GREAT   WESTERN  DOCKS.  433 

had  to  be  performed  at  high  water,  which  only  lasted  for  a 
short  time. 

In  fixing  the  upper  gate,  the  water  was  kept  np  to  the 
proper  level  by  the  lower  gate,  and  therefore  there  was  no 
need  to  do  the  work  quickly. 

Plymouth  Great  Western  Bocks. 

As  it  was  considered  probable  that,  on  the  completion 
of  railway  communication,  mail  packets  and  other  large 
ocean  steamers  might  make  Plymouth  their  port  of  de- 
parture, a  company  was  formed  in  1846  for  the  construc- 
tion of  a  dock  in  Mill-bay,  a  large  inlet  in  Plymouth 
Sound  near  the  entrance  to  the  Hamoaze. 

The  bay  was  already  protected  from  the  prevailing  winds 
by  a  pier  at  its  eastern  side  constructed  by  Mr.  Rendel. 

It  was  decided  to  form  a  wet  dock  and  graving  dock  at 
the  inner  end  of  the  bay,  and  to  make  quay  walls  along 
the  side  of  the  outer  part,  to  join  the  existing  pier.  A 
floating  pier  for  large  vessels  afterwards  became  part  of 
the  scheme.  In  1847  preliminary  trials  were  made  as  to 
the  best  means  of  excavating  in  deep  water  the  limestone 
rock  of  which  part  of  the  bottom  of  the  bay  consisted ; 
some  quay  walls  were  also  constructed  and  made  use  of  by 
the  shipping. 

At  the  end  of  1851  a  contract  was  entered  into  for  the 
execution  of  the  whole  of  the  works  remaining  to  be  com- 
pleted ;  the  most  important  of  these  were  the  entrance,  the 
graving  dock,  and  the  completion  of  the  floating  basin. 

The  progress  of  the  undertaking  was  much  facilitated 
by  Mr.  Brunei  giving  his  sanction  to  the  proposal  of  the 
contractors  to  form  a  stone  and  earth  embankment  across 
the  mouth  of  the  bay,  instead  of  employing  the  usual 
timber  coffer-dams.  This  embankment,  which  completely 
answered  its  purpose,  was  finished  by  the  middle  of  1853. 

F  F 


434  DOCK  AND  PIEE  WOEKS. 

The  works  now  proceeded  steadily  until  they  were  com- 
pleted, and  at  the  end  of  the  year  1856  the  dock  was 
opened. 

The  middle  of  the  embankment  was  cut  through,  and 
an  entrance  channel  dredged  to  a  level  of  8  feet  below 
low  water.  The  remainder  of  the  dam,  being  partly  pro- 
tected by  masonry  walling,  was  used  as  a  quay,  and 
served  for  the  protection  of  the  outer  basin. 

Mr.  Brunei  had  prepared  the  foundation,  and  had  in- 
tended to  build  a  pier  to  shelter  the  entrance  gate  from 
the  sea,  and  to  assist  in  pointing  long  vessels.  The 
want  of  this  shelter  was  felt  in  the  gale  of  October 
1857,  when  the  gates  were  thrown  down.  In  order  to 
avoid  any  future  casualty,  storm  gates,  or  framed  struts 
reaching  down  to  low  water  level,  were  placed  immediately 
behind  the  entrance  gates,  so  as  to  support  them  against 
heavy  seas. 

The  dock,  which  is  of  oblong  shape,  has  an  area  of  1 3 
acres,  and  a  length  of  quay  wall  of  3,490  feet.  The 
greater  part  has  a  depth  of  22  feet  below  high  water  at 
springtides,  or  16  feet  at  neap  tides;  the  remainder  is 
4  feet  deeper,  or  the  same  depth  as  the  channel  in  the 
outer  basin. 

The  walls  are  8 1  feet  thick  at  bottom,  and  3^  feet  at  top, 
and  are  built  to  a  curved  batter.  They  reach  generally  to 
a  depth  of  5  feet  below  low  water,  and  rest  on  concrete 
12^  feet  thick,  carried  down  until  a  rock  foundation  is 
reached,  which  in  some  places  is  as  much  as  40  feet  below 
the  bottom  of  the  dock. 

To  accommodate  the  larger  paddlewheel  steamers,  the 
entrances  to  the  basin  and  graving  dock  were  made  80  feet 
in  width. 

The  dock  is  entered  through  a  short  passage,  the  sill 
being  13  feet  below  low  water.     The   masonry  of  this 


PLYMOUTH  GREAT   WESTERN  DOCKS. 


435 


entrance  has  curved  battering  sides,  with,  a   segmental 
invert. 

The  entrance  is  closed  by  a  pair  of  wrought-iron  buoyant 
gates,  which  meet  at  an  angle  of  127°.  Each  gate  is 
48  feet  long,  and  weighs  seventy-five  tons,  the  breadth 
being  8  feet  in  the  middle,  curving  to  2  feet  at  the  ends. 
There  are  six  horizontal  decks  and  four  vertical  bulk- 
heads. The  depth  at  the  heel-post  is  22  feet,  and  at  the 
meeting-post  35  feet  (see  woodcut,  fig.  19). 


-^ 


Fig.  19.    Plymouth  Dock  Gates. 
Elevation. 


T.n,T....T 


Scale  of  feet. 


In  each  gate  is  an  air-chamber,  the  top  of  which  is  at 
half- tide  level ;  and  its  volume  is  such  that  when  the  gate 
is  wholly  immersed  there  is  a  small  downward  pressure.' 

Under  each  gate,  near  the  meeting-post,  is  placed  a 
wheel,  which  supports  part  of  the  weight.  This  wheel  is 
so  arranged  that  it  can  be  easily  removed  for  repair.  The 
heel-posts  are  of  cast  iron,  planed  and  ground  in  place 

•  The  arrangements  of  a  buoyant  gate  have  been  explained  above,  p.  429. 

F  F  2 


436  DOCK  AND  PIEE  WORKS. 

against  the  polished  surface  of  the  granite  hollow  quoins 
so  as  to  form  a  water-tight  joint. 

There  are  large  scouring  culverts  behind  the  side  walls 
of  the  entrance ;  but  for  the  purpose  of  regulating  the  level 
of  the  water  in  the  dock,  and  of  discharging  a  large  volume 
of  water  readily,  without  having  to  overcome  the  friction 
of  ordinary  sluice  valve  faces,  each  gate  is  furnished  with 
a  cylindrical  valve,  of  the  following  description  : — 

From  an  opening  in  the  side  of  the  gate  next  the  dock 
there  is  a  large  curved  pipe  or  sluice-way,  which  termi- 
nates inside  the  body  of  the  gate,  with  a  circular  horizontal 
orifice  about  5  feet  in  diameter.  The  opening  is  covered 
by  a  short  length  of  vertical  pipe  of  the  same  diameter, 
reaching  above  high  water,  the  bottom  edge  making  a 
water-tight  joint.  This  pipe  can  be  raised  or  lowered  by 
a  screw  at  the  top  of  the  gate.  When  raised  a  short  dis- 
tance it  allows  the  water  from  the  dock  to  flow  out 
between  the  bottom  of  the  movable  pipe  and  the  orifice 
of  the  sluice-way  into  an  isolated  compartment  of  the  gate, 
and  to  escape  by"  an  opening  provided  in  the  outer  face. 
The  movable  pipe  is  guided  by  rollers,  and  from  the  con- 
struction the  pressures  on  it  are  balanced. 

The  entrance  to  the  graving  dock,  80  feet  wide,  is 
closed  by  a  pair  of  gates  of  the  same  dimensions  and  con- 
struction as  those  of  the  entrance.  This  dock  is  380  feet 
long,  92  feet  wide,  and  has  a  depth  of  28  feet  over  the  sill. 

The  floating  pier  was  erected  in  Mill-bay  in  1852,  to 
accommodate  the  steam-shipping  trade.  It  consists  of  a 
pontoon  with  a  bridge  leading  to  it. 

The  pontoon  is  a  large  wrought- iron  vessel  of  nearly 
rectangular  cross-section,  300  feet  long,  with  40  feet 
breadth  of  beam,  and  a  depth  of  17^  feet.  It  is  loaded 
so  as  to  draw  10  feet  of  water,  and  is  capable  of  storing 


BRITON  FERRY  DOCKS.  437 

4,000  tons  of  coals.  To  connect  the  pontoon  with  the 
shore  there  is  an  iron  bridge,  working  upon  hinges,  in  two 
spans  of  125  feet  each.  The  connection  between  the  two 
spans  was  supported  on  a  timber  pier,  and  was  made  so 
as  to  be  movable  vertically,  and  capable  of  being  ad- 
justed by  a  crab  and  counterbalance  weights.  By  means 
of  this  arrangement  a  uniform  gradient  over  the  whole 
length  of  the  bridge  could  be  obtained  at  any  time  of  tide, 
for  the  convenience  of  heavily  laden  carts  passing  to  and 
from  the  pontoon. 

Briton  Ferry  Docks. 

In  1846  a  company  was  formed  to  establish  docks  in 
Baglan  Bay  at  Briton  Ferry,  near  the  mouth  of  the  river 
Neath;  but  nothing  was  done  until  1851,  when  the 
necessary  powers  were  obtained  under  an  Act  of  Parlia- 
ment. From  the  vicinity  of  the  proposed  docks  to  the 
South  Wales  and  Vale  of  Neath  Railways,  a  large  amount 
of  trade  was  anticipated ;  and  in  1853  an  Act  was  ob- 
tained for  the  South  Wales  Mineral  Railway,  which  was 
intended  to  terminate  at  the  docks,  and  was  expected 
to  bring  a  large  traffic  in  coals  and  other  minerals. 

The  dock  works  were  begun  soon  afterwards,  but  the 
earthwork  was  not  completed,  nor  the  construction  of  the 
gate  commenced,  until  the  year  1858.  The  docks  were 
completed,  after  Mr.  Brunei's  death,  by  Mr.  Brereton, 
and  were  formally  opened  on  August  22,  1861. 

They  consist  of  an  outer  tidal  basin  of  about  7^  acres, 
and  an  inner  floating  basin  of  about  11  acres,  with  a  depth 
of  water  of  27  feet  at  spring  tides,  and  16  feet  at  neap 
tides.  The  two  basins  are  connected  by  a  passage  or 
entrance  of  50  feet  in  width,  with  curved  battering  walls 
and  an  invert,  closed  by  a  gate  of  a  single  leaf.  An  im- 
portant advantage  of  single   gates  is   that  the  sill  and 


438  DOCK  AND  PIER  WORKS. 

quoins  may  be  in  one  plane,  and  that  the  troublesome 
and  costly  fitting  of  the  hollow  quoins  is  avoided.  The 
sill  was  laid  6  feet  below  what  was  then  the  low- water  level, 
as  it  was  thought  that  future  improvements  might  reduce 
the  bar  at  the  entrance  of  the  river  Neath  to  that  level. 
This  has  already  been  nearly  accomplished.'  The  total 
length  of  the  docks  is  a  little  over  half  a  mile,  and  the 
average  breadth  is  about  400  feet.  They  are  connected 
with  the  South  Wales  Railway  by  branch  railways. 

With  the  exception  of  the  walls  dividing  the  two  basins 
near  the   entrance  gate,   the  sides  of  the  dock  are  not 
constructed   with   masonry  quay  walls,  in  the   ordinary 
manner,  but  are  formed  in  a  very  inexpensive  manner  of 
slopes  pitched  with  furnace  slag,  obtained  from  the  copper 
smelting  works  on  the  Neath  river,  with  jetties  at  intervals 
for  the  shipping.     Besides  being  suitable  for  the  soft  clay 
in  which  the  dock  is  made,  this  plan  is  specially  adapted 
for  mineral  traffic,  as  the  work  of  loading  or  discharging 
a  cargo  of  minerals  can  only  be  properly  carried  on  at 
the  point  where  fixed  machinery  is  provided  for  the  pur- 
pose.    This  machinery  may  be  placed  as  conveniently  on 
projecting  jetties  as  on  a  dock  wall.     The  traffic,  which 
consists  mainly  of  coals  and  metals,  is  accommodated  at 
the  jetties,  which  are  furnished  with  cranes  for  loading 
and    unloading  the  vessels  employed  in  the  metal  and 
iron  ore  trade,  and  with  tipping-frames,  which  discharge 
the  coals  into  the  ships.    These  cranes  and  tipping-frames 
are  worked  by  hydraulic  machinery. 

'  In  the  year  1856  and  afterwards,  be   done   with    safety.     Mr.   Brunei 

Mr.  Brunei  was  engaged  in  improving  carried  a  training  bank  still  farther, 

the   navigable   channel   of  the  river  and  succeeded  in  cutting  off  a  bend  of 

Neath,   at   its   embouchure    into   the  the   river ;    Mr.   Brereton   has    since 

Bristol  Channel.     A  bank  of  furnace  extended  the  navigable  channel  in  a 

slag,  for  directing  the  course  of  the  straight  line  to  low- water  mark,  a  dis- 

river,  had  been  made  previously  by  tanee  of  two  miles ;  and  the  bar  has 

Mr.  Palmer,  and  continued  as  far  sea-  been  lowered  to  within  1  foot  of  the 

wards  as  it  was  then    thought  could  level  of  the  dock  sill. 


BEITON  FERRY  DOCKS. 


439 


In  order  to  facilitate  tlie  entrance  of  vessels  from  the 
river  Neath  to  the  tidal  basin,  and  to  protect  it  from  the 
sea,  two  pier-heads  were  built,  one  at  each  side  of  the 
basin  at  the  point  where  it  joins  the  river.  These  piers 
are  of  timber  piling  and  framework,  fiUed  in  with  copper 
slag ;  the  entrance  between  them  is  300  feet  wide.  They 
were  constructed  after  Mr.  Brunei's  death. 

The  gate  is  a  wrought-iron  buoyant  gate,  with  five 
vertical  partitions  or  bulkheads  and  six  decks.  The 
length  is  56  feet ;  the  depth  in  the  middle  is  31  feet  6 
inches,  and  at  the  sides  26  feet  6  inches.  The  breadth 
in  the  middle  is  9  feet,  and  is  curved  to  2^  feet  at  the 
ends  (see  woodcut,  fig.  20). 

Jli 


Fig.  20.    Briton  Ferry  Dock  Gate. 
Elevation, 


Flan. 


Scale  o/feet. 


The  air-chamber,  which  is  similar  to  that  of  the 
Plymouth  gates,  is  placed  so  that  the  top  is  at  the  level  of 
high-water  neap  tides,  about  half-way  up  the  gate. 

There  are  two  sluices  at  low-water  level,  each  having  an 
area  of  8  square  feet. 

The  entrance  invert  being  subject  to  the  influx  of  sand 
from  the  outer  basin,  and  to  the  deposit  of  coal  rubbish 
dropped  into  the  dock,  Mr.  Brunei  decided  in  this  gate  not 


440  DOCK  AND  PIER  WORKS. 

to  use  wheels,  but  to  make  the  hinge  and  heel-post  strong 
enough  to  carry  the  whole  weight  of  the  gate,  even  if  it 
were  unsupported  by  the  buoyancy  of  the  air-chamber. 

The  heel-post  is  a  massive  piece  of  cast  iron ;  the  bottom 
part  is  bored  out,  and  into  it  is  fitted  a  cast-iron  cylindrical 
pin,  1  foot  6  inches  diameter  and  7  feet  6  inches  long. 
On  this  are  ground  discs  of  steel,  lubricated  with  oil, 
whereon  the  gate  rests  and  turns.  Thus  the  surfaces 
exposed  to  friction  are  above  the  sand  or  grit  at  the 
bottom  of  the  dock.  The  lower  end  of  the  pin  fits  into  a 
cast-iron  socket  fastened  to  the  masonry,  and  is  prevented 
from  turning  round  by  being  made  hexagonal.  The  sides 
of  the  hexagon  have  sufficient  play  to  enable  the  gate  to 
adjust  itself,  when  shut,  to  the  masonry  sill,  so  as  to  be 
water-tight.  The  top  of  the  heel-post  works  in  a  brass 
bush,  18  inches  diameter  and  15  inches  broad,  enclosed 
in  a  massive  wrought-iron  collar,  which  is  strongly  fast- 
ened by  anchor  chains  to  the  masonry.  After  the  gate 
was  completed  the  strength  of  the  hinge  was  tested  by 
moving  the  gate  before  the  water  was  admitted  into  the 
dock.  The  only  resistance  to  the  motion  of  the  gate  is 
the  slight  friction  at  the  hinge. 

No  coffer-dam  was  used  in  the  construction  of  this 
work,  but  advantage  was  taken  of  a  large  bank  of  slag 
and  earth  enclosing  a  portion  of  the  site  of  the  dock. 
This  was  extended  and  raised,  and  a  sea  dam  formed. 
The  dam  was  cut  through  when  the  works  were  completed, 
and  a  channel  dredged  to  the  depth  of  6  feet  below  low 
water. 

Brentford  Dock. 

In  1855  an  Act  was  obtained  for  making  a  dock  on 
the  Thames  at  Brentford,  and  a  railway  to  join  the  Great 
Western  Railway  at  Southall.  The  dock  has  an  area  of 
about  3^  acres. 


BRENTFORD  DOCK. 


441 


The  works  were  begun  in  July  1856,  and  were  com- 
pleted, and  the  dock  opened,  three  years  later. 

The  walls  are  founded  in  the  London  clay,  which  here 
underlies  a  bed  of  gravel  of  some  thickness ;  from  this 
there  was  a  considerable  influx  of  water. 

The  chief  peculiarity  of  the  dock  is  the  form  of  construc- 
tion adopted  for  the  sides.  Piers  of  brickwork,  10  feet 
long  and  2  feet  3  inches  thick,  are  placed  at  right  angles 
to  the  sides  of  the  dock  at  intervals  of  26  feet.  The  backs 
of  these  piers  are  connected  by  horizontal  arches,  carried 
up  with  a  curved  batter.     The  piers  are  about  20  feet 


Pig.  21.    Brentford  Dock  Gate. 

Elevation.  Section  A .  B. 


T 


Q    oL 


Scale  of  feet. 

high,  and  arches  are  turned  upon  them,  which  support 
the  front  part  of  the  quay,  and  meet  the  horizontal  arches 
at  the  backs  of  the  piers.  Thus  the  sides  of  the  dock  con- 
sist of  a  series  of  vaults,  arched  over  at  the  top,  and  also 
at  the  back  towards  the  pressure  of  the  earth. 

The  thickness  of  the  horizontal  arches  which  form  the 
bulk  of  the  wall  is  only  3  feet,  but  these  are  so  strength- 
ened by  the  piers  in  front,  that  a  wall  strong  enough  to 
resist  the  pressure  of  the  earth  behind  it  was  obtained  by 
means  of  a  very  small  quantity  of  brickwork. 

Along  one  side  of  the  dock  the  piers  are  31  feet  long, 
in  order  that  coal  barges  may  lie  with  part  of  their  length 


442  DOCK  AND  PIER  WORKS. 

in  the  vaults  between  the  piers  while  their  cargo  is 
being  put  on  board.  By  this  arrangement  the  barges 
have  their  longest  dimension  at  right  angles  to  the  side 
of  the  dock,  and  a  much  greater  number  can  be  accommo- 
dated than  if  each  occupied  a  space  alongside  the  quay- 
wall.  The  contents  of  the  coal  trucks  are  tipped  into 
the  barges  through  sloping  shoots. 

The  entrance  has  a  clear  width  of  30  feet,  and  is  closed 
by  a  single  wrought- iron  buoyant  gate,  which,  like  the 
Bristol  gates,  is,  when  shut,  not  quite  at  right  angles 
to  the  entrance. 

The  gate  is  33  feet  long,  19  feet  high,  2  feet  6  inches 
wide  at  the  middle,  curved  to  1  foot  6  inches  at  the  sides, 
and  weighs  sixteen  and  a  half  tons.  It  is  divided  into 
compartments  by  four  decks  and  two  vertical  bulkheads. 
The  air-chamber  occupies  the  whole  space  below  one  of 
the  decks,  7  feet  6  inches  above  the  bottom  (see  woodcut, 
fig.  21) ;  and  there  are  two  sluices,  each  having  an  opening 
of  4  feet  by  2  feet.  This  gate,  like  that  at  Briton  Ferry, 
has  no  wheel  under  it,  the  weight  being  carried  upon  the 
pivot. 

In  order  to  avoid  side  strains  upon  the  pivot  and  top 
collar,  a  counterbalance  arm  is  fastened  on  the  top  of  the 
gate.  This  is  formed  of  two  cast-iron  girders,  bolted 
together  and  enclosing  weights  between  them.  The 
ends  of  these  girders  project  beyond  the  heel-post  over 
the  quay,  as  in  canal  lock  gates,  and  carry  the  ma- 
chinery by  which  the  gate  is  turned,  as  there  are  no 
crabs,  chains,  or  chain  rollers.  Instead  of  these,  a  cast- 
iron  circular  rack  is  fixed  on  the  top  of  the  masonry, 
in  which  a  pinion  works,  turned  by  gearing  fixed  to  the 
end  of  the  counterbalance. 

This  gate  turns  with  remarkable  freedom,  and  the 
current  of  water  running  into  the  dock  on  a  spring  tide 
opens  it  completely. 


PIER  AT  MILFORD  HAVEN.  443 

Pier  at  Neyland,  Milford  Haven, 

The  South  Wales  Eailway  was  originally  intended  to 
terminate  at  Fishguard,  on  the  north  coast  of  Pembroke- 
shire, with  the  view  of  securing  a  large  quantity  of  Irish 
traffic,  the  distance  across  the  channel  to  the  Irish  coast 
at  Wexford  being  only  60  miles,  less  than  the  distance 
from  Holyhead  to  Kingstown. 

It  was,  however,  ultimately  decided  to  form  a  terminus, 
which  would  accommodate  the  ordinary  Irish  traffic,  and 
would  not  require  such  an  extensive  outlay  on  harbour 
works  as  would  have  been  necessary  on  the  northern 
coast. 

With  this  object,  the  inlet  or  natural  harbour  of  Milford 
Haven  was  examined,  and  the  South  Wales  Railway  was 
carried  to  Neyland  Point,  opposite  Pembroke,  where 
the  position  is  sheltered,  and  there  is  deep  water  at  all 
times  of  tide  for  the  largest  vessels. 

The  pier  at  Neyland,  or  New  Milford,  which  was 
made  in  1857,  consists  of  a  timber  viaduct,  with  a  pon- 
toon at  the  end,  150  feet  long  and  42  feet  beam,  loaded 
so  as  to  draw  about  7  feet.  There  is  a  depth  of  16 
feet  alongside  it  at  low  water,  and  it  is  connected  with 
the  shore  by  a  landing  bridge.  The  pontoon  is  made  of 
wrought  iron,  and  has  three  transverse  and  two  longitu- 
dinal bulkheads.  It  is  moored  by  chain  cables,  which  pass 
through  two  large  hawse  pipes,  extending  from  the  bot- 
tom nearly  up  to  the  deck,  with  cast-iron  mouthpieces  at 
their  lower  ends.  The  cables  passing  through  these  are 
anchored  firmly  to  the  ground  at  a  considerable  distance 
from  the  pontoon. 

The  pontoon  was  intended  to  be  the  centre  of  several 
others,  which  were  to  be  moored  in  deeper  water. 

The  rise  of  tide  being  sometimes  as  much  as  25  feet,  it 


444  DOCK  AND  PIEE  WORKS. 

was  necessary  that  the  landing  bridge  should  be  of  con- 
siderable length,  in  order  that  there  should  be  a  moderate 
inclination  at  all  times  of  tide.  It  is  accordingly  made 
in  one  span  of  205  feet.  It  consists  of  two  plate-iron  side 
girders,  of  the  uniform  depth  throughout  of  14  feet, 
and  width  of  2  feet  6  inches.  These  are  placed  12  feet 
6  inches  apart,  the  roadway  being  between  them.  The 
ends  of  the  girders  which  rest  on  the  pontoon  are  provided 
with  cast-iron  wheels,  1  foot  6  inches  in  diameter. 

The  pier  has  since  been  extended  by  additional  pon- 
toons, which  were  those  used  in  the  floating  of  the  Saltash 
Bridge. 


445 


CHAPTER  XV. 

MISCELLANEOUS   WORKS. 

I^THE  GREAT  EXHIBITION  OF  1851 — THE  CRYSTAI-  PAXACE  WATEE  TOWERS,  1853 — 

POLYGONAL     EIFLE,     1852 GUNNKEY      EXPERIMENTS,    1854 FLOATING     GTJN- 

CAREIAGE,  1854 EENKIOI  HOSPITAL  BUILDINGS,  1855. 

There  are  several  matters  of  importance  in  which  Mr. 
Brunei  was  engaged,  which  could  not  under  any  system  of 
classification  be  introduced  into  the  preceding  chapters ; 
these  are  therefore  collected  under  one  head  of  '  mis- 
*  cellaneous  works.' 

The  first  of  these  is  his  connection  with  the  Great 
Exhibition  of  1851.  He  was  from  the  beginning  one 
of  the  most  zealous  supporters  of  this  undertaking, 
and  was  appointed  a  member  of  the  Committee  of  the 
Section  of  Machinery,  whose  duty  it  was  to  classify  the 
objects  to  be  exhibited  in  that  department. 

Upon  the  question  of  awarding  prizes  to  exhibitors,  Mr. 
Brunei  held  a  very  decided  opinion  adverse  to  the  plan 
ultimately  adopted.  In  a  letter  to  the  Chairman  of  the 
Committee,  dated  March  11,  1850,  he  writes : — 

I  am  sorry  to  say  that  I  am  obliged  to  leave  town  to-night. 

We  are  summoned  to-morrow,  it  appears,  on  the  subject  of  prizes. 
Not  being  a  member  of  the  Commission,  I  have  perhaps  no  right  to 
express  an  opinion  upon  a  principle  which  seems  to  have  been 
adopted — that  of  giving  prizes — but  as  applied  to  machinery  I  sup- 
pose I  may.  I  strongly  disapprove  of  any  prizes  being  offered  in 
our  section. 

1.  I  believe  it  is  quite  unnecessary. 

2.  I  believe  it  will  be  impossible  to  define  beforehand  the  subjects 


446  MISCELLANEOUS    WORKS. 

for  which  any  limited  niimber  and  amount  of  prizes  are  to  be  pro- 
mised, the  subjects  are  so  indefinitely  numerous;  and  like  the 
building,  however  large  it  may  be  made,  will  not  be  large  enough 
to  hold  all  that  is  sent,  so  as  regards  the  prizes,  however  numerous 
the  subjects,  they  may  very  likely  not  embrace  the  very  things 
which  turn  out  to  be  most  deserving. 

3.  I  believe  it  will  be  impossible  to  distribute  any  limited  num- 
ber of  prizes  with  justice,  and  quite  impossible  to  satisfy  the  public. 

Two  machines  for  the  same  purpose  may  be  remarkable — one  for 
its  ingenuity  and  beauty  of  workmanship,  but  of  doubtful  practical 
economy  in  application ;  the  other  clumsy,  and  not  well  made,  but 
apparently  likely  to  have  the  germs  of  much  good — there  are  thou- 
sands, or  rather  an  infinity,  of  shades  of  degrees  and  qualities  of 
merit. 

And  lastly,  I  believe  the  prizes  will  be  mischievous,  as  conferring 
undue  advantages  in  many  cases  upon  a  thing  well  displayed,  and 
well  got  up,  and  will  be  sought  for  and  obtained  for  puffing  pur- 
poses. The  opportunity  of  exhibition  I  believe  will  be  quite  sufficient 
to  induce  all  the  competition  we  can  desire. 

I  think  money  prizes  quite  a  mistake,  and  medals  or  distinctions 
pretty  nearly  as  bad.  I  hope  you  hold  the  same  views,  but  I  send 
you  mine. 

Mr.  Bninel's  views  found  no  favour  at  the  time;  but 
subsequent  experience  has  convinced  those  best  able  to 
form  a  sound  judgment  in  the  matter,  that  *no  prizes 
*  of  any  kind  should  be  awarded '  in  International  Ex- 
hibitions.^ 

Mr.  Brunei  was  also  a  Member  of  the  Building  Com- 
mittee; and  he  accepted  the  office  of  Chairman  and 
Reporter  of  the  Jury  for  Class  YII.,  on  Civil  Engineering, 
Architecture,  and  Building  Contrivances. 

He  took  a  very  active  part  in  the  proceedings  of  the 
Building  Committee.  Designs  were  invited,  and  two  hun- 
dred and  forty-five  were  sent  in.  None  of  these  were 
considered  satisfactory  by  the  Committee,  and  they  sub- 
mitted to  the  Royal  Commission  a  design  of  their  own,  the 
principal  feature  of  which  was  a  dome  200  feet  in  diameter. 


'  Reports  on  the  Paris  Universal  Exhibition    IRR?  yrl 


■^•ir'.r-     10« 


GREAT  EXHIBITION  OF   1851.  447 

Mr.  Brunei  was  responsible  as  a  member  of  the 
Committee  for  the  plans  prepared  bj  them,  and  as  regards 
the  dome  may  be  said  to  have  designed  it  himself,  but  he 
expressed  strong  objections  to  the  substantial  and  ex- 
pensive buildings  which  it  was  proposed  to  erect  in  brick- 
work. His  idea  was  that  the  building  should  be  in  what 
he  called  the  *  railway  shed  style ; '  and  he  wished  to 
produce  effect  rather  by  the  construction  of  the  roofs,  &c., 
than  by  any  architectural  elevation. 

When,  therefore,  the  plans  of  the  Building  Committee 
failed  to  meet  with  public  approval,  and  the  late  Sir 
Joseph  Paxton  submitted  his  well-known  design,  Mr. 
Brunei  gave  it  his  cordial  support,  and  defended  it  against 
its  detractors.  He  thus  spoke  of  it  in  the  report  of  the 
Jury  of  Class  VII. 

As  regards  Mr.  Paxton's  claim,  amid  the  competition  of  the  whole 
of  Europe,  he  proposed  that  mode  and  form  of  construction  of  build- 
ing which  appeared  on  first  sight,  and  has  since  proved  to  be,  the 
best  adapted  in  every  respect  for  the  purpose  for  which  it  was  intended. 
The  design  possessed  this  merit  of  fitness  for  its  object  in  a  singular 
manner.  There  was  no  startling  novelty  in  any  one  point  which  could 
lead  astray  the  judgment  of  those  who  had  to  determine  upon  the 
choice  of  plan,  or  which  could  in  the  first  instance  obtain,  still  less 
permanently  secure,  the  good  opinion  of  the  public.  As  regards  the 
form  of  outline,  which  is  most  simple,  several  designs  nearly  resembling 
it  had  been  submitted  in  the  general  competition.  As  to  the  material, 
several  proposals  had  been  previously  made  to  cover  the  whole  area 
to  be  enclosed  with  glass,  and  iron  would  of  necessity  be  employed 
for  the  framing  ;  but  in  the  combination  of  form  and  materials,  in 
the  particular  mode  of  applying  those  materials,  and  in  the  adapta- 
tion of  the  forms  to  be  selected  to  their  convenient  use,  as  well  as  in 
the  various  details  by  which  the  whole  was  rendered  perfect,  the 
design  was  entirely  distinct  in  character  from  all  that  had  been  pro- 
posed, and  appeared  at  once  to  have  the  one  single  merit  of  being 
exactly  that  which  was  required  for  the  purposes  in  view.  The 
design  as  realised  has  completely  fulfilled  every  condition  of  utility. 

The  award  of  Council  Medals  (the  highest  prize  given) 


448  MISCELLANEOUS  WORKS. 

was  recommended  to  Sir  Joseph  Paxton,  and  to  the  con- 
tractors, Messrs.  Fox,  Henderson  and  Co. 

In  a  later  part  of  the  report,  in  announcing  the  recom- 
mendation of  a  Council  Medal  to  His  Eoyal  Highness 
Prince  Albert,  for  the  model  dwelling  houses  which  were 
erected  near  the  Exhibition  building,  and  exhibited  by 
the  Prince,  Mr.  Brunei  spoke  in  emphatic  language  of 
the  magnitude  and  importance  of  the  results  which  would 
follow  from  the  introduction  of  improved  dwellings  for 
the  working  classes.' 

When  the  Crystal  Palace  Company  was  formed  in 
order  to  purchase  the  Exhibition  building  and  erect  it, 
with  additions,  at  Sydenham,  Mr.  Brunei  took  a  great 
interest  in  the  project,  and  frequently  went  down  to 
examine  the  progress  of  the  building  and  gardens,  and 
the  beautiful  architectural  courts  which  were  to  be  the 
chief  attraction  in  the  interior  of  the  Palace.  The  water 
towers,  which  are  so  conspicuous  a  feature  in  the  building, 
were  designed  by  him. 

The  towers  are  284  feet  high,  and  carry  near  the  top 
tanks  47  feet  in  diameter  and  38  feet  high,  holding  1,200 
tons  of  water. 

The  foundations  required  great  care  in  their  construction. 
The  tanks  ha.d  to  be  placed  at  a  height  of  more  than  200 
feet,  and  the  towers,  which,  with  their  load,  weighed  fully 
3,000  tons  each,  had  to  rest  on  the  sloping  side  of  a  clay 
hill.  There  was  also  the  possibility  that  by  the  bursting 
of  a  pipe  a  large  quantity  of  water  might  be  suddenly 
discharged,  and  so  cause  a  slip  in  the  surrounding  ground. 
Mr.  Brunei  carried  the  foundations  down  to  a  considerable 

'  When,  at  the  close  of  the  Exhibi-  spent  the  money  in  the   erection  of 

tion,  Mr.  Brunei  was  compelled,  much  model  cottages   at  Barton,  a   village 

against  his  will,  to  accept  a  pecuniary  near  his  property  in  Devonshire, 
acknowledgment   of  his   services,  he 


CRYSTAL  PALACE  TOWERS.  449 

depth,  forming  a  large  base  of  Portland  cement  concrete, 
and  placing  on  it  a  cone  of  brickwork  in  cement,  rising 
up  to  the  ground  level.  The  towers  are  twelve-sided,  with 
two  hollow  cast-iron  columns  at  each  angle.  The  height 
of  the  building  below  the  tanks  is  divided  into  ten  stories, 
and  at  each  floor  there  is  a  strong  wrought-iron  diaphragm, 
or  shelf,  5  feet  wide.  The  columns  are  also  connected 
by  strong  diagonal  bracing  in  the  sides  of  the  tower. 

The  tanks  are  made  of  wrought  iron,  and  the  water  pipes 
are  placed  in  the  interior  of  the  tower.  Mr.  Brunei  did  not 
think  it  would  be  prudent  to  form  any  of  the  columns  of 
the  towers  into  pipes,  lest  the  expansion  due  to  the  tem- 
perature of  the  water  should  cause  unequal  support  to  be 
given  to  the  tanks. 

In  July  1855,  the  pipes  were  proved,  and  the  towers 
were  completed  shortly  afterwards. 

The  remainder  of  this  chapter  will  relate  to  matters 
which  have  but  little  in  common  with  the  subjects  of  the 
earlier  part  of  it ;  but  the  change  is  hardly  less  marked 
than  that  which  took  place  in  the  nature  of  the  questions 
which  occupied  public  attention  within  a  few  years  of  the 
close  of  the  Great  Exhibition. 


Polygonal  Rifle. 

In  October  1852,  Mr.  Brunei  consulted  Mr.  Westley 
Richards,  of  Birmingham,  as  to  the  manufacture  of  a  rifle 
*  for  the  purpose  of  determining  whether  there  was  any- 
'  thing  in  a  crotchet  he  had  upon  the  subject.'  The  rifle 
was  made  by  Mr.  Westley  Eichards  according  to  Mr. 
Brunei's  directions,  and  finished  in  May  1854.  Many 
experiments  were  tried  with  it,  at  Birmingham  and  at 

G  G 


450  MISCELLANEOUS  WORKS. 

Manchester,  in  the  spring  of  1855,  and  afterwards  at 
Woolwich ;  and  its  performances  obtained  great  notoriety. 
The  history  of  this  rifle,  and  the  objects  Mr.  Brunei  had 
in  view  in  its  design,  will  be  understood  from  Jbhe  following 
letters  to  Mr.  Westley  Eichards  : — 

I. 

October  25,  1852. 

I  have  long  wanted  to  try  an  experiment  with  a  rifle,  for  the 
purpose  of  determining  whether  there  is  anything  in  a  crotchet  I 
have  upon  the  subject,  but  I  have  been  deterred  from  attempting  it 
from  the  feeling  that  in  these  abominable  patenting  days  (I  hate 
patents)  the  chances  were,  that  if,  in  the  progress  of  my  experiments, 
any  new  result,  good  or  bad,  were  observed,  or  a  workman  should 
think  he  saw  something,  a  patent  would  be  taken  over  my  head, 
and,  to  say  the  least,  I  should  be  stopped  in  pursuing  my  owa.  in- 
vestigation, as  has  happened  to  me  more  than  once. 

I  have  also  been  deterred  by  my  not  knowing  whether  the  existing 
machinery  for  rifling  barrels  would  enable  me  to  obtain  an  increasing 
or  varying  twist  from  one  end  of  the  barrel  to  the  other,  as  this 
would  be  necessary  to  make  the  experiment,  and  I  should  not  care 
to  incur  the  expense  of  a  machine  on  purpose.  My  introduction  to 
you,  through  our  mutual  friend  Whateley,  induces  me  to  make  the 
enquiry  whether  your  apparatus  or  mode  of  rifling  enables  you  to 
give  such  a  twist,  and  if  so,  whether  you  could  and  would  make  me 
a,  barrel.  If  so,  I  will  trouble  you  with  an  explanation  of  my  scheme, 
as  I  should  have  no  secrets  with  you. 

II. 

February  7,  1853. 

I  take  this  opportunity  of  mentioning  again  the  subject  I  once  wrote 
or  spoke  to  you  about.  I  want  a  rifle  barrel  made  octagon  shaped 
inside,  the  octagon  having  a  twist  rather  more  than  usual,  and  an 
increasing  twist,  say  twice  as  much  at  the  mouth  of  the  piece  as  at 
the  breech.  Can  you  make  me  such  a  barrel  for  an  experiment  ?  I 
will  explain  to  you  the  object  when  we  meet,  as  it  can  only  be  done 
viva  voce. 

III. 

[The  following  letterwaswritten  to  Mr.  Westley  Richards  in  answer 
to  a  request  that  Mr.  Brunei  would  permit  him  to  obtain  a  licetise 


POLYGONAL  EIFLE.  451 

from  Mr.  (now  Sir  Joseph)  Whitworth  to  make  rifles  of  a  polygonal 
shape.  Mr.  Whitworth  had  obtained  a  patent  for  improvements  in 
cannons,  guns,  and  fire-arms,  in  February  1855,  and  in  his  complete 
specification,  dated  May  30,  1855,  he  had  for  the  first  time  claimed — ■ 
Firstly,  the  several  combinations  of  parts  forming,  when  put 
together,  the  barrels  of  ordnance,  or  fire-arms,  having  a  polygonal 
spiral  shape.  Secondly,  the  use  of  the  spirally-shaped  segments. 
Thirdly,  the  adoption  of  the  polygonal  spiral  for  rifled  ordnance  and 
fire-arms.  Fourthly,  the  combination  of  parts  forming  the  breech- 
loading  apparatus.] 

November  26,  1858. 

I  am  obliged  to  you  for  your  communication  on  the  subject  of  the 
octagon  gun,  and  in  acknowledging  your  courtesy  and  gentlemanly 
feeling  I  would  add  that  it  is  only  what  I  always  felt  I  could  rely 
upon  from  you. 

I  beg  you  will  not  hesitate  to  take  out  a  license  from  Mr.  Whit- 
worth for  octagon  guns  (if,  as  a  matter  of  business,  you  think  it 
convenient  to  do  so)  on  account  of  any  prior  claim  which  you  may 
know  I  could  set  up,  and  if  you  get  a  license  for  a  nominal  con- 
sideration, as  I  understand  you  can,  of  course  as  a  man  of  business 
you  should  do  so.  I  have  no  intention  of  interfering  with  Mr.  Whit- 
worth's  patent,  even  to  indulge  the  feeling  I  have  against  all  patents 
and  protective  laAvs,  which  I  consider  have  become  the  curse  of  the 
day,  and  the  sources  of  the  greatest  injury  to  inventors  and  manu- 
facturers, and  still  more  to  the  public ;  and  I  should  also  be  very 
sorry  even  to  annoy  my  friend  Mr.  Whitworth  merely  for  the  sake 
of  showing  that  I  had  previously  made  the  gun  (at  least  you  made 
it  for  me),  and  I  believe  others  have  preceded  me,  which  he  has 
patented  ;  and  I  assure  you  that  I  shall  not  consider  your  taking  out 
a  license  as  in  any  way  a  denial  of  this  fact,  of  which  you  are 
cognisant. 

I  have  never  seen  Whitworth's  patent ;  what  is  it  exactly  that  he 
does  patent?  It  cannot  be  merely  the  polygon,  because,  even  if 
nobody  had  preceded  me,  that  would  have  been  already  a  copy  of 
mine,  which  not  only  was  made  before  he  began  his  investigation, 
but  was  lent  by  me,  at  your  request,  to  him,  I  think  before  his 
patent.  My  rifle  is,  I  am  told,  doing  quite  wonders  at  Woolwich, 
and  I  begin  to  think  there  must  be  something  in  the  principle  which 
I  intended  to  introduce  into  it,  and  which  is  totally  different  from 
what  I  understood  to  be  Whitworth's.  I  sought  to  use  a  com- 
paratively loose  ball,  but  which  I  thought  would  centre  itself,  both 
in  position  and  direction,  to  the  axis  of  the  barrel  by  the  peculiar 

G  G  2 


452  MISCELLANEOUS  WORKS. 

action  of  a  polygon  within  a  polygon  acted  upon  by  an  increasing 
pitch,  and  it  really  seems  from  the  results  as  if  my  theory  "was 
correct.  1 

Chinnery  Experiments. 

In  1854  Mr.  Brunei  took  up  warmly  tlie  question  of 
improvement  in  large  guns,  wliicli  was  then  attracting  the 
attention  of  several  scientific  men. 

The  friendship  which  had  for  some  years  previously 
existed  between  him  and  Mr.  (now  Sir  William)  Arm- 
strong, of  Newcastle-on-Tyne,  gave  Mr.  Brunei  opportu- 
nities for  discussing  these  matters,  with  a  view  to  their 
being  carried  into  practical  effect. 

The  following  extracts  from  a  letter  written  by  Mr. 
Brunei,  in  April  1855,  to  Mr.  James  Nasmyth,  explain 
generally  his  opinions  at  that  time  upon  the  construction 
of  large  guns  : — 

From  what  I  have  observed  of  the  operation  of  fractures  under 
sudden,  quick-acting  forces — such  as  bursting  of  guns,  and  fractures 
under  blows,  as  in  our  railway  smashes — I  have  arrived  deliberately 
by  observation  at  the  conclusion,  which  every  mechanical-minded 
man  arrives  at  more  or  leas  by  intuition,  that  homogeneity  and 
equality  of  tension  and  of  elasticity  in  the  parts  are  necessary  for 
strength  to  resist  a  violent  strain  applied  suddenly  in  its  full  force, 
which  I  will  call  a  blow.  My  impression,  from  the  result  of  observa- 
tion, is,  that  this  operates  much  more  than  is  generally  assumed. 

If  you  suppose  a  bar,  say  an  axle  of  uniform  section  and  imiform 
quality  in  every  respect,  it  will  bear  bending  into  extraordinary 
forms  even  by  a  blow;  and  if  you  assume  that  portions  of  it  become 
more  tenacious  and  stronger,  but  remain  equally  elastic,  the  ultimate 

'  See  Eeport  of  the   Select  Com-  1337);  pp.  58,  59,  the  same  (Q.  1385- 

mittee  of  the  House  of  Commons  on  1410);  pp.  402,  403,  Papers  delivered 

Ordnance,  1863,  M'inutes  of  Evidence  in  by  Mr.  Isambard  Brunei;  p.  110, 

and  Appendix  (ordered  to  be  printed  Further  Evidence  of  Mr.  Whitworth 

Jiily  23,  1863):— p.  306,  Eeport  of  (Q.    2545-2551);   p.    112,   the   same 

Ordnance   Select   Committee;   p.  44,  (Q.  2602-2610);  p.  548,  Letter  from 

Statement  of  Mr.  Whitworth;  p.  56,  Mr.  Westley  Eichards  to  Mr. Isambard 

Evidence  of  Mr.  Whitworth  (Q.  1329-  Brunei. 


GUNNERY  EXPERIMENTS.  463 

strength  of  this  bar  will  not,  I  think,  be  materially  increased  or  di- 
minished ;  but  if  you  suppose  the  elasticity  of  these  portions  either 
increased  or  diminished,  I  believe  the  ultimate  strength  of  the  bar 
under  a  blow  is  diminished,  r  In  like  manner,  I  imagine  that  in  the 
section  of  a  gun  barrel,  if  portions  are  more  or  less  elastic  than 
others,  or  at  all  different  in  their  character,  not  only  many  points  of 
fi'acture  may  be  determined  on,  but  that  the  whole  may  be  rendered 
much  less  able  to  resist  the  violent  explosion.  The  strain  produced  by 
the  explosion  and  the  plane  of  fracture  is  almost  certain  to  be  in  a 
plane  passing  through  the  longitudinal  axis,  and  therefore  I  had 
assumed  that  one  would  avoid  as  much  as  possible  having  any  varia- 
tion of  quality  which  fagotting  must  produce  to  some  extent  in 
planes  in  this  direction.  To  attain  this  end,  I  had  endeavoured  to 
scheme  some  way  of  welding  up  *  cheeses '  or  discs,  which  might  be 
hammered  up  splendidly  homogeneous  of  the  full  diameter  and  of  a 
considerable  thickness,  and  I  wish  ihat  you  would  scheme  the  best 
way  of  welding  them  together.  I  should  suppose  that  the  centre 
surface  might  be  welded,  and  wedges  welded  in  all  round,  or  some 
other  mode  devised,  bearing  in  mind  that  the  strain  in  any  plane 
transverse  to  the  axis  is  small,  only  that  arising  from  the  recoil  of  the 
breech  and  the  friction  of  the  shot. 

I  have  also  an  impression  that  something  harder  than  ordinary 
wrought  iron  is  wanted  for  the  inner  surface  to  resist  the  explosion. 
This  you  might  give  probably  in  fagotting  up.  I  am  trying  the  effect — 
as  much  for  the  amusement  of  the  thing  as  with  any  great  expectation 
— of  a  cylinder  of  hardish  material  wrapped  round  with  iron  wire,  laid 
on  with  a  certain  amount  of  tension  proportioned  to  the  diameter. 
Such  a  barrel  ought  to  be  strong — whether  practically  successful  is 
another  thing. 

The  sclieine  of  making  a  gun  with  the  barrel  wrapped 
round  with  wire,  which  is  referred  to  in  this  letter,  was 
one  which  Mr.  Brunei  and  Mr.  Armstrong  were  very 
desirous  of  making  the  subject  of  actual  experiment. 
Whether  or  not  it  would  under  their  hands  have  become 
practically  successful,  could  not  be  ascertained,  as  they 
were  obliged  to  abandon  the  project,  in  consequence  of 
the  wire  covering  being  patented,  in  May  1855,  by 
Mr.  Longridge.  _     _       - 

The  following  letter -tie  Mr:  ArmaijiriCHig  (j^lates^  to""  the 


454  MISCELLANEOUS  WOEKS. 

same  subject,  and  is  interesting  not  only  as  showing  Mr. 
Brunei's  correct  appreciation  of  a  principle  which,  is  the 
essence  of  the  coil  system  of  constructing  guns,  but  as 
further  illustrating  his  objections  to  the  patent  laws  : — 

Juno  8,  1855. 
Have  you  ever  done  anything  towards  my -experiment  of  the 
wire  gun  ?  I  have  been  anxious  for  some  time  past  to  learn  about 
it,  but  have  waited  to  see  you;  to-day  I  learn  that  Longridge  is 
taking  out  a  patent  for  it.  I  daresay  it  is  his  own  idea,  and  I  only 
regret  it,  as  I  suppose  it  will  now  prevent  my  pursuing  it ;  and  I 
think  it  likely  that  with  your  assistance  we  should  have  succeeded 
in  making  at  least  as  good  a  gun  as  he  will.  The  principle  I  am 
disposed  to  think  good  ;  the  success  would  depend  upon  the  practical 
application,  and  but  for  these  patents,  the  more  competitors  the 
better  for  the  public.  As  it  is,  competition  is  destroyed.  Let  me 
know  if  you  had  done  anything.  Pray  let  me  know  also  what  you 
are  doing  about  your  own,  in  which  I  feel  equally  interested. 

Mr.  Brunei  had  also  considered  the  advantages  of 
making  the  bore  of  the  gun  polygonal,  with  a  projectile 
shaped  to  fit  it.  He  had  a  portion  of  cannon  tube  and  a 
projectile  made  by  Mr.  Armstrong  in  the  beginning  of 
1855,  but  he  did  not  himself  pursue  the  question  further. 

Indeed,  after  the  middle  of  the  year  1856,  when  the 
works  of  the  '  Great  Eastern  '  steam-ship  began  to  occupy 
a  large  portion  of  his  time,  Mr.  Brunei  was  unable  any 
longer  to  take  part  in  gunnery  investigations ;  but  he 
watched  with  unabated  interest  the  proceedings  of  those 
friends  who  have  continued  their  experiments,  with  the 
great  practical  success  of  which  he  lived  to  see  only  the 
beginning. 

Floating  Gun-Carriage. 

The  plan  of  a  g-un-boat,  or,  as  it  would  be  more  cor- 
rectly called,  a  floating  gun-carriage,  which  Mr.  Brunei 
designed  for  an  attack  on  Cronstadt  and  other  Baltic  forts 


FLOATING  aUN-CAERIAGE.  455 

during  the  Russian  war,  is  clearly  described  in  tlie  follow- 
ing memorandum,  which  he  drew  up  for  the  information 
of  the  Admiralty  : — 

December  20,  1855. 

The  principle  is  simply  the  fixing  a  very  heavy  gun  in  a  floating 
shot-proof  chamber  or  casemate,  exposing  the  smallest  possible  sur- 
face ;  that  surface  to  be  of  such  a  form  as  to  be  struck  by  shot  only 
at  a  very  oblique  angle ;  and  the  gun  being  a  fixture,  with  the  means 
only  of  elevating  and  depressing  to  an  extent  of  10  or  12  degrees, 
but  with  no  lateral  motion,  the  port  or  embrasure  need  be  only  of 
the  size  of  the  muzzle  of  the  gun,  so  that  the  gun,  the  men  working 
the  gun,  and  everything  on  board  will  be  perfectly  protected. 

The  gun  will  be  directed  by  elevating  the  breech,  and  by  slewing 
the  vessel  slightly  and  slowly  backwards  and  forwards  across  the 
line  of  aim,  by  means  afterwards  explained. 

The  men  loading  the  gun  will  simply  load  as  quickly  as  they  can, 
and  when  the  gun  is  loaded  push  out  a  trigger. 

The  governor  or  person  directing  the  gun  Avill  stand  behind  the 
hood  or  chamber,  looking  direct  at  the  object  through  a  telescope  of 
low  power,  fixed  horizontally  in  the  axis  of  the  vessel,  and  made  to 
move  vertically  parallel  with  the  axis  of  the  gun,  and  mounted  with 
reflectors ;  so  that  both  telescope  and  man  are  completely  under 
cover,  and  he,  keeping  the  vessel  truly  in  range  and  the  elevation 
correct,  will  only  touch  the  trigger  whenever  his  line  of  sight  crosses 
the  object. 

The  vessel  will  carry  a  small  engine,  of  power  suflicient  to  drive 
it  for  a  short  time  at  a  good  speed,  say  eight  or  nine  knots,  and  at 
other  times  to  keep  up  a  small  forward  motion  to  counteract  the  re- 
coil, and  to  keep  the  vessel's  head  moving  a  few' degrees  right  and 
left  across  the  line  of  range. 

A  suflicient  portion  of  the  vessel  to  contain  and  to  float  the  gun, 
ammunition,  and  engine,  will  be  shot-proof. 

A  fore-body  and  after- body,  the  top  of  which  will  be  aJleu7'-cVeau, 
or  a  few  inches  tmder  water,  will  be  added,  to  give  such  a  form  of 
entrance  and  run  as  will  admit  of  the  vessel  attaining  the  speed 
mentioned ;  but  these  parts  will  be  mere  shells,  and  may  be  full  of 
water,  and  if  damaged  by  shot  will  not  affect  the  buoyancy  of  the 
float,  besides  which,  not  being  above  the  surface  of  the  water,  they 
cannot  be  much  exposed  to  injury. 

The  mode  of  propelling  may  be  by  a  sci'cw,  but  I  prefer  the  'jet,' 
which,  whether   an   economical  mode  of  propelling  or  not,  is    a 


456  MISCELLANEOUS  WORKS. 

sufficiently  good  one  for  this  purpose,  and  exposes  nothing  whatever 
to  be  injured  by  shot.^ 

Whether  propelled  by  jet  or  not,  I  should  have  two  small  lateral 
jets  for  directing  the  vessel,  such  jets  being  governed  by  two  cocks 
handled  by  the  gunner. 

Such  a  mode  of  directing  the  aim  by  a  man  under  cover  looking 
through  a  telescope,  with  one  hand  directing  the  gun  -and  the 
other  on  the  trigger,  will  admit  of  an  almost  unlimited  degree  of 
accuracy. 

The  gun  being  in  a  perfectly  shot-proof  casemate,  machinery  may 
be  adapted  to  expedite  the  loading  of  the  gun ;  and  it  is  not  difficult 
to  make  a  mechanical  arrangement  by  which  the  shot  and  cartridge 
shall  be  lifted  up  to  the  gun,  inserted,  and  rammed  home,  at  a  rate 
far  exceeding  anything  that  can  now  be  done  by  hand  ;  and  as  the 
weight  and  clumsiness  of  the  gun,  the  carriage,  and  machinery  are  of 
no  object,  I  think  I  can  make  a  breech-loading  gun  capable  of 
carrying  12-inch  solid  shot  with  a  full  charge,  which  may  be  loaded 
and  discharged  at  the  rate  of  two  or  three  per  minute ;  but  the  prin- 
ciple of  mounting  a  gun  in  such  a  float  is  equally  applicable  to  a 
common  gun,  which  might  still  be  loaded  mechanically. 

A  few  loopholes  may  be  provided  through  which  a  fire  could  be 
kept  up  from  a  couple  of  heavy  swivel  rifles,  carrying,  say  6-oz. 
shot,  which  would  pierce  any  mantelets  or  other  cover  likely  next 
year  to  be  provided  against  ordinary  rifles. 

A  battery,  say  of  twelve  such  guns,  should  probably  have  also 
two,  or  perhaps  three,  shot-proof  vessels  of  about  the  same  size 
without  guns,  but  pierced  with  a  longitudinal  fin  or  ridge,  like  a 
wall,  standing,  say  10  feet  above  the  water,  and  50  or  60  feet  long, 
strong  enough  to  stand  the  direct  blow  of  heavy  shot  at  long  range, 
or  the  oblique  blow  of  the  same  shot  at  short  range,  and  which  could 
be  placed  as  screens  or  traverses  to  cover  the  flanks  of  the  battery 
against  distant  shot.  Against  vertical  fire  I  cannot  sixggest  any  de- 
fence :  the  point  of  attack  must  be  selected  to  avoid  it. 

The  covering  vessels  may  be  provided  also  with  loop-holes  for 
heavy  swivels. 

There  should  also  be  two  or  three  small  and  comparatively  light, 
but  shot-proof  vessels,  to  run  in  and  bring  out  a  disabled  gun-boat. 

These  last-named  auxiliary  unarmed  boats  form  an  essential  part 
of  the  system. 


'  Captain  Claxton,  at  Mr.  Brunei's       Ruthven's    vessel,    the   *  Enterprise,' 
desire,  went  for  a  voyage  in  Messrs.      in  order  to  test  her  performances. 


FLOATING  GUN-CARRIAGE.  457 

In  all  probability  the  enemy  have  by  this  time  thrown  atones  and 
other  obstacles,  and  placed  infernal  machines  round  the  detached 
fort,  to  impede  a  close  approach.  They  cannot,  however,  have 
covered  a  very  large  surface,  so  that,  with  some  previous  soiinding, 
an  approach  may  be  found  and  a  position  taken  up. 

The  auxiliary  boats  should  therefore  have  strong  bottoms  under 
the  engine-room,  and  the  rest  of  the  body  be  so  subdivided  into 
compartments  that  they  would  be  proof  against  serious  damage  from 
rocks  and  infernal  machines,  and  be  able  to  run  in  imder  fire  and 
ascertain  if  obstructions  exist,  and  find  the  channel  if  they  do. 

A  battery  of  such  guns  could  be  placed  at  various  points  out  of 
range,  say  at  3,000  yards,  at  which  distance  they  would  hardly  at- 
tract attention  by  daylight,  and  would  not  be  visible  in  the  twilight 
of  night,  and  could  then  be  concentrated  in  a  few  minutes  at  the 
point  selected  for  attack  within  safe  breeching  distance,  say  250 
yards ;  and,  if  twenty-four  shot  per  minute,  of  200  lbs.  to  250  lbs. 
each,  thrown  with  a  full  charge  at  250  yards,  can  be  directed  against 
a  small  surfixce  of  any  stone  wall  yet  built  (which  is  pierced  with 
embrasiu-es),  the  effect  ought  to  be  great  and  rapid.  I  believe, 
moreover,  that  the  means  of  directing  the  aim  will  be  so  effective 
that  if  the  embrasures  can  be  seen  a  shell  or  shot  may  always  be 
sent  in  with  certainty  at  250  yards,  and  the  enemy's  guns  dis- 
mounted. 

Such  vessels  can  rapidly  change  their  position,  retreat  or  advance, 
be  replaced  by  fresh  ones,  or  withdrawn  altogether. 

The  means  of  transport  of  such  vessels  to  the  seat  of  war,  although 
a  secondary  consideration,  has  been  considered. 

They  might  easily  be  placed  in  an  outer  shell  of  iron  of  a  good 
form,  which  could  be  rigged  complete,  and  so  constructed  as  to  give 
up  its  burden  when  arrived  in  the  seas  where  it  is  to  act — in  fact,  a 
ship  of  the  class  of  small  screw  colliers,  made  to  open  at  the  bows 
and  its  contents  floated  out  ready  for  action  ;  but  the  gun-boat  itself, 
when  lightened  of  ammunition,  and  the  gun  lowered  to  the 
bottom  as  ballast,  and  fitted  up  with  bulwarks,  and  a  light  movable 
iron  chamber,  forming  a  water-tight  forecastle-deck  reaching  back, 
say  30  feet,  and  schooner-rigged,  will,  I  undertake  to  say,  make  a 
very  fair  sea  boat.  Probably  no  compasses  could  be '  corrected '  to  be 
trusted  to  in  such  a  mass  of  iron,  but  a  compass  fixed  to  the  mizen- 
mast,  say  at  30  feet  from  the  deck,  would  be  all  that  could  be  re- 
quired. 

Immediately  abaft  the  hood  or  gun -chamber  there  would  be  a 
space  under  cover  from  shot  where  a  companion  and  skylight  could 


458  MISCELLANEOUS  WORKS. 

be  fitted  up  when  at  sea,  and  through  which  light  and  air  could  be 
obtained  at  all  times  when  fitted  for  service. 

The  funnel,  if  ever  used  when  the  vessel  is  not  in  action,  would 
be  removed  for  fighting,  and  the  steam  and  smoke  ejected  through 
an  oblique  aperture  right  aft. 

The  only  point  to  be  determined  by  experiment  is  whether  a 
moderate  thickness  of  iron  of  the  best  quality  will  stand  heavy  shot 
at  short  range  striking  very  obliquely,  say  at  the  worst  at  an  angle 
of  30  degrees. 

By  the  form  of  the  proposed  vessel,  however,  when  placed  in 
position  at  250  yards  of  any  of  the  Cronstadt  forts,  it  could  not  be 
struck  at  30  degrees,  and  probably  99  out  of  100  shots  that  hit 
would  graze  at  an  angle  of  10  to  20  degrees. 

A  small  part  only  round  the  port,  or  what  may  be  more  correctly 
termed  the  muzzle-hole,  could  be  struck  with  a  direct  blow. 

There  is  every  reason  to  believe  that  slabs  of  iron  of  good  quality 
of  4  inches  thick  would  stand  against  such  grazing,  provided  they 
are  put  together  without  being  weakened  by  holes  and  with  some 
other  precautions,  and  that  soiand  forgings  of  10  or  12  inches  thick, 
if  of  sufiicient  weight  in  a  single  piece,  would  stand  the  direct  blow. 
I  do  not  believe  that  less  than  this  would  be  safe  against  68-lb.,  or,  as 
we  must  expect  to  meet  with,  120-lb.  shot  at  short  range,  even  when 
struck  obliquely,  and  this  thickness  can  be  applied  without  requiring, 
with  the  gun  ammunition,  &c.,  more  than  6  feet  9  inches,  say  7  feet 
draught  of  water. 

Another  inch  of  thickness  would  require  another  foot  of  draught ; 
but  if  it  has  been  ascertained  that  the  charts  are  correct,  there  would 
appear  to  be  10  to  15  feet  of  water  close  up  to  the  principal  detached 
forts,  and  it  would  be  an  immense  advantage  to  take  9  feet  draught 
of  water,  and  have  an  unquestionably  invulnerable  skin. 

If  it  were  considered  desirable  to  construct  such  a  battery,  it  is 
now  barely  possible  to  do  it  in  time  for  the  coming  season ;  but  if 
possible,  it  could  only  be  rendered  so  by  ascertaining  exactly  the 
dimension  and  form  of  iron  that  each  of  the  large  makers  could  turn 
out  with  their  present  tools,  and  according  to  their  present  experience 
and  habits,  and  to  design  the  details  to  suit  their  existing  means, 
sacrificing  probably  much  that  would  render  the  result  more  perfect 
for  the  sake  of  rendering  it  possible  to  obtain  anything  in  time.  No 
doubt  promises  and  even  contracts  could  easily  be  obtained  for 
making  anything  in  any  given  time,  and  zealous  and  honest  eff'orts 
afterwards  made  to  effect  what  had  been  undertaken ;  but  if  the 
slightest  attempt  is  made  that  involves  new  tools  or  new  practices, 


FLOATINa  GUN-CARRIAGE,  459 

promises  and  contracts  will  not  effect  impossibilities,  and  the  proba- 
bility is  that  the  short  time  still  available  will  be  lost. 

While  all  the  preparations  shall  be  made  on  the  assumption  that 
the  result  is  attainable  and  will  be  successful,  trials  must  be  made, 
without  loss  of  time,  on  the  several  points  to  be  determined — a§  to 
the  resistance  of  the  iron,  &c.  If  they  fail,  the  expense  incurred  up 
to  that  time  in  preparing  for  the  whole  work  will  not  have  been 
great.  If  they  succeed,  it  is  just  possible  that  by  great  exertions 
but,  above  all,  by  judicious  and  methodical  plans  of  proceeding,  a 
complete  battery  might  be  launched  ready  for  service  in  five  months. 

Lastly,  I  should  observe  that  although  the  main  feature  of  the 
plan  is  the  resisting  the  effects  of  the  enemy's  shot  by  always 
exposing  an  oblique  surface,  yet  the  chances  of  fatal  damage  would 
be  small  if  such  vessels  were  to  run  the  gauntlet,  at  night,  through 
the  deep  channel,  and  get  into  the  waters  east  of  Cronstadt.  Or  if 
this  is  very  desirable,  as  I  sliould  think  it  must  be,  nothing  is  easier 
than  to  lift  the  whole  flotilla  over  the  shoal  water  and  launch  them 
into  the  deep  water  beyond. 

Mr.  Brunei  liad  matured  these  plans  in  September  1854, 
and  they  were  then  brought  under  the  notice  of  the 
Admiralty;  but  no  steps  were  taken  to  test  the  prac- 
ticability of  the  scheme. 

He  was,  however,  induced  to  make  a  futther  representa- 
tion to  the  Admiralty  in  the  following  July.     He  wrote, — 

Having  endeavoured  ineffectually  several  times  at  the  commence- 
ment of  the  war  to  impress  upon  members  of  the  Government  the 
great  advantages  that  might  be  derived  from  the  use  of  iron  floating 
batteries  or  gun-boats,  if  properly  constructed,  I  made  another 
effort  at  the  close  of  the  last  year's  campaign,  but  early  enough  to 
have  allowed  of  the  construction  of  what  I  proposed  before  the 
opening  of  the  Baltic  in  the  present  year,  and  caused  my  plans  to 
be  submitted  to  the  Admiralty  through  a  friend.  They  were  not 
approved,  and  I  should  judge  from  the  answer  I  received  that  the}'^ 
were  not  understood,  and  I  was  never  applied  to  for  an  explana- 
tion. I  had  no  object  in  view  but  the  public  good,  and  I  therefore 
kept  the  idea,  such  as  it  was,  unpublished,  believing  the  principle  to 
be  sound  and  good,  and  that  the  day  would  come  when  it  might  be 
usefully  applied,  and  the  more  usefully  to  this  country  if  not  pre- 
viously publicly  discussed. 


460  MISCELLANEOUS  WORKS. 

I  have  no  other  object  to  serve  now ;  but  after  the  clear  proof 
that  I  was  correct  in  the  opinion  I  shared  with  so,  many  other 
persons  of  the  entire  inability  of  any  of  the  present  floating  ships, 
boats,  or  war  engines  to  cope  with  any  moderately  constructed  and 
well-armed  land  battery,  I  think  it  right  once  more,  and  this  time 
more  formally,  to  urge  upon  Government  the  consideration  of  the 
construction  of  armaments  mechanically  constructed  and  properly 
fitted  for  the  special  object.  I  beg  to  say  that  I  do  not  mean  a 
consideration  in  the  ordinary  mode,  by  the  able  and  practical,  but 
still  executive  officers  of  departments,  whether  engineers  or  ship- 
builders, because  I  believe  that  I  must  be  myself,  from  my  practical 
experience  in  this  particular  branch,  at  least  as  competent,  if  not 
more  so,  to  judge  in  questions  of  mechanical  construction,  whether 
it  be  the  forging  or  casting  of  a  gun  of  large  dimensions,  or  the 
construction  of  a  vessel  fit  for  navigation  and  capable  of  resisting 
shot,  or  the  best  mode  of  propelling  such  a  vessel — on  all  which 
branches  I  have  had  much  and  tolerably  successful  practice;  but  I  ask 
on  public  grounds  for  the  deliberate  consideration  by  men  of  judg- 
ment and  experience  in  the  military  branch  of  the  subject,  such  as 
the  attack  upon  a  fortified  place,  of  which  I  cannot  pretend  to  be  a 
competent  judge,  and  by  men  in  a  position  to  be  able  to  express 
freely  their  independent  opinions  of  the  advantages  that  might  be 
attained  by  the  principle  I  propose,  if  capable  of  being  successfully 
carried  out. 

Although,  the  want  of  efficient  gun-boats  was  then 
severely  felt,  this  letter  appears  to  have  produced  no  effect 
upon  the  Board  of  Admiralty.  But  the  friend  who  had 
originally  brought  the  matter  under  the  notice  of  the 
Board  took  the  bold  step  of  writing  to  Lord  Palmerston, 
and  acquainting  him  with  what  had  passed. 

Lord  Palmerston  at  once  saw  the  importance  of  investi- 
gating the  subject,  and  sent  for  Mr.  Brunei,  who  explained 
the  plans  to  him.  Lord  Palmerston  then  asked  him  to 
see  the  officials  at  the  Admiralty.  Mr.  Brunei  did  so ; 
but  great  delay  followed.  It  was,  however,  unimportant, 
as  hostilities  soon  afterwards  terminated,  and  there  was 
no  further  need  of  gun-boats,  good  or  bad. 

This  project  did  not  exist  only  in  the  outline  in  which 


FLOATING  GUN-CAREIAGE.  461 

it  is  described  in  the  memorandum  given  above.  Mr. 
Brunei  had  worked  out  all  the  calculations  of  displacement, 
&c.,  and  had  made  designs  and  models  for  the  boat  and 
its  various  appliances,  and  had  been  for  some  months  in 
constant  communication  with  Mr.  W.  G.  Armstrong  upon 
the  form  and  construction  of  the  gun. 

This  will  be  a  fitting  place  to  mention  that  in  1855 
Captain  Cowper  Coles,  C.B.,  showed  Mr.  Brunei  the  designs 
for  his  shot-proof  raft,  the  principle  of  which  was  after- 
wards developed  in  the  turret  ship.  Mr.  Brunei  gave 
Captain  Coles  the  benefit  of  his  advice  on  the  various 
questions  involved,  and  allowed  him  to  use  the  services  of 
his  principal  draughtsman,  and  to  have  the  drawings  got 
out  in  his  office  without  expense. 

Captain  Coles,  in  a  lecture  which  he  delivered  at  the 
United  Service  Institution  on  June  29,  1860,  warmly- 
acknowledged  the  obligations  he  was  under  to  Mr.  Brunei 
for  this  act  of  kindness,  and  generosity,  and  said  that  it  had 
greatly  encouraged  him  to  persevere  in  bringing  his  plans 
into  public  notice. 

BenJcioi  Hospital. 

In  February  1855,  after  the  first  winter  of  the  allied  armies 
in  the  Crimea,  Mr.  Brunei  was  asked  by  the  War  Depart- 
ment to  undertake  the  design  and  construction  of  hospital 
buildings  for  the  East. 

He  replied  (on  the  same  day  that  he  received  this 
application,  February  16)  that  his  Hime  and  best  exertions 
*  would  be,  without  any  limitations,  entirely  at  the  service 
<  of  Government.' 

He  was  accordingly  appointed  as  engineer,  and  pro- 
ceeded to  design  and  superintend  the  manufacture  of  the 
required  buildings  and  all  their  internal  arrangements. 


462  MISCELLANEOUS  WORKS. 

They  were  sent  out  under  his  supervision,  and  erected 
at  Eenkioi,  on  the  Dardanelles.  All  use  for  the  buildings 
was  ended  with  the  conclusion  of  peace ;  but,  for  the 
seven  months  during-  which  they  were  occupied,  they  added 
much  to  the  comfort  of  more  than  thirteen  himdred  sick 
and  wounded  soldiers. 

Many  of  the  special  arrangements  adopted  at  Mr. 
Brunei's  suggestion  have  been  since  brought  into  general 
use;  and  the  success  of  these  buildings  was,  to  a  con- 
siderable extent,  influential  in  leading  the  Americans  to 
construct  similar  hospitals  during  their  civil  war.  These 
are  now  (1870)  being  copied  in  the  German  armies. 

The  history  of  the  Eenkioi  hospital  buildings  is  a 
striking  instance  of  the  zeal  with  which  Mr.  Brunei 
entered  into  any  undertaking  which  had  a  claim  upon 
his  assistance,  of  the  varied  experience  and  fertility  of  in- 
vention which  he  could  bring  to  bear  upon  any  subject, 
however  remote  it  might  seem  to  be  from  his  ordinary 
occupations,  and  of  the  minute  personal  attention  he  was 
accustomed  to  give  to  every  detail,  as  the  only  certain 
means  of  ensuring  success. 

Mr.  Brunei  entered  upon  his  duties  on  February  16,  and 
reported  to  the  War  Ofl&ce  on  March  5  that  he  had  not 
lost  any  time  nor  spared  any  exertion  or  any  means  in 
his  power  to  forward  the  important  business  he  had 
undertaken.  He  stated  that  he  availed  himself  freely  of 
the  advice  and  assistance  of  all  persons  to  whom  he  could 
apply  with  any  prospect  of  advantage ;  and  he  added, '  It  is 
'  most  gratifying  to  be  able  to  state  that  from  everybody  I 
'  have  received  the  most  zealous  and  cordial  assistance,  and 
*  found  it  sufficient  to  mention  the  object  of  my  enquiries 
'  to  obtain  immediately  every  assistance  I  could  possibly 
'  require.' 


RENKIOI  HOSPITAL.  463 

An  experimental  ward  was  erected  a  few  days  afterwards 
on  the  premises  of  tlie  Great  Western  Eailway  at  Pad- 
dington,  and  was  carefully  criticised  by  competent  persons  ; 
and,  the  plans  having  been  approved  of,  specifications  were 
made,  with  drawings  of  the  various  parts,  and  tenders  were 
invited  for  the  construction  of  the  buildings. 

The  following  paper  gives  a  description  of  the  buildings, 
and  was  written  by  Mr.  Brunei  in  order  to  satisfy  the 
curiosity  of  his  friends  :  ^ — 

March  1855. 

The  conditions  that  it  was  considered  necessary  to  lay  down  in 
designing  these  buildings  were,— 

First.  That  they  should  be  capable  of  adapting  themselves  to 
any  plot  of  ground  that  might  be  selected,  whatever  its  form,  level, 
or  inclination,  within  reasonable  limits. 

Secondly.  That  each  set  of  buildings  should  be  capable  of  being 
easily  extended  from  one  holding  500  patients  to  one  for  1,000  or 
1,500,  or  whatever  might  be  the  limit  which  sanitary  or  other  con- 
ditions might  prescribe. 

Thirdly.  That  when  erected  they  might  be  sure  to  contain 
every  comfort  which  it  would  be  possible  under  the  circumstances 
to  afford.     And — 

Fourthly.  That  they  should  be  very  portable,  and  of  the  cheapest 
construction. 

The  mode  in  which  it  has  been  sought  to  comply  with  these  con- 
ditions is  as  follows  : — 

The  whole  hospital  will  consist  of  a  number  of  separate  buildings, 
each  sufficiently  large  to  admit  of  the  most  economical  construction, 
but  otherwise  small  and  compact  enough  to  be  easily  placed  on 
ground  with  a  considerable  slope,  without  the  necessity  of  placing 
the  floor  of  any  part  below  the  level  of  the  ground,  or  of  having  any 
considerable  height  of  foundation  to  carry  up  under  any  other  part. 

These  separate  buildings  have  been  made  all  of  the  same  size  and 
shape ;  so  that,  with  an  indefinite  length  of  open  corridor  to  connect 
the  various  parts,  they  may  be  arranged  in  any  form,  to  suit  the 
levels  and  shape  of  the  ground. 

Each  building,  except  those  designed  for  stores  and  general  pur- 

'  This  appears  to  be  the  only  instance  in  which  Mr.  Brunei  printed  an 
account  of  any  of  his  works. 


464  MISCELLANEOUS  WORKS. 

poses,  is  made  to  contain  in  itself  all  that  is  absolutely  essential  for 
an  independent  hospital  ward-room ;  so  that,  by  the  lengthening  of 
the  corridors,  and  the  addition  of  any  number  of  these  buildings, 
the  hospital  may  be  extended  to  any  degree. 

To  ensure  the  necessary  comforts,  and  particularly  to  provide 
against  the  contingency  of  any  cargo  of  materials  not  arriving  on  the 
spot  in  time,  each  building  contains  within  itself  two  ward-rooms, 
one  nurse's  room,  a  small  store-room,  bath-room,  and  surgery, 
water-closets,  lavatories,  and  ventilating  apparatus. 

The  ward-room  is  made  wide  enough  and  high  enough  to  ensure  a 
good  space  of  air  to  each  bed,  even  if  these  should  be  unduly 
crowded.  Each  building  contains  two  ward-rooms,  intended  for 
twenty-six  beds  each,  which  is  found  in  practice  to  be  a  size  of  room 
admitting  of  proper  control  and  supervision. 

With  respect  to  closets  and  lavatories,  after  examining  and  con- 
sidering everything  that  has  been  done,  both  in  hospitals  of  the 
best  description  and  poor-houses  of  the  cheapest  construction,  it  was 
found  tliat  the  requisite  security  for  cleanliness  and  the  greatest 
amount  of  economy  of  labour,  and  of  consumption  of  water,  could  be 
obtained  by  a  cheap  description  of  water-closet  designed  for  the 
purpose ;  and  with  the  same  object  of  diminishing  the  amount  of 
labour  and  the  waste  of  water,  and  securing  cleanliness  without 
depending  upon  the  constant  attention  of  assistants,  fixed  basins  for 
lavatories  and  mechanical  appliances  for  supplying  and  drawing  off 
water  were  adopted. 

As  a  protection  against  heat,  experience  in  hot  climates  and 
experiments  made  expressly  for  the  purpose  satisfactorily  proved 
that  a  covering  of  extremely  thin  and  highly  polished  tin,  which 
reflects  all  direct  rays  of  heat,  was  the  cheapest,  lightest,  and  most 
effective  protection,  and  every  piece  of  woodwork  not  covered  with 
tin  is  to  be  whitewashed  externally.  Internally  the  lime-wash  has 
a  slight  tint  of  colour,  to  take  off  the  glare.  ^ 

To  secure  ventilation  in  a  hot  climate  with  low  buildings  extend- 
ing over  a  large  area,  and  therefore  incapable  of  being  connected 
with  any  general  system  of  ventilation,  it  was  considered  that 
forcing  in  fresh  air  by  a  small  mechanical  apparatus  attached  to 

'  On  this  application  of  tin  for  the  '  found,  however,  somewhat  difficult  to 

covering  of  the  roof.  Dr.  Parkes  ob-  '  place  it  so  as  to  exclude  rain,  and  the 

serves  {Manual  of  Practical  Hygiene,  '  surface  soon  became  tarnished.     The 

London,  1869,    p.    317):  —  'In    the  '  thermometric   experiments   did   not 

'  Crimean  War  the  roofs  of  Renkioi  '  show  a  greaterlesseningof  heat  than 

'  Hospital,  on  the  Dardanelles,  were  '  3°   Fahr.    below    houses    not    tin- 

'  covered  with  polished  tin ;    it  was  '  coated.' 


RENKIOI  HOSPITAL.  465 

each  building  would  be  the  only  effective  means.  Each  ward-room 
is  therefore  furnished  with  a  small  fan,  or  rotatory  air-pump,  which, 
easily  worked  by  one  man,  is  found  capable  of  supplying  1,000  to 
1,500  cubic  feet  of  air  per  minute,  or  20  to  30  feet  for  each  patient. 
This  air  is  conveyed  along  the  centre  of  the  floors  of  each  ward- 
room, and  rising  up  under  foot-boards  placed  under  the  tables,  is 
found  to  flow  over  the  floor  to  every  part  of  the  room. 

Besides  this  mechanical  supply  of  air,  opening  windows  are  pro- 
vided along  the  whole  length  of  the  eaves,  and  spaces  left  im- 
mediately beneath  the  roof  at'  the  two  gables,  amply  sufficient 
together  to  ventilate  the  rooms  thoroughly  if  any  breezes  are 
stirring,  without  the  help  of  the  fan. 

The  light  is  admitted  by  a  long  range  of  narrow  windows,  im- 
mediately under  the  eaves,  which  protect  them  from  the  direct  rays 
of  the  sun.  These  windows  open,  and  are  provided  with  shutters 
inside,  which  exclude  the  light,  but  admit  the  air. 

By  forcing  the  air  into  the  room,  instead  of  drawing  it  out,  the 
entrance  of  bad  air  from  the  closets,  drains,  or  any  surrounding 
nuisances  is  prevented.  The  fan  is  placed  at  the  opposite  end  to 
the  closets  and  di-ains ;  and  all  the  fans  being  in  the  open  corridor, 
the  workmen  can  be  seen  by  a  single  sentry,  and  kept  to  their  work. 

The  buildings,  as  now  constructed,  are  adapted  to  protect  the 
interior  from  external  heat.  Should  winter  come  while  they  are 
still  in  use,  the  framework  is  adapted  to  receive  an  internal  lining  of 
boarding,  and  the  interstices  can  be  filled  with  a  non-conductor. 

Two  buildings,  of  the  same  form  and  dimensions,  are  fitted  up 
with  every  convenience  as  store-rooms  and  apothecaries'  dispen- 
saries. 

An  iron  kitchen,  slightly  detached  fi-om  the  wooden  buildings, 
fitted  up  with  every  contrivance  capable  of  cooking  for  fi-om  500  to 
1,000  patients,  is  attached. 

A  similar  building  of  iron  is  fitted  up  with  all  the  machinery 
lately  introduced  in  the  baths  and  washhouses  of  London  for  wash- 
ing and  drying  in  the  minimum  space,  and  with  the  least  amount  of 
labour. 

If  an  aggregate  of  buildings  should  be  placed  in  one  spot  for  more 
than  1,000  patients,  a  second  kitchen  would  be  added,  but  the 
single  washhouse  would  be  sufficient. 

With  each  set  of  buildings  is  sent  a  pumping  apparatus,  a  small 
general  reservoir,  and  a  sufficient  length  of  main,  with  all  its 
branches,  to  supply  water  to  every  detached  building;  and  all  the 
pipes  and  branches  are  of  such  construction  as  to  admit  of  being  put- 

H  U 


466  MISCELLANEOUS  WOEKS. 

together  without  any  soldering  or  cement.  A  system  of  drains  is 
provided,  formed  of  wooden  trunks  properly  prepared,  and  of  suffi- 
cient extent  to  form  a  complete  and  perfect  system  of  drainage  from 
every  building  to  a  safe  distance  from  the  general  hospital.^ 

A  number  of  small  buildings,  intended  to  be  detached  from  the 
main  body,  are  provided  for  residences  for  the  officers  and  servants 
of  the  establishment,  and  for  a  small  detachment  of  soldiers.  A 
slaughter-house  and  store-yard  and  some  other  appurtenances  are 
also  provided,  the  extent  of  Avhich  depends  on  the  circumstances  of 
each  case. 

The  construction  of  each  building  has  been  studied  with  very 
great  care,  so  as  to  secure  the  minimum  amount  of  material,  the 
least  possible  amount  of  work  in  construction  or  erection,  and  the 
means  of  arranging  all  the  parts  in  separate  packages  capable  each 
of  being  carried  by  two  men ;  and  the  result  is  that  each  building 
is  the  cheapest  and  lightest  that  has  yet  been  constructed  in  propor- 
tion to  the  area  covered. 

For  the  transport  of  the  materials  to  the  spot  selected,  two  sailing- 
vessels  and  three  steamboats,  capable  of  carrying  one  hospital  for 
1,000  men,  which  is  the  first  about  to  be  sent  out,  have  been 
secured.  In  each  vessel  is  sent  a  certain  number  of  complete 
buildings,  with  every  detail,  including  their  proportion  of  water- 
pipes  and  drains,  closets,  lavatories,  baths,  &c.,  and  a  small  amount 
of  surplus  material  and  tools ;  and  in  each  of  two  separate  vessels 
are  sent  a  set  of  pumps  and  mains,  and  a  kitchen  and  washhouse. 
So  that  by  no  accident,  mistake,  or  confusion,  short  of  the  loss  of 
several  of  the  ships,  can  there  fail  to  be  a  certain  amount  of  hospital 
accommodation,  provided  with  every  comfort  and  essential. 

The  peculiar  circumstances  under  which  these  establishments  are 
likely  to  be  placed  have  required  not  only  peculiarities  of  construc- 
tion, but  these,  in  turn,  have  required  numerous  provisions  and 
details  specially  designed  for  the  case. 

As  all  the  buildings,  except  the  kitchen  and  washhouse,  are  en- 
tirely constructed  of  wood,  it  is  considered  essential  that  no  stove  or 
fire-place  of  any  description  should  be  allowed  in  any  part,  except 
in  the   iron  buildings;  in  these  there  is  provision  for  an  ample 

•  '  At    Eenkioi,    in    Turkey,   Mr.  '  box  below  the  cistern,  to  economise 

'  Brunei  supplied  square  wooden  sewers  '  water,  never  got  out  of  order,  and  in 

'  about  15  inches  to  the  side ;  they  were  '  fact  the  drainage  of  the  hospital  was 

'  tarred    inside,   and   acted   most  ad-  '  literally  perfect.    I  have  little  doubt 

'  mirably  without  leakage  for  fifteen  '  such  well-tarred  wooden  sewers  would 

'  months,  till  the  end  of  the  war.  The  '  last  two  or   three   years '  (Parkes's 

'  water-closets  (Jennings's  simple  sy-  Maimal  of  Practical  Hygiene,  p.  635). 
'phon),  arranged  with  a  small  water- 


RENKIOI  HOSPITAL.  467 

supply  of  hot  water,  but  each  ward-building  is  provided  with  a 
small  boiler,  heated  by  candles,  which  by  experiment  have  been 
found  amply  sufficient  for  all  that  can  be  required.  Candles  are  to 
be  used  exclusively  for  lighting,  and  lamps  and  lanterns  have  been 
constructed  for  the  purpose. 

A  proper  supply  of  fire-engines  is  provided,  and  other  precau- 
tionary measures  are  adopted  against  fire. 

The  condition  of  portability  requiring  that  the  walls  and  roofs 
should  be  of  the  thinnest  and  slightest  possible  construction,  protec- 
tion against  heat  has  been  provided  for  in  the  manner  before  referred 
to,  and  good  ventilation  secured  by  mechanical  means.  But,  in 
addition  to  this,  there  is  a  very  simple  provision  made  for  passing 
the  air  over  a  considerable  extent  of  water  surface ;  which  would 
not  only  cool  it,  but  diminish  the  effect  of  excessive  dryness,  which 
is  said  to  be  occasionally  in  this  climate  more  oppressive  than  even 
the  temperature. 

As  the  space  in  the  wards  is  very  liable  to  be  encroached  upon, 
and  the  beds .  crowded,  portable  baths  have  been  designed,  into 
which  the  more  helpless  patients  can  be  lifted,  and  lowered,  on  a 
frame  or  sack,  without  requiring  space  for  assistants  to  stand 
around,  or  with  the  bath  placed  only  at  the  foot  of  the  bed. 

The  kitchen  and  laundry  have  each  required  many  special  con- 
trivances. 

The  instructions  given  to  Mr.  Brunton,  the  engineer,  who  has 
been  sent  out  for  the  purpose  of  erecting  these  buildings,  are,  to 
commence  by  determining  on  his  plan  of  arrangement  to  suit  the 
peculiarities  of  the  ground,  and  then  to  construct  the  complete 
system  of  drainage  and  to  lay  on  the  water  supply  before  the 
buildings  are  rendered  capable  of  receiving  patients ;  and  all  the 
arrangements  of  the  details  are  designed  with  the  view  of  obtaining, 
as  the  first  conditions,  a  perfect  system  of  drainage,  a  good  supply 
of  water,  Ixee  ventilation,  and  the  most  perfect  cleanliness,  quite 
independent  of  labour  and  of  the  continued  attention  of  assistants ; 
these  conditions  being  assumed  as  essentials,  preceding  even  the 
mere  covering  in  of  space  and  providing  shelter  for  patients. 

The  cost  of  these  buildings,  delivered  ready  for  shipment,  will  be 
from  18/.  to  22Z.  per  bed,  allowing  1,000  cubic  feet  of  space  in  each 
ward-room  to  each  bed.  If  pressing  emergency  should  lead  to  the 
beds  being  placed  closer,  and  fifty  per  cent,  more  patients  should 
be  introduced,  it  is  believed  that  the  perfect  system  of  ventilation 
which  is  secured  would  render  these  hospitals  very  superior  to  any 
now  in  use  for  the  army. 

H  u  2 


468  MISCELLANEOUS  WORKS. 

Of  the  cost  above  named,  about  121.  per  bed  is  that  due  to  the 
•ward-rooms  themselves,  with  all  their  conveniences  attached,  and 
the  rest  arises  from  the  cost  of  the  store-rooms,  kitchen,  machinery, 
residences,  and  appurtenances. 

The  cargo  space  required  for  their  conveyance  is  about  a  ton  and 
a  half  to  a  ton  and  three-quarters  measurement  per  bed. 

As  the  buildings  were  completed  the  work  of  transport 
was  commenced;  and  twenty- three  steamers  and  sailing- 
vessels  were  despatched,  containing  altogether  about 
11,500  tons  measurement  of  materials  and  stores.  The 
first  vessel  arrived  out  on  May  7,  1855,  and  the  last  on 
December  5,  in  the  same  year. 

Meanwhile  the  important  question  of  the  site  for  the 
hospital  buildings  was  being  determined  by  Dr.  Parkes, 
the  Medical  Superintendent,  with  the  assistance  of  Mr. 
Brunton,  who  was  in  constant  communication  with 
Mr.  Brunei  on  the  subject. 

After  visiting  various  places.  Dr.  Parkes  finally  selected 
a  spot  near  the  village  of  Renkioi,  on  the  Dardanelles. 
In  a  report  which  he  addressed  to  the  Secretary  of  State 
for  War  upon  the  formation  and  general  management  of 
the  hospital,  he  thus  describes  '  the  nature  of  the  site, 

*  and  the  means  which  were  used  in  the  formation  of  the 

*  hospital : ' — 

The  piece  of  land  on  which  the  hospital  was  placed  was  a  shelving 
bank  of  a  light,  porous,  sandy  soil,  resting  on  marl ;  it  contained 
about  270  acres,  stretched  tongue-like  into  the  waters  of  the  Dar- 
danelles, and  was  bounded  inland  by  a  low  range  of  sandstone  hills, 
which  were  themselves  backed  by  rather  lofty  ranges  of  oolitic  lime- 
stone, intersected  by  deep  ravines.  The  tongue  of  land  formed  two 
bays,  north  and  south,  in  both  of  which  was  good  anchorage  for 
ships,  and  as  the  wind  blew  almost  always  up  or  down  the  Darda- 
nelles, i.e.  from  the  north-east  or  south-west,  one  or  other  of  these 
bays  was  comparatively  calm  in  all  winds  except  those  which  came 
infrequently  from  the  west. 

The  position  of  the  spot  was  on  the  Asiatic  coast,  nine  miles  from 


RENKIOI  HOSPITAL.  469 

the  mouth  of  the  Dardanelles,  in  lat.  40°  2',  long.  26°  21'.     It  was 
the  site  of  the  port  of  an  old  Greek  city,  the  ancient  Ophrynium. 

The  extreme  point  of  this  tongue  of  land  was  about  10  feet  above 
the  sea,  but  from  this  point  it  rose  regularly  and  gradvially  to  about 
100  feet  above  the  sea.  An  admirable  fall  was  thus  given  for 
drainage,  and  so  gradual  was  the  rise  that  the  wooden  houses  were 
placed  on  the  ground  without  terracing  or  excavation,  whereby  very 
great  expense  was  saved.  The  extreme  length  from  the  point  to  a 
spot  too  steep  for  the  erection  of  houses  was  about  half  a  mile,  and 
we  were  enabled  thus  to  place  down  the  centre  of  the  tongue  of  land 
no  less  than  thirty-four  houses,  capable  of  holding  1,500  sick,  in  one 
long  line  on  either  side  of  the  central  corridor,  an  arrangement 
which  facilitated  very  greatly  the  laying  of  both  water-pipes  and 
drain-tubes.  In  fact,  we  were  able  to  carry  out  the  plan  which  Mr. 
Brunei  had  suggested  as  the  best. 

There  was  enough  space  on  the  tongue  of  land,  on  either  side  of 
this  long  central  line,  for  two  shorter  parallel  lines  of  seventeen 
houses  each. .  These  two  lines  Avere  placed  one  to  the  north,  and  the 
other  to  the  south  of  the  large  central  hospital.  Each  was  capable 
of  containing  750  men,  and  one  of  them  to  the  north  was  nearly 
completed  when  the  declaration  of  peace  put  a  stop  to  the  works. 

On  the  sides  of  the  hills  in  rear  were  numerous  small  springs  of 
excellent  water,  which  were  collected  together  and  conveyed  in 
earthenware  pipes  to  a  large  reservoir,  placed  by  Mr.  Brunton  70 
feet  above  the  highest  house,'  which  was  itself  about  60  feet  above 
the  sea.  From  this  reservoir  the  water  was  carried  in  iron  pipes 
down  the  centre  of  the  long  corridor,  and  at  every  ward  (which  was 
placed  at  intervals  at  either  side  of  the  corridor)  a  leaden  service- 
pipe  came  off,  and  led  an  abundant  and  never-ceasing  supply  into 
the  ward  cisterns,  which  supplied  the  baths,  lavatories,  and  closets. 
By  this  arrangement  all  necessity  for  pumping  water  was  avoided, 
and  the  sewers  were  able  to  be  flushed  very  perfectly. 

The  lavatories  and  closets  were  placed  at  the  ends  of  the  wards 
most  remote  from  the  corridor,  and  immediately  outside  them  ran 
the  two  main  sewers,  which  at  their  sea  terminations  were  carried 
some  distance  into  the  Dardanelles. 

The  plan  of  the  hospital  may  be  at  once  understood  by  imagining 
a  covered  way,  open  at  the  sides,  and  22  feet  wide,  running  nearly 
east  and  west,  and  reaching  for  a  length  of  more  than  a  third  of  a 
mile,  on  either  side  of  which  stood,  at  intervals  of  27  feet  on  the 
south  side,  and  in  most  cases  94  feet  on  the  north,  the  thirty-four 
houses,  each  of  which,  as  already  said,  was  100  feet  long,  40  feet 


470 


MISCELLANEOUS  WORKS. 


wide,  12  feet  high  at  the  eaves,  and  25  in  the  centre,  and  was 
capable  of  containing  fifty  patients,  with  an  allowance  of  nearly 
1,300  cubic  feet  of  air  for  each  man.  Some  portion  of  this  space 
was  occupied  by  the  closets  and  some  small  rooms  used  as  orderlies' 


Fig.  22.     Eenkioi  Hospital, 

WARD  BUILDING. 

A.  Corridor  p.  Lavatory,  &c. 

B.  Ward  room  g.  Ventilating  fan 

C.  Orderlies'  bed-room  h.  Ventilating  air-trunk 

D.  Bath-room  i.  Main  drain 

E.  Medical  officer  j.  Tables  in  wards 


Tramverie  Section. 


Lotigitudinal  Section. 


Blddtidd,btjbtibdOd 


t3*~^ 


41 


C 


5-i:; 


J  J  i~aia~j~inr:n3trri 


□DaaaaaaaDDD 


ddddddddd 


«5rzrrr:Jkrx 


g=r"?>rT-:t 


Br-n   r-i   r-i 


DDaDrrnnnanDDD 


UM^--^- 


Ground  plan. 


VWiTmi't- 


Scale  of  feet. 

and  bath-rooms.  Thirty  of  these  houses  were  used  as  wards ;  four 
were  used  as  dispensaries  and  purveyor's  stores.  A  drawing  by 
Mr.  Brunton,  showing  the  arrangements  of  one  of  the  wards,  is 
attached.! 

To  the  south  of  each  division  of  ten  houses  was  placed  an  iron 
kitchen,  which  afforded  the  necessary  accommodation  for  preparing 
500  diets. 

At  the  inland  extremity  of  the  corridor  were  placed  two  iron 
laundries,  the  water  from  which  (some  4,000  gallons  daily)  was 
passed  into  the   sewers.     Beyond  the  laimdries  were  placed  on 

'  The  woodcut,  fi  .  22,  is  a  reduction  of  part  of  this  drawing. 


RENKIOI  HOSPITAL.  '471 

either  side  the  wooden  houses  of  the  medical  and  other  officers,  ■who 
were  thus  able  to  see  down  either  side  of  this  long  line,  and  to  pre- 
serve to  a  certain  extent  surveillance  over  the  patients. 

The  two  smaller  hospitals  were  constructed  on  a  similar  plan, 
each  range  having,  however,  only  one  iron  laundry  inland,  and  one 
iron  kitchen  in  the  centre  of  the  range. 

About  half  a  mile  from  the  hospital,  close  to  the  sea  in  the  south 
bay,  three  store-houses  were  erected,  and  a  railway  led  from  an 
adjacent  jetty  or  pier  by  the  side  of  these  store-houses  to  the  centre 
of  the  main  hospital.  Had  the  war  continued,  it  would  have  been 
carried  to  the  north  pier  and  bay,  and  would  also  have  had  a 
branch  running  along  the  corridor  of  each  hospital,  so  as  to  deposit 
the  sick  at  the  very  doors  of  the  wards  into  which  they  were  to  go. 

Nothing  could  exceed  the  simplicity  of  the  whole  arrangement ,'  it 
was  a  repetition  of  similar  parts  throughout ;  and  experience  enables 
me  to  say,  that  nothing  could  be  better  adapted  for  a  hospital  than 
this  system  of  isolated  buildings,  between  every  one  of  which  was  a 
large  body  of  moving  air,  rendering  ventilation  easy,  and  communi- 
cation of  disease  from  ward  to  ward  impossible. 

The  introduction  of  the  covered  way  connecting  the  various 
houses  was  a  happy  idea.  In  the  summer  this  corridor  was  left 
quite  open  at  the  sides,  and  formed  a  cool  walk  for  the  convalescents ; 
while  in  winter  we  boarded  up  its  north  side,  so  that  in  the  coldest 
blasts  of  the  northern  wind  the  men  were  protected,  and  were  able 
to  leave  their  wards  and  to  take  exercise.  I  need  only  further 
observe  that,  in  order  to  secure  perfect  ventilation,  not  only  were 
openings  left  under  the  eaves  and  in  the  gables  of  the  buildings 
(which  could  be  closed  in  cold  weather),  but  air-shafts  were  placed 
under  the  floors  through  which  1,000  cubic  feet  of  air  per  minute 
could  be  forced  into  the  wards  by  fans  placed  in  the  corridor 
and  worked  by  hand  [see  fig.  22].  As  the  amount  of  wind  at 
Eenkioi  was  always  considerable,  we  never  had  occasion  to  use  these 
machines ;  but  had  the  hospital  been  placed  in  a  less  airy  situation, 
they  would  have  been  of  the  greatest  use. 

For  the  construction  of  this  hospital  every  necessary  part  was 
sent  out  by  Mr.  Brunei.  The  houses  were  erected  with  great  care 
by  Mr.  Brunton,  assisted  by  Mr.  Eassie,  jun.,  and  by  eighteen 
English  workmen  (thirteen  carpenters,  one  pipelayer,  three  plumbers, 
and  one  smith)  sent  out  for  this  purpose.  On  account  of  the 
size  and  height  of  the  houses  (which  were  many  times  the  size 
of  the  largest  Crimean  huts),  the  framework  was  obliged  to  be  put 
together  very  carefully,  and  Mr.  Brunton  felt  it  necessary  to  employ 


472  MISCELLANEOUS  WORKS, 

none  l)ut  the  English  .workmen  on  this  duty ;  consequently  the 
erection  of  the  houses  took  much  longer  time  than  we  originally 
anticipated ;  but  during  the  winter  we  had  reason  to  be  satisfied 
that  Mr.  Brunton  had  done  Avisely,  for,  in  spite  of  the  heavy  winds 
we  often  had,  no  finished  house  was  ever  damaged,  except  in  one  or 
two  instances  to  a  very  slight  amount. 

The  erection  of  the  houses  was  commenced  on  May  21,  1855. 
On  July  12  I  reported  the  hospital  ready  for  300  sick;  on  August  11 
it  was  ready  for  500,  and  on  December  4  for  1,000  sick.  By 
January  1856,  viz.  seven  months  after  its  commencement,  it  was 
ready  for  1,500  sick;  and  when  the  works  were  discontinued, at  the 
end  of  March  1856,  we  could,  with  a  little  pressure,  have  admitted 
2,200  patients.  In  about  three  months  more  this  immense  esta- 
blishment for  3,000  sick  could  have  been  finished  and  in  full  activity. 

On  the  working  of  tlae  system.  Dr.  Parkes  says  in  his 
report : — 

Although  the  hospital  was  ready  for  300  patients  on  July  12, 
1855,  we  were  not  called  on  to  receive  sick  till  October  2.  From 
that  time  till  February  11,  eleven  ships  arrived  from  Balaclava 
and  Smyrna.  .  .  .  After  February  11,  1856,  we  received  no  more 
sick.  The  total  number  of  military  patients  who  were  received 
from  these  ships  was  1,244,  and,  in  addition,  87  soldiers  were  ad- 
mitted, either  from  the  guard  at  Eenkioi  or  Abydos,  from  transport 
ships  which  touched  at  Renkioi,  or  from  the  English  soldiers  attached 
to  the  Osmanli  Horse  stationed  at  the  town  of  Dardanelles  during  the 
summer  and  autumn. 

The  total  number  of  admissions  Avas  1,331 — 

Cured  .......     961 

Invalided         ......     320 

Deaths  .,,...       50 

Besides  the  military  patients,  we  admitted  77  civilians 

The  total  number  of  patients  actually  treated  was  1,408,  the 
largest  number  at  any  one  time  642.  .  .  . 

The  anticipations  we  had  formed  of  the  health  of  the  spot  and  of 
its  adaptability  for  a  hospital  were  quite  confirmed  by  the  ex- 
perience of  more  than  a  year.  The  winter  was  mild,  and  the 
climate  seemed  especially  adapted  for  pulmonary  complaints,  of 
which  we  had  a  large  number.  The  changes  of  temperature,  it  is 
true,  were  very  sudden  and  great ;  but  as  the  men  had  warm  wards, 
these  changes  were  not  felt,  j^nd  there  were  few  days  in  which  the 


RENKIOI  HOSPITAL.  473 

moat  delicate  consumptive  patient  could  not  get  out  into  the 
sheltered  corridor  for  a  short  time  during  the  day.  The  con- 
struction of  the  hospital  was  admirably  adapted  for  men  recovering 
from  illness.  As  all  the  wards  were  on  the  ground,  as  soon  as  a 
man  could  crawl  he  could  get  into  the  air  either  in  the  cool  and 
sheltered  corridor  or  in  the  spaces  round  the  hospital. 

In  April  and  May  1856  the  greater  number  of  the  patients  had 
been  either  discharged  or  invalided  home,  and  .  .  .  the  medical 
and  nursing  staff  was  reduced  more  than  one-half,  and  .  .  . 
in  the  middle  of  July  the  remaining  staff  was  sent  home. 

All  the  stores  which  were  likely  to  be  used  or  to  sell  well  in 
England  were  sent  home,  and  everything  else  was  sold  on  the 
ground.  Major  Chads,  with  twenty  soldiers,  and  Mr.  Brunton 
remained  behind,  to  superintend  the  sale  of  the  buildings,  which 
took  place  on  September  20. 


474 


CHAPTEE  XVI. 

MR.  BRUNELS  PROFESSIONAL  OPINIONS  AND  PRACTICE. 

.       SCHEME  OF  THE    CHAFTEB ME.  BRUNEL's    POSITION  IN    EELATION    TO  THE 

COMPANIES  OF  WHICH   HE  "WAS    ENGINEBB LETTER  ON    THE    DIRECTION  OF 

RAILWAY    WORKS     IN     ITALY    (mARCH  4,  1845) LETTER     ON   THE   POSITION 

OF    JOINT     ENGINEER    (OCTOBER  16,  1843) LETTER    ON    THE    POSITION    OF 

CONSULTING  ENGINEER  (DECEMBER  30,  1851) — LETTER  ON  THE  POSITION    OF 

THE    ENGINEER    IN     RELATION     TO     THE     CONTRACTORS     (mAY     26,    1854) 

LETTERS     ON     THE    POSITION    OF    THE     ENGINEER    IN     RELATION    TO    THE 

DIRECTORS     (APRIL     15,    1850 ;     DECEMBER     6,    1851  ;     JANUARY   22,    1857) 

MR.     BRUNEL's    ASSISTANTS — LETTERS     ON    INTERFERENCE     OF     DIRECTORS 
WITH     THE   ASSISTANT    ENGINEERS    (JANUARY    19,1842;    JANUARY   28,1842; 

JANUARY    12,1851) MR.    BRUNEl's  PUPILS HIS    RELATIONS    WITH    OTHEK 

ENGINEERS — INVENTORS LETTER  IN  REPLY  TO  AN  INTENTOR  (SEPTEMBER 

17,  18*7) — MR.  BRUNEl's  VIEWS  AS    TO    STATE    INTERFERENCE — LETTER    ON 
THE    ROYAL    COMMISSION    ON     THE    APPLICATION    OF    IRON    TO     RAILWAY 

STRUCTURES    (mARCH    13,1848) LETTER    ON   A   PROPOSAL   TO    OBTAIN    THE 

RECOGNITION    IN    ENGLAND    OF   DECORATIONS    CONFERRED    AT   THE    PARIS 

EXHIBITION    OF  1855  (FEBRUARY   9,  1856) ME.    BRUNEl's    OPINION    ON  THE 

PATENT    LAWS MEMORANDUM   FOR   EVIDENCE    BEFORE    THE    SELECT    COM- 
MITTEE    OF     THE    HOUSE     OF    LOEDS     ON    THE    PATENT    LAWS,     1851 EX- 

TEACT  FEOM    OBSERVATIONS    ON    THE   PATENT  LAWS,  MADE  BY  MR.  BRUNEL 
AT  A  MEETING  OF  THE  SOCIETY  OF  ARTS  (mARCH  26,  1856). 

It  is  proposed  in  tlie  earlier  part  of  this  chapter  to 
describe,  principally  by  extracts  from  Mr.  Brunei's  corre- 
spondence, the  position  occupied  by  him  in  regard  to  the 
Companies  which  he  served,  and  to  the  various  classes 
of  persons  with  whom  he  acted  in  the  discharge  of  his 
duties  as  engineer  to  those  Companies.  These  selections 
are  followed  by  extracts  relating  to  questions  of  general 
professional  interest. 

The  first  point  to  be  considered  is,  his  relations  with  the 
Companies  which  employed  him  as  their  engineer,  and  with 
the  Directors  who  formed  the  governing  body. 

Mr.  Brunei   conceived  that   he  was,  by  virtue   of  his 


ON  THE  DIRECTION  OF  RAILWAY  WORKS.  475 

appointment  as  engineer,  the  sole  and  confidential  adviser 
of  the  Company  in  all  matters  relating  to  the  construction 
and  mechanical  working  of  the  undertaking.  He  did 
not  permit  any  one  to  be  associated  with  him  in  the 
supreme  control  over  those  matters  which  were  in  his 
department ;  and  the  moment  he  thought  that  confidence 
was  no  longer  placed  in  him,  he  was  prepared  at  every 
sacrifice  to  resign  his  office.  But,  as  long  as  he  was 
supported  by  the  Directors,  he  thoroughly  identified  him- 
self with  their  cause,  and  he  never  allowed  considera- 
tions of  health  or  convenience  or  pecuniary  advantage 
to  interfere  with  the  performance  of  any  service  which 
he  could  render  them.  The  fearless  independence  of  his 
position,  combined  with  his  absolute  devotion  to  the 
interests  of  his  employers,  was  no  doubt  the  secret  of  the 
immense  influence  he  acquired,  and  of  the  affectionate 
esteem  with  which  he  was  regarded  by  those  whom  he 
served. 

On  the  Direction  of  Railway  Works. 

March  4,  1845. 

I  have  well  considered  the  communication  which  you  did  me  the 
honour  of  making  on  the  part  of  the  Government  of  His  Majesty 
the  King  of  Sardinia  with  reference  to  my  undertaking  the  direction 
of  the  works  of  the  proposed  railway  from  Genoa  to  Alessandria, 
about  to  be  executed  by  the  Government  itself.     .     .     . 

In  the  first  place  I  assume  that  if  the  direction  of  the  works  be 
confided  to  me  as  the  engineer,  the  same  degree  of  confidence  will 
be  placed  in  me,  and  the  same  authority  will  result  from  that  con- 
fidence, as  would  be  the  case  in  England — that  is  to  say,  I  should  be 
the  confidential  adviser  of  the  Government  in  all  engineering 
questions  connected  with  this  railway,  my  communications  would  in 
all  matters  be  made  direct  with  the  Government,  and  as  long  as  I 
continued  to  be  responsible  for  the  direction  of  the  works  no 
other  engineer  would  be  consulted  or  allowed  to  interfere.  Of  course 
I  claim  no  right  to  direct  anything  but  that  which  has  the  sanction 
of  the  Government ;  but  I  should  claim  to  be  their  sole  adviser  on 
all  engineering  points  (connected  with  the  construction  of  the  rail- 


476  PROFESSIONAL  OPINIONS  AND  PRACTICE. 

way),  and  to  possess  their  entire  confidence ;  and  also  that,  if  any 
portion  of  that  full  confidence  were  at  any  time  withdrawn,  the  fact 
should  be  immediately  communicated  to  me ;  when,  after  making 
every  possible  arrangement  to  prevent  inconvenience  to  the  Govern- 
ment, I  might  withdraw  from  the  direction  of  the  work.  This  is 
the  position  which  an  engineer  of  any  standing  occupies  in  this 
country,  whether  acting  for  the  Government  or  for  individuals  ;  and 
I  believe  it  to  be  as  fully  essential  for  the  success  of  the  proposed 
undertaking,  and  as  necessary  for  the  interests  of  His  Majesty's 
Government  as  for  my  satisfaction,  that  I  should  be  placed  in  a 
feimilar  position. 

-  The  circumstance  of  my  being  a  foreigner,  of  my  being  rarely 
present  to  meet  objections,  if  any  are  raised,  of  the  unavoidable  fre- 
quency of  real  as  well  as  apparent  failures  in  works  of  such  variety 
and  so  numerous  as  those  which  occur  on  this  line,  of  the  difiiculties 
which  always  attend  the  introduction  of  novelties  and  everything 
connected  with  a  railway,  the  rapid  mode  of  its  construction,  the 
necessity  which  experience  has  proved  of  frequently  adopting  appar- 
ently hasty  and  hazardous  methods  to  prevent  the  evil  consequences 
of  protracted  delays, — all  this  will  be  novelty  with  you  as  it  was  a  few 
years  ago  in  England,  all  these  circumstances  combine  to  render  it 
peculiarly  essential  to  the  satisfactory  progress  of  the  undertaking 
that  it  should  be  well  known  to  all  parties  that  full  and  entire  con- 
fidence is  placed  in  me  by  the  Government. 

It  will  of  course  also  be  necessary  that  all  parties  acting  under 
me  in  the  direction  of  the  works  should  feel  that  their  appointment 
or  dismissal  depends  entirely  upon  me. 

In  return  for  the  confidence  thus  placed  in  me  and  the  autho- 
rity given  to  me,  I  should  of  course  know  no  interest  but  that  of  the 
Govemmenti  If  the  Government  is  willing  to  appoint  me  engineer 
according  to  this  definition  of  my  position,  I  shall  feel  pride  in 
the  appointment,  and  I  shall  devote  my  best  energies  to  the 
accomplishment  of  one  of  the  finest  and  most  interesting  works  of 
the  day.     .     .     . 

On  the  Position  of  Joint  Engineer. 

October  16,  1843. 
The  contents  of  your  letter  of  yesterday  take  me  quite  by  sur- 
prise ;  the  expression  you  use  of  joint-engineership  implies  a  view 
of  our  relative  position  diametrically  opposed  to  the  views  which  I 
have  plainly  and  unequivocally  expressed  to  you  and  to  the  Directors 
when  such  a  thing  as  joint-engineership  was  proposed  to  and  rejected 
by  mc,     .     .     . 


ON  THE  POSITION  OF  ENGINEER.  477 

You  wind  up  your  letter  by  saying  *  we  have  accepted  the  duty 
'  of  joint-engineers,'  &c.,  and  you  add  a  postscript  requesting  me  to 
lay  your  letter  before  the  Directors:  this  I  should  have  been 
obliged  to  do  without  any  such  request.  I  never  accepted  the  duty 
of  joint-engineer;  I  have  always  refused  to  do  so.  I  thought  I 
had  made  this  very  clear  both  to  you  and  the  Directors  on  several 
occasions ;  indeed  I  often  feared  that  I  expressed  myself  too  strongly 
instead  of  leaving  it  capable  of  misapprehension.     ...  \ 


On  the  Position  of  Consulting  Engineer. 

December  30,  1851. 

I  shall  be  happy  to  act  in  any  capacity  (subject  to  the  exception  I 
wiU  further  explain)  which  can  be  useful  to  your  Company  ;  .  .  . 
but  the  exception  I  have  to  make  is  one  which  perhaps  resolves  itself 
merely  into  a  question  of  name.  The  term  *  Consulting  Engineer  '  is 
a  very  vague  one,  and  in  practice  has  been  too  much  used  to  mean  a 
man  who  for  a  consideration  sells  his  name,  but  nothing  more.  Now 
I  never  connect  myself  with  an  engineering  work  except  as  the  Direct- 
ing Engineer,  who,  under  the  Directors,  has  the  sole  responsibility 
and  control  of  the  engineering,  and  is  therefore  *  The  Engineer ; '  and 
I  have  always  objected  to  the  term  '  Consulting  Engineer.'     . 

In  a  railway  the  only  works  to  be  constructed  are  engineering 
works,  and  there  can  really  be  only  one  engineer ;  and  in  your  case 
especially,  where,  as  I  apprehend,  the  contractor  is  part  of  the  company, 
and  has  to  be  treated  with  consideration,  and  perhaps  less  vigorously, 
at  all  events  differently  from  an  ordinary  contractor,  considerable 
management  and  discretion  will  be  required  of  your  engineer,  and 
a  degree  of  responsibility  which  I  would  only  undertake  if  sole 
engineer.  Possibly  this  is  what  you  meant,  and  that  I  alone  see  the 
distinction,  but  it  is  an  important  one  with  which  you  may  not  be 
so  familiar  as  I  am. 


On  the  Position  of  the  Engineer  in  Relation  to  the 
Contractors. 

May  26,  1854. 

I  have  in  due  course  taken  steps  to  prepare  a  report  for  the 

Directors  on  the  state  of  the  work,  but  you  must  not  apply  to  the. 

contractors  for  such  reports.     In  the  first  place,  it  would  lead  to 

ridiculous  contradictions,  inasmuch  as  most  likely  my  reports  would 


478  PROFESSIONAL  OPINIONS  AND  PRACTICE. 

differ  materially  from  theirs ;  and  also  it  would  reverse  the  whole 
order  of  things.  I  must  alone,  so  long  at  least  as  I  am  the  pro- 
fessional adviser  of  the  Company,  be  the  medium  of  communication 
with  contractors  in  all  matters  which  the  terms  of  the  contract  refer 
to  me.  I  am  very  particular  about  the  regularity  of  all  these  forms, 
because,  although,  while  all  goes  smooth,  they  are  of  no  consequence, 
yet  if,  unfortunately,  any  little  difficulties  arise,  then  it  is  unpleasant 
and  difficult  to  alter  a  previous  course. 

I  would  ask,  then,  that  all  official  communications  with  the  con- 
tractors should  be  made  through  me,  and  that,  even  as  regards  these, 
we  should  confer  together  before  any  formal  resolution  should  at  any 
time  be  passed,  so  as  to  be  sure  that  it  is  properly  worded,  and  that 
no  awkward  precedent  is  established. 

You  may  have  seen  that  a  great  appeal  case  before  the  Lords, 
affecting  claims  of  some  hundreds  of  thousands,  has  just  been  finally 
decided  in  favour  of  the  Great  Western  Railway  Company  after 
fourteen  years  of  litigation ;  ^  and  this  favourable  decision  was 
entirely  obtained  by  carefully  prepared  specifications,  and  by  my  not 
having  departed  in  any  single  case,  in  years  of  correspondence,  from 
the  letter  and  spirit  of  the  contract,  and  particularly  from  the  fact — 
strongly  commented  upon  by  Lords  Cranworth  and  Brougham — that 
I  had  maintained  my  position  of  umpire  between  the  Company  and 
contractor.  It  is,  then,  as  essential  to  the  Company  as  to  the  con- 
tractor and  to  me  that  I  should  maintain  that  position. 


On  the  Relations  between  the  Engineer  and  the  Directors. 

I. 

April  15,  1850. 

You  will  remember  that  on  the  2nd  of  November  last  I  addressed 
you  a  letter  on  the  subject  of  my  acting  as  umpire  in  several  cases 
of  reference  between  the  Company  and  contractors,  who  were 
raising  heavy  claims  against  the  Company,  in  Avhich  I  expressed  my 
readiness  to  act  in  a  very  responsible,  laborious,  and  thankless 
position.     .     . 

I  am  also  still  acting,  so  far  as  my  services  can  be  useful,  as 
your  engineer ;  and  in  arranging  with  contractors,  &c.,  there  is 
even  noAv  much  remaining  to  be  done.  As  long  as  I  enjoy  your 
fuU  confidence,  it  would  be  a  great  pleasure  to  me,  although  the 

'  The  case  of  Ranger  v.  the  Great  Western  Railway  Company. 


EELATIONS  BETWEEN  ENGINEEK  AND  DIRECTORS.    479 

profit  might  for  the  present  be  small,  to  continue  your  engineer, 
looking  forward,  as  I  do,  at  no  distant  period  to  the  completion  of  the 
•works;  but  the  changes  that  have  lately  taken  place  in  the  Board, 
and  the  excitement  which  has  been  displayed  by  some  of  your  pro- 
prietors in  effecting  those  changes — such  excitement  as  is  too  apt 
frequently  to  lead  men  to  form  most  unjust  and  erroneous  opinions 
of  the  trustworthiness  of  those  who  have  been  long  engaged  in  their 
service — very  naturally  causes  anxiety.  I,  and  you  who  have  been 
acting  with  me  for  so  long,  know  that  I  have  always  advised  you 
honestly,  and  1  hope  generally  wisely,  on  such  matters  as  I  have  been 
consulted  upon,  notwithstanding  my  knoAvn  connection  with  other 
and  sometimes  conflicting  interests.  But  new  men  may  not  have 
the  same  confidence  in  me,  and  I  cannot  afford  to  run  the  risk  of  any 
doubts  being  entertained  upon  the  subject. 

I  must  therefore  beg  of  you  to  bring  the  matter  before  the  Board 
formally,  and  if  it  is  desired  that  I  should  continue  to  act  as  your 
engineer,  that  I  may  have  it  clearly  understood  that  I  do  so  with  the 
full  concurrence  of  the  Board  as  now  constituted,  and  particularly  of 
the  new  Directors ;  and  that  to  render  the  expression  of  their  con- 
fidence clear,  I  wish  them  to  understand  that  I  am  quite  ready  to 
tender  them  my  resignation  if  they  do  not  feel  that  confidence,  and 
that  such  resignation  cannot  prejudice  any  of  the  cases  under  arbi- 
tration before  me,  as  1  undertook  them  upon  the  express  under- 
standing that  it  was  as  agreed  umpire,  and  not  as  engineer  to  the 
Company. 

I  shall  only  add  that  by  being  engineer  to  a  Company,  I  mean 
acting  in  perfect  confidence  with  the  Directors  on  matters  generally, 
as  I  have  been  in  the  habit  of  doing. 

n. 

December  6,  1851. 
I  really  cannot  consent  to  forego  in  this  case  the  rule  I  lay  down 
for  myself  in  my  professional  business,  which  is  to  yield  as  far  as 
I  comfortably  c^n  to  the  mere  wishes  of  Directors  in  the  mode  in 
which  I  direct  the  works  they  may  order,  but  not  beyond  this 
point — and  if  the  Directors  of  any  body  claim  the  right  to  control 
the  staff  which  I  think  necessary  to  carry  on  my  work,  I  concede 
the  right  at  once,  and  resign  the  direction  of  that  staff.  The  staff 
for  constructing  engineering  works  is  not  a  permanent  establish- 
ment, which  can  be  extended  or  restricted  just  as  a  Board  of  Directors 
may  determine ;  it  is  much  more  of  the  character  of  a  personal  staff 
attached  to  the  engineer-in-chief,  and  by  means  of  which  he  is 


480  PROFESSIONAL  OPINIONS  AND  PRACTICE. 

enabled  to  take  great  responsibility  upon  himself,  both  in  respect  of 
the  works  which  he  executes,  and  the  settlement  of  large  amounts  of 
payments,  in  which  settlement  both  the  company  and  the  contractors 
are  very  much  at  his  mercy.  It  is  the  duty  of  an  engineer  of  course 
to  study  economy  as  well  as  efficiency  in  his  staiF,  and  to  pay  atten- 
tion to  the  wishes  of  the  Directors  so  far  as  he  can  ;  but  he  must  be 
the  ultimate  judge  of  the  number  and  the  persons  of  that  staff.  At 
least,  that  is  my  rule,  and  I  cannot  depart  from  it  in  this  case.  I 
should  wish  to  state  this  as  respectfully  as  possible  to  the  Board,  but 
at  the  same  time  to  state  it  clearly. 

III. 

January  22,  1857. 

...  I  have  replied  very  fully  to  the  observations  of  the  Directors, 
but  having  done  so  I  must  again  place  my  resignation  in  the  hands 
of  the  Directors.  A  Board  of  Directors  has  a  perfect  right  to  dis- 
pense with  the  services  of  an  engineer,  or  to  lay  down  any  rules  of 
conduct  they  may  think  fit,  and  to  engineer  the  works  themselves, 
either  as  a  body  or  by  appointing  one  of  their  members,  if  they  think 
fit ;  but  if  they  desire  to  have  the  advice  and  responsibility  of  any 
respectable  engineer — at  all  events,  if  they  wish  to  have  mine — they 
must  place  the  usual  amount  of  confidence  in  me  ;  and  as  long  as  I 
am  engineer  they  must  leave  me  to  conduct  the  engineering,  and 
must  act  as  if  they  assumed  that  I  was  more  able  to  advise  the 
Board  upon  all  the  usual  practical  questions  of  engineering  than 
any  one  of  the  Directors.  Admitting  as  I  do  the  full  right  of  a  Board 
of  Directors  to  determine  whether  they  will  have  an  engineer  or 
not,  if  they  have  one  they  must  trust  him  to  do  his  own  work. 

As  a  mere  question  of  time  it  would  be  impossible  that  I  could 
be  constantly  entering  into  long  explanations  of  the  most  trifling 
character  upon  points  on  which  I  must  be  by  far  the  most  com- 
petent judge  —  and  in  fact  the  competent  and  responsible  judge, 
expressly  employed,  and  paid  professionally  because  I  am  so.  If 
individual  Directors  are  more  competent  than  their  engineer,  let 
them  assume  the  office  and  the  responsibility ;  but  do  not  have  a 
divided  responsibility.  I  am  most  happy  at  all  times  to  receive  any 
hints  or  suggestions  from  any  body  whether  Directors  or  not,  but  I 
cannot  undertake  the  labour  of  replying  to  them  all,  neither  can  I 
act  as  engineer  to  a  Board  of  Directors  who,  either  as  a  body  or  by 
one  or  two  of  their  members,  make  a  practice  of  taking  upon  them- 
selves to  judge  of  those  details  of  which  I  must  be  assumed  to  be 
the  competent  judge,  and  thereby  interfering  with  my  proper  duties. 


ON  THE  POSITION  OF  ASSISTANTS.  481 

If  the  engineer  is  not  assumed  to  be  worthy  of  trust  both  in  respect 
of  zeal  in  the  interests  of  the  Company,  and  very  superior  to  any 
one  of  the  Directors  as  regards  experience,  and  ability  to  carry  out 
what  the  Directors  may  determine  upon,  he  is  not  fit  to  be  the 
engineer ;  but  if  he  is  so,  he  must  be  left  to  carry  out  those  details 
of  his  department  of  the  business.  These  are  the  general  principles 
upon  which  alone  I  can  act. 

It  is,  from  the  nature  of  the  case,  impossible  by  any 
extracts  from  Mr.  Brunei's  correspondence  to  give  an 
adequate  idea  of  the  position  which  he  occupied  in  re- 
lation to  his  assistants.  There  was  so  much  personal 
intercourse  between  them  that  letter  writing  was  but 
little  resorted  to. 

His  relations  with  them  were  of  the  most  affectionate 
and  intimate  kind,  and  were  maintained  without  any  osten- 
tation or  outward  show.  He  was  in  the  habit  of  placing 
entire  confidence  in  his  subordinates  as  long  as  he  con- 
sidered that  they  deserved  it ;  and,  while  he  preserved  his 
own  proper  position,  he  was  always  ready  to  shield  them 
from  the  interference  of  others.  The  letters  which  are 
printed  below  are  evidence  of  this.  When,  on  the  other 
hand,  anything  occurred  to  displease  him  in  the  conduct  of 
his  assistants,  he  was  eager  to  give  the  offender  a  chance 
of  retrieving  his  position ;  and  he  was  always  ready  to 
help  them  in  any  difficulties. 

On  Interference  of  Directors  with  the  Assistant  Engineers. 

I. 

January  19,  1842. 
"While  I  am  upon  the  subject,  and  as  I  have  referred  to  the  impolicy 
of  Directors  taking  notice  of  little  things,  and  as  I  speak  freely  to 
you,  I  will  mention  that  I  have  obsei-ved  with  pain  on  some  occa- 
sions this  tendency ;  and  I  will  give  one  instance  of  what  I  must  call 
most  unwise  interference.  It  was  lately,  and  unfortunately  at  the  same 
moment  as  this  complaint,  intimated  that  a  pair  of  boxing  gloves  had 
been  seen  in  one  of  the  Company's  offices,  and  that  the  Directors  had 

I  I 


482  PEOFESSIONAL  OPINIONS  AND  PEACTICE. 

observed  it.  Now  I  really  do  not  know  why  a  gentlemanly  and  indus- 
trious young  man  like should  be  subject  to  have  his  trifling 

actions  remarked  upon  more  than  I  myself,  unless  the  observer  gave 
him  credit  for  a  much  more  gentle  temper  than  I  possess ;  because  I 
confess,  if  any  man  had  taken  upon  himself  to  remark  upon  my 
having  gone  to  the  pantomime,  which  I  always  do  at  Christmas,  no 
respect  for  Directors  or  any  other  officer  would  have  restrained  me. 
I  will  do  my  best  to  keep  my  team  in  order  ;  but  I  cannot  do  it  if 
my  master  sits  by  me,  and  amuses  himself  by  touching  them  up 
with  the  whip. 


II. 

January  28, 1842. 

I  am  much  obliged  to  you  for  your  letter.  I  am  sorry  to  find, 
however,  that  the  impression,  a  very  erroneous  one  as  I  believe, 
remains  upon  your  mind  that  the  assistant  engineers  are  predisposed 
to  encourage,  or  at  all  events  allow,  improper  conduct  on  the  part  either 
of  contractors  or  the  inferior  agents  of  the  Company.     .     . 

From  some  experience  in  these  matters  it  is  that  I  have  come  to 
the  conclusion  that  it  is  wise  (however  strange  you  may  think  the 
doctrine  to  be)  to  shut  one's  ears  and  eyes  really  and  truly  to  every- 
thing which  does  not  come  forward  in  such  a  shape  as  to  demand 
and  admit  of  an  enquiry ;  and  it  is  for  this  reason  also  that  I  do 
entertain  the  opinion  very  strongly  (in  which  you  appear  to  differ 
from  me),  that  it  is  not  the  interest,  it  is  not  wise,  and  therefore 
only  it  is  not  the  duty  of  Directors  to  look  after,  or  to  see  into,  the 
smaller  details  of  the  conduct  of  an  establishment  which,  being  of  a 
very  temporary,  changing,  and  uncertain  character,  cannot  at  the  best 
be  conducted  with  the  discipline  and  regularity  of  a  permanent 
establishment,  in  which  the  parties  have  their  clearly  defined  and 
unchanging  duties,  and  look  forward  to  the  permanent  occupation  of 
their  places  as  their  means  of  support. 

At  all  events,  when  the  Directors  see  anything  they  think 
desirable  to  correct  or  to  modify,  they  can  fully  communicate  it  to 
me  Avithout  the  possibility  of  giving  to  me  any  soreness  of  feeling, 
which  it  is  always  desirable  not  to  excite,  even  in  the  case  of  the 
lowest  menial  whose  best  services  one  wishes  to  have  and  use. 


ON  THE  POSITION   OF  ASSISTANTS.  483 


III. 

December  12,  1851. 

With  reference  to  your  letter  of  December  11,  stating  that  the 
Directors  *  are  satisfied  that  great  irregularities  have  existed,  and 

*  that  they  feel  it  to  be  their  duty,  and  will  not  hesitate  on  any 

*  occasion,  to  represent  to  me  any  irregularity  on  the  part  of  my 
'  staiF  that  may  come  to  their  knowledge,'  I  am  almost  afraid, 
unless  in  a  short  note  you  may  have  failed  to  convey  to  me  the 
meaning  of  the  Directors,  that  they  greatly  misunderstand  my  feel- 
ings on  the  subject ;  my  great  desire,  as  great  as,  possibly  greater 
than  even  that  of  the  Directors,  who  cannot  feel  so  personally  re- 
sponsible as  I  do  for  the  efficiency  of  mystaff — my  great  desire  I  say 
is  to  hear  immediately  from  anybody,  and  particularly  of  course 
from  a  Director,  of  any  supposed  iiTegularity ;  and  I  should  feel  that 
1  had  ground  of  complaint  even  if  any  such  report  or  any  suspicion  of 
any  irregularity  were  not  immediately  communicated  to  me.  The 
moment  that  the  Directors  could  doubt  my  being  as  anxious  as  they 
can  be  to  know  and  to  remedy  any  irregularity,  or  that  they  should 
look  upon  me  in  such  matters  otherwise  than  as  one  of  themselves, 
I  should  feel  that  I  had  lost  their  confidence,  and  could  no  longer 
carry  on  satisfactorily  to  myself  my  duties,  and  should  therefore 
resign  them.  Such  must,  I  beg,  be  our  relative  position  as  regards 
the  future ;  and  carrying  out  this  principle  as  regards  the  past,  I  must 
beg  of  them  to  tell  me  explicitly  what  are  the  irregularities  to  which 
they  refer  as  having  been  committed.  I  ought  to  be  fully  informed 
of  such  things — indeed,  nothing  ought  to  be  suspected  even  without 
my  knowing ;  for  if  /  ought  not  to  know,  who  ought  ? 

As  a  matter  of  form,  and  to  be  strictly  correct,  I  must  guard 
myself  against  being  supposed  to  mean  that  I  could  desire  or 
approve  of  what  the  Directors  I  am  sure  would  also  disapprove  of — 
namely,  a  system  of  fault-seeking — because  in  a  very  numerous  staff 
or  body  of  men,  particularly  where  they  have  not  the  benefit  of  per- 
manent situations,  the  perfection  of  regularity  cannot  be  hoped  for ; 
what  I  principally  seek  and  require  of  my  assistants  is  an  honest 
discharge  of  their  duties,  and  any  departure  from  this  it  is  well  known 
amongst  them  I  never  overlook.  Have  the  goodness,  therefore,  to 
a.scertain  for  me,  and  to  let  me  know  immediately,  what  these 
irregularities  have  been. 

A  few  words  may  here  be  added  on  Mr.  Brunei's  practice 
in  reference  to  taking  pnpils. 

1  I  2 


484  PEOFESSIONAL  OPINIONS  AND  PRACTICE. 

Although  many  of  his  assistants  had  been  his  pupils,  he 
did  not  encourage  young  men  to  come  to  him  with  the 
object  of  learning  their  profession  in  his  office.  He 
never  absolutely  declined  to  take  pupils ;  but  he  endea- 
voured, by  fixing  a  high  premium,  to  reduce  the  number 
of  applicants. 

He  did  not  profess  to  do  more  for  his  pupils  than 
to  give  them  the  opportunities  of  seeing  work,  afforded 
by  his  office,  and  the  chance  of  being  afterwards  em- 
ployed as  his  assistants.  He  attached  much  importance 
to  private  study  of  mathematics  and  other  branches  of 
science. 

Passing  on  to  the  position  assumed  by  Mr.  Brunei  in 
his  relations  to  the  profession  at  large ; — it  may  be  stated 
in  a  few  words,  that  he  was  desirous  on  aU  occasions 
of  promoting  its  welfare  by  encouraging  friendly  inter- 
course among  its  members,  by  healing  strife,  by  sup- 
pressing as  far  as  he  could  all  cant  or  pretension,  and 
by  setting  his  face  steadfastly  against  all  attempts  to 
fetter  the  freedom  of  invention  or  to  lessen  the  inde- 
pendence of  engineers  by  State  patronage  or  control. 

It  may  appear  strange  to  affirm  of  one  who  was  foremost 
in  almost  all  the  professional  contests  of  his  time,  that  he 
was  zealous  in  healing  strife ;  but  it  is  nevertheless  true 
that  Mr.  Brunei,  while  he  was  a  bold  and  uncompromising 
advocate  of  his  own  schemes,  was  at  the  same  time  untiring 
in  his  exertions  to  limit  the  area  of  controversy,  to  confine 
it  strictly  within  its  proper  bounds,  and  to  divest  it  of  all 
personality  or  of  anything  which  could  lead  to  unpleasant 
feeling  or  annoyance. 

His  endeavours  to  this  end  were  greatly  helped  by  the 
friendly  relations  which  he  maintained  at  all  times  with 
his  professional  brethren.     He  never  allowed  any  diver- 


ON  HIS  RELATIONS  WITH  OTHER  ENGINEERS.  485 

gence  of  opinion  to  interfere  with  private  friendship  ;  and, 
even  in  the  height  of  controversy,  he  was  glad  to  give, 
and  ready  to  ask  for,  advice  on  matters  connected  with  the 
scientific  departments  of  civil  engineering. 

It  is  but  seldom  that  extracts  have  been  made  from 
Mr.  Brunei's  private  journals  ;  but  it  may  be  permitted,  in 
illustration  of  what  has  been  said  on  this  point,  to  give  the 
following  passage,  written  during  the  great  contests  of  the 
year  1846. 

May  5,  1846. 

I  am  just  returned  from  spending  an  evening  with  E.  Stephenson. 
It  is  very  deHghtful,  in  the  midst  of  our  incessant  personal  pro- 
fessional contests,  carried  to  the  extreme  limit  of  fair  opposition,  to 
meet  him  on  a  perfectly  friendly  footing,  and  discuss  engineering 
points.  .  .  .  Again  I  cannot  help  recording  the  great  pleasure  I 
derive  from  these  occasional  though  rare  meetings. 

Mr.  BruneFs  opinions  on  the  working  of  the  patent 
laws  will  be  given  below,  as  following  more  fitly  after 
extracts  from  his  correspondence  relating  to  the  position 
of  his  profession  in  regard  to  the  Government;  but, 
before  entering  upon  that  subject,  a  few  words  may  be 
said  in  reference  to  a  class  of  persons  who  formed  a 
very  large  proportion  of  his  correspondents — the  class 
of  *  Inventors.' 

He  used  to  receive  numerous  applications  from  persons 
who  had  invented,  or  who  thought  they  had  invented,  some 
useful  contrivance,  from  a  locomotive  which  would  save 
fifty  per  cent,  in  fuel  over  those  then  in  use,  to  a  machine 
which,  as  Mr.  Brunei  assured  its  inventor,  *  would  not 
*  even  have  a  tendency  to  move.*  He  was  always  ready 
to  encourage  inventions  which  seemed  likely  to  produce 
good  results,  and  to  enquire  into  their  merits,  if  they  were 
patented ;  but  not  otherwise,  lest  it  should  be  said  that 
confidence  had  been  placed  in  him. 


486  PROFESSIONAL  OPINIONS  AND  PRACTICE. 

The  following  is  one  of  the  many  letters  he  had  to  write 
in  answer  to  requests  of  this  nature. 

September  17,  1847. 

I  could  not  have  complied  with  your  request  of  giving  any 
opinion  upon  the  merits  of  the  invention.  Simple  as  such  an  act  may 
be,  it  too  frequently  involves  one  in  controversy  ;  and  I  never  found, 
before  I  made  the  rule  not  to  give  opinions,  that  my  advice  was 
ever  followed,  if  it  was  to  discourage  the  inventor  from  ilirther 
expense  and  trouble. 

I  should  tell  you  in  this  case  that  the  idea  of  dovetailing,  which 
in  your  first  letter  I  find  was  the  principle  of  the  invention,  had 
long  before  been  worked  out  in  every  shape  and  form  that  ingenuity 
or  blundering  could  possibly  give  it. 

Upon  the  important  question  how  far,  if  at  all,  the 
practice  of  civil  engineers  should  be  subject  to  State  con- 
trol, Mr.  Brunei  held  very  decided  views.  He  was  strongly 
opposed  both  to  any  interference  on  the  part  of  the  State 
with  the  freedom  of  civil  engineers  in  the  conduct  of  their 
professional  work,  and  to  the  recognition  of  merit  by  the 
bestowal  of  honours  or  rewards. 


On  the  Royal  Commission  on  the  Application  of  Iron  to 
Railway  Structures.^ 

March  13,  1848. 
I  regret  that  the  Commissioners  should  have  done  me  the  honour 
of  requesting  *  my  opinion  upon  the  enquiry  referred  to  them ;  ' 
because,  as  it  is  known  to  one  or  more  of  these  Commissioners  that 
I  have  expressed  very  strongly,  both  publicly  and  privately,  my 
doubts  of  the  advantage  of  such  an  enquiry,  and  my  fears  of  its 
being,  on  the  contrary,  productive  of  much  mischief,  both  to  science 
and  to  the  profession,  it  would  expose  me  to  a  charge  of  weakness 
and  of  inconsistency  if  I  were  now  to  refrain  from  expressing  those 
opinions,  which  otherwise  I  had  no  idea  of  intruding  upon  the 
Commissioners ;  and,  indeed,  I  had  hoped  that,  by  making  those 
opinions  known  to  some  of  the  members,  I  might  have  been  passed 
over,  and  not  invited  to  assist  in  the  proceedings. 

'  See  aboTe,  p.  192. 


ON   STATE  CONTROL  OVER  ENGINEERING  WORKS.      487 

I  shall  be  most  happy  to  communicate,  as  I  am  at  all  times  most 
anxious  to  do,  any  knowledge  which  I  may  obtain  in  the  course  of 
my  practice,  and  such  intercommunication  of  ideas  and  of  experience 
amongst  engineers  I  believe  to  be  most  useful ;  but  the  attempt  to 
collect  and  re-issue  as  facts,  with  the  stamp  of  authority,  all  that 
may  be  offered  gratuitously  to  a  Commission  in  the  shape  of  evidence 
or  opinions,  to  stamp  with  the  same  mark  of  value  statements  and 
facts,  hasty  opinions  and  well-considered  and  matured  convictions, 
the  good  and  the  bad,  the  metal  and  the  dross  (and  simple  courtesy 
to  the  donors  must  prevent  the  Commissioners  from  attempting  to 
draw  distinctions  which  might  appear  invidious) — this,  I  believe, 
always  has  rendered,  and  always  will  render,  such  collections  of 
miscalled  evidence  injurious  instead  of  advantageous  to  science; 
and  the  facts  or  statements  and  opinions  so  collected  will  form 
generally,  I  believe,  a  lower  average  of  information  than  that  which 
is  already  in  the  possession,  or  at  least  within  the  reach,' of  those 
who  have  occasion  to  study  the  subject :  for  it  is  remarkable  that 
in  this  particular  enquiry  the  Commissioners  can  have  no  peculiar 
means  of  obtaining,  and,  as  I  believe,  cannot  hope  to  get  better  or 
more  extended  information  than  that  possessed  by  any  one  of  the 
principal  engineers  of  the  day ;  wliile  they  will  be  compelled  to 
receive  and  to  publish  much  that  a  prudent  man,  acting  on  his  own 
responsibility,  would  either  not  have  attended  to,  or  would  silently 
have  rejected.  This,  however,  is  perhaps  a  negative  evil,  or,  at 
most,  one  which  cannot  much  affect  the  proceedings  of  the  well- 
informed  in  our  profession  ;  but  the  mischief  which  I  anticipate  is 
much  more  dangerous  to  the  progress  of  science. 

If  the    Commission   is   to    enquire   into    the   conditions    '  to   he 

*  observed,^  it  is  to  be  presumed  that  they  will  give  the  result  of  their 
enquiries ;  or,  in  otlier  words,  that  they  will  lay  down,  or  at  least 
suggest,  '  rules '  and  '  conditions  to  be  (hereafter)  observed '  in  the 
construction  of  bridges,  or,  in  other  words,  embarrass  and  shackle  the 
progress  of  improvement  to-morrow  by  recording  and  registering 
as  law  the  prejudices  or  errors  of  to-day. 

Nothing,  I  believe,  has  tended  more  to  distinguish  advantageously 
the  profession  of  engineering  in  England  and  in  America,  nothing 
has  conduced  more  to  the  great  advance  made  in  our  profession  and 
to  our  pre-eminence  in  the  real  practical  application  of  the  science, 
than  the  absence  of  all  regies  de  Vart — a  term  which  I  fear  is  now 
going  to  be  translated  into  English  by  the  words  '  conditions  to  be 

*  obsei-ved.'  No  man,  however  bold  or  however  high  he  may  stand 
in  his  profession,  can  resist  the  benumbing  effect  of  rules  laid  down 


488  PROFESSIONAL  OPINIONS  AND  PEACTICE. 

by  authority.  Occupied  as  leading  men  are,  they  could  not  afford 
the  time,  or  trouble,  or  responsibility  of  constantly  fighting  against 
them — they  would  be  compelled  to  abandon  all  idea  of  improving 
upon  them ;  while  incompetent  men  might  commit  the  grossest 
blunder  provided  they  followed  the  rules.  For,  in  the  simplest  branch 
of  construction,  rules  may  be  followed  literally  without  any  security 
as  to  the  result.  There  is  hardly  a  branch  of  engineering  that 
could  have  been  selected  which  in  its  present  state  is  less  capable 
of  being  made  the  subject  of  fixed  laws  or  instructions  than  the 
application  of  iron  to  railway  structures,  and  certainly  there  is  no 
branch  in  which  there  is  more  room  for  improvement,  or  which 
offers  so  many  different  channels  or  directions  for  that  improvement. 

In  the  quality  of  the  material,  the  workmanship,  or  the  mode  of 
manufacture,  and  in  the  application  of  it,  there  is  every  imaginable 
variety,  there  is  room  for  almost  any  imaginable  degree  or  nature  of 
improvement;  and  unless  the  Commissioners  are  endowed  with 
prophetic  powers,  it  is  impossible  that  they  can  now  foresee  what 
may  be  the  result  of  changes  in  any  one  of  these  conditions.*    .     .     . 

What  rules  or  '  conditions  to  be  observed '  could  be  drawn  up  now 
that  would  not  become,  not  merely  worthless,  but  totally  erroneous 
and  misleading,  under  such  improved  circumstances  ?  But  above 
all,  I  fear — nay,  I  feel  convinced — that  any  attempt  to  establish  any 
rules,  any  publication  of  opinions  which  may  create  or  guide  public 
prejudice,  any  suggestions  coming  fi:om  authority,  must  close  the  door 
to  improvement  in  any  direction  but  that  pointed  out  by  the  Com- 
missioners, and  must  tend  to  lead  and  direct,  and  therefore  to  control 
and  to  limit,  the  number  of  the  roads  now  open  for  advance. 

I  believe  that  nothing  could  tend  more  to  arrest  improvement 
than  such  assistance,  and  that  any  attempt  to  fix  now,  or  at  any 
given  period,  the  conditions  to  be  thereafl;er  observed  in  the  mode  of 
construction  of  any  specific  woik  of  art,  and  thus  to  dictate  for  the 
present  and  for  the  future  the  theory  which  is  to  be  adopted  as  the 
correct  one  in  any  branch  of  engineering,  is  contrary  to  all  sound 
philosophy,  and  will  be  productive  of  great  mischief,  in  tending  to 
check  and  to  control  the  extent  and  direction  of  all  improvements, 
and  preventing  that  rapid  advance  in  the  useful  application  of 
science  to  mechanics  which  has  resulted  fi-om  the  free  exercise  of 
engineering  skill  in  this  country,  subjected  as  it  ever  is,  under  the 
present  system,  to  the  severe  and  unerring  control  and  test  of  com- 
peting skill  and  of   public   opinion.      Devoted   as   I   am   to   my 

'  The  remainder  of  this  letter  is  printed  above,  p.  192. 


I 


ON  STATE  CONTROL  OVER  ENGINEERING  WORKS.      489 


profession,  I  see  with  fear  and  regret  that  this  tendency  to  legislate 
and  to  rule,  which  is  tlie  fasliion  of  the  day,  is  flowing  in  our  direc- 
tion. 

I  must  repeat  my  regret  that  circumstances  should  have  forced  me 
to  intrude  these  my  opinions  upon  the  Commissioners';  but,  for  the 
reasons  I  have  before  given,  the  application  to  me,  after  the  part  I 
have  taken,  left  me  no  alternative  ;  but  having  expressed  my  opin- 
ions, and  respectfully  protested  against  the  objects  and  proceedings 
of  the  Commissioners,  I  shall  feel  it  my  duty  to  attend  to  their  sum- 
mons, and  afford  any  information  in  my  power. 

On  a  Proposal   to  obtain   the  Recognition  in  England   of 
Decorations  conferred  at  the  Paris  Exhibition  of  1855. 

February  9,  1856. 

I  regretted  to  be  under  the  necessity  of  declining  to  sign  the 
memorial  that  was  brought  to  me  by  a  gentleman  introducing  him- 
self with  your  card,  without  an  opportunity  of  explaining  to  you 
my  reasons ;  and  it  would  be  difficult  to  do  so  satisfactorily  without 
an  opportunity  of  personal  explanation.  In  a  few  words,  however, 
I  will  state  that  I  disapprove  strongly,  and  after  full  consideration, 
of  any  introduction  into  England  of  the  system  of  distinctions  con- 
ferred by  Government  upon  individuals,  whether  engaged  in  pro- 
fessions, arts,  or  manufactures,  whose  merits  can  be  so  much  better 
and  more  surely  marked  by  public  opinion.  In  countries  where 
^  public  opinion  is  not  so  searching  and  so  powerful  as  in  England, 
the  evils  of  favouritism  may  be  out-balanced  by  the  advantages  of 
some  means  of  distinguishing  men.  I  admit  the  possibility,  though 
I  doubt  the  fact ;  but  I  feel  sure  that  the  evils  would  be  far  greater 
than  the  advantages  in  England.  The  few  cases  of  knighthood  con- 
ferred in  England  generally  follow  public  opinion,  though  I  should 
not  wish  to  see  this  system  carried  further.  Such  being  my  opinion, 
I  could  not  consistently  ask  for  my  own  letter  of  Chevalier  de  la 
Legion  d'Honneur  being  recognised  here. 

On  the  question  of  the  patent  laws,  Mr.  Brunei  held  the 
opinion  that  the  system  of  protecting  inventions  by  means 
of  letters  patent  was  productive  of  immense  evil.  The 
prominent  j)art  which  he  took  in  all  discussions  upon  this 
subject  exposed  him  to  much  adverse  criticism,  which  was 


490  PEOFESSIONAL  OPINIONS  AND  PRACTICE. 

perhaps  the  more  freely  bestowed,  because  it  was  felt  that 
he  was  a  very  formidable  opponent,  not  only  from  the  force 
of  his  arguments,  but  also  from  the  authority  with  which 
he  spoke. 

He  was,  from  the  necessity  of  his  position  as  a  civil 
engineer,  himself  an  inventor;  he  had  in  his  staff  and 
among  those  with  whom  he  acted  many  inventors  ;  he  did 
not,  therefore,  underrate  the  benefits  conferred  on  science 
by  those  who,  by  inventing,  add  to  its  resources.  He  was 
continually  being  trammelled  and  thwarted  in  his  various 
undertakings  by  patents,  and  he  therefore  could  judge  of 
their  evil  effects  upon  the  progress  of  practical  engineering ; 
and,  lastly,  he  had  the  best  possible  means  of  judging  of 
their  effects  upon  the  inventors  themselves,  both  from 
his  opportunities  of  becoming  acquainted  with  the  fate  of 
others,  and  from  his  own  experience.  His  father.  Sir 
Isambard  Brunei,  had  taken  out  patents  for  most  of  his 
inventions,  and,  as  Mr.  Brunei  stated  before  the  House  of 
Lords  Committee  of  1851,  with  very  unfortunate  results, 
especially  in  the  case  of  the  carbonic-gas  engine  (see 
Note  B  to  Chapter  I.) ;  where,  if  they  had  not  been 
obliged  to  work  secretly,  in  order  to  conceal  the  process 
before  the  patent  was  granted,  they  could  have  obtained 
valuable  advice,  which  might  either  have  led  to  an  earlier 
abandonment  of  the  project,  or  to  its  improvement  in  those 
points  in  which  it  failed. 

Mr.  Brunei  drew  up  the  following  statement  when  asked 
to  give  evidence  before  the  Select  Committee  of  the  House 
of  Lords  in  1851.  His  evidence  will  be  found  at  p.  246  of 
the  Minutes  of  Evidence  (ordered  to  be  printed  July  1, 1851). 

Memorandum  for  Evidence  before  the  Select  Committee  of  the 
House  of  Lords  on  the  Patent  Laws,  1851. 

I  have  for  many  years  had  considerable  experience  of  the  opera- 
tion of  patents. 


ON  THE  PATENT  LAWS.  491 

I  liave  been  engaged  under  my  father  in  the  working  out  of 
numerous  inventions  of  his,  and  the  taking  out  of  patents  on  his 
account,  also  in  advising  others  professionally  with  him,  and , by 
myself,  and  have  been  engaged  in  numerous  questions  of  disputes 
resulting  from  patents;  and  I  have  had  frequent  occasion  to  use 
the  patents  and  inventions  of  others.  I  have  also  had  to  introduce 
improvements  of  my  own  without  patents,  and  to  defend  my  use  of 
them  against  patents. 

I  have  thiis  for  the  last  twenty-eight  years  been  in  the  midst  of 
everything  connected  with  inventions,  and  in  constant  contact  with 
the  operation  of  the  patent  laws. 

I  have  been  behind  the  scenes  the  whole  time. 

The  result  has  been  that  I  have  never  taken  out  a  patent  myself, 
or  ever  thought  of  doing  so ;  and  I  have  gradually  become  convinced 
that  the  whole  system  of  patents  is,  in  the  present  advanced  state  of 
arts  and  science  and  manufactures,  productive  of  immense  evil. 

I  think  that  it  does  nothing  of  what  it  professes  to  do,  and  which 
I  believe  to  be  impracticable  in  the  present  state  of  things,  but  that, 
on  the  contrary,  it  impedes  everything  it  means  to  encoiu-age,  and 
ruins  the  class  it  professes  to  protect,  and  that  it  is  productive  of 
immense  mischief  to  the  public. 

I  should  wish  to  observe  that  my  opinions  are  not  formed  from 
any  theory,  or  from  any  consideration  of  what  are  or  ought  to  be  the 
laws  of  patents,  or  whether  the  details  of  such  laws  are  capable  of 
improvement  or  otherwise;  but  they  are  simply  the  result  of  a  very 
long  and  tolerably  intimate  knowledge  of  the  operation  of  the  hope 
of  protection  held  out,  and  the  operation  of  that  protection  such  as 
it  can  be  when  obtained ;  and  these  results  do  not,  in  my  opinion, 
depend  at  all  upon  any  question  of  whether  patents  are  cheap  or 
dear,  whether  they  are  granted  sparingly  or  profusely,  by  a  simple  or 
by  complicated  machinery  ;  it  is  the  ruinous  effects  upon  the  class 
of  inventors,  of  the  false  dreams  and  hopes  excited  by  the  system, 
and  the  injurious  effect  upon  improvements  of  the  greater  or  less 
degree  of  exclusive  privilege  which  is  attained,  which  I  have  had 
constantly  before  my  eyes  for  so  many  years,  and  which  must 
be  increased  by  any  real  improvement  of  the  patent  laws. 

I  should,  therefore,  be  an  advocate  for  very  cheap  patents  granted 
with  great  facility,  to  the  poor  illiterate  workman,  as  well  as  to  the 
rich  manufacturer  with  his  counsel  and  agents,  and  as  well  protected 
as  legal  ingenuity  can  devise. 

If  the  system  is  good  in  principle  it  must  bear  extension,  but  I 
believe  it  could  not  stand  a  twelvemonth  under  such  a  test — every 


492  PROFESSIONAL   OPINIONS  AND  PEACTICE. 

evil  now  inherent  in  the  system  would  be  greatly  increased  in  quan- 
tity, and  the  absurdities  which  are  now  ascribed  to  errors  of  detail 
would  all  become  so  evident  that  the  system  would  be  abandoned  by 
universal  consent. 

I  believe,  paradoxical  as  it  may  seem,  that  the  privileges  thus 
promised  and  granted  to  inventors  are  most  injurious  to  them.  To 
understand  this,  it  must  be  known  and  borne  in  mind  that  useful 
inventions  or  improvements  in  the  present  day,  certainly  in  nine 
hundred  and  ninety-nine  cases  out  of  a  thousand,  are  not  new  dis- 
coveries, but  generally  slight  modifications  of  what  is  already  in  use  ; 
judicious  applications  of  known  principles  and  of  well-known  and 
common  parts  of  machinery,  or  of  common  substances,  very  often 
mere  revivals  or  re-inventions  of  something  which  had  many  times 
previously  been  thought  of,  and  perhaps  tried,  and  failed  from  the 
want  only  of  some  substance  or  of  some  tool  which  has  since  been 
introduced. 

I  believe  that  the  most  useful  and  novel  inventions  and  improve- 
ments of  the  present  day  are  mere  progressive  steps  in  a  highly 
wrought  and  highly  advanced  system,  suggested  by,  and  dependent 
on,  other  previous  steps,  their  whole  value  and  the  means  of  their 
application  probably  dependent  on  the  success  of  some  or  many  other 
inventions,  some  old,  some  new.  I  think  also  that  really  good  im- 
provements are  not  the  result  of  inspiration ;  they  are  not,  strictly 
speaking,  inventions,  but  more  or  less  the  results  of  an  observing 
mind,  brought  to  bear  upon  circumstances  as  they  arise,  with  an 
intimate  knowledge  of  what  has  already  been  done,  or  what  might 
now  be  done,  by  means  of  the  present  improved  state  of  things, 
and  that  in  most  cases  they  result  from  a  demand  which  circum- 
stances happen  to  create.  The  consequence  is  that  most  good 
things  are  being  thought  of  by  many  persons  at  the  same  time ; 
and  if  there  were  publicity  and  freedom  of  communication,  instead  of 
concealment  and  mystery,  ten  times  or  a  hundred  times  the  number 
of  useful  ideas  would  be  generated  by  each  man,  and  with  less 
mental  effort  and  far  less  expenditure  of  time  and  money. 

In  the  present  state  of  things,  if  a  man  thinks  he  has  invented 
something,  he  immediately  dreams  of  a  patent,  and  of  a  fortune  to 
be  made  by  it.  If  he  is  a  rich  man  he  loses  his  money,  and  no 
great  harm  is  done ;  but  if  he  is  a  workman,  and  a  poor  man,  his 
thoughts  are  divided  betAveen  scheming  at  his  machine  in  secret,  and 
scheming  at  the  mode  of  raising  money  to  carry  it  out.  He  does 
not  consult  his  fellow-workmen,  or  men  engaged  in  the  same  pur- 
suits, as  to  whether  the  same  thing  had  ever  been  tried,  why  it  had 


ON  THE  PATENT  LAWS,  493 

failed,  what  are  the  difficulties,  or  (what  is  most  probable)  whether 
something  better  is  not  already  known,  and  waiting  only  the  demand. 
In  nine  cases  out  of  ten  he  devotes  his  time  and  money  to  the  idea, 
instead  of  pursuing  his  legitimate  and  natural  pursuits.  In  elabo- 
rating this  idea  his  whole  thoughts  are  turned  to  the  means  of 
making  it  different  from  what  he  may  happen  to  know  of  similar 
ideas,  so  that  he  may  secure  a  patent,  rather  than  to  an  honest 
endeavour  to  obtain  the  most  xiseful  result.  He  does  not  make  use 
of  other  good  ideas  which  may  be  already  patented  or  in  use,  even 
if  he  knows  of  them,  because  his  sole  object  thenceforth  is  not  im- 
provement, but  *  exclusive  right.'  Afler  much  time  and  money 
spent  in  experiments,  he  takes  out  a  patent.  I  will  assume  that  the 
mere  patent  costs  him  nothing,  but  the  waste  of  time  and  money  in 
elaborating  his  idea  is  generally  considerable,  and  far  more  serious 
in  its  effects  upon  the  man  than  the  payment  of  the  fees  now 
demanded  for  a  patent.  When  his  patent  is  complete,  and  his  in- 
vention published,  the  chances  are,  and  ever  will  be,  one  hundred 
or  one  thousand  to  one  that  it  is  not  worth  a  sixpence  as  an  exclu- 
sive right  which  others  will  buy  of  him  :  every  chance  is  against  him. 

In  the  first  2)lace  it  must  be  a  good  thing,  it  must  be  an  improve- 
ment upon  the  very  '  best  thing  '  of  the  same  sort :  the  chances  are 
of  coiu-se  great  against  this, 

Secondlij. — It  must  be  new,  nothing  of  the  sort  must  have  been  in 
use  before — ^liow  very  few  things  can  be  devised  which  will  bear 
this  test.  I  do  not  know  of  half-a-dozen  clear  cases  of  distinctly 
new  inventions  since  I  have  been  acquainted  with  machinery  and 
science ;  and,  judging  from  analogy,  I  cannot  bring  my  mind  to 
believe  that  these  would  bear  the  test  of  a  strict  and  searching 
enquiry  by  interested  parties.  The  chances  are  then  immensely 
against  his  invention,  if  good  enough  to  be  disputed,  proving  to  be 
new  enough  to  stimd  as  giving  a  claim  to  exclusiveness. 

Thirdly. — It  must  not  depend  for  its  success  upon  the  use  of  some 
other  exclusive  and  privileged  invention,  or  else  of  course  it  is  of 
little  saleable  value,  even  if  not  an  infringement  upon  the  previous 
patent. 

Fourthly. — There  must  be  a  demand  existing  or  cr eatable  for 
the  article  produced ;  or,  like  many  other  good  things,  it  will  be  out 
of  time,  and  drop  accordingly. 

Fifthly. — He  must  find  some  parties  whose  interest  it  is  to  encour- 
age the  introduction  of  the  change,  and  who  have  the  means  of  com- 
bating those  interests  which  are  embarked  in  previous  monopolies. 

Since  all  these  conditions  are  necessary  for  success,  it  is  not  sur- 
prising that  the  result  should  be,  as  I  am  positive  that  it   is   in 


494  PEOFESSIONAL  OPINIONS  AND  PRACTICE. 

practice,  that  the  aggregate  of  individual  benefit  derived  by  the 
exclusive  privileges  granted,  is  greatly  below  the  aggregate  expendi- 
ture of  time  and  money  involved  in  the  production  of  the  whole, 
taking  the  good  and  bad ;  but  the  proportion  of  the  aggregate  benefits 
as  compared  with  the  cost  to  the  real  inventor  is  still  less. 

It  is  known  to  all  persons  acquainted  with  the  subject  that,  in 
nine  cases  out  of  ten  of  successful  inventions,  the  patents  are  not 
beneficially  enjoyed  by  the  original  inventor.  And  it  always  must 
be  so.  The  mere  original  invention  forms  generally  but  a  small 
part  of  the  whole  business  or  merit  of  bringing  into  uaeful  operation 
any  new  thing.  Judgment,  a  knowledge  of  the  world,  and  of 
business  and  other  qualities  not  particularly  belonging  to  inventors, 
are  just  as  requisite  as  mere  ingenuity,  although  they  are  not  the 
subject  of  protection.  Capital  and  connection  are  also  generally 
required.  All  these  command,  as  they  ought  to  do,  a  large  share  in 
the  ultimate  profits,  but  it  is  rare  that  an  inventor  at  once  finds  such 
a  partner.  The  invention  generally  changes  hands  once  or  twice,  or 
oftener,  till  some  chance  brings  it  into  operation  ;  and  ultimately  it 
is  (as  must  be  admitted  by  all  who  know  anything  about  these 
matters)  very  rarely,  even  in  the  case  of  good  things,  that  the  party 
who  originated  the  subject  of  the  patent  has  ultimately  any  large 
beneficial  interest  in  it ;  and  certainly,  from  these  and  all  the  other 
causes  mentioned,  it  is  an  undoubted  fact  that  inventors,  on  the 
5vhole,  make  a  heavy  annual  loss,  quite  irrespective  of  mere  patent 
fees,  by  inventions  and  patents,  and  that  patents  are  not  therefore 
a  benefit, to  the  present  class  of  inventors,  and  particularly  not  to 
the  poorer  members  of  the  class. 

Without  the  hopes  of  any  exclusive  privileges,  I  believe  that  a 
clever  man  would  produce  many  more  good  ideas,  and  derive  much 
more  easily  some  benefit  from  them.  It  is  true  that  he  will  aim 
only  at  earning  a  few  pounds  instead  of  dreaming  of  thousands ;  but 
he  will  earn  these  few  pounds  frequently,  and  without  interfering 
with'  his  daily  pursuits ;  on  the  contrary,  he  will  make  himself  more 
useful. 

An  observing  man  sees  what  he  thinks  to  be  a  mode  of  increasing 
the  production  of  a  certain  machine  or  manufacturing  operation  in 
which  he  is  engaged,  or  a  better  mode  than  that  which  he  is 
acquainted  with  of  producing  some  article.  In  all  probability  the 
same  circumstances  which  led  him  to  make  the  observation  have 
attracted  the  attention  of  others  before  him ;  perhaps,  at  the 
same  time,  a  little  fi-ee  communication  with  his  fellow-workmen  or 
with  other  manufiicturers  or  men  of  science  would  show  him  that 


r 


ON  THE  PATENT  LAWS.  495 


there  were  insuperable  difficulties,  and  he  would  turn  his  attention 
at  once  to  other  things,  or  that  there  were  better  ways  of  doing 
the  same  thing,  or,  by  pointing  out  difficulties,  enable  him  to 
avoid  useless  investigations,  or  to  make  a  change  that  would  vastly 
improve  his  scheme ;  or  he  would  communicate  his  ideas,  instead  of 
wasting  his  time  in  elaborating  them,  which  very  possibly  others 
more  acquainted  with  the  particular  branch  would  do  much  better 
than  he ;  if  he  is  a  workman,  his  master  would  give  him  something 
for  the  idea,  or  if  not,  his  value  as  a  workman  would  soon  become 
known.  It  is  a  great  eiTor  to  suppose  that  stupid  men  can  live  upon 
the  clever  man's  brains  if  they  are  all  left  free  scope  in  the  use  of 
their  intellect;  but  if  by  artificial  means  an  exclusive  right  or 
property  in  an  idea  can  be  secured,  then  of  course  the  thief  may 
steal  the  idea,  and  having  registered  his  property  in  it,  his  inferiority 
of  intellect  is  more  than  counterbalanced.  Intelligent  men  who 
would  always  be  suggesting  improvements  in  a  manufactory  would 
soon  become  necessary,  and  would  be  valued  accordingly.  A 
manufacturer  who  was  not  surrounded  by  such  assistants  would 
stand  no  chance  in  the  general  competition,  and  what  is  necessary 
and  valuable  will  in  England  fetch  its  price  ;  and  thus  clever  work- 
men will  get  well  paid,  and  earn  much  more,  and  that  more  healthily, 
than  the  whole  body  of  schemers  now  do. 

The  impediments  thrown  in  the  way  of  improvements  by  the 
existence  of  patents  will  hardly  be  credited  by  those  who  are  not 
familiar  with  the  operation  of  them.  In  the  present -state  of  things 
they  create  such  barriers  that  it  is  almost  wonderful  that  any- im- 
provements can  be  effected. 

It  will  not  be  difficult  to  understand  that,  from  the  infinite 
number  of  patents  that  are  now  taken  out,  it  is  hardly  possible  to 
devise  a  mechanism  or  a  chemical  combination  that  does  not,  in 
some  shape  or  other,  form  part  of  some  previous  invention  or 
process.  This  would  be  the  case  even  if  patents  were  only  taken 
out  to  secure  real,  or  what  are  believed  to  be  real,  inventions.  But 
the  shoals  of  patents  have  brought  into  existence  animals  to  feed 
upon  them.  There  is  a  trade  which  nothing  can  destroy  as  long  as 
patents  last,  and  which  must  increase  with  the  increase  of  patent?, 
whatever  may  be  the  mode  of  granting  them.  Patents  are  taken 
out  even  in  very  general  terms,  so  as  to  embrace  everything  that 
can  resemble  some  probable  or  imaginary  improvement,  and  then, 
like  a  spider  in  his  web,  the  patentee  watches  for  his  victims.  Besides 
this,  the  honest  but  trading  patentee,  the  more  completely  to  secure  a 
monopoly,  often  takes  out  several  separate  patents  for  nearly  the 


496  PROFESSIONAL  OPINIONS  AND  PRACTICE. 

same  thing  in  different  forms,  some  avowedly  worthless.  In 
doing  this,  without  even  intending  it,  he  includes  combinations,  any- 
beneficial  application  of  which  perhaps  never  crossed  his  mind,  and 
which,  in  the  shape  in  which  he  suggested  them  were  good  for 
nothing,  but  which  nevertheless  more  or  less  prevent  anybody  else 
from  touching  them,  even  to  make  a  good  thing. 

Again,  the  most  respectable  houses  take  out  patents  merely  to 
secure  a  monopoly  of  some  one  form  of  article  without  much  regard 
to  the  superiority  of  it.  The  result  of  all  this  is  that  it  is  almost 
impossible  now  to  introduce  the  slightest  real  improvement  in  any- 
thing without  infringing  upon  some  patent,  and  exposing  oneself 
to  be  proceeded  against  by  some  patentee. 

The  extent  to  which  improvements  are  impeded  by  this  state  of 
things  is  hardly  conceivable,  except  to  those  who,  like  myself,  are 
daily  suffering  under  it. 

There  is  another  very  serious  evil  produced  by  the  system.  In 
taking  out  a  patent,  the  necessity  for  avoiding  all  claim  to  anything 
that  can  be  shown  to  have  been  patented  or  in  common  u,se  before 
compels  you  in  most  cases  to  seek  rather  what  part  of  it  can  best  be 
patented  than  what  it  is  that  is  good  in  the  invention.  Comparatively 
trivial  points  are  frequently  patented  in  order  to  secure  the  monopoly 
of  that  which,  although  it  constitutes  the  merit  of  the  invention,  may 
not  happen  to  be  so  new  in  every  respect  as  to  admit  of  a  patent. 
When  the  patent  is  taken,  other  modes  of  carrying  out  the  real 
invention  are  discovered ;  these  modes  are  patented  and  the  original 
patentee  is  obliged  to  lose  the  benefit  of  his  invention  or  to  buy  up 
these  new  patents.  There  are  instances  where  enormous  sums  have 
been  spent  in  this  manner  to  protect  an  original  invention. 

And,  lastly,  there  is  an  evil  which  acts  like  a  numbing  disease  on  all 
improvements ;  a  patentee  frequently  dares  not  himself  introduce 
improvements  in  any  apparatus  or  process  which  he  has  patented, 
for  fear  of  thus  injuring  his  patent ;  and  I  have  seen  numerous  cases 
of  very  important  inventions  where  all  improvement  has  been  thus 
checked  and  resisted  by  the  very  parties  most  capable  of  effecting 
them,  and  who  would  have  brought  great  talent  and  zeal  to  the  work 
if  they  had  been  free. 


ON  THE  PATENT  LAWS.  497 


Extract  from,  Observations  on  the  Patent  Laws  made  by  Mr. 
Brunei  at  a  Meeting  of  the  Society  of  Arts. 

March  28,  1856. 
He  did  not  agree  at  all  as  to  the  advantages  of  patents.  He  quite 
agreed  as  to  the  desirability  of  protecting,  as  far  as  possible,  a  man's 
property,  whether  it  was  in  the  power  of  invention,  or  any  other 
good  thing  that  was  within  him,  and  still  more  would  he  protect  in 
every  possible  way  the  property  in  inventions  of  those  who 
possessed  but  little  other  property — the  powers  of  the  inventor  and 
the  ingenuity  of  the  workman ;  but,  having  had  some  considerable 
experience  with  patentees,  manufacturers,  and  workmen,  he  was  of 
opinion  that  any  practical  benefits  derived  from  the  patent  lawa  did 
not  compensate  for  the  injury  inflicted.  He  believed,  on  the  con- 
trary, that  both  the  inventors  and  the  public  greatly  suffered  from  tlie 
attempt  to  protect  inventions.  He  had  had  great  experience  on  this 
subject,  being  compelled  daily  to  examine  inventions  of  various  kinds, 
and  having  himself  constantly  to  invent  in  the  occupations  in  which  he 
was  engaged.  Having,  then,  all  his  life,  been  connected  with  inven- 
tors and  workmen,  he  had  witnessed  the  injury,  the  waste  of  mind, 
the  waste  of  time,  the  excitement  of  false  hopes,  the  vast  waste  of 
money,  caused  by  the  patent  laws,  in  fact,  all  the  evils  which  gene- 
rally resulted  from  the  attempt  to  protect  that  which  did  not 
naturally  admit  of  protection.  He  agreed  as  to  the  abstract  de- 
sirability of  protecting  inventors  in  some  way,  provided  it  did  not 
foster  unhealthy  invention,  as  he  thought  it  desirable  to  protect 
every  species  of  property  that  existed.  He  was  disposed  to  en- 
courage every  step  towards  facilitating  the  obtaining  patents ;  he 
hoped  they  would  be  made  dirt  cheap,  as  he  thought  that  would  be 
the  most  effectual  way  of  destroying  them  altogether.  Therefore, 
whenever  he  had  been  consulted  on  the  subject  of  the  patent  laws, 
he  had  always  advocated  the  rendering  of  patents  as  open  and  free 
and  cheap  as  possible  ;  in  the  first  place,  because  he  saw  no  reason 
for  attaching  a  price  to  them,  and  next,  because  they  would  sooner 
arrive  where  the  principle  would  be  fully  tested.  "We  were  already 
nearly  arrived  at  that  state  of  things  when  engineers  were  almost 
brought  to  a  dead  stand  in  their  attempt  to  introduce  improvements, 
from  the  excess  of  protection.  He  foimd  that  he  could  hardly 
introduce  the  slightest  improvement  in  his  own  machinery  without 
being  stopped  by  a  patent.  He  could  mention  a  striking  instance, 
in  which,  a  few  months  ago,  wishing  to  introduce  an  improvement 

K  K 


498  PEOFESSIONAL  OPINIONS  AND  PRACTICE. 

that  he  thought  would  have  been  valuable  to  the  public  in  a  large 
work  on  which  he  was  engaged,  he  had  no  sooner  entered  upon  it, 
with  a  willingness  to  incur  considerable  expense  in  the  preliminary 
requirements  and  in  the  trial  of  it,  than  he  was  stopped  by  a 
patentee ;  but  he  was  fortunate  enough  to  find  that  another  patent 
existed  of  the  same  thing,  and  a  week  after  a  third  appeared.  There 
was  thus,  fortunately,  a  probability  that,  by  the  destruction  of  all 
value  in  any  of  the  patents,  he  might  be  able  to  continue  the 
improvements  he  was  desirous  of  introducing. 


499 


CHAPTEE  XVII. 

PRIVATE   LIFE. 

EKMINISCENCES    OF    ME.    BETTNEl's     PEIVATE    LIFE — EEMOTAL    TO    18    DTJKB 

STEEET,    TVESTMINSTEE HIS    MAEEIAGE,     1836 SPECIAL    CONSTABLE    IN    1848 

ME.    BEUNEl's    love    OF    AET — HIS    JOURNEY    TO    ITALY,    1842 — ACCIDENT 

•WITH      THE     HALF-SOVEEEIGN,     1843 PURCHASE     OF     PEOPEETY     IN     DEVON- 
SHIRE,    1847 — HIS      LIFE     AT     WATCOMBE THE      LAUNCH      OF      THE      'GREAT 

'  EASTEEN,'  1867 ME.  BEUNEl's  FAILING  HEALTH JOUENIES  TO  STVITZEELAND 

AND  EGYPT,  1858 LETTEE  FROM  PHIL^  (FEBRUARY  12,     1859) — HIS   LAST  ILL- 
NESS— HIS     DEATH      (SEPTEMBER     15,1859) —  FUNERAL ADDRESS  OF   JOSEPH 

LOCKE,  ESQ.,  M.P.,  AT  THE  INSTITUTION  OF  CIVIL  ENGINEERS  (NOVEMBEE  8,  1859). 

Under  any  circumstances,  and  by  wliomsoever  made,  the 
attempt  to  describe  Mr.  Brunei's  borne  life  must  fail  to 
satisfy  those  who  knew  him,  and  who  remember  him  in 
the  midst  of  his  family  or  among  his  friends. 

But  those  who  did  not  know  him,  except  as  a  professional 
man,  or  who  are  only  acquainted  with  his  works,  will  ex- 
pect to  find  in  these  pages  some  account  of  his  private 
life,  and  of  the  manner  in  which  he  spent  those  brief  in- 
tervals of  relaxation  which  he  permitted  himself  to  enjoy. 

Although  Mr.  Brunei  was  never  an  idle  man,  he  was 
able,  until  he  obtained  business  on  his  own  account,  to 
enjoy  many  amusements  from  which  in  after  life  he  was 
completely  debarred. 

This  a.rose  partly  from  his  work  under  his  father  being 
near  his  own  home  and  his  friends,  and  partly  from  the 
power  he  possessed,  and  which  never  deserted  him,  of  being 

K  K    2 


500  PRIVATE  LIFE. 

able  to  throw  aside  cares  and  anxieties  and  to  join  with  the 
utmost  zest  in  passing  amusements. 

The  following  letter,  relating  to  this  time,  is  written  by 
one  who  was  Mr.  Brunei's  constant  companion  during 
the  period  to  which  it  refers  : — 

June  28,  1870. 

*  Dear  Isambard  Brunei, — I  will  endeavour  to  supply 

*  you  with  some  reminiscences  of  your  father,  before  he 
'  became  a  public  man,  and  was  engrossed  by  the  very 

*  severe  labour  of  his  profession. 

*  The  most  striking  feature  in  his  character  as  a  young 
'  man,  and  one  which  afterwards  produced  such  great 
'  results,  was  an  entire  abnegation  of  self  in  his  intercourse 
'  with  his  friends  and  associates. 

*  His  influence  among  them  was  unbounded,  but  never 

*  sought  by  him  ;  it  was  the  result  of  his  love  of  fair  play, 

*  of  his  uniform  kindness  and  willingness  to  assist  them, 

*  of  the  confidence  he  inspired  in  his  judgment,  and  of  the 

*  simplicity  and  high-mindedness  of  his  character. 

*  From  1824  to  1832  he  joined  his  friends  in  every  manly 

*  sport ;  and  when,  after  his  accident  at  the  Tunnel,  he 

*  was  obliged  to  withdraw  from  more  violent  exercise,  he 
'  was  still  ready  to  co-operate  in  the  arrangements  required 

*  to  give  effect  to  whatever  was  in  hand. 

'  Whether  in  boating,  in  pic-nic  parties,  or  in  private 

*  theatricals,  he  was  always  the  life  and  soul  of  the  party ; 
'  for  his  skilfal  arrangements,  as  well  as  his  never-failing 

*  invention  and  power  of  adaptation  of  whatever  came  to 
'  hand,  made  him  the  invariable  leader  in  every  amuse- 
'  ment  or  sport  in  which  he  took  part. 

'  To  ensure  the  success  of  his  friends  in  a  rowing  match 

*  against  time,  from  London  to  Oxford  and  back,  in  1828, 

*  he  designed  and  superintended  the  building  of  a  four- 

*  oared  boat,  which,  in  length  and  in  the  proportion  of  its 


EARLY  REMNISCENCES  OF  MR.  BRUNEL.  601 

length  to  its  breadth,  far  exceeded  any  boat  of  the  kind 
which  had  then  been  seen  on  the  Thames. 

'  During  that  portion  of  the  period  to  which  these  notes 
refer,  when  your  father  was  engaged  at  the  Tunnel  works, 
the  freshness  and  energy  with  which  he  joined  in  the 
amusements  of  his  friends  after  many  consecutive  days 
and  nights  spent  in  the  Tunnel — for  frequently  he  did 
not  go  to  bed,  T  might  almost  say,  for  weeks  together — 
surprised  them  all. 

'  His  power  of  doing  without  sleep  for  long  intervals  was 
most  remarkable.  He  also  possessed  the  power,  which  I 
have  never  seen  equalled  in  any  other  man,  of  maintaining 
a  calm  and  even  temper,  never  showing  irritation  even 
when  he  was  bearing  an  amount  of  mental  and  bodily 
fatigue  which  few  could  have  sustained.  His  presence  of 
mind  and  courage  never  failed  him,  and  it  was  especially 
exhibited  after  the  first  irruption  of  water  into  the  Tunnel, 
when  he  descended  in  the  diving-bell  to  examine  the 
extent  of  the  disturbance  of  the  bed  of  the  river,  and  the 
injury,  if  any,  which  had  been  done  to  the  brickwork. 

*  The  bell  could  not  be  lowered  deep  enough,  and  he 
dropped  himself  out  of  the  bell,  holding  on  by  a  rope, 
and  ascertained  by  careful  examination  that  the  brick- 
work was  uninjured. 

*  He  was  several  minutes  in  the  water ;  and  upon  this 
fact  being  stated,  many  persons,  and  I  think  the  officers 
of  the  Eoyal  Humane  Society,  denied  the  possibility  of 
his  retaining  his  consciousness  so  long  in  the  water, 
forgetting,  which  he  did  not,  that  his  lungs  were  filled 
with  air  at  two  and  a  half  atmospheres'  pressure. 

*  In  1830,  he  joined  the  Surrey  Yeomanry  and  attended 
drill,  and  was  out  with  the  troop  to  which  he  belonged 
on  several  occasions. 

'  In  this  capacity  he  was  as  popular  as  in  every  other ; 


602  PEIVATE  LIFE. 

*  but  his  remarkable  talent  in  obtaining  personal  influence, 
'  even  among  those  with  whom  he  was  comparatively  a 

*  stranger,  was  about  this  time  most  usefully  exhibited 
'  during  the  election  of  his  brother-in-law  as  member  for 

*  Lambeth. 

*  He  made  friends  and  conciliated  opponents  among  all 
'  classes  of  electors — especially  among  working  men,  large 

*  bodies  of  whom  he  met  on  several  occasions — and  among 

*  all  shades  of  politicians ;  and  to  his  energy,  good  judg- 

*  ment  and  skilful  arrangement  of  electioneering  details, 

*  which  were  not  then  so  well  understood  as  they  now  are, 

*  very  much  of  the  success  achieved  was  due. 

'  No  one,  I  believe,  ever  saw  him  out  of  temper  or  heard 

*  him  utter  an  ill-natured  word.  He  often  said  that  spite 
'  and  ill-nature  were  the  most  expensive  luxuries  in  life  ; 
'  and  his  advice,  then  often  sought,  was  given  with  that 

*  clearness  and  decision,  and  that  absence  of  all  prejudice, 
'  which  characterised  his  opinions  in  after-life. 

*  All  his  friends  of  his  own  age  were  attached  to  him  in 

*  no  ordinary  degree,  and  they  watched  every  step  in  his 

*  future  career  with  pride  and  interest. 

*  In  fact,  he  was  a  joyous,  open-hearted,  considerate 

*  friend,  willing  to  contribute  to  the  pleasure  and  enjoy- 

*  ment  of  those  about  him  ;  well  knowing  his  own  power, 

*  but  never  intruding  it  to  the  annoyance  of  others,  unless 
'  he  was  thwarted  or  opposed  by  pretentious  ignorance ; 
'  and  then,  though  at  times  decided  and  severe  in  his 
'  remarks,  he  generally  preferred  leaving  such  individuals 

*  to  themselves,  rather  than,  by  noticing  them,  to  give  pro- 

*  minence  to  their  deficiencies. 

'  His  appreciation  of  character  was  so  exact,  and  his 

*  dislike  to  anything  approaching  to  vulgarity  in  thought 
'  or  action  or  to  undue  assumption  was  so  decided,  that 
'  to  be  his  friend  soon  became  a  distinction :  and  the 


EAELY  REMINISCENCES  OF  MR.  BRUNEL.  603 

*  extent  to  which  his   society  was  sought,  not  only  in 

*  private  life,  but  in  the  scientific  world,  at  this  early 
'  period,  marked  strongly  the  distinguishing  features  of 
'  his  mind  and  character. 

*  In  1825  and  1826  he  attended  the  morning  lectures 

*  at  the  Royal  Institution,  and  the  eagerness  and  rapidity 

*  with  which  he  followed  the  chemical  discoveries  which 

*  were  then  being  made  by  Mr.  Faraday,  showed  the 
'  facility  with  which  he  gained  and  retained  scientific 
'  knowledge. 

'  To  write  more  would  lead  me  to  the  events  of  a  later 

*  period  of  his  life,  in  the  history  of  which  you  require  no 

*  aid  from  me ;  nevertheless,  I  cannot  refrain  from  adding 

*  a  few  words  upon  your  father's  personal  and  professional 

*  character,  which  was  not,  in  my  opinion,  adequately 
'  appreciated  by  the  public. 

*  His   professional   friends   before  his   death,   and  his 

*  private  friends  at  all  times,  well  knew  the  genius,  the 

*  intense  energy,  and  indefatigable  industry  with  which 

*  every  principle  and  detail  of  his  profession  was  mastered ; 
'  and  both  knew  and  valued  the  high  moral  tone  which 
'  pervaded  every  act  of  his  life. 

*  The  public,  however,  did  not  see  him  under  the  same 

*  circumstances. 

'  Their  imperfect  acquaintance  with  his  character  arose 

*  in  a  great  degree  from  his  disregard  of  popular  approba- 

*  tion,  for  he  was  never  so  satisfied  with  his  own  work  as  to 
'  feel  himself  entitled  to  receive  praise  in  the  adulatory 
'  style  of  modern  writing,  and  he  preferred  to  work  quietly 
'  in  his  own  sphere,  and  to  rely  on  the  intrinsic  merits 
'  of  his  undertakings  bringing  their  reward,  rather  than  to 
'  court  temporary  popularity. 

*  The  rapidity  with  which  he  gained  a  high  position  as 

*  a  civil  engineer  is  the  best  evidence  of  his  talents.     He 


504  PEIVATE  LIFE. 

*  passed  almost  direct  from  boyhood  to  an  equality  with 
'  any  one  then  in  the  profession — a  position  attained  by 
'  the  rapidity  and  accuracy  with  which  he  could  apply 
'  theory  to  practice,  and  support  his  conclusions  by  mathe- 
'  matical  demonstrations. 

*  This   knowledge,   always   used    without    ostentation, 

*  soon  placed  him  above  most  of  his  contemporaries; 
'  and  his  intimate  acquaintance  with  the  strength  and 
'  peculiarities  of  the  various  materials  he  had  to  employ, 
'  and  of  the  best  and  most  economical  mode  of  applying 
'  them,  impressed  both  directors  and  contractors  with  a 
'  degree  of  confidence  in  his  estimates  and  opinions  which 

*  no  one  had  before  possessed. 

*  His  power  of  observation  was  singularly  accurate ;  he 
'  was  not  satisfied  with  a  hasty  or  superficial  examination, 
'  nor  with  the  mere  assertion  of  a  fact ;  his  mind  required 

*  evidence  of  its  correctness  before  he  could  receive  and 

*  adopt  it.     I  may  illustrate  this  by  a  reference  to  the 

*  experiments  he  made  with  French  mesmerists,  and  the 
'  pains  he  took  to  expose  the  farce  of  table-turning  and  its 
'  accompanying  follies. 

*  My  object,  however,  by  this  addition  to  my  note,  is  to 
'  dwell  upon  the  fact  that  he  left  a  mark  upon  his 
'  profession  which  cannot  be  obliterated.  He  set  up  a 
'  high   standard   of  professional  excellence,   and  endea- 

*  voured  to  impress  on  all  who  were  associated  with  him, 
'  or  under  him  professionally,  that  to  attain  the  highest 
'  honours  required  the  strictest  integrity,  sound  mathe- 
'  matical  knowledge,  originality  and  accuracy  of  thought 

*  and   expression,  both  in  viva  voce  descriptions  and  in 

*  designs  and  working  drawings,  and  a  practical  acquaint- 
'  ance  with  the  durability  and  strength  of  materials,  so 
'  as  to  know  the  best  conditions  under  which  each  might 

*  be  applied. 


EAELY  REMINISCENCES  OF  MR.  BRUNEL.     605 

'  It  was  his  excellence  in   these  respects,  when  still 

*  young,  which  soon  earned  for  him  a  great  reputation  as 
'  a  witness  before  the  Committees  of  the  Houses  of  Par- 

*  liament., 

'  His  calmness  and  unobtrusive  manner,  when  under 
'  severe  examination,  or  while  attending  public  meetings, 
'  led  many  to  think  him  cold,  and  regardless  of  the  feelings 

*  or  interests  of  those  with  whom  he  was  associated ;  but 

*  nothing  was  further  from  his  character,  as  every  one  knew 

*  who  was  engaged  in  the  consultations  upon  the  result 
'  of  which  future  proceedings  depended. 

'  He  was  a  prudent  and  cautious,  but  bold  adviser, 
'  and  a  warm-hearted  and  generous  friend. 

'  Yours  faithfully, 

'Isambard  Brunei,  Esq.'  *  W.  HaWES. 

The  events  of  the  year  1835  brought  with  them,  not  un- 
naturally, other  changes.  At  the  beginning  of  1836,  he 
removed  to  18  Duke  Street,  Westminster,  a  large  house 
looking  on  St.  James's  Park,  and  now  (1870)  the  last 
in  the  street,  next  to  the  new  India  OflSce. 

In  July  of  the  same  year  he  married  the  eldest 
daughter  of  the  late  William  Horsley,  and  granddaughter 
of  Doctor  Callcott.  Of  this  marriage  there  was  issue  two 
sons  and  a  daughter,  all  of  whom  survive  him. 

Although,  as  will  be  presently  mentioned,  he  afterwards 
bought  some  property  in  Devonshire,  the  Duke  Street 
house  was  always  his  home.  He  spent  his  life  there, 
having  his  offices  on  the  lower  floors. 

He  had  no  wish  to  enter  Parliament,  although  it  had 
been  more  than  once  suggested  to  him  to  do  so,  and  his 
work  prevented  his  taking  an  active  share,  as  an  inhabitant 
of  Westminster,  in  the  concerns  of  his  neighbourhood. 

The  only  occasion  on  which  he  took  a  prominent  part  in 


506  PEIVATE  LIFE. 

local  affairs  was  as  a  special  constable  in  April  1848,  when 
lie  acted  as  one  of  the  two  '  leaders '  of  the  special  con- 
stables in  the  district  between  Great  George  Street  and 
Downing  Street. 

He  was  not  without  experience  of  the  duties  of  a  special 
constable,  as  he  had  been  sworn  in  during  the  Bristol  riots 
of  1830,  and  on  that  occasion  saw  active  service.  Happily, 
matters  were  better  managed  in  London,  and  no  actual 
collision  took  place  between  the  constables,  or  the  militarj, 
and  the  mob. 

The  extent  to  which  Mr.  Brunei  kept  his  works  in  his 
own  hands,  and  under  his  own  superintendence,  made  it 
necessary  for  him  to  have  a  large  amount  of  office  accom- 
modation ;  and  the  inconvenience  of  having  branch  offices 
in  the  streets  near  his  house  led  him,  in  1848,  to  enlarge 
his  offices  :  with  this  object  he  added  the  adjoining  house, 
17  Duke  Street,  which  he  rebuilt.  A  large  room  on 
the  ground  floor,  looking  on  the  Park,  was  thenceforward 
his  own  office,  and  the  room  above  was  made  the  dining- 
room.  It  was  decorated  in  the  Elizabethan  style,  and  was 
to  have  contained  a  collection  of  pictures  illustrative  of 
scenes  in  '  Shakespeare,'  painted  for  him  by  the  principal 
artists  of  the  day.  This  project  was  never  completely 
carried  out,  but  several  pictures  (about  ten  in  all)  were 
painted  and  hung  up,  among  them  the  '  Titania '  of 
Sir  Edwin  Landseer.  These  subjects  are  again  referred 
to  in  the  following  letter : — 

Februaiy,  1870. 

'  My  dear  Isambard, — You  ask  me  to  jot  down  for  you 
'  any  reminiscences  I  have  of  your  father's  love  and  feeling 
'  for  art. 

'  I  remember  with  singular  distinctness  the  first  time  I 
'  ever  sa-w  him,  when  I  was  a  lad  of  fourteen,  and  had  just 


MK.  BRUNEL'S  TASTE  IN  ART.  507 

'  obtained  my  studentsliip  at  the  Royal  Academy.  He 
'  criticised  with  great  keenness  and  judgment  a  drawing 
'  which  I  had  with  me,  and  at  the  same  time  gave  me  a 
'  lesson  on  paper  straining.  From  that  time  till  his  death 
'  he  was  my  most  intimate  friend.  Being  naturally  im- 
'  bued  with  artistic  taste  and  perception  of  a  very  high 

*  order,  his  critical  remarks  were  always  of  great  value, 

*  and  were  made  with  an  amount  of  good  humour  which 
'  softened  their  occasionally  somewhat  trying  pungency. 
'  He  had  a  remarkably  accurate  eye  for  proportion,  as 
'  well  as  taste  for  form.  This  is  evinced  in  every  line  to 
'  be  found  in  his  sketch  books,  and  in  all  the  architectural 

*  features  of  his  various  works. 

'  So  small  an  incident  as  the  choice  of  colour  in  the 

*  original  carriages  of  the  Great  Western  Railway,  and 
'  any  decorative  work  called  for  on  the  line,  gave  public 

*  evidence   of  his   taste   in   colour ;    but  those   who   re- 

*  member  the  gradual  arrangement  and  fitting  up  of  his 

*  house  in  Duke  Street  wiU  want  no  assurance  from  me  of 

*  your  father's  rare  artistic  feeling.  He  passed,  I  believe, 
'  the  pleasantest  of  his  leisure  moments  in  decorating  that 
'  house,  and  well  do  I  remember  our  visits  in  search  of 

*  rare  furniture,  china,  bronzes,  &c.,  with  which  he  filled 
'  it,  till  it  became  one  of  the  most  remarkable  and  attrac- 

*  tive  houses  in  London.  Its  interest  was  greatly  in- 
'  creased  when  he  formed  that  magnificent  dining-room, 

*  now,  with  the  house  of  which  it  was  a  part,  pulled  down. 

*  This  room,  hung  with  pictures,  with  its  richly  carved  fire- 

*  place,  doorways,  and  ceiling,  its  silken  hangings  and 
^  Venetian  mirrors,  lighted  up  on  one  of  the  many  festive 

*  gatherings  frequent  in  that  hospitable  house,  formed  a 
'  scene  which  none  will  forget  who  had  the  privilege  of 

*  taking  part  in  it.     When  from  time  to  time  he  went 

*  abroad,  and  especially  in  his  visit  to  Venice  in  1862,  he 


508  PRIVATE  LIFE. 

*  added  to  his  collection  by  purchases  made  with  great 

*  judgment  and  skill.  In  buying  pictures,  your  father 
'  evinced  a  taste  often  found  in  men  of  refined  mind  and 
'  feeling — viz.  a  repugnance  to  works,  however  excellent  in 
'  themselves,  where  violent  action  was  represented.  He 
'  preferred  pictures  where  the  subject  partook  more  of  the 
'  suggestive  than  the  positive,  and  where  a  considerable 
'  scope  was  left  in  which  the  imagination  of  the  spectator 
'  might  disport  itself.  This  feeling  was  displayed  in  a 
'  great  love  of  landscape  art,  and  in  the  keenest  appre- 
'  ciation  of  the  beauties  of  nature.     It  is  an  interesting 

*  fact  to  record,  and  one  which  I  often  heard  him  mention, 

*  when  his  friends  were  admiring  his  beautiful  grounds  at 
'  Watcombe,  that  in  the  old  posting  days,  when  travelling 
'  on  the  cliff  road  between  Teignmouth  and  Torquay,  he 
'  constantly  stopped  the  carriage  to  get  out  and  admire 
'  the  view  which  he  had  discovered  from  a  field  at  Wat- 
'  combe,  little  thinking  then  that  it  would  ultimately  be 
'  the  site  of  his  intended  country  home. 

'  When  your  father  and  I  went  to  Italy  together  in  1842, 
'  posting  from  Westminster  to  Eome  and  back  again,  I 
'  had  ample  opportunities  of  observing  his  love  and  en- 
'  thusiasm  for  nature  and  art. 

'  Overwhelmed  as  he  was  with  work  in  England  at  the 
'  time,  it  was  no  easy  matter  for  him  to  leave  the  country 
'  for  a  couple  of  months ;  and  I  remember  that  our  starting 
'  at  all  was  uncertain  up  to  the  last  moment ;  and  that, 

*  an  hour  before  quitting  London,  it  was  only  by  a  coujp 
'  de  theatre^  which   he   most  adroitly  performed,  that  he 

*  escaped  the  serving  of  a  subpcena,  the  bearer  of  which 

*  had  actually  penetrated  to  the  dining-room  door  in  Duke 
'  Street. 

'  We  left  London  one  evening  in  April  1842.  During 
'  our  journey  we   constantly  passed  several   consecutive 


MR.    BRUNEL'S  FIRST  JOURNEY  TO  ITALY,  a.d.  1842.   609 

days  and  nights  in  the  carriage ;  and  I  am  sure  there  was 
not  one  of  our  waking  hours  in  which  some  incident  of 
interest  did  not  occur. 

*  I  remember  your  father  agreeing  with  me,  that  our 
experiences  merely  of  post-boys  and  their  various  cha- 
racteristics would  be  worthy  of  recording  in  detail — from 
Newman's  two  smart  lads,  who  took  us  the  first  stage 
out  of  London,  on  to  the  genuine  "  postilion  "  (boots  and 
all)  we  found  at  Calais ;  then  to  the  wild  young  brigands 
(in  appearance)  who,  inspired  by  the  prospect  of  extra 
"buon  mano,"  whirled  us  along  the  road  from  Civita 
Yecchia  towards  Rome,  and  winding  up  with  the  stolid 
German  who  rose  slowly  in  his  stirrups,  and  distracted 
us  by  a  melancholy  performance  on  the  horn  slung 
round  him,  and  which  no  entreaty  would  induce  him  to 
give  up. 

*  We  posted  from  Calais,  via  Paris,  to  Chalons-sur- 
Saone,  marvelling  the  whole  way  whereabouts  "  La  Belle 
"  France  "  was  to  be  found ;  for  a  drearier  and  more 
utterly  monotonous  ride  of  something  like  800  miles  it  is 
impossible  to  conceive.  From  Chalons  we  went  down  the 
river  to  Lyons,  then  onwards,  visiting  Nismes,  and 
through  Aries  to  Toulon. 

'  From  Toulon  we  went  through  Cannes  and  Nice  and 
along  the  lovely  Cornice  road  to  Genoa.  Tour  father  was 
intensely  delighted  with  this  portion  of  the  journey. 
Those  wonderfully  picturesque  towns,  with  their  roccoco 
churches  looking  like  toys,  and  painted  all  over  upon 
the  principle  of  colour  generally  developed  in  that  species 
of  art,  especially  interested  him.  The  streets  were  so 
narrow  that  it  was  sometimes  doubtful  whether  the 
carriage  could  be  squeezed  through,  and  more  than 
once  it  grazed  the  houses  on  either  side  as  it  passed 
on. 


510  PRIVATE  LIFE. 

*  The  work  for  which   your  father  had  come  to  Italy 

*  commenced  at  Genoa,  and  he  was  met  there  by  a  staff 

*  appointed  by  the  Government  to  accompany  him  during- 

*  his  stay. 

*  While   at   Genoa  he  came  to  me   one  morning  and 

*  said,  that,  in  consequence  of  some  delay,  he  had  a 
'  week  in  which  to  make  complete  holiday,  and  gave  me 

*  the  choice  of  Florence  or  Eome.  I  need  scarcely  say 
'  that  I  chose  Rome,  and  for  three  days  we  were  in  the 

*  Eternal  City,  seeing  more  in  that  time  than  those  to 

*  whom  we  related  our  proceedings  could  believe. 

'  How  well  do  I  remember  our  entering  Rome  by  the 

*  gate  on  the  Civita  Vecchia  road,  and  standing  up  in  the 
'  carriage  to  get  our  first  view  of  St.  Peter's,  and,  having 
'  seen  it,  the  blank  look  of  disappointment  we  turned  on 

*  each  other  at  the  sight !     But  the  interior  of  the  great 

*  church  as  far  exceeded  our  expectations  as  the  exterior 

*  had  fallen  short  of  them. 

'  We  were  back  at  Genoa  to  the  minute  your  father  had 

*  appointed ;  and  the  work  being  completed  there,  we 
'  went  on  to  Turin.     Here  we  were  in  time  to  be  present 

*  at  the  Court  balls  and  ceremonies  consequent  upon  the 

*  marriage  of  the  present  King  of  Italy. 

*  From  Turin  we  proceeded  to  Milan. 

'  At    Milan  your    father  parted   from    his   staff,   and 

*  completed  the  work  he  had  undertaken  as  far  as  it  was 

*  necessary  to  do  so  in  Italy.  From  Milan,  therefore,  our 
'  journey   home    was    one    of    uninterrupted  enjoyment 

*  through  those  glorious  Lombard  towns  to  Venice,  which 
'  happily  we  reached  in  a  gondola  from  Mestre,  and  not 
'  by  a  railway  viaduct ;  then  through  the  Tyrol  to  Munich, 
'  and  so  down  the  Rhine  to  Belgium,  reaching  home  from 

*  Antwerp. 

*  Thus  was  completed  an  expedition  in  which  there  was 


MR.  BRUNEL'S  FIRST  JOURNEY  TO  ITALY,  a.d.  1842.   511 

*  neither  hitch  nor  disagreeable   adventure  of  any  kind, 

*  and  upon  which  I  look  back  with  unmixed  pleasure. 

'  The  next  and  last  time  that  your  father  and  I  jour- 

*  neyed  on  the  Continent  together  was  in  April  1848,  when 
'  he  wished  to  see  Paris  in  Republican  garb,  and  asked 

*  me  to  accompany  him. 

*  We  were  there  for  some  days,  and,  armed  with  cards 

*  of  admission,  on  which  our  names  were  inscribed  with 

*  the  prefix   of  "  Citoyen,"   heard   and   saw  the  various 

'  celebrities  of  the  hour. 

*  Affectionately  yours, 

*  J.  C.  HORSLET. 
'  Isambard  Brunei,  Esq.' 

Within  less  than  a  year  of  Mr.  Brunei's  return  from  his 
visit  to  Italy,  a  strange  accident  happened  to  him,  which 
placed  his  life  in  great  jeopardy. 

On  April  3,  1843,  he  was  amusing  some  children  at  his 
house  by  the  exhibition  of  conjuring  tricks,  when,  in  pre- 
tending to  pass  a  half-sovereign  from  his  ear  to  his  mouth, 
the  coin  he  had  placed  in  his  mouth  slipped  down  his 
throat.  After  a  few  days  he  began  to  suffer  from  a  trouble- 
some cough,  and  on  April  18  Sir  Benjamin  Brodie  was 
consulted. 

The  nature  of  the  accident  and  the  course  of  treatment 
adopted  are  described  in  the  following  letter  from  Mr. 
Brunei's  brother-in-law,  the  late  Dr.  Seth  Thompson,  which 
was  published  in  the  *  Times '  newspaper  of  May  16, 
1843  :— 

I  shall  be  much  obliged  by  your  giving  insertion  to  the  following 
statement  of  the  treatment  pursued  by  Sir  Benjamin  Brodie  in  the 
case  of  Mr.  Brunei,  it  being  the  wish  of  Mr.  Brunei  and  his  friends 
that  the  true  facts  shotdd  be  known,  as  a  just  tribute  to  the  skill  of 
this  eminent  surgeon,  and  as  a  guide  to  future  practice.  The 
accident  happened  on  April  3  ;  Sir  B.  Brodie  was  consulted  on  the 


512  PRIVATE  LIFE. 

18th,  and  his  opinion  was  that  the  half-sovereign  had  passed  into 
the  windpipe.  The  following  day- Mr.  Brunei  strengthened  this 
opinion  by  a  simple  experiment.  lie  bent  his  head  and  shoulders 
over  a  chair,  and  distinctly  felt  the  coin  drop  towards  the  glottis ; 
whilst  raising  himself  a  violent  fit  of  coughing  came  on,  which  ceased 
after  a  few  minutes.  He  repeated  this  a  second  time,  with  the  same 
results.  A  consultation  was  held  on  the  22nd,  at  which  it  was 
decided  that  conclusive  evidence  existed  of  the  half-sovereign  having 
passed  into  the  windpipe,  that  it  was  probably  lodged  at  the  bottom 
of  the  right  bronchus,  and  that  it  was  movable.  It  was  determined 
that  every  effort  should  be  made  for  its  removal,  and  that  for  this 
purpose  an  apparatus  should  be  constructed  for  inverting  the  body 
of  the  patient,  in  order  that  the  weight  of  the  coin  might  assist  the 
natural  effort  to  expel  it  by  coughing.  The  first  experiment  was 
made  on  the  25th.  The  body  of  the  patient  being  inverted,  and  the 
back  gently  struck  with  the  hand  between  the  shoulders,  violent 
cough  came  on,  but  of  so  convulsive  and  alarming  a  nature  that 
danger  was  apprehended,  and  the  experiment  was  discontinued. 
On  this  occasion  the  coin  was  again  moved  from  its  situation,  and 
slipped  towards  the  glottis.  On  the  27  th  tracheotomy  was  per- 
formed by  Sir  B.  Brodie,  assisted  by  Mr.  Aston  Key,  with  the 
intention  of  extracting  the  coin  by  the  forceps,  if  possible,  or,  in  the 
event  of  this  failing,  with  the  expectation  that  the  opening  in  the 
windpipe  would  facilitate  a  repetition  of  the  experiment  of  the  22nd. 
On  this  occasion,  and  subsequently  on  May  2,  the  introduction  of 
the  forceps  was  attended  with  so  much  irritation,  that  it  could  not 
be  persevered  in  without  danger  to  life.  On  the  3rd  another  con- 
sultation was  held,  when  Mr.  Lawrence  and  Mr.  Stanley  entirely 
confirmed  the  views  of  Sir  B.  Brodie  and  Mr.  Key,  and  it  wa's 
agreed  that  the  experiment  of  inversion  should  be  repeated  as  soon 
as  Mr.  Brunei  had  recovered  sufiScient  strength,  the  incision  in  the 
windpipe  being  kept  open.  On  Saturday,  the  13th,  Mr.  Brunei 
was  again  placed  on  the  apparatus,  the  body  inverted,  and  the  back 
gently  struck.  After  two  or  three  coughs,  he  felt  the  coin  quit  its 
place  on  the  right  side  of  the  chest,  and  in  a  few  seconds  it  dropped 
from  his  mouth  without  exciting  in  its  passage  through  the  glottis 
any  distress  or  inconvenience,  the  opening  in  the  windpipe  pre- 
venting any  spasmodic  action  of  the  glottis. 

In  this  remarkable  case  the  following  circumstances  appear  to 
be  worthy  of  note — that  a  piece  of  gold  remained  in  the  air-tube  for 
six  weeks,  quite  movable,  and  without  exciting  any  inflammatory 
action,  the  breathing  entirely  undisturbed,  and  the  only  symptoms 


THE  HALF-SOVEREIGN  ACCIDENT,  a.d.   1843.  513 

'  if  its  presence  occasional  uneasiness  on  the  right  side  of  the  chest 
and  frequent  fits  of  coughing ;  that  an  accurate  diagnosis  was  formed 
v/ithout  being  able  to  obtain  any  assistance  from  the  stethoscope, 
although  the  chest  Avas  repeatedly  and  carefully  examined ;  and  also 
that,  a  fair  trial  having  been  given  to  the  forceps,  the  application  of 
this  instrument  to  the  removal  of  a  body  of  this  peculiar  form  from 
the  bottom  of  the  bronchus  was  proved  to  be  attended  with  great 
risk  to  life,  while  the  cautious  and  well-considered  plan  of  treatment 
above  detailed  was  attended  with  complete  success,  and  without 
risk. 

During  the  time  that  Mr.  Brunei  was  in  danger  the 
public  excitement  was  intense%  His  high  professional 
position,  the  extraordinary  nature  of  the  accident,  and  the 
greatness  of  the  loss,  were  the  result  to  prove  fatal,  made 
his  condition  and  the  chances  of  his  recovery  an  engrossing 
topic  of  conversation ;  and,  when  the  news  was  spread  that 
*  it  is  out,'  the  message  needed  no  explanation. 

That  the  result  V7as  successful  was  due,  not  only  to  the 
skiU  of  the  surgeons  engaged,  and  to  the  anxious  care 
with  which  those  who  nursed  him  left  nothing  undone  to 
ensure  his  safety,  but  also  to  the  remarkable  coolness 
which  Mr.  Brunei  himself  displayed  throughout.  From 
the  first  he  took  part  in  the  consultations  which  were 
held  on  his  case,  and  assisted  materially  in  determining 
the  course  of  treatment  which  should  be  pursued. 

The  ten  years  which  followed  were  the  most  prosperous 
in  Mr.  Brunei's  life ;  he  had  attained  to  great  eminence 
in  his  profession,  and  was  still  in  the  enjoyment  of  robust 
health.  But  the  results  of  the  gauge  controversy  and  the 
fierce  contests  which  followed  it,  and,  above  all,  the  failure 
of  the  Atmospheric  System  on  the  South  Devon  Railway, 
caused  him  grave  anxiety  and  sorrow.  Critics  have  erred 
greatly  in  representing  him  as  a  man  who,  in  order 
to  accomplish  some  vast  design,  thought  but  little  of 
the  distress  which  follows  want  of  success  in  commercial 

L  L 


514  PRIVATE  LIFE. 

enterprises.  So  far  from  its  being  true  fhat  Mr.  Brunei 
was  indifferent  to  tke  interests  of  Ms  employers,  his  private 
journals  show  that  throughout  (to  use  his  own  words)  *  the 
*  incessant  warfare  in  which  he  was  engaged '  he  was 
earnestly  desiring  peace  and  endeavouring  to  secure  it, 
and  that  in  times  of  difficulty,  such  as  the  trial  of  the 
Atmospheric  System  and  the  launch  of  the  '  Great  Eastern,' 
his  chief  thoughts  were  for  those  who  would  suffer  through 
the  failure  of  his  plans. 

In  the  midst  of  his  professional  occupations  he  was  able 
occasionally,  though  rarely",  to  enjoy  the  society  of  his 
friends.  After  the  session  was  over,  in  1844  and  1845,  he 
went  to  Italy  on  business,  and  in  1846  to  Switzerland 
for  a  short  holiday.  In  1847  the  South  Devon  Railway 
was  occupying  his  attention,  and  he  determined  to  take 
a  house  at  Torquay.  While  there,  the  important  character 
of  his  railway  works  in  Devonshire  and  Cornwall  led 
him  to  think  of  making  a  more  permanent  settlement  in 
that  part  of  the  country. 

After  a  good  deal  of  hesitation  between  various  places, 
he  fixed  upon  a  spot  at  Watcombe,  about  three  miles  from 
Torquay,  on  the  Teignmouth  turnpike  road.  He  made 
his  first  purchase  of  land  in  the  autumn  of  1847  ;  and  from 
that  time  to  within  a  year  of  his  death  the  improvement 
of  this  property  was  his  chief  delight. 

He  had  always  a  great  love  and  appreciation  of 
beautiful  scenery,  and  in  his  choice  of  a  place  in  which 
to  plant  and  build  he  provided  amply  for  his  complete 
gratification. 

The  principal  view,  which,  if  the  house  had  been  built, 
would  have  been  the  view  from  the  terrace,  is  one  of  the 
loveliest  in  that  part  of  Devonshire.  On  one  side  is  the 
sea,  and  on  the  other  the  range  of  Dartmoor,  while  in  front 


WATCOMBE.  516 

is  spread  undulating  country,  bounded  by  the  hills  on  the 
further  side  of  Torbay,  the  bay  itself  looking  like  a  lake, 
being  shut  in  by  the  hills  above  Torquay. 

When  Mr.  Brunei  bought  this  property  it  consisted 
of  fields  divided  by  hedgerows;  but,  assisted  by  Mr. 
William  Nesfield,  he  laid  it  out  in  plantations  of  choice 
trees.  The  occupation  of  arranging  them  gave  him  un- 
failing pleasure ;  and,  although  he  could  seldom  spare  more 
than  a  few  days'  holiday  at  a  time,  there  can  be  little  doubt 
that  the  happiest  hours  of  his  life  were  spent  in  walking 
about  in  the  gardens  with  his  wife  and  children,  and  dis- 
cvissing  the  condition  and  prospects  of  his  favourite  trees.^ 

He  could  not,  of  course,  take  a  prominent  part  in  the 
affairs  of  the  parish,  but  he  was  always  ready  to  assist 
in  any  work  that  had  been  taken  in  hand.  He  will  be 
long  remembered  there  by  his  friends  in  every  rank 
of  life. 

In  purchasing  this  property  in  Devonshire,  Mr.  Brunei 
had  looked  forward  to  retiring  gradually  from  active  pro- 
fessional life,  *  to  draw  in  and  make  room  for  others,'  and 
to  spend  a  greater  portion  of  his  time  in  the  country. 

It  may  well  be  questioned  whether  he  would  have  been 
happy  in  giving  up  work  while  yet  in  middle  life ;  but 
the  wisdom  of  his  resolve  was  not  to  be  put  to  the  test. 

From  the  beginning  of  the  year  1852  the  *  Great 
*  Eastern '  steam-ship  began  to  occupy  his  time  and 
thoughts.  As  the  works  progressed  he  was  more  and 
more  tied  to  London;    and  the  large  pecuniary  invest- 

'  Although    Mr.    B.-unel     endea-  before  they  were  transplanted,  though 

voured,  as  far  as  possible,  to  lay  aside  he  attended  to  the  work  himself,  and 

work  during  his  visits  to  Wateombe,  took    care  that    a   large    amount   of 

he  found  occasions  for  the  use  of  his  earth  was  moved  with  the  tree.     The 

mechanical  knowledge.     He  prepared  bridge  of  rough  poles  across  the  tui-n- 

tooLs  for  transplanting  young  trees;  pike  road  between   Teignmouth  and 

he    did     not,    however,    succeed    in  Torquay  is  as  good  of  its  kind  as  hia 

making    them    flourish    as    well    as  larger  works. 

L  L   2 


516  PKIVATE  LIFE. 

ment  he  had  made  in  the  shares  of  the  company  caused 
him  to  hesitate  before  proceeding  with  the  building  of  his 
house. 

Thus  the  hopes  he  had  formed  for  making  his  home  in 
Devonshire  faded  gradually  away,  and  were  at  length 
extinguished  by  the  failure  of  his  health. 

Many  things  had  happened  in  the  earlier  part  of  1857 
which  gave  him  pleasure.  In  June  he  received,  in  com- 
pany with  Mr.  Eobert  Stephenson,  the  honorary  degree  of 
Doctor  in  Civil  Law  from  the  University  of  Oxford.'  In 
the  summer  he  paid  several  visits  to  Devonshire,  and  at 
the  beginning  of  September  the  floating  of  the  first  truss 
of  the  Saltash  bridge  was  successfully  accomplished. 

The  history  of  the  launch  of  the  *  Great  Eastern,'  which 
was  commenced  in  November,  has  been  already  told. 
Throughout  all  the  disappointments  he  then  endured  Mr. 
Brunei  took  comfort  from  the  sympathy  of  valued  friends, 
and  from  those  higher  sources  of  consolation  on  which  it 
was  his  habit  to  rely.  He  paid  for  his  exertions  a  heavy 
price,  for  they  left  him  broken  in  health  and  already 
suffering  from  the  disease  of  which  in  a  little  more  than 
eighteen  mouths  afterwards  he  died.* 

In  May  1858  Mr.  Brunei  went  to  Vichy,  and  thence  to 
Switzerland,  returning  home  in  the  autumn  by  way  of 
Holland.  When  at  Lucerne  he  went  up  the  Eighi,  and 
was  so  charmed  with  it  that,  instead  of  spending  only  a 

'  On  June  10,  1830,  when  he  was  expiration  of  Mr.  Eobert  Stephenson's 

twenty-four  years  old,  Mr.  Brunei  was  term  of  office  as  President  of  the  Insti- 

elected  a  Fellow  of  the  Eoyal  Society.  tution  of  Civil  Engineers,  Mr.  Brunei 

He  subsequently  became  a  member  of  came  next  in  rotation  for  election ;  but 

most  of  the  other  scientific  societies  ;  his  failing  health,  and  the  pressure  of 

but  he  rarely  attended  any  meetings,  his  professional  duties,  led  him  to  re- 

except  those  of  the  Institution  of  Civil  quest  that  he  might  not  then  be  put  in 

Engineers.  nomination.- — See  Inaugural  Address 

*  At  the  beginning  of  1858,  on  the  of  John  Fowler,  Esq.,  January  9, 1866. 


MR.   BRUNEL'S  FAILING  HEALTH,  a.d.   1858.  517 

night  there,  he  remained  a  week,  working  at  the  designs 
for  the  Eastern  Bengal  Eailway. 

It  was  on  his  return  to  England  in  September  that  the 
alarming  nature  of  his  illness  was  ascertained.  After 
anxious  consultation  with  Sir  Benjamin  Brodie  and  Dr. 
Bright,  he  was  ordered  to  spend  the  winter  in  Egypt,  in 
the  hope  that  he  might  return  in  the  March  or  April  fol- 
lowing in  restored  health. 

He  was  very  unwilling  to  be  so  long  absent  from  Eng- 
land, especially  as  a  new  company  had  just  been  formed 
to  finish  the  '  Great  Eastern,'  and  the  contracts  for  her 
completion  were  about  to  be  let. 

However,  it  was  thought  that  very  serious  consequences 
might  follow  if  he  remained  at  home ;  and  in  the  beginning 
of  December  he  left  for  Alexandria,  with  his  wife  and 
younger  son. 

Having  stayed  there  a  day  or  two,  they  went  on  to 
Cairo,  where  they  found  Mr.  Eobert  Stephenson.  He  and 
Mr.  Brunei  dined  together  on  Christmas  Day. 

On  December  30  the  journey  up  the  Nile  commenced. 
On  January  21  they  arrived  at  Thebes,  and  spent  some 
days  there.  Mr.  Brunei  was  able  to  ride  about  on  a  don- 
key, and  made  some  sketches  of  the  celebrated  ruins  in 
the  neighbourhood.^ 

They  reached  Assouan  on  February  2,  and  made  pre- 
parations for  ascending  the  cataracts.  They  went  as  far  as 
Dakkeh,  and  got  back  to  Assouan  on  February  19. 

The  following  letter  from  Mr.  Brunei  to  his  sister.  Lady 
Hawes,  describes  some  of  the  scenes  through  which  he 
passed : — 

Philae,  February  12,  1859. 
I  now  write  to  you  from  a  charming  place ;  but  Assouan,  which  I 

'  A  drawing  of  their  Nile  boat,  the  minuteness  which  appears  in  all  his 
'  Florence,'  which  he  made  for  his  early  sketches  for  the  Clifton  bridge 
daughter,  exhibits  the  same  beautiful       and  Great  Western  Kailwaj. 


518  PRIVATE  LIFE. 

left  to  come  liere,  is  also  beautiful,  and  I  will  speak  of  that  first.  It 
is  strange  that  so  little  is  said  in  the  guide  books  of  the  picturesque 
beauty  of  these  places.  Approaching  Assouan,  you  glide  through 
a  reef  of  rocks,  large  boulders  of  granite  polished  by  the  action  of 
the  water  charged  with  sand.  You  arrive  at  a  charming  bay  or  lake 
of  perfectly  still  water  and  studded  with  these  singular  jet-black  or 
red  rock  islands.  In  the  distance  you  see  a  continuation  of  the  river, 
with  distant  islands  shut  in  by  mountains,  of  beautiful  colours,  some 
a  lilac  sandstone,  some  the  bright  red  yellow  of  the  sands  of  the 
desert.  Above  the  promontories  the  water  excursions  are  delicious. 
You  enter  at  once  among  the  islands  of  the  Cataracts,  fantastic  forms 
of  granite  heaps  of  boulders  split  and  worn  into  singular  shapes. 

After  spending  a  week  at  Assouan,  with  a  trip  by  land  to  Philse,  I 
was  so  charmed  with  the  appearance  of  the  Cataracts  as  seen  from 
the  shore,  and  with  the  deliciously  quiet  repose  of  Philse,  that  I 
determined  to  get  a  boat,  and  sleep  a  few  nights  there.  We  succeeded 
in  hiring  a  country  boat  laden  with  dates,  and  emptied  her,  and 
fitted  up  her  three  cabins.^  We  put  our  cook  and  dragoman  and 
provisions,  &c.,  on  board,  and  some  men,  and  went  up  the  Cataract. 
It  was  a  most  amusing  affair,  and  most  beautiful  and  curious  scenery 
all  the  way.  It  is  a  long  rapid  of  three  miles,  and  perhaps  one 
mile  wide,  full  of  rocky  islands  and  isolated  rocks.  A  bird's-eye  view 
hardly  shows  a  free  passage,  and  some  of  the  more  rapid  falls  are 
between  rocks  not  forty  feet  wide — in  appearance  not  twenty. 
Although  they  do  not  drag  the  boats  up  perpendicular  falls  of  three 
or  four  feet,  as  the  travellers'  books  tell  you,  they  really  do  drag  the 
boats  up  rushes  of  water  which,  until  I  had  seen  it,  and  had  then 
calculated  the  power  required,  I  should  imprtidently  have  said  could 
not  be  efiected.  We  were  dragged  up  at  one  place  a  gush  of  water, 
what  might  fairly  be  called  a  fall  of  about  three  feet,  the  water  rushing 
past  very  formidably,  and  between  rocks  seemingly  not  more  than 
wide  enough  to  let  our  boat  pass,  and  this  only  by  some  thirty-five 
men  at  three  or  four  ropes,  the  men  standing  in  the  water  and  on  the 
rocks  in  all  directions,  shouting,  plunging  into  the  water,  swimming 
across  the  top  or  bottom  of  the  fall,  just  as  they  wanted,  then  getting 
under  the  boat  to  push  it  off  rocks,  all  with  an  immense  expenditure 
of  noise  and  apparent  co.nfusion  and  want  of  plan,  yet  on  the  whole 
properly  and  successfully.  We  were  probably  twenty  or  thirty 
minutes  getting  up  this  one,  sometimes  bumping  hard  on  one  rock, 
sometimes  on  another,  and  jammed  hard  first  on  one  side  and  then 

'  Mr.  Brunei's  Nile  boat,  being  of  iron,  conld  not  safely  go  up  the  Cataracts. 


VISIT  TO   EGYPT,   a.d.  1858—1859.  519 

(111  the  other,  the  boat  all  the  time  on  the  fall  with  ropes  all  strained, 
sometimes  going  up  a  foot  or  two,  sometimes  losing  it,  till  at  last 
we  crept  to  the  top,  and  sailed  quietly  on  in  a  perfectly  smooth  lake. 
These  efforts  up  the  different  falls  had  been  going  on  for  nearly  eight 
houra,  and  the  relief  from  noise  was  delicious.  We  selected  a  quiet 
spot  under  the  temples  of  Philaj.  .  .  .  Our  poultry-yard  is  on 
the  sandbank,  wliere  fowls,  pigeons,  and  turkeys  are  walking  about 
loose,  and,  like  all  animals  in  this  country,  perfectly  tame.  Yes, 
they  walk  up  and  catch  a  pigeon  to  be  killed  when  you  like.  In 
the  midst  of  these  and  of  the  small  birds  which  always  walk  and  fly 
about  us,  have  been  walking  for  hours  this  morning  three  or  four 
large  eagles,  who,  Avith  the  politeness  peculiar  to  animals  here,  pay 
no  attention  to  our  fowls,  nor  do  they  to  the  eagles.  But  here  I 
am  entering  on  the  anomalies  and  contradictions  of  Egypt,  which 
would  fill  volumes. 

After  leaving  Egypt,  Mr.  Brunei  went  to  Naples  and 
Rome,  where  lie  spent  Easter,  and  he  returned  to  England 
in  the  middle  of  May. 

When  abroad,  Mr.  Brunei  made  sight-seeing  a  pleasure 
rather  than  a  business ;  thus  in  Egypt  he  preferred  to  visit 
frequently  the  same  places,  and  rather  to  enjoy  that  which 
he  knew  gave  him  pleasure,  than  to  hurry  about  with  the 
object  of  seeing  all  that  was  to  be  seen.  At  Philse  he 
stopped  more  than  a  week,  and  at  Thebes  he  spent  more 
time  in  a  small  outlying  temple  near  Karnac  than  in 
the  great  ruin  itself.  So  also  at  Home  he  went  frequently 
to  the  Colosseum,  and  he  spent  many  hours  in  the  interior 
of  St.  Peter's. 

Shortly  after  his  return  to  England  he  went  to  Ply- 
mouth, and  over  the  Saltash  bridge  and  other  parts  of  the 
Cornwall  Railway,  which  had  been  opened  during  his 
absence  abroad. 

Although  it  had  by  this  time  become  certain  that  the 
disease  under  which  he  laboured  had  assumed  a  fatal  cha- 
racter, he  continued  to  give  unremitting  attention  to  his 
various  professional  duties ;  and  in  order  to  be   nearey 


520  ME.   BRUNEL'S   DEATH,   SEPTEMBER   15,    1859. 

the  *  Great  Eastern,'  he  took  a  house  at  Sydenham,  and 
removed  there  with  his  family  in  the  beginning  of  August. 

Almost  every  day  he  went  to  the  great  ship  and  super- 
intended the  preparations  for  getting  her  to  sea.  She  was 
advertised  to  sail  on  September  6,  and  Mr.  Brunei  had 
intended  going  round  in  her  to  Weymouth. 

He  was  on  board  early  on  the  morning  of  the  5th,  and 
his  memorandum  book  has,  under  that  date,  an  entry  of 
some  unfinished  work  which  had  to  be  looked  after.  To- 
wards midday  he  felt  symptoms  of  failing  power,  and  went 
home  to  his  house  in  Duke  Street,  when  it  became  evident 
that  he  had  been  attacked  with  paralysis. 

At  one  time  it  seemed  possible  that  he  might  recover ; 
but  on  the  tenth  day  after  his  seizure,  Thursday,  Sep- 
tember 15,  all  hope  was  taken  away.  In  the  afternoon  he 
spoke  to  those  who  watched  around  him,  calling  them  to 
him  by  their  names;  as  evening  closed  in  he  gradually 
sank,  and  died  at  half-past  ten,  quietly  and  without  pain. 

The  funeral  was  on  September  20,  at  the  Kensal  Green 
Cemetery. 

Along  the  road  leading  to  the  chapel  many  hundreds  of 
his  private  and  professional  friends,  his  neighbours  among 
the  tradespeople  of  Westminster,  the  Council  of  the 
Institution  of  Civil  Engineers,  and  the  servants  of  the 
Great  Western  Railway  Company,  had  assembled,  and,  with 
his  family,  followed  his  body  to  its  place  of  burial,  in 
the  grave  of  his  father  and  mother.' 

'  A  few  weeks  after  Mr.  Brunei's  Mr.  Brunei's  family,  by  the  per- 
death,  a  meeting  of  his  friends  was  mission  of  the  Dean  of  Westminster, 
held,  when  it  was  determined  to  raise  have  placed  a  memorial  window  in 
some  memorial  to  him.  A  statue  was  the  north  aisle  of  the  nave  of  West- 
made  by  the  late  Baron   Marochetti,  minster  Abbey. 

and  a  site  for  it  promised  by  the  First  Along  the   bottom  of  the  window 

Commissioner   of  Works;  but  it  has  (which  consists   of  two  lights,  each 

not  yet  been  erected.  2S  feet  6  inches  high  and  i  feet  wide, 


CONCLUDING  REMAKES.  ^    521 

It  would  be  improper  here  to  attempt  to  enter  into  a 
general  criticism  of  Mr.  Brunei's  works,  or  to  determine 
the  position  which  he  is  entitled  to  occupy  among  civil 
engineers.  That  task  has  yet  to  be  accomplished,  and  must 
be  undertaken  by  those  who  can  claim  to  be  impartial 
judges.  It  has  been  the  object  of  this  book  to  provide,  as 
far  as  possible,  the  materials  on  which  a  just  judgment  of 
his  career  can  be  based. 

But  it  may  be  permitted,  in  conclusion,  to  place  on  record 
the  following  testimony  to  the  high  position  held  by  Mr. 
Brunei  in  the  esteem  of  his  contemporaries. 

On  November  8, 1859,  at  the  first  meeting  of  the  Insti- 
tution of  Civil  Engineers  after  the  death  of  Mr.  Brunei 
and  of  Mr.  Eobert  Stephenson,  Mr.  Joseph  Locke,  M.P., 
the  President,  rose  and  said — 

*  I  cannot  permit  the  occasion  of  opening  a  new  session 
*  to  pass  without  alluding  to  the  iiTeparable  loss  which  the 
'  Institution  has  sustained  by  the  death,  during  the  recess, 
'  of  its  two  most  honoured  and  distinguished  members. 

*  In  the  midst  of  difficulties  of  no  ordinary  kind,  with  an 

surmounted  by  a  quatrefoil  opening,  subjects  in  the  eastern  light  are  from 

6  feet  6  inches  across)  is  the  Inscrip-  the    New    Testament — viz,     Simeon 

tion, 'IN  MEMORY  OF  isAMBARD  KING-  Blessiug  the   Infant  Saviour,  Christ 

'  DOM  BRUNEL,  CIVIL  ENGINEER.     BORN  Disputing  with  the  Doctors,  and  The 

'  APRIL  9,  1806.    DEPARTED  THIS  LIFE,  Disciples  pointing  out  to  Christ  the 

'  SEPTEMBER  15,  1859.'    Ovcr  this  are  Buildings   of   the    Temple.     In   the 

four  allegorical  figures  (two  in  each  headsof  each  light  are  angels  kneeling, 

light) :  Fortitude,  Justice,  Faith,  and  and  in  the  quatrefoil  is  a  representa- 

Charity.      The    upper    part    of    the  tion  of  Our  Lord  in  Glory,  surrounded 

window  consists  of  six  panels,  divided  by  angels. 

by    a    pattern    work    of   lilies    and  The  work  was  placed  in  the  hands 

pomegranates.      The  panels   contain  of  Mr.  R.   Norman  Shaw,  architect, 

subjects    from    the    history    of   the  who  prepared  the  general  design,  ar- 

Temple.     The  three  subjects   in  the  ranged  the  scale  of  the  various  figures, 

western  light  represent  scenes  from  and  designed  the  ornamental  pattern 

the  Old  Testament — viz.  the  Dedica-  work.  The  figure  subjects  were  drawn 

tion  of  the  Temple  by  Solomon,  the  by  Mr.  Henry  Holiday,  and  the  whole 

Finding  of  the  Book  of  the  Law  by  design    was    executed    in    glass    by 

Hilkiab,  and  the  Laying  the  Founda-  Messrs.  Heaton,  Butler,  &  Bayne. 
tions  of  the   Second   Temple.     The 


522  ADDEESS  OF  MR.  LOGKE. 

*  ardour  rarely  equalled,  and  an  application  botli  of  body 

*  and  mind  almost  beyond  the  limit  of  physical  endurance, , 

*  in  the  full  pursuit  of  a  great  and  cherished  idea,  Brunei 

*  was  suddenly  struck  down,  before  he  had  accomplished 
'  the  task  which  his  daring  genius  had  set  before  him. 

'  Following  in  the  footsteps  of  his  distinguished  parent, 
'  Sir  Isambard   Brunei,  his   early  career,  even   from   its 

*  commencement,  was  remarkable  for  originality  in  the 
'  conception   of   the    works    confided  to    him.      As    his 

*  experience  increased,  his  confidence  in  his  own  powers 

*  augmented ;  and  the  Great  Western  Railway,  with  its 

*  broad-gauge  line,  colossal  engines,  large  carnages,  and 

*  bold  designs  of  every  description,  was  carried  onward, 

*  and  ultimately  embraced  a  wide  district  of  the  country. 

*  The  same  feeling  induced,  in  steam  navigation,  the 

*  successive  construction  of  the  "  Great  Western  "  steamer, 

*  the  largest  vessel  of  the  time,  until  superseded  by  the 

*  "  Great  Britain,"  which  was  in  its  turn  eclipsed  by  the 
'  "  Great  Eastern,"  the  most  gigantic  experiment  of  the 

*  age. 

'  The  Great  Ship  was  Brunei's  peculiar  child ;  he  ap- 

*  plied  himself  to  it  in  a  manner  whicli  could  not  fail  to 

*  command  respect ;  and,  if  he  did  not  live  to  see  its  final 

*  and  successful  completion,  he  saw  enough,  in  his  later 

*  hours,  to  sustain  him  in  the  belief  that  his  idea  would 

*  ultimately  become  a  triumphant  reality. 

*  The  shock  which  the  loss  of  Brunei  created  was  yet 

*  felt,  when  we  were  startled  by  an  announcement  that 

*  another  of  our  esteemed  members  had  been  summoned 

*  from  us.^ 

*  It  is  not  my  intention  at  this  time  to  give  even  an 

*  outline  of  the  works  achieved  by  our  two  departed  friends. 

'  Mr.  Locke  here  spoke  in  feeling. language  of  Mr.  Eobert  Stephenson. 


ADDEESS  OF  MR.  LOCKE.  523 

*  Their  lives  and  labours,  however,  are  before  us ;  and  it 

*  will  be  our  own  fault  if  we  fail  to  draw  from  them  useful 

*  lessons  for  our  own  guidance.     Man  is  not  perfect,  and 

*  it  is  not  to  be  expected  that  he  should  be  always  suc- 

*  cessful ;   and,  as  in  the  midst  of  success  we  sometimes 

*  learn  great  truths  before  unknown  to  us,  so  also  we  often 

*  discover  in  failure  the  causes  which  frustrate  our  best 
'  directed  efforts.     Our  two  friends  may  probably  form  no 

*  exception  to  the  general  rule  ;  but,  judging  by  the  posi- 

*  tion  they  had  each  secured,  and  by  the  universal  respect 

*  and  sympathy  which  the  public  has  manifested  for  their 

*  loss,  and  remembering  the  brilliant  ingenuity  of  argument, 

*  as  well  as  the  more  homely  appeals  to  their  own  long 

*  experience,  often  heard  in  this  hall,  we  are  well  assured 
'  that  they  have  not  laboured  in  vain. 

'  We,   at  least,  who  are  benefited  by  their  successes, 

*  who  feel  that  our  Institution  has  reason  to  be  proud  of 

*  its  association  with  such  names  as  Brunei  and  Stephen- 
'  son,  have  a  duty  to  perform ;  and  that  duty  is,  to  honour 

*  their  memory  and  emulate  their  example.' 


525 


APPENDIX  I. 

(See  Chapter  V.  on  the  Broad  Gai^e,  p.  99.) 


Report  to  the  Board  of  Directors  of  the  Great  Western 
Railway  Company. 

Arigust  1838. 

Gentlemen, — As  the  endeavour  to  obtain  the  opinions  and  reports 
of  Mr.  Walker,  Mr.  Stephenson,  and  Mr.  "Wood,  prior  to  the  next 
half-yearly  meeting,  has  not  been  successful,  I  am  anxious  to  record 
more  fully  than  I  have  previously  done,  and  to  combine  them  into 
one  report,  my  own  views  and  opinions  upon  the  success  of  the 
several  plans  which  have  been  adopted  at  my  recommendation  in  the 
formation  and  in  the  working  of  our  line  ;  and  in  justice  to  myself 
and  to  these  plans,  and  indeed  to  enable  others  to  arrive  at  any  just 
conclusion  as  to  the  result  which  has  been  attained,  or  as  to  the 
probable  ultimate  success  or  advantages  of  the  system,  it  is  necessary 
that  I  should  enter  very  fully,  I  fear  even  tediously,  into  a  recapitu- 
lation of  the  circumstances,  peculiar  to  this  railway,  which  led  to  the 
consideration  and  the  adoption  of  these  plans,  which  some  call  inno- 
vations and  wide  deviations  from  the  results  of  past  experience,  but 
the  majority  of  which  I  will  undertake  to  show  are  merely  adapta- 
tions of  those  plans  to  our  particular  circumstances. 

It  will  be  necessary  also  that  I  should  refer  to  all  the  numerous 
difficulties  which  we  have  had  to  encounter,  which  have  necessarily 
prevented  the  perfect  working  of  these  plans  in  the  first  instance,  but 
which  have  been  overcome,  or  which  are  gradually  and  successively 
diminishing ;  and,  finally,  I  am  prepared  to  show  that,  notwithstand- 
ing the  novelty  of  the  circumstances,  and  the  difficulties  and  delays 
which  at  the  outset  invariably  attend  any  alteration,  however 
necessary,  or  however  desirable,  from  the  accustomed  mode  of  pro- 
ceeding, and  notwithstanding  the  violent  prejudices  excited  against 


526  APPENDIX  I. 

us,  and  the  increased  difficulties  caused  by  these  prejudices,  the 
result  is  still  such  as  to  justify  the  attempt  which  has  been  made, 
and  to  show  that  in  the  main  features,  if  not  in  all  the  details,  the 
system  hitherto  followed  is  good,  and  ought  to  be  pursued. 

The  peculiarity  of  the  circumstances  of  this  railway,  to  which  I 
would  more  particularly  refer,  and  which  have  frequently  been  men- 
tioned, consists  in  the  unusually  favourable  gradients  and  curves 
which  we  have  been  able  to  obtain.  With  the  capability  of  carry- 
ing the  line  upwards  of  fifty  miles  out  of  London  on  almost  a  dead 
level,  and  without  any  objectionable  curve,  and  having  beyond 
this,  and  for  the  whole  distance  to  Bristol,  excellent  gradients,  it  was 
thought  that  unusually  high  speed  might  easily  be  attained,  and  that 
the  very  large  extent  of  passenger  traffic  which  such  a  line  would 
certainly  command  would  ensure  a  return  for  any  advantages  which 
could  be  offered  to  the  public,  either  in  increased  speed  or  increased 
accommodations.  With  this  view  every  possible  attention  was  paid 
to  the  improvement  of  the  line  as  originally  laid  down  in  the  parlia- 
mentary plans.  We  ultimately  succeeded  in  determining  a  maximum 
gradient  of  4  feet  per  mile,  which  could  be  maintained  for  the 
unusual  distance,  before  mentioned,  of  upwards  of  fifty  miles  from 
London,  and  also  between  Bristol  and  Bath,  comprehending  those 
parts  of  the  line  on  which  the  principal  portion  of  the  passenger 
traffic  will  be  carried.  The  attainment  of  high  speed  appeared  to 
involve  the  question  of  the  width  of  gauge,  and  on  this  point  accord- 
ingly I  expressed  my  opinion  at  a  very  early  pei-iod. 

It  has  been  asserted  that  4  feet  8  inches,  the  width  adopted  on 
the  Liverpool  and  Manchester  Eailway,  is  exactly  the  proper  width 
for  all  railways,  and  that  to  adopt  any  other  dimension  is  to  deviate 
from  a  positive  rule  which  experience  has  proved  correct ;  but  such 
an  assertion  can  be  maintained  by  no  reasoning.  Admitting,  for  the 
sake  of  argument,  that,  under  the  particular  circumstances  in  which 
it  has  been  tried,  4  feet  8  inches  has  been  proved  the  best  possible 
dimension,  the  question  would  still  remain — What  are  the  best 
dimensions  under  the  circumstances  ? 

Although  a  breadth  of  4  feet  8  inches  has  been  found  to  create  a 
certain  resistance  on  curves  of  a  certain  radius,  a  greater  breadth 
would  produce  only  the  same  resistance  on  curves  of  greater  radius. 
If  carriages  and  engines,  and  more  particularly  if  wheels  and 
axles  of  a  certain  weight,  have  not  been  found  inconvenient  upon 
one  railway,  greater  weights  may  be  employed  and  the  same  results 
obtained  on  a  railway  with  better  gradients.  To  adopt  a  gauge  of 
the  same  number  of  inches  on  the  Great  Western  Railway  as  on  the 


KEPORT  ON  THE  BROAD  GAUGE,  ETC.  527 

Grand  Junction  Eailway,  would  ia  fact  amount  practically  to*  the 
use  of  a  different  gauge  ia  similar  railways.  The  gauge  which  is 
well  adapted  to  the  one  is  not  well  adapted  to  the  other,  unless, 
indeed,  some  mysterious  cause  exists  which  has  never  yet  been 
explained  for  the  empirical  law  which  would  fix  the  gauge  under 
all  circumstances. 

Fortimately  this  no  longer  requires  to  be  argued,  as  too  many 
authorities  may  now  be  quoted  in  support  of  a  very  considerable 
deviation  from  this. prescribed  width,  and  in  every  case  this  change 
has  been  an  increase.  I  take  it  for  granted  that,  in  determining 
the  dimensions  in  each  case,  due  regard  has  been  had  to  the  curves 
and  gradients  of  the  line,  which  ought  to  form  a  most  essential,  if 
not  the  principal,  condition. 

In  the  Report  of  the  Commissioners  upon  Irish  Railways,  the 
arguments  are  identically  the  same  with  those  which  I  used  when 
first  addressing  you  on  the  subject  in  my  Report  of  October  1835. 
The  mechanical  advantage  to  be  gained  by  increasing  the  diameter 
of  the  carriage-wheels  is  pointed  out,  the  necessity,  to  attain  this, 
of  increasing  the  width  of  way,  the  dimensions  of  the  bridges, 
tunnels,  and  other  principal  works,  not  being  materially  affected  by 
this ;  but,  on  the  other  hand,  the  circumstance  which  limits  this 
increase  being  the  curves  on  the  line,  and  the  increased  proportional 
resistance  on  inclinations  (and  on  this  account  it  is  stated  to  be 
almost  solely  applicable  to  very  level  lines) ;  and,  lastly,  the  increased 
expense,  which  could  be  justified  only  by  a  great  traffic. 

The  whole  is  clearly  argued  in  a  general  point  of  view,  and  then 
applied  to  the  particular  case,  and  the  result  of  this  application  is 
the  recommendation  of  the  adoption  of  6  feet  2  inches  on  the  Ii-ish 
railways.  Thus,  an  increase  in  the  breadth  of  way  to  attain  one 
particular  object — viz.  the  capability  of  increasing  the  diameter  of 
the  carriage-wheels  without  raising  the  bodies  of  the  carriages — is 
admitted  to  be  most  desirable,  but  is  limited  by  certain  circumstances, 
namely,  the  gradients  and  ctirves  of  the  line,  and  the  extent  of  traffic. 

Every  argument  here  adduced,  and  every  calcluation  made,  would 
tend  to  the  adoption  of  about  7  feet  on  the  Great  Western  Railway. 

The  gradients  of  the  lines  laid  down  by  the  Irish  Commission  are 
considerably  steeper  than  those  of  the  London  and  Birmingham 
Railway,  and  four  and  five  times  the  inclination  of  those  on  the 
Great  Western  Railway  ;  the  curves  are  by  no  means  of  very  large 
radius,  and  indeed  the  Commissioners,  after  fixing  the  gauge  of  6 
feet  2  inches,  express  their  opinion,  that  upon  examination  into  the 
question  of  curves,  with  a  view  to  economy,  they  do  not  find  that 


528  APPENDIX  I. 

the  effect  is  so  injurious  as  might  have  been  anticipated,  and  imply 
therefore  that  curves,  generally  considered  of  small  radius  on  our 
English  lines,  are  not  incompatible  with  the  6  feet  2  inch  gauge ; 
and,  lastly,  the  traflSic,  instead  of  being  unusually  large,  so  as  to 
justify  any  expense  beyond  that  absolutely  required,  is  such  as  to 
render  assistance  from  Government  necessary  to  ensure  a  return  for 
the  capital  embarked.  As  compared  with  this,  what  are  the  circum- 
stances in  our  case  ? 

The  object  to  be  attained  is  the  placing  an  ordinary  coach  body, 
which  is  upwards  of  6  feet  6  inches  in  width,  between  the  wheels. 
This  necessarily  involves  a  gauge  of  rail  of  about  6  feet  10^  inches 
to  6  feet  1 1  inches,  but  7  feet  allows  of  its  being  done  easily ;  it 
allows,  moreover,  of  a  different  arrangement  of  the  body  :  it  ad- 
mits all  sorts  of  carriages,  stage-coaches,  and  carts  to  be  carried 
between  the  wheels.  And  what  are  the  limits  in  the  case  of  the 
Great  Western  Railway,  as  compared  to  those  on  Irish  railways  ? 
Gradients  of  one-fifth  the  inclination,  very  favourable  curves,  and 
probably  the  largest  traffic  in  England. 

I  think  it  unnecessary  to  say  another  word  to  show  that  the  Irish 
Commissioners  would  have  arrived  at  7  feet  on  the  Great  "Western 
Railway  by  exactly  the  same  train  of  argument  that  led  them  to 
adopt  6  feet  2  inches  in  the  case  then  before  them,    {^y 

All  these  arguments  were  advanced  by  me  in  my  first  Report  to 
you,  and  the  subject  was  well  considered.  The  circumstance  of  the 
Great  Western  Railway,  and  other  principal  railways  likely  to 
extend  beyond  it,  having  no  connection  with  other  lines  then  made, 
leaving  us  free  from  any  prescribed  dimension,  the  7-feet  gauge  was 
ultimately  determined  upon.  Many  objections  were  certainly  urged 
against  it :  the  deviation  from  the  established  4  feet  8  inches  was 
then  considered  as  the  abandonment  of  the  principle  :  this,  however, 
was  a  mere  assertion,  unsupported  even  by  plausible  argument,  and 
was  gradually  disused ;  but  objections  were  still  tirged,  that  the 
original  cost  of  construction  of  all  the  works  connected  with  the 
formation  of  the  line  must  be  greatly  increased ;  that  the  carriages 
must  be  so  much  stronger ;  that  they  would  be  proportionally 
heavier ;  that  they  would  not  run  round  the  curves,  and  would  be 
more  liable  to  run  off  the  rails  ;  and  particularly,  that  the  increased 
length  of  the  axles  would  render  them  liable  to  be  broken :  and 
these  objections  were  not  advanced  as  difficulties  which,  as  existing 
in  all  railways,  might  be  somewhat  increased  by  the  increase  of 
gauge,  but  as  peculiar  to  this,  and  fatal  to  the  system. 

With  regard  to  the  first  objection,  namely,  the  increased  cost  in 


REPOET  ON  THE  BROAD  GAUGE,  ETC.  529 

the  original  construction  of  the  line,  if  there  be  any,  it  is  a  question 
of  calculation  which  is  easily  estimated,  and  was  so  estimated  before 
the  increased  gauge  Avas  determined  upon.  Here,  however,  pre- 
conceived opinions  have  been  allowed  weight  in  lieu  of  arguments 
and  calculations  ;  cause  and  effect  are  mixed  up,  and  without  much 
consideration  it  was  assumed  at  once  that  an  increased  gauge  neces- 
sarily involved  increased  width  of  way,  and  dimensions  of  bridges, 
tunnels,  &c. 

Yet  such  is  not  the  case  within  the  limits  we  are  now  treating  of: 
a  7-feet  rail  requires  no  wider  bridge  or  tunnel  than  a  5-feet ;  the 
breadth  is  governed  by  a  maximum  width  allowed  for  a  loaded 
waggon,  or  the  largest  load  to  be  carried  on  the  railway,  and  the 
clear  space  to  be  allowed  on  either  side  beyond  this. 

On  the  Manchester  and  Liverpool  Railway  this  total  breadth  is 
only  9  feet  10  inches,  and  the  bridge  and  viaducts  need  only  have 
been  twice  this,  or  19  feet  8  inches;  9  feet  10  inches  was  found, 
however,  rather  too  small,  and  in  the  London  and  Birmingham,  with 
the  same  width  of  way,  this  was  increased  to  11  feet  by  widening 
the  interval  between  the  two  rails. 

In  the  space  of  11  feet,  allowed  for  each  rail,  a  7-feet  gauge  might 
be  placed  just  as  well  as  a  5-feet,  leaving  the  bridges,  tunnels,  and 
viaducts  exactly  the  same;  but  11  feet  was  thought  by  some  still  too 
narrow :  and  when  it  is  remembered  that  this  barely  allows  a  width 
of  10  feet  for  loads,  whether  of  cotton,  wool,  agricultural  produce, 
or  other  light  goods,  and  which  are  liable  also  to  be  displaced  in 
travelling,  13  feet  (which  has  been  fixed  upon  in  the  Great  Western 
Eailway,  and  which  limits  the  maximum  breadth,  under  any  cir- 
cumstances, to  about  12  feet)  will  not  be  found  excessive. 

It  is  this  which  makes  the  minimum  width,  actually  required 
under  bridges  and  tunnels,  26  feet  instead  of  22  feet,  and  not  the 
increased  gauge. 

The  earthwork  is  slightly  affected  by  the  gauge,  but  only  to  the 
extent  of  2  feet  on  the  embankment,  and  not  quite  so  much  in 
the  cuttings ;  but  what,  in  practice,  has  been  the'  result  ?  The 
bridges  over  the  railway  on  the  London  and  Birmingham  are  30 
feet,  and  the  width  of  viaducts  28  feet;  on  the  Great  Western 
Eailway  they  are  both  30  feet ;  no  great  expense  is  therefore  incurred 
on  these  items,  and  certainly  a  very  small  one  compared  to  the 
increased  space  gained,  which,  as  I  have  stated,  is  from  10  to  12  feet. 
In  the  tunnels  exists  the  greatest  difference ;  on  the  London  and 
Birmingham  Railway,  which  I  refer  to  as  being  the  best  and  most 
analogous  case  to  that  of  the  Great  Western  Railway,  the  tunnels 

M  M 


530  APPENDIX   I. 

are  24  feet  wide.  On  the  Great  Western  Railway  the  constant 
width  of  30  feet  is  maintained,  more  with  a  view  of  diminishing  the 
objections  to  tunnels,  and  maintaining  the  same  minimum  space 
which  hereafter  may  form  a  limit  to  the  size  and  form  of  everything 
carried  on  the  railway,  than  from  such  a  width  being  absolutely 
necessary. 

Without  pretending  to  find  fault  with  the  dimensions  fixed,  and 
which  have,  no  doubt,  been  well  considered,  upon  the  works  on 
other  lines,  I  may  state  that  the  principle  which  has  governed  has 
been  to  fix  the  minimum  width,  and  to  make  all  the  works  the 
same,  considering  it  unnecessary  to  have  a  greater  width  between 
the  parapet  walls  of  a  viaduct,  which  admits  of  being  altered,  than 
between  the  sides  of  a  tunnel  which  cannot  be  altered. 

The  embankments  on  the  London  and  Birmingham  Railway  are 
26  feet,  on  the  Great  Western  30  feet,  making  an  excess  of  about 
six  and  a  half  per  cent,  on  the  actual  quantity  of  earthwork. 

The  difference  in  the  quantity  of  land  required  is  under  half  an 
acre  to  a  mile.  On  the  whole,  the  increased  dimensions  from  10  to 
12  feet  will  not  cause  any  average  increased  expense  in  the  con- 
struction of  the  works,  and  purchase  of  land,  of  above  seven  per 
cent. — eight  per  cent,  having  originally  been  assumed  in  my  Report 
in  1835  as  the  excess  to  be  provided  for. 

With  respect  to  the  weight  of  the  carriages,  although  we  have 
wheels  of  4  feet  diameter,  instead  of  3  feet,  which,  of  course,  in- 
volves an  increased  weight  quite  independent  of  the  increase  of 
width,  and  although  the  space  allowed  for  each  passenger  is  a  trifle 
more,  and  the  height  of  the  body  greater,  yet  the  gross  weight  per 
passenger  is  somewhat  less. 

Tons  cwt.  qrs.  lbs. 
A  Birmingham  first-class  coach  weighs  .  .       3  17     2     0 

Which  with  18  passengers  at  15  to  the  ton      .  .14     0     0 

Or  631  lbs.  per  passenger 

A  Great  Western  first-class  weighs      .  . 

And  with  24  passengers  .... 

Or  588  lbs.  per  passenger 

And  oiir  6 -wheeled  first-class  .... 
With  32  passengers     ..... 

Or  600  lbs.  per  passenger 
Being  an  average  of  594  lbs.  on  the  two  carriages. 


5 

1 

2 

0 

4 

14 

0 

0 

1 

12 

0 

0 

6 

6 

0 

0 

6 

11 

0 

0 

2 

2 

2 

0 

8 

13 

2 

0 

EEPORT   ON  THE  BROAD  GAUGE,  ETC.  531 

This  saving  of  weight  does  not  arise  from  the  increased  width, 
and  is  notwithstanding  the  increased  strength  of  the  framing  and 
the  increased  diameter  and  weight  of  the  wheels ;  I  1  ave  not 
weighed  our  second-class  open  carriages,  but  i  sliould  think  the 
s;ime  proportion  would  exist. 

As  to  the  breaking  of  axles  or  running  off  the  line,  the  practical 
result  has  been  that,  from  some  cause  or  other,  we  have  been 
almost  perfectly  free  from  those  very  objections  which  have  been 
felt  so  seriously  on  some  other  lines.  Far  from  breaking  any  engine 
axles,  not  even  a  single  cranked  axle  has  been  strained,  although 
the  engines  have  been  subjected  to  rather  severe  trials.  One  of  our 
largest  having,  a  short  time  back,  been  sent  along  the  line  at  night, 
when  it  was  not  expected,  came  in  collision  with  some  ballast 
waggons,  and  was  thrown  off  the  line  nearly  6  feet ;  none  of  the 
axles  were  bent,  or  even  strained  in  the  least,  although  the  front  of 
the  carriage,  a  piece  of  oak  of  very  large  scantling,  was  shattered; 
After  ten  weeks'  running,  one  solitary  instance  has  occurred  of  a 
carriage  in  a  train  getting  off  the  line  and  dragging  another  with  it, 
and  which  was  not  discovered  till  after  running  a  mile  and  a  half. 
As  the  carriage  was  in  the  middle  of  the  train,  and  one  end  of 
the  axle  was  thrown  completely  out  of  the  axle  guard,  there  must 
evidently  have  been  some  extraordinary  cause — possibly  a  plank 
thrown  across  the  railway  by  a  blow  from  the  carriage  which  pre- 
ceded, and  which  might  have  produced  the  same  effect  on  any  rail- 
way ;  and  at  any  rate  it  was  a  strong  trial  to  the  axle,  which  was 
not  broken,  but  merely  restored  to  its  place,  and  the  carriage  sent  on 
to  London.  The  same  mode  of  reasoning  which  has  by  some  been 
used  in  favour  of  the  4  feet  8  inches  gauge,  if  applied  here,  would 
prove  that  long  axles  are  stronger  than  short,  and  wide  rails  best 
adapted  for  curves.  All  that  I  think  proved,  however,  is  this — 
that  the  increased  tendency  of  the  axles  to  break,  or  of  the  wheels 
to  run  off  the  rails,  is  so  slight  that  it  is  more  than  counterbalanced 
by  the  increased  steadiness  from  the  width  of  the  base,  and  the 
absence  of  those  violent  strains  which  arise  from  irregularity  on  the 
gauge  and  the  harshness  of  the  ordinary  construction  of  rails.  In 
fact,  not  one  of  the  objections  originally  urged  against  the  practical 
working  of  the  wide  gauge  has  been  found  to  exist,  while  the  object 
sought  for  is  obtained,  namely,  the  capability  of  increasing  at  any 
future  period  the  diameter  of  the  wheels,  which  cannot  be  done, 
however  desirable  it  may  hereafter  be  found,  with  the  old  width  of 
rail.  This  may  be  said  to  be  only  pi-ospective ;  but,  in  the  meantime, 
contingent  advantages  are  sensibly  felt  in  the  increased  lateral  steadi- 

M   M   2 


532  APPENDIX  I. 

ness  of  the  carriages  and  engines,  and  the  greater  space  which  is 
afforded  for  the  works  of  the  locomotives.  And  here  I  wish  particu- 
larly to  call  yonr  attention  to  the  fact  that  this  prospective  advantage 
' — this  absence  of  a  most  inconvenient  limit  to  the  reduction  of  the 
friction,  "which,  with  our  gradients,  forms  four-fifths  or  eighty  per 
cent,  of  the  total  resistance — was  the  object  sought  for,  and  that,  at 
the  time  of  recommending  it,  I  expressly  stated  as  follows: — '  I  am 

*  not  by  any  means  prepared  at  present  to  recommend  any  particular 
'  size  of  wheel,  or  even  any  great  increase  of  the  present  dimensions. 

*  I  believe  they  will  be  materially  increased ;  but  my  great  object 
'  would  be  in  every  possible  way  to  render  each  part  capable  of  im- 

*  provement,  and  to  remove  what  appears  an  obstacle  to  any  great 

*  progress  in  such  a  very  important  point  as  the  diameter  of  the 

*  wheels,  upon  which  the  resistance,  which  governs  the  cost  of 
'  transport  and   the   speed   that   may  be   obtained,  so   materially 

*  depends.' 

These  advantages  were  considered  important  by  you,  they  are 
now  considered  so  by  many  others ;  and  certainly  everything  which 
has  occurred  in  the  practical  working  of  the  line  confirms  me  in  my 
conviction  that  we  have  secured  a  most  valuable  power  to  the  Great 
Western  Eailway,  and  that  it  would  be  folly  to  abandon  it. 

The  next  point  I  shall  consider  is  the  construction  of  the  engines, 
the  modifications  in  which,  necessary  to  adapt  them  to  higher  speeds 
than  usual,  have,  like  the  increased  width  of  gauge,  been  condemned 
as  innovations. 

I  shall  not  attempt  to  argue  with  those  who  consider  any  increase 
of  speed  unnecessary.  The  public  will  always  prefer  that  convey- 
ance which  is  most  perfect,  and  speed  within  reasonable  limits  is  a 
material  ingredient  in  perfection  in  travelling. 

A  rate  of  thirty-five  to  forty  miles  an  hour  is  not  unfi*equently 
attained  at  present  on  other  railways  in  descending  planes,  or  with 
light  loads  on  a  level,  and  is  found  practically  to  be  attended  with  no 
inconvenience.  To  maintain  such  a  speed  with  regularity  on  a 
level  line,  with  moderate  loads,  is  therefore  quite  practicable,  and 
unquestionably  desirable.  With  this  view  the  engines  were  con- 
structed, but  nothing  new  was  required  or  recommended  by  me. 

A  certain  velocity  of  the  piston  is  considered  the  most  advantageous. 

The  engines  intended  for  slow  speeds  have  always  had  the  driving 
wheels  small  in  proportion  to  the  length  of  stroke  of  the  piston. 
The  faster  engines  have  had  a  different  proportion ;  the  wheels  have 
been  larger,  or  the  strokes  of  the  piston  shorter.  From  the  some- 
what clamorous  objections  raised  against  the  large  wheels,  and  the 


REPORT  ON  THE  BROAD  GAUGE,  ETC.  533 

construction  of  the  Great  Western  Railway  engines,  and  the  opinions 
rather  freely  expressed  of  my  judgment  in  directing  this  construction, 
it  Avould  naturally  be  supposed  that  some  established  principle  had 
been  departed  from,  and  that  I  had  recommended  this  departure. 

The  facts  are,  that  a  certain  velocity  of  piston  being  found  most 
advantageous,  I  fixed  this  velocity,  so  that  the  engines  should  be 
adapted  to  run  thirty -five  miles  an  hour,  and  capable  of  running 
forty — as  the  IManchester  and  Liverpool  Eailway  engines  are  best 
calculated  for  twenty  to  twenty-five,  but  capable  of  running  easily 
up  to  thirty  and  thirty-five  miles  per  hour ;  and  fixing  also  the  load 
which  the  engine  was  to  be  capable  of  drawing,  I  left  the  form  o£ 
construction  and  the  proportions  entirely  to  the  manufactiu-ers, 
stipulating  merely  that  they  should  submit  detail  drawings  to  me  for 
my  approval.  This  was  the  substance  of  the  circular,  which,  with 
your  sanction,  was  sent  to  several  of  the  moat  experienced  manufac- 
turers. Most  of  these  manufacturers,  of  their  own  accord,  and 
•vvithout  previous  communication  with  me,  adopted  the  large  wheels, 
as  a  necessary  consequence  of  the  speed  required.  The  recommenda- 
tion coming  from  such  quarters,  there  can  he  no  necessity  for 
defending  my  opinion  in  its  favour ;  neither  have  I  now  the  slightest 
doubt  of  its  correctness.  As  it  has  been  supposed  that  the  manu- 
facturers may  have  been  compelled  or  induced  by  me  to  adopt  certain 
modes  of  construction,  or  certain  dimensions,  in  other  parts  by  a 
specification — a  practice  which  has  been  adopted  on  some  lines — and 
that  these  restrictions  may  have  embarrassed  them,  I  should  wish 
to  take  this  opportunity  to  state  distinctly  that  such  is  not  the  case. 
I  have  indeed  strongly  recommended  to  their  consideration  the  ad- 
vantages of  having  very  large  and  well-formed  steam  passages,  which 
generally  they  have  adopted,  and  with  good  results ;  and  with  this 
single  exception,  if  it  can  be  considered  one,  they  have  been  left 
unfettered  by  me  (perhaps  too  much  so)  and  uninfluenced,  except 
indeed  by  the  prejudices  and  fears  of  those  by  whom  they  have  been 
surrounded,  which  have  by  no  means  diminished  the  diflSculties  I 
have  had  to  contend  with. 

The  principal  proportions  of  these  engines  being  those  which  have 
been  recommended  by  the  most  able  experimentalists  and  writers, 
and  these  having  been  adopted  by  the  most  experienced  makei-s,  it 
is  difficult  to  understand  who  can  constitute  themselves  objectors, 
or  what  can  be  their  objections. 

Even  if  these  engines  had  not  been  found  effective,  at  least  it  must 
"be  admitted  that  the  best  and  most  liberal  means  had  been  adopted 
to  procure  them  ;  but  I  am  far  from  asking  such  an  admission.    The 


534  APPENDIX  I. 

engines,  I  think,  have  proved  to  be  well  adapted  to  the  particular 
task  for  which  they  were  calculated — namely,  high  speeds — but  cir- 
cumstances prevent  their  being  beneficially  applied  to  this  purpose 
at  present,  and  they  are,  therefore,  working  under  great  disadvantages. 
An  engine  constructed  expressly  for  a  high  velocity  cannot,  of  course, 
be  well  adapted  to  exert  great  power  at  a  low  speed ;  neither  can 
it  be  well  adapted  for  stopping  frequently  and  regaining  its  speed. 
But  such  was  not  the  intention  when  these  engines  were  made, 
neither  will  it  be  the  case  when  the  arrangements  on  the  line  are 
complete  ;  in  the  meantime,  our  average  rate  of  travelling  is  much 
greater  than  it  was  either  on  the  Grand  Junction  or  the  Birmingham 
Railway  within  the  same  peiiod  of  the  opening.  I  have  but  one 
serious  objection  to  make  to  our  present  engines,  and  for  this, 
strange  as  it  may  seem,  I  feel  that  we  are  mainly  indebted  to  those 
who  have  been  most  loud  in  their  complaints — ■!  refer  to  the  un- 
necessary weight  of  the  engines.  There  is  nothing  in  the  wide  gauge 
which  involves  any  considerable  increased  weight  in  the  engine. 
An  engine  of  the  same  power  and  capacity  for  speed,  whether  for 
a  4-feet  8-inch  rail,  or  for  a  7-feet  rail,  will  have  identically 
the  same  boiler,  the  same  fire-box,  the  same  cylinder  and  piston, 
and  other  working  gear,  the  same  side  frames,  and  the  same  wheels ; 
the  axles  and  the  cross-framing  will  alone  differ,  and  upon  these 
alone  need  there  be  any  increase ;  but,  if  these  were  doubled  in 
weight,  the  difference  upon  the  whole  engine  would  be  immaterial. 
But  the  repeated  assertion,  frequently  professing  to  come  from  ex- 
perienced authorities,  and  repeated  until  it  was  supposed  to  be  proved, 
that  the  increased  gauge  must  require  increased  strength  and  great 
poAver,  was  not  without  its  indirect  effect  upon  the  manufacturers. 
Unnecessary  dimensions  have  been  given  to  many  parts,  and  the 
weight  thereby  increased — rather  tending,  as  I  believe,  to  diminish 
than  to  add  to  the  strength  of  the  whole.  I  thought  then,  and  I 
believe  now,  that  it  would  have  been  unwise  in  this  case  to  have 
resisted  the  general  opinion,  and  taken  upon  myself  the  responsi-  / 
bility  which  belonged  to  the  manufacturers ;  but  I  need  not  now  v 
hesitate  to  say  that  a  very  considerable  reduction  may  be  effected, 
and  that  no  such  unusual  precautions  are  necessary  to  meet  these 
anticipated  strains  and  resistances — such  being,  in  fact,  imaginary. 
It  cannot  surprise  anybody  that,  under  such  circumstances,  attention 
was  more  occupied  in  endeavouring  to  meet  these  imaginary  pre- 
judiced objections,  than  in  boldly  taking  advantage  of  the  new 
circumstances,  and  that  a  piece  of  machinery  constructed  under  such 
disadvantages  was  not  likely  to  be  a  fair  sample  of  what  might  be 


EEPOKT  ON  THE  BROAD  GAUGE,   ETC.  535 

clone.  I  am  happy  to  say,  however,  that  the  result  of  the  trials  that 
have  been  made  has  entirely  destroyed  all  credit  in  these  alarmists 
Avith  the  manufacturer,  and  that  we  may  hope  in  future  to  have  the 
benefits  of  the  free  exercise  of  the  intelligence  and  practical  know- 
ledge of  engine-manufacturers. 

The  mode  of  laying  the  rails  is  the  next  point  which  I  shall  con- 
sider. It  may  appear  strange  that  I  should  again  in  this  case  dis- 
claim having  attempted  anything  perfectly  new  ;  yet  regard  to  truth 
compels  me  to  do  so.  I  have  recommended,  in  the  case  of  the  Great 
Western,  the  principle  of  a  continuous  bearing  of  timber  under  the 
rail,  instead  of  isolated  supports — an  old  system  recently  revived,  and 
as  such  I  described  it  in  my  Report  of  January  1836 ;  the  result  of 
many  hundred  miles  laid  in  this  manner  in  America,  and  of  some 
detached  portions  of  railways  in  England,  was  quite  sufficient  to 
prove  that  the  system  was  attended  with  many  advantages ;  but  since 
we  first  adopted  it  these  proofs  have  been  multiplied — there  need 
now  be  no  apprehension.  There  are  railways  in  full  work,  upon 
which  the  experiment  has  been  tried  sufficiently  to  prove  beyond 
doubt,  to  those  willing  to  be  convinced,  that  a  permanent  way  in 
continuous  bearings  of  wood  may  be  constructed,  in  which  the  motion 
will  be  much  smoother,  the  noise  less,  and  consequently — for  they 
are  eifects  produced  by  the  same  cause — the  wear  and  tear  of  the 
machinery  much  less.  Such  a  plan  is  certainly  best  adapted  for 
high  speeds,  and  this  is  the  system  recommended  by  me  and  adopted 
on  our  road.  There  are,  no  doubt,  different  modes  of  construction, 
and  that  which  I  have  adopted  as  an  improvement  upon  others  may, 
on  the  contrary,  be  attended  with  disadvantages.  For  the  system  I 
will  strenuously  contend. 

But  I  should  be  sorry  to  enter  with  any  such  determined  feeling 
into  a  discussion  of  the  merits  of  the  particular  mode  of  construction. 
I  would  refer  to  my  last  Report  for  the  reasons  which  influenced  me, 
and  the  objects  I  had  in  view  in  introducing  the  piling;  that  part 
which  had  been  made  under  my  own  eye  answered  fully  all  my  ex- 
pecfcitions.  Here  the  piles  did  answer  their  purpose,  and  no  incon- 
venience resulted  from  their  use.  The  difficulties  which  we  have 
since  encountered,  the  bad  state  in  which  the  line  was  for  a  consider- 
able time,  and  which  is  only  recently  improved,  have  undoubtedly 
been  aggravated,  if  not  caused,  by  these  piles ;  but  not,  as  I  believe, 
frorh  a  defect  in  the  principle  as  applied  in  our  case,  where  the  line 
is  mostly  in  cutting,  or  on  the  surface,  but  from  defective  execu- 
tion ;  for,  notwithstiuicling  the  determination  to  allow  sufficient  time 
for  this  most  important  operation,  yet,   to  make   up  lor   previoas 


536  APPENDIX  I. 

delays  and  loss  of  time,  It  became  necessary  at  last  to  force  forward 
the  work  more  rapidly  than  was  at  all  consistent  with  due  care  in 
the  execution ;  and  during  the  whole  of  this  period  I  was  most 
unfortunately  prevented  by  a  serious  accident  from  even  seeing  the 
work  almost  until  the  day  of  opening,  when  I  ought  to  have  per- 
sonally superintended  the  whole.  I  do  not  mean  that  the  work  was 
neglected  by  tho!»e  whose  duty  it  was  to  supply  my  place — far  from 
it ;  but  in  such  a  case,  a  new  work  cannot  be  properly  directed 
except  under  the  eye  of  the  master.  Following  exactly  the  plan 
which,  had  succeeded  on  the  first  piece  completed,  several  serious 
faults  were  committed.  A  much  greater  density  and  firmness  of 
packing  is  required  than  was  previously  supposed ;  the  mode  of 
packing  adopted,  and  the  material  selected,  in  the  first  instance, 
have  proved  defective  elsewhere ;  and  over  a  great  extent  in  the 
line,  particularly  in  the  clay  cuttings,  and  where  the  work  was  at 
last  most  hurried,  it  has  been  badly  executed.  But  many  parts  have 
stood  well  from  the  commencement ;  others  are  fast  improving ;  and 
I  have  the  satisfaction,  although  a  very  painful  one,  of  seeing  that 
if,  in  the  first  instance,  a  foundation  of  coarse  gravel  had  been 
everywhere  well  rammed  in  before  the  timbers  had  been  laid,  and 
the  packing  formed  upon  this,  we  should,  from  the  outset,  have  ob- 
tained as  solid  a  road  as  we  have  now  over  a  great  part  of  the  line. 
What  we  have  been  able  to  effect  since  the  opening  of  the  line  has 
necessarily  been  a  slow,  expensive,  and  laborious  operation.  We 
have  been  compelled  to  open  the  ground,  and  excavate  it  to  a  depth 
of  18  inches  under  the  longitudinal  timbers,  and  this  without  inter- 
rupting the  traffic  :  to  remove  the  whole  of  the  material  thus  ob- 
tained from  off  the  line,  and  to  replace  it  by  coarse  ballast ;  and  not 
having  the  means  of  sufficiently  consolidating  this  ballast  by  ramming 
while  the  timber  is  in  its  place,  the  packing  has  to  be  repeated  once 
or  twice  after  it  has  been  compressed  by  the  passing  of  the  trains.  I'his 
new  packing,  however,  does  stand,  and  in  a  few  weeks  I  expect  the 
line  will  be  in  a  very  different  state  from  that  in  which  it  has  been, 
or  indeed  now  is.  From  what  I  have  described  as  the  result  which 
can  now  be,  and  might  have  been,  obtained  from  the  commencement, 
it  will  be  inferred  that  I  am  disposed  still  to  defend  the  system  of 
piling.  I  certainly  could  not  abandon  it  from  conviction  of  its  in- 
efficiency, for  I  see  proofs  of  the  contrary ;  and  I  feel  that  under 
similar  circumstances  I  could  now  prevent  the  mischief  which  has 
occurred.  Upon  that  portion  of  the  line  where  the  permanent  way 
must  next  be  formed,  piling  could  not  be  resorted  to,  the  ground 
being  a  solid  hard  chalk  for  many  miles.  I  had  intended,  however, 
recommending  the  same  principle,  but  in  a  different  form,  holding 


REPOET  ON  THE  BROAD  GAUGE,  ETC.  537 

down  the  longitudinals  by  small  iron  rods  driven  into  the  chalk  ; 
but  the  same  objection  could  not  exist,  because  the  chalk  cannot  yield 
under  the  timbers  like  clay,  or  even  gravel.  But  I  should  wish 
most  anxiously  to  avoid  anything  like  an  obstinate  adherence  to  a 
plan,  if  the  object  which  I  believe  essential  can  be  obtained  by  other 
means,  particularly  when,  that  plan  being  my  own,  I  may  be  some- 
what prejudiced  in  its  favour.  I  find  that  the  system  of  piling 
involves  considerable  expenses  in  the  first  construction,  and  requires 
perhaps  too  great  a  perfection  in  the  whole  work,  and  that  if  the 
whole  or  a  part  of  this  cost  were  expended  in  increased  scantling 
of  timber  and  weight  of  metal,  that  a  very  solid  continuous  rail 
would  be  formed. 

For  this  as  a  principle,  as  for  the  width  of  gauge,  I  am  prepared 
to  contend,  and  to  stand  or  fall  by  it,  believing  it  to  be  a  most 
essential  improvement,  where  high  speeds  are  to  be  obtained.  I 
strongly  urge  upon  you  not  to  hesitate  upon  these  two  main  points, 
which,  combined  with  what  may  be  termed  the  natural  advantages 
of  the  line,  will  eventually  secure  to  you  a  superiority  which,  under 
other  circumstances,  cannot  be  obtained. 

As  regards  the  expense  of  forming  the  permanent  way  on  this 
principle,  I  am  quite  prepared  to  maintain  what  I  have  on  a  former 
occasion  advanced :  that  even  on  the  system  which  we  have  adopted 
between  London  and  Maidenhead,  the  total  cost  does  not  materially 
exceed  that  of  a  well-constructed  line  with  stone  blocks.  I  did  not 
make  in  the  outset  an  exact  estimate  of  the  cost  of  either  mode  ;  I 
was  unable  to  obtain  the  cost  which  has  actually  been  incurred  on 
other  lines  ;  but  a  comparative  estimate  was  made,  and  the  result  of 
that  comparison  led  me  to  state  that  the  one  might  exceed  the  other 
by  500/.  a  mile.  The  actual  cost  of  our  permanent  way  appears,  by 
the  detailed  account  which  has  been  made  out,  to  have  been  above 
9,000/.,  including  expenses  of  under-draining  and  forming  the  surfaces 
which  cannot  be  included  in  the  cost  given  in  other  cases,  because 
that  drainage  (although  I  believe  generally  forming  part  of  the  plan) 
is  not  yet  constructed.  This  sum  includes  the  sidings  at  the  stations, 
switches,  joints,  and  other  contingencies,  and  also  the  expenses  in- 
curred during  the  first  month  of  working  the  line,  and  which,  as  I 
have  before  stated,  consisted  in  removing  and  replacing  work  which 
had  been  improperly  executed.  These  items  will  make  a  consider- 
able reduction ;  and  besides  these,  larger  reductions  may  be  effected 
in  parts  of  the  work  which  were  new,  and,  from  the  circumstances 
naturally  attending  a  first  attempt,  were  not  so  economically 
conducted  as  they  might  be,  or  indeed,  as  they  were  towards  the 
doae  of  the  works,  when  the  different  parts  were  let  by  contract. 


538  APPENDIX  I. 

Taking  the  prices  at  which  the  work  was  latterly  actually  executed, 
8,000/.  per  mile  would  be  a  liberal  allowance  for  our  future  proceed- 
ing, even  adopting  the  same  system  ;  and  with  a  modified  system, 
such  as  that  suggested  of  simple  longitudinal  bearers  of  large  scant- 
ling, and  a  rail  of  fifty-four  pounds  per  yard,  at  the  present  high 
price  of  iron,  the  cost,  calculated  upon  our  actual  past  expenditure, 
Avould  not  exceed  7,400/.  per  mile.  This,  I  am  aware,  is  a  larger 
sum  than  that  which  has  iisually  been  assumed  as  the  cost  of  the 
permanent  way.  I  cannot  prove  that  others  have  cost  more,  or  even 
so  much  as  this,  as  I  have  nothing  but  the  published  accounts  to 
refer  to ;  but  this  I  can  state,  and  prove  if  necessary,  that  rails  and 
blocks,  such  as  are  now  being  adopted  on  the  Manchester  and 
Liverpool  Eailway,  would  upon  our  line  cost  at  least  as  much. 

The  prime  cost  of  rails  and  chairs  delivered  on  the  line  would 
alone  amount  to  half  the  money ;  and  nothing  is,  perhaps,  more 
certain  than  that  the  experience  of  other  lines  within  the  last  two 
or  three  years  has  proved  that  this  part  of  the  construction  of  a 
railway  is  unavoidably  much  more  expensive  than  Avas  ever  calcu- 
lated for  at  the  time  our  estimates  were  made. 

I  am,  gentlemen,  your  obedient  servant, 

(Signed)  I.  K.  Bjsunel. 


539 


APPENDIX   II. 

(Sec  Chapter  IX.  on  the  '  Great  Britain    Steam-Ship,  p.  254.) 

Report  to  the  Directors  of  the  Great ^  Western  Steam-Ship  Company. 

October  1840. 

Gentlemen, — I  have  now  the  pleasure  to  lay  before  you  the  result 
of  the  diiFerent  experiments  which  I  have  made,  and  of  the  best 
consideration  I  have  been  enabled  to  give  to  the  subject  of  the 
screw  propeller. 

The  observations  which  I  have  to  make  are  naturally  divided 
under  two  principal  heads,  namely :  first,  the  simple  question  of  the 
applicability  and  efficiency  of  the  screw  considered  merely  as  a 
means  of  propelling  a  vessel,  compared  with  the  ordinary  paddle- 
wheel  ;  and,  secondly,  the  general  advantages  or  disadvantages 
attending  its  use. 

The  consideration  of  the  comparative  efiiciency  of  the  screw  as 
a  means  of  propelling,  of  course  embraces  the  whole  question,  not 
merely  of  the  effect  produced,  but  also  that  of  the  proportionate 
power  absorbed  in  producing  that  effect. 

With  respect  to  the  mere  effect  of  a  screw,  the  performance  of 
the  'Archimedes'  has  proved,  in  a  satisfactory  and  undeniable  manner, 
that  a  screw  acting  against  the  water  with  a  surface  even  much 
smaller  than  that  offered  by  the  paddle-boards  of  a  well-proportioned 
paddlewheel,  will  propel  the  ship  at  a  very  fair  speed,  but  at  what 
expense  of  power  this  effect  has  been  produced  is  not  so  evident. 

I  shall  first  examine  into  the  principal  cause  of  what  amounts 
practically  to  a  loss  of  power,  and  which  is  common  in  a  greater 
or  less  degree  to  all  modes  of  propelling  a  vessel  by  exerting  a 
pressure  against  the  water  as  against  a  fixed  point. 

The  resistance,  whether  to  the  surface  of  a  screw,  or  of  a  paddle- 
board,  or  of  the  blade  of  an  oar,  or  any  other  propelling  body, 
offered  by  the  fluid  against  which  it  acts,  is  of  coui'se  not  perfect, 


540  APPENDIX   II. 

and  there  is  a  certain  amount  of  yielding,  commonly  called  tlie 
slip,  of  the  paddlewheel ;  the  amount  thus  slipped  causes  a  con- 
siderable waste  of  power,  inasmuch  as  the  full  power  of  the  engine 
is  expended  through  the  entire  space  passed  over  by  the  paddles  or 
other  propelling  surface,  while  the  useful  effect  produced  is  only 
equal  to  the  same  power  expended  over  the  space  through  which 
the  vessel  passes :  this  loss  frequently  amounts  to  one-quarter,  and 
even  one-third,  of  the  whole  power  employed.  To  investigate  theo- 
retically the  amount  of  slip  due  to  any  given  form  and  quantity  of 
surface,  involves  much  more  complicated  calculations  than  have 
generally  been  applied,  and  would  indeed  require  data  which  we 
hardly  possess  ;  but  fortunately  we  have  had  the  means  of  making 
experiments,  the  results  of  which  enable  us  to  determine  the  com- 
parative slip  of  the  paddle  and  of  the  screw,  with  sufficient  accuracy 
for  all  practical  purposes. 

The  screw  in  use  on  board  the  '  Archimedes '  is  5  feet  9  inches 
diameter,  with  a  pitch  of  8  feet — that  is  to  say,  in  making  one  revo- 
lution the  thread  of  the  screw  advances  8  feet;  the  area  of  the 
screw,  considered  as  a  disc  of  the  same  diameter,  or  the  extent  of  the 
surface  of  water  which  is  acted  upon  in  the  direction  of  the  axis  of 
the  vessel,  is  therefore  about  26  feet,  without  deducting  the  section 
of  the  shaft-bearing,  &c.  The  midship  section  of  the  vessel  when  I 
experimented  upon  her  was,  according  to  Mr.  Patterson's  estimate, 
122  feet;  the  ratio  of  the  resisting  surface  to  the  midship  section 
being  therefore  as  1  to  4*7,  which  is  a  small  proportion ;  and  the 
form  of  the  vessel  is  by  no  means  peculiarly  good  as  a  steamboat. 
This  proportion  of  propelling  surface  to  midnhip  section  is  much 
smaller — that  is,  the  area  of  the  screw  is  much  less  in  proportion  to 
the  size  of  the  vessel  than  is  the  area  of  paddle-boards  immersed  in 
steamboats  generally. 

The  average  paddle-board  immersed  and  really  effective  is  rather 
difficult  to  estimate,  as  allowances  must  be  made  for  the  disturbance 
of  the  water,  when  the  wheel  is  in  motion  ;  but  this  average  in  the 
*  Great  Western'  measured  perpendicularly — that  is,  allowing  for  the 
obliquity  of  the  paddle — cannot  be  less  than  180  to  200  feet,  say 
only  180,  while  the  midship  section  averages  about  462  feet ;  the 
surface  of  paddle  is  therefore  about  ^.^^  of  the  midship  section. 

I  will  now  give  the  comparative  effects  of  these  different  pro- 
pelling surfaces  in  these  two  cases. 

I  have  made  very  accurate  experiments  upon  the  comparative 
rate  of  the  '  Archimedes,'  and  of  the  space  passed  through  by  the 
screw,  and  was  enabled  to  determine  this  ratio  with  great  cer- 
tainty. 


REPORT  ON  THE  SCREW  PROPELLER.  541 

The  average  of  a  number  of  trials  gave  the  following  results: 

Kate  of  ship,  50,867  feet  per  hour,  or  about  8^  knots. 

Space  passed  through  by  screw  due  to  the  number  of  revolutions, 
65,085  feet. 

The  average  rate  of  vessel  being  to  that  of  screw  therefore  as 
1  to  1-2913. 

In  the  performances  of  the  '  Great  Western,'  upon  an  average  of 
20  voyages  the  ratio  has  been  as  1  to  1*2997;  but,  separating 
from  these  20  such  voyages  as  were  unusually  short  or  long,  and 
taking  only  such  as,  occupying  14,  15,  or  16  days,  may  be  con- 
sidered as  giving  a  fair  average  of  the  speed  of  the  ship  when  not 
adversely  affected  by  the  wind  or  heavy  seas,  the  average  of  these 
13  voyages  give  1  to  1*283;  and  leaving  out  again  those  of  16 
days,  and  taking  only  8  voyages  of  14  and  15  days,  the  average 
gives  a  ratio  of  1  to  1*27187. 

Of  these,  5  voyages  of  15  days  give  1  to  1*29077, 
"and'         3  „  14       „  1  to  1*23901. 

The  last  three,  however,  were  short  passages  and  homeward, 
when  the  currents  and  winds  have  been  in  favour,  and  consequently 
we  may  safely  say  that  the  ratio  must  be  above  1  to  1*239;  and 
after  making  every  allowance  for  the  effect  of  swell  and  other  im- 
pediments (the  experiments  upon  the  'Archimedes'  being  made  in 
smooth  water),  the  average  of  the  8  (5  of  which  were  homeward 
voyages  with  favourable  current  and  wind  and  the  vessel  in  good 
trim),  giving  a  ratio  of  1  to  1*27,  may  be  taken  as  a  fair  average. 

The  comparison  between  the  '  Archimedes '  and  the  *  Great 
*  Western '  will  therefore  stand  thus — 

Area  of  Propelling        Diiference  of  Speed  of  Vessel  and 
Surface,  the  Midship  Propelling  Surface,  or  amount 

Section  being  I'O.      of  Slip,  the  ratio  of  Vessel  being  1*0, 
'  Archimedes,' screw        .        .     0*203         .        .        .     0*2913 
'  Great  Western,'  paddle  .         .     0*391         .        .        .     0*2708 

Showing  an  amount  of  slip  in  the  '  Great  Western  '  very  nearly  equal 
to  that  of  the  *  Archimedes,'  while  the  ratio  of  the  propelling  surface 
to  the  midship  section  in  the  case  of  the  screw  is  little  more  than 
half  that  of  the  paddle-boards  in  the  '  Great  Western.' 

In  taking  the  average  of  the  eight  voyages  of  the  '  Great  Western  ' 
with  favourable  winds  as  I  have  done,  I  believe  I  have  made  full 
allowance  for  the  difEerent  circumstances  of  smooth  water  and  sea ; 
but  there  is  ample  room  in  the  above  comparison  to  make  even 
greater  allowance  for  these  circumstances,  and  still  to  leave  a  result 


Univer: 

Department  of  Civil  Engineehinc 


542 


APPENDIX  II. 


which  would  prove  that  with  similar  areas  the  screw  would  meet 
with  at  least  equal,  if  not  a  greater  resistance,  and  consequently  will 
slip  as  little  or  less  than  the  ordinary  paddle-board. 

I  subjoin  a  table  also,  taken  from  a  well-known  work  on  the 
steam-engine  (Tredgold's),  of  the  slip  of  a  number  of  vessels,  of 
which  in  every  case  the  surface  of  paddle  immersed  is  far  greater  in 
proportion  to  the  midship  section  than  that  of  the  screw  in  the 
*  Archimedes.' 

JRate  of  F addle,  that  of  Ship  being  1. 


Medea 

1-595 

Monarch 

.     1-323 

Flamer 

1-483 

Magnet 

.     1-310 

Firebrand  , 

1-501 

Meteor 

.     1-490 

Columbine. 

1-529 

Carron 

.     1-287 

Salamander 

1-200' 

Average    , 

.     r381 

Dee   . 

1-366 

Firefly 

1-364 

Great  Western     . 

.     1-27 

Firebrand,  as  altered 

;i-295 

Archimedes . 

.     1-29 

Phito 

1-215 

This  list  shows  that  the  result  in  the  '  Great  Western,'  with  which 
ship  I  have  made  the  comparison,  is  in  itself  a  favourable  one,  and 
that  compared  with  many  others  the  '  Archimedes '  would  stand 
much  better. 

This  apparent  superiority  of  the  screw  over  the  paddle  as  regards 
the  resistance  offered  to  it  by  the  water  may  at  first  appear  startling, 
but  there  is  a  great  mistake  committed  in  asstiming  that  the  action 
of  the  screw  is  a  very  oblique  action,  tending  rather  to  drive  the 
water  laterally  with  a  rotatory  motion  than  to  push  it  steadily 
backwards. 

Having  witnessed  and  carefully  observed  the  degree  and  the 
nature  of  the  disturbance  in  the  water  caused  by  the  screw,  and 
comparing  this  with  the  violent  displacement  of  the  water  by  the 
action  of  paddle-boards,  even  under  the  most  favourable  circum- 
stances, I  no  longer  feel  surprised. 

The  mass  of  water  pushed  backwards  by  the  action  of  the  screw 
appears  to  be  very  large,  spreading  from  the  screw  probably  in  the 
form  of  an  inverted  cone,  but  there  is  little  or  no  appearance  of  any 
rotatoi-y  motion,  and  the  surface  of  the  water  is  not  put  into  rapid 
motion  as  in  the  case  of  the  paddlewheel,  which  may  be  observed 


'  There  appears,  from  the  table,  to 
be  an  immense  extent  of  paddle- 
board  to  this  vessel,  if  the  table  be 


correct — greater    than 
section. 


the    midship 


EEPORT   ON  THE  SCEEW  PROPELLER.  543 

to  impart  a  considerable  velocity  to  the  water,  probably  for  a  small 
depth  only,  but  over  a  very  large  space. 

As  regards  the  oblique  action  also,  a  great  mistake  appears  to  have 
been  generally  made,  and  very  naturally  made,  by  most  persons  when 
first  considering  the  working  of  the  screw.  It  is  generally  assiimed 
that  the  inclined  plane  formed  by  the  thread  of  the  screw  strikes  the 
particles  of  water  at  that  angle  and  with  the  velocity  of  the  revo- 
lution of  the  screw,  but  it  is  forgotten  that  the  screw  is  moving 
forward  with  the  ship,  and  therefore  that  the  angle  at  which  the 
water  is  struck  by  the  plane  is  diminished  by  all  that  much  that  the 
ship  with  the  screw  advances — indeed,  it  is  evident  that  if  the  ship 
advanced  the  whole  amount  of  the  pitch  of  the  screw,  the  screw, 
oblique  as  it  appears,  and  rapidly  as  it  revolves,  would  not  strike 
the  water  at  all,  but  simply  glide  through. 

The  angle  at  which  any  given  part  of  the  screw  does  in  fact  strike 
the  water  is  only  equal  to  the  difference  between  the  angle  to  which 
that  part  of  the  screw  is  formed  and  the  angle  or  direction  in  which 
it  moves  by  the  compound  motion  of  the  revolution  of  the  screw  and 
of  the  forward  motion  of  the  ship  and  screw ;  and,  contrary  to  one's 
hastily  imbibed  notions  of  the  action  of  the  screw,  this  angle  at 
which  the  plane  of  the  screw  is  driven  against  the  particles  of  water, 
is  in  such  a  screw  as  that  of  the  '  Archimedes '  very  nearly  equal  over 
the  greater  portion  of  the  surface,  diminishing  to  nothing  at  the 
centre  ;  and  the  motion  imparted  to  the  water,  although  perpendicular 
to  the  plane  of  the  screw  in  point  of  direction,  is  sniall  in  extent  or 
velocity,  being  also  nearly  the  same  over  the  whole  surface  of  the 
screw,  except  close  to  the  centre,  where  it  is  infinitely  small. 

In  the  'Archimedes'  screw,  which  appears  to  the  eye  so  oblique,  and 
the  centre  part  of  which  would  appear  to  act  flat  against  the  water, 
only  causing  it  to  revolve,  the  outer  circumference  being  18  feet  and 
the  slip  1  foot  8  inches,  the  angle  at  which  this  outer  edge  acts 
upon  the  water  is  only  one  in  11^. 

The  total  amount  of  motion  imparted  to  the  water  at  right  angles 
to  the  plane  of  the  screw  by  one  entire  revolution  even  at  the  outer 
edge  is  not  quite  equal  to  the  slip,  being  only  1"67  foot.  The 
rotatory  motion  is  still  less,  the  total  distance  to  which  any  particle 
of  water  is  displaced  laterally,  or  at  right  angles  to  the  axis  of  the 
ship,  by  one  entire  revolution  of  the  screw  being  at  the  outer  edge 
only  0'69  foot,  and  the  maximum  distance  being  in  any  screw  only 
equal  to  half  the  slip,  and  occurring  at  that  part  of  the  screw  where 
the  circumference  is  equal  to  the  advance  of  the  ship  due  to  one 
revolution.    This  maximum  of  lateral  motion  is  0*9  foot,  and  takes 


544  APPENDIX  II. 

place  at  0"99  foot,  or  about  1  foot  from  the  centre.  In  this  mode 
of  considering  the  direction  at  which  the  particles  of  water  are  acted 
upon  by  the  plate  of  the  screw  I  have  taken  no  notice  of  the  effect 
of  the  friction  upon  the  surface  of  the  screw,  which,  causing  to  be 
carried  with  it  a  film  of  water,  will  modify  more  or  less  according  to 
the  degree  of  smoothness  of  the  surface  the  effect  of  the  screw  upon 
the  water;  and  towards  the  centre  this  friction,  however  smooth 
the  surface  may  be  made,  will  gradually  become  equal  to,  and  at 
last  greater  than,  the  propelling  effect  of  that  part  of  the  screw  ;  but 
this  defect  applies  only  to  a  very  small  portion  of  the  whole  area  of 
the  screw,  and  the  absence  of  any  very  violent  impulse  to  the  water  in 
a  direction  approaching  to  a  right  angle  with  the  axis  of  the  vessel,  and 
which  has  always  been  assumed  as  an  unavoidable  evil  in  the  screw, 
will  account  for  the  absence  I  have  observed  upon  of  any  apparent 
rotatory  motion. 

I  would  not  pretend,  however,  to  advance  these  circumstances 
which  I  have  observed,  or  these  reasonings,  as  arguments  whereon  to 
found  an  opinion  of  the  action  of  the  screw,  the  facts  as  proved  by 
the  experiments  are  what  I  rely  upon  ;  but  it  is  satisfactory  to  be 
able  to  account  for  the  results  by  circumstances  actually  observed, 
and  the  reasons  which  suggest  themselves. 

The  effect  of  a  propelling  surface  in  the  form  of  a  screw,  and 
moving  at  a  certain  velocity,  as  compared  with  an  equal  surface 
moving  at  the  same  velocity  but  applied  in  the  shape  of  paddle- 
boards,  having  been  ascertained,  it  remains  to  determine  the  com- 
parative power  required  to  give  motion  to  that  surface. 

The  diflSculty  of  determining  this  with  any  degree  of  accuracy 
from  any  experiments  which  we  could  make  on  board  the  *  Archi- 
*  medes '  was  very  great,  but  considering  such  results  as  I  could 
obtain  in  conjunction  with  experiments  which  I  have  since  made  in 
our  own  works,  and  with  the  results  upon  steamboats  recorded  by 
others,  and  of  those  of  experiments  made  by  Colonel  Beaufoy  on 
the  resistance  of  bodies  in  water,  I  think  we  may  arrive  at  ap- 
proximate conclusions  sufficiently  accurate  for  our  purpose,  and 
which  may  safely  be  relied  upon. 

In  the  case  of  the  '  Archimedes '  the  engines  were  certainly  not 
effective  well-working  engines,  the  proportions  of  the  gearing  or 
wheel-work  between  the  engine  and  the  screw  was  bad — such  that 
the  engine  could  not  attain  its  proper  speed — the  friction  of  the 
gearing  (which,  whether  it  be  a  source  of  resistance  necessarily 
attending  the  use  of  the  screw  or  not,  I  shall  consider  afterwards) 
was  very  great,  and  the  surface  of  the  screw  itself,  which  I  had  an 


p 


EEPORT   ON   THE  SCREW  PROPELLER.  645 


opportunity  of  examining  out  of  water,  was  so  rough  as  necessarily 
to  create  very  much  more  friction  than  would  be  caused  by  a 
tolerably  smooth  metallic  surface.  With  all  these  sources  of  re- 
sistance, and  under  these  imfavourable  circumstances,  the  power 
calculated  for  the  effective  pressure  on  the  piston  and  without  de- 
duction for  friction  or  other  causes,  which,  for  the  sake  of  distinction 
hereafter,  I  shall  call  the  gross  power,  was  about  145  horses,  the 
speed  of  the  vessel  being  about  8^  knots  per  hour,  as  actually 
measured  by  the  land,  and  full  9  knots  as  measured  with  great 
care  by  heaving  the  common  log,  the  midship  section  being,  as 
before  stated,  122  feet,  and  the  lines  of  the  vessel  not  so  good  as 
those  of  fast  boats ;  comparing  this  with  the  gross  power  of  the 
*  Great  Western '  engines  when  propelling  that  vessel  at  the  same 
velocity,  with  the  advantage  of  better  lines  and  the  other  ad- 
vantages arising  from  greater  dimensions,  there  does  not  appear 
any  such  discrepancy  as  to  indicate  any  loss  of  power  by  the  use 
of  the  screw  in  the  *  Archimedes  ' ;  on  the  contrary,  the  power  ex- 
pended in  the  *  Great  Western  '  is  actually  as  great  as  that  in  the 
'  Archimedes,'  as  compared  with  their  relative  midship  sections — and 
if  any  great  allowance  is  to  be  made  for  the  circumstances  which 
I  have  referred  to  of  larger  dimensions  and  better  lines,  there  would 
appear  to  be  actually  less  power  expended  in  proportion  to  the  di- 
mensions and  form  of  the  *  Archimedes'  than  in  the  *  Great  Western.' 

The  results  obtained  with  the  *  Great  Western,'  which  as  regards 
speed  are  similar  to  those  of  the  '  Archimedes,'  are  necessarily  taken 
from  experiments  made  when  she  was  rather  deep,  and  the  speed 
thereby  reduced  to  7*9  knots ;  but  I  have  compared  these  with 
results  reduced  by  calculations  from  experiments  at  higher  speeds, 
and  I  find  them  agree  satisfactorily — indeed,  at  the  draft  and  con- 
sequent immersion  of  paddles  when  in  this  state,  I  consider  the 
'  Great  Western  '  as  very  nearly  at  her  best  as  regards  economy  of 
power  and  effect  produced.  I  should  observe  that  the  particular 
experiments  from  which  the  following  calculations  are  deduced  were 
made  with  the  '  Great  Western '  in  smooth  water  in  the  Severn.  I 
have  added  also  some  calculations  deduced  from  data  given  by 
Tredgold  as  to  the  performance  of  the  ^  Riiby,'  a  good  boat  with 
immense  surface  of  paddle-board. 

The  comparison  stands  thus : 


N  N 


54G 


APPENDIX   II. 


Great 

Western 

Archimedes 

RUBT 

Actual  Dimensions  : 

Midship  section   .... 

520 

122 

63 

Area  of  board  immersed 

230 



64 

Area  of  a  disc  of  diameter  of  screw 

— 

26 

— 

Relative  Dimensions  and  Po-wer  : 

Area  of  propelling  surface,  mid- 

ship section  being  =  1      . 

0-442 

0-213 

1-016 

Gross  power    expended  for  one 

square  foot  of  midship  section  . 

1-023 

1-026 

0-976 

The  speed  being  the  same,  viz.,  7*9  knots,  the  power  expended 
is  as  nearly  as  possible  the  same  in  the  three,  and  equal  to  one 
horse-power  gioss  to  one  foot  of  midship  section ;  while  the  relative 
propelling  surface  in  the  *  Archimedes  '  is  equal  to  only  half  that  of 
the  *  Great  Western,'  and  one-fifth  that  of  the  '  Ruby.'  This  gross 
horse-power,  it  will  be  observed,  is  about  equal  to  one-half  a  nominal 
horse-power. 

I  have  made  several  comparisons  with  recorded  observations 
made  on  board  the  *  Great  "Western '  at  different  times,  and  with 
experiments  made  in  other  vessels,  and  I  find  the  same  result ;  in 
estimating  the  powers  used  more , particularly  in  some  comparisons 
with  the  *  Great  Western,'  I  have  taken  the  mean  pressure  as  ascer- 
tained on  both  sides  of  the  piston,  while  in  the  '  Archimedes '  I  only 
obtained  that  on  the  top  of  the  piston,  which  appears  generally  to 
be  the  best,  and  consequently  the  estimate  is  made  imfavourably  to 
the  '  Archimedes.' 

Such  general  results  are  all  that  I  could  obtain  from  the  experi- 
ments on  board  the  '  Archimedes,'  but  since  that  time  I  have  made 
some  experiments  upon  the  friction  of  a  plate  of  metal  in  water^ 
and  have  compared  these  results  with  the  experiments  of  Colonel 
Beaufoy,  and  the  conclusion  I  have  come  to  is  that  the  power 
absorbed  by  friction  in  a  well-made  screw,  apart  from  all  question 
of  the  means  adopted  for  working  it,  would  not  be  such  as  to 
interfere  with  its  beneficial  application. 

The  resistance  created  by  the  screw  itself  arises  principally  from 
two  sources— the  resistance  to  the  cutting  edge  and  the  tail-edge, 
and  the  friction  of  the  surface  in  contact  with  the  water.  The 
amount  of  the  first  may  of  course  be  reduced  to  an  unlimited  extent 
by  having  a  fine  edge,  and  practically  such  edge  ought  to  be  much 
finer  than  that  of  the  screw  of  the  *  Archimedes.' 

The  friction  upon  the  surface  will  of  course  materially  depend 
upon  the  smoothness  of  that  surface,,  and  in  the '  Archimedes '  it  was. 


REPORT   ON   THE  SCREW  PROPELLER.  547 

Tery  rough,  the  iron  being  corroded  at  many  places,  \nth  exfolia- 
tions and  small  holes — the  corrosion  arising  apparently  from  the 
galvanic  effect  produced  by  the  iron  and  the  ship's  copper. 

The  great  number  of  revolutions  required  in  the  screw  as  com- 
pared with  those  of  the  paddlewheel,  leads  a  person  to  assume, 
without  much  consideration,  that  a  very  high  velocity  is  given  to 
the  cutting  edges  and  to  the  surface  of  the  screw,  and  consequently 
that  great  friction  must  be  produced — this  velocity  is  not,  however, 
nearly  so  great  as  it  at  first  appears. 

In  the  present  screw  of  the  'Archimedes'  the  velocity  of  the  extreme 
point,  following  its  oblique  or  spiral  course,  is  only  about  three  times 
that  of  the  vessel,  while  the  average  velocity  of  either  of  these  knife 
edges  or  of  the  surface  is  not  twice  that  of  the  vessel. 

Now  without  determining  what  the  actual  amount  of  these  resist- 
ances may  be,  we  can  at  once  satisfy  ourselves  that  it  cannot  be 
very  considerable,  by  comparing  it  (which  we  have  the  means  of 
doing)  with  the  resistance  caused  by  the  cutwater  and  any  given 
portion  of  the  ship's  bottom.  The  resistance  of  a  knife-edge  will  be 
about  as  the  square  of  the  velocity,  and  if  we  assume  the  surface 
friction  to  increase  in  the  ratio  determined  by  Colonel  Beaufoy — 
namely,  at  the  l*75th  power,  or  as  the  4th  root  of  the  7fch  power 
of  the  velocity — then  the  resistance  of  the  knife-edge  will  be  equal 
to  the  resistance  of  a  similar  edge  of  about  five  and  a-half  times 
the  length  of  the  diameter  of  the  screw  moving  at  the  same  rate  as 
the  vessel,  and  the  surface  friction  will  be  equal  to  that  of  a  piece  of 
the  ship's  bottom  about  six  and  five-eighth  times  the  area  of  the 
screw — or,  in  the  case  of  the  *  Archimedes,'  the  additional  power 
absorbed  by  the  friction  of  the  screw  would  be  about  equal  to  that 
absorbed  by  the  friction  of  little  more  than  twice  the  space  of  the 
dead  wood  which  had  been  cut  out  to  receive  the  screw — while  the 
knife-edges  would  be  about  equivalent  to  three  knife-edgea  immersed 
in  the  water,  of  the  same  depth  as  the  ship's  stem. 

The  actual  amount  of  power  absorbed  in  driving  the  *  Archimedes' 
screw  was  probably  about  twenty  horse-power  gross,  or  from  ten  to 
twelve  nominal  horse-power ;  but  I  have  no  doubt  that  a  screw  of 
similar  diameter  and  in  good  condition  would  not  absorb  half  that 
power :  and  this  amount  may  be  still  ftirther,  and  very  much  reduced, 
by  increasing  the  relative  size  of  the  screw  to  that  of  the  ship,  and 
thereby  reducing  the  slip,  and  proportionately  reducing  the  number 
of  revolutions  required. 

The  great  extent  to  which  this  is  capable  of  being  carried  will  at 
once  be  seen  when  I  state  that  if  the  ship's  progress  were  made  to 

H  H  2 


548  APPENDIX  II. 

be  7  feet  instead  of  6  feet  to  each  revolution  of  the  screw,  which 
a  very  slight  increase  of  diameter  and  pitch  of  screw  would  effect, 
the  power  absorbed   in  driving  the  screw  would  be  diminished  in 

the  ratio  of  the  G^^/G^  to  7^  ^7^— that  is,  as  6i  to  7'*,  or  about 
as  3  to  2. 

I  must  repeat  here  the  observation  I  have  previously  made,  and 
remind  you  that  these  calculations  are  not  introduced  as  proving, 
but  merely  as  explaining,  that  which  appears  to  me  proved  by  the 
general  results  of  the  experiments  on  the  'Archimedes' — namely,  that 
the  effect  produced  was,  considering  all  the  circumstances,  fully 
proportionate  to  the  power  expended,  while  the  experiments  and 
calculations  which  I  have  since  made  also  satisfy  me  that  these 
results  may  be  very  much  improved  upon. 

As  regards  the  first  of  the  two  heads  under  which  I  stated  that  I 
proposed  to  consider  the  subject,  namely,  the  mere  eflSciency  of  the 
screw  as  a  propeller,  I  think  but  one  conclusion  can  be  drawn  from 
the  results  of  the  experiments  quoted,  and  that  is,  that  as  compared 
with  the  ordinary  paddlewheel  of  sea-going  steamers,  the  screw  is, 
both  as  regards  the  effect  produced,  and  the  proportionate  power 
required  to  obtain  that  effect,  an  efficient  propeller. 

I  limit  the  comparison  to  the  ordinary  paddlewheels  of  sea-going 
steamers,  first,  because  those  are  the  circumstances  which  we  have  alone 
to  consider ;  and,  secondly,  because  it  is  possible,  by  increasing  the 
diameter  and  breadth  of  the  paddles,  which,  for  the  attainment  of 
an  adequate  object  is  practicable  to  any  extent  in  a  mere  river  boat, 
to  render  the  action  of  the  common  paddle  all  but  perfect,  and 
probably  more  effective  than  any  other  propeller. 

In  considering  the  advantages  and  disadvantages  likely  to  attend 
the  use  of  the  screw  propeller,  I  will,  commencing  with  the  latter, 
consider  such  objections  as  have  been  advanced  by  others,  as  well 
as  those  which  may  have  occurred  to  myself. 

The  only  objections,  however,  which  I  think  worth  consideration 
are: — 

First.  The  necessity  of  a  pectdiar  form  of  vessel. 

Secondly.  The  situation  of  the  screw  under  water,  and  conse- 
quently to  a  certain  extent  unseen  and  inaccessible,  and  the  liability 
to  injury  fi*om  its  position  from  grounding  or  in  other  ways. 

Thirdly.  The  probability  of  its  being  lifted  out  of  water  when 
the  ship  pitched  deep. 

Fourthly.  The  difficulty  of  getting  up  the  required  number  of 
revolutions,  and  the  great  defects  of  the  mode  employed  in  the 
'  Archimedes,'  and  the  shaking  caused  by  the  machinery. 


REPORT   ON  THE  SCREW  PROPELLER.  549 

As  regards  the  form  of  vessel,  undoubtedly  a  shallow  boat,  in- 
tended for  shallow  waters,  would  be  very  unfit  for  the  application  of 
the  screw,  which  would  probably  require  a  greater  depth  of  water 
than  the  whole  draft  of  the  vessel;  but  I  see  no  defector  difficulty  of 
this  description  in  the  vessel  now  under  consideration,  nor  can  I 
anticipate  any  in  any  vessel  this  Company  is  likely  to  be  interested 
in  ;  a  clean  run  is  the  most  essential  condition,  and  I  shoidd  suppose 
no  ship  was  ever  built  in  which  this  principle  of  form  was  carried 
to  a  greater  extent  than  in  our  new  iron  ship.  Her  present  form  I 
believe  to  be  excellent  for  the  screw,  and  with  a  very  slight  dropping 
of  the  keel  towards  the  stern,  which  can  easily  be  done  now  without 
any  expense,  assisted  by  the  different  trim,  which,  as  I  shall  pre- 
sently show,  will  be  effected  by  the  use  of  the  screw,  the  required  draft 
of  water  will  be  attained. 

It  may,  perhaps,  be  as  well  to  mention  here,  that  the  diameter  of 
the  screw,  if  in  the  same  ratio  to  the  midship  section  as  in  the 
*  Archimedes,'  would  be  only  12  feet  3  inches,  my  friend  Captain 
Claxton  having  made  a  mistake  upon  this  point  in  calculating  it  at 
16  feet,  and  that  if  increased  only  to  14  feet  4  inches,  the  diminution 
referred  to  in  a  former  part  of  my  Report  of  one-third  in  the  power 
lost  in  working  the  screw  would  be  effected ;  considering  the  speed 
we  wish  to  attain,  probably  15  feet  6  inches  would  be  a  good 
diameter.  Upon  the  whole  I  think  the  vessel  is  as  well  fitted  for  a 
screw  as  she  is  for  paddles,  and  much  better  adapted  for  either  than 
the  'Archimedes; '  but  if  originally  intended  for  a  screw,  possibly  some 
trifling  modification  in  the  form  and  construction,  principally  of  the 
keel  near  the  stem,  might  have  been  introduced  which  would  have 
rendered  the  whole  a  more  perfect  job  than  she  would  now  be  if 
altered — but  the  absence  of  this  would  in  no  way  lessen  the  efficiency 
of  the  screw,  and  I  cannot  think  that  any  alteration  we  might  now 
be  obliged  to  make  would  exceed  in  cost  the  sum  of  200Z. 

Secondl}'^,  the  inaccessibility  of  the  screw  and  liability  to  damage ; 
this  appears  to  me  the  objection  most  plausible,  but  I  cannot  say 
that  I  attach  much  weight  to  it,  particularly  in  the  case  of  a  vessel 
intended  for  long  voyages  and  across  the  ocean.  During  the  whole 
passage  in  deep  water  I  consider  the  screw  far  less  exposed  to  injury 
than  a  paddlewheel,  and  that  the  chances  of  injury  are  so  remote 
that  even  if  it  were  quite  inaccessible  it  would  still  be  altogether 
safer  than  paddles,  which  are  so  much  exposed ;  but  it  is  by  no 
means  inaccessible,  the  screw  may  be  rend(!red  stationary  at  any 
time  or  during  any  weather,  when  it  would  be  barely  safe  to  stop 
the  engines  with  common  paddles,  and  when  it  would  be  very  diffi- 


650  APPENDIX  n. 

cult  to  do  anything  to  the  paddles  even  if  the  engines  were  stopped, 
while  the  whole  of  the  screw,  bearings,  &c.,  may  easily  be  examined 
and  felt  from  above,  and,  if  necessary,  men  sent  down  with  common 
diving  jackets  and  hoods  to  replace  bearings,  or  attach  tackle  to 
move  the  screw,  or  clear  away  any  obstacle  entangled  in  it.  When 
in  port  I  still  think  the  chances  of  injury  very  remote ;  an  inspec- 
tion of  our  model  will  satisfy  you  that  from  the  form  and  size  of  her 
midship  section  the  vessel  cannot  lay  in  any  position  in  which  the 
screw  would  touch  the  ground,  while  at  that  time  the  whole  screw 
may  be  very  easily  examined  and  replaced  without  any  necessity  for 
going  into  dock. 

Thirdly,  the  probability  of  its  being  lifted  out  of  water  when  the 
ship  pitches  deep. 

This  appears  at  first  to  be  a  very  natural  and  an  unavoidable  ob- 
jection, but  the  result  of  observations  proves  that  the  motion  of 
vessels,  of  steamers  at  least,  is  not  such  as  to  cause  the  apprehended 
diflSculty.  Among  the  observations  made  on  board  the  *  Great 
*  Western '  steam-ship  by  Mr.  Berkeley  Claxton,  under  my  direction, 
were  measurements  of  the  angles  of  rolling  and  pitching,  and  from 
these  it  was  evident  that  the  vessel  never  pitches  to  so  great  an  angle  as 
that  to  which  she  rises ;  such  a  result  might  indeed  have  been  anti- 
cipated by  considering  the  form  of  the  vessel  forward  and  aft,  and 
the  circumstance  that  a  steamer  is  almost  invariably  meeting  or 
passing  the  seas,  or,  if  overtaken  by  them,  is  still  going  at  a  good 
rate,  which  reduces  the  relative  speed  of  the  sea ;  consequently, 
although  the  vessel  may  be  frequently  thrown  up  very  violently  for- 
ward, yet  the  stern,  which  has  no  displacement  under  water,  settles 
down  quietly  and  heavily  upon  the  surface ;  or,  considering  it  in 
another  way,  the  variation  of  displacement  at  the  stern  is  very  rapid, 
falling  off  almost  to  nothing  at  a  few  feet  below  the  water-line,  and 
spreading  out  to  a  great  extent  at  a  few  feet  above,  whilst  forward 
the  difference  of  displacement  is  comparatively  small,  the  centre  of 
motion,  therefore,  is  thrown  very  far  aft,  and  while  the  bows,  which 
are  also  opposed  to  the  first  shock,  are  thrown  alternately  high  out 
of  water  or  plunged  deeply  into  it,  the  stem  floats  nearly  steady,  the 
vessel  resting  on  its  broad  counter  nearly  as  the  centre  of  motion : 
whatever  may  be  the  explanation  such  is  the  operation,  not  only  as 
measured  by  instruments,  but  more  particularly  as  observed  since, 
practically. 

In  the  *  Great  Western  '  the  whole  cutwater  and,  it  is  said,  a  con- 
siderable length  of  keel,  is  frequently  seen  out  of  water  from  the  bow- 
sprit, while  astern  it  is  very  doubtful  whether  more  than  half  the 


EEPOET  ON  THE  SCREW  PROPELLER.  561 

stem  part  was  ever  seen ;  marks  have  been  made  by  my  direction 
on  the  rudder  to  observe  this ;  as  yet  the  9-foot  mark  is  the  lowest 
seen,  and  this  occurring  rarely,  and  for  very  short  intervals. 

In  the  *  Archimedes,'  during  a  voyage  performed  in  her  by  Mr. 
Guppy  from  Bristol  to  Liverpool,  and  during  which  they  were  ex- 
posed on  more  than  one  occasion  to  violent  pitching,  the  screw 
(which  can  be  watched  from  the  deck)  never  was  uncovered ;  and 
Mr.  Smith  and  others  on  board  the  '  Archimedes,'  whose  wliole  con- 
duct was  such  as  to  inspire  unusual  confidence  in  all  information 
obtained  from  them,  assured  me  that  such  was  always  the  case. 

In  the  voyage  to  Oporto  and  back,  in  which  I  sent  Mr.  Berkeley 
Claxton,  he  made  the  same  observation  ;  these  facts,  in  conjunction 
with  previous  and  subsequent  observations  on  board  the  '  Great 
'  Western,'  convince  me  that  nothing  is  to  be  feared  on  this  head ;  but 
even  if  the  screw  were  occasionally  to  be  partly  exposed,  I  know  of 
no  evil  consequences  likely  to  ensue,  as  I  shall  clearly  point  out 
when  referring  to  tlie  advantages  of  this  propeller  over  the  common 
paddle. 

Fourthly,  the  difficulty  of  getting  up  the  required  number  of 
revolutions,  and  the  great  defects  of  the  mode  employed  in  the 
*  Archimedes.' 

Upon  this  point  certainly  the  *  Archimedes '  offers  but  a  miserable 
example,  and  the  result  is  almost  enough  to  prejudice  the  mind  of 
any  person  against  the  whole  scheme;  the  proportions  of  the  gear- 
ing, as  I  have  before  stated,  are  so  bad^that  the  engines  appear,  even 
to  the  eye,  to  labour  ineffectually  to  get  up  their  speed.  The  re- 
quired speed  of  the  screw  is  not  nearly  attained,  while  the  noise  and 
tremor  caused  by  the  machinery  is  such  as  to  render  the  vessel 
uninhabitable,  and  perfectly  unfit  for  passengers,  I  should  almost 
say  for  a  crew.  I  never  attached  much  importance  to  these  circum- 
stances, because  I  felt  convinced  that  such  a  mere  mechanical 
difficulty  would  by  some  means  be  overcome,  if,  as  I  confess  I  did 
not  then  at  all  anticipate,  the  screw  itself  should  prove  efficient. 

The  most  simple  and  effectual  means  of  overcoming  all  objections 
on  these  heads  always  appeared  to  me  to  be  by  the  use  of  straps  in- 
stead of  gearing ;  and  all  my  experience,  and  I  have  seen  a  great  deal 
of  the  working  of  machinery  by  straps  and  ropes  in  the  numerous 
works  executed  by  my  father,  led  me  to  the  conclusion  that  there 
existed  no  difficulty  whatever  in  sending  the  necessary  power 
through  a  rope  or  hemp  strap,  but  I  was  hardly  prepared  to  find 
the  result  so  entirely  satisfactory  as  it  has  proved  to  be. 

In  an  experiment  made  in  your  works  at  the  yard,  I  have  sent 


562  APPENDIX  II. 

through  two  small  whale  lines,  a  power  equal  to  about  one-thirtieth  of 
that  which  would  be  required  in  the  strap  if  used  in  the  new  ship, 
and  this  without  any  slip  or  straining  of  the  rope  which  would  be 
injurious  in  practice,  and  without  any  peculiar  means  of  ensuring 
adhesion  to  the  drums ;  so  that  we  have  ascertained  beyond  doubt 
that  sixty  such  whale  lines  upon  a  drum  of  only  4  feet  3  inches 
diameter  is  adequate  to  our  wants,  but  if  we  suppose  seventy  lines 
of  superior  manufacture  to  that  used  in  the  experiments  with  a 
perfect  mode  of  tightening  and  working  upon  a  drum  of  6  feet 
diameter,  all  of  which  can  easily  be  had,  it  will  ensure  the  perfect 
and  easy  working  of  a  mode  of  obtaining  the  required  number  of 
revolutions  of  the  screw  without  noise  or  tremor.  The  strap  in 
question  would  be  only  about  3  feet  or  3  feet  3  inches  broad,  easily 
replaced  piecemeal,  and  even,  if  necessary,  without  stopping  the 
engines. 

All  the  difficulties  enumerated  under  the  fifth  head  may  be  con- 
sidered as  entirely  overcome,  or  rather  as  ceasing  to  exist ;  and  so 
far  from  the  working  of  the  screw  involving  difficulties  and  unavoid- 
able friction,  noise,  or  tremor,  it  may  be  worked  with  unquestion- 
able and  perfect  facility,  and  as  compared  even  with  the  best-made 
paddles  in  smooth  water,  the  whole  machine  will  be  noiseless. 

It  is  almost  unnecessary  that  I  sliould  say  that  the  screw,  apart 
from  the  gearing  in  use  onboard  the  '  Archimedes,' carenoi and  does  not 
produce  the  slightest  tremor  or  noise — it  was  with  some  difficulty, 
and  at  least  only  by  attentively  listening,  that  the  revolutions  of  the 
screw  could  be  counted,  even  when  disconnected  and  free  from  the 
noise  of  the  engine  or  gearing  and  the  vessel  being  towed,  and  then 
only  from  some  defect  in  the  bearings  or  the  shaft  of  the  screw 
causing  a  slight  beat. 

In  thus  answering  the  objections  supposed  to  have  been  urged 
against  the  use  of  the  screw,  I  may  probably  have  appeared  to  see 
everything  in  a  favourable  light ;  unhesitatingly  I  admit  that  it  is  so, 
and  that  both  formerly  when  I  was  completely  sceptical  as  to  the 
mere  efficiency  of  the  screw  as  a  propeller,  and  since  my  doubts  on 
that  head  have  been  removed,  I  always  felt  that  upon  all  other  points 
the  screw  possessed  every  superiority  that  could  be  desired  over  a 
common  paddlewheel  for  a  sea-going  vessel. 

I  shall  now  proceed  to  point  out  the  principal  advantages  peculiar 
to  the  use  of  the  screw  ;  they  are — 

First.  A  considerable  saving  of  weight,  and  that  principally  top 
weight. 

Secondly,     The  admitting  of  a  better  and  simpler  form  of  vessel, 


EEPORT  ON  THE  SCREW  PROPELLEE.  553 

having  greater  stiffness  with  the  same  quantity  of  material,  and 
offering  less  resistance  to  head  wind  and  seas,  and  affording  more 
available  space  within. 

Thirdly.  The  operation  of  the  screw  being  imaffected  by  tlie 
trim  or  the  rolling  of  the  vessel,  and  allowing  of  the  free  use  of  sails, 
with  the  capability  of  entirely  disconnecting  the  screw  or  of  varying 
the  multiplying  motion  so  as  to  adapt  the  power  of  the  engine  to  the 
circumstance  either  of  strong  adverse  winds  or  scudding. 

Fourthly.  Perfect  regialarity  of  motion  and  freedom  from  the 
possibility  of  violent  shocks  to  the  engines. 

Fifthly.  The  singularly  increased  power  of  steering  given  to  the 
vessel — and 

Sixthly.     The  great  reduction  in  the  breadth  of  beam. 

I  have  gone  into  some  detail  in  calculating  the  weights  of  the 
parts  which  are  not  common  to  the  two  systems,  and  I  find  that  the 
difference,  or  actual  diminution  in  weight  in  favour  of  the  screw  as 
applied  to  our  new  ship,  is  upwards  of  ninety -five  tons  ;  but  that  a 
much  greater  weight  even  than  this  is  transposed  from  the  top  of 
the  ship  to  the  bottom — no  less  a  mass  than  one  hundred  and  sixty 
tons  is  removed  from  the  level  of  the  paddle-shaft  or  from  about  10 
feet  above  the  water-line,  and  replaced  by  sixty-five  tons  at  about 
7  feet  below  the  water-line ;  not  only  is  buoyancy,  and  consequently 
proportionate  space  for  cargo,  gained  to  the  extent  of  the  difference, 
but  the  relief  to  the  labouring  of  the  vessel  in  bad  weather  from  the 
change  of  position  must  be  immense.  If  the  reverse  were  under  con- 
sideration, if  in  a  vessel  fitted  for  sea,  however  stiff  in  trim  or  form, 
it  were  suggested  to  remove  sixty-five  tons  of  her  ballast,  and  to 
place  one  hundred  and  sixty  tons  upon  her  deck,  and  thus  navigate 
her  across  the  Atlantic  in  all  weathers,  it  would  probably  be  con- 
sidered, not  merely  as  highly  dangerous,  but  as  actually  impossible. 
Although  such  an  opinion  as  that  it  would  be  impracticable  we  now 
know  would  be  incorrect,  yet  the  extent  of  the  beneficial  change  is 
much  more  striking  when  considered  in  this  way.  As  regards  the 
trim  of  the  ship,  about  one  hundred  and  forty-five  tons  would  be  re- 
moved from  nearly  the  centre  of  flotation,  and  the  balance  of  fifty 
tons  added  and  distributed  over  the  after  part,  principally  quite  aft. 

I  have  not  calculated  the  exact  effect  of  this  upon  her  trim ;  it 
would  only  bring  her  down  by  the  stem,  and  this  is  a  defect  which 
there  seems,  as  we  too  well  know,  never  any  difiiculty  in  remedying. 

Secondly.  The  simplifying  and  improving  the  form  of  the  ship — 
both  as  regards  strength  and  mass  exposed  to  the  wind  and  sea. 

The   necessity   of  contracting   the   midships  of  a  steamer,  and 


654  APPENDIX  II. 

making  her  completely  wall-sided,  and  forming  a  sort  of  recess  to 
receive  the  paddles,  interferes  considerably  with  the  framing  of  the 
ship.  In  a  wooden  ship  of  the  size  of  our  new  one  the  whole  beam 
of  the  ship  would  have  to  be  contracted  in  order  to  carry  the  plank- 
ing through  in  a  direct  line  and  obtain  the  requisite  fore  and  aft  tie 
as  has  been  done  in  the  *  Great  Western  ' ;  in  the  new  ship  the  almost 
infinite  resources  aiforded  by  the  material  used,  enabled  us  to 
expand  the  sides  and  obtain  breadth  of  beam  for  cabin  room,  both 
before  and  abaft  the  paddles,  and  contract  the  sides  at  the  paddles  as 
seen  upon  the  plan  ;  but  in  order  to  strengthen  this  part,  so  evidently 
weak  by  form,  much  contrivance  and  much  material  was  required. 
By  dispensing  with  paddles,  the  best  form  of  ship  is  left  free  to  be 
adopted ;  perfect  lines  may  be  preserved,  more  equal  strength 
obtained  with  increased  space,  and  the  whole  mass  of  paddle-boxes 
and  their  accompanying  sponsons  and  deck-houses  swept  aAvay,  and 
the  resistance  of  these  huge  wings  to  head  winds  or  seas  entirely 
avoided. 

The  space  gained  by  avoiding  the  contraction  is  calculated  by 
Mr.  Patterson  to  amount  to  two  hundred  tons  measurement ;  this 
would  be  entirely  gained,  and  would  not  even  involve  increased 
dues  or  tolls,  as  it  would  be  added  to  the  engine-room ;  it  would 
therefore  perhaps  counterbalance  any  loss  of  room  caused  by  the 
shaft  conveying  the  movement  from  the  engine  to  the  screw,  but  I 
believe  this  nominal  increase  at  one  part  would  not  be  so  great,  while 
in  fact  the  ship  would  really  be  more  compact,  and,  though  to  a  very 
small  extent,  a  smaller  ship,  as  the  sponsons  would  be  removed. 

The  third  point  of  advantage  named  is  perhaps  the  most  im- 
portant. With  paddles,  the  action  is  materially  affected  by  the  depth 
of  immersion ;  when  the  vessel  is  deep,  and  consequently  the 
paddles  deep,  their  action  is  impeded,  a  greater  part  of  the  power 
of  the  engine  is  absorbed  in  driving  the  paddle,  the  speed  of  the 
engine  is  reduced  and  the  effect  diminished ;  when  too  light  also 
the  paddles  do  not  take  sufficient  hold  of  the  water,  the  amount  of 
slip  increases  and  power  is  wasted ;  in  rolling  the  same  effects  are 
produced,  and  thus  at  those  times  when  the  greatest  effect  is  re- 
quired, namely,  with  deep  immersion  or  in  bad  weather  to  over- 
come the  increased  resistance  offered  to  the  vessel,  the  propelling 
power  is  least  effective,  and  Captain  Hoskins  actually  estimates  this 
loss  as  occasionally  equal  to  two-thirds  the  whole  power. 

The  bad  effects  of  one  paddle  being  immersed  too  deeply,  and  the 
other  not  sufficiently,  also  prevents  the  free  use  of  the  sails ;  and  it 
must  often  occur  that  the  impediment  thus  offered  to  the  working 


REPORT  ON  THE  SCREW  PROPELLER.  656 

of  the  paddles  more  than  counterbalances  the  good  effects  of  a 
tolerably  fair  wind.  With  the  screw  the  effect  is  constant,  at  least 
unaffected  by  the  position  or  motion  of  the  ship,  whether  deep  or 
liffht  the  screw  acts  nearly  the  same,  and  as  to  rolhng  or  heehng 
over,  the  screw  would  work  equally  well  (as  long  as  it  be  im- 
mersed)  if  the  vessel  were  on  her  beam-ends  or  bottom  upwards. 

The  screw  therefore  leaves  the  ship  free  to  be  used  as  a  sailing- 
vessel  to  any  extent  that  other  circumstances  will  admit  of,  and  a^ 
long  as  the  sails  draw  there  can  generally  be  no  doubt  that  the 
wind  is  assisting  the  ship.     The  screw  may  also  be  thrown  in  and 
out  of  gear  at  any  time  and  during  any  weather,  either  in  case  ol 
accident  to  the  engines,  or  in  the  event  of  her  scudding  before  a 
gale  of  wind,  when  the  engine  would  be  useless;  this  last,  however, 
I  do  not  consider  a  probable   occurrence,  particularly  if  another 
arrangement    of    which    the    screw   is   susceptible    be   taken   ad- 
vantage of.  ^  ,  ,   , 
If  the  motion  be  conveyed  by  a  strap,  as  I  have  recommended, 
there  is  no  difficulty  in  having  two  or  even  three  drums  on  the 
Bcrew-shaft  of  different  diameters,  and  thus  when  the  resistance  to 
the  ship  is  very  much  increased  by  strong  headwinds,  deep  draught 
and  other  causes,  to  use  the  slow  motion  and  obtain  an  mcreased 
propelling  force,  or  when,  on  the  contrary,  the  vessel  is  running 
before  the  wind  to  use  the  quick  motion-by  which,  m  both  cases, 
a  great  increase  of  speed  would  be  attained. 

This  is  in  fact  obtaining  at  once  and  by  simple  means  all  those  ^ 
advantages,  and  to  a  much  fuller  extent,  which  are  aimed  at  in  the 

reefing-paddles. 

Fourthly,  great  regularity  of  motion  is  naturally  consequent  upon 
the  screw  being  unaffected  by  the  rolling  of  the  ship,  and  upon  its 
being  immersed  and  not  exposed  therefore  to  blows  from  the  sea, 
and  except  in  the  case  of  its  being  lifted  out  of  water,  the  resistance 
is  perfectly  uniform  and  perfectly  smooth. 

An  engine  could  not  have  a  work  less  capable  of  causing  any  jar 
or  shock  as  to  the  effect ;  even  if  lifted  partially  out  of  water  the 
variation  of  resistance  would  be  as  easy  or  soft,  to  use  a  mechanical 
term,  as  possible,  while  the  extent  of  the  variation  could  never 
approach  to  that  to  which  paddles  continually  expose  an  engine.  A 
heavy  sea  or  a  deep  plunge  wiU  occasionally  bring  the  engines 
nearly  to  a  stand;  while  at  other  moments,  if  the  engineers  are  to 
be  believed,  the  paddles  are  left  free  and  the  engines  run  away  at  a 
fearful  speed.  I  am  inclined  to  think  this  description  of  the  effects 
somewhat  exaggerated;  but  certainly  the  screw  camiot  by  possi- 


656  APPENDIX  II. 

bility  be  exposed  to  the  same  variations  as  the  paddles — it  cannot 
be  stopped  by  the  action  of  the  sea,  indeed,  being  wholly  immersed, 
the  resistance  cannot  be  increased  at  all,  while  under  no  circum- 
stances can  it  be  relieved  to  the  extent  to  which  paddles  are,  which 
may  both  on  some  rare  occasions  be  quite  out  of  the  water ;  and 
therefore  whether  the  resistance  of  the  screw  is  so  constant  as  I 
believe  it  to  be,  or  not,  yet  as  compared  with  that  offered  by 
paddles,  it  is  certainly  all  but  perfectly  constant. 

Fifthly,  the  effect  upon  the  steerage  is  singular,  the  mass  of 
water  put  into  motion  by  the  thrust  of  the  screw  is  thrown  directly 
upon  the  rudder,  and  the  consequence  is  not  only  that  when  the 
ehip  is  going  at  any  given  rate,  the  rudder  is  passing  through  the 
water  at  a  greater  rate,  and  consequently  is  more  sensible,  and  acts 
more  powerfully  upon  the  ship ;  but  even  when  the  ship  has  no  way, 
but  the  screw  is  at  work,  the  rudder  is  acted  upon  by  water  moving 
perhaps  at  two  or  three  knots  per  hour,  and  the  vessel  is  still  under 
command — this  must  be  a  most  important  power  to  possess  in  a 
ship,  and  must  materially  diminish  many  of  the  greatest  dangers 
arising  from  a  strong  head  wind  and  sea,  and  at  the  same  time  and 
under  the  same  circumstances  must  increase  the  speed  by  improving 
the  steerage. 

And  lastly,  her  diminished  breadth  of  beam.  Important  as  this 
alteration  would  be  to  any  vessel,  it  is  peculiarly  so  as  connected 
with  Bristol ;  the  total  breadth,  including  paddle-boxes,  would  be 
at  least  78  feet ;  with  the  screw,  and  taking  all  the  increased  beam 
that  might  be  convenient,  it  would  be  under  50 — very  nearly  30 
feet  of  difference.  One  of  the  principal  objections  to  her  coming 
up  the  river  would  be  removed,  and  the  dock  gates  might  easily  be 
made  to  receive  her.^ 

There  are  many  other  points  upon  which  comparisons  may  be 
drawn,  but  I  am  not  aware  that  any  very  important  differences 
exist. 

As  regards  first  cost  I  believe  there  would  be  little  difference — 
if  any,  it  would  be  in  favour  of  the  screw  ;  as  a  reduction  of  ninety- 

'  In  a  Report  by  Mr.  Brunei  on  '  by  railways  in   land  carriage.     To 

improvements  in  the  port  of  Bristol,  '  ensure  the  speed  which  the  passenger 

dated  December  26,  1839,  the  follow-  '  traffic   demands,  great   size    in   the 

ing  passage  occurs :  '  A  great  change  '  vessels   is   required ;    in  the  course 

'  is    unquestionably    about    to    take  '  of  a  very  few  years  we  shall   find 

'  place  in  the  carriage  of  merchandise  *  Atlantic  steamers  desirous  of  taking 

'  by   sea,   a    change    similar,  though  '  500  or  600  tons  of  cargo  to  make  up 

'  possibly    not    so    striking,  as    that  '  their  draught.' 
'  which  has  so  suddenly  been  eflfected 


REPORT  ON  THE  SCREW  PROPELLER.  557 

five  tons  of  iron  can  hardly  fail  to  cause  some  saving,  although 
some  portion  of  the  substituted  machinery  may  be  more  costly 
per  ton. 

As  regards  wear  and  tear  I  can  have  no  doubt  that  some  consider- 
able saving  would  be  effected ;  the  paddles  are  a  constant  source  of 
trouble  and  expense,  and  seem  never  to  be  capable  of  being  kept  in 
good  repair;  indeed,  they  are  huge  and  comparatively  light  frame- 
works subjected  to  extraordinary  and  constantly  repeated  shocks, 
each  arm  receiving  direct  about  260,000  very  sharp  blows  per 
voyage,  independently  of  the  more  violent  shocks  from  heavy  seas, 
while  the  screw  can  be  subjected  to  no  such  constant  source  of 
mischief 

From  all  that  I  have  said  it  must  be  evident  to  you,  gentlemen, 
that  my  opinion  is  strong  and  decided  in  favour  of  the  advantage  ctf 
employing  the  screw  in  the  new  ship ;  it  certainly  is  so.     I  am  fully 
aware  of  the  responsibility  I  take  upon  myself  by  giving  this  advice, 
I  am  also  fully  sensible  of  the  large  amount  we  have  at  stake,  and  I 
have  not  forgotten  the  nature  and  tone  of  the  observations  which 
have  on  more  occasions  than  one  been  so  freely  made  by  individuals 
upon  the  course  we  have  hitherto  pursued ;  although,  and  I  have 
pleasure  in  referring  to  the  fact,  this  course  has  in  every  instance 
where  results  have  been  obtained  proved  successful ;  but  my  con- 
viction of  the  wisdom,  I  may  almost  say  the  necessity,  of  our  adopting 
the  improvement  I  now  recommend  is  too  strong,  and  I  feel  it  is  too 
well  founded,  for  me  to  hesitate  or  to  shrink  from  the  responsibility. 
I  think  I  have  hardly  advanced  an  opinion  which  I  have  not 
supported,  and  in  most  cases  preceded,  by  a  statement  of  facts, 
leaving  no  doubt  as  to  the  correctness  and  safety  of  relying  on  these 
opinions ;  still  it  would  be  too  much  to  hope  that  my  mode  of  laying 
before  you  these  facts  which  I  have  collected  and  the  opinions  I 
have  formed  could  produce  as  strong  a  conviction  in  your  minds  as 
the  consideration  of  them  has  in  my  own ;  but  if  you  bear  in  mind 
that  the  actual  results  of  the  fair  and  fuU  trial  of  the  *  Archimedes  ' 
for  several  months  has  completely  established  the  fact  of  the  effi- 
ciency of  the  screw  as  a  propeller ;   that  the  experiments  I  have 
made,  as  well  as  the  general  and  apparent  results  of  her  working, 
have  equally  satisfactorily  explained  the  fact  of  the  power  required 
being  no  greater  in  proportion  to  the  effect  produced  than  in  the 
*  Great  Western  '  steam-ship,  and  many  other  good  steamboats ;  and 
that  these  results  are  satisfactorily  explained  by  theory,  you  cannot 
foil  to  draw  the  same  conclusion  that  I  have  done  as  to  the  general 
question  of  at  least  the  equal  «fficiency  of  the  screw. 


558  APPENDIX   II. 

As  to  the  comparisons  I  have  drawn  between  the  general  and 
what  I  may  call  the  indirect  advantages  of  the  one  mode  of  propelling 
over  the  other,  they  seem  to  me  so  evident  that  I  am  disposed  to 
apologise  to  you  for  having  occupied  your  time  in  pointing  them 
out,  and  we  have  the  satisfaction  of  knowing  that  they  are  now  very 
generally  admitted,  particularly  by  practical  men. 

In  conclusion,  I  must  observe  that  much  more  detailed  informa- 
tion and  recorded  results  than  appear  on  the  face  of  this  Eeport  have 
been  required  to  enable  me  to  form  correct  comparisons,  and  to  re- 
duce to  calculation  and  to  actual  figures  and  amounts  many  results 
observed;  and  that  it  would  have  been  impossible  for  me  to  have 
given  you  such  clear  and  positive  facts  on  many  most  important 
points  without  the  very  detailed  observations  made  and  recorded  by 
Mr.  Berkeley  Claxton  in  the  several  voyages  of  the  '  Great  Western,' 
and  also  in  one  on  board  the  '  Archimedes.' 

The  information  obtained  from  these  logs  has  been,  and  may  still 
be,  of  the  greatest  importance  to  us  in  our  future  working,  and  I 
have  much  pleasure  in  adding  that  the  manner  in  which  my  direc- 
tions were  carried  out  was  highly  creditable  to  Mr.  Berkeley  Claxton, 
who,  I  think,  has  conferred  a  great  benefit  on  the  Company  by  his 
labours.  I  have  to  express  also  my  thanks  to  my  friends  Captain 
Claxton  and  Mr.  Guppy  for  their  assistance  in  the  various  experi- 
ments which  have  been  made,  and  in  working  out  the  results. 

I  am,  Gentlemen, 

Yours  very  faithfully, 
(Signed)  I.  K.  Brunel. 


INDEX 


INDEX. 


'  ADELAIDE,'    THE 
'  A  DELAIDE '  steam-ship,  built  under 
■^  Mr.  Brunei's  directions,  290 
Admiralty,    Mr.    Brunei's     connection 
with  the,  respecting  the  screw   pro- 
peller, 283.  Communication'with  the, 
on  floating  gun-carriage,  459 
Airy,  G.  B.,  Astronomer  Royal,  member 
of  the  Gauge  Commission,  117.   Cor- 
respondence   with    Mr.    Brunei    on 
astronomical    observations    for    the 
'  Great  Eastern,'  321 
Angarrack,  viaduct  at,  189 
'  Archimedes '  steamer,  the  screw  pro- 
peller   used   in    the,   253.     Experi- 
ments made  in  the,  254 
Armstrong,  Sir  W.  G.    His  hydraulic 
machinery  at  Paddington  station,  85 
noie.^     Engaged  with  Mr.  Brunei  on 
gunnery  investigations,  452.     Letter 
to,  454.     461 
Atlantic  cable  expeditions  of  the  '  Great 
Eastern,'    412.      Loss    of   the    first 
cable,  412.     A  second  one  laid,  and 
the  first  recovered,  413.    The  French 
cable  of  1869,  413 
Atmospheric   system  of  propulsion  on 
railways,    131.     Description  of   this 
method  of  traction,  134.    History  of 
its  introduction  prior  to  1844,  136. 
Mr.  Brunei's  Ariews  respecting  it,  137. 
His  report  recommending  its  adoption 
on   the   South  Devon  Railway,  138. 
Grounds  of  his  recommendation,  142. 
Select  Committee  on,  144.    Working 
of  the  system,  153.    Imperfections  of 
engines,  154,  and  longitudinal  valve, 


BOX  TUNNEL 
157.  Mr.  Bnmel's  report  on  the 
failure  of  the  Atmospheric  apparatus, 
159.  Abandonment  of  the  system,  164 
Australian  Mail  Company,  Mr.  Brunei 
appointed  engineer  of  the,  290 


BARLOW,  Professor  P.,  member  of 
the  Gauge  Commission,  117 

Barlow,  W.  H.,  57 

Bath,  station  at,  84 

Bath,  bridges  at,  175,  179 

Bathford,  bridge  at,  1 75 

Beamish,  Richard,  his  account  of  Sir 
Isambard  Brunei's  block  machinery 
at  Portsmouth,  quoted,  3.  Joins  the 
Thames  Tunnel  works,  21 

Bennett,  Joseph,  Mr.  Brunei's  secretary, 
92 

Berks  and  Hants  Railway,  88 

Birmingham  and  Oxford  Junction  Rail- 
way, 90 

Birmingham,  Great  Western  extension 
to,  124 

Birth  of  Mr.  Brunei,  1 

Blake,  H.  W.,  consulted  by  Mr.  Brunei 
on  the  '  Great  Eastern,'  297 

Block  machinery  at  Portsmouth,  Sir 
Isambard  Brunei's,  2 

Bourbon,  He  de.  Sir  Isambard  Brunei's 
suspension  bridges  for  the,  6.  De- 
scription of  them,  40 

Bourne  viaduct,  181 

Box  Tbnnel,  70  note  ',  72,  81.  Criticism 
as  to  its  safety,  81.  Letter  from  Mr. 
Brunei  on  the,  81 


0   O 


562 


INDEX. 


BEKi»mER,   A. 

Bremner,  A.,  263,  280 

Brentford,  dock  at,  440 

Brentford,  extension  of  the  Great  West- 
ern Eailway  to,  86 

Brereton,  Kobert  Pearson,  chief  of  Mr. 
Brunei's  engineering  staff,  92,  210, 
215  note\  217  note  \  223,  225,  437, 
438  note ' 

Brickwork,  use  of,  59.    Bridges  in,  172 

Bridges,  suspension,  Sir  Isambard 
Brunei's:  in  the  He  de  Bourbon,  5, 
40  ;  designs  for  the  Serpentine,  and 
for  the  Thames  at  Kingston,  5.  Mr. 
Brunei's :  at  Clifton,  46 ;  Charing 
Cross,  59 

Bridges,  railway,  171.  1.  Brickwork 
and  masonry  bridges,  172.  Flying 
bridges,  176.  Skew  bridges,  177. 
Letter  from  Mr.  Brunei  on  bridge 
construction,  178.  2.  Timber  bridges 
and  viaducts,  179.  3.  Cast-iron 
bridges,  190.  4.  Wrought  -  iron 
bridges,  192.  Girder  bridges,  193. 
Opening  bridges,  195.  Trussed 
bridges,  199.  Extracts  from  letters 
on  bridges  of  large  span,  212  note  ^. 
Experiments  on  matters  connected 
with  bridge  construction,  227 

Bristol,  Mr.  Brunei's  early  connection 
with,  58, 64.  Station  at,  84.  Bridges 
at,  175, 1-95.  Floating  Harbour,  422. 
Proposed  improvement  of  the  port, 
426.     New  lock  at,  427 

Bristol  and  Exeter  Eailway,  86 

Bristol  and  Gloucester  Eailway,  90 

Bristol  and  South  Wales  Union  Eail- 
way, 90 

Briton  Ferry  Docks,  437 

Broad  Gauge.     See  Gauge 

Brunei,  Sir  Marc  Isambard,  birth  of,  2. 
Arrives  in  England,  2.  Marries  Miss 
Sophia  Kingdom,  2.  Designs  the 
Block  machinery  at  Portsmouth,  2. 
Veneering  machinery,  5.  Shoe  ma- 
chinery, 6.  Designs  suspension 
bridges  for  the  He  de  Bourbon,  5,  40. 
Experiments  on  carbonic  acid  gas,  5, 
42.    Proposes  the  Thames  Timnel,  5. 


CLIFTON  BRIDGE 
Extracts  from  his  Journal  relating 
to  the  Eotherhithe  shaft,  10.  Ex- 
tracts from  his  Journal  relating  to 
the  works  at  the  Thames  Tunnel  up 
to  January  1828,  16.  His  death,  39. 
Hoop  iron  introduced  by,  in  brick- 
work, 177.  Designed  a  large  timber 
bridge  to  cross  the  Neva,  211  note'^ 
BuUo  Pill  opening  bridge,  197 


OAEEMAETHEN,  opening  bridge  at, 
198 

Carbonic  acid  gas,  experiments  on,  by 
Sir  Isambard  Brunei  and  Mr.  Brunei, 
6,42 

Cast-iron  bridges,  190.  Mr.  Brunei's 
views  as  to  the  use  of  cast  iron  in 
bridge  construction,  190,  192 

Cheltenham  and  Great  Western  Union 
Eailway,  88 

Chepstow  bridge,  203.  Mode  of  form- 
ing piers,  203.  Description  of  super- 
structure, 206.  Floating  and  erec- 
tion, 209 

Clarke,  Seymour,  117 

Claxton,  Captain,  57.  Assists  Mr. 
Brunei  at  the  floating  of  the  Chep- 
stow bridge,  210.  And  the  Saltash 
bridge,  222.  Appointed  Managing 
Director  of  the  Great  Western  Steam- 
Ship  Company,  234,  242,  247.  Letter 
to,  from  Mr.  Brunei,  on  the  '  Great 
Britain,'  264.  Goes  to  Dundrum  to 
carry  out  Mr.  Brunei's  plans  for  the 
protection  of  the  'Great  Britain,'  272.. 
Letter  to,  from  Mr.  Brunei,  on  the 
breakwater,  272.  Eeport  of,  on 
breakwater,  274.  Superintends  float- 
ing of  the  '  Great  Britain,'  280.  Con- 
sulted by  Mr.  Brunei  on  the  '  Great 
Eastern,'  291,  297.  Floating  Har- 
bour, Bristol,  424 

Clifton  Suspension  Bridge,  origin  of 
the,  47.  Mr.  Brunei's  designs,  47. 
Eejected  by  Mr.  Telford,  51.  Mr. 
Telford's  own  design,  52.  Second 
competition,   62.      Mr.   Brunei  sue- 


INDEX. 


563 


COLES,    CAPT.    C. 
cessful,  and  appointed  engineer,  53. 
The  site  described,  54,    Description 
of    the    design,   55.      Architectural 
features,  56.     Commencement  of  the 
work,  56.     Completed,  57 
Coles,  Captain  Cowper,  461 
Construction  of  works,  letter  on,  178 
Continuous  girders,  208 
Cork  and  Youghal  Eailway,  91 
Cornwall  Railway,  87.     Viaducts   on, 

185 
Crystal  Palace  at  Sydenham,  water- 
towers  of  the,  448 
Cylinders,  of  Chepstow  bridge,  method 
of  sinking  the,  204.  The  great 
cylinder  of  the  Eoyal  Albert  Bridge, 
214 


DALKEY  RAILWAY,  Atmospheric 
System  on,  131 
Dartmouth  and  Torbay  Railway,  87 
Death  of  Mr.  Brunei,  520 
Dock  and  pier  works :  Monkwearmouth, 

418;   Bristol,  422;    Plymouth,  433; 

Briton  Ferry,  437 ;  Brentford,  440 ; 

Neyland,  443 
Draught,  Mr.  Brunei's  paper  on,    101 

note ' 
Dublin,  railway  to  Wicklow  ixaxa,  91 
Dundrum  Bay,  stranding  of  the  '  Great 

'  Britain '  in,  263 


EARLY  LIFE  of  Mr.  Brunei.  He 
goes  to  school  at  Chelsea,  4 ; 
at  Brighton,  4 ;  at  Paris,  6.  Em- 
ployed in  his  father's  oflSce,  6.  En- 
gaged at  the  Thames  Tunnel,  6. 
References  by  Sir  I.  Brunei  to  his 
exertions,  17,  19,  21,  22,  25,  33. 
Appointed  resident  engineer,  25  note '. 
First  irruption  of  the  river,  29.  Se- 
cond irruption,  35.  Accident,  36. 
Visit  to  Plymouth,  46 
Eastern  Bengal  Railway,  91,  195,  617 
Eastern  Counties  Eailway,  gauge 
adopted  on  the,  106 


GENOA-ALESSANDRIA   RAILWAY 

Eastern  Steam  Navigation  Company, 
formation  of  the,  291.  See  'Great 
Eastern ' 

Egypt,  visit  to,  6i7 

Electric  telegraph,  application  of  the,  in 
connection  with  railways,  155 

Engineer,  Mr.  Brunei's  view  of  the 
position  of,  475.  Of  joint-engineer, 
476.  Of  consulting  engineer,  477. 
Of  the  position  of  the  engineer  in 
relation  to  the  contractors,  477.  To 
the  Directors,  478.  Remarks  on  in- 
terference of  Directors  with  assistant 
engineers,  481.  On  State  control 
over  engineering  works,  486 

Experiments:  Strength  of  timber,  182, 
227.  Cast-iron  girders,  190,  191. 
Wrought-iron  girder,  193.  Rivet- 
ing, 194,  228.  Continuous  beams, 
209,  229.  Bridge  construction,  227. 
Ropes  and  chains,  228.  Friction, 
348,  368,  385 


FARADAY,  M.,  his   experiments  on 
the  liquefaction  of  gases,  42.    Con- 
sulted by  Mr.  Brunei  on  the  Kyanis- 

ing  process,  1 89 
Field,  Cyrus,  411,  414 
Field,  J.,  consulted  by  Mr.  Bnmel  on 

the  '  Great  Eastern,'  297 
Floating  gun-carriage,  454 
Floating  harbour  at  Bristol,  422 
Floating  pier,  proposed  at  Portishead, 

426.     In  Mill  Bay,  436 
Florence  and  Pistoja  Railway,  91 
Flying  bridges,  1 76 
Ford,  Captain  Robert,  consulted  by  Mr. 

Brunei  on  the  '  Great  Eastern,'  297 
Friction,  experiments  and  observations 

on,  348,  368,  385 
Froude,  W.,  letter  to,  describing  floating 

of  the  '  Great  Eastern,'  389 


GATHAMPTON,  bridge  at,  174 
Genoa,    Novi,    and    Alessandria 
Eailway,  91 

2 


564 


INDEX. 


GAUGE    OF   RAILWAYS 

Gauge  of  railways,  difference  between 
the  broad  and  narrow,  99.  Origin  of 
the  ordinary  gaiige,  99.  Adoption 
of  the  broad  gauge  on  the  Great 
Western  Eailway,  101,  106.  Eeasons 
for  its  adoption,  102.  Attacks  on, 
106.  Keports  of  Mr.  Wood  and  Mr. 
Hawkshaw  on,  107.  Eeport  by  Mr. 
Brunei  on,  107.  Northern  extension, 
116.  Inconveniences  of  a  break  of 
gauge,  116.  Eoyal  Commission  on  the 
gauge  question,  117.  Report  of  the 
Commissioners,  117.  '  Observations 
on  the  Eeport,'  119.  Eeport  of  the 
Board  of  Trade,  1 22.  Act  for  regu- 
lating gauge,  122.  The  mixed  gauge, 
124.  Summary  of  the  advantages  of 
the  broad  gauge,  127.  Partial  aban- 
donment of  the  broad  gauge,  127, 129. 
Eeport  on  the  broad  gauge,  525 

Gilbert,  Da  vies,  appointed  referee  in 
the  second  competition  for  the  Clifton 
Suspension  Bridge,  52.  Eecommends 
Mr.  Brunei's  design,  63 

Girder  bridges,  193 

Glennie,  W.,  215  note  > 

Gloucester,  opening  bridges  near,  196 

Gloucester  and  Dean  Forest  Eailway,  88 

Gooch,  Sir  Daniel,  117,  119.  Experi- 
ments by,  125 

Gravatt,  William,  an  assistant  engineer 
at  the  Thames  Tunnel,  26 

'Great  Britain'  steam-ship,  commence- 
ment of  the,  247.  Eeport  on  the 
engines,  249.  Adoption  of  the  screw 
propeller,  254.  Principal  features  of 
her  design,  255.  Arrives  in  the 
Thames,  261.  Her  voyages,  262. 
Stranded  in  Dundrum  Bay,  263. 
Letter  from  Mr.  Brunei  on  the 
subject,  264.  His  reports  to  the 
Directors,  267,  273.  Construction 
of  breakwater,  274.  Floating  of 
the  ship,  280.  Her  subsequent  his- 
tory, 282.  Dimensions  of  ship  and 
engines,  282 

'  Great  Eastern '  steam-ship,  origin  of 
the  project,  291.     Memorandum   by 


*  GREAT  EASTERN,'  THE 
Mr.  Brunei  to  the  Directors  of  the 
Eastern  Steam  Navigation  Company, 
292.  He  is  appointed  engineer,  293. 
Letter  on  the  form  and  dimensions 
of  the  ship,  294.  Eeport  on  mode 
of  proceeding,  296.  On  enquiries 
relating  to  the  draught  and  form  of 
the  vessel,  297.  On  the  dimensions, 
299.  Tenders  invited,  300.  Eeport 
on  tenders,  301.  Commencement 
of  the  work,  304.  Extracts  from 
Mr.  Brunei's  memoranda,  304,  310. 
Letters  on  his  position  as  engineer, 
311.  Eeport  describing  the  ship, 
315.  Letter  to  the  Astronomer  Eoyal, 
321.  The  observers'  department  in 
the  ship,  322,  Captain  Harrison 
appointed  to  the  command,  323. 
Memorandum  on  the  management  of 
the  ship,  324.  Letter  on  the  duties 
of  chief  engineer,  335.  Suspension 
and  resumption  of  the  works,  339. 
Eeasons  for  launching  the  ship 
broadside  to  the  river,  340.  Adop- 
tion of  iron  sliding-surfaces,  343. 
The  ways  and  cradles,  345.  Motive 
power,  348.  Checking  gear,  351. 
Eiver  tackle,  352.  Letter  to  Cap- 
tain Harrison   on   the   river    tackle, 

354.  Letter  to  the  Directors  re- 
specting the  operation  of  launching, 

355.  Memorandum  of  arrangements 
and   intended   mode   of    proceeding, 

356.  Particular  instructions,  358. 
Final  preparations,  359.  Com- 
mencement of  the  launch,  360. 
Accident  at  one  of  the  drums,  361. 
Failure  of  the  first  attempt,  362. 
Second  attempt,  364.  Eeport  on 
operations,  366.  Progress  of  the 
launch,  368.  Suspension  of  opera- 
tions, 376.  Eeport  and  memorandum, 
377.  Ee-commencement,  379.  Float- 
ing of  the  ship,  382.  Experiments 
and  observations  on  friction,  385. 
Letter  to  Mr.  W.  Froude,  describing 
the  floating,  389.  -Formation  of  the 
Great  Ship  Company,  393.    Progress 


INDEX. 


665 


GREAT  EXHIBITION 
of  the  works  to  Mr.  Brunei's  last 
iUness,  393.  Completion  of  the 
ship,  393.  Voyage  to  Weymouth, 
393.  Explosion  of  water-heater, 
393.  Storm  at  Holyhead,  395.  De- 
scription of  the  ship,  396.  Her  first 
voyages  to  New  York,  403.  To  Que- 
bec, with  troops,  404.  Accident  to 
rudder,  and  loss  of  paddlewheels,  405. 
Voyages  in  1862,  407.  Accident  oflF 
Montauk  Point,  407.  Formation  of 
Great  Eastern  Steam-Ship  Company, 
409.  Remarks  on  performance  of 
ship,  409.  Employed  in  laying  At- 
lantic cables,  412,  The  Indian  cable, 
414.  Dimensions  of  ship  and  en- 
gines, 416 

Great  Exhibition  of  1851,  Mr.  Brunei's 
opinion  respecting  prizes  to  exhi- 
bitors,  445.  His  part  in  the  work  of 
the  Building  Committee,  446.  Sup- 
ports Sir  Joseph  Paxton'a  design,  447 

Great  Western  Hotel,  86 

Great  Western  Railway,  origin  of  the, 

63.  Mr.  Brunei  appointed  engineer, 

64.  Survey  of  the  country,  65. 
Bill  for  a  line  from  London  to  Read- 
ing, and  Bath  to  Bristol,  read  a  second 
time,  and  referred  to  a  committee,  66. 
Opposition  to  the  Bill,  67.  Plan  of 
entering  London,  68,  Mr.  Brunei's 
cross-examination,  69.  The  Bill 
passed  by  the  Commons,  but  thrown 
out  in  the  Lords,  70.  A  Bill 
for  the  whole  line  introduced,  read 
a  second  time,  and  committed,  71. 
Evidence  taken  before  the  Commons' 
Committee,  72.  Evidence  before  the 
Lords'  Committee,  73.  The  Bill 
receives  the  Royal  Assent,  74,  Con- 
struction of  the  line,  80.  Opening 
from  London  to  Bristol,  80.  Levels 
and  inclines,  80,  104.  The  Box 
Tunnel,  81.  The  Bath  and  Bristol 
stations,  84.  Paddington  station, 
84.  Branches  and  extensions  of  the 
railway,  86,  88,  90.  Adoption  of 
the  broad  gauge,  106,     The  perma- 


IVYBRIDGE   VIADUCT 
nont    way,    108,    111,     Meeting    of 
shareholders   on   broad  gauge.    111. 
Extension    of   the    Great    Western 
system,  116 

'  Great  Western  '  steam-ship,  formation 
of  the  company,  233.  Details  of 
the  construction  of  the  vessel,  234 
note^.  Report  on  the  selection  of 
the  builders  of  the  engines,  235, 
Controversy  with  Dr.  Lardner,  237. 
Launch  of  the  vessel,"'and  voyage  to 
London,  241.  Return  to  Bristol,  242. 
Fire  on  board,  and  accident  to  Mr. 
Brunei,  242.  First  voyage  to  New 
York,  243.  Subsequent  history,  244. 
Dimensions  of  ship  and  engines,  245 

Gunnery  experiments,  452 

Guppy,  T.  R.,  148,  233,  234,  247,  253, 
254.  Letter  to,  on  iron-ship  building, 
259 


HAMMOND,  J.  W.,  65,  92 
Hanwell,  bridge  at,  destroyed  by 
fire,  190 

Hanwell  viaduct,  172 

Harrison,  Captain,  223.  Appointed  com- 
mander of  the  '  Great  Eastern,'  323. 
Letter  to,  on  the  river  tackle,  354. 
At  the  launch,  362,  370,  382.     392 

Haverfordwest,  opening  bridge  at,  198 

Hawkshaw,  J.,  57.  Report  on  broad 
gauge  and  permanent  way,  107 

Henley  branch  of  the  Great  Western 
Railway,  86 

Hungerford  Suspension  Bridge,  57,  59 


INDIA,  railway  works  in,  91 
Indian    Cable    expedition    of   the 

•  Great  Eastern,'  414 
Institution  of  Civil  Engineers,  516  note"^, 

621 
Inventors,  communications  with,  485 
Ireland,  railway  works  in,  90 
Italy,  Mr.  Brunei's  railway  works  in, 

91,  510 
Ivybridge  viaduct,  182 


566 


INDEX. 


KENNET,    BRIDGE   OVER  THE 

IT-ENNET,  bridge  over  the  river,  175 
»-    Kidwelly,  opening  bridge  at,  198 
Kyanising  process,  189,  421 


LANDOKE,  viaduct  at,  183 
Lane,  Michael,  29 

Lardner,  Dr.,  114  note  '.     Opinions  re- 
specting ocean  steam  navigation,  237 

Llansamlet,  flying  arches  near,  176 

Llynvi  Valley  Eailway,  89 

Locke,  Joseph,  62,  74.     His  address  on 
the  death  of  Mr.  Brunei,  521 

Locomotive  power,  comparison  of,  with 
stationary  power,  142,  166 

Loughor,  opening  bridge  at,  197 


MAIDENHEAD  bridge,  96,  173 
Masonry,  bridges  in,  172 
Maudslay  and  Field,  15, 148, 236,  284 
Milford  Haven,  88,  443 
Monkwearmouth,  docks  at,  417,    418 
Moulsford,  bridge  at,  174 


NASMYTH,  James,  his  steam  ham- 
mer designed,  252  note  '.     Letter 
to,  on  gunnery  experiments,  452 
Neath,  improvement  of  river,  438  note  ' 
Newport  viaduct,  185,  199 
Neyland,  pier  at,  443 


OCEAN     STEAM     NAVIGATION, 
Mr.  Brunei's  connection  with,  231, 

313 
Opening  bridges,  195 
Oxford,  Mr.  Brunei  created  a  Doctor  in 

Civil  Law  at,  516 
Oxford   and   Rugby   extension   of  the 

Great  Western  Railway,  90,  116 
Oxford  branch  of  the  Great  Western 

Railway,  86 
Oxford,  Worcester,  and  Wolverhampton 

Railway,  90,  116 


RAILWATS 

PADDINGTON  station,  84 
Paris  Exhibition  of   1855,  letter 
on  decorations  conferred  at,  489 

Parkes,  Dr.,  medical  superintendent  of 
Renkioi  Hospital,  468.  Report  of, 
on  hospital  buildings,  468 

Patent  laws,  Mr.  Brunei's  opinions  on 
the,  212  note,''  450,  451,  454,  485, 
489,  497 

Patterson,  W.,  234,  247,  263 

Paxton,  Sir  Joseph,  his  design  for  the 
Great  Exhibition  building,  447 

Permanent  way  on  the  Great  Western 
Railway,  108,  535 

Plymouth  Great  Western  Docks,  433 

Polygonal  rifle,  449 

Portishead,  proposed  pier  at,  426 

Prince  Consort,  H.R.H.  the,  opens  the 
Royal  Albert  Bridge,  226.  Present  at 
floating  of  the  '  Great  Britain,'  269 

Private  life  of  Mr.  Brunei,  499.  Early 
reminiscences,  500.  Removal  to  Duke 
Street,  and  marriage,  505.  His  taste 
in  art,  506.  First  journey  to  Italy, 
608.  Half-sovereign  accident,  511. 
Purchase  of  property  in  Devonshire, 
514.  Life  at  Watcombe,  516.  Fail- 
ing health,  516.  Journeys  to  Switzer- 
land and  Egypt,  616.  Letter  from 
Philae,  517.     His  last  iUness,  520 


AUAKER'S  YARD,  viaduct  at,  89 


RAILWAYS,  sketch  of,  in  England 
prior  to  1833,  61.  Extent  of 
Mr.  Brunei's,  79.  Great  Western, 
80.  Branches  to  Oxford,  86.  Wind- 
sor, 86.  Wycombe,  86.  Uxbridge, 
86.  Henley,  86.  Brentford,  86. 
Bristol  and  Exeter  Railway,  86. 
South  Devon,  87.  South  Devon 
and  Tavistock,  87.  Cornwall,  87. 
Branch  lines  now  incorporated  with 
Great  Western  Railway:  Berks  and 


RAILWAY  STRUCTURES 
Hants,  88.  Wilts  and  Somerset,  88. 
Cheltenham  and  Great  Western 
Union,  88.  Gloucester  and  Dean 
Forest,  88.  The  South  Wales,  88. 
The  Taff  Vale,  89.  The  Vale  of 
Neath,  89.  The  Llynvi  Valley,  89. 
The  South  Wales  Mineral,  89.  Bris- 
tol and  South  Wales  Union,  90. 
Bristol  and  Gloucester,  90.  The 
Oxford  and  Eugby,  90.  Birming- 
ham and  Oxford  Junction,  90. 
Oxford,  Worcester,  and  Wolrer- 
hampton,  90.  Ireland,  90.  Italy, 
91.  India  (Eastern  Bengal),  91 
Railway  Structures,  letter  on  the  Royal 
Commission  on  the  Application  of 
Iron  to,  192,  486 
'Rattler'  steam-ship,  trials   with  the, 

287 
Rendel,  J.  M.,  211,  433 
Renkioi,    hospital    buildings    at,    461. 
Description    of  the   buildings,    463. 
Dr.  Parkes's  report  on  the  formation 
and  general  management  of  the  hos- 
pital, 468 
Rennie,  G.  and  J.,  148 
Richards,  Westley,  letters  to,  on  poly- 
gonal rifle,  450 
Riveting,  experiments  on,  1 94,  228 
Ropes    and    chains,    experiments    on. 

228 
Rotherhithe  shaft  of  the  Thames  Tun- 
nel, construction  of  the,  9 
Royal   Albert  Bridge   at  Saltash,  211. 
Plans  for  crossing  the   river  Tamar 
at  Saltash,  211.     Trial  cylinder  for 
centre  pier,  213.     Report  on  making 
bridge  for  a  single  line,  214.     Mode 
of  construction  of  centre  pier,    214. 
Description   of    superstructure,   218. 
Floating  of  first  truss,  221.     Lifting 
of  first   truss,    224.      Floating    and 
lifting  of  second  truss,  225.     Open- 
ing by  H.R.H.  the  Prince  Consort,  226 
Royal  Society,  516  note  * 
Russell,  J.  Scott,  builds  the  '  Victoria ' 
and    '  Adelaide,'    290.     Assists   Mr. 
Brunei     in     maturing    designs     of 


INDEX.  567 

STEPHENSON,  ROBERT 
the  'Great  Eastern,'  291,  292,  297. 
Letter  to,  on  the  form  and  dimen- 
sions of  the  ship,  294.  Tender 
accepted  for  huU  and  paddle-engines, 
301 


ST.  MARY'S  viaduct,  181 
St.  Pinnock  viaduct,  186 
Saltash     bridge.       See    Royal    Albert 

Bridge 
Samuda  J.,  131,  134,  148,  160 
Saunders,  C.  A.,  92,  117,  119 
Screw  propeller,  the,  adopted  for  the 
'Great  Britain,'  254.      Communica- 
tions on,  with  the  Board  of  Admiralty, 

283.  Trials  with  the  'Polyphemus,' 

284.  With  the  'Rattler,'  287. 
Report  recommending  adoption  of, 
539 

Shield,  Thames  Tunnel,  the,  11,  12 

'  Sirius  '  steam-ship,  241 

Skew  bridges,  177 

Smith,  F.  P.,  the  screw  propeller,  253, 
287.  Consulted  by  Mr.  Brunei  on  the 
'Great  Eastern,'  297,  298 

Smith,  Sir  F.,  member  of  the  Gauge 
Commission,  117 

Smyth,  C.  Piazzi,  Astronomer  Eoyal  for 
Scotland,  correspondence  with  Mr. 
Brunei  on  astronomical  instruments 
for  the  '  Great  Eastern,'  322 

Sonning  Cutting  brickwork  bridge, 
175.     Timber  bridge,  179 

South  Devon  and  Tavistock  Railway, 
87.     Viaducts,  188 

South  Devon  Railway,  87.  Course  of 
the  line,  132.  Atmospheric  System 
adopted  on  the,  138.     Viaducts,  182 

South  Wales  Mineral  Railway,  89 

South  Wales  Railway,  88.  Viaducts, 
183,  194 

Standard  drawings,  172  Jiote  * 

Stationary  and  locomotive  power,  com- 
parison of,  142,  166 

Statue  of  Mr.  Bnmel,  520  note  ' 

Stephenson,  George,  61,  62,  70,  74,  99 

Stephenson,  Robert,  62,  106,  107,  134 


568 


INDEX. 


STONEHOUSE  VIADUCT 
Atmospheric  System,  136,  137  note  ', 
138,  144.  Conway  and  Britannia 
bridges,  221,  223.  Launch  of  the 
'Great  Eastern,'  375,  376,  377,  378, 
384«oi;e».  485,516,517,521 
Stonehouse  viaduct,  181 


TAFF  YALE  Railway,  89,  104  note  ' 
Tamar,  plans  for  crossing  the  river, 
6  note'',  46,  211 

Telford,  T.,  appointed  referee  to  de- 
cide upon  the  plans  for  the  Clifton 
Suspension  Bridge,  51.  Rejects  Mr. 
Brunei's  plan,  51.  Designs  one  him- 
self, 52.     His  plan  described,  52 

Thames  Tunnel,  project  of,  first  occupies 
Sir  Isambard  Brunei's  attention,  6. 
Plans  suggested  for  the  construction 
of  a  tunnel,  6.  Borings,  7.  Remarks 
on  borings,  8  note  '.  Commencement 
of  the  work,  9.  Construction  of  the 
Rotherhithe  shaft,  9.  Description  of 
the  shield,  12.  Journals  of  Sir  I. 
Brunei  of  the  progress  of  the  work, 
10,  11,  16.  Mr.  Brunei  appointed 
resident  engineer  of,  25  note '.  First 
irruption  of  the  river,  29.  Second 
irruption,  35.  Works  suspended,  37. 
Resumed,  38.  The  Wapping  shaft, 
38.  Completed  and  opened,  39.  Its 
subsequent  history,  39  note  * 

Thompson,  Dr.  Seth.  Letter  on  the 
half-sovereign  accident,  511 

Timber  bridges  and  viaducts,  179 

Timber,  experiments  on  strength  of,  1 82, 
227 

T^orquay  branch  of  the  South  Devon 
Railway,  87  . 

Trussed  bridges,  199  ■ 


WYCOMBE    RAILWAY 


UXBRIDGE    branch    of   the    Great 
Western  Railway,  86 

VALE    OF    NEATH    Railway,    89. 
Viaducts,  171 
Vick,  Alderman  William,  his  bequest 

for  a  bridge  at  Clifton,  47 
'  Victoria '  steam-ship,  built  under  Mr. 

Brunei's  direction,  290 
Vignoles,  C,  74 

WALKER,  J.,  107 
Walkham  viaduct,  189 

Wapping  shaft  of  the  Thames  Tunnel, 
construction  of  the,  38 

Watcombe,  Mr.  Brunei's  life  at,  514 

Watt,  James  &  Co.,  148.  Tender  ac- 
cepted for  screw  engines  of  the 
'  Great" Eastern,'  301 

West  Cornwall  Railway,  87.  Viaducts, 
189 

Westminster  Abbey,  memorial  window 
in,  520  note  * 

Wilts  and  Somerset  Railway,  88 

Windsor  branch  of  the  Great  Western 
Railway,  86 

Windsor  bridge,  200.  Description  of 
superstructure,  200.  Mode  of  forming 
piers,  201 

Wire  gun,  453 

Witness,  Mr.  Brunei's  reputation  as  a, 
69,  93,  505 

Wood,  Nicholas,  101.  Report  on  broad 
gauge  and  permanent  way,  107 

Wrought-iron  bridges,  192 

Wrought-iron  girder,  experiments  ou, 
193 

Wyatt,  Sir  M.  D.,  84 

Wycombe  extension  of  the  Great  West- 
em  Railway,  86 


lOirDON:    PEIITTED  BT 

SPOTTISWOODK    AND    CO.,    NBW-STEEKT    SQPAEK 

XVD  PABLIA.MENI   BIBBEI 


/       J 


o 


PLEASE  DO  NOT  REMOVE 
CARDS  OR  SLIPS  FROM  THIS  POCKET 

UNIVERSITY  OF  TORONTO  LIBRARY 


TA  Brunei,   Isambard 

1^  The  life  of  Isambard 

B75B6  Kingdom  Brunei 

Engineering